emergency, nasa

4,547 media by topicpage 1 of 46
The STS-92 crew exits the Operations and Checkout Building on their way to the Astrovan and Launch Pad 39A for a simulated countdown. Walking left to right are (foreground) Mission Specialists Koichi Wakata of Japan, Peter J.K. “Jeff” Wisoff and Leroy Chiao; and Pilot Pamela Ann Melroy. Behind them are Mission Specialists Michael E. Lopez-Alegria and William S. McArthur Jr.; and Commander Brian Duffy. The crew is taking part in Terminal Countdown Demonstration Test activities that provide emergency egress training, opportunities to inspect the mission payload, and the simulated countdown. STS-92 is scheduled to launch Oct. 5 at 9:38 p.m. EDT on the fifth flight to the International Space Station. It will carry two elements of the Space Station, the Integrated Truss Structure Z1 and the third Pressurized Mating Adapter. The mission is also the 100th flight in the Shuttle program KSC-00pp1360

The STS-92 crew exits the Operations and Checkout Building on their wa...

The STS-92 crew exits the Operations and Checkout Building on their way to the Astrovan and Launch Pad 39A for a simulated countdown. Walking left to right are (foreground) Mission Specialists Koichi Wakata of ... More

KENNEDY SPACE CENTER, FLA. -- At the slidewire basket area of Launch Pad 39A, the STS-92 crew poses for a group photograph after a question and answer session with the media. Standing left to right are Commander Brian Duffy, Pilot Pamela Ann Melroy and Mission Specialists Leroy Chiao, William S. McArthur Jr. (with microphone), Peter J.K. “Jeff” Wisoff, Michael E. Lopez-Alegria and Koichi Wakata of Japan. The crew is at KSC for Terminal Countdown Demonstration Test activities that provide emergency egress training, opportunities to inspect the mission payload, and take part in a simulated countdown. The slidewire basket area is a landing site for the crew if they have to use the slidewire baskets to exit the orbiter on the pad in an emergency. STS-92 is scheduled to launch Oct. 5 at 9:38 p.m. EDT on the fifth flight to the International Space Station. It will carry two elements of the Space Station, the Integrated Truss Structure Z1 and the third Pressurized Mating Adapter. The mission is also the 100th flight in the Shuttle program KSC00pp1367

KENNEDY SPACE CENTER, FLA. -- At the slidewire basket area of Launch P...

KENNEDY SPACE CENTER, FLA. -- At the slidewire basket area of Launch Pad 39A, the STS-92 crew poses for a group photograph after a question and answer session with the media. Standing left to right are Commande... More

KENNEDY SPACE CENTER, Fla.  --  STS-118 Mission Specialist Dave Williams, who represents the Canadian Space Agency, gets ready to practice driving an M-113 armored personnel carrier as part of emergency exit training.  Behind him is Mission Specialist Barbara R. Morgan.  They and other crew members are at Kennedy for the Terminal Countdown Demonstration Test (TCDT), a dress rehearsal for launch. TCDT activities include the M-113 training, payload familiarization, emergency egress training at the pad and a simulated launch countdown.  The STS-118 payload aboard Space Shuttle Endeavour includes the S5 truss, a SPACEHAB module and external stowage platform 3. The mission is the 22nd flight to the International Space Station and is targeted for launch on Aug.7.  NASA/George Shelton KSC-07pd1895

KENNEDY SPACE CENTER, Fla. -- STS-118 Mission Specialist Dave Willia...

KENNEDY SPACE CENTER, Fla. -- STS-118 Mission Specialist Dave Williams, who represents the Canadian Space Agency, gets ready to practice driving an M-113 armored personnel carrier as part of emergency exit tr... More

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, the crew members of space shuttle Discovery's STS-133 mission go for a ride in an M-113 armored personnel carrier with Battalion Chief David Seymour. An M-113 is kept at the foot of the launch pad in case an emergency egress from the vicinity of the pad is needed, and training on the vehicle is part of the Terminal Countdown Demonstration Test (TCDT). TCDT provides each shuttle crew and launch team an opportunity to participate in various simulated activities, including equipment familiarization and a launch countdown.    Space shuttle Discovery and its STS-133 crew will deliver the Permanent Multipurpose Module, packed with supplies and critical spare parts, as well as Robonaut 2, the dexterous humanoid astronaut helper, to the International Space Station. Launch is targeted for Nov. 1 at 4:40 p.m. For more information on the STS-133 mission, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts133/. Photo credit: NASA/Kim Shiflett KSC-2010-5109

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, the...

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, the crew members of space shuttle Discovery's STS-133 mission go for a ride in an M-113 armored personnel carrier with Battalion Chief David Se... More

KENNEDY SPACE CENTER, Fla. - STS-112 Mission Specialist Sandra Magnus gets help donning her boots during suit check,  part of Terminal Countdown Demonstration Test activities.   The TCDT also includes emergency egress training and a simulated launch countdown.  The mission aboard Space Shuttle Atlantis  is scheduled to launch no earlier than Oct. 2, between 2 and 6 p.m. EDT.  STS-112 is the 15th assembly mission to the International Space Station.  Atlantis will be carrying the S1 Integrated Truss Structure, the first starboard truss segment.  The S1 will be attached to the central truss segment, S0, during the 11-day mission.  Magnus will serve as one of two operators of the Canadarm2 robotic arm for S1 truss installation and during three scheduled spacewalks.  STS-112 is her first Shuttle flight. KSC-02pd1320

KENNEDY SPACE CENTER, Fla. - STS-112 Mission Specialist Sandra Magnus ...

KENNEDY SPACE CENTER, Fla. - STS-112 Mission Specialist Sandra Magnus gets help donning her boots during suit check, part of Terminal Countdown Demonstration Test activities. The TCDT also includes emergency... More

CAPE CANAVERAL, Fla. –At the Shuttle Landing Facility at NASA's Kennedy Space Center in Florida, STS-128 Pilot Kevin Ford walks away from the Shuttle Training Aircraft, or STA, after completing shuttle landing practice.  The practice is in preparation for launch of space shuttle Discovery's STS-128 mission in late August to the International Space Station. The STA is a Grumman American Aviation-built Gulfstream II jet that was modified to simulate a shuttle’s cockpit, motion and visual cues, and handling qualities. The STS-128 crew is at Kennedy for a launch dress rehearsal called the terminal countdown demonstration test, or TCDT, which includes emergency exit training and equipment familiarization, as well as a simulated launch countdown.  Discovery will deliver 33,000 pounds of equipment to the station, including science and storage racks, a freezer to store research samples, a new sleeping compartment and the COLBERT treadmill. Photo credit: NASA/Kim Shiflett KSC-2009-4483

CAPE CANAVERAL, Fla. –At the Shuttle Landing Facility at NASA's Kenned...

CAPE CANAVERAL, Fla. –At the Shuttle Landing Facility at NASA's Kennedy Space Center in Florida, STS-128 Pilot Kevin Ford walks away from the Shuttle Training Aircraft, or STA, after completing shuttle landing ... More

KENNEDY SPACE CENTER, FLA. -- At Launch Complex 39, members of the STS-117 crew are instructed in the operation of an M-113 armored personnel carrier by the astronaut rescue team. The astronauts on the STS-117 crew are participating in M-113 armored personnel carrier training during Terminal Countdown Demonstration Test (TCDT) activities, a dress rehearsal for their launch, targeted for March 15. The M-113 could be used to move the crew away from the launch pad quickly in the event of an emergency. The TCDT also includes pad emergency egress training and a simulated launch countdown. The mission payload aboard Space Shuttle Atlantis is the S3/S4 integrated truss structure, along with a third set of solar arrays and batteries. The crew of six astronauts will install the truss to continue assembly of the station. Photo credit: NASA/Kim Shiflett KSC-07pd0477

KENNEDY SPACE CENTER, FLA. -- At Launch Complex 39, members of the STS...

KENNEDY SPACE CENTER, FLA. -- At Launch Complex 39, members of the STS-117 crew are instructed in the operation of an M-113 armored personnel carrier by the astronaut rescue team. The astronauts on the STS-117 ... More

KENNEDY SPACE CENTER, FLA. --  A bald eagle perches on a pole on Launch Pad 39A, seemingly monitoring the instruction of the space shuttle Atlantis STS-122 crew on slidewire basket operation, part of the emergency exit system on the fixed service structure of the pad.  Bald eagles use a specific territory for nesting (they mate for life), winter feeding or a year-round residence. Its natural domain is from Alaska to Baja, California, and from Maine to Florida. Bald eagles have a presence in every U. S. state except Hawaii. There are a dozen eagle nests in both Kennedy Space Center and the Merritt Island National Wildlife Refuge, which surrounds Kennedy.  Bald eagles live near large bodies of open water such as lakes, marshes, seacoasts and rivers, where there are plenty of fish to eat and tall trees for nesting and roosting. Bald eagles feed primarily on fish, but also eat small animals (ducks, coots, muskrats, turtles, rabbits, snakes, etc.).  Photo credit: NASA/Kim Shiflett KSC-07pd3396

KENNEDY SPACE CENTER, FLA. -- A bald eagle perches on a pole on Launc...

KENNEDY SPACE CENTER, FLA. -- A bald eagle perches on a pole on Launch Pad 39A, seemingly monitoring the instruction of the space shuttle Atlantis STS-122 crew on slidewire basket operation, part of the emerge... More

KENNEDY SPACE CENTER, FLA. -- On the 195-foot level of the Fixed Service Structure on Launch Pad 39A, STS-92 Pilot Pamela Ann Melroy and Commander Brian Duffy learn more about the emergency egress training they and the rest of the crew have received. The training is part of Terminal Countdown Demonstration Test activities that also include a simulated countdown. STS-92 is scheduled to launch Oct. 5 at 9:38 p.m. EDT on the fifth flight to the International Space Station. It will carry two elements of the Space Station, the Integrated Truss Structure Z1 and the third Pressurized Mating Adapter. The mission is also the 100th flight in the Shuttle program KSC-00pp1382

KENNEDY SPACE CENTER, FLA. -- On the 195-foot level of the Fixed Servi...

KENNEDY SPACE CENTER, FLA. -- On the 195-foot level of the Fixed Service Structure on Launch Pad 39A, STS-92 Pilot Pamela Ann Melroy and Commander Brian Duffy learn more about the emergency egress training they... More

KENNEDY SPACE CENTER, Fla.  --  STS-118 Mission Specialist Rick Mastracchio gets help with the fit of his launch and entry suit during Terminal Countdown Demonstration Test (TCDT) activities, a dress rehearsal for launch. TCDT activities include the M-113 training, payload familiarization, emergency egress training at the pad and a simulated launch countdown.  The STS-118 payload aboard Space Shuttle Endeavour includes the S5 truss, a SPACEHAB module and external stowage platform 3. The mission is the 22nd flight to the International Space Station and is targeted for launch on Aug. 7.  NASA/George Shelton KSC-07pd1917

KENNEDY SPACE CENTER, Fla. -- STS-118 Mission Specialist Rick Mastra...

KENNEDY SPACE CENTER, Fla. -- STS-118 Mission Specialist Rick Mastracchio gets help with the fit of his launch and entry suit during Terminal Countdown Demonstration Test (TCDT) activities, a dress rehearsal ... More

KENNEDY SPACE CENTER, FLA. -- STS-101 Mission Specialist Susan J. Helms adjusts her helmet after climbing into her seat inside Space Shuttle Atlantis for a simulated launch countdown. The countdown is part of Terminal Countdown Demonstration Test (TCDT) activities that also include emergency egress training and familiarization with the payload. Other crew members taking part are Commander James D. Halsell Jr., Pilot Scott J. "Doc" Horowitz and Mission Specialists Mary Ellen Weber, James Voss, Jeffrey N. Williams, and Yury Usachev of Russia. During their mission to the International Space Station, the STS-101 crew will be delivering logistics and supplies, plus preparing the Station for the arrival of the Zvezda Service Module, expected to be launched by Russia in July 2000. Also, the crew will conduct one space walk to perform maintenance on the Space Station. This will be the third assembly flight for the Space Station. STS-101 is scheduled to launch April 24 at 4:15 p.m. from Launch Pad 39A KSC00pp0473

KENNEDY SPACE CENTER, FLA. -- STS-101 Mission Specialist Susan J. Helm...

KENNEDY SPACE CENTER, FLA. -- STS-101 Mission Specialist Susan J. Helms adjusts her helmet after climbing into her seat inside Space Shuttle Atlantis for a simulated launch countdown. The countdown is part of T... More

STS-92 Pilot Pamela Ann Melroy is happy to arrive at the KSC Shuttle Landing Facility after a flight from Houston. She and the rest of the crew are at KSC to take part in Terminal Countdown Demonstration Test activities, which include emergency egress training from the orbiter and pad, and a simulated countdown. The fifth mission to the International Space Station, STS-92 will carry the Integrated Truss Structure Z1, the first of the planned 10 trusses on the Space Station, and the third Pressurized Mating Adapter. The Z1 will allow the first U.S. solar arrays on a future flight to be temporarily installed on Unity for early power. PMA-3 will provide a Shuttle docking port for the solar array installation on the sixth ISS flight and Lab installation on the seventh ISS flight. STS-92 is scheduled to launch Oct. 5 from launch Pad 39A. It will be the 100th flight in the Shuttle program KSC00pp1304

STS-92 Pilot Pamela Ann Melroy is happy to arrive at the KSC Shuttle L...

STS-92 Pilot Pamela Ann Melroy is happy to arrive at the KSC Shuttle Landing Facility after a flight from Houston. She and the rest of the crew are at KSC to take part in Terminal Countdown Demonstration Test a... More

KENNEDY SPACE CENTER, FLA. - After landing at NASA's Kennedy Space Center aboard a Grumman G2 aircraft, the STS-121 crew gathers at a microphone for the media.  Seen here at center is Pilot Mark Kelly.  Other crew members are Mission Commander Steven Lindsey and Mission Specialists Michael Fossum, Lisa Nowak, Stephanie Wilson, Piers Sellers and Thomas Reiter, who represents the European Space Agency.  The crew is at the space center to take part in a Terminal Countdown Demonstration Test, or TCDT. Over several days, the crew will practice emergency egress from the pad and suit up in their orange flight suits for the simulated countdown to launch. Space Shuttle Discovery is designated to launch July 1 on mission STS-121.  It will carry supplies to the International Space Station.  Photo credit: NASA/Kim Shiflett KSC-06pd1042

KENNEDY SPACE CENTER, FLA. - After landing at NASA's Kennedy Space Cen...

KENNEDY SPACE CENTER, FLA. - After landing at NASA's Kennedy Space Center aboard a Grumman G2 aircraft, the STS-121 crew gathers at a microphone for the media. Seen here at center is Pilot Mark Kelly. Other c... More

CAPE CANAVERAL, Fla. - At NASA's Kennedy Space Center in Florida, the crew members of space shuttle Endeavour's STS-130 mission pause from their M113 training for a group portrait.  From left are Commander George Zamka; Pilot Terry Virts; and Mission Specialists Robert Behnken, Kathryn Hire, Stephen Robinson and Nicholas Patrick.    An M113 is kept at the foot of the launch pad in case an emergency egress from the vicinity of the pad is needed.  The crew members of space shuttle Endeavour's STS-130 mission are at Kennedy for training related to their launch dress rehearsal, the Terminal Countdown Demonstration Test.  The primary payload on STS-130 is the International Space Station's Node 3, Tranquility, a pressurized module that will provide room for many of the station's life support systems. Attached to one end of Tranquility is a cupola, a unique work area with six windows on its sides and one on top.  Endeavour's launch is targeted for Feb. 7.  For information on the STS-130 mission and crew, visit http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts130/index.html.  Photo credit: NASA/Kim Shiflett KSC-2010-1307

CAPE CANAVERAL, Fla. - At NASA's Kennedy Space Center in Florida, the ...

CAPE CANAVERAL, Fla. - At NASA's Kennedy Space Center in Florida, the crew members of space shuttle Endeavour's STS-130 mission pause from their M113 training for a group portrait. From left are Commander Geor... More

CAPE CANAVERAL, Fla. -- A tunnel beneath Launch Pad 39B at NASA's Kennedy Space Center in Florida leads to the blast-resistant "rubber room." The room is a steel dome floating on rubber isolators and was used as an escape route during the Apollo Program in case of an emergency. It has since been abandoned by astronauts, but throughout the years nature found its way inside, including raccoons, snakes, birds and even a bobcat and opossum.    Starting in 2009, the structure above the room on the pad was no longer needed for NASA's Space Shuttle Program, so it is being restructured for future use. The new design will feature a "clean pad" for rockets to come with their own launcher, making it more versatile for a number of vehicles. For information on NASA's future plans, visit www.nasa.gov. Photo credit: NASA/Kim Shiflett KSC-2010-4668

CAPE CANAVERAL, Fla. -- A tunnel beneath Launch Pad 39B at NASA's Kenn...

CAPE CANAVERAL, Fla. -- A tunnel beneath Launch Pad 39B at NASA's Kennedy Space Center in Florida leads to the blast-resistant "rubber room." The room is a steel dome floating on rubber isolators and was used a... More

KENNEDY SPACE CENTER, FLA. --  In the Launch Pad 39A area, Mission STS-117 crew members receive instruction on emergency egress using the slidewire basket system during Terminal Countdown Demonstration Test activities. Here, Mission Specialists Steven Swanson (left) and Danny Olivas (right) practice exiting from the slidewire basket. The TCDT also includes M-113 armored personnel carrier training, and a simulated launch countdown. The mission payload aboard Space Shuttle Atlantis is the S3/S4 integrated truss structure, along with a third set of solar arrays and batteries. The crew of six astronauts will install the truss to continue assembly of the International Space Station. Photo credit: NASA/Kim Shiflett KSC-07pd0494

KENNEDY SPACE CENTER, FLA. -- In the Launch Pad 39A area, Mission STS...

KENNEDY SPACE CENTER, FLA. -- In the Launch Pad 39A area, Mission STS-117 crew members receive instruction on emergency egress using the slidewire basket system during Terminal Countdown Demonstration Test act... More

CAPE CANAVERAL, Fla. -- At Launch Pad 39A at NASA's Kennedy Space Center in Florida, members of the STS-133 crew receive instruction by the catch nets for the slidewire baskets at the base of the pad as part of the Terminal Countdown Demonstration Test (TCDT) emergency exit training. From left are Mission Specialist Tim Kopra, Pilot Eric Boe, Commander Steve Lindsey, and Mission Specialists Alvin Drew, Nicole Stott and Michael Barratt.    TCDT provides each shuttle crew and launch team an opportunity to participate in various simulated activities, including equipment familiarization and a launch countdown. Space shuttle Discovery and its STS-133 crew will deliver the Permanent Multipurpose Module, packed with supplies and critical spare parts, as well as Robonaut 2, the dexterous humanoid astronaut helper, to the International Space Station. Launch is targeted for Nov. 1 at 4:40 p.m. For more information on the STS-133 mission, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts133/. Photo credit: NASA/Kim Shiflett KSC-2010-5166

CAPE CANAVERAL, Fla. -- At Launch Pad 39A at NASA's Kennedy Space Cent...

CAPE CANAVERAL, Fla. -- At Launch Pad 39A at NASA's Kennedy Space Center in Florida, members of the STS-133 crew receive instruction by the catch nets for the slidewire baskets at the base of the pad as part of... More

CAPE CANAVERAL, Fla. –  In the White Room on Launch Pad 39A at NASA's Kennedy Space Center in Florida, STS-126 Mission Specialist Shane Kimbrough gets help with his suit before entering space shuttle Endeavour. He and other crew members will take part in a simulated launch countdown.  The crew is at Kennedy to take part in the Terminal Countdown Demonstration Test, which includes equipment familiarization, emergency exit training and the simulated countdown. On the STS-126 mission, space shuttle Endeavour's crew will deliver equipment and supplies to the International Space Station in preparation for expansion from a three- to six-person resident crew aboard the complex. The mission also will include four spacewalks to service the station’s Solar Alpha Rotary Joints. Endeavour is targeted to launch Nov. 14. Photo credit: NASA/Troy Cryder KSC-08pd3433

CAPE CANAVERAL, Fla. – In the White Room on Launch Pad 39A at NASA's ...

CAPE CANAVERAL, Fla. – In the White Room on Launch Pad 39A at NASA's Kennedy Space Center in Florida, STS-126 Mission Specialist Shane Kimbrough gets help with his suit before entering space shuttle Endeavour.... More

CAPE CANAVERAL, Fla. -  STS-125 Pilot Gregory C. Johnson is ready to practice driving the M-113 armored personnel carrier. The crew members of space shuttle Atlantis' STS-125 mission will each practice driving the M-113 in turn as part of their training on emergency egress procedures. An M-113 will be available to transport the crew to safety in the event of a contingency on the pad before their launch. The crew is at NASA's Kennedy Space Center for a dress launch rehearsal called the terminal countdown demonstration test, or TCDT. It provides astronauts and ground crews with an opportunity to participate in various simulated countdown activities, including equipment familiarization,  emergency training and a simulated launch countdown. The STS-125 mission aboard space shuttle Atlantis to service NASA’s Hubble Space Telescope is targeted to launch Oct. 10.    Photo credit: NASA/Kim Shiflett KSC-08pd2816

CAPE CANAVERAL, Fla. - STS-125 Pilot Gregory C. Johnson is ready to p...

CAPE CANAVERAL, Fla. - STS-125 Pilot Gregory C. Johnson is ready to practice driving the M-113 armored personnel carrier. The crew members of space shuttle Atlantis' STS-125 mission will each practice driving ... More

CAPE CANAVERAL, Fla. -- During a simulated launch countdown on Launch Pad 39A at NASA's Kennedy Space Center in Florida, STS-133 Mission Specialists Nicole Stott, left, and Michael Barratt are strapped into their seats on space shuttle Discovery. Next, they will practice escaping the shuttle, in preparation for an unlikely emergency at the pad on launch day. The simulated launch countdown and emergency exit training are part of a week-long Terminal Countdown Demonstration Test (TCDT).        Discovery and its STS-133 crew will deliver the Permanent Multipurpose Module, packed with supplies and critical spare parts, as well as Robonaut 2, the dexterous humanoid astronaut helper, to the International Space Station. Launch is targeted for Nov. 1 at 4:40 p.m. For more information on the STS-133 mission, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts133/. Photo credit: NASA/Kim Shiflett KSC-2010-5204

CAPE CANAVERAL, Fla. -- During a simulated launch countdown on Launch ...

CAPE CANAVERAL, Fla. -- During a simulated launch countdown on Launch Pad 39A at NASA's Kennedy Space Center in Florida, STS-133 Mission Specialists Nicole Stott, left, and Michael Barratt are strapped into the... More

CAPE CANAVERAL, Fla. –  In the White Room on Launch Pad 39A at NASA's Kennedy Space Center in Florida, STS-126 Pilot Eric Boe waits to finish his suit-up. He and other crew members will take part in a simulated launch countdown after entering space shuttle Endeavour. The crew is at Kennedy to take part in the Terminal Countdown Demonstration Test, which includes equipment familiarization, emergency exit training and the simulated countdown.  On the STS-126 mission, space shuttle Endeavour's crew will deliver equipment and supplies to the International Space Station in preparation for expansion from a three- to six-person resident crew aboard the complex. The mission also will include four spacewalks to service the station’s Solar Alpha Rotary Joints. Endeavour is targeted to launch Nov. 14. Photo credit: NASA/Troy Cryder KSC-08pd3430

CAPE CANAVERAL, Fla. – In the White Room on Launch Pad 39A at NASA's ...

CAPE CANAVERAL, Fla. – In the White Room on Launch Pad 39A at NASA's Kennedy Space Center in Florida, STS-126 Pilot Eric Boe waits to finish his suit-up. He and other crew members will take part in a simulated... More

KENNEDY SPACE CENTER, FLA. -- The STS-117 crew arrives at NASA's Kennedy Space Center to take part in the Terminal Countdown Demonstration Test (TCDT), a preparation for the launch March 15 to the International Space Station. NASA Launch Director Mike Leinbach greets Mission Specialist Steven Swanson at the Shuttle Landing Facility. The TCDT includes emergency egress training and a simulated launch countdown. The mission payload aboard Space Shuttle Atlantis is the S3/S4 integrated truss structure, along with a third set of solar arrays and batteries. The crew of six astronauts will install the truss to continue assembly of the station.  Photo credit: NASA/Kim Shiflett KSC-07pd0457

KENNEDY SPACE CENTER, FLA. -- The STS-117 crew arrives at NASA's Kenne...

KENNEDY SPACE CENTER, FLA. -- The STS-117 crew arrives at NASA's Kennedy Space Center to take part in the Terminal Countdown Demonstration Test (TCDT), a preparation for the launch March 15 to the International... More

KENNEDY SPACE CENTER, FLA. -- Expedition 6 crew member Nikolai Budarin relaxes during fit check of his launch and entry suit, part of Terminal Countdown Demonstration Test activities. He and the rest of the crew are preparing for the mission aboard Space Shuttle Endeavour, which is scheduled to launch Nov. 10.  The TCDT includes emergency egress training and a launch countdown. The Expedition 6 crew will travel on Space Shuttle Endeavour to the International Space Station to replace Expedition 5, returning to Earth after 4 months. The primary payloads on mission STS-113 are the first port truss segment, P1, and the Crew and Equipment Translation Aid (CETA) Cart B.   Once delivered, the P1 truss will remain stowed until flight 12A.1 in 2003 when it will be attached to the central truss segment, S0, on the Space Station.  Launch is scheduled for Nov. 10, 2002. KSC-02pd1566

KENNEDY SPACE CENTER, FLA. -- Expedition 6 crew member Nikolai Budarin...

KENNEDY SPACE CENTER, FLA. -- Expedition 6 crew member Nikolai Budarin relaxes during fit check of his launch and entry suit, part of Terminal Countdown Demonstration Test activities. He and the rest of the cre... More

CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, members of the news media are briefed on the agency's Space Launch System SLS Program Todd May, program manager for Space Launch Systems SLS at NASA's Marshall Space Flight Center in Huntsville, Alabama. The briefing took place in the spaceport's Booster Fabrication Facility BFF. During the Space Shuttle Program, the facility was used for processing forward segments and aft skirts for the solid rocket boosters. The BFF will serve a similar role for the SLS.      Orion is the exploration spacecraft designed to carry astronauts to destinations not yet explored by humans, including an asteroid and Mars. It will have emergency abort capability, sustain the crew during space travel and provide safe re-entry from deep space return velocities. The first unpiloted flight test of Orion is scheduled to launch Dec. 4, 2014 atop a United Launch Alliance Delta IV Heavy rocket, and in 2018 on NASA’s Space Launch System rocket. For more information, visit www.nasa.gov/orion Photo credit: NASA/Kim Shiflett KSC-2014-4616

CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, memb...

CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, members of the news media are briefed on the agency's Space Launch System SLS Program Todd May, program manager for Space Launch Systems SLS at ... More

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, STS-133 Commander Steve Lindsey talks to media at Launch Pad 39A, where space shuttle Discovery is poised for launch next month. The six-member STS-133 crew is at Kennedy for the Terminal Countdown Demonstration Test (TCDT), which provides each shuttle crew and launch team an opportunity to participate in various simulated activities, including equipment familiarization and emergency training at the launch pad.    Discovery and its crew will deliver the Permanent Multipurpose Module, packed with supplies and critical spare parts, as well as Robonaut 2, the dexterous humanoid astronaut helper, to the International Space Station. Launch is targeted for Nov. 1 at 4:40 p.m. For more information on the STS-133 mission, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts133/. Photo credit: NASA/Kim Shiflett KSC-2010-5148

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, STS...

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, STS-133 Commander Steve Lindsey talks to media at Launch Pad 39A, where space shuttle Discovery is poised for launch next month. The six-member... More

JSC2011-E-040290 (27 March 2011) --- Moscow stretches out in all directions as seen from a commercial flight carrying NASA astronauts Doug Hurley, STS-135 pilot, and Rex Walheim, mission specialist, to Moscow, Russia on March 27, 2011. The crew of the final shuttle mission traveled to Moscow to be fitted for Russian Sokol spacesuits which would be required in the event of an emergency. If the shuttle is unable to return to Earth, the crew will remain on the International Space Station and return on a staggered basis in the course of a year on scheduled Soyuz flights to the station. Photo credit: NASA Photo/Houston Chronicle, Smiley N. Pool STS_135_Russia

JSC2011-E-040290 (27 March 2011) --- Moscow stretches out in all direc...

JSC2011-E-040290 (27 March 2011) --- Moscow stretches out in all directions as seen from a commercial flight carrying NASA astronauts Doug Hurley, STS-135 pilot, and Rex Walheim, mission specialist, to Moscow, ... More

CAPE CANAVERAL, Fla. - At NASA's Kennedy Space Center in Florida, STS-134 Mission Specialist Greg Chamitoff, left, and Commander Mark Kelly take a break from training on the M113 armored personnel carrier at NASA's Kennedy Space Center in Florida. An M113 is kept at the foot of the launch pad in case an emergency exit from the pad is needed and every shuttle crew is trained on driving the vehicle before launch.        Endeavour's six crew members are at Kennedy for the launch countdown dress rehearsal called the Terminal Countdown Demonstration Test (TCDT) and related training. Targeted to launch April 19 at 7:48 p.m. EDT, they will deliver the Express Logistics Carrier-3, Alpha Magnetic Spectrometer-2 (AMS), a high-pressure gas tank, additional spare parts for the Dextre robotic helper and micrometeoroid debris shields to the space station. This will be the final spaceflight for Endeavour. For more information visit, www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts134/index.html. Photo credit: NASA/Kim Shiflett KSC-2011-2552

CAPE CANAVERAL, Fla. - At NASA's Kennedy Space Center in Florida, STS-...

CAPE CANAVERAL, Fla. - At NASA's Kennedy Space Center in Florida, STS-134 Mission Specialist Greg Chamitoff, left, and Commander Mark Kelly take a break from training on the M113 armored personnel carrier at NA... More

An STS-102 crew member reaches for the release lever for the slidewire basket, used for emergency egress from the orbiter and pad. The crew is at KSC for Terminal Countdown Demonstration Test activities, which include the emergency training and a simulated launch countdown. On the horizon in the background can be seen the Vehicle Assembly Building. STS-102 is the eighth construction flight to the International Space Station, with Space Shuttle Discovery carrying the Multi-Purpose Logistics Module Leonardo. In addition, the Expedition Two crew will be on the mission, to replace Expedition One, who will return to Earth with Discovery. Launch on mission STS-102 is scheduled for March 8 KSC01pp0340

An STS-102 crew member reaches for the release lever for the slidewire...

An STS-102 crew member reaches for the release lever for the slidewire basket, used for emergency egress from the orbiter and pad. The crew is at KSC for Terminal Countdown Demonstration Test activities, which ... More

KENNEDY SPACE CENTER, FLA. -- The STS-98 crew poses for a group photo on the 215-foot level of the Fixed Service Structure at Launch Pad 39A. Dressed in their orange launch and entry suits are (left to right) Commander Ken Cockrell, Mission Specialist Marsha Ivins, Pilot Mark Polansky and Mission Specialists Robert Curbeam and Thomas Jones. Behind them can be seen the white nose cone of a solid rocket booster and the orange external tank on Space Shuttle Atlantis. The crew is taking part in emergency egress training and a simulated launch countdown as part of Terminal Countdown Demonstration Test activities. STS-98 is the seventh construction flight to the International Space Station, carrying as payload the U.S. Lab Destiny, a key element in the construction of the ISS. Launch of STS-98 is scheduled for Jan. 19 at 2:11 a.m. EST KSC01pp0058

KENNEDY SPACE CENTER, FLA. -- The STS-98 crew poses for a group photo ...

KENNEDY SPACE CENTER, FLA. -- The STS-98 crew poses for a group photo on the 215-foot level of the Fixed Service Structure at Launch Pad 39A. Dressed in their orange launch and entry suits are (left to right) C... More

CAPE CANAVERAL, Fla. – STS-127 Mission Specialist Tim Kopra is happy to have successfully driven the M-113 armored personnel carrier, which is part of the training on emergency egress procedures. The crew members of space shuttle Endeavour's STS-127 mission are taking turns driving the M-113.  An M-113 will be available to transport the crew to safety in the event of a contingency on the pad before their launch. The crew is at NASA's Kennedy Space Center for a launch dress rehearsal called the terminal countdown demonstration test, or TCDT, which includes the emergency egress training and equipment familiarization.  The STS-127 mission is the final of three flights dedicated to the assembly of the Japanese Kibo laboratory complex.  Endeavour's launch is targeted for June 13.  Photo credit: NASA/Kim Shiflett KSC-2009-3379

CAPE CANAVERAL, Fla. – STS-127 Mission Specialist Tim Kopra is happy t...

CAPE CANAVERAL, Fla. – STS-127 Mission Specialist Tim Kopra is happy to have successfully driven the M-113 armored personnel carrier, which is part of the training on emergency egress procedures. The crew membe... More

CAPE CANAVERAL, Fla. -- Battalion Chief David Seymour provides supervision while space shuttle Atlantis' STS-135 crew members participate in M113 armored personnel carrier training at NASA's Kennedy Space Center in Florida. Driving the M113 is Pilot Doug Hurley; seated are  Mission Specialist Sandy Magnus (background right) and Commander Chris Ferguson.  An M113 is kept at the foot of the launch pad in case an emergency exit from the launch pad is needed and every shuttle crew is trained on driving the vehicle before launch. The STS-135 crew is at Kennedy to participate in a launch countdown dress rehearsal called the Terminal Countdown Demonstration Test (TCDT) and related training.       Atlantis and its crew are targeted to lift off July 8, taking with them the Raffaello multi-purpose logistics module packed with supplies and spare parts to the International Space Station. The STS-135 mission also will fly a system to investigate the potential for robotically refueling existing satellites and return a failed ammonia pump module to help NASA better understand the failure mechanism and improve pump designs for future systems. STS-135 will be the 33rd flight of Atlantis, the 37th shuttle mission to the space station, and the 135th and final mission of NASA's Space Shuttle Program. For more information visit, www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html.  Photo credit: NASA/Kim Shiflett KSC-2011-4666

CAPE CANAVERAL, Fla. -- Battalion Chief David Seymour provides supervi...

CAPE CANAVERAL, Fla. -- Battalion Chief David Seymour provides supervision while space shuttle Atlantis' STS-135 crew members participate in M113 armored personnel carrier training at NASA's Kennedy Space Cente... More

CAPE CANAVERAL, Fla. – At NASA’s Kennedy Space Center in Florida, a full-size mock-up of the Orion spacecraft and launch abort system were transported to the Kennedy Space Center Visitor Complex. In the background are full-size replicas of the external fuel tank and solid rocket boosters that mark the entranceway to the new Space Shuttle Atlantis exhibit. Crane operators and technicians practice de-stacking operations on mock-ups of Orion and the launch abort system in the Vehicle Assembly Building in order to keep processing procedures and skills current.    Orion is the exploration spacecraft designed to carry crews to space beyond low Earth orbit. It will provide emergency abort capability, sustain the crew during the space travel and provide safe re-entry from deep space return velocities. Orion’s first unpiloted test flight is scheduled to launch in 2014 atop a Delta IV rocket. A second uncrewed flight test is scheduled for 2017 on NASA’s Space Launch System rocket. For more information, visit http://www.nasa.gov/orion. Photo credit: NASA/Jim Grossmann KSC-2013-2903

CAPE CANAVERAL, Fla. – At NASA’s Kennedy Space Center in Florida, a fu...

CAPE CANAVERAL, Fla. – At NASA’s Kennedy Space Center in Florida, a full-size mock-up of the Orion spacecraft and launch abort system were transported to the Kennedy Space Center Visitor Complex. In the backgro... More

The STS-92 crew spends a few minutes on the tarmac at the KSC Shuttle Landing Facility to address the media. At the microphone, Commander Brian Duffy introduces the crew: (from left) Mission Specialists Koichi Wakata, Michael Lopez-Alegria, Jeff Wisoff, Bill McArthur and Leroy Chiao; and Pilot Pam Melroy. The crew is at KSC to take part in Terminal Countdown Demonstration Test (TCDT) activities. The TCDT includes emergency egress training from the orbiter and pad, plus a simulated countdown. The fifth mission to the International Space Station, STS-92 will carry the Integrated Truss Structure Z1, the first of the planned 10 trusses on the Space Station, and the third Pressurized Mating Adapter. The Z1 will allow the first U.S. solar arrays on a future flight to be temporarily installed on Unity for early power. PMA-3 will provide a Shuttle docking port for the solar array installation on the sixth ISS flight and Lab installation on the seventh ISS flight. STS-92 is scheduled to launch Oct. 5 from launch Pad 39A. It will be the 100th flight in the Shuttle program KSC00pp1308

The STS-92 crew spends a few minutes on the tarmac at the KSC Shuttle ...

The STS-92 crew spends a few minutes on the tarmac at the KSC Shuttle Landing Facility to address the media. At the microphone, Commander Brian Duffy introduces the crew: (from left) Mission Specialists Koichi ... More

KENNEDY SPACE CENTER, Fla.  --  On the slidewire basket bunker area of Launch Pad 39A, STS-118 educator astronaut and Mission Specialist Barbara R. Morgan responds to a question from the media before the crew's morning training activities in the terminal countdown demonstration test, or TCDT.  Morgan joined NASA's Teacher in Space program in 1985 and was selected as an astronaut in 1998. TCDT activities include M-113 training, payload familiarization, the emergency egress training at the pad and a simulated launch countdown.  The mission is the 22nd flight to the International Space Station and Space Shuttle Endeavour will carry a payload including the S5 truss, a SPACEHAB module and external stowage platform 3. STS-118 is targeted for launch on Aug. 7.  NASA/George Shelton KSC-07pd1935

KENNEDY SPACE CENTER, Fla. -- On the slidewire basket bunker area of...

KENNEDY SPACE CENTER, Fla. -- On the slidewire basket bunker area of Launch Pad 39A, STS-118 educator astronaut and Mission Specialist Barbara R. Morgan responds to a question from the media before the crew's... More

KENNEDY SPACE CENTER, FLA. --  The space shuttle Atlantis STS-122 crew receives instruction on emergency exit from the fixed service structure on Launch Pad 39A. From left are Pilot Alan Poindexter and Mission Specialists Leopold Eyharts and Stanley Love.  Eyharts is with the European Space Agency and will remain on the International Space Station as a flight engineer for Expedition 16 following the STS-122 mission.   The STS-122 crew is at NASA's Kennedy Space Center to take part in terminal countdown demonstration test, or TCDT, activities, a standard part of launch preparations. The TCDT provides astronauts and ground crews with equipment familiarization and a simulated launch countdown before launch. On mission STS-122, Atlantis will deliver the European Space Agency's Columbus module to the International Space Station.  Columbus is a multifunctional, pressurized laboratory that will be permanently attached to U.S. Node 2, called Harmony, and will expand the research facilities aboard the station. Launch is targeted for Dec. 6.  Photo credit: NASA/Kim Shiflett KSC-07pd3384

KENNEDY SPACE CENTER, FLA. -- The space shuttle Atlantis STS-122 crew...

KENNEDY SPACE CENTER, FLA. -- The space shuttle Atlantis STS-122 crew receives instruction on emergency exit from the fixed service structure on Launch Pad 39A. From left are Pilot Alan Poindexter and Mission ... More

CAPE CANAVERAL, Fla. -   On Launch Pad 39A at NASA's Kennedy Space Center in Florida, STS-125 Mission Specialist Megan McArthur is ready to talk to the media about her role in the mission. The crew is at Kennedy to take part in terminal countdown demonstration test, or TCDT, activities before launching on space shuttle Atlantis’ mission to service NASA’s Hubble Space Telescope. TCDT provides astronauts and ground crews with an opportunity to participate in various simulated countdown activities, including equipment familiarization, emergency training and a simulated launch countdown. Atlantis is targeted to launch Oct. 10. Photo credit: NASA/Kim Shiflett KSC-08pd2849

CAPE CANAVERAL, Fla. - On Launch Pad 39A at NASA's Kennedy Space Cen...

CAPE CANAVERAL, Fla. - On Launch Pad 39A at NASA's Kennedy Space Center in Florida, STS-125 Mission Specialist Megan McArthur is ready to talk to the media about her role in the mission. The crew is at Kenned... More

CAPE CANAVERAL, Fla. – Space shuttle Discovery's STS-128 mission crew members arrive in T-38 training jets at NASA Kennedy Space Center's Shuttle Landing Facility.   Mission Specialist Nicole Stott is seen here. Stott will join the Expedition 20 crew on the International Space Station as a flight engineer.  The astronauts will be taking part in terminal countdown demonstration test activities that include equipment familiarization and emergency egress training, and will culminate in a simulated launch countdown aboard Discovery.  The mission will deliver 33,000 pounds of equipment to the International Space Station. The equipment includes science and storage racks, a freezer to store research samples, a new sleeping compartment and the COLBERT treadmill.  Launch of Discovery is targeted for late August. Photo credit: NASA/Kim Shiflett KSC-2009-4460

CAPE CANAVERAL, Fla. – Space shuttle Discovery's STS-128 mission crew ...

CAPE CANAVERAL, Fla. – Space shuttle Discovery's STS-128 mission crew members arrive in T-38 training jets at NASA Kennedy Space Center's Shuttle Landing Facility. Mission Specialist Nicole Stott is seen here... More

CAPE CANAVERAL, Fla. – On the fixed service structure on Launch Pad 39A at NASA's Kennedy Space Center in Florida, STS-125 crew members review emergency exit procedures.  Seen here are Mission Specialists Michael Good and Megan McArthur. Not clearly visible in the background is Mission Specialist Andrew Feustel.  Space shuttle Atlantis' 11-day flight is targeted for launch May 12 and will include five spacewalks to refurbish and upgrade the telescope with state-of-the-art science instruments. As a result, Hubble's capabilities will be expanded and its operational lifespan extended through at least 2014.  Photo credit: NASA/Cory Huston KSC-2009-2530

CAPE CANAVERAL, Fla. – On the fixed service structure on Launch Pad 39...

CAPE CANAVERAL, Fla. – On the fixed service structure on Launch Pad 39A at NASA's Kennedy Space Center in Florida, STS-125 crew members review emergency exit procedures. Seen here are Mission Specialists Micha... More

CAPE CANAVERAL, Fla. -- The first of four new emergency egress vehicles, called Mine-Resistant Ambush-Protection, or MRAP, vehicles arrived at Kennedy Space Center in Florida from the U.S. Army Red River Depot in Texarkana, Texas. Each vehicle will be processed in and then transported to the Rotation, Processing and Surge Facility near the Vehicle Assembly Building for temporary storage.    The Ground Systems Development and Operations Program at Kennedy led the efforts to an emergency egress vehicle that future astronauts could quickly use to leave the Launch Complex 39 area in case of an emergency. During crewed launches of NASA’s Space Launch System and Orion spacecraft, the MRAP will be stationed by the slidewire termination area at the pad. In case of an emergency, the crew will ride a slidewire to the ground and immediately board the MRAP for safe egress from the pad. The new vehicles replace the M-113 vehicles that were used during the Space Shuttle Program. Photo credit: NASA/Jim Grossmann KSC-2013-4300

CAPE CANAVERAL, Fla. -- The first of four new emergency egress vehicle...

CAPE CANAVERAL, Fla. -- The first of four new emergency egress vehicles, called Mine-Resistant Ambush-Protection, or MRAP, vehicles arrived at Kennedy Space Center in Florida from the U.S. Army Red River Depot ... More

KENNEDY SPACE CENTER, FLA. - "Astronauts" were safely and successfully recovered from a "downed" Space Shuttle in a Mode VII contingency simulation led by Don Hammel, NASA Landing and Recovery Director. KSC Fire/Rescue and Emergency Medical workers, along with Johnson Space Center and Patrick Air Force Base personnel, participated in the drill. Mode simulations are held periodically at KSC to ensure contingency response forces are well prepared to respond to a wide variety of potential emergency situations. KSC-02pd1252

KENNEDY SPACE CENTER, FLA. - "Astronauts" were safely and successfully...

KENNEDY SPACE CENTER, FLA. - "Astronauts" were safely and successfully recovered from a "downed" Space Shuttle in a Mode VII contingency simulation led by Don Hammel, NASA Landing and Recovery Director. KSC Fir... More

CAPE CANAVERAL, Fla. -- A Shuttle Training Aircraft (STA) is ready for flight on the Shuttle Landing Facility runway at NASA's Kennedy Space Center in Florida. STS-133 Commander Steve Lindsey and Pilot Eric Boe will fly the modified Gulfstream II business jets to mimic the shuttle's handling during the final phase of landing. Practice landings are part of the Terminal Countdown Demonstration Test (TCDT), which provides each shuttle crew and launch team an opportunity to participate in various simulated activities, including equipment familiarization and emergency training at the launch pad.    Space shuttle Discovery and its STS-133 crew will deliver the Permanent Multipurpose Module, packed with supplies and critical spare parts, as well as Robonaut 2, the dexterous humanoid astronaut helper, to the International Space Station. Launch is targeted for Nov. 1 at 4:40 p.m. For more information on the STS-133 mission, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts133/. Photo credit: NASA/Jack Pfaller KSC-2010-5093

CAPE CANAVERAL, Fla. -- A Shuttle Training Aircraft (STA) is ready for...

CAPE CANAVERAL, Fla. -- A Shuttle Training Aircraft (STA) is ready for flight on the Shuttle Landing Facility runway at NASA's Kennedy Space Center in Florida. STS-133 Commander Steve Lindsey and Pilot Eric Boe... More

STS-92 Commander Brian Duffy smiles after landing at the KSC Shuttle Landing Facility in a T-38 training jet aircraft. He and the rest of the crew are at KSC to take part in Terminal Countdown Demonstration Test activities, which include emergency egress training from the orbiter and pad, and a simulated countdown. The fifth mission to the International Space Station, STS-92 will carry the Integrated Truss Structure Z1, the first of the planned 10 trusses on the Space Station, and the third Pressurized Mating Adapter. The Z1 will allow the first U.S. solar arrays on a future flight to be temporarily installed on Unity for early power. PMA-3 will provide a Shuttle docking port for the solar array installation on the sixth ISS flight and Lab installation on the seventh ISS flight. STS-92 is scheduled to launch Oct. 5 from launch Pad 39A. It will be the 100th flight in the Shuttle program KSC-00pp1303

STS-92 Commander Brian Duffy smiles after landing at the KSC Shuttle L...

STS-92 Commander Brian Duffy smiles after landing at the KSC Shuttle Landing Facility in a T-38 training jet aircraft. He and the rest of the crew are at KSC to take part in Terminal Countdown Demonstration Tes... More

KENNEDY SPACE CENTER, FLA. --  STS-110 Commander Michael Bloomfield settles into his seat in Space Shuttle Atlantis as he prepares for a simulated launch countdown. The simulation is part of Terminal Countdown Demonstration Test activities.  TCDT also includes emergency egress training and is held at KSC prior to each Space Shuttle flight.  Scheduled for launch April 4, the 11-day mission will feature Shuttle Atlantis docking with the International Space Station (ISS) and delivering the S0 truss, the centerpiece-segment of the primary truss structure that will eventually extend over 300 feet KSC-02pd0312

KENNEDY SPACE CENTER, FLA. -- STS-110 Commander Michael Bloomfield se...

KENNEDY SPACE CENTER, FLA. -- STS-110 Commander Michael Bloomfield settles into his seat in Space Shuttle Atlantis as he prepares for a simulated launch countdown. The simulation is part of Terminal Countdown ... More

CAPE CANAVERAL, Fla. –  STS-127 crew members gather at NASA Kennedy Space Center's Launch Pad 39A for a question-and-answer session with the media. At left is Commander Mark Polansky, introducing the other astronauts, who are, from left, Pilot Doug Hurley and Mission Specialists Julie Payette, Tom Marshburn, Tim Kopra, Chris Cassidy and Dave Wolf.  Payette represents the Canadian Space Agency. In the background is the fixed service structure with the solid rocket boosters and external fuel tank attached to space shuttle Endeavour.  The crew is at Kennedy for a launch dress rehearsal called the terminal countdown demonstration test, or TCDT, which includes emergency egress training and equipment familiarization.  Space shuttle Endeavour's STS-127 mission is the final of three flights dedicated to the assembly of the Japanese Kibo laboratory complex on the International Space Station.  Endeavour's launch is targeted for June 13.    Photo credit: NASA/Kim Shiflett KSC-2009-3403

CAPE CANAVERAL, Fla. – STS-127 crew members gather at NASA Kennedy Sp...

CAPE CANAVERAL, Fla. – STS-127 crew members gather at NASA Kennedy Space Center's Launch Pad 39A for a question-and-answer session with the media. At left is Commander Mark Polansky, introducing the other astr... More

STS-102 Mission Specialists Andrew Thomas (front, left) and Paul Richards take their seats in the slidewire basket, used for emergency egress from the orbiter and pad. Behind them, other crew members climb into their basket. The crew is at KSC for Terminal Countdown Demonstration Test activities, which include the emergency training and a simulated launch countdown.; STS-102 is the eighth construction flight to the International Space Station, with Space Shuttle Discovery carrying the Multi-Purpose Logistics Module Leonardo. In addition, the Expedition Two crew will be on the mission, to replace Expedition One, who will return to Earth with Discovery. Launch on mission STS-102 is scheduled for March 8 KSC01pp0341

STS-102 Mission Specialists Andrew Thomas (front, left) and Paul Richa...

STS-102 Mission Specialists Andrew Thomas (front, left) and Paul Richards take their seats in the slidewire basket, used for emergency egress from the orbiter and pad. Behind them, other crew members climb into... More

CAPE CANAVERAL, Fla. –  At NASA's Kennedy Space Center in Florida, STS-119 Mission Specialist Koichi Wakata is ready to practice driving the M-113 armored personnel carrier used for emergency escape, if needed, from the launch pad.  Wakata represents the Japan Aerospace Exploration Agency. The crew members are at Kennedy for prelaunch preparation known as terminal countdown demonstration test, or TCDT. The training provides astronauts and ground crews with an opportunity to participate in various simulated countdown activities, including equipment familiarization and a simulated launch countdown.  The crew of space shuttle Discovery is targeted to launch on the STS-119 mission Feb. 12. During Discovery's 14-day mission, the crew will install the S6 truss segment and solar arrays to the starboard side of the International Space Station, completing the station's truss, or backbone. Photo credit: NASA/Kim Shiflett KSC-2009-1204

CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, STS...

CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, STS-119 Mission Specialist Koichi Wakata is ready to practice driving the M-113 armored personnel carrier used for emergency escape, if needed,... More

KENNEDY SPACE CENTER, FLA. -- At NASA Kennedy Space Center's Launch Complex 39, STS-123 crew members are instructed on the use of the M-113 armored personnel carrier from Capt. George Hoggard, astronaut rescue team leader.  The crew members of space shuttle Endeavour's STS-123 mission will each practice driving the M-113 in turn as part of his training on emergency egress procedures.      An M-113 will be available to transport the crew to safety in the event of a contingency on the pad before their launch.  The STS-123 crew is at Kennedy for a full launch dress rehearsal, known as the terminal countdown demonstration test or TCDT.  Endeavour's seven astronauts arrived at Kennedy's Shuttle Landing Facility in their T-38 training aircraft between 10:45 and 10:58 a.m. EST. The terminal countdown demonstration test provides astronauts and ground crews with an opportunity to participate in various simulated countdown activities, including equipment familiarization and emergency training. Endeavour is targeted to launch March 11 at 2:28 a.m. EDT on a 16-day mission to the International Space Station. On the mission, Endeavour and its crew will deliver the first section of the Japan Aerospace Exploration Agency's Kibo laboratory and the Canadian Space Agency's two-armed robotic system, Dextre. Photo credit: NASA/Kim Shiflett KSC-08pd0466

KENNEDY SPACE CENTER, FLA. -- At NASA Kennedy Space Center's Launch Co...

KENNEDY SPACE CENTER, FLA. -- At NASA Kennedy Space Center's Launch Complex 39, STS-123 crew members are instructed on the use of the M-113 armored personnel carrier from Capt. George Hoggard, astronaut rescue ... More

STS-97 Pilot Mike Bloomfield reaches for the control panel as he settles into his seat in the cockpit on Space Shuttle Endeavour on Launch Pad 39B. He and the rest of the crew are taking part in a simulated launch countdown, part of Terminal Countdown Demonstration Test activities that also include emergency egress training and familiarization with the payload. Mission STS-97 is the sixth construction flight to the International Space Station. Its payload includes the P6 Integrated Truss Structure and a photovoltaic (PV) module, with giant solar arrays that will provide power to the Station. The mission includes two spacewalks to complete the solar array connections. STS-97 is scheduled to launch Nov. 30 at about 10:05 p.m. EST KSC-00padig091

STS-97 Pilot Mike Bloomfield reaches for the control panel as he settl...

STS-97 Pilot Mike Bloomfield reaches for the control panel as he settles into his seat in the cockpit on Space Shuttle Endeavour on Launch Pad 39B. He and the rest of the crew are taking part in a simulated lau... More

KENNEDY SPACE CENTER, FLA. - Emergency crew members prepare to rescue another “astronaut” from inside the orbiter crew compartment mock-up that is the scene of a “Mode VII” emergency landing simulation at Kennedy Space Center.  The purpose of the Mode VII is to exercise emergency preparedness personnel, equipment and facilities in rescuing astronauts from a downed orbiter and providing immediate medical attention.  This simulation presents an orbiter that has crashed short of the Shuttle Landing Facility in a wooded area 2-1/2 miles south of Runway 33.  Emergency crews are responding to the volunteer astronauts who are simulating various injuries.  Rescuers must remove the crew, provide triage and transport to hospitals those who need further treatment.  Local hospitals are participating in the exercise.

KENNEDY SPACE CENTER, FLA. - Emergency crew members prepare to rescue ...

KENNEDY SPACE CENTER, FLA. - Emergency crew members prepare to rescue another “astronaut” from inside the orbiter crew compartment mock-up that is the scene of a “Mode VII” emergency landing simulation at Kenne... More

KENNEDY SPACE CENTER, FLA. - "Astronauts" were safely and successfully recovered from a "downed" Space Shuttle in a Mode VII contingency simulation led by Don Hammel, NASA Landing and Recovery Director. KSC Fire/Rescue and Emergency Medical workers, along with Johnson Space Center and Patrick Air Force Base personnel, participated in the drill. Mode simulations are held periodically at KSC to ensure contingency response forces are well prepared to respond to a wide variety of potential emergency situations. KSC-02pd1226

KENNEDY SPACE CENTER, FLA. - "Astronauts" were safely and successfully...

KENNEDY SPACE CENTER, FLA. - "Astronauts" were safely and successfully recovered from a "downed" Space Shuttle in a Mode VII contingency simulation led by Don Hammel, NASA Landing and Recovery Director. KSC Fir... More

KENNEDY SPACE CENTER, FLA. -- Following the simulated launch countdown, STS-123 crew members begin exiting space shuttle Endeavour into the White Room on Launch Pad 39 at NASA's Kennedy Space Center.  To leave the pad, the STS-123 crew will practice emergency egress using the slidewire baskets.  The countdown was the culmination of the terminal countdown demonstration test, or TCDT. The TCDT provides astronauts and ground crews with an opportunity to participate in various countdown activities, including equipment familiarization and emergency egress training. Endeavour is targeted to launch at 2:28 a.m. EDT March 11 on the 16-day STS-123 mission to the International Space Station.  Endeavour and its crew will deliver the first section of the Japan Aerospace Exploration Agency's Kibo laboratory and the Canadian Space Agency's two-armed robotic system, Dextre.   Photo credit: NASA/Kim Shiflett KSC-08pd0583

KENNEDY SPACE CENTER, FLA. -- Following the simulated launch countdown...

KENNEDY SPACE CENTER, FLA. -- Following the simulated launch countdown, STS-123 crew members begin exiting space shuttle Endeavour into the White Room on Launch Pad 39 at NASA's Kennedy Space Center. To leave ... More

KENNEDY SPACE CENTER, FLA. -- STS-113 Mission Specialist John Herrington is at the wheel of an M-113 armored personnel carrier during emergency egress training at the pad. He is accompanied by (left) Mission Specialist Michael Lopez-Alegria and Commander James Wetherbee.  The crew is preparing for the mission aboard Space Shuttle Endeavour, which is scheduled to launch Nov. 10, by taking part in Terminal Countdown Demonstration Test activities.   The TCDT includes a simulated launch countdown..  The primary payloads on mission STS-113 are the first port truss segment, P1, and the Crew and Equipment Translation Aid (CETA) Cart B.   Once delivered, the P1 truss will remain stowed until flight 12A.1 in 2003 when it will be attached to the central truss segment, S0, on the Space Station.  Also onboard Space Shuttle Endeavour will be the Expedition 6 crew who will replace Expedition 5, returning to Earth after 4 months. KSC-02pd1551

KENNEDY SPACE CENTER, FLA. -- STS-113 Mission Specialist John Herringt...

KENNEDY SPACE CENTER, FLA. -- STS-113 Mission Specialist John Herrington is at the wheel of an M-113 armored personnel carrier during emergency egress training at the pad. He is accompanied by (left) Mission Sp... More

CAPE CANAVERAL, Fla. -  On the 195-foot level of the fixed service structure on Launch Pad 39A at NASA's Kennedy Space Center in Florida, STS-125 crew members talk about using the slidewire baskets for emergency escape from the shuttle and pad.  In the foreground are Mission Specialists John Grunsfeld, Mike Massimino and Andrew Feustel.  Standing above them are (left to right) Mission Specialists Michael Good and Megan McArthur and Commander Scott Altman. The crew is at Kennedy to take part in terminal countdown demonstration test, or TCDT, activities before launching on space shuttle Atlantis’ mission to service NASA’s Hubble Space Telescope. TCDT provides astronauts and ground crews with an opportunity to participate in various simulated countdown activities, including equipment familiarization, emergency training and a simulated launch countdown. Atlantis is targeted to launch Oct. 10. Photo credit: NASA/Kim Shiflett KSC-08pd2863

CAPE CANAVERAL, Fla. - On the 195-foot level of the fixed service str...

CAPE CANAVERAL, Fla. - On the 195-foot level of the fixed service structure on Launch Pad 39A at NASA's Kennedy Space Center in Florida, STS-125 crew members talk about using the slidewire baskets for emergenc... More

During pre-pack and fit check in the Operations and Checkout Building, STS-92 Mission Specialist Koichi Wakata of Japan gets an adjustment on his launch and entry suit. This mission is Wakata’s second Shuttle flight. He and the rest of the crew are at KSC for Terminal Countdown Demonstration Test activities. The TCDT provides emergency egress training, simulated countdown exercises and opportunities to inspect the mission payload. STS-92 is scheduled to launch Oct. 5 at 9:38 p.m. EDT from Launch Pad 39A on the fifth flight to the International Space Station. It will carry two elements of the Space Station, the Integrated Truss Structure Z1 and the third Pressurized Mating Adapter. The mission is also the 100th flight in the Shuttle program KSC-00pp1341

During pre-pack and fit check in the Operations and Checkout Building,...

During pre-pack and fit check in the Operations and Checkout Building, STS-92 Mission Specialist Koichi Wakata of Japan gets an adjustment on his launch and entry suit. This mission is Wakata’s second Shuttle f... More

KENNEDY SPACE CENTER, FLA. --   STS-123 Mission Specialist Garrett Reisman works at putting on his gloves while suiting up for the launch dress rehearsal, culmination of the terminal countdown demonstration test, or TCDT.  The TCDT provides astronauts and ground crews with an opportunity to participate in various simulated countdown activities, including equipment familiarization and emergency training. Space shuttle Endeavour is targeted to launch March 11 at 2:28 a.m. EDT on the 16-day STS-123 mission to the International Space Station.  Endeavour and its crew will deliver the first section of the Japan Aerospace Exploration Agency's Kibo laboratory and the Canadian Space Agency's two-armed robotic system, Dextre.   Photo credit: NASA/Kim Shiflett KSC-08pd0539

KENNEDY SPACE CENTER, FLA. -- STS-123 Mission Specialist Garrett Rei...

KENNEDY SPACE CENTER, FLA. -- STS-123 Mission Specialist Garrett Reisman works at putting on his gloves while suiting up for the launch dress rehearsal, culmination of the terminal countdown demonstration tes... More

At the commissioning of a new high-pressure helium pipeline at Kennedy Space Center, participants watch as helium-filled balloons take to the sky after their lines were cut. From left, they are Center Director Roy Bridges; Michael Butchko, president, SGS; Pierre Dufour, president and CEO, Air Liquide America Corporation; David Herst, director, Delta IV Launch Sites; Pamela Gillespie, executive administrator, office of Congressman Dave Weldon; and Col. Samuel Dick, representative of the 45th Space Wing. The nine-mile-long buried pipeline will service launch needs at the new Delta IV Complex 37 at Cape Canaveral Air Force Station. It will also serve as a backup helium resource for Shuttle launches. Nearly one launch’s worth of helium will be available in the pipeline to support a Shuttle pad in an emergency. The line originates at the Helium Facility on KSC and terminates in a meter station at the perimeter of the Delta IV launch pad. Others at the ceremony were Jerry Jorgensen, pipeline project manager, Space Gateway Support (SGS), and Ramon Lugo, acting executive director, JPMO KSC00padig075

At the commissioning of a new high-pressure helium pipeline at Kennedy...

At the commissioning of a new high-pressure helium pipeline at Kennedy Space Center, participants watch as helium-filled balloons take to the sky after their lines were cut. From left, they are Center Director ... More

KENNEDY SPACE CENTER, Fla.  --  STS-118 Mission Specialist Tracy Caldwell practices driving an M-113 armored personnel carrier as part of emergency exit training.  Seen in the back are Mission Specialist Alvin Drew, Pilot Charlie Hobaugh and educator astronaut and Mission Specialist Barbara R. Morgan.  They and other crew members are at Kennedy for the Terminal Countdown Demonstration Test (TCDT), a dress rehearsal for launch.  TCDT activities include the M-113 training, payload familiarization, emergency egress training at the pad and a simulated launch countdown.  The STS-118 payload aboard Space Shuttle Endeavour includes the S5 truss, a SPACEHAB module and external stowage platform 3. The mission is the 22nd flight to the International Space Station and is targeted for launch on Aug.7.  NASA/George Shelton KSC-07pd1894

KENNEDY SPACE CENTER, Fla. -- STS-118 Mission Specialist Tracy Caldw...

KENNEDY SPACE CENTER, Fla. -- STS-118 Mission Specialist Tracy Caldwell practices driving an M-113 armored personnel carrier as part of emergency exit training. Seen in the back are Mission Specialist Alvin ... More

KENNEDY SPACE CENTER, FLA.  -  In a simulated emergency landing of a shuttle crew at NASA Kennedy Space Center's Shuttle Landing Facility, emergency rescue personnel place an "injured astronaut" onto a stretcher.  Known as a Mode VI exercise, the operation uses volunteer workers from the Center to pose as astronauts. The purpose of the simulation is to exercise emergency preparedness personnel, equipment and facilities in rescuing astronauts from a downed orbiter and providing immediate medical attention. Photo credit: NASA/Kim Shiflett KSC-06pd0491

KENNEDY SPACE CENTER, FLA. - In a simulated emergency landing of a s...

KENNEDY SPACE CENTER, FLA. - In a simulated emergency landing of a shuttle crew at NASA Kennedy Space Center's Shuttle Landing Facility, emergency rescue personnel place an "injured astronaut" onto a stretche... More

CAPE CANAVERAL, Fla. –  During suit-up in the Operations and Checkout Building at NASA's Kennedy Space Center in Florida, STS-126 Mission Specialists Sandra Magnus, Donald Pettit and Heidemarie Stefanyshyn-Piper pause for a photo.  The crew members are having their launch-and-entry suits fit-checked prior to heading for Launch Pad 39A.  The crew will take part in a simulated launch countdown at the pad. The crew is at Kennedy to take part in the Terminal Countdown Demonstration Test, which includes equipment familiarization, emergency exit training and the simulated countdown.  On the STS-126 mission, space shuttle Endeavour's crew will deliver equipment and supplies to the International Space Station in preparation for expansion from a three- to six-person resident crew aboard the complex. The mission also will include four spacewalks to service the station’s Solar Alpha Rotary Joints. Endeavour is targeted to launch Nov. 14. Photo credit: NASA/Kim Shiflett KSC-08pd3424

CAPE CANAVERAL, Fla. – During suit-up in the Operations and Checkout ...

CAPE CANAVERAL, Fla. – During suit-up in the Operations and Checkout Building at NASA's Kennedy Space Center in Florida, STS-126 Mission Specialists Sandra Magnus, Donald Pettit and Heidemarie Stefanyshyn-Pipe... More

KENNEDY SPACE CENTER, FLA. --  At the slidewire basket landing on Launch Pad 39A, the space shuttle Atlantis STS-122 crew responds to questions from the media.  From left are Commander Steve Frick (with the microphone); Pilot Alan Poindexter; and Mission Specialists Leland Melvin, Rex Walheim, Hans Schlegel, Stanley Love and Leopold Eyharts.  Schlegel and Eyharts are with the European Space Agency.  Eyharts will remain on the International Space Station as a flight engineer for Expedition 16 following the STS-122 mission.  The STS-122 crew is at NASA's Kennedy Space Center to take part in terminal countdown demonstration test, or TCDT, activities, a standard part of launch preparations. The TCDT provides astronauts and ground crews with equipment familiarization, emergency egress training and a simulated launch countdown. On mission STS-122, Atlantis will deliver the European Space Agency's Columbus module to the International Space Station.  Columbus is a multifunctional, pressurized laboratory that will be permanently attached to U.S. Node 2, called Harmony, and will expand the research facilities aboard the station. Launch is targeted for Dec. 6.  Photo credit: NASA/Kim Shiflett KSC-07pd3372

KENNEDY SPACE CENTER, FLA. -- At the slidewire basket landing on Laun...

KENNEDY SPACE CENTER, FLA. -- At the slidewire basket landing on Launch Pad 39A, the space shuttle Atlantis STS-122 crew responds to questions from the media. From left are Commander Steve Frick (with the mic... More

CAPE CANAVERAL, Fla. -- Inside Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, technicians remove the top emergency escape window from space shuttle Atlantis.     The window is being removed in order to gain access to remove hazardous pyrotechnics from the shuttle. The window will be shipped to Johnson Space Center in Houston for inspections and a replacement outer pane will be installed in its place. The work is part of the Space Shuttle Program’s transition and retirement processing of shuttle Atlantis. The shuttle is being prepared for display at the Kennedy Space Center Visitor Complex in Florida.  Photo credit: NASA/Kim Shiflett KSC-2012-1003

CAPE CANAVERAL, Fla. -- Inside Orbiter Processing Facility-2 at NASA’s...

CAPE CANAVERAL, Fla. -- Inside Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, technicians remove the top emergency escape window from space shuttle Atlantis. The window is being re... More

During pre-pack and fit check, STS-92 Commander Brian Duffy tests his launch and entry suit for comfort and ease while sitting. This mission will be Duffy’s fourth Shuttle flight. He and the rest of the crew are at KSC for Terminal Countdown Demonstration Test activities. The TCDT provides emergency egress training, simulated countdown exercises and opportunities to inspect the mission payload. STS-92 is scheduled to launch Oct. 5 at 9:38 p.m. EDT from Launch Pad 39A on the fifth flight to the International Space Station. It will carry two elements of the Space Station, the Integrated Truss Structure Z1 and the third Pressurized Mating Adapter. The mission is also the 100th flight in the Shuttle program KSC-00pp1342

During pre-pack and fit check, STS-92 Commander Brian Duffy tests his ...

During pre-pack and fit check, STS-92 Commander Brian Duffy tests his launch and entry suit for comfort and ease while sitting. This mission will be Duffy’s fourth Shuttle flight. He and the rest of the crew ar... More

CAPE CANAVERAL, Fla. --   The crew of space shuttle Discovery's STS-124 mission arrive at NASA Kennedy Space Center's Shuttle Landing Facility to take part in the Terminal Countdown Demonstration Test, or TCDT. Here, Commander Mark Kelly is greeted by Shuttle Launch Director Mike Leinbach. Behind Leinbach is Mission Specialist Greg Chamitoff.  TCDT is a rehearsal for launch that includes practicing emergency procedures, handling on-orbit equipment, and simulating a launch countdown. On the STS-124 mission, the crew will deliver and install the Japanese Experiment Module – Pressurized Module and Japanese Remote Manipulator System.  Discovery's launch is targeted for May 31.  Photo credit: NASA/Kim Shiflett KSC-08pd1149

CAPE CANAVERAL, Fla. -- The crew of space shuttle Discovery's STS-12...

CAPE CANAVERAL, Fla. -- The crew of space shuttle Discovery's STS-124 mission arrive at NASA Kennedy Space Center's Shuttle Landing Facility to take part in the Terminal Countdown Demonstration Test, or TCDT.... More

CAPE CANAVERAL, Fla. -   On Launch Pad 39A at NASA's Kennedy Space Center in Florida, STS-126 Mission Specialist Sandra Magnus (with microphone) answers a question from the media.  The other crew members with her are (from left) Commander Chris Ferguson, Pilot Eric Boe and Mission Specialists Steve Bowen, Shane Kimbrough, Donald Pettit and Heidemarie Stefanyshyn-Piper. The crew is at Kennedy to take part in the Terminal Countdown Demonstration Test, which includes equipment familiarization, emergency exit procedures and a simulated launch countdown.  On the STS-126 mission, space shuttle Endeavour's crew will deliver equipment and supplies to the International Space Station in preparation for expansion from a three- to six-person resident crew aboard the complex. The mission also will include four spacewalks to service the station’s Solar Alpha Rotary Joints. Endeavour is targeted to launch Nov. 14.  Photo credit: NASA/Kim Shiflett KSC-08pd3400

CAPE CANAVERAL, Fla. - On Launch Pad 39A at NASA's Kennedy Space Cen...

CAPE CANAVERAL, Fla. - On Launch Pad 39A at NASA's Kennedy Space Center in Florida, STS-126 Mission Specialist Sandra Magnus (with microphone) answers a question from the media. The other crew members with h... More

KENNEDY SPACE CENTER, FLA. -- During emergency egress from Launch Pad 39A, STS-120 Mission Specialists Stephanie Wilson (foreground) and Doug Wheelock settle in the slidewire basket.  Wilson reaches for the release lever.  The basket can carry them to a safe landing site below, if needed.  The activity is part of the prelaunch terminal countdown demonstration test, or TCDT.  The TCDT at NASA's Kennedy Space Center provides astronauts and ground crews an opportunity to participate in various launch preparation activities, including equipment familiarization and emergency training. The STS-120 mission will deliver the U.S. Node 2 module, named Harmony, aboard space shuttle Discovery to the International Space Station.  Discovery is targeted to launch on its 14-day mission at 11:38 a.m. EDT on Oct. 23. Photo credit: NASA/Kim Shiflett KSC-07pd2801

KENNEDY SPACE CENTER, FLA. -- During emergency egress from Launch Pad ...

KENNEDY SPACE CENTER, FLA. -- During emergency egress from Launch Pad 39A, STS-120 Mission Specialists Stephanie Wilson (foreground) and Doug Wheelock settle in the slidewire basket. Wilson reaches for the rel... More

CAPE CANAVERAL, Fla. - At NASA's Kennedy Space Center in Florida, STS-130 Mission Specialist Kathryn Hire takes her crew and instructor for a ride in an M113 armored personnel carrier during driving practice. Left of Hire is the instructor, Battalion Chief David Seymour.    An M113 is kept at the foot of the launch pad in case an emergency egress from the vicinity of the pad is needed.  The crew members of space shuttle Endeavour's STS-130 mission are at Kennedy for training related to their launch dress rehearsal, the Terminal Countdown Demonstration Test.  The primary payload on STS-130 is the International Space Station's Node 3, Tranquility, a pressurized module that will provide room for many of the station's life support systems. Attached to one end of Tranquility is a cupola, a unique work area with six windows on its sides and one on top.  Endeavour's launch is targeted for Feb. 7.  For information on the STS-130 mission and crew, visit http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts130/index.html.  Photo credit: NASA/Kim Shiflett KSC-2010-1298

CAPE CANAVERAL, Fla. - At NASA's Kennedy Space Center in Florida, STS-...

CAPE CANAVERAL, Fla. - At NASA's Kennedy Space Center in Florida, STS-130 Mission Specialist Kathryn Hire takes her crew and instructor for a ride in an M113 armored personnel carrier during driving practice. L... More

KENNEDY SPACE CENTER, Fla. --  STS-108 Mission Specialist Daniel M. Tani is ready to practice driving an M-113 armored personnel carrier.  He and other crew members are taking part in Terminal Countdown Demonstration Test activities, which include emergency exit from the launch pad and a simulated launch countdown.   STS-108 is a Utilization Flight that will carry the replacement Expedition 4 crew to the International Space Station, as well as the Multi-Purpose Logistics Module Raffaello, filled with supplies and equipment.  The l1-day mission is scheduled for launch Nov. 29 on Space Shuttle Endeavour KSC-01PP1653

KENNEDY SPACE CENTER, Fla. -- STS-108 Mission Specialist Daniel M. Ta...

KENNEDY SPACE CENTER, Fla. -- STS-108 Mission Specialist Daniel M. Tani is ready to practice driving an M-113 armored personnel carrier. He and other crew members are taking part in Terminal Countdown Demonst... More

CAPE CANAVERAL, Fla. -- A Shuttle Training Aircraft (STA) performs touch-and-go landings as the sun sets over the Shuttle Landing Facility runway at NASA's Kennedy Space Center in Florida. STS-133 Commander Steve Lindsey and Pilot Eric Boe are flying two Gulfstream II business jets that are modified to mimic the shuttle's handling during the final phase of landing. Practice landings are part of the Terminal Countdown Demonstration Test (TCDT), which provides each shuttle crew and launch team an opportunity to participate in various simulated activities, including equipment familiarization and emergency training at the launch pad.        Space shuttle Discovery and its STS-133 crew will deliver the Permanent Multipurpose Module, packed with supplies and critical spare parts, as well as Robonaut 2, the dexterous humanoid astronaut helper, to the International Space Station. Launch is targeted for Nov. 1 at 4:40 p.m. For more information on the STS-133 mission, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts133/. Photo credit: NASA/Dimitri Gerondidakis KSC-2010-5130

CAPE CANAVERAL, Fla. -- A Shuttle Training Aircraft (STA) performs tou...

CAPE CANAVERAL, Fla. -- A Shuttle Training Aircraft (STA) performs touch-and-go landings as the sun sets over the Shuttle Landing Facility runway at NASA's Kennedy Space Center in Florida. STS-133 Commander Ste... More

CAPE CANAVERAL, Fla. –   After arriving at NASA's Kennedy Space Center in Florida on a T-38 jet training aircraft, STS-119 Commander Lee Archambault (left) is greeted by Pete Nickolenko, chief of the NASA Launch and Landing Division.  Between them is Shuttle Launch Director Mike Leinbach. The crew flew to Kennedy to take part in terminal countdown demonstration test activities, which include equipment familiarization and emergency exit training and culminate in a simulated launch countdown. Photo credit: NASA/Kim Shiflett KSC-2009-1175

CAPE CANAVERAL, Fla. – After arriving at NASA's Kennedy Space Center...

CAPE CANAVERAL, Fla. – After arriving at NASA's Kennedy Space Center in Florida on a T-38 jet training aircraft, STS-119 Commander Lee Archambault (left) is greeted by Pete Nickolenko, chief of the NASA Launc... More

Center Director Roy Bridges addresses the audience at the commissioning of a new high-pressure helium pipeline at Kennedy Space Center that will service launch needs at the new Delta IV Complex 37 at Cape Canaveral Air Force Station. The nine-mile-long buried pipeline will also serve as a backup helium resource for Shuttle launches. Nearly one launch’s worth of helium will be available in the pipeline to support a Shuttle pad in an emergency. The line originates at the Helium Facility on KSC and terminates in a meter station at the perimeter of the Delta IV launch pad. Others at the ceremony were Jerry Jorgensen, pipeline project manager, Space Gateway Support (SGS); Col. Samuel Dick, representative of the 45th Space Wing; Ramon Lugo, acting executive director, JPMO; David Herst, director, Delta IV Launch Sites; Pierre Dufour, president and CEO, Air Liquide America Corporation; and Michael Butchko, president, SGS KSC-00padig072

Center Director Roy Bridges addresses the audience at the commissionin...

Center Director Roy Bridges addresses the audience at the commissioning of a new high-pressure helium pipeline at Kennedy Space Center that will service launch needs at the new Delta IV Complex 37 at Cape Canav... More

With Capt. George Hoggard, trainer with the KSC Fire Department, riding on top, Mission Specialist Koichi Wakata of Japan practices driving the M-113, part of emergency egress training during Terminal Countdown Demonstration Test (TCDT) activities. Riding in the back (on the left) are other crew members, waiting their turn to drive. The tracked vehicle could be used by the crew in the event of an emergency at the pad during which the crew must make a quick exit from the area. The TCDT also provides simulated countdown exercises and opportunities to inspect the mission payloads in the orbiter’s payload bay. STS-92 is scheduled to launch Oct. 5 at 9:30 p.m. EDT on the fifth flight to the International Space Station. It will carry two elements of the Space Station, the Integrated Truss Structure Z1 and the third Pressurized Mating Adapter. The mission is also the 100th flight in the Shuttle program KSC-00pp1320

With Capt. George Hoggard, trainer with the KSC Fire Department, ridin...

With Capt. George Hoggard, trainer with the KSC Fire Department, riding on top, Mission Specialist Koichi Wakata of Japan practices driving the M-113, part of emergency egress training during Terminal Countdown... More

KENNEDY SPACE CENTER, Fla.  -- In the White Room on Launch Pad 39A, Mission Specialist Barbara R. Morgan adjusts the collar of her launch and entry suit before she enters Space Shuttle Endeavour.  Morgan, the teacher-turned-astronaut, and the rest of the crew are taking part in a simulated launch countdown, the culmination of terminal countdown demonstration test activities.  The White Room is situated at the end of the orbiter access arm and provides entry into the orbiter. TCDT activities also include M-113 training, payload familiarization and emergency egress training at the pad.  The mission is the 22nd flight to the International Space Station and Space Shuttle Endeavour will carry a payload including the S5 truss, a SPACEHAB module and external stowage platform 3. STS-118 is targeted for launch on Aug. 7.  Photo credit: NASA/Amanda Diller KSC-07pd1993

KENNEDY SPACE CENTER, Fla. -- In the White Room on Launch Pad 39A, Mi...

KENNEDY SPACE CENTER, Fla. -- In the White Room on Launch Pad 39A, Mission Specialist Barbara R. Morgan adjusts the collar of her launch and entry suit before she enters Space Shuttle Endeavour. Morgan, the t... More

CAPE CANAVERAL, Fla. –  STS-126 Mission Specialist Steve Bowen fits his helmet during suit-up in the Operations and Checkout Building at NASA's Kennedy Space Center in Florida. Bowen and other crew members are having their launch-and-entry suits fit-checked prior to heading for Launch Pad 39A.  The crew will take part in a simulated launch countdown at the pad. The crew is at Kennedy to take part in the Terminal Countdown Demonstration Test, which includes equipment familiarization, emergency exit training and the simulated countdown.  On the STS-126 mission, space shuttle Endeavour's crew will deliver equipment and supplies to the International Space Station in preparation for expansion from a three- to six-person resident crew aboard the complex. The mission also will include four spacewalks to service the station’s Solar Alpha Rotary Joints. Endeavour is targeted to launch Nov. 14. Photo credit: NASA/Kim Shiflett KSC-08pd3422

CAPE CANAVERAL, Fla. – STS-126 Mission Specialist Steve Bowen fits hi...

CAPE CANAVERAL, Fla. – STS-126 Mission Specialist Steve Bowen fits his helmet during suit-up in the Operations and Checkout Building at NASA's Kennedy Space Center in Florida. Bowen and other crew members are ... More

CAPE CANAVERAL, Fla. - At NASA's Kennedy Space Center in Florida, STS-130 Mission Specialist Stephen Robinson takes his crew and instructor for a ride in an M113 armored personnel carrier during driving practice. Left of Robinson is the instructor, Battalion Chief David Seymour.    An M113 is kept at the foot of the launch pad in case an emergency egress from the vicinity of the pad is needed.  The crew members of space shuttle Endeavour's STS-130 mission are at Kennedy for training related to their launch dress rehearsal, the Terminal Countdown Demonstration Test.  The primary payload on STS-130 is the International Space Station's Node 3, Tranquility, a pressurized module that will provide room for many of the station's life support systems. Attached to one end of Tranquility is a cupola, a unique work area with six windows on its sides and one on top.  Endeavour's launch is targeted for Feb. 7.  For information on the STS-130 mission and crew, visit http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts130/index.html.  Photo credit: NASA/Kim Shiflett KSC-2010-1300

CAPE CANAVERAL, Fla. - At NASA's Kennedy Space Center in Florida, STS-...

CAPE CANAVERAL, Fla. - At NASA's Kennedy Space Center in Florida, STS-130 Mission Specialist Stephen Robinson takes his crew and instructor for a ride in an M113 armored personnel carrier during driving practic... More

KENNEDY SPACE CENTER, FLA. --  Space shuttle Atlantis STS-122 Mission Specialist Leland Melvin talks to the media at Kennedy Space Center's Shuttle Landing Facility following his arrival to participate in three days of terminal countdown demonstration test, or TCDT, activities.  The TCDT provides astronauts and ground crews with equipment familiarization, emergency egress training and a simulated launch countdown. On mission STS-122, Atlantis will deliver the Columbus module to the International Space Station. The European Space Agency's largest single contribution to the station, Columbus is a multifunctional, pressurized laboratory that will be permanently attached to U.S. Node 2, called Harmony. The laboratory will expand the research facilities aboard the station, providing crew members and scientists from around the world the ability to conduct a variety of experiments in the physical, materials and life sciences. Photo credit: NASA/George Shelton KSC-07pd3328

KENNEDY SPACE CENTER, FLA. -- Space shuttle Atlantis STS-122 Mission ...

KENNEDY SPACE CENTER, FLA. -- Space shuttle Atlantis STS-122 Mission Specialist Leland Melvin talks to the media at Kennedy Space Center's Shuttle Landing Facility following his arrival to participate in three... More

KENNEDY SPACE CENTER, FLA. --  Space shuttle Atlantis STS-122 Commander Steve Frick puts on his helmet, part of his launch and entry suit, in astronaut crew quarters.   The STS-122 crew is preparing for a simulated launch countdown aboard Atlantis, part of terminal countdown demonstration test, or TCDT, activities at NASA's Kennedy Space Center. The TCDT is a dress rehearsal for launch and also provides astronauts and ground crews with equipment familiarization and emergency egress training.  On mission STS-122, Atlantis will deliver the Columbus module to the International Space Station. The European Space Agency's largest single contribution to the station, Columbus is a multifunctional, pressurized laboratory that will be permanently attached to U.S. Node 2, called Harmony. The laboratory will expand the research facilities aboard the station, providing crew members and scientists from around the world the ability to conduct a variety of experiments in the physical, materials and life sciences. Launch is targeted for Dec. 6.  Photo credit: NASA/Kim Shiflett KSC-07pd3411

KENNEDY SPACE CENTER, FLA. -- Space shuttle Atlantis STS-122 Commande...

KENNEDY SPACE CENTER, FLA. -- Space shuttle Atlantis STS-122 Commander Steve Frick puts on his helmet, part of his launch and entry suit, in astronaut crew quarters. The STS-122 crew is preparing for a simul... More

KENNEDY SPACE CENTER, FLA. - With the help of the Closeout Crew in the White Room on Launch Pad 39B, STS-114 Commander Eileen Collins adjusts her launch suit before entering Space Shuttle Discovery.  The crew is taking part in a full dress rehearsal for launch, including countdown and culminating in main engine cutoff. The rehearsal is the final part of Terminal Countdown Demonstration Test (TCDT) activities that the crew has been involved in for three days.  TCDT provides the crew of each mission an opportunity to participate in various simulated countdown activities, including equipment familiarization and emergency egress training. STS-114 is the first Return to Flight mission to the International Space Station. The launch window extends July 13 through July 31. KSC-05pp0997

KENNEDY SPACE CENTER, FLA. - With the help of the Closeout Crew in the...

KENNEDY SPACE CENTER, FLA. - With the help of the Closeout Crew in the White Room on Launch Pad 39B, STS-114 Commander Eileen Collins adjusts her launch suit before entering Space Shuttle Discovery. The crew i... More

KENNEDY SPACE CENTER, FLA. -- Expedition 6 crew member Nikolai Budarin stands ready for a practice drive in an M-113 armored personnel carrier during emergency egress training at the pad, one of the Terminal Countdown Demonstration Test activities in preparation for launch.  The TCDT also includes a simulated launch countdown. The Expedition 6 crew will travel on Space Shuttle Endeavour to the International Space Station to replace Expedition 5, returning to Earth after 4 months. The primary payloads on mission STS-113 are the first port truss segment, P1, and the Crew and Equipment Translation Aid (CETA) Cart B.   Once delivered, the P1 truss will remain stowed until flight 12A.1 in 2003 when it will be attached to the central truss segment, S0, on the Space Station.  Launch is scheduled for Nov. 10, 2002. KSC-02pd1560

KENNEDY SPACE CENTER, FLA. -- Expedition 6 crew member Nikolai Budarin...

KENNEDY SPACE CENTER, FLA. -- Expedition 6 crew member Nikolai Budarin stands ready for a practice drive in an M-113 armored personnel carrier during emergency egress training at the pad, one of the Terminal Co... More

KENNEDY SPACE CENTER, FLA. -   The STS-115 crew members are suiting up for their simulated launch countdown.   Shown here is Mission Specialist Joseph Tanner. The mission crew is at KSC for Terminal Countdown Demonstration Test (TCDT) activities that are preparation for launch on Space Shuttle Atlantis, scheduled to take place in a window that opens Aug. 27.  The TCDT has included emergency egress training as well as the simulation.  During their 11-day mission to the International Space Station, the STS-115 crew will continue construction of the station and attach the payload elements, the Port 3/4 truss segment with its two large solar arrays.  Photo credit: NASA/Cory Huston KSC-06pd1812

KENNEDY SPACE CENTER, FLA. - The STS-115 crew members are suiting up...

KENNEDY SPACE CENTER, FLA. - The STS-115 crew members are suiting up for their simulated launch countdown. Shown here is Mission Specialist Joseph Tanner. The mission crew is at KSC for Terminal Countdown D... More

KENNEDY SPACE CENTER, Fla.  --  STS-118 crew members get a close look at the payloads installed in Space Shuttle Endeavour.  Seen in the foreground are Mission Specialists Dave Williams (center), who represents the Canadian Space Agency, and Tracy Caldwell (right).  In the background is Mission Specialist Rick Mastracchio.  The STS-118 crew has been at Kennedy for terminal countdown demonstration test activities that also include M-113 training, emergency egress training at the pad and a simulated launch countdown.  The mission is the 22nd flight to the International Space Station and Space Shuttle Endeavour will carry a payload including the S5 truss, a SPACEHAB module and external stowage platform 3. STS-118 is targeted for launch on Aug. 7.    Photo credit: NASA/George Shelton KSC-07pd2029

KENNEDY SPACE CENTER, Fla. -- STS-118 crew members get a close look ...

KENNEDY SPACE CENTER, Fla. -- STS-118 crew members get a close look at the payloads installed in Space Shuttle Endeavour. Seen in the foreground are Mission Specialists Dave Williams (center), who represents... More

KENNEDY SPACE CENTER, FLA. --  Space shuttle Atlantis STS-122 Mission Specialist Leland Melvin tries on his launch and entry suit, preparing for launch. The fitting is part of terminal countdown demonstration test, or TCDT, activities the crew is undertaking at NASA's Kennedy Space Center.  The TCDT provides astronauts and ground crews with equipment familiarization, emergency egress training and a simulated launch countdown. On mission STS-122, Atlantis will deliver the Columbus module to the International Space Station. The European Space Agency's largest single contribution to the station, Columbus is a multifunctional, pressurized laboratory that will be permanently attached to U.S. Node 2, called Harmony. The laboratory will expand the research facilities aboard the station, providing crew members and scientists from around the world the ability to conduct a variety of experiments in the physical, materials and life sciences. Launch is targeted for Dec. 6.  Photo credit: NASA/Kim Shiflett KSC-07pd3358

KENNEDY SPACE CENTER, FLA. -- Space shuttle Atlantis STS-122 Mission ...

KENNEDY SPACE CENTER, FLA. -- Space shuttle Atlantis STS-122 Mission Specialist Leland Melvin tries on his launch and entry suit, preparing for launch. The fitting is part of terminal countdown demonstration t... More

KENNEDY SPACE CENTER, FLA. -- At NASA Kennedy Space Center's Launch Complex 39, STS-123 Mission Specialist Robert L. Behnken takes time out from driving practice of the M-113 armored personnel carrier to pose for a photo.  The crew members of space shuttle Endeavour's STS-123 mission will each practice driving the M-113 in turn as part of his training on emergency egress procedures.  An M-113 will be available to transport the crew to safety in the event of a contingency on the pad before their launch.  The STS-123 crew is at Kennedy for a full launch dress rehearsal, known as the terminal countdown demonstration test or TCDT.  Endeavour's seven astronauts arrived at Kennedy's Shuttle Landing Facility in their T-38 training aircraft between 10:45 and 10:58 a.m. EST. The terminal countdown demonstration test provides astronauts and ground crews with an opportunity to participate in various simulated countdown activities, including equipment familiarization and emergency training. Endeavour is targeted to launch March 11 at 2:28 a.m. EDT on a 16-day mission to the International Space Station. On the mission, Endeavour and its crew will deliver the first section of the Japan Aerospace Exploration Agency's Kibo laboratory and the Canadian Space Agency's two-armed robotic system, Dextre. Photo credit: NASA/Kim Shiflett KSC-08pd0470

KENNEDY SPACE CENTER, FLA. -- At NASA Kennedy Space Center's Launch Co...

KENNEDY SPACE CENTER, FLA. -- At NASA Kennedy Space Center's Launch Complex 39, STS-123 Mission Specialist Robert L. Behnken takes time out from driving practice of the M-113 armored personnel carrier to pose f... More

KENNEDY SPACE CENTER, Fla. - Astronaut E. Michael Fincke is ready to practice driving an M-113 armored personnel carrier. Fincke is a backup crew member for the International Space Station Expedition 4 crew, who are flying on Space Shuttle Endeavour as part of mission STS-108.  Both the mission crew and Expedition 4 crews are at KSC for Terminal Countdown Demonstration Test activities.  The TCDT includes emergency exit from the launch pad and a simulated launch countdown. The 11-day mission will also carry the Multi-Purpose Logistics Module Raffaello, filled with supplies and equipment.  STS-108 is scheduled to launch Nov. 29 KSC-01PP1658

KENNEDY SPACE CENTER, Fla. - Astronaut E. Michael Fincke is ready to p...

KENNEDY SPACE CENTER, Fla. - Astronaut E. Michael Fincke is ready to practice driving an M-113 armored personnel carrier. Fincke is a backup crew member for the International Space Station Expedition 4 crew, wh... More

KENNEDY SPACE CENTER, FLA. -- The STS-120 crew is at NASA's Kennedy Space Center for the pre-launch terminal countdown demonstration test, or TCDT.  Here, during emergency egress training, crew members practice climbing into the slidewire baskets that can carry them safely to a landing site away from the shuttle.  In the basket are, from left, Mission Specialists Doug Wheelock and Scott Parazynski and Pilot George Zamka.  Watching them are, from left, Commander Pamela Melroy and Mission Specialists Stephanie Wilson and Daniel Tani, with camera.  After the mission, Tani will remain aboard the International Space Station and return with the STS-122 crew, targeted to launch Dec. 6.  The TCDT provides astronauts and ground crews an opportunity to participate in various simulated countdown activities, including equipment familiarization and emergency training. The STS-120 mission will deliver the U.S. Node 2 module, named Harmony, aboard space shuttle Discovery to the International Space Station.  Launch of Discovery on mission STS-120 is targeted for Oct. 23 at 11:38 a.m. EDT on a 14-day mission.  Photo credit: NASA/Kim Shiflett KSC-07pd2738

KENNEDY SPACE CENTER, FLA. -- The STS-120 crew is at NASA's Kennedy Sp...

KENNEDY SPACE CENTER, FLA. -- The STS-120 crew is at NASA's Kennedy Space Center for the pre-launch terminal countdown demonstration test, or TCDT. Here, during emergency egress training, crew members practice... More

CAPE CANAVERAL, Fla. -- On Launch Pad 39A at NASA's Kennedy Space Center, STS-124 Mission Specialist Akihiko Hoshide sits in his seat aboard space shuttle Discovery following the simulated launch countdown, part of the launch dress rehearsal known as the terminal countdown demonstration test. TCDT provides astronauts and ground crews with an opportunity to participate in various simulated countdown activities, including a simulated launch countdown, equipment familiarization and emergency egress training.  On the STS-124 mission, the crew will deliver and install the Japanese Experiment Module – Pressurized Module and Japanese Remote Manipulator System.  Discovery's launch is targeted for May 31.   Photo credit: NASA/Kim Shiflett KSC-08pd1256

CAPE CANAVERAL, Fla. -- On Launch Pad 39A at NASA's Kennedy Space Cent...

CAPE CANAVERAL, Fla. -- On Launch Pad 39A at NASA's Kennedy Space Center, STS-124 Mission Specialist Akihiko Hoshide sits in his seat aboard space shuttle Discovery following the simulated launch countdown, par... More

KENNEDY SPACE CENTER, FLA. --  The STS-112 crew listen to further instructions about emergency egress from the Shuttle.  Standing, left to right, are Mission Specialist Piers Sellers, Commander Jeffrey Ashby, Pilot Pamela Melroy, Mission Specialists Fyodor Yurchikhin (with the Russian Space Agency), David Wolf and Sandra Magnus. The training is part of Terminal Countdown Demonstration Test activities, which include a simulated launch countdown.  Mission STS-112 aboard Space Shuttle Atlantis is scheduled to launch no earlier than Oct. 2, between 2 and 6 p.m. EDT.  STS-112 is the 15th assembly mission to the International Space Station.  Atlantis will be carrying the S1 Integrated Truss Structure, the first starboard truss segment, to be attached to the central truss segment, S0, and the Crew and Equipment Translation Aid (CETA) Cart A.  The CETA is the first of two human-powered carts that will ride along the ISS railway, providing mobile work platforms for future spacewalking astronauts. KSC-02pd1340

KENNEDY SPACE CENTER, FLA. -- The STS-112 crew listen to further inst...

KENNEDY SPACE CENTER, FLA. -- The STS-112 crew listen to further instructions about emergency egress from the Shuttle. Standing, left to right, are Mission Specialist Piers Sellers, Commander Jeffrey Ashby, P... More

KENNEDY SPACE CENTER, FLA. -- In space shuttle Discovery's payload bay, STS-120 crew members get a close look at the equipment and payloads.  Seen here are Mission Specialists Stephanie Wilson and Paolo Nespoli, who represents the European Space Agency.  The TCDT provides astronauts and ground crews an opportunity to participate in various simulated countdown activities, including equipment familiarization and emergency training. The STS-120 mission will deliver the U.S. Node 2 module, named Harmony, aboard space shuttle Discovery to the International Space Station.  Launch of Discovery on mission STS-120 is targeted for Oct. 23 at 11:38 a.m. EDT on a 14-day mission.  Photo credit: NASA/Kim Shiflett KSC-07pd2756

KENNEDY SPACE CENTER, FLA. -- In space shuttle Discovery's payload bay...

KENNEDY SPACE CENTER, FLA. -- In space shuttle Discovery's payload bay, STS-120 crew members get a close look at the equipment and payloads. Seen here are Mission Specialists Stephanie Wilson and Paolo Nespoli... More

CAPE CANAVERAL, Fla. –  In the White Room on Launch Pad 39A at NASA's Kennedy Space Center in Florida, STS-119 Mission Specialist Steve Swanson is helped by the Closeout Crew to put on his harness.  The White Room provides access into space shuttle Discovery.  Swanson and other crew members will conduct a simulated launch countdown as part of the prelaunch preparation known as Terminal Countdown Demonstration Test.  The TCDT also includes equipment familiarization and emergency egress training. Discovery is targeted to launch on the STS-119 mission Feb. 12. During the 14-day mission, the crew will install the S6 truss segment and solar arrays to the starboard side of the International Space Station, completing the station's truss, or backbone. Photo credit: NASA/Jim Grossmann KSC-2009-1270

CAPE CANAVERAL, Fla. – In the White Room on Launch Pad 39A at NASA's ...

CAPE CANAVERAL, Fla. – In the White Room on Launch Pad 39A at NASA's Kennedy Space Center in Florida, STS-119 Mission Specialist Steve Swanson is helped by the Closeout Crew to put on his harness. The White R... More

During pre-pack and fit check in the Operations and Checkout Building, STS-92 Mission Specialist William S. McArthur Jr. uses a laptop computer while garbed in his full launch and entry suit. McArthur and the rest of the crew are at KSC for Terminal Countdown Demonstration Test activities. The TCDT provides emergency egress training, simulated countdown exercises and opportunities to inspect the mission payload. This mission will be McArthur’s third Shuttle flight. STS-92 is scheduled to launch Oct. 5 at 9:38 p.m. EDT from Launch Pad 39A on the fifth flight to the International Space Station. It will carry two elements of the Space Station, the Integrated Truss Structure Z1 and the third Pressurized Mating Adapter. The mission is also the 100th flight in the Shuttle program KSC00pp1339

During pre-pack and fit check in the Operations and Checkout Building,...

During pre-pack and fit check in the Operations and Checkout Building, STS-92 Mission Specialist William S. McArthur Jr. uses a laptop computer while garbed in his full launch and entry suit. McArthur and the r... More

KENNEDY SPACE CENTER, FLA. -   The STS-115 crew gets instructions about using the slidewire baskets for emergency egress from the space shuttle on the pad.  Seen here are Mission Specialists Heidemarie Stefanyshyn-Piper and Daniel Burbank, Pilot Chris Ferguson, Mission Specialist Steven MacLean and Commander Brent Jett. MacLean is with the Canadian Space Agency.  Not seen is Mission Specialist Joseph Tanner. The mission crew is at KSC for Terminal Countdown Demonstration Test (TCDT) activities that are preparation for launch on Space Shuttle Atlantis, scheduled to take place in a window that opens Aug. 27.  During their 11-day mission to the International Space Station, the STS-115 crew will continue construction of the station and attach the payload elements, the Port 3/4 truss segment with its two large solar arrays.  Photo credit: NASA/Cory Huston KSC-06pd1776

KENNEDY SPACE CENTER, FLA. - The STS-115 crew gets instructions abou...

KENNEDY SPACE CENTER, FLA. - The STS-115 crew gets instructions about using the slidewire baskets for emergency egress from the space shuttle on the pad. Seen here are Mission Specialists Heidemarie Stefanys... More

KENNEDY SPACE CENTER, FLA. - Expedition 5 crew member Peggy Whitson undergoes a suit check as part of Terminal Countdown Demonstration Test activities at KSC.  The TCDT includes emergency egress training at the pad and a simulated launch countdown.  Expedition 5 will travel to the International Space Station on mission STS-111 as the replacement crew for Expedition 4, who will return to Earth aboard Endeavour.  Known as Utilization Flight -2, the mission includes attaching a Canadian-built mobile base system to the International Space Station that will enable the Canadarm2 robotic arm to move along a railway on the Station's truss to build and maintain the outpost.  The crew will also replace a faulty wrist/roll joint on the Canadarm2 as well as unload almost three tons of experiments and supplies from the Italian-built Multi-Purpose Logistics Module Leonardo.  Launch of Space Shuttle Endeavour on mission STS-111 is scheduled for May 30, 2002 KSC-02pd0675

KENNEDY SPACE CENTER, FLA. - Expedition 5 crew member Peggy Whitson un...

KENNEDY SPACE CENTER, FLA. - Expedition 5 crew member Peggy Whitson undergoes a suit check as part of Terminal Countdown Demonstration Test activities at KSC. The TCDT includes emergency egress training at the... More

CAPE CANAVERAL, Fla. --  Back at the NASA Kennedy Space Center Shuttle Landing Facility, STS-124 Commander Mark Kelly happily crosses the parking area after the successful space shuttle landing practice aboard NASA's Shuttle Training Aircraft, or STA.  The STA is a Grumman American Aviation-built Gulf Stream II jet that was modified to simulate an orbiter's cockpit, motion and visual cues, and handling qualities. In flight, the STA duplicates the orbiter's atmospheric descent trajectory from approximately 35,000 feet altitude to landing on a runway. Because the orbiter is unpowered during re-entry and landing, its high-speed glide must be perfectly executed the first time. The crew for space shuttle Discovery's STS-124 mission is at Kennedy for a full launch dress rehearsal, known as the terminal countdown demonstration test, or TCDT.  Providing astronauts and ground crews with an opportunity to participate in various simulated countdown activities, TCDT includes equipment familiarization and emergency training.  Discovery's launch is targeted for May 31.   Photo credit: NASA/Kim Shiflett KSC-08pd1162

CAPE CANAVERAL, Fla. -- Back at the NASA Kennedy Space Center Shuttle...

CAPE CANAVERAL, Fla. -- Back at the NASA Kennedy Space Center Shuttle Landing Facility, STS-124 Commander Mark Kelly happily crosses the parking area after the successful space shuttle landing practice aboard ... More

KENNEDY SPACE CENTER, FLA. -   The STS-115 crew is in the White Room on the orbiter access arm on Launch Pad 39B to get instruction on using the emergency egress system. From left are Commander Brent Jett, Pilot Chris Ferguson, and Mission Specialists Heidemarie Stefanyshyn-Piper, Joseph Tanner, Steven MacLean and Daniel Burbank.  MacLean is with the Canadian Space Agency.  The White Room provides access into the orbiter through the crew access hatch. The mission crew is at KSC for Terminal Countdown Demonstration Test (TCDT) activities that are preparation for launch on Space Shuttle Atlantis, scheduled to take place in a window that opens Aug. 27.  During their 11-day mission to the International Space Station, the STS-115 crew will continue construction of the station and attach the payload elements, the Port 3/4 truss segment with its two large solar arrays.  Photo credit: NASA/Cory Huston KSC-06pd1774

KENNEDY SPACE CENTER, FLA. - The STS-115 crew is in the White Room o...

KENNEDY SPACE CENTER, FLA. - The STS-115 crew is in the White Room on the orbiter access arm on Launch Pad 39B to get instruction on using the emergency egress system. From left are Commander Brent Jett, Pilo... More

STS-97 Mission Specialist Marc Garneau arrives at the Shuttle Landing Facility aboard a T-38 jet aircraft. Garneau is with the Canadian Space Agency. He and the rest of the crew are at KSC to take part in Terminal Countdown Demonstration Test activities that include emergency egress training, familiarization with the payload, and a simulated launch countdown. The other crew members are Commander Brent Jett, Pilot Mike Bloomfield and Mission Specialists Joe Tanner and Carlos Noriega. Mission STS-97is the sixth construction flight to the International Space Station. Its payload includes the P6 Integrated Truss Structure and a photovoltaic (PV) module, with giant solar arrays that will provide power to the Station. The mission includes two spacewalks to complete the solar array connections. STS-97 is scheduled to launch Nov. 30 at 10:05 p.m. EST KSC00pp1639

STS-97 Mission Specialist Marc Garneau arrives at the Shuttle Landing ...

STS-97 Mission Specialist Marc Garneau arrives at the Shuttle Landing Facility aboard a T-38 jet aircraft. Garneau is with the Canadian Space Agency. He and the rest of the crew are at KSC to take part in Termi... More

CAPE CANAVERAL, Fla. –  At the Launch Pad 39A slidewire basket landing site at NASA's Kennedy Space Center in Florida, a Mode II-IV exercise is underway, involving NASA fire rescue personnel, volunteers portraying astronauts with simulated injuries, helicopters and personnel from the Air Force’s 920th Rescue Wing and medical trauma teams at three central Florida hospitals.  The drill allows teams to practice an emergency response at Pad 39A, including helicopter evacuation to local hospitals. The Space Shuttle Program and U.S. Air Force are conducting the emergency simulation.  Photo credit: NASA/Dimitri Gerondidakis KSC-2009-5261

CAPE CANAVERAL, Fla. – At the Launch Pad 39A slidewire basket landing...

CAPE CANAVERAL, Fla. – At the Launch Pad 39A slidewire basket landing site at NASA's Kennedy Space Center in Florida, a Mode II-IV exercise is underway, involving NASA fire rescue personnel, volunteers portray... More

CAPE CANAVERAL, Fla. -  The STS-125 crew members listen to instructions for driving the M-113 armored personnel carrier.  From left are Mission Specialists John Grunsfeld, Megan McArthur, Michael Good, Mike Massimino and Gregory C. Johnson. The crew members of space shuttle Atlantis' STS-125 mission will each practice driving the M-113 in turn as part of their training on emergency egress procedures. An M-113 will be available to transport the crew to safety in the event of a contingency on the pad before their launch. The crew is at NASA's Kennedy Space Center for a dress launch rehearsal called the terminal countdown demonstration test, or TCDT. It provides astronauts and ground crews with an opportunity to participate in various simulated countdown activities, including equipment familiarization,  emergency training and a simulated launch countdown. The STS-125 mission aboard space shuttle Atlantis to service NASA’s Hubble Space Telescope is targeted to launch Oct. 10.    Photo credit: NASA/Kim Shiflett KSC-08pd2807

CAPE CANAVERAL, Fla. - The STS-125 crew members listen to instruction...

CAPE CANAVERAL, Fla. - The STS-125 crew members listen to instructions for driving the M-113 armored personnel carrier. From left are Mission Specialists John Grunsfeld, Megan McArthur, Michael Good, Mike Mas... More

KENNEDY SPACE CENTER, FLA.  -  At NASA Kennedy Space Center's Shuttle Landing Facility, emergency rescue personnel get equipment ready for a simulated emergency rescue of a shuttle crew after landing.  Known as a Mode VI exercise, the operation uses volunteer workers from the Center to pose as astronauts. The purpose of the simulation is to exercise emergency preparedness personnel, equipment and facilities in rescuing astronauts from a downed orbiter and providing immediate medical attention. Photo credit: NASA/Kim Shiflett KSC-06pd0487

KENNEDY SPACE CENTER, FLA. - At NASA Kennedy Space Center's Shuttle ...

KENNEDY SPACE CENTER, FLA. - At NASA Kennedy Space Center's Shuttle Landing Facility, emergency rescue personnel get equipment ready for a simulated emergency rescue of a shuttle crew after landing. Known as... More

KENNEDY SPACE CENTER, FLA. -- At NASA Kennedy Space Center's Launch Pad 39A, the crew for space shuttle Endeavour's STS-123 mission receives instruction for emergency egress from the pad.  In blue flight suits, from left, are Mission Specialist Mike Foreman; Pilot Gregory H. Johnson; Mission Specialists Takao Doi of the Japan Aerospace Exploration Agency, Garrett Reisman and Robert L. Behnken; and Commander Dominic Gorie. The crew is at Kennedy for a full launch dress rehearsal, known as the terminal countdown demonstration test or TCDT.  The terminal countdown demonstration test provides astronauts and ground crews with an opportunity to participate in various simulated countdown activities, including equipment familiarization and emergency training. Endeavour is targeted to launch March 11 at 2:28 a.m. EDT on a 16-day mission to the International Space Station.  On the mission, Endeavour and its crew will deliver the first section of the Japan Aerospace Exploration Agency's Kibo laboratory and the Canadian Space Agency's two-armed robotic system, Dextre. Photo credit: NASA/Kim Shiflett KSC-08pd0506

KENNEDY SPACE CENTER, FLA. -- At NASA Kennedy Space Center's Launch Pa...

KENNEDY SPACE CENTER, FLA. -- At NASA Kennedy Space Center's Launch Pad 39A, the crew for space shuttle Endeavour's STS-123 mission receives instruction for emergency egress from the pad. In blue flight suits,... More

KENNEDY SPACE CENTER, FLA. -- The STS-101 crew poses on the tarmac at the Shuttle Landing Facility after arriving to take part in a Terminal Countdown Demonstration Test (TCDT). The two days of activities include emergency egress training and a dress rehearsal for launch. Standing left to right are Mission Specialist Susan Helms, Commander James Halsell, Pilot Scott Horowitz, and Mission Speciaists Jeffrey Williams, James Voss, Yury Usachev and Mary Ellen Weber. During their mission to the International Space Station, the STS-101 crew will be delivering logistics and supplies, plus preparing the Station for the arrival of the Zvezda Service Module, expected to be launched by Russia in July 2000. Also, the crew will conduct one space walk to perform maintenance on the Space Station. This will be the third assembly flight for the Space Station. STS-101 is scheduled to launch April 24 at 4:15 p.m. from Launch Pad 39A KSC00pp0447

KENNEDY SPACE CENTER, FLA. -- The STS-101 crew poses on the tarmac at ...

KENNEDY SPACE CENTER, FLA. -- The STS-101 crew poses on the tarmac at the Shuttle Landing Facility after arriving to take part in a Terminal Countdown Demonstration Test (TCDT). The two days of activities inclu... More

The STS-101 crew wave at onlookers as they walk from the Operations and Checkout Building to the Astrovan, which will take them to Space Shuttle Atlantis on Launch Pad 39A for a simulated countdown exercise. Leading the way are (left) Pilot Scott J. "Doc" Horowitz and (right) Commander James D. Halsell Jr. In the second row are Mission Specialists (left) Mary Ellen Weber and (right) Jeffrey N. Williams. In the third row are Mission Specialists (left) James Voss, (waving) Susan J. Helms, and (right) Yury Usachev of Russia. The dress rehearsal for launch is part of Terminal Countdown Demonstration Test (TCDT) activities that include emergency egress training and familiarization with the payload. During their mission to the International Space Station, the STS-101 crew will be delivering logistics and supplies, plus preparing the Station for the arrival of the Zvezda Service Module, expected to be launched by Russia in July 2000. Also, the crew will conduct one space walk to perform maintenance on the Space Station. This will be the third assembly flight for the Space Station. STS-101 is scheduled to launch April 24 at 4:15 p.m. from Launch Pad 39A KSC-00pp0460

The STS-101 crew wave at onlookers as they walk from the Operations an...

The STS-101 crew wave at onlookers as they walk from the Operations and Checkout Building to the Astrovan, which will take them to Space Shuttle Atlantis on Launch Pad 39A for a simulated countdown exercise. Le... More

Previous

of 46

Next