cross country, kennedy space center

240 media by topicpage 1 of 3
CAPE CANAVERAL, Fla. – In Orbiter Processing Facility Bay 2 at NASA’s Kennedy Space Center in Florida, the tail cone has been placed in position surrounding the replica main engines on the space shuttle Endeavour. The tail cone covers the main engines in the aft providing aerodynamic stability during the cross-country ferry flight.      The work is part of Transition and Retirement of the remaining space shuttles, Endeavour and Atlantis. Endeavour is being prepared for public display at the California Science Center in Los Angeles. Its ferry flight to California is targeted for mid-September. Endeavour was the last space shuttle added to NASA’s orbiter fleet. Over the course of its 19-year career, Endeavour spent 299 days in space during 25 missions. For more information, visit http://www.nasa.gov/transition Photo credit: NASA/ Jim Grossmann KSC-2012-4285

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility Bay 2 at NASA’s ...

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility Bay 2 at NASA’s Kennedy Space Center in Florida, the tail cone has been placed in position surrounding the replica main engines on the space shuttle Endeavo... More

CAPE CANAVERAL, Fla. – The space shuttle Endeavour approaches sister shuttle Atlantis for a brief photo opportunity at the Kennedy Space Center in Florida. Endeavour moved from Bay 2 of the Orbiter Processing Facility to switch places with Atlantis which had been in Vehicle Assembly Building VAB. In the VAB, Endeavour will undergo final preparations for its cross-country ferry flight targeted for mid-September. The work is part of Transition and Retirement of the remaining space shuttles, Endeavour and Atlantis. Endeavour is being prepared for public display at the California Science Center in Los Angeles. Endeavour was the last space shuttle added to NASA’s orbiter fleet. Over the course of its 19-year career, Endeavour spent 299 days in space during 25 missions. For more information, visit http://www.nasa.gov/transition Photo credit: NASA/Dimitri Gerondidakis KSC-2012-4481

CAPE CANAVERAL, Fla. – The space shuttle Endeavour approaches sister s...

CAPE CANAVERAL, Fla. – The space shuttle Endeavour approaches sister shuttle Atlantis for a brief photo opportunity at the Kennedy Space Center in Florida. Endeavour moved from Bay 2 of the Orbiter Processing F... More

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility Bay 2 at NASA’s Kennedy Space Center in Florida, the tail cone is moved into position for attachment to the space shuttle Endeavour. The tail cone covers the main engines in the aft providing aerodynamic stability during the cross-country ferry flight.      The work is part of Transition and Retirement of the remaining space shuttles, Endeavour and Atlantis. Endeavour is being prepared for public display at the California Science Center in Los Angeles. Its ferry flight to California is targeted for mid-September. Endeavour was the last space shuttle added to NASA’s orbiter fleet. Over the course of its 19-year career, Endeavour spent 299 days in space during 25 missions. For more information, visit http://www.nasa.gov/transition Photo credit: NASA/ Jim Grossmann KSC-2012-4272

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility Bay 2 at NASA’s ...

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility Bay 2 at NASA’s Kennedy Space Center in Florida, the tail cone is moved into position for attachment to the space shuttle Endeavour. The tail cone covers th... More

KENNEDY SPACE CENTER, FLA. --  Workers use an aircraft tug vehicle to back Atlantis away from the mate/demate device at Kennedy Space Center's Shuttle Landing Facility. The orbiter will be towed to the Orbiter Processing Facility where processing will begin for its next launch, mission STS-122 in December. Atlantis arrived at Kennedy Space Center atop the  SCA on July 3 after a three-day, cross-country flight due to fuel stops and weather delays. Touchdown was at 8:27 a.m. EDT. Atlantis landed at Edwards Air Force Base in California on June 22 to end mission STS-117.  Photo credit: NASA/George Shelton. KSC-07pd1796

KENNEDY SPACE CENTER, FLA. -- Workers use an aircraft tug vehicle to ...

KENNEDY SPACE CENTER, FLA. -- Workers use an aircraft tug vehicle to back Atlantis away from the mate/demate device at Kennedy Space Center's Shuttle Landing Facility. The orbiter will be towed to the Orbiter ... More

KENNEDY SPACE CENTER, FLA. --  After demate from the shuttle carrier aircraft, or SCA, Atlantis begins its trek from Kennedy Space Center's Shuttle Landing Facility to the Orbiter Processing Facility. The orbiter will undergo processing for its next launch, mission STS-122 in December. Visible on Atlantis is the tail cone that covers and protects the main engines during the ferry flight. Atlantis arrived at Kennedy Space Center atop the  SCA on July 3 after a three-day, cross-country flight due to fuel stops and weather delays. Touchdown was at 8:27 a.m. EDT. Atlantis landed at Edwards Air Force Base in California on June 22 to end mission STS-117.  Photo credit: NASA/George Shelton. KSC-07pd1800

KENNEDY SPACE CENTER, FLA. -- After demate from the shuttle carrier a...

KENNEDY SPACE CENTER, FLA. -- After demate from the shuttle carrier aircraft, or SCA, Atlantis begins its trek from Kennedy Space Center's Shuttle Landing Facility to the Orbiter Processing Facility. The orbit... More

CAPE CANAVERAL, Fla. – The space shuttle Endeavour backs out of Bay 2 of the Orbiter Processing Facility at the Kennedy Space Center in Florida. Endeavour will be moved to the Vehicle Assembly Building to undergo final preparations for its cross-country ferry flight targeted for mid-September. The work is part of Transition and Retirement of the remaining space shuttles, Endeavour and Atlantis. Endeavour is being prepared for public display at the California Science Center in Los Angeles. Endeavour was the last space shuttle added to NASA’s orbiter fleet. Over the course of its 19-year career, Endeavour spent 299 days in space during 25 missions. For more information, visit http://www.nasa.gov/transition. Photo credit: NASA/Dimitri Gerondidakis KSC-2012-4474

CAPE CANAVERAL, Fla. – The space shuttle Endeavour backs out of Bay 2 ...

CAPE CANAVERAL, Fla. – The space shuttle Endeavour backs out of Bay 2 of the Orbiter Processing Facility at the Kennedy Space Center in Florida. Endeavour will be moved to the Vehicle Assembly Building to under... More

CAPE CANAVERAL, Fla. – The space shuttle Endeavour backs out of Bay 2 of the Orbiter Processing Facility at the Kennedy Space Center in Florida. Endeavour will be moved to the Vehicle Assembly Building to undergo final preparations for its cross-country ferry flight targeted for mid-September. The work is part of Transition and Retirement of the remaining space shuttles, Endeavour and Atlantis. Endeavour is being prepared for public display at the California Science Center in Los Angeles. Endeavour was the last space shuttle added to NASA’s orbiter fleet. Over the course of its 19-year career, Endeavour spent 299 days in space during 25 missions. For more information, visit http://www.nasa.gov/transition. Photo credit: NASA/Dimitri Gerondidakis KSC-2012-4471

CAPE CANAVERAL, Fla. – The space shuttle Endeavour backs out of Bay 2 ...

CAPE CANAVERAL, Fla. – The space shuttle Endeavour backs out of Bay 2 of the Orbiter Processing Facility at the Kennedy Space Center in Florida. Endeavour will be moved to the Vehicle Assembly Building to under... More

KENNEDY SPACE CENTER, FLA. --  Atlantis is towed back from the mate/demate device at Kennedy Space Center's Shuttle Landing Facility. The orbiter will be towed to the Orbiter Processing Facility, where processing will begin for its next launch, mission STS-122 in December. Visible on Atlantis is the tail cone that covers and protects the main engines during the ferry flight. Atlantis arrived at Kennedy Space Center atop the  SCA on July 3 after a three-day, cross-country flight due to fuel stops and weather delays. Touchdown was at 8:27 a.m. EDT. Atlantis landed at Edwards Air Force Base in California on June 22 to end mission STS-117.  Photo credit: NASA/George Shelton. KSC-07pd1798

KENNEDY SPACE CENTER, FLA. -- Atlantis is towed back from the mate/de...

KENNEDY SPACE CENTER, FLA. -- Atlantis is towed back from the mate/demate device at Kennedy Space Center's Shuttle Landing Facility. The orbiter will be towed to the Orbiter Processing Facility, where processi... More

KENNEDY SPACE CENTER, FLA. --  On the KSC Shuttle Landing Facility, the shuttle carrier aircraft, or SCA, with the orbiter Atlantis on its back is towed under the mate/demate device.  The orbiter will be detached from the SCA and lowered onto a transporter.  Then Atlantis will be towed to the Orbiter Processing Facility to begin processing for its next launch, mission STS-122 in December. Atlantis landed at Edwards Air Force Base in California on June 22 to end mission STS-117.  It returned to Kennedy atop the SCA on July 3 after a three-day, cross-country flight due to fuel stops and weather delays. Touchdown was at 8:27 a.m. EDT. Photo credit: NASA/Kim Shiflett KSC-07pd1759

KENNEDY SPACE CENTER, FLA. -- On the KSC Shuttle Landing Facility, th...

KENNEDY SPACE CENTER, FLA. -- On the KSC Shuttle Landing Facility, the shuttle carrier aircraft, or SCA, with the orbiter Atlantis on its back is towed under the mate/demate device. The orbiter will be detach... More

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility Bay 2 at NASA’s Kennedy Space Center in Florida, the space shuttle Endeavour's hatch has been locked and sealed in final preparation for its cross-country ferry flight to California.      The work is part of Transition and Retirement of the remaining space shuttles, Endeavour and Atlantis. Endeavour is being prepared for public display at the California Science Center in Los Angeles. Its ferry flight to California is targeted for mid-September. Endeavour was the last space shuttle added to NASA’s orbiter fleet. Over the course of its 19-year career, Endeavour spent 299 days in space during 25 missions. For more information, visit http://www.nasa.gov/transition Photo credit: NASA/ Jim Grossmann KSC-2012-4398

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility Bay 2 at NASA’s ...

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility Bay 2 at NASA’s Kennedy Space Center in Florida, the space shuttle Endeavour's hatch has been locked and sealed in final preparation for its cross-country f... More

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility Bay 2 at NASA’s Kennedy Space Center in Florida, United Space Alliance senior aerospace technician Bobby Wright prepares two launch and entry seats to be moved from the space shuttle Endeavour's mid-deck to the flight deck. The orbiter is undergoing final preparations for its cross-country ferry flight to California. The work is part of Transition and Retirement of the remaining space shuttles, Endeavour and Atlantis. Endeavour is being prepared for public display at the California Science Center in Los Angeles. Its ferry flight to California is targeted for mid-September. Endeavour was the last space shuttle added to NASA’s orbiter fleet. Over the course of its 19-year career, Endeavour spent 299 days in space during 25 missions. For more information, visit http://www.nasa.gov/transition Photo credit: NASA/ Jim Grossmann KSC-2012-4347

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility Bay 2 at NASA’s ...

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility Bay 2 at NASA’s Kennedy Space Center in Florida, United Space Alliance senior aerospace technician Bobby Wright prepares two launch and entry seats to be mo... More

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility Bay 2 at NASA’s Kennedy Space Center in Florida, Kennedy Space Center Director Bob Cabana, far right, watches as, left to right, United Space Alliance quality inspector Ken Carson, along with technicians Gary Hamilton and Joe Walsh remove protective covers in preparation to close the space shuttle Endeavour's hatch. The orbiter is undergoing final preparations for its cross-country ferry flight to California.      The work is part of Transition and Retirement of the remaining space shuttles, Endeavour and Atlantis. Endeavour is being prepared for public display at the California Science Center in Los Angeles. Its ferry flight to California is targeted for mid-September. Endeavour was the last space shuttle added to NASA’s orbiter fleet. Over the course of its 19-year career, Endeavour spent 299 days in space during 25 missions. For more information, visit http://www.nasa.gov/transition Photo credit: NASA/ Jim Grossmann KSC-2012-4393

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility Bay 2 at NASA’s ...

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility Bay 2 at NASA’s Kennedy Space Center in Florida, Kennedy Space Center Director Bob Cabana, far right, watches as, left to right, United Space Alliance quali... More

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility Bay 2 at NASA’s Kennedy Space Center in Florida, the tail cone is moved into position for attachment to the space shuttle Endeavour. The tail cone covers the main engines in the aft providing aerodynamic stability during the cross-country ferry flight.      The work is part of Transition and Retirement of the remaining space shuttles, Endeavour and Atlantis. Endeavour is being prepared for public display at the California Science Center in Los Angeles. Its ferry flight to California is targeted for mid-September. Endeavour was the last space shuttle added to NASA’s orbiter fleet. Over the course of its 19-year career, Endeavour spent 299 days in space during 25 missions. For more information, visit http://www.nasa.gov/transition Photo credit: NASA/ Jim Grossmann KSC-2012-4271

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility Bay 2 at NASA’s ...

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility Bay 2 at NASA’s Kennedy Space Center in Florida, the tail cone is moved into position for attachment to the space shuttle Endeavour. The tail cone covers th... More

KENNEDY SPACE CENTER, FLA. --  Atlantis is towed toward the Orbiter Processing Facility from the Shuttle Landing Facility at Kennedy Space Center. The orbiter will undergo processing for its next launch, mission STS-122 in December. Visible on Atlantis is the tail cone that covers and protects the main engines during the ferry flight. The massive Vehicle Assembly Building towers in the background. Atlantis arrived at Kennedy Space Center atop the SCA on July 3 after a three-day, cross-country flight due to fuel stops and weather delays. Touchdown was at 8:27 a.m. EDT. Atlantis landed at Edwards Air Force Base in California on June 22 to end mission STS-117.  Photo credit: NASA/George Shelton. KSC-07pd1802

KENNEDY SPACE CENTER, FLA. -- Atlantis is towed toward the Orbiter Pr...

KENNEDY SPACE CENTER, FLA. -- Atlantis is towed toward the Orbiter Processing Facility from the Shuttle Landing Facility at Kennedy Space Center. The orbiter will undergo processing for its next launch, missio... More

CAPE CANAVERAL, Fla. – ATK and NASA officials accompanied the Florida East Coast Railroad train carrying the booster segments for the Ares I-X test rocket on its route to NASA's Kennedy Space Center in Florida from Jacksonville, Fla.  Seen here in the passenger car are, from left NASA KSC Shuttle Launch Director Mike Leinbach, a Florida East Coast Railroad representative, ATK Ares I First Stage program Director Fred Brasfield, a Florida East Coast Railroad representative, ATK Vice President Space Launch Systems Charlie Precourt, a Florida East Coast Railroad representative, and NASA Marshall Space Flight Center Reusable Solid Rocket Booster Integration Lead Roy Worthy. The four reusable motor segments and the nozzle exit cone, manufactured by the Ares I first-stage prime contractor Alliant Techsystems Inc., or ATK, departed Utah March 12 on the seven-day, cross-country trip to Florida.  The segments will be delivered to the  Rotation, Processing and Surge Facility for final processing and integration. The booster used for the Ares I-X launch is being modified by adding new forward structures and a fifth segment simulator. The motor is the final hardware needed for the rocket's upcoming test flight this summer. The stacking operations are scheduled to begin in the Vehicle Assembly Building in April.   Photo credit: NASA/Kim Shiflett KSC-2009-2206

CAPE CANAVERAL, Fla. – ATK and NASA officials accompanied the Florida ...

CAPE CANAVERAL, Fla. – ATK and NASA officials accompanied the Florida East Coast Railroad train carrying the booster segments for the Ares I-X test rocket on its route to NASA's Kennedy Space Center in Florida ... More

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility Bay 2 at NASA’s Kennedy Space Center in Florida, two launch and entry seats were installed on the space shuttle Endeavour's aft flight deck as part of final preparations for the orbiter's cross-country ferry flight to California.      The work is part of Transition and Retirement of the remaining space shuttles, Endeavour and Atlantis. Endeavour is being prepared for public display at the California Science Center in Los Angeles. Its ferry flight to California is targeted for mid-September. Endeavour was the last space shuttle added to NASA’s orbiter fleet. Over the course of its 19-year career, Endeavour spent 299 days in space during 25 missions. For more information, visit http://www.nasa.gov/transition Photo credit: NASA/ Jim Grossmann KSC-2012-4350

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility Bay 2 at NASA’s ...

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility Bay 2 at NASA’s Kennedy Space Center in Florida, two launch and entry seats were installed on the space shuttle Endeavour's aft flight deck as part of final... More

CAPE CANAVERAL, Fla. – At the Kennedy Space Center in Florida, the new space shuttle, Atlantis, arrives at the Shuttle Landing Facility. The shuttle is mounted atop the Shuttle Carrier Aircraft, a modified Boeing 747. Over the next seven months Atlantis will be prepared for its maiden voyage, STS-51J.      Atlantis, NASA's fourth space-rated shuttle, was named after the two-masted boat that served as the primary research vessel for the Woods Hole Oceanographic Institute in Massachusetts from 1930 to 1966. The boat had a 17-member crew and accommodated up to five scientists who worked in two onboard laboratories, examining water samples and marine life. Like its predecessors, Atlantis was constructed by Rockwell International in Palmdale, Calif. The spacecraft was transported over land from Palmdale to Edwards Air Force Base on April 3, 1985 for the cross-country ferry flight to Kennedy. For more: http://www.nasa.gov/centers/kennedy/shuttleoperations/orbiters/atlantis-info.html Photo credit: NASA/Louie Rochefort KSC-385C-1298-05

CAPE CANAVERAL, Fla. – At the Kennedy Space Center in Florida, the new...

CAPE CANAVERAL, Fla. – At the Kennedy Space Center in Florida, the new space shuttle, Atlantis, arrives at the Shuttle Landing Facility. The shuttle is mounted atop the Shuttle Carrier Aircraft, a modified Boei... More

CAPE CANAVERAL, Fla. – At the Kennedy Space Center in Florida, the new space shuttle, Atlantis, arrives at the Shuttle Landing Facility. The shuttle is mounted atop the Shuttle Carrier Aircraft, a modified Boeing 747. Over the next seven months Atlantis will be prepared for its maiden voyage, STS-51J.      Atlantis, NASA's fourth space-rated shuttle, was named after the two-masted boat that served as the primary research vessel for the Woods Hole Oceanographic Institute in Massachusetts from 1930 to 1966. The boat had a 17-member crew and accommodated up to five scientists who worked in two onboard laboratories, examining water samples and marine life. Like its predecessors, Atlantis was constructed by Rockwell International in Palmdale, Calif. The spacecraft was transported over land from Palmdale to Edwards Air Force Base on April 3, 1985 for the cross-country ferry flight to Kennedy. For more: http://www.nasa.gov/centers/kennedy/shuttleoperations/orbiters/atlantis-info.html Photo credit: NASA/Louie Rochefort KSC-385C-1296-01

CAPE CANAVERAL, Fla. – At the Kennedy Space Center in Florida, the new...

CAPE CANAVERAL, Fla. – At the Kennedy Space Center in Florida, the new space shuttle, Atlantis, arrives at the Shuttle Landing Facility. The shuttle is mounted atop the Shuttle Carrier Aircraft, a modified Boei... More

CAPE CANAVERAL, Fla. – At the Kennedy Space Center in Florida, the new space shuttle, Atlantis, arrives at the Shuttle Landing Facility. The shuttle is mounted atop the Shuttle Carrier Aircraft, a modified Boeing 747. Over the next seven months Atlantis will be prepared for its maiden voyage, STS-51J.      Atlantis, NASA's fourth space-rated shuttle, was named after the two-masted boat that served as the primary research vessel for the Woods Hole Oceanographic Institute in Massachusetts from 1930 to 1966. The boat had a 17-member crew and accommodated up to five scientists who worked in two onboard laboratories, examining water samples and marine life. Like its predecessors, Atlantis was constructed by Rockwell International in Palmdale, Calif. The spacecraft was transported over land from Palmdale to Edwards Air Force Base on April 3, 1985 for the cross-country ferry flight to Kennedy. For more: http://www.nasa.gov/centers/kennedy/shuttleoperations/orbiters/atlantis-info.html Photo credit: NASA/Louie Rochefort KSC-385C-1298-06

CAPE CANAVERAL, Fla. – At the Kennedy Space Center in Florida, the new...

CAPE CANAVERAL, Fla. – At the Kennedy Space Center in Florida, the new space shuttle, Atlantis, arrives at the Shuttle Landing Facility. The shuttle is mounted atop the Shuttle Carrier Aircraft, a modified Boei... More

CAPE CANAVERAL, Fla. – At the Kennedy Space Center in Florida, the new space shuttle, Atlantis, arrives at the Shuttle Landing Facility. The shuttle is mounted atop the Shuttle Carrier Aircraft, a modified Boeing 747. Over the next seven months Atlantis will be prepared for its maiden voyage, STS-51J.      Atlantis, NASA's fourth space-rated shuttle, was named after the two-masted boat that served as the primary research vessel for the Woods Hole Oceanographic Institute in Massachusetts from 1930 to 1966. The boat had a 17-member crew and accommodated up to five scientists who worked in two onboard laboratories, examining water samples and marine life. Like its predecessors, Atlantis was constructed by Rockwell International in Palmdale, Calif. The spacecraft was transported over land from Palmdale to Edwards Air Force Base on April 3, 1985 for the cross-country ferry flight to Kennedy. For more: http://www.nasa.gov/centers/kennedy/shuttleoperations/orbiters/atlantis-info.html Photo credit: NASA/Louie Rochefort KSC-385C-1298-02

CAPE CANAVERAL, Fla. – At the Kennedy Space Center in Florida, the new...

CAPE CANAVERAL, Fla. – At the Kennedy Space Center in Florida, the new space shuttle, Atlantis, arrives at the Shuttle Landing Facility. The shuttle is mounted atop the Shuttle Carrier Aircraft, a modified Boei... More

CAPE CANAVERAL, Fla. – At the Kennedy Space Center in Florida, the new space shuttle, Atlantis, arrives at the Shuttle Landing Facility. The shuttle is mounted atop the Shuttle Carrier Aircraft, a modified Boeing 747. Over the next seven months Atlantis will be prepared for its maiden voyage, STS-51J.      Atlantis, NASA's fourth space-rated shuttle, was named after the two-masted boat that served as the primary research vessel for the Woods Hole Oceanographic Institute in Massachusetts from 1930 to 1966. The boat had a 17-member crew and accommodated up to five scientists who worked in two onboard laboratories, examining water samples and marine life. Like its predecessors, Atlantis was constructed by Rockwell International in Palmdale, Calif. The spacecraft was transported over land from Palmdale to Edwards Air Force Base on April 3, 1985 for the cross-country ferry flight to Kennedy. For more: http://www.nasa.gov/centers/kennedy/shuttleoperations/orbiters/atlantis-info.html Photo credit: NASA/Louie Rochefort KSC-385C-1297-11

CAPE CANAVERAL, Fla. – At the Kennedy Space Center in Florida, the new...

CAPE CANAVERAL, Fla. – At the Kennedy Space Center in Florida, the new space shuttle, Atlantis, arrives at the Shuttle Landing Facility. The shuttle is mounted atop the Shuttle Carrier Aircraft, a modified Boei... More

CAPE CANAVERAL, Fla. – At the Kennedy Space Center in Florida, the new space shuttle, Atlantis, arrives at the Shuttle Landing Facility. The shuttle is mounted atop the Shuttle Carrier Aircraft, a modified Boeing 747. Over the next seven months Atlantis will be prepared for its maiden voyage, STS-51J.      Atlantis, NASA's fourth space-rated shuttle, was named after the two-masted boat that served as the primary research vessel for the Woods Hole Oceanographic Institute in Massachusetts from 1930 to 1966. The boat had a 17-member crew and accommodated up to five scientists who worked in two onboard laboratories, examining water samples and marine life. Like its predecessors, Atlantis was constructed by Rockwell International in Palmdale, Calif. The spacecraft was transported over land from Palmdale to Edwards Air Force Base on April 3, 1985 for the cross-country ferry flight to Kennedy. For more: http://www.nasa.gov/centers/kennedy/shuttleoperations/orbiters/atlantis-info.html Photo credit: NASA/Louie Rochefort KSC-385C-1297-06

CAPE CANAVERAL, Fla. – At the Kennedy Space Center in Florida, the new...

CAPE CANAVERAL, Fla. – At the Kennedy Space Center in Florida, the new space shuttle, Atlantis, arrives at the Shuttle Landing Facility. The shuttle is mounted atop the Shuttle Carrier Aircraft, a modified Boei... More

CAPE CANAVERAL, Fla. – At the Kennedy Space Center in Florida, the new space shuttle, Atlantis, arrives at the Shuttle Landing Facility. The shuttle is mounted atop the Shuttle Carrier Aircraft, a modified Boeing 747. Over the next seven months Atlantis will be prepared for its maiden voyage, STS-51J.      Atlantis, NASA's fourth space-rated shuttle, was named after the two-masted boat that served as the primary research vessel for the Woods Hole Oceanographic Institute in Massachusetts from 1930 to 1966. The boat had a 17-member crew and accommodated up to five scientists who worked in two onboard laboratories, examining water samples and marine life. Like its predecessors, Atlantis was constructed by Rockwell International in Palmdale, Calif. The spacecraft was transported over land from Palmdale to Edwards Air Force Base on April 3, 1985 for the cross-country ferry flight to Kennedy. For more: http://www.nasa.gov/centers/kennedy/shuttleoperations/orbiters/atlantis-info.html Photo credit: NASA/Louie Rochefort KSC-385C-1296-02

CAPE CANAVERAL, Fla. – At the Kennedy Space Center in Florida, the new...

CAPE CANAVERAL, Fla. – At the Kennedy Space Center in Florida, the new space shuttle, Atlantis, arrives at the Shuttle Landing Facility. The shuttle is mounted atop the Shuttle Carrier Aircraft, a modified Boei... More

The orbiter Endeavour, riding atop the 747 Shuttle Carrier Aircraft (SCA), landed at KSC's Shuttle Landing Facility at about 9:44 a.m. today, completing is cross-country ferry flight from Palmdale, CA. Endeavour departed Palmdale at about 9 a.m. EST March 26 and stopped briefly for fuel at Ft. Worth Naval Air Station, TX. The vehicle then proceeded to Warner Robbins Air Force Base, GA, where it stayed overnight last night before departing for KSC this morning. Endeavour will be removed from the SCA today and transported to Orbiter Processing Facility bay 1 early tomorrow morning KSC-97pc549

The orbiter Endeavour, riding atop the 747 Shuttle Carrier Aircraft (S...

The orbiter Endeavour, riding atop the 747 Shuttle Carrier Aircraft (SCA), landed at KSC's Shuttle Landing Facility at about 9:44 a.m. today, completing is cross-country ferry flight from Palmdale, CA. Endeavou... More

The orbiter Endeavour, riding atop the 747 Shuttle Carrier Aircraft (SCA), landed at KSC's Shuttle Landing Facility at about 9:44 a.m. today, completing is cross-country ferry flight from Palmdale, CA. Endeavour departed Palmdale at about 9 a.m. EST March 26 and stopped briefly for fuel at Ft. Worth Naval Air Station, TX. The vehicle then proceeded to Warner Robbins Air Force Base, GA, where it stayed overnight last night before departing for KSC this morning. Endeavour will be removed from the SCA today and transported to Orbiter Processing Facility bay 1 early tomorrow morning KSC-97pc550

The orbiter Endeavour, riding atop the 747 Shuttle Carrier Aircraft (S...

The orbiter Endeavour, riding atop the 747 Shuttle Carrier Aircraft (SCA), landed at KSC's Shuttle Landing Facility at about 9:44 a.m. today, completing is cross-country ferry flight from Palmdale, CA. Endeavou... More

KENNEDY SPACE CENTER, FLA. -- The orbiter Endeavour, riding atop the 747 Shuttle Carrier Aircraft (SCA), landed at KSC's Shuttle Landing Facility at about 9:44 a.m. today, completing its cross-country ferry flight from Palmdale, Calif. Endeavour departed Palmdale at about 9 a.m. EST March 26 and stopped briefly for fuel at Ft. Worth Naval Air Station, Texas. The vehicle then proceeded to Warner Robbins Air Force Base, Ga., where it stayed overnight last night before departing for KSC this morning. Endeavour will be removed from the SCA today and transported to Orbiter Processing Facility bay 1 early tomorrow morning KSC-97pc551

KENNEDY SPACE CENTER, FLA. -- The orbiter Endeavour, riding atop the 7...

KENNEDY SPACE CENTER, FLA. -- The orbiter Endeavour, riding atop the 747 Shuttle Carrier Aircraft (SCA), landed at KSC's Shuttle Landing Facility at about 9:44 a.m. today, completing its cross-country ferry fli... More

KENNEDY SPACE CENTER, FLA. -- On an orbiter transporter, Columbia is turned, after rolling out of KSC's Orbiter Processing Facility bay 3, for its move to the Shuttle Landing Facility's (SLF) Mate-Demate Device. At the SLF the orbiter is to be mated to the Boeing 747 Shuttle Carrier Aircraft for a ferry flight to Palmdale, Calif. On the rear of the orbiter can be seen the tail cone, a fairing that is installed over the aft fuselage of the orbiter to decrease aerodynamic drag and buffet when the Shuttle Carrier Aircraft is transporting the orbiter cross-country. It is 36 feet long, 25 feet wide, and 22 feet high. Columbia, the oldest of four orbiters in NASA's fleet, will undergo extensive inspections and modifications in Boeing's Orbiter Assembly Facility during a nine-month orbiter maintenance down period (OMDP), the second in its history. Orbiters are periodically removed from flight operations for an OMDP. Columbia's first was in 1994. Along with more than 100 modifications on the vehicle, Columbia will be the second orbiter to be outfitted with the multifunctional electronic display system, or "glass cockpit." Columbia is expected to return to KSC in July 2000 KSC-99pp1136

KENNEDY SPACE CENTER, FLA. -- On an orbiter transporter, Columbia is t...

KENNEDY SPACE CENTER, FLA. -- On an orbiter transporter, Columbia is turned, after rolling out of KSC's Orbiter Processing Facility bay 3, for its move to the Shuttle Landing Facility's (SLF) Mate-Demate Device... More

KENNEDY SPACE CENTER, FLA. -- The orbiter Columbia (foreground) moves under the Mate-Demate Device at KSC's Shuttle Landing Facility (SLF). The crane seen above it will lift the orbiter so that the Boeing 747 Shuttle Carrier Aircraft (SCA) in the background can move underneath Columbia, which will then be attached to the back of the SCA for a ferry flight to Palmdale, Calif. On the rear of the orbiter is the tail cone, a fairing that is installed over the aft fuselage of the orbiter to decrease aerodynamic drag and buffet when the Shuttle Carrier Aircraft is transporting the orbiter cross-country. It is 36 feet long, 25 feet wide, and 22 feet high. Columbia, the oldest of four orbiters in NASA's fleet, will undergo extensive inspections and modifications in Boeing's Orbiter Assembly Facility during a nine-month orbiter maintenance down period (OMDP), the second in its history. Orbiters are periodically removed from flight operations for an OMDP. Columbia's first was in 1994. Along with more than 100 modifications on the vehicle, Columbia will be the second orbiter to be outfitted with the multifunctional electronic display system, or "glass cockpit." Columbia is expected to return to KSC in July 2000 KSC-99pp1140

KENNEDY SPACE CENTER, FLA. -- The orbiter Columbia (foreground) moves ...

KENNEDY SPACE CENTER, FLA. -- The orbiter Columbia (foreground) moves under the Mate-Demate Device at KSC's Shuttle Landing Facility (SLF). The crane seen above it will lift the orbiter so that the Boeing 747 S... More

KENNEDY SPACE CENTER, FLA. -- Aboard a transporter, the orbiter Columbia is moved on the tow-way along the Banana Creek. Columbia is heading to the Shuttle Landing Facility's (SLF) Mate-Demate Device where it will be mated to the Boeing 747 Shuttle Carrier Aircraft for a ferry flight to Palmdale, Calif. On the rear of the orbiter can be seen the tail cone, a fairing that is installed over the aft fuselage of the orbiter to decrease aerodynamic drag and buffet when the Shuttle Carrier Aircraft is transporting the orbiter cross-country. It is 36 feet long, 25 feet wide, and 22 feet high. Columbia, the oldest of four orbiters in NASA's fleet, will undergo extensive inspections and modifications in Boeing's Orbiter Assembly Facility during a nine-month orbiter maintenance down period (OMDP), the second in its history. Orbiters are periodically removed from flight operations for an OMDP. Columbia's first was in 1994. Along with more than 100 modifications on the vehicle, Columbia will be the second orbiter to be outfitted with the multifunctional electronic display system, or "glass cockpit." Columbia is expected to return to KSC in July 2000 KSC-99pp1138

KENNEDY SPACE CENTER, FLA. -- Aboard a transporter, the orbiter Columb...

KENNEDY SPACE CENTER, FLA. -- Aboard a transporter, the orbiter Columbia is moved on the tow-way along the Banana Creek. Columbia is heading to the Shuttle Landing Facility's (SLF) Mate-Demate Device where it w... More

KENNEDY SPACE CENTER, FLA. -- The orbiter Columbia rolls out of KSC's Orbiter Processing Facility bay 3, bound for the Shuttle Landing Facility's (SLF) Mate-Demate Device. At the SLF the orbiter is to be mated to the Boeing 747 Shuttle Carrier Aircraft for a ferry flight to Palmdale, Calif. On the rear of the orbiter can be seen the tail cone, a fairing that is installed over the aft fuselage of the orbiter to decrease aerodynamic drag and buffet when the Shuttle Carrier Aircraft is transporting the orbiter cross-country. It is 36 feet long, 25 feet wide, and 22 feet high. Columbia, the oldest of four orbiters in NASA's fleet, will undergo extensive inspections and modifications in Boeing's Orbiter Assembly Facility during a nine-month orbiter maintenance down period (OMDP), the second in its history. Orbiters are periodically removed from flight operations for an OMDP. Columbia's first was in 1994. Along with more than 100 modifications on the vehicle, Columbia will be the second orbiter to be outfitted with the multifunctional electronic display system, or "glass cockpit." Columbia is expected to return to KSC in July 2000 KSC-99pp1134

KENNEDY SPACE CENTER, FLA. -- The orbiter Columbia rolls out of KSC's ...

KENNEDY SPACE CENTER, FLA. -- The orbiter Columbia rolls out of KSC's Orbiter Processing Facility bay 3, bound for the Shuttle Landing Facility's (SLF) Mate-Demate Device. At the SLF the orbiter is to be mated ... More

KENNEDY SPACE CENTER, FLA. -- Photographed from overhead, the orbiter Columbia begins to turn after rolling out of KSC's Orbiter Processing Facility bay 3, bound for the Shuttle Landing Facility's (SLF) Mate-Demate Device. At the SLF the orbiter is to be mated to the Boeing 747 Shuttle Carrier Aircraft for a ferry flight to Palmdale, Calif. On the rear of the orbiter can be seen the tail cone, a fairing that is installed over the aft fuselage of the orbiter to decrease aerodynamic drag and buffet when the Shuttle Carrier Aircraft is transporting the orbiter cross-country. It is 36 feet long, 25 feet wide, and 22 feet high. Columbia, the oldest of four orbiters in NASA's fleet, will undergo extensive inspections and modifications in Boeing's Orbiter Assembly Facility during a nine-month orbiter maintenance down period (OMDP), the second in its history. Orbiters are periodically removed from flight operations for an OMDP. Columbia's first was in 1994. Along with more than 100 modifications on the vehicle, Columbia will be the second orbiter to be outfitted with the multifunctional electronic display system, or "glass cockpit." Columbia is expected to return to KSC in July 2000 KSC-99pp1135

KENNEDY SPACE CENTER, FLA. -- Photographed from overhead, the orbiter ...

KENNEDY SPACE CENTER, FLA. -- Photographed from overhead, the orbiter Columbia begins to turn after rolling out of KSC's Orbiter Processing Facility bay 3, bound for the Shuttle Landing Facility's (SLF) Mate-De... More

On an orbiter transporter, Columbia is ready for its move to the Shuttle Landing Facility's (SLF) Mate-Demate Device (MDD), in the distance at the top of the photo. Seen next to the MDD is the Boeing 747 Shuttle Carrier Aircraft which will carry the orbiter piggyback in a ferry flight to Palmdale, Calif. On the rear of the orbiter can be seen the tail cone, a fairing that is installed over the aft fuselage of the orbiter to decrease aerodynamic drag and buffet when the Shuttle Carrier Aircraft is transporting the orbiter cross-country. It is 36 feet long, 25 feet wide, and 22 feet high. Columbia, the oldest of four orbiters in NASA's fleet, will undergo extensive inspections and modifications in Boeing's Orbiter Assembly Facility during a nine-month orbiter maintenance down period (OMDP), the second in its history. Orbiters are periodically removed from flight operations for an OMDP. Columbia's first was in 1994. Along with more than 100 modifications on the vehicle, Columbia will be the second orbiter to be outfitted with the multifunctional electronic display system, or 'glass cockpit.' Columbia is expected to return to KSC in July 2000. KSC-99PP-1137

On an orbiter transporter, Columbia is ready for its move to the Shutt...

On an orbiter transporter, Columbia is ready for its move to the Shuttle Landing Facility's (SLF) Mate-Demate Device (MDD), in the distance at the top of the photo. Seen next to the MDD is the Boeing 747 Shuttl... More

KENNEDY SPACE CENTER, FLA. -- Aboard a transporter, the orbiter Columbia moves past the Boeing 747 Shuttle Carrier Aircraft (SCA) at the Shuttle Landing Facility. There the orbiter will be mated to the SCA, with the help of a Mate-Demate Device, for a ferry flight to Palmdale, Calif. On the rear of the orbiter is the tail cone, a fairing that is installed over the aft fuselage of the orbiter to decrease aerodynamic drag and buffet when the Shuttle Carrier Aircraft is transporting the orbiter cross-country. It is 36 feet long, 25 feet wide, and 22 feet high. Columbia, the oldest of four orbiters in NASA's fleet, will undergo extensive inspections and modifications in Boeing's Orbiter Assembly Facility during a nine-month orbiter maintenance down period (OMDP), the second in its history. Orbiters are periodically removed from flight operations for an OMDP. Columbia's first was in 1994. Along with more than 100 modifications on the vehicle, Columbia will be the second orbiter to be outfitted with the multifunctional electronic display system, or "glass cockpit." Columbia is expected to return to KSC in July 2000 KSC-99pp1139

KENNEDY SPACE CENTER, FLA. -- Aboard a transporter, the orbiter Columb...

KENNEDY SPACE CENTER, FLA. -- Aboard a transporter, the orbiter Columbia moves past the Boeing 747 Shuttle Carrier Aircraft (SCA) at the Shuttle Landing Facility. There the orbiter will be mated to the SCA, wit... More

KENNEDY SPACE CENTER, FLA. -- From the Shuttle Landing Facility at Kennedy Space Center, the orbiter Columbia moves down the runway on the back of a Boeing 747 Shuttle Carrier Aircraft on a ferry flight to Palmdale, Calif. On the rear of the orbiter can be seen the tail cone, a fairing that is installed over the aft fuselage of the orbiter to decrease aerodynamic drag and buffet when the Shuttle Carrier Aircraft is transporting the orbiter cross-country. It is 36 feet long, 25 feet wide, and 22 feet high. Columbia, the oldest of four orbiters in NASA's fleet, will undergo extensive inspections and modifications in Boeing's Orbiter Assembly Facility during a nine-month orbiter maintenance down period (OMDP), the second in its history. Orbiters are periodically removed from flight operations for an OMDP. Columbia's first was in 1994. Along with more than 100 modifications on the vehicle, Columbia will be the second orbiter to be outfitted with the multifunctional electronic display system, or "glass cockpit." Columbia is expected to return to KSC in July 2000 KSC-99padig008

KENNEDY SPACE CENTER, FLA. -- From the Shuttle Landing Facility at Ken...

KENNEDY SPACE CENTER, FLA. -- From the Shuttle Landing Facility at Kennedy Space Center, the orbiter Columbia moves down the runway on the back of a Boeing 747 Shuttle Carrier Aircraft on a ferry flight to Palm... More

KENNEDY SPACE CENTER, FLA. -- At the Shuttle Landing Facility at Kennedy Space Center, the orbiter Columbia takes to the sky on the back of a Boeing 747 Shuttle Carrier Aircraft on a ferry flight to Palmdale, Calif. On the rear of the orbiter can be seen the tail cone, a fairing that is installed over the aft fuselage of the orbiter to decrease aerodynamic drag and buffet when the Shuttle Carrier Aircraft is transporting the orbiter cross-country. It is 36 feet long, 25 feet wide, and 22 feet high. Columbia, the oldest of four orbiters in NASA's fleet, will undergo extensive inspections and modifications in Boeing's Orbiter Assembly Facility during a nine-month orbiter maintenance down period (OMDP), the second in its history. Orbiters are periodically removed from flight operations for an OMDP. Columbia's first was in 1994. Along with more than 100 modifications on the vehicle, Columbia will be the second orbiter to be outfitted with the multifunctional electronic display system, or "glass cockpit." Columbia is expected to return to KSC in July 2000 KSC-99padig009

KENNEDY SPACE CENTER, FLA. -- At the Shuttle Landing Facility at Kenne...

KENNEDY SPACE CENTER, FLA. -- At the Shuttle Landing Facility at Kennedy Space Center, the orbiter Columbia takes to the sky on the back of a Boeing 747 Shuttle Carrier Aircraft on a ferry flight to Palmdale, C... More

KENNEDY SPACE CENTER, FLA. -- At the Shuttle Landing Facility at Kennedy Space Center, the orbiter Columbia takes off into a clear sky on the back of a Boeing 747 Shuttle Carrier Aircraft on a ferry flight to Palmdale, Calif. On the rear of the orbiter can be seen the tail cone, a fairing that is installed over the aft fuselage of the orbiter to decrease aerodynamic drag and buffet when the Shuttle Carrier Aircraft is transporting the orbiter cross-country. It is 36 feet long, 25 feet wide, and 22 feet high. Columbia, the oldest of four orbiters in NASA's fleet, will undergo extensive inspections and modifications in Boeing's Orbiter Assembly Facility during a nine-month orbiter maintenance down period (OMDP), the second in its history. Orbiters are periodically removed from flight operations for an OMDP. Columbia's first was in 1994. Along with more than 100 modifications on the vehicle, Columbia will be the second orbiter to be outfitted with the multifunctional electronic display system, or "glass cockpit." Columbia is expected to return to KSC in July 2000 KSC-99padig010

KENNEDY SPACE CENTER, FLA. -- At the Shuttle Landing Facility at Kenne...

KENNEDY SPACE CENTER, FLA. -- At the Shuttle Landing Facility at Kennedy Space Center, the orbiter Columbia takes off into a clear sky on the back of a Boeing 747 Shuttle Carrier Aircraft on a ferry flight to P... More

JoAnn Morgan, associate director for Advanced Development and Shuttle Upgrades at KSC, studies posters of space-related news stories in the mobile exhibition called "NewsCapade with Al Neuharth." The exhibit started its cross-country tour in San Francisco in April. It is a traveling version of the Newseum in Arlington, Va. Morgan was among four speakers discussing "Space, the Media and the Millennium" at a reception Jan. 24 kicking off the display at KSC KSC00pp0099

JoAnn Morgan, associate director for Advanced Development and Shuttle ...

JoAnn Morgan, associate director for Advanced Development and Shuttle Upgrades at KSC, studies posters of space-related news stories in the mobile exhibition called "NewsCapade with Al Neuharth." The exhibit st... More

JoAnn Morgan, associate director for Advanced Development and Shuttle Upgrades at KSC, studies posters of space-related news stories in the mobile exhibition called "NewsCapade with Al Neuharth." The exhibit started its cross-country tour in San Francisco in April. It is a traveling version of the Newseum in Arlington, Va. Morgan was among four speakers discussing "Space, the Media and the Millennium" at a reception Jan. 24 kicking off the display at KSC KSC-00pp0099

JoAnn Morgan, associate director for Advanced Development and Shuttle ...

JoAnn Morgan, associate director for Advanced Development and Shuttle Upgrades at KSC, studies posters of space-related news stories in the mobile exhibition called "NewsCapade with Al Neuharth." The exhibit st... More

KENNEDY SPACE CENTER, FLA. - Space Shuttle Endeavour lands on runway 15 at KSC's Shuttle Landing Facility at 10:58 a.m. EDT atop a modified Boeing 747 Shuttle Carrier Aircraft.  The cross-country ferry flight became necessary when three days of unfavorable weather conditions at KSC forced Endeavour to land on runway 22 at Dryden Flight Research Center, Edwards Air Force Base, Calif., on June 19 following mission STS-111.  Processing of Endeavour will now begin for the launch of mission STS-113 targeted for October 2002 KSC-02pd1095

KENNEDY SPACE CENTER, FLA. - Space Shuttle Endeavour lands on runway 1...

KENNEDY SPACE CENTER, FLA. - Space Shuttle Endeavour lands on runway 15 at KSC's Shuttle Landing Facility at 10:58 a.m. EDT atop a modified Boeing 747 Shuttle Carrier Aircraft. The cross-country ferry flight b... More

KENNEDY SPACE CENTER, FLA. - Space Shuttle Endeavour approaches the Mate-Demate Device (left) following landing on runway 15 at KSC's Shuttle Landing Facility at 10:58 a.m. EDT atop a modified Boeing 747 Shuttle Carrier Aircraft.  The cross-country ferry flight became necessary when three days of unfavorable weather conditions at KSC forced Endeavour to land on runway 22 at Dryden Flight Research Center, Edwards Air Force Base, Calif., on June 19 following mission STS-111.  Processing of Endeavour will now begin for the launch of mission STS-113 targeted for October 2002 KSC-02pd1099

KENNEDY SPACE CENTER, FLA. - Space Shuttle Endeavour approaches the Ma...

KENNEDY SPACE CENTER, FLA. - Space Shuttle Endeavour approaches the Mate-Demate Device (left) following landing on runway 15 at KSC's Shuttle Landing Facility at 10:58 a.m. EDT atop a modified Boeing 747 Shuttl... More

KENNEDY SPACE CENTER, FLA. - Space Shuttle Endeavour lands on runway 15 at KSC's Shuttle Landing Facility at 10:58 a.m. EDT atop a modified Boeing 747 Shuttle Carrier Aircraft.  The cross-country ferry flight became necessary when three days of unfavorable weather conditions at KSC forced Endeavour to land on runway 22 at Dryden Flight Research Center, Edwards Air Force Base, Calif., on June 19 following mission STS-111.  Processing of Endeavour will now begin for the launch of mission STS-113 targeted for October 2002 KSC-02pd1094

KENNEDY SPACE CENTER, FLA. - Space Shuttle Endeavour lands on runway 1...

KENNEDY SPACE CENTER, FLA. - Space Shuttle Endeavour lands on runway 15 at KSC's Shuttle Landing Facility at 10:58 a.m. EDT atop a modified Boeing 747 Shuttle Carrier Aircraft. The cross-country ferry flight b... More

KENNEDY SPACE CENTER, FLA. - Space Shuttle Endeavour lands on runway 15 at KSC's Shuttle Landing Facility at 10:58 a.m. EDT atop a modified Boeing 747 Shuttle Carrier Aircraft.  The cross-country ferry flight became necessary when three days of unfavorable weather conditions at KSC forced Endeavour to land on runway 22 at Dryden Flight Research Center, Edwards Air Force Base, Calif., on June 19 following mission STS-111.  Processing of Endeavour will now begin for the launch of mission STS-113 targeted for October 2002 KSC-02pd1093

KENNEDY SPACE CENTER, FLA. - Space Shuttle Endeavour lands on runway 1...

KENNEDY SPACE CENTER, FLA. - Space Shuttle Endeavour lands on runway 15 at KSC's Shuttle Landing Facility at 10:58 a.m. EDT atop a modified Boeing 747 Shuttle Carrier Aircraft. The cross-country ferry flight b... More

KENNEDY SPACE CENTER, FLA. - Space Shuttle Endeavour is towed toward the Mate-Demate Device following landing on runway 15 at KSC's Shuttle Landing Facility at 10:58 a.m. EDT atop a modified Boeing 747 Shuttle Carrier Aircraft.  The cross-country ferry flight became necessary when three days of unfavorable weather conditions at KSC forced Endeavour to land on runway 22 at Dryden Flight Research Center, Edwards Air Force Base, Calif., on June 19 following mission STS-111.  Processing of Endeavour will now begin for the launch of mission STS-113 targeted for October 2002 KSC-02pd1096

KENNEDY SPACE CENTER, FLA. - Space Shuttle Endeavour is towed toward t...

KENNEDY SPACE CENTER, FLA. - Space Shuttle Endeavour is towed toward the Mate-Demate Device following landing on runway 15 at KSC's Shuttle Landing Facility at 10:58 a.m. EDT atop a modified Boeing 747 Shuttle ... More

KENNEDY SPACE CENTER, FLA. - Space Shuttle Endeavour is towed toward the Mate-Demate Device following landing on runway 15 at KSC's Shuttle Landing Facility at 10:58 a.m. EDT atop a modified Boeing 747 Shuttle Carrier Aircraft.  The cross-country ferry flight became necessary when three days of unfavorable weather conditions at KSC forced Endeavour to land on runway 22 at Dryden Flight Research Center, Edwards Air Force Base, Calif., on June 19 following mission STS-111.  Processing of Endeavour will now begin for the launch of mission STS-113 targeted for October 2002 KSC-02pd1097

KENNEDY SPACE CENTER, FLA. - Space Shuttle Endeavour is towed toward t...

KENNEDY SPACE CENTER, FLA. - Space Shuttle Endeavour is towed toward the Mate-Demate Device following landing on runway 15 at KSC's Shuttle Landing Facility at 10:58 a.m. EDT atop a modified Boeing 747 Shuttle ... More

KENNEDY SPACE CENTER, FLA. - Space Shuttle Endeavour is towed toward the Mate-Demate Device (right) following landing on runway 15 at KSC's Shuttle Landing Facility at 10:58 a.m. EDT atop a modified Boeing 747 Shuttle Carrier Aircraft.  The cross-country ferry flight became necessary when three days of unfavorable weather conditions at KSC forced Endeavour to land on runway 22 at Dryden Flight Research Center, Edwards Air Force Base, Calif., on June 19 following mission STS-111.  Processing of Endeavour will now begin for the launch of mission STS-113 targeted for October 2002 KSC-02pd1098

KENNEDY SPACE CENTER, FLA. - Space Shuttle Endeavour is towed toward t...

KENNEDY SPACE CENTER, FLA. - Space Shuttle Endeavour is towed toward the Mate-Demate Device (right) following landing on runway 15 at KSC's Shuttle Landing Facility at 10:58 a.m. EDT atop a modified Boeing 747 ... More

KENNEDY SPACE CENTER, FLA. --  On the KSC Shuttle Landing Facility, the shuttle carrier aircraft, or SCA, with the orbiter Atlantis on its back is towed under the mate/demate device.  Visible on Atlantis is the tail cone that covers and protects the main engines during the ferry flight. The orbiter will be detached from the SCA and lowered onto a transporter.  Then Atlantis will be towed to the Orbiter Processing Facility to begin processing for its next launch, mission STS-122 in December.  Atlantis landed at Edwards Air Force Base in California on June 22 to end mission STS-117.  It returned to Kennedy atop the SCA on July 3 after a three-day, cross-country flight due to fuel stops and weather delays. Touchdown was at 8:27 a.m. EDT. Photo credit: NASA/Kim Shiflett KSC-07pd1762

KENNEDY SPACE CENTER, FLA. -- On the KSC Shuttle Landing Facility, th...

KENNEDY SPACE CENTER, FLA. -- On the KSC Shuttle Landing Facility, the shuttle carrier aircraft, or SCA, with the orbiter Atlantis on its back is towed under the mate/demate device. Visible on Atlantis is the... More

KENNEDY SPACE CENTER, FLA. --   After landing at the KSC Shuttle Landing Facility, the shuttle carrier aircraft, or SCA, and its piggyback passenger Atlantis are towed toward the mate/demate device that will put the orbiter back on the ground.  After a three-day, cross-country trip, the duo touched down at 8:27 a.m. EDT. The SCA is a modified Boeing 747 jetliner. Visible on Atlantis is the tail cone that covers and protects the main engines during the ferry flight. Atlantis landed at Edwards Air Force Base in California to end mission STS-117.  The return to KSC began July 1 and included several stops across the country for fuel.  The last stop was at Ft. Campbell in Kentucky. Weather conditions over the last leg postponed the return trip until July 3.  After demate, Atlantis will then be towed to the Orbiter Processing Facility to begin processing for its next launch, mission STS-122 in December.  Photo credit: NASA/Kim Shiflett KSC-07pd1746

KENNEDY SPACE CENTER, FLA. -- After landing at the KSC Shuttle Landi...

KENNEDY SPACE CENTER, FLA. -- After landing at the KSC Shuttle Landing Facility, the shuttle carrier aircraft, or SCA, and its piggyback passenger Atlantis are towed toward the mate/demate device that will pu... More

KENNEDY SPACE CENTER, FLA. --   The shuttle carrier aircraft, or SCA, and its piggyback passenger Atlantis are poised to be towed into the mate/demate device, in the foreground.  The device will lift the orbiter and put it back on the ground.  After a three-day, cross-country trip, the orbiter/SCA duo touched down at 8:27 a.m. EDT. The SCA is a modified Boeing 747 jetliner.  Atlantis landed at Edwards Air Force Base in California to end mission STS-117.  The return to KSC began July 1 and included several stops across the country for fuel.  The last stop was at Ft. Campbell in Kentucky. Weather conditions over the last leg postponed the return trip until July 3.  After demate, Atlantis will then be towed to the Orbiter Processing Facility to begin processing for its next launch, mission STS-122 in December.  Photo credit: NASA/Kim Shiflett KSC-07pd1750

KENNEDY SPACE CENTER, FLA. -- The shuttle carrier aircraft, or SCA, ...

KENNEDY SPACE CENTER, FLA. -- The shuttle carrier aircraft, or SCA, and its piggyback passenger Atlantis are poised to be towed into the mate/demate device, in the foreground. The device will lift the orbite... More

KENNEDY SPACE CENTER, FLA. --  On the KSC Shuttle Landing Facility, the overhead sling is moved into place on either side of the orbiter Atlantis.  The sling will lift the orbiter away from the shuttle carrier aircraft (SCA) underneath.  The SCA carried the orbiter piggyback from California.  Atlantis landed at Edwards Air Force Base in California on June 22 to end mission STS-117.  It returned to Kennedy atop the SCA on July 3 after a three-day, cross-country flight due to fuel stops and weather delays. Touchdown was at 8:27 a.m. EDT. Photo credit: NASA/Kim Shiflett KSC-07pd1765

KENNEDY SPACE CENTER, FLA. -- On the KSC Shuttle Landing Facility, th...

KENNEDY SPACE CENTER, FLA. -- On the KSC Shuttle Landing Facility, the overhead sling is moved into place on either side of the orbiter Atlantis. The sling will lift the orbiter away from the shuttle carrier ... More

KENNEDY SPACE CENTER, FLA. -- On the KSC Shuttle Landing Facility, workers supervise the movement of the sling above the orbiter Atlantis.  The sling will be attached and lift the orbiter away from the shuttle carrier aircraft (SCA) underneath.  The SCA carried the orbiter piggyback from California.  Atlantis landed at Edwards Air Force Base in California on June 22 to end mission STS-117.  It returned to Kennedy atop the SCA on July 3 after a three-day, cross-country flight due to fuel stops and weather delays. Touchdown was at 8:27 a.m. EDT. Photo credit: NASA/Kim Shiflett KSC-07pd1764

KENNEDY SPACE CENTER, FLA. -- On the KSC Shuttle Landing Facility, wor...

KENNEDY SPACE CENTER, FLA. -- On the KSC Shuttle Landing Facility, workers supervise the movement of the sling above the orbiter Atlantis. The sling will be attached and lift the orbiter away from the shuttle ... More

KENNEDY SPACE CENTER, FLA. --  On the KSC Shuttle Landing Facility, the shuttle carrier aircraft, or SCA, with the orbiter Atlantis on its back is towed under the mate/demate device.  The orbiter will be detached from the SCA and lowered onto a transporter.  Then Atlantis will be towed to the Orbiter Processing Facility to begin processing for its next launch, mission STS-122 in December.  Atlantis landed at Edwards Air Force Base in California on June 22 to end mission STS-117.  It returned to Kennedy atop the SCA on July 3 after a three-day, cross-country flight due to fuel stops and weather delays. Touchdown was at 8:27 a.m. EDT. Photo credit: NASA/Kim Shiflett KSC-07pd1761

KENNEDY SPACE CENTER, FLA. -- On the KSC Shuttle Landing Facility, th...

KENNEDY SPACE CENTER, FLA. -- On the KSC Shuttle Landing Facility, the shuttle carrier aircraft, or SCA, with the orbiter Atlantis on its back is towed under the mate/demate device. The orbiter will be detach... More

KENNEDY SPACE CENTER, FLA. -- On the KSC Shuttle Landing Facility, the orbiter Atlantis is moved into place under the mate/demate device.  A large sling will be attached and lift the orbiter away from the shuttle carrier aircraft (SCA) underneath.  The SCA carried the orbiter piggyback from California.  Atlantis landed at Edwards Air Force Base in California on June 22 to end mission STS-117.  It returned to Kennedy atop the SCA on July 3 after a three-day, cross-country flight due to fuel stops and weather delays. Touchdown was at 8:27 a.m. EDT. Photo credit: NASA/Kim Shiflett KSC-07pd1763

KENNEDY SPACE CENTER, FLA. -- On the KSC Shuttle Landing Facility, the...

KENNEDY SPACE CENTER, FLA. -- On the KSC Shuttle Landing Facility, the orbiter Atlantis is moved into place under the mate/demate device. A large sling will be attached and lift the orbiter away from the shutt... More

KENNEDY SPACE CENTER, FLA. --  On the KSC Shuttle Landing Facility, the shuttle carrier aircraft, or SCA, with the orbiter Atlantis on its back is towed toward the mate/demate device (background).  Visible on Atlantis is the tail cone that covers and protects the main engines during the ferry flight. Under the device, the orbiter will be detached from the SCA and lowered onto a transporter.  Then Atlantis will be towed to the Orbiter Processing Facility to begin processing for its next launch, mission STS-122 in December. Atlantis landed at Edwards Air Force Base in California on June 22 to end mission STS-117.  It returned to Kennedy atop the SCA on July 3 after a three-day, cross-country flight due to fuel stops and weather delays. Touchdown was at 8:27 a.m. EDT. Photo credit: NASA/Kim Shiflett KSC-07pd1760

KENNEDY SPACE CENTER, FLA. -- On the KSC Shuttle Landing Facility, th...

KENNEDY SPACE CENTER, FLA. -- On the KSC Shuttle Landing Facility, the shuttle carrier aircraft, or SCA, with the orbiter Atlantis on its back is towed toward the mate/demate device (background). Visible on A... More

KENNEDY SPACE CENTER, FLA. --   After landing at the KSC Shuttle Landing Facility, the shuttle carrier aircraft, or SCA, and its piggyback passenger Atlantis are towed to the mate/demate device that will put the orbiter back on the ground.  After a three-day, cross-country trip, the duo touched down at 8:27 a.m. EDT. The SCA is a modified Boeing 747 jetliner. Visible on Atlantis is the tail cone that covers and protects the main engines during the ferry flight.  Atlantis landed at Edwards Air Force Base in California to end mission STS-117.  The return to KSC began July 1 and included several stops across the country for fuel.  The last stop was at Ft. Campbell in Kentucky. Weather conditions over the last leg postponed the return trip until July 3.  After demate, Atlantis will then be towed to the Orbiter Processing Facility to begin processing for its next launch, mission STS-122 in December.  Photo credit: NASA/Kim Shiflett KSC-07pd1747

KENNEDY SPACE CENTER, FLA. -- After landing at the KSC Shuttle Landi...

KENNEDY SPACE CENTER, FLA. -- After landing at the KSC Shuttle Landing Facility, the shuttle carrier aircraft, or SCA, and its piggyback passenger Atlantis are towed to the mate/demate device that will put th... More

KENNEDY SPACE CENTER, FLA. --   The shuttle carrier aircraft, or SCA, and its piggyback passenger Atlantis are poised to be towed into the mate/demate device, in the foreground.  The device will lift the orbiter and put it back on the ground.  After a three-day, cross-country trip, the orbiter/SCA duo touched down at 8:27 a.m. EDT. The SCA is a modified Boeing 747 jetliner.  Atlantis landed at Edwards Air Force Base in California to end mission STS-117.  The return to KSC began July 1 and included several stops across the country for fuel.  The last stop was at Ft. Campbell in Kentucky. Weather conditions over the last leg postponed the return trip until July 3.  After demate, Atlantis will then be towed to the Orbiter Processing Facility to begin processing for its next launch, mission STS-122 in December.  Photo credit: NASA/Kim Shiflett KSC-07pd1749

KENNEDY SPACE CENTER, FLA. -- The shuttle carrier aircraft, or SCA, ...

KENNEDY SPACE CENTER, FLA. -- The shuttle carrier aircraft, or SCA, and its piggyback passenger Atlantis are poised to be towed into the mate/demate device, in the foreground. The device will lift the orbite... More

KENNEDY SPACE CENTER, FLA. --  On the KSC Shuttle Landing Facility, the shuttle carrier aircraft, or SCA, with the orbiter Atlantis on its back is towed toward the mate/demate device (upper foreground).  Under the device, the orbiter will be detached from the SCA and lowered onto a transporter.  Then Atlantis will be towed to the Orbiter Processing Facility to begin processing for its next launch, mission STS-122 in December.  Atlantis landed at Edwards Air Force Base in California on June 22 to end mission STS-117.  It returned to Kennedy atop the SCA on July 3 after a three-day, cross-country flight due to fuel stops and weather delays. Touchdown was at 8:27 a.m. EDT. Photo credit: NASA/Kim Shiflett KSC-07pd1758

KENNEDY SPACE CENTER, FLA. -- On the KSC Shuttle Landing Facility, th...

KENNEDY SPACE CENTER, FLA. -- On the KSC Shuttle Landing Facility, the shuttle carrier aircraft, or SCA, with the orbiter Atlantis on its back is towed toward the mate/demate device (upper foreground). Under ... More

KENNEDY SPACE CENTER, FLA. --   The shuttle carrier aircraft, or SCA, and its piggyback passenger Atlantis come to a rest near the mate/demate device on the KSC Shuttle Landing Facility.  After a three-day, cross-country trip, the duo touched down at 8:27 a.m. EDT. The SCA is a modified Boeing 747 jetliner.  Atlantis landed at Edwards Air Force Base in California to end mission STS-117.  The return to KSC began July 1 and included several stops across the country for fuel.  The last stop was at Ft. Campbell in Kentucky. Weather conditions over the last leg postponed the return trip until July 3.  After demate, Atlantis will then be towed to the Orbiter Processing Facility to begin processing for its next launch, mission STS-122 in December.  Photo credit: NASA/Kim Shiflett KSC-07pd1748

KENNEDY SPACE CENTER, FLA. -- The shuttle carrier aircraft, or SCA, ...

KENNEDY SPACE CENTER, FLA. -- The shuttle carrier aircraft, or SCA, and its piggyback passenger Atlantis come to a rest near the mate/demate device on the KSC Shuttle Landing Facility. After a three-day, cro... More

KENNEDY SPACE CENTER, FLA. --  On the KSC Shuttle Landing Facility, the shuttle carrier aircraft, or SCA, with the orbiter Atlantis on its back is towed toward the mate/demate device.  Under the device, the orbiter will be detached from the SCA and lowered onto a transporter.  Then Atlantis will be towed to the Orbiter Processing Facility to begin processing for its next launch, mission STS-122 in December.  Atlantis landed at Edwards Air Force Base in California on June 22 to end mission STS-117.  It returned to Kennedy atop the SCA on July 3 after a three-day, cross-country flight due to fuel stops and weather delays. Touchdown was at 8:27 a.m. EDT. Photo credit: NASA/Kim Shiflett KSC-07pd1757

KENNEDY SPACE CENTER, FLA. -- On the KSC Shuttle Landing Facility, th...

KENNEDY SPACE CENTER, FLA. -- On the KSC Shuttle Landing Facility, the shuttle carrier aircraft, or SCA, with the orbiter Atlantis on its back is towed toward the mate/demate device. Under the device, the orb... More

KENNEDY SPACE CENTER, FLA. --  At the mate/demate device at Kennedy Space Center's Shuttle Landing Facility, the lifting crane begins to lift Atlantis up from the shuttle carrier aircraft, or SCA, beneath it. Visible on Atlantis is the tail cone that covers and protects the main engines during the ferry flight.  Technicians monitor the lifting process on a raised platform to the left. Atlantis arrived at Kennedy Space Center atop the SCA on July 3 after a three-day, cross-country flight due to fuel stops and weather delays. Touchdown was at 8:27 a.m. EDT. Atlantis landed at Edwards Air Force Base in California on June 22 to end mission STS-117.  Photo credit: NASA/Jack Pfaller. KSC-07pd1782

KENNEDY SPACE CENTER, FLA. -- At the mate/demate device at Kennedy Sp...

KENNEDY SPACE CENTER, FLA. -- At the mate/demate device at Kennedy Space Center's Shuttle Landing Facility, the lifting crane begins to lift Atlantis up from the shuttle carrier aircraft, or SCA, beneath it. V... More

KENNEDY SPACE CENTER, FLA. --  Atlantis is towed toward the Orbiter Processing Facility from the Shuttle Landing Facility at Kennedy Space Center. The orbiter will undergo processing for its next launch, mission STS-122 in December. Visible on Atlantis is the tail cone that covers and protects the main engines during the ferry flight. The massive Vehicle Assembly Building can be seen to the left. Atlantis arrived at Kennedy Space Center atop the SCA on July 3 after a three-day, cross-country flight due to fuel stops and weather delays. Touchdown was at 8:27 a.m. EDT. Atlantis landed at Edwards Air Force Base in California on June 22 to end mission STS-117.  Photo credit: NASA/George Shelton. KSC-07pd1801

KENNEDY SPACE CENTER, FLA. -- Atlantis is towed toward the Orbiter Pr...

KENNEDY SPACE CENTER, FLA. -- Atlantis is towed toward the Orbiter Processing Facility from the Shuttle Landing Facility at Kennedy Space Center. The orbiter will undergo processing for its next launch, missio... More

KENNEDY SPACE CENTER, FLA. --  At the mate/demate device at Kennedy Space Center's Shuttle Landing Facility, Atlantis is lifted up as the shuttle carrier aircraft, or SCA, begins to back away. The orbiter will be lowered to the ground and then towed to the Orbiter Processing Facility to begin processing for its next launch, mission STS-122 in December. Atlantis arrived at Kennedy Space Center atop the SCA on July 3 after a three-day, cross-country flight due to fuel stops and weather delays. Touchdown was at 8:27 a.m. EDT. Atlantis landed at Edwards Air Force Base in California on June 22 to end mission STS-117.  Photo credit: NASA/Jack Pfaller. KSC-07pd1785

KENNEDY SPACE CENTER, FLA. -- At the mate/demate device at Kennedy Sp...

KENNEDY SPACE CENTER, FLA. -- At the mate/demate device at Kennedy Space Center's Shuttle Landing Facility, Atlantis is lifted up as the shuttle carrier aircraft, or SCA, begins to back away. The orbiter will ... More

KENNEDY SPACE CENTER, FLA. --   Framed by work platforms inside the Orbiter Processing Facility, Atlantis is towed toward the entrance to the facility. The orbiter will undergo processing for its next launch, mission STS-122 in December. Atlantis arrived at Kennedy Space Center atop the SCA on July 3 after a three-day, cross-country flight due to fuel stops and weather delays. Touchdown was at 8:27 a.m. EDT. Atlantis landed at Edwards Air Force Base in California on June 22 to end mission STS-117.  Photo credit: NASA/George Shelton. KSC-07pd1804

KENNEDY SPACE CENTER, FLA. -- Framed by work platforms inside the Or...

KENNEDY SPACE CENTER, FLA. -- Framed by work platforms inside the Orbiter Processing Facility, Atlantis is towed toward the entrance to the facility. The orbiter will undergo processing for its next launch, m... More

KENNEDY SPACE CENTER, FLA. --  At the mate/demate device at Kennedy Space Center's Shuttle Landing Facility, technicians begin the process of detaching the lifting crane from Atlantis. Visible on Atlantis is the tail cone that covers and protects the main engines during the ferry flight. The orbiter will be towed to the Orbiter Processing Facility to begin processing for its next launch, mission STS-122 in December. Atlantis arrived at Kennedy Space Center atop the shuttle carrier aircraft, or SCA, on July 3 after a three-day, cross-country flight due to fuel stops and weather delays. Touchdown was at 8:27 a.m. EDT. Atlantis landed at Edwards Air Force Base in California on June 22 to end mission STS-117.  Photo credit: NASA/George Shelton. KSC-07pd1792

KENNEDY SPACE CENTER, FLA. -- At the mate/demate device at Kennedy Sp...

KENNEDY SPACE CENTER, FLA. -- At the mate/demate device at Kennedy Space Center's Shuttle Landing Facility, technicians begin the process of detaching the lifting crane from Atlantis. Visible on Atlantis is th... More

KENNEDY SPACE CENTER, FLA. --  The shuttle carrier aircraft, or SCA, sits on the tarmac at Kennedy Space Center's Shuttle Landing Facility after demate from Atlantis. Several service vehicles have arrived to prepare the aircraft for its flight back to Johnson Space Center in Texas. Atlantis arrived at Kennedy Space Center atop the  SCA on July 3 after a three-day, cross-country flight due to fuel stops and weather delays. Touchdown was at 8:27 a.m. EDT. Atlantis landed at Edwards Air Force Base in California on June 22 to end mission STS-117.  Photo credit: NASA/George Shelton. KSC-07pd1795

KENNEDY SPACE CENTER, FLA. -- The shuttle carrier aircraft, or SCA, s...

KENNEDY SPACE CENTER, FLA. -- The shuttle carrier aircraft, or SCA, sits on the tarmac at Kennedy Space Center's Shuttle Landing Facility after demate from Atlantis. Several service vehicles have arrived to pr... More

KENNEDY SPACE CENTER, FLA. --  Atlantis is lowered to the ground at the mate/demate device at Kennedy Space Center's Shuttle Landing Facility. In the background the shuttle carrier aircraft, or SCA, can be seen. The orbiter will be detached from the lifting crane and then towed to the Orbiter Processing Facility to begin processing for its next launch, mission STS-122 in December. Atlantis arrived at Kennedy Space Center atop the SCA on July 3 after a three-day, cross-country flight due to fuel stops and weather delays. Touchdown was at 8:27 a.m. EDT. Atlantis landed at Edwards Air Force Base in California on June 22 to end mission STS-117.  Photo credit: NASA/Jack Pfaller. KSC-07pd1791

KENNEDY SPACE CENTER, FLA. -- Atlantis is lowered to the ground at th...

KENNEDY SPACE CENTER, FLA. -- Atlantis is lowered to the ground at the mate/demate device at Kennedy Space Center's Shuttle Landing Facility. In the background the shuttle carrier aircraft, or SCA, can be seen... More

KENNEDY SPACE CENTER, FLA. --  A soft glow surrounds Atlantis as it is lifted up from the shuttle carrier aircraft, or SCA, at the mate/demate device at Kennedy Space Center's Shuttle Landing Facility. The orbiter will be lowered to the ground and then towed to the Orbiter Processing Facility to begin processing for its next launch, mission STS-122 in December. Atlantis arrived at Kennedy Space Center atop the SCA on July 3 after a three-day, cross-country flight due to fuel stops and weather delays. Touchdown was at 8:27 a.m. EDT. Atlantis landed at Edwards Air Force Base in California on June 22 to end mission STS-117.  Photo credit: NASA/Jack Pfaller. KSC-07pd1781

KENNEDY SPACE CENTER, FLA. -- A soft glow surrounds Atlantis as it is...

KENNEDY SPACE CENTER, FLA. -- A soft glow surrounds Atlantis as it is lifted up from the shuttle carrier aircraft, or SCA, at the mate/demate device at Kennedy Space Center's Shuttle Landing Facility. The orbi... More

KENNEDY SPACE CENTER, FLA. --  At the mate/demate device at Kennedy Space Center's Shuttle Landing Facility, work begins to lower Atlantis to the ground. In the background, a towing device is used to back the shuttle carrier aircraft, or SCA, away from the device. When the orbiter is lowered to the ground it will be  towed to the Orbiter Processing Facility to begin processing for its next launch, mission STS-122 in December. Atlantis arrived at Kennedy Space Center atop the SCA on July 3 after a three-day, cross-country flight due to fuel stops and weather delays. Touchdown was at 8:27 a.m. EDT. Atlantis landed at Edwards Air Force Base in California on June 22 to end mission STS-117.  Photo credit: NASA/Jack Pfaller. KSC-07pd1788

KENNEDY SPACE CENTER, FLA. -- At the mate/demate device at Kennedy Sp...

KENNEDY SPACE CENTER, FLA. -- At the mate/demate device at Kennedy Space Center's Shuttle Landing Facility, work begins to lower Atlantis to the ground. In the background, a towing device is used to back the s... More

KENNEDY SPACE CENTER, FLA. --  On the mate/demate device at Kennedy Space Center's Shuttle Landing Facility, technicians attach a lifting crane to Atlantis. The orbiter will be lifted up from the shuttle carrier aircraft, or SCA, and lowered to the ground. Then Atlantis will be towed to the Orbiter Processing Facility to begin processing for its next launch, mission STS-122 in December. Atlantis arrived at Kennedy Space Center atop the SCA on July 3 after a three-day, cross-country flight due to fuel stops and weather delays. Touchdown was at 8:27 a.m. EDT. Atlantis landed at Edwards Air Force Base in California on June 22 to end mission STS-117.  Photo credit: NASA/Jack Pfaller. KSC-07pd1780

KENNEDY SPACE CENTER, FLA. -- On the mate/demate device at Kennedy Sp...

KENNEDY SPACE CENTER, FLA. -- On the mate/demate device at Kennedy Space Center's Shuttle Landing Facility, technicians attach a lifting crane to Atlantis. The orbiter will be lifted up from the shuttle carrie... More

KENNEDY SPACE CENTER, FLA. --  At the mate/demate device at Kennedy Space Center's Shuttle Landing Facility, Atlantis is lifted up from the shuttle carrier aircraft, or SCA. The SCA is backed away from the mate/demate device. Visible on Atlantis is the tail cone that covers and protects the main engines during the ferry flight. The orbiter will be lowered to the ground and then towed to the Orbiter Processing Facility to begin processing for its next launch, mission STS-122 in December. Atlantis arrived at Kennedy Space Center atop the SCA on July 3 after a three-day, cross-country flight due to fuel stops and weather delays. Touchdown was at 8:27 a.m. EDT. Atlantis landed at Edwards Air Force Base in California on June 22 to end mission STS-117.  Photo credit: NASA/Jack Pfaller. KSC-07pd1787

KENNEDY SPACE CENTER, FLA. -- At the mate/demate device at Kennedy Sp...

KENNEDY SPACE CENTER, FLA. -- At the mate/demate device at Kennedy Space Center's Shuttle Landing Facility, Atlantis is lifted up from the shuttle carrier aircraft, or SCA. The SCA is backed away from the mate... More

KENNEDY SPACE CENTER, FLA. --  Atlantis is slowly lowered to the ground at the mate/demate device at Kennedy Space Center's Shuttle Landing Facility. The orbiter will be detached from the lifting crane and then towed to the Orbiter Processing Facility to begin processing for its next launch, mission STS-122 in December. Atlantis arrived at Kennedy Space Center atop the SCA on July 3 after a three-day, cross-country flight due to fuel stops and weather delays. Touchdown was at 8:27 a.m. EDT. Atlantis landed at Edwards Air Force Base in California on June 22 to end mission STS-117.  Photo credit: NASA/Jack Pfaller. KSC-07pd1790

KENNEDY SPACE CENTER, FLA. -- Atlantis is slowly lowered to the groun...

KENNEDY SPACE CENTER, FLA. -- Atlantis is slowly lowered to the ground at the mate/demate device at Kennedy Space Center's Shuttle Landing Facility. The orbiter will be detached from the lifting crane and then... More

KENNEDY SPACE CENTER, FLA. --  Atlantis is towed back from the mate/demate device at Kennedy Space Center's Shuttle Landing Facility. The orbiter will be towed to the Orbiter Processing Facility, where processing will begin for its next launch, mission STS-122 in December. In the background is the shuttle carrier aircraft, or SCA. Atlantis arrived at Kennedy Space Center atop the  SCA on July 3 after a three-day, cross-country flight due to fuel stops and weather delays. Touchdown was at 8:27 a.m. EDT. Atlantis landed at Edwards Air Force Base in California on June 22 to end mission STS-117.  Photo credit: NASA/George Shelton. KSC-07pd1797

KENNEDY SPACE CENTER, FLA. -- Atlantis is towed back from the mate/de...

KENNEDY SPACE CENTER, FLA. -- Atlantis is towed back from the mate/demate device at Kennedy Space Center's Shuttle Landing Facility. The orbiter will be towed to the Orbiter Processing Facility, where processi... More

KENNEDY SPACE CENTER, FLA. --  At the mate/demate device at Kennedy Space Center's Shuttle Landing Facility, Atlantis is detached from the lifting crane and workers prepare the orbiter for towing to the Orbiter Processing Facility where processing will begin for its next launch, mission STS-122 in December. Visible on Atlantis is the tail cone that covers and protects the main engines during the ferry flight. Atlantis arrived at Kennedy Space Center atop the shuttle carrier aircraft, or SCA, on July 3 after a three-day, cross-country flight due to fuel stops and weather delays. Touchdown was at 8:27 a.m. EDT. Atlantis landed at Edwards Air Force Base in California on June 22 to end mission STS-117.  Photo credit: NASA/George Shelton. KSC-07pd1794

KENNEDY SPACE CENTER, FLA. -- At the mate/demate device at Kennedy Sp...

KENNEDY SPACE CENTER, FLA. -- At the mate/demate device at Kennedy Space Center's Shuttle Landing Facility, Atlantis is detached from the lifting crane and workers prepare the orbiter for towing to the Orbiter... More

KENNEDY SPACE CENTER, FLA. --  Atlantis arrives at the Orbiter Processing Facility from the Shuttle Landing Facility at Kennedy Space Center. The orbiter will undergo processing for its next launch, mission STS-122 in December. Visible on Atlantis is the tail cone that covers and protects the main engines during the ferry flight. Atlantis arrived at Kennedy Space Center atop the SCA on July 3 after a three-day, cross-country flight due to fuel stops and weather delays. Touchdown was at 8:27 a.m. EDT. Atlantis landed at Edwards Air Force Base in California on June 22 to end mission STS-117.  Photo credit: NASA/George Shelton. KSC-07pd1803

KENNEDY SPACE CENTER, FLA. -- Atlantis arrives at the Orbiter Process...

KENNEDY SPACE CENTER, FLA. -- Atlantis arrives at the Orbiter Processing Facility from the Shuttle Landing Facility at Kennedy Space Center. The orbiter will undergo processing for its next launch, mission STS... More

KENNEDY SPACE CENTER, FLA. --  After demate from the shuttle carrier aircraft, or SCA, Atlantis begins its trek from Kennedy Space Center's Shuttle Landing Facility to the Orbiter Processing Facility. The orbiter will undergo processing for its next launch, mission STS-122 in December. Visible on Atlantis is the tail cone that covers and protects the main engines during the ferry flight. Atlantis arrived at Kennedy Space Center atop the  SCA on July 3 after a three-day, cross-country flight due to fuel stops and weather delays. Touchdown was at 8:27 a.m. EDT. Atlantis landed at Edwards Air Force Base in California on June 22 to end mission STS-117.  Photo credit: NASA/George Shelton. KSC-07pd1799

KENNEDY SPACE CENTER, FLA. -- After demate from the shuttle carrier a...

KENNEDY SPACE CENTER, FLA. -- After demate from the shuttle carrier aircraft, or SCA, Atlantis begins its trek from Kennedy Space Center's Shuttle Landing Facility to the Orbiter Processing Facility. The orbit... More

KENNEDY SPACE CENTER, FLA. --  At the mate/demate device at Kennedy Space Center's Shuttle Landing Facility, workers monitor the progress as Atlantis is lifted up from the shuttle carrier aircraft, or SCA. The orbiter will be lowered onto the ground and then towed to the Orbiter Processing Facility to begin processing for its next launch, mission STS-122 in December. Atlantis arrived at Kennedy Space Center atop the SCA on July 3 after a three-day, cross-country flight due to fuel stops and weather delays. Touchdown was at 8:27 a.m. EDT. Atlantis landed at Edwards Air Force Base in California on June 22 to end mission STS-117.  Photo credit: NASA/Jack Pfaller. KSC-07pd1786

KENNEDY SPACE CENTER, FLA. -- At the mate/demate device at Kennedy Sp...

KENNEDY SPACE CENTER, FLA. -- At the mate/demate device at Kennedy Space Center's Shuttle Landing Facility, workers monitor the progress as Atlantis is lifted up from the shuttle carrier aircraft, or SCA. The ... More

KENNEDY SPACE CENTER, FLA. --  At the mate/demate device at Kennedy Space Center's Shuttle Landing Facility, the crane lowers Atlantis close to the ground. The shuttle carrier aircraft, or SCA, can be seen in the background. Once on the ground, the orbiter will be towed to the Orbiter Processing Facility to begin processing for its next launch, mission STS-122 in December. Atlantis arrived at Kennedy Space Center atop the SCA on July 3 after a three-day, cross-country flight due to fuel stops and weather delays. Touchdown was at 8:27 a.m. EDT. Atlantis landed at Edwards Air Force Base in California on June 22 to end mission STS-117.  Photo credit: NASA/Jack Pfaller. KSC-07pd1789

KENNEDY SPACE CENTER, FLA. -- At the mate/demate device at Kennedy Sp...

KENNEDY SPACE CENTER, FLA. -- At the mate/demate device at Kennedy Space Center's Shuttle Landing Facility, the crane lowers Atlantis close to the ground. The shuttle carrier aircraft, or SCA, can be seen in t... More

KENNEDY SPACE CENTER, FLA. --  At the mate/demate device at Kennedy Space Center's Shuttle Landing Facility, Atlantis is detached from the lifting crane. Workers prepare the orbiter for towing to the Orbiter Processing Facility where processing will begin for its next launch, mission STS-122 in December. Atlantis arrived at Kennedy Space Center atop the shuttle carrier aircraft, or SCA, on July 3 after a three-day, cross-country flight due to fuel stops and weather delays. Touchdown was at 8:27 a.m. EDT. Atlantis landed at Edwards Air Force Base in California on June 22 to end mission STS-117.  Photo credit: NASA/George Shelton. KSC-07pd1793

KENNEDY SPACE CENTER, FLA. -- At the mate/demate device at Kennedy Sp...

KENNEDY SPACE CENTER, FLA. -- At the mate/demate device at Kennedy Space Center's Shuttle Landing Facility, Atlantis is detached from the lifting crane. Workers prepare the orbiter for towing to the Orbiter Pr... More

KENNEDY SPACE CENTER, FLA. --   Atlantis is towed into the Orbiter Processing Facility, completing its journey from the Shuttle Landing Facility. The orbiter will undergo processing for its next launch, mission STS-122 in December. Visible on Atlantis is the tail cone that covers and protects the main engines during the ferry flight. Atlantis arrived at Kennedy Space Center atop the SCA on July 3 after a three-day, cross-country flight due to fuel stops and weather delays. Touchdown was at 8:27 a.m. EDT. Atlantis landed at Edwards Air Force Base in California on June 22 to end mission STS-117.  Photo credit: NASA/George Shelton. KSC-07pd1806

KENNEDY SPACE CENTER, FLA. -- Atlantis is towed into the Orbiter Pro...

KENNEDY SPACE CENTER, FLA. -- Atlantis is towed into the Orbiter Processing Facility, completing its journey from the Shuttle Landing Facility. The orbiter will undergo processing for its next launch, mission... More

KENNEDY SPACE CENTER, FLA. --  At the mate/demate device at Kennedy Space Center's Shuttle Landing Facility, Atlantis is lifted up from the shuttle carrier aircraft, or SCA, beneath it. The orbiter will be lowered to the ground and then towed to the Orbiter Processing Facility to begin processing for its next launch, mission STS-122 in December. Atlantis arrived at Kennedy Space Center atop the SCA on July 3 after a three-day, cross-country flight due to fuel stops and weather delays. Touchdown was at 8:27 a.m. EDT. Atlantis landed at Edwards Air Force Base in California on June 22 to end mission STS-117.  Photo credit: NASA/Jack Pfaller. KSC-07pd1784

KENNEDY SPACE CENTER, FLA. -- At the mate/demate device at Kennedy Sp...

KENNEDY SPACE CENTER, FLA. -- At the mate/demate device at Kennedy Space Center's Shuttle Landing Facility, Atlantis is lifted up from the shuttle carrier aircraft, or SCA, beneath it. The orbiter will be lowe... More

KENNEDY SPACE CENTER, FLA. --  On the mate/demate device at Kennedy Space Center's Shuttle Landing Facility, technicians monitor the progress as Atlantis is lifted up from the shuttle carrier aircraft, or SCA, beneath it. The orbiter will be lowered to the ground and then towed to the Orbiter Processing Facility to begin processing for its next launch, mission STS-122 in December. Atlantis arrived at Kennedy Space Center atop the SCA on July 3 after a three-day, cross-country flight due to fuel stops and weather delays. Touchdown was at 8:27 a.m. EDT. Atlantis landed at Edwards Air Force Base in California on June 22 to end mission STS-117.  Photo credit: NASA/Jack Pfaller. KSC-07pd1783

KENNEDY SPACE CENTER, FLA. -- On the mate/demate device at Kennedy Sp...

KENNEDY SPACE CENTER, FLA. -- On the mate/demate device at Kennedy Space Center's Shuttle Landing Facility, technicians monitor the progress as Atlantis is lifted up from the shuttle carrier aircraft, or SCA, ... More

KENNEDY SPACE CENTER, FLA. --   Atlantis is towed into the Orbiter Processing Facility. The orbiter will undergo processing for its next launch, mission STS-122 in December. Visible on Atlantis is the tail cone that covers and protects the main engines during the ferry flight.  Atlantis arrived at Kennedy Space Center atop the SCA on July 3 after a three-day, cross-country flight due to fuel stops and weather delays. Touchdown was at 8:27 a.m. EDT. Atlantis landed at Edwards Air Force Base in California on June 22 to end mission STS-117.  Photo credit: NASA/George Shelton. KSC-07pd1805

KENNEDY SPACE CENTER, FLA. -- Atlantis is towed into the Orbiter Pro...

KENNEDY SPACE CENTER, FLA. -- Atlantis is towed into the Orbiter Processing Facility. The orbiter will undergo processing for its next launch, mission STS-122 in December. Visible on Atlantis is the tail cone... More

CAPE CANAVERAL, Fla. – The Florida East Coast Railway train arrives at the Jay Jay Rail Yard with the booster segments for the Ares I-X test rocket for interchange with the NASA Railroad.  The four reusable motor segments and the nozzle exit cone, manufactured by the Ares I first-stage prime contractor Alliant Techsystems Inc., or ATK, departed Utah March 12 on the seven-day, cross-country trip to Florida.  The segments will be delivered to the  Rotation, Processing and Surge Facility for final processing and integration. The booster used for the Ares I-X launch is being modified by adding new forward structures and a fifth segment simulator. The motor is the final hardware needed for the rocket's upcoming test flight this summer. The stacking operations are scheduled to begin in the Vehicle Assembly Building in April.   Photo credit: NASA/Kim Shiflett KSC-2009-2204

CAPE CANAVERAL, Fla. – The Florida East Coast Railway train arrives at...

CAPE CANAVERAL, Fla. – The Florida East Coast Railway train arrives at the Jay Jay Rail Yard with the booster segments for the Ares I-X test rocket for interchange with the NASA Railroad. The four reusable mot... More

CAPE CANAVERAL, Fla. – ATK and NASA officials accompanied the Florida East Coast Railroad train carrying the booster segments for the Ares I-X test rocket on its route to NASA's Kennedy Space Center in Florida from Jacksonville, Fla.  Seen here in the passenger car are, from left, ATK Vice President Space Launch Systems Charlie Precourt, a Florida East Coast Railroad representative, ATK Deputy Site Director in Florida Ted Shaffner, ATK Vice President Of Space Launch Propulsion Cary Ralston,  NASA KSC Shuttle Launch Director Mike Leinbach, a Florida East Coast Railroad representative and  ATK Ares I First Stage program Director Fred Brasfield. The four reusable motor segments and the nozzle exit cone, manufactured by the Ares I first-stage prime contractor Alliant Techsystems Inc., or ATK, departed Utah March 12 on the seven-day, cross-country trip to Florida.  The segments will be delivered to the  Rotation, Processing and Surge Facility for final processing and integration. The booster used for the Ares I-X launch is being modified by adding new forward structures and a fifth segment simulator. The motor is the final hardware needed for the rocket's upcoming test flight this summer. The stacking operations are scheduled to begin in the Vehicle Assembly Building in April.   Photo credit: NASA/Kim Shiflett KSC-2009-2207

CAPE CANAVERAL, Fla. – ATK and NASA officials accompanied the Florida ...

CAPE CANAVERAL, Fla. – ATK and NASA officials accompanied the Florida East Coast Railroad train carrying the booster segments for the Ares I-X test rocket on its route to NASA's Kennedy Space Center in Florida ... More

CAPE CANAVERAL, Fla. – The booster segments for the Ares I-X test rocket were delivered to NASA's Kennedy Space Center in Florida by the Florida East Coast Railroad and the NASA Railroad.  Accompanying the train on its route from Jacksonville, Fla., were NASA and ATK officials.  Standing here, from left, are ATK Ares I Flight Tests Program Director Joe  Oliva, ATK Ares I-X Florida Program Manager Russ Page, NASA Ares Program Manager Steve Cook, ATK Deputy Site Director in Florida Ted Shaffner, NASA KSC Ares I-X Deputy Mission Manager Jon Cowart, ATK Vice President of Space Launch Propulson Cary Ralston, ATK Ares I First Stage program Director Fred Brasfield, ATK Vice President Space Launch Systems Charlie Precourt, ATK Ares I Flight Tests Deputy Program Director Kathy Philpot, NASA Marshall Space Flight Center Reusable Solid Rocket Booster Integration Lead Roy Worthy, ATK Florida Site Director Bob Herman, NASA Res First Stage Project Manager Alex Priskos and NASA KSC Shuttle Launch Director Mike Leinbach.  The four reusable motor segments and the nozzle exit cone, manufactured by the Ares I first-stage prime contractor Alliant Techsystems Inc., or ATK, departed Utah March 12 on the seven-day, cross-country trip to Florida.  The segments will be delivered to the  Rotation, Processing and Surge Facility for final processing and integration. The booster used for the Ares I-X launch is being modified by adding new forward structures and a fifth segment simulator. The motor is the final hardware needed for the rocket's upcoming test flight this summer. The stacking operations are scheduled to begin in the Vehicle Assembly Building in April.   Photo credit: NASA/Kim Shiflett KSC-2009-2211

CAPE CANAVERAL, Fla. – The booster segments for the Ares I-X test rock...

CAPE CANAVERAL, Fla. – The booster segments for the Ares I-X test rocket were delivered to NASA's Kennedy Space Center in Florida by the Florida East Coast Railroad and the NASA Railroad. Accompanying the trai... More

CAPE CANAVERAL, Fla. – The NASA Railroad (right) is ready for the exchange of the Florida East Coast Railway cars carrying the booster segments for the Ares I-X test rocket. The four reusable motor segments and the nozzle exit cone, manufactured by the Ares I first-stage prime contractor Alliant Techsystems Inc., or ATK, departed Utah March 12 on the seven-day, cross-country trip to Florida.  The segments will be delivered to the  Rotation, Processing and Surge Facility for final processing and integration. The booster used for the Ares I-X launch is being modified by adding new forward structures and a fifth segment simulator. The motor is the final hardware needed for the rocket's upcoming test flight this summer. The stacking operations are scheduled to begin in the Vehicle Assembly Building in April.   Photo credit: NASA/Kim Shiflett KSC-2009-2208

CAPE CANAVERAL, Fla. – The NASA Railroad (right) is ready for the exch...

CAPE CANAVERAL, Fla. – The NASA Railroad (right) is ready for the exchange of the Florida East Coast Railway cars carrying the booster segments for the Ares I-X test rocket. The four reusable motor segments and... More

CAPE CANAVERAL, Fla. – The NASA Railroad makes the exchange with the Florida East Coast Railway cars carrying the booster segments for the Ares I-X test rocket. The four reusable motor segments and the nozzle exit cone, manufactured by the Ares I first-stage prime contractor Alliant Techsystems Inc., or ATK, departed Utah March 12 on the seven-day, cross-country trip to Florida.  The segments will be delivered to the  Rotation, Processing and Surge Facility for final processing and integration. The booster used for the Ares I-X launch is being modified by adding new forward structures and a fifth segment simulator. The motor is the final hardware needed for the rocket's upcoming test flight this summer. The stacking operations are scheduled to begin in the Vehicle Assembly Building in April.   Photo credit: NASA/Kim Shiflett KSC-2009-2212

CAPE CANAVERAL, Fla. – The NASA Railroad makes the exchange with the F...

CAPE CANAVERAL, Fla. – The NASA Railroad makes the exchange with the Florida East Coast Railway cars carrying the booster segments for the Ares I-X test rocket. The four reusable motor segments and the nozzle e... More

CAPE CANAVERAL, Fla. – Leaving the Florida East Coast Railroad train that delivered the booster segments for the Ares I-X test rocket to NASA's Kennedy Space Center in Florida are Senior Manager of Regional Communications for ATK Jessica Rye and ATK Vice President of Space Launch Systems Charlie Precourt, who is a former astronaut.  ATK and NASA officials accompanied the train on its route from Jacksonville, Fla.  The four reusable motor segments and the nozzle exit cone, manufactured by the Ares I first-stage prime contractor Alliant Techsystems Inc., or ATK, departed Utah March 12 on the seven-day, cross-country trip to Florida.  The segments will be delivered to the  Rotation, Processing and Surge Facility for final processing and integration. The booster used for the Ares I-X launch is being modified by adding new forward structures and a fifth segment simulator. The motor is the final hardware needed for the rocket's upcoming test flight this summer. The stacking operations are scheduled to begin in the Vehicle Assembly Building in April.   Photo credit: NASA/Kim Shiflett KSC-2009-2210

CAPE CANAVERAL, Fla. – Leaving the Florida East Coast Railroad train t...

CAPE CANAVERAL, Fla. – Leaving the Florida East Coast Railroad train that delivered the booster segments for the Ares I-X test rocket to NASA's Kennedy Space Center in Florida are Senior Manager of Regional Com... More

CAPE CANAVERAL, Fla. – – The NASA Railroad (right) is ready for the exchange of the Florida East Coast Railway cars carrying the booster segments for the Ares I-X test rocket. The four reusable motor segments and the nozzle exit cone, manufactured by the Ares I first-stage prime contractor Alliant Techsystems Inc., or ATK, departed Utah March 12 on the seven-day, cross-country trip to Florida.  The segments will be delivered to the  Rotation, Processing and Surge Facility for final processing and integration. The booster used for the Ares I-X launch is being modified by adding new forward structures and a fifth segment simulator. The motor is the final hardware needed for the rocket's upcoming test flight this summer. The stacking operations are scheduled to begin in the Vehicle Assembly Building in April.   Photo credit: NASA/Kim Shiflett KSC-2009-2209

CAPE CANAVERAL, Fla. – – The NASA Railroad (right) is ready for the ex...

CAPE CANAVERAL, Fla. – – The NASA Railroad (right) is ready for the exchange of the Florida East Coast Railway cars carrying the booster segments for the Ares I-X test rocket. The four reusable motor segments a... More

CAPE CANAVERAL, Fla. – The Florida East Coast Railway train arrives at the Jay Jay Rail Yard with the booster segments for the Ares I-X test rocket for interchange with the NASA Railroad. The four reusable motor segments and the nozzle exit cone, manufactured by the Ares I first-stage prime contractor Alliant Techsystems Inc., or ATK, departed Utah March 12 on the seven-day, cross-country trip to Florida.  The segments will be delivered to the  Rotation, Processing and Surge Facility for final processing and integration. The booster used for the Ares I-X launch is being modified by adding new forward structures and a fifth segment simulator. The motor is the final hardware needed for the rocket's upcoming test flight this summer. The stacking operations are scheduled to begin in the Vehicle Assembly Building in April.   Photo credit: NASA/Kim Shiflett KSC-2009-2203

CAPE CANAVERAL, Fla. – The Florida East Coast Railway train arrives at...

CAPE CANAVERAL, Fla. – The Florida East Coast Railway train arrives at the Jay Jay Rail Yard with the booster segments for the Ares I-X test rocket for interchange with the NASA Railroad. The four reusable moto... More

CAPE CANAVERAL, Fla. – The Florida East Coast Railway train arrives at the Jay Jay Rail Yard with the booster segments for the Ares I-X test rocket for interchange with the NASA Railroad.  Officials from Alliant Techsystems Inc. and NASA accompany the train. The four reusable motor segments and the nozzle exit cone, manufactured by the Ares I first-stage prime contractor Alliant Techsystems Inc., or ATK, departed Utah March 12 on the seven-day, cross-country trip to Florida.  The segments will be delivered to the  Rotation, Processing and Surge Facility for final processing and integration. The booster used for the Ares I-X launch is being modified by adding new forward structures and a fifth segment simulator. The motor is the final hardware needed for the rocket's upcoming test flight this summer. The stacking operations are scheduled to begin in the Vehicle Assembly Building in April.   Photo credit: NASA/Kim Shiflett KSC-2009-2202

CAPE CANAVERAL, Fla. – The Florida East Coast Railway train arrives at...

CAPE CANAVERAL, Fla. – The Florida East Coast Railway train arrives at the Jay Jay Rail Yard with the booster segments for the Ares I-X test rocket for interchange with the NASA Railroad. Officials from Allian... More

CAPE CANAVERAL, Fla. – The Florida East Coast Railway train arrives at the Jay Jay Rail Yard with the booster segments for the Ares I-X test rocket for interchange with the NASA Railroad. The four reusable motor segments and the nozzle exit cone, manufactured by the Ares I first-stage prime contractor Alliant Techsystems Inc., or ATK, departed Utah March 12 on the seven-day, cross-country trip to Florida.  The segments will be delivered to the  Rotation, Processing and Surge Facility for final processing and integration. The booster used for the Ares I-X launch is being modified by adding new forward structures and a fifth segment simulator. The motor is the final hardware needed for the rocket's upcoming test flight this summer. The stacking operations are scheduled to begin in the Vehicle Assembly Building in April.   Photo credit: NASA/Kim Shiflett KSC-2009-2201

CAPE CANAVERAL, Fla. – The Florida East Coast Railway train arrives at...

CAPE CANAVERAL, Fla. – The Florida East Coast Railway train arrives at the Jay Jay Rail Yard with the booster segments for the Ares I-X test rocket for interchange with the NASA Railroad. The four reusable moto... More

CAPE CANAVERAL, Fla. – The NASA Railroad leaves four of the cars with Ares I-X segments at Suspect siding on NASA's Kennedy Space Center in Florida and continues on with the remaining car to the Rotation, Processing and Surge Facility.  The four reusable motor segments and the nozzle exit cone, manufactured by the Ares I first-stage prime contractor Alliant Techsystems Inc., or ATK, departed Utah March 12 on the seven-day, cross-country trip to Florida.  The segments will be delivered to Kennedy's  Rotation, Processing and Surge Facility for final processing and integration. The booster used for the Ares I-X launch is being modified by adding new forward structures and a fifth segment simulator. The motor is the final hardware needed for the rocket's upcoming test flight this summer. The stacking operations are scheduled to begin in the Vehicle Assembly Building in April.   Photo credit: NASA/Jack Pfaller KSC-2009-2230

CAPE CANAVERAL, Fla. – The NASA Railroad leaves four of the cars with ...

CAPE CANAVERAL, Fla. – The NASA Railroad leaves four of the cars with Ares I-X segments at Suspect siding on NASA's Kennedy Space Center in Florida and continues on with the remaining car to the Rotation, Proce... More

CAPE CANAVERAL, Fla. – The NASA Railroad hauls cars carrying the Ares I-X motor segments and nozzle exit cone over a river bridge to NASA's Kennedy Space Center in Florida. The four reusable motor segments and the nozzle exit cone, manufactured by the Ares I first-stage prime contractor Alliant Techsystems Inc., or ATK, departed Utah March 12 on the seven-day, cross-country trip to Florida.  The segments will be delivered to Kennedy's  Rotation, Processing and Surge Facility for final processing and integration. The booster used for the Ares I-X launch is being modified by adding new forward structures and a fifth segment simulator. The motor is the final hardware needed for the rocket's upcoming test flight this summer. The stacking operations are scheduled to begin in the Vehicle Assembly Building in April.   Photo credit: NASA/Kim Shiflett KSC-2009-2227

CAPE CANAVERAL, Fla. – The NASA Railroad hauls cars carrying the Ares ...

CAPE CANAVERAL, Fla. – The NASA Railroad hauls cars carrying the Ares I-X motor segments and nozzle exit cone over a river bridge to NASA's Kennedy Space Center in Florida. The four reusable motor segments and ... More

CAPE CANAVERAL, Fla. – The NASA Railroad hauls cars carrying the Ares I-X motor segments and nozzle exit cone over a river bridge to NASA's Kennedy Space Center in Florida.  The four reusable motor segments and the nozzle exit cone, manufactured by the Ares I first-stage prime contractor Alliant Techsystems Inc., or ATK, departed Utah March 12 on the seven-day, cross-country trip to Florida.  The segments will be delivered to Kennedy's  Rotation, Processing and Surge Facility for final processing and integration. The booster used for the Ares I-X launch is being modified by adding new forward structures and a fifth segment simulator. The motor is the final hardware needed for the rocket's upcoming test flight this summer. The stacking operations are scheduled to begin in the Vehicle Assembly Building in April.   Photo credit: NASA/Kim Shiflett KSC-2009-2226

CAPE CANAVERAL, Fla. – The NASA Railroad hauls cars carrying the Ares ...

CAPE CANAVERAL, Fla. – The NASA Railroad hauls cars carrying the Ares I-X motor segments and nozzle exit cone over a river bridge to NASA's Kennedy Space Center in Florida. The four reusable motor segments and... More

CAPE CANAVERAL, Fla. –This NASA Railroad engine is hauling one of the cars with an Ares I-X segment to the Rotation, Processing and Surge Facility at NASA's Kennedy Space Center in Florida.  The four reusable motor segments and the nozzle exit cone, manufactured by the Ares I first-stage prime contractor Alliant Techsystems Inc., or ATK, departed Utah March 12 on the seven-day, cross-country trip to Florida.  The segments will be delivered to Kennedy's  Rotation, Processing and Surge Facility for final processing and integration. The booster used for the Ares I-X launch is being modified by adding new forward structures and a fifth segment simulator. The motor is the final hardware needed for the rocket's upcoming test flight this summer. The stacking operations are scheduled to begin in the Vehicle Assembly Building in April.   Photo credit: NASA/Jack Pfaller KSC-2009-2232

CAPE CANAVERAL, Fla. –This NASA Railroad engine is hauling one of the ...

CAPE CANAVERAL, Fla. –This NASA Railroad engine is hauling one of the cars with an Ares I-X segment to the Rotation, Processing and Surge Facility at NASA's Kennedy Space Center in Florida. The four reusable m... More

CAPE CANAVERAL, Fla. – The NASA Railroad hauls cars carrying the Ares I-X motor segments and nozzle exit cone over a river bridge to NASA's Kennedy Space Center in Florida.  The four reusable motor segments and the nozzle exit cone, manufactured by the Ares I first-stage prime contractor Alliant Techsystems Inc., or ATK, departed Utah March 12 on the seven-day, cross-country trip to Florida.  The segments will be delivered to Kennedy's  Rotation, Processing and Surge Facility for final processing and integration. The booster used for the Ares I-X launch is being modified by adding new forward structures and a fifth segment simulator. The motor is the final hardware needed for the rocket's upcoming test flight this summer. The stacking operations are scheduled to begin in the Vehicle Assembly Building in April.   Photo credit: NASA/Kim Shiflett KSC-2009-2225

CAPE CANAVERAL, Fla. – The NASA Railroad hauls cars carrying the Ares ...

CAPE CANAVERAL, Fla. – The NASA Railroad hauls cars carrying the Ares I-X motor segments and nozzle exit cone over a river bridge to NASA's Kennedy Space Center in Florida. The four reusable motor segments and... More

CAPE CANAVERAL, Fla. –The cars on the NASA Railroad are separated for different destinations at NASA's Kennedy Space Center in Florida.  They carry Ares I-X segments.  One of the cars is going to the Rotation, Processing and Surge Facility. The four reusable motor segments and the nozzle exit cone, manufactured by the Ares I first-stage prime contractor Alliant Techsystems Inc., or ATK, departed Utah March 12 on the seven-day, cross-country trip to Florida.  The segments will be delivered to Kennedy's  Rotation, Processing and Surge Facility for final processing and integration. The booster used for the Ares I-X launch is being modified by adding new forward structures and a fifth segment simulator. The motor is the final hardware needed for the rocket's upcoming test flight this summer. The stacking operations are scheduled to begin in the Vehicle Assembly Building in April.   Photo credit: NASA/Jack Pfaller KSC-2009-2231

CAPE CANAVERAL, Fla. –The cars on the NASA Railroad are separated for ...

CAPE CANAVERAL, Fla. –The cars on the NASA Railroad are separated for different destinations at NASA's Kennedy Space Center in Florida. They carry Ares I-X segments. One of the cars is going to the Rotation, ... More

CAPE CANAVERAL, Fla. – A close-up of the NASA Railroad locomotive #3, and the EMDSW-1500 switcher, that is hauling the Ares I-X motor segments and nozzle exit cone to NASA's Kennedy Space Center in Florida.  The four reusable motor segments and the nozzle exit cone, manufactured by the Ares I first-stage prime contractor Alliant Techsystems Inc., or ATK, departed Utah March 12 on the seven-day, cross-country trip to Florida.  The segments will be delivered to Kennedy's  Rotation, Processing and Surge Facility for final processing and integration. The booster used for the Ares I-X launch is being modified by adding new forward structures and a fifth segment simulator. The motor is the final hardware needed for the rocket's upcoming test flight this summer. The stacking operations are scheduled to begin in the Vehicle Assembly Building in April.   Photo credit: NASA/Kim Shiflett KSC-2009-2228

CAPE CANAVERAL, Fla. – A close-up of the NASA Railroad locomotive #3, ...

CAPE CANAVERAL, Fla. – A close-up of the NASA Railroad locomotive #3, and the EMDSW-1500 switcher, that is hauling the Ares I-X motor segments and nozzle exit cone to NASA's Kennedy Space Center in Florida. Th... More

CAPE CANAVERAL, Fla. –The NASA Railroad is hauling one of the cars with an Ares I-X segment to the Rotation, Processing and Surge Facility at NASA's Kennedy Space Center in Florida.  The four reusable motor segments and the nozzle exit cone, manufactured by the Ares I first-stage prime contractor Alliant Techsystems Inc., or ATK, departed Utah March 12 on the seven-day, cross-country trip to Florida.  The segments will be delivered to Kennedy's  Rotation, Processing and Surge Facility for final processing and integration. The booster used for the Ares I-X launch is being modified by adding new forward structures and a fifth segment simulator. The motor is the final hardware needed for the rocket's upcoming test flight this summer. The stacking operations are scheduled to begin in the Vehicle Assembly Building in April.   Photo credit: NASA/Jack Pfaller KSC-2009-2233

CAPE CANAVERAL, Fla. –The NASA Railroad is hauling one of the cars wit...

CAPE CANAVERAL, Fla. –The NASA Railroad is hauling one of the cars with an Ares I-X segment to the Rotation, Processing and Surge Facility at NASA's Kennedy Space Center in Florida. The four reusable motor seg... More

CAPE CANAVERAL, Fla. – After switching out the box cars on the train, the NASA Railroad hauls the Ares I-X motor segments and nozzle exit cone to NASA's Kennedy Space Center in Florida. The four reusable motor segments and the nozzle exit cone, manufactured by the Ares I first-stage prime contractor Alliant Techsystems Inc., or ATK, departed Utah March 12 on the seven-day, cross-country trip to Florida.  The segments will be delivered to Kennedy's  Rotation, Processing and Surge Facility for final processing and integration. The booster used for the Ares I-X launch is being modified by adding new forward structures and a fifth segment simulator. The motor is the final hardware needed for the rocket's upcoming test flight this summer. The stacking operations are scheduled to begin in the Vehicle Assembly Building in April.   Photo credit: NASA/Jack Pfaller KSC-2009-2229

CAPE CANAVERAL, Fla. – After switching out the box cars on the train, ...

CAPE CANAVERAL, Fla. – After switching out the box cars on the train, the NASA Railroad hauls the Ares I-X motor segments and nozzle exit cone to NASA's Kennedy Space Center in Florida. The four reusable motor ... More

Previous

of 3

Next