A dredge pipeline floats out before submerging behind
Summary
A dredge pipeline floats out before submerging behind the hydraulic cutter head dredge, as it positions to begin a cut in the turning basin of the Lynnhaven Inlet Federal Navigation Project, Virginia Beach, Virginia, June 23, 2019. This pipeline is slated to transport a slurry of sand and water to Cape Henry Beach where approximately 165,000 cubic yards of dredged material will be placed as a secondary benefit of the Norfolk District, U.S. Army Corps of Engineers federal project. (U.S. Army photo by Andria Allmond)
Tags
Date
23/06/2019
Source
Defense Visual Information Distribution Service
Copyright info
Public Domain Dedication. Public Use Notice of Limitations: https://www.dvidshub.net/about/copyright