jack, sts

1,740 media by topicpage 1 of 18
KENNEDY SPACE CENTER, FLA. -   On Launch Pad 39B, the cargo in Space Shuttle Atlantis' payload bay is seen before the closing of the bay doors.  The cargo is the 17-and-a-half-ton P3/P4 truss segment for the International Space Station. Scheduled to launch Aug. 27, Atlantis will fly on mission STS-115 with a crew of six to deliver and install the P3/P4 segment to the port side of the integrated truss system on the orbital outpost.  The truss includes a new set of photovoltaic solar arrays.  When unfurled to their full length of 240 feet, the arrays will provide additional power for the station in preparation for the delivery of international science modules over the next two years.  STS-115 is expected to last 11 days and includes three scheduled spacewalks.  Photo credit: NASA/Jack Pfaller KSC-06pd1915

KENNEDY SPACE CENTER, FLA. - On Launch Pad 39B, the cargo in Space S...

KENNEDY SPACE CENTER, FLA. - On Launch Pad 39B, the cargo in Space Shuttle Atlantis' payload bay is seen before the closing of the bay doors. The cargo is the 17-and-a-half-ton P3/P4 truss segment for the In... More

CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, a worker from NASA's Goddard Space Flight Center cuts away the protective wrapping from the Orbital Replacement Unit Carrier for the Hubble Space Telescope. The Orbital Replacement Unit Carrier, or ORUC, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. The Super Lightweight Interchangeable Carrier, or SLIC, and the Flight Support System, or FSS, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in late July. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller KSC-08pd2076

CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servic...

CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, a worker from NASA's Goddard Space Flight Center cuts away the protective wrapping from the Orb... More

CAPE CANAVERAL, Fla. - In the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida, external fuel tank, ET-138, for space shuttle Atlantis' STS-135 mission, is positioned between the twin solid rocket boosters on the mobile launcher platform in high bay-1. Shuttle Atlantis' move, or "rollover," from Orbiter Processing Facility-1 to the VAB is targeted for May 10. Once there it will be mated with the external tank and boosters. Atlantis and its crew of four will deliver the Raffaello multipurpose logistics module packed with supplies and spare parts to the International Space Station. STS-135 is targeted to launch June 28, and will be the last spaceflight for the Space Shuttle Program. Photo credit: NASA/Jack Pfaller KSC-2011-3053

CAPE CANAVERAL, Fla. - In the Vehicle Assembly Building (VAB) at NASA'...

CAPE CANAVERAL, Fla. - In the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida, external fuel tank, ET-138, for space shuttle Atlantis' STS-135 mission, is positioned between the twin s... More

CAPE CANAVERAL, Fla. -- In the early morning hours after landing, space shuttle Endeavour's "towback" vehicle slowly pulls it from the Shuttle Landing Facility to Orbiter Processing Facility-1 at NASA's Kennedy Space Center in Florida. A purge unit that pumps conditioned air into a shuttle after landing is connected to Endeavour's aft end. Once inside the processing facility, Endeavour will be prepared for future public display.            Endeavour's final return from space completed the 16-day, 6.5-million-mile STS-134 mission. Main gear touchdown was at 2:34:51 a.m. EDT, followed by nose gear touchdown at 2:35:04 a.m., and wheelstop at 2:35:36 a.m.   Endeavour and its crew delivered the Alpha Magnetic Spectrometer-2 (AMS) and the Express Logistics Carrier-3 (ELC-3) to the International Space Station. AMS will help researchers understand the origin of the universe and search for evidence of dark matter, strange matter and antimatter from the station. ELC-3 carried spare parts that will sustain station operations once the shuttles are retired from service. STS-134 was the 25th and final flight for Endeavour, which spent 299 days in space, orbited Earth 4,671 times and traveled 122,883,151 miles. Photo credit: NASA/Jack Pfaller KSC-2011-4263

CAPE CANAVERAL, Fla. -- In the early morning hours after landing, spac...

CAPE CANAVERAL, Fla. -- In the early morning hours after landing, space shuttle Endeavour's "towback" vehicle slowly pulls it from the Shuttle Landing Facility to Orbiter Processing Facility-1 at NASA's Kennedy... More

CAPE CANAVERAL, Fla. -- Folks from across the country camped out in communities surrounding NASA's Kennedy Space Center in Florida to witness space shuttle Discovery make history by lifting off on its final scheduled mission from Launch Pad 39A. Seen here is Sand Point Park near U. S. Highway 1 and State Road 406, also known as the A. Max Brewer Causeway, in Titusville, Fla.        Liftoff is set for 4:50 p.m. EST on Feb. 24. Discovery and its six-member STS-133 crew will deliver the Permanent Multipurpose Module, packed with supplies and critical spare parts, as well as Robonaut 2, the dexterous humanoid astronaut helper, to the International Space Station. Discovery, which will fly its 39th mission, is scheduled to be retired following STS-133. This will be the 133rd Space Shuttle Program mission and the 35th shuttle voyage to the space station. For more information on the STS-133 mission, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts133/. Photo credit: NASA/Jack Pfaller KSC-2011-1629

CAPE CANAVERAL, Fla. -- Folks from across the country camped out in co...

CAPE CANAVERAL, Fla. -- Folks from across the country camped out in communities surrounding NASA's Kennedy Space Center in Florida to witness space shuttle Discovery make history by lifting off on its final sch... More

CAPE CANAVERAL, Fla. -- A Hyster forklift moves NASA's Juno spacecraft into Astrotech's payload processing facility in Titusville, Fla. to begin final testing and preparations for launch.        The solar-powered spacecraft will orbit Jupiter's poles 33 times to find out more about the gas giant's origins, structure, atmosphere and magnetosphere and investigate the existence of a solid planetary core. Juno is scheduled to launch aboard an Atlas V rocket from Cape Canaveral, Fla. Aug. 5. For more information visit, www.nasa.gov/juno. Photo credit: NASA/Jack Pfaller    It will splash down into the Atlantic Ocean where the ship and its crew will recover it and tow it back through Port Canaveral for refurbishing for another launch. The STS-124 mission is the second of three flights launching components to complete the Japan Aerospace Exploration Agency's Kibo laboratory. The shuttle crew will install Kibo's large Japanese Pressurized Module and its remote manipulator system, or RMS. Photo credit: USA/Jeff Suter KSC-2011-2818

CAPE CANAVERAL, Fla. -- A Hyster forklift moves NASA's Juno spacecraft...

CAPE CANAVERAL, Fla. -- A Hyster forklift moves NASA's Juno spacecraft into Astrotech's payload processing facility in Titusville, Fla. to begin final testing and preparations for launch. The solar-power... More

CAPE CANAVERAL, Fla. –   Technicians in the Payload Hazardous Servicing Facility remove the protective cover from the Wide Field Camera 3, or WFC3.  The WFC3 is part of the payload on space shuttle Atlantis for the fifth and final Hubble servicing mission, STS-125.  As Hubble enters the last stage of its life, WFC3 will be Hubble's next evolutionary step, allowing Hubble to peer ever further into the mysteries of the cosmos. WFC3 will study a diverse range of objects and phenomena, from young and extremely distant galaxies, to much more nearby stellar systems, to objects within our very own solar system. WFC3 will take the place of Wide Field Planetary Camera 2, which astronauts will bring back to Earth aboard the shuttle. Launch of Atlantis is targeted at 1:34 a.m. EDT Oct. 8.  Photo credit: NASA/Jack Pfaller KSC-08pd2450

CAPE CANAVERAL, Fla. – Technicians in the Payload Hazardous Servicin...

CAPE CANAVERAL, Fla. – Technicians in the Payload Hazardous Servicing Facility remove the protective cover from the Wide Field Camera 3, or WFC3. The WFC3 is part of the payload on space shuttle Atlantis for... More

CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, space shuttle Endeavour's main engine no. 2 is moved out of Orbiter Processing Bay 2 after removal from the shuttle. Engine removal is part of the post-landing processing. Endeavour returned from the STS-127 mission July 31.  Endeavour's next mission is STS-130 targeted for February 2010.  Endeavour will deliver to the International Space Station the Tranquility pressurized module that will provide room for many of the station's life support systems.  Photo credit: NASA/Jack Pfaller KSC-2009-4706

CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, spac...

CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, space shuttle Endeavour's main engine no. 2 is moved out of Orbiter Processing Bay 2 after removal from the shuttle. Engine removal is part of t... More

CAPE CANAVERAL, Fla. -- A "towback" vehicle slowly pulls shuttle Endeavour from the Shuttle Landing Facility to Orbiter Processing Facility-1 at NASA's Kennedy Space Center in Florida. A purge unit that pumps conditioned air into a shuttle after landing is connected to Endeavour's aft end. In the background is the massive Vehicle Assembly Building. Once inside the processing facility, Endeavour will be prepared for future public display.              Endeavour's final return from space completed the 16-day, 6.5-million-mile STS-134 mission. Main gear touchdown was at 2:34:51 a.m. EDT, followed by nose gear touchdown at 2:35:04 a.m., and wheelstop at 2:35:36 a.m.   Endeavour and its crew delivered the Alpha Magnetic Spectrometer-2 (AMS) and the Express Logistics Carrier-3 (ELC-3) to the International Space Station. AMS will help researchers understand the origin of the universe and search for evidence of dark matter, strange matter and antimatter from the station. ELC-3 carried spare parts that will sustain station operations once the shuttles are retired from service. STS-134 was the 25th and final flight for Endeavour, which spent 299 days in space, orbited Earth 4,671 times and traveled 122,883,151 miles. Photo credit: NASA/Jack Pfaller KSC-2011-4273

CAPE CANAVERAL, Fla. -- A "towback" vehicle slowly pulls shuttle Endea...

CAPE CANAVERAL, Fla. -- A "towback" vehicle slowly pulls shuttle Endeavour from the Shuttle Landing Facility to Orbiter Processing Facility-1 at NASA's Kennedy Space Center in Florida. A purge unit that pumps c... More

CAPE CANAVERAL, Fla. – In the Vehicle Assembly Building at NASA's Kennedy Space Center, the external tank for space shuttle Atlantis is lowered toward the solid rocket boosters (the nose cone of one of the boosters is seen here) for mating. The tank and boosters will be secured on the mobile launcher platform below.  Atlantis' STS-125 mission is the fifth and final shuttle servicing mission to NASA’s Hubble Space Telescope.  Launch is targeted for Oct. 8.    Photo credit: NASA/Jack Pfaller KSC-08pd2265

CAPE CANAVERAL, Fla. – In the Vehicle Assembly Building at NASA's Kenn...

CAPE CANAVERAL, Fla. – In the Vehicle Assembly Building at NASA's Kennedy Space Center, the external tank for space shuttle Atlantis is lowered toward the solid rocket boosters (the nose cone of one of the boos... More

CAPE CANAVERAL, Fla. -- Space shuttle Discovery is attached to Launch Pad 39A as the sun rises over NASA's Kennedy Space Center in Florida. It took the spacecraft about six hours to make the journey, known as "rollout," from the Vehicle Assembly Building to the pad. Rollout sets the stage for Discovery's STS-133 crew to practice countdown and launch procedures during the Terminal Countdown Demonstration Test in mid-October.      Targeted to liftoff Nov. 1, Discovery will take the Permanent Multipurpose Module (PMM) packed with supplies and critical spare parts, as well as Robonaut 2 (R2) to the International Space Station. Photo credit: NASA/Jack Pfaller KSC-2010-4736

CAPE CANAVERAL, Fla. -- Space shuttle Discovery is attached to Launch ...

CAPE CANAVERAL, Fla. -- Space shuttle Discovery is attached to Launch Pad 39A as the sun rises over NASA's Kennedy Space Center in Florida. It took the spacecraft about six hours to make the journey, known as "... More

KENNEDY SPACE CENTER, FLA. --  After greeting the media on the Shuttle Landing Facility at NASA's Kennedy Space Center, the STS-122 crew stands in front of space shuttle Atlantis for a final group photo.  From left are Mission Specialists Leland Melvin, Hans Schlegel, Rex Walheim  and Stanley Love, Pilot Alan Poindexter and Commander Steve Frick.  Schlegel represents the European Space Agency.  After a round trip of nearly 5.3 million miles, space shuttle Atlantis and crew returned to Earth with a landing at 9:07 a.m. EST. The shuttle landed on orbit 202 to complete the 13-day STS-122 mission. Main gear touchdown was 9:07:10 a.m. Nose gear touchdown was 9:07:20 a.m. Wheel stop was at 9:08:08 a.m. Mission elapsed time was 12 days, 18 hours, 21 minutes and 44 seconds. During the mission, Atlantis' crew installed the new Columbus laboratory, leaving a larger space station and one with increased science capabilities. The Columbus Research Module adds nearly 1,000 cubic feet of habitable volume and affords room for 10 experiment racks, each an independent science lab. Photo credit: NASA/Jack Pfaller KSC-08pd0407

KENNEDY SPACE CENTER, FLA. -- After greeting the media on the Shuttle...

KENNEDY SPACE CENTER, FLA. -- After greeting the media on the Shuttle Landing Facility at NASA's Kennedy Space Center, the STS-122 crew stands in front of space shuttle Atlantis for a final group photo. From ... More

CAPE CANAVERAL, Fla. –  In the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida, the external fuel tank for space shuttle Atlantis' STS-125 mission is moved out of the checkout cell.  The tank will be lowered into high bay 3 onto the mobile launcher platform and attached to the solid rocket boosters already installed. Atlantis' STS-125 mission is the fifth and final shuttle servicing mission to NASA’s Hubble Space Telescope.  Launch is targeted for May 12.  Photo credit: NASA/Jack Pfaller KSC-2009-1166

CAPE CANAVERAL, Fla. – In the Vehicle Assembly Building at NASA's Ken...

CAPE CANAVERAL, Fla. – In the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida, the external fuel tank for space shuttle Atlantis' STS-125 mission is moved out of the checkout cell. The tan... More

KENNEDY SPACE CENTER, FLA. -- In the Vehicle Assembly Building at NASA's Kennedy Space Center, a crane lifts a frustum high above the transfer aisle.  The solid rocket booster segment is being moved into a high bay where it will be added to the stack being prepared for space shuttle mission STS-122, targeted for launch in December. On this mission, Atlantis will carry the Columbus Laboratory, the European Space Agency's largest contribution to the International Space Station.  Columbus is a multifunctional, pressurized laboratory that will be permanently attached to U.S. Node 2, also called Harmony, to carry out experiments in materials science, fluid physics and biosciences, as well as to support a number of technological applications. Photo credit: NASA/Jack Pfaller KSC-07pd2847

KENNEDY SPACE CENTER, FLA. -- In the Vehicle Assembly Building at NASA...

KENNEDY SPACE CENTER, FLA. -- In the Vehicle Assembly Building at NASA's Kennedy Space Center, a crane lifts a frustum high above the transfer aisle. The solid rocket booster segment is being moved into a high... More

KENNEDY SPACE CENTER, FLA. -- The solid rocket booster retrieval ship Freedom Star is temporarily docked at Port Canaveral while the booster it was towing is moved alongside for the remainder of the trip upriver to Cape Canaveral Air Force Station.  Freedom Star retrieved the booster after the launch of space shuttle Atlantis' STS-122 mission. The space shuttle's solid rocket booster casings and associated flight hardware are recovered at sea. The boosters impact the Atlantic Ocean approximately seven minutes after liftoff. The splashdown area is a square of about 6 by 9 nautical miles located about 140 nautical miles downrange from the launch pad. The retrieval ships are stationed approximately 8 to 10 nautical miles from the impact area at the time of splashdown. As soon as the boosters enter the water, the ships accelerate to a speed of 15 knots and quickly close on the boosters. The pilot chutes and main parachutes are the first items to be brought on board. With the chutes and frustum recovered, attention turns to the boosters. The ship's tow line is connected and the booster is returned to the Port and, after transfer to a position alongside the ship, to Hangar AF at Cape Canaveral Air Force Station. There, the expended boosters are disassembled, refurbished and reloaded with solid propellant for reuse.  Photo credit: NASA/Jack Pfaller KSC-08pd0262

KENNEDY SPACE CENTER, FLA. -- The solid rocket booster retrieval ship ...

KENNEDY SPACE CENTER, FLA. -- The solid rocket booster retrieval ship Freedom Star is temporarily docked at Port Canaveral while the booster it was towing is moved alongside for the remainder of the trip uprive... More

CAPE CANAVERAL, Fla. - The giant external fuel tank and twin solid rocket boosters attached to space shuttle Endeavour bask in the sunlight as the rotating service structure (RSS) moves away on Launch Pad 39A at NASA's Kennedy Space Center in Florida. The structure provides weather protection and access to the shuttle while it awaits lift off on the pad. RSS "rollback," as it's called, began at 11:44 a.m. EDT on May 15 and was completed at 12:24 p.m.           STS-134 will deliver the Alpha Magnetic Spectrometer-2 (AMS), Express Logistics Carrier-3, a high-pressure gas tank and additional spare parts for the Dextre robotic helper to the International Space Station. May 16 at 8:56 a.m. will be the second launch attempt for Endeavour. The first attempt on April 29 was scrubbed because of an issue associated with a faulty power distribution box called the aft load control assembly-2 (ALCA-2). STS-134 will be the final spaceflight for Endeavour. For more information visit, www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts134/index.html. Photo credit: NASA/Jack Pfaller KSC-2011-3551

CAPE CANAVERAL, Fla. - The giant external fuel tank and twin solid roc...

CAPE CANAVERAL, Fla. - The giant external fuel tank and twin solid rocket boosters attached to space shuttle Endeavour bask in the sunlight as the rotating service structure (RSS) moves away on Launch Pad 39A a... More

CAPE CANAVERAL, Fla. - Workers move the Orbiter Transporter System (OTS) into Orbiter Processing Facility-1 at NASA's Kennedy Space Center in Florida. The OTS will be moved under shuttle Atlantis for its rollover to the nearby Vehicle Assembly Building (VAB).            Once inside the VAB, Atlantis will be joined to its solid rocket boosters and external fuel tank on the mobile launcher platform. Later this month, Atlantis is scheduled to "rollout" to Launch Pad 39A on the STS-135 mission, which will deliver the Raffaello multi-purpose logistics module packed with supplies and spare parts to the International Space Station. STS-135, targeted to launch June 28, will be the 33rd flight of Atlantis, the 37th shuttle mission to the station, and the 135th and final mission of NASA's Space Shuttle Program. For more information, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. NASA/Jack Pfaller KSC-2011-3350

CAPE CANAVERAL, Fla. - Workers move the Orbiter Transporter System (OT...

CAPE CANAVERAL, Fla. - Workers move the Orbiter Transporter System (OTS) into Orbiter Processing Facility-1 at NASA's Kennedy Space Center in Florida. The OTS will be moved under shuttle Atlantis for its rollov... More

CAPE CANAVERAL, Fla. -- Technicians in the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, check the progress of the Payload Attach System, or PAS, as it is lifted up to the Alpha Magnetic Spectrometer, where it will be attached to the bottom of the AMS. The PAS provides a method of securely connecting the payload to the International Space Station.      AMS, a state-of-the-art particle physics detector, is designed to operate as an external module on the International Space Station. It will use the unique environment of space to study the universe and its origin by searching for dark matter. AMS will fly to the station aboard space shuttle Endeavour's STS-134 mission targeted to launch Feb. 26, 2011. Photo credit: NASA/Jack Pfaller KSC-2010-4548

CAPE CANAVERAL, Fla. -- Technicians in the Space Station Processing Fa...

CAPE CANAVERAL, Fla. -- Technicians in the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, check the progress of the Payload Attach System, or PAS, as it is lifted up to the Alpha M... More

CAPE CANAVERAL, Fla. -- Repair work to space shuttle Discovery's external fuel tank begins in the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida. Technicians will modify 32 support beams, called stringers, on the tank's intertank region by fitting pieces of metal, called radius blocks, over the stringers' edges where they attach to the thrust panel area. The thrust panel is where the tank meets the two solid rocket boosters and sees the most stress during the flight into orbit. After the modifications and additional scans of the stringers are complete, foam insulation will be re-applied.            Discovery's next launch opportunity to the International Space Station on the STS-133 mission is no earlier than Feb. 3, 2011. For more information on STS-133, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts133/. Photo credit: NASA/Jack Pfaller KSC-2011-1000

CAPE CANAVERAL, Fla. -- Repair work to space shuttle Discovery's exter...

CAPE CANAVERAL, Fla. -- Repair work to space shuttle Discovery's external fuel tank begins in the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida. Technicians will modify 32 support beams, c... More

CAPE CANAVERAL, Fla. -- Michael McCulley, former astronaut and chairman of the Astronauts Memorial Foundation, speaks to a crowd gathered in front of the Space Mirror Memorial at the Kennedy Space Center Visitor Complex in Florida to honor space shuttle Challenger's STS-51L crew members who gave their lives for while furthering the cause of exploration and discovery. 2011 marks the 25th anniversary of the loss of Challenger, which broke apart over the Atlantic Ocean 73 seconds into flight on Jan. 28, 1986.          NASA/Jack Pfaller KSC-2011-1244

CAPE CANAVERAL, Fla. -- Michael McCulley, former astronaut and chairma...

CAPE CANAVERAL, Fla. -- Michael McCulley, former astronaut and chairman of the Astronauts Memorial Foundation, speaks to a crowd gathered in front of the Space Mirror Memorial at the Kennedy Space Center Visito... More

CAPE CANAVERAL, Fla. -- Swarms of people are at the Kennedy Space Center Visitor Complex in Florida to watch space shuttle Discovery lift off on its final scheduled mission from Launch Pad 39A.      Liftoff is set for 4:50 p.m. EST on Feb. 24. Discovery and its six-member STS-133 crew will deliver the Permanent Multipurpose Module, packed with supplies and critical spare parts, as well as Robonaut 2, the dexterous humanoid astronaut helper, to the International Space Station. Discovery, which will fly its 39th mission, is scheduled to be retired following STS-133. This will be the 133rd Space Shuttle Program mission and the 35th shuttle voyage to the space station. For more information on the STS-133 mission, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts133/. Photo credit: NASA/Jack Pfaller KSC-2011-1624

CAPE CANAVERAL, Fla. -- Swarms of people are at the Kennedy Space Cent...

CAPE CANAVERAL, Fla. -- Swarms of people are at the Kennedy Space Center Visitor Complex in Florida to watch space shuttle Discovery lift off on its final scheduled mission from Launch Pad 39A. Liftoff is ... More

CAPE CANAVERAL, Fla. – Space shuttle Discovery is being towed from NASA Kennedy Space Center's Shuttle Landing Facility to Orbiter Processing Facility 3.  Discovery returned to Kennedy atop a Shuttle Carrier Aircraft Sept. 21 after a two-day ferry flight. The piggybacked shuttle and aircraft touched down on the Shuttle Landing Facility's runway 33 at 12:05 p.m. EDT and the shuttle later was demated from the aircraft.  Discovery landed at Edwards Air Force Base in California on Sept. 11 after the 13-day STS-128 mission to the International Space Station. Landings at Kennedy were waved off on two days due to inclement weather, leading to the landing at Edwards.   Photo credit: NASA/Jack Pfaller KSC-2009-5168

CAPE CANAVERAL, Fla. – Space shuttle Discovery is being towed from NAS...

CAPE CANAVERAL, Fla. – Space shuttle Discovery is being towed from NASA Kennedy Space Center's Shuttle Landing Facility to Orbiter Processing Facility 3. Discovery returned to Kennedy atop a Shuttle Carrier Ai... More

CAPE CANAVERAL, Fla. - At the Shuttle Landing Facility at NASA's Kennedy Space Center in Florida, workers prepare to roll the transportation case protecting the Russian-built Mini Research Module1, or MRM1, from the cargo bay of a Volga-Dnepr Antonov AN-124-100, a Ukranian/Russian aircraft.    The second in a series of new pressurized components for Russia, the module, named Rassvet, will be permanently attached to the International Space Station's Zarya module on space shuttle Atlantis' STS-132 mission. An Integrated Cargo Carrier will join the MRM in Atlantis' payload bay. Three spacewalks are planned to store spare components outside the station, including six spare batteries, a boom assembly for the Ku-band antenna and spares for the Canadian Dextre robotic arm extension. A radiator, airlock, and European robotic arm for the Russian Multi-purpose Laboratory Module also will be delivered to the station.  Launch is targeted for May 14, 2010.  Photo credit: NASA/Jack Pfaller KSC-2009-6857

CAPE CANAVERAL, Fla. - At the Shuttle Landing Facility at NASA's Kenne...

CAPE CANAVERAL, Fla. - At the Shuttle Landing Facility at NASA's Kennedy Space Center in Florida, workers prepare to roll the transportation case protecting the Russian-built Mini Research Module1, or MRM1, fro... More

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility 1 at NASA's Kennedy Space Center, space shuttle Atlantis' payload bay has been thoroughly cleaned and is ready to receive the carriers transporting the instruments and equipment needed to service the Hubble Space Telescope.  Atlantis is targeted to launch Oct. 8 on the STS-125 mission to service Hubble. The mission crew will perform history-making, on-orbit “surgery” on two important science instruments aboard the telescope. After capturing the telescope, two teams of spacewalking astronauts will perform the repairs during five planned spacewalks. Photo credit: NASA/Jack Pfaller KSC-08pd2122

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility 1 at NASA's Kenn...

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility 1 at NASA's Kennedy Space Center, space shuttle Atlantis' payload bay has been thoroughly cleaned and is ready to receive the carriers transporting the inst... More

CAPE CANAVERAL, Fla. -- In the Space Shuttle Main Engine Processing Facility at NASA's Kennedy Space Center in Florida, two of six space shuttle main engines are prepared for the STS-134 and STS-335 missions. Postflight inspections and maintenance of each engine are conducted in the facility between shuttle missions by Pratt & Whitney Rocketdyne aerospace technicians. Three main engines are clustered at the aft end of the shuttle and have a combined thrust of more than 1.2 million pounds. Each engine utilizes liquid hydrogen for fuel and liquid oxygen as oxidizer and operates during the entire eight-and-a-half minute ride to orbit.    Space shuttle Endeavour's STS-134 mission is the final planned mission of the Space Shuttle Program and will deliver the Alpha Magnetic Spectrometer, as well as critical spare components, to the International Space Station next year. Shuttle Atlantis will be prepared for STS-335, which is the planned "launch on need," or potential rescue mission, for Endeavour's STS-134 mission. For information, visit www.nasa.gov/shuttle. Photo credit: NASA/Jack Pfaller KSC-2010-4670

CAPE CANAVERAL, Fla. -- In the Space Shuttle Main Engine Processing Fa...

CAPE CANAVERAL, Fla. -- In the Space Shuttle Main Engine Processing Facility at NASA's Kennedy Space Center in Florida, two of six space shuttle main engines are prepared for the STS-134 and STS-335 missions. P... More

KENNEDY SPACE CENTER, FLA. -   External tank No. 123 is being transported from the Pegasus barge in the turn basin at the Launch Complex 39 Area to the Vehicle Assembly Building where it will be lifted into a checkout cell for further work.  The tank, shipped from NASA's Michoud Assembly Facility in New Orleans, has undergone major safety changes, including removal of the protuberance air load ramps.  It is designated to launch Space Shuttle Discovery on mission STS-116 in December.  Mission STS-116 will deliver the P5 truss segment, a SPACEHAB module and other key components to the International Space Station.  Launch is currently scheduled no earlier than Dec. 14.  Photo credit: NASA/Jack Pfaller KSC-06pd2178

KENNEDY SPACE CENTER, FLA. - External tank No. 123 is being transpor...

KENNEDY SPACE CENTER, FLA. - External tank No. 123 is being transported from the Pegasus barge in the turn basin at the Launch Complex 39 Area to the Vehicle Assembly Building where it will be lifted into a c... More

CAPE CANAVERAL, Fla. – In High Bay 1 in the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida, space shuttle Endeavour hovers over the mobile launcher platform to which its external fuel tank and solid rocket boosters are secured.  Next, Endeavour will be attached to the tank to complete the shuttle stack.    Rollout of the stack to Kennedy’s Launch Pad 39A, a significant milestone in launch processing activities, is planned for early January 2010. The Italian-built Tranquility module, the primary payload for Endeavour's STS-130 mission, will be installed in the payload bay after the shuttle arrives at the pad.  Launch is targeted for early February. For information on the STS-130 mission and crew, visit http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts130/index.html.  Photo credit: NASA/Jack Pfaller KSC-2009-6777

CAPE CANAVERAL, Fla. – In High Bay 1 in the Vehicle Assembly Building ...

CAPE CANAVERAL, Fla. – In High Bay 1 in the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida, space shuttle Endeavour hovers over the mobile launcher platform to which its external fuel tank ... More

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, Shuttle Weather Officer Kathy Winters talks to media about the weather forecast for space shuttle Discovery's upcoming launch to the International Space Station during a Countdown Status Briefing.            Scheduled to lift off Nov. 3 at 3:52 p.m. EDT, Discovery and crew will deliver the Permanent Multipurpose Module, packed with supplies and critical spare parts, as well as Robonaut 2, the dexterous humanoid astronaut helper, to the orbiting outpost. For more information on the STS-133 mission, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts133/. Photo credit: NASA/Jack Pfaller KSC-2010-5404

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, Shu...

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, Shuttle Weather Officer Kathy Winters talks to media about the weather forecast for space shuttle Discovery's upcoming launch to the Internatio... More

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-3 at NASA's Kennedy Space Center in Florida, workers discuss moving, or "rolling over," shuttle Discovery to the nearby Vehicle Assembly Building (VAB). Once inside the VAB, the shuttle will be joined to its solid rocket boosters and external fuel tank. Later this month, Discovery is scheduled to "rollout" to Launch Pad 39A for its launch to the International Space Station on the STS-133 mission.    Targeted to liftoff Nov. 1, Discovery will take the Permanent Multipurpose Module (PMM) packed with supplies and critical spare parts, as well as Robonaut 2 (R2) to the station. Photo credit: NASA/Jack Pfaller KSC-2010-4583

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-3 at NASA's Ken...

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-3 at NASA's Kennedy Space Center in Florida, workers discuss moving, or "rolling over," shuttle Discovery to the nearby Vehicle Assembly Building (VAB). On... More

CAPE CANAVERAL, Fla. – In the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, a technician removes the protective cover from the Soft Capture and Rendezvous System, or SCRS.  The SCRS will enable the future rendezvous, capture and safe disposal of Hubble by either a crewed or robotic mission. The SCRS greatly increases the current shuttle capture interfaces on Hubble, therefore significantly reducing the rendezvous and capture design complexities associated with the disposal mission. The SCRS comprises the Soft Capture Mechanism system and the Relative Navigation System and is part of the payload on the fifth and final Hubble servicing mission, STS-125, targeted for launch Oct. 8.  Photo credit: NASA/Jack Pfaller KSC-08pd2385

CAPE CANAVERAL, Fla. – In the Payload Hazardous Servicing Facility at ...

CAPE CANAVERAL, Fla. – In the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, a technician removes the protective cover from the Soft Capture and Rendezvous System, or SCRS. The SCRS will ... More

CAPE CANAVERAL, Fla. -- A Shuttle Training Aircraft (STA) is ready for flight on the Shuttle Landing Facility runway at NASA's Kennedy Space Center in Florida. STS-133 Commander Steve Lindsey and Pilot Eric Boe will fly the modified Gulfstream II business jets to mimic the shuttle's handling during the final phase of landing. Practice landings are part of the Terminal Countdown Demonstration Test (TCDT), which provides each shuttle crew and launch team an opportunity to participate in various simulated activities, including equipment familiarization and emergency training at the launch pad.    Space shuttle Discovery and its STS-133 crew will deliver the Permanent Multipurpose Module, packed with supplies and critical spare parts, as well as Robonaut 2, the dexterous humanoid astronaut helper, to the International Space Station. Launch is targeted for Nov. 1 at 4:40 p.m. For more information on the STS-133 mission, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts133/. Photo credit: NASA/Jack Pfaller KSC-2010-5093

CAPE CANAVERAL, Fla. -- A Shuttle Training Aircraft (STA) is ready for...

CAPE CANAVERAL, Fla. -- A Shuttle Training Aircraft (STA) is ready for flight on the Shuttle Landing Facility runway at NASA's Kennedy Space Center in Florida. STS-133 Commander Steve Lindsey and Pilot Eric Boe... More

KENNEDY SPACE CENTER, FLA. -   External tank No. 123 makes the turn toward the Vehicle Assembly Building after being offloaded from the Pegasus barge in the turn basin at the Launch Complex 39 Area.  Once inside the VAB, the tank will be lifted into a checkout cell for further work.  Shipped from NASA's Michoud Assembly Facility in New Orleans, the tank has undergone major safety changes, including removal of the protuberance air load ramps.  It is designated to launch Space Shuttle Discovery on mission STS-116 in December.  Mission STS-116 will deliver the P5 truss segment, a SPACEHAB module and other key components to the International Space Station.  Launch is currently scheduled no earlier than Dec. 14.  Photo credit: NASA/Jack Pfaller KSC-06pd2180

KENNEDY SPACE CENTER, FLA. - External tank No. 123 makes the turn to...

KENNEDY SPACE CENTER, FLA. - External tank No. 123 makes the turn toward the Vehicle Assembly Building after being offloaded from the Pegasus barge in the turn basin at the Launch Complex 39 Area. Once insid... More

CAPE CANAVERAL, Fla. –   The Pegasus barge carrying the external tank for space shuttle Atlantis' STS-125 mission to NASA's Hubble Space Telescope is tied to the dock in the turn basin in the Launch Complex 39 Area of NASA's Kennedy Space Center.  The tank will offloaded and moved to the Vehicle Assembly Building.   Once inside the building, the tank will be raised to vertical, lifted and moved into a checkout cell.  Stacking of the tank and solid rocket boosters is planned to start Aug. 7.  Atlantis is targeted to launch Oct. 8.  Photo credit: NASA/Jack Pfaller KSC-08pd1979

CAPE CANAVERAL, Fla. – The Pegasus barge carrying the external tank ...

CAPE CANAVERAL, Fla. – The Pegasus barge carrying the external tank for space shuttle Atlantis' STS-125 mission to NASA's Hubble Space Telescope is tied to the dock in the turn basin in the Launch Complex 39 ... More

CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, a worker from NASA's Goddard Space Flight Center removes the protective wrapping from the Orbital Replacement Unit Carrier for the Hubble Space Telescope.  The Orbital Replacement Unit Carrier, or ORUC, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. The Super Lightweight Interchangeable Carrier, or SLIC, and the Flight Support System, or FSS, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in late July. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller KSC-08pd2081

CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servic...

CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, a worker from NASA's Goddard Space Flight Center removes the protective wrapping from the Orbit... More

CAPE CANAVERAL, Fla. -- A United Space Alliance technician monitors the Space Shuttle Program's last external fuel tank, ET-122, as it moves from the Turn Basin to the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida. The tank traveled 900 miles by sea from NASA's Michoud Assembly Facility in New Orleans aboard the Pegasus Barge. Once inside the Vehicle Assembly Building, it eventually will be attached to space shuttle Endeavour for the STS-134 mission to the International Space Station. STS-134, targeted to launch in Feb. 2011, currently is scheduled to be the last mission in the shuttle program.          The tank, which is the largest element of the space shuttle stack, was damaged during Hurricane Katrina in August 2005 and restored to flight configuration by Lockheed Martin Space Systems Company employees. Photo credit: NASA/Jack Pfaller KSC-2010-4893

CAPE CANAVERAL, Fla. -- A United Space Alliance technician monitors th...

CAPE CANAVERAL, Fla. -- A United Space Alliance technician monitors the Space Shuttle Program's last external fuel tank, ET-122, as it moves from the Turn Basin to the Vehicle Assembly Building at NASA's Kenned... More

CAPE CANAVERAL, Fla. -- In High Bay 3 of the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida, a large yellow, metal sling lowers shuttle Discovery to its external fuel tank and solid rocket boosters. The lift and mate operation began Sept. 9 and wrapped up early Sept. 10. Discovery is scheduled to roll out to Launch Pad 39A later this month in preparation for its launch to the International Space Station on the STS-133 mission.    Targeted to lift off Nov. 1, Discovery will take the Permanent Multipurpose Module (PMM) packed with supplies and critical spare parts, as well as Robonaut 2 (R2) to the station. Photo credit: NASA/Jack Pfaller KSC-2010-4626

CAPE CANAVERAL, Fla. -- In High Bay 3 of the Vehicle Assembly Building...

CAPE CANAVERAL, Fla. -- In High Bay 3 of the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida, a large yellow, metal sling lowers shuttle Discovery to its external fuel tank and solid rocket ... More

CAPE CANAVERAL, Fla. -- Technicians in the Astrotech payload processing facility in Titusville, Fla. install thermal insulation on NASA's Juno magnetometer boom. The boom structure is attached to Juno's solar array #1 that will help power the NASA spacecraft on its mission to Jupiter.      The solar-powered spacecraft will orbit Jupiter's poles 33 times to find out more about the gas giant's origins, structure, atmosphere and magnetosphere and investigate the existence of a solid planetary core. Juno is scheduled to launch aboard an Atlas V rocket from Cape Canaveral, Fla. Aug. 5. For more information visit, www.nasa.gov/juno. Photo credit: NASA/Jack Pfaller    It will splash down into the Atlantic Ocean where the ship and its crew will recover it and tow it back through Port Canaveral for refurbishing for another launch. The STS-124 mission is the second of three flights launching components to complete the Japan Aerospace Exploration Agency's Kibo laboratory. The shuttle crew will install Kibo's large Japanese Pressurized Module and its remote manipulator system, or RMS. Photo credit: USA/Jeff Suter KSC-2011-2821

CAPE CANAVERAL, Fla. -- Technicians in the Astrotech payload processin...

CAPE CANAVERAL, Fla. -- Technicians in the Astrotech payload processing facility in Titusville, Fla. install thermal insulation on NASA's Juno magnetometer boom. The boom structure is attached to Juno's solar a... More

CAPE CANAVERAL, Fla. –   In the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, the transporter holds the container with the second shipment of hardware space shuttle Atlantis' STS-125 mission to NASA's Hubble Space Telescope. The container holds the Super Lightweight Interchangeable Carrier, or SLIC, and the Orbital Replacement Unit Carrier, or ORUC. Another payload carrier, the Flight Support System, has already been delivered,  and the Multi-Use Lightweight Equipment carrier will be delivered in late July. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8.  Photo credit: NASA/Jack Pfaller KSC-08pd2039

CAPE CANAVERAL, Fla. – In the Payload Hazardous Servicing Facility a...

CAPE CANAVERAL, Fla. – In the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, the transporter holds the container with the second shipment of hardware space shuttle Atlantis' STS-125 miss... More

CAPE CANAVERAL, Fla. -- In the Press Site auditorium at NASA's Kennedy Space Center in Florida, Shuttle Launch Director Mike Leinbach briefs media about the launch status of space shuttle Endeavour's STS-134 mission and announces a new launch date.      Technicians replaced and tested the aft load control assembly-2 (ALCA-2) and wiring located in Endeavour's aft avionics bay 5. ALCA-2 distributes power to nine shuttle systems and is believed to have caused fuel line heaters for Endeavour's auxiliary power unit-1 (APU-1) to fail April 29 during the first launch attempt. Launch now is scheduled for May 16 at 8:56 a.m. EDT. Endeavour and its crew will deliver the Express Logistics Carrier-3, Alpha Magnetic Spectrometer-2 (AMS), a high-pressure gas tank and additional spare parts for the Dextre robotic helper to the station. This will be the final spaceflight for Endeavour. For more information visit, www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts134/index.html. Photo credit: NASA/Jack Pfaller KSC-2011-3421

CAPE CANAVERAL, Fla. -- In the Press Site auditorium at NASA's Kennedy...

CAPE CANAVERAL, Fla. -- In the Press Site auditorium at NASA's Kennedy Space Center in Florida, Shuttle Launch Director Mike Leinbach briefs media about the launch status of space shuttle Endeavour's STS-134 mi... More

CAPE CANAVERAL, Fla. - In the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida, external fuel tank, ET-138, for space shuttle Atlantis' STS-135 mission, is lowered into high bay-1 for joining with the twin solid rocket boosters on the mobile launcher platform. Shuttle Atlantis' move, or "rollover," from Orbiter Processing Facility-1 to the VAB is targeted for May 10. Once there it will be mated with the external tank and boosters. Atlantis and its crew of four will deliver the Raffaello multipurpose logistics module packed with supplies and spare parts to the International Space Station. STS-135 is targeted to launch June 28, and will be the last spaceflight for the Space Shuttle Program. Photo credit: NASA/Jack Pfaller KSC-2011-3041

CAPE CANAVERAL, Fla. - In the Vehicle Assembly Building (VAB) at NASA'...

CAPE CANAVERAL, Fla. - In the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida, external fuel tank, ET-138, for space shuttle Atlantis' STS-135 mission, is lowered into high bay-1 for j... More

CAPE CANAVERAL, Fla. –– Space shuttle Atlantis on Launch Pad 39A is viewed across the lagoon at NASA's Kennedy Space Center in Florida.  Atlantis is targeted to launch May 12 on the STS-125 mission to upgrade NASA's Hubble Space Telescope.  Endeavour will be prepared on the pad for liftoff in the unlikely event that a rescue mission is necessary following space shuttle Atlantis' launch May 12 on the STS-125 mission to upgrade NASA's Hubble Space Telescope. After Atlantis is cleared to land, Endeavour will move to Launch Pad 39A for its upcoming STS-127 mission to the International Space Station, targeted to launch June 13. Photo credit: NASA/Jack Pfaller KSC-2009-2753

CAPE CANAVERAL, Fla. –– Space shuttle Atlantis on Launch Pad 39A is vi...

CAPE CANAVERAL, Fla. –– Space shuttle Atlantis on Launch Pad 39A is viewed across the lagoon at NASA's Kennedy Space Center in Florida. Atlantis is targeted to launch May 12 on the STS-125 mission to upgrade N... More

CAPE CANAVERAL, Fla. -- In the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, technicians are documenting the installation of radius blocks to space shuttle Discovery's external fuel tank's support beams known as "stringers" near the intertank’s thrust panel area.            The thrust panel is where the tank meets the two solid rocket boosters and sees the most stress during the flight into orbit. After the modifications and additional scans of the stringers are complete, foam insulation will be re-applied. Discovery's next launch opportunity to the International Space Station on the STS-133 mission is targeted for liftoff Feb. 24. For more information on STS-133, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts133/. Photo credit: NASA/Jack Pfaller KSC-2011-1072

CAPE CANAVERAL, Fla. -- In the Vehicle Assembly Building at NASA’s Ken...

CAPE CANAVERAL, Fla. -- In the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, technicians are documenting the installation of radius blocks to space shuttle Discovery's external fuel tank'... More

CAPE CANAVERAL, Fla. --  Space shuttle Endeavour is towed by a diesel-powered tractor into the Orbiter Processing Facility, or OPF, at NASA's Kennedy Space Center in Florida.  After landing in California to end the STS-126 mission, Endeavour returned to Kennedy on a piggyback flight atop a shuttle carrier aircraft.  In the OPF, Endeavour will begin preparations for its next mission, STS-127, targeted for May 2009. Photo credit: NASA/Jack Pfaller KSC-08pd4026

CAPE CANAVERAL, Fla. -- Space shuttle Endeavour is towed by a diesel-...

CAPE CANAVERAL, Fla. -- Space shuttle Endeavour is towed by a diesel-powered tractor into the Orbiter Processing Facility, or OPF, at NASA's Kennedy Space Center in Florida. After landing in California to end... More

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, the Alpha Magnetic Spectrometer, or AMS, arrives on the Shuttle Landing Facility runway aboard an Air Force C-5M aircraft from Europe. The state-of-the-art particle physics detector is designed to operate as an external module on the International Space Station. It will use the unique environment of space to study the universe and its origin by searching for dark matter.      AMS will fly to the International Space Station aboard space shuttle Endeavour's STS-134 mission targeted to launch Feb. 26, 2011.  Photo credit: NASA/Jack Pfaller KSC-2010-4481

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, the...

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, the Alpha Magnetic Spectrometer, or AMS, arrives on the Shuttle Landing Facility runway aboard an Air Force C-5M aircraft from Europe. The stat... More

CAPE CANAVERAL, Fla. - In the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, a technician works to replace the protective cover on the Super Lightweight Interchangeable Carrier, or SLIC.  The cover was removed to clean  the carrier of contaminants found Sept. 17 during preparations to deliver NASA's Hubble Space Telescope servicing payload to Launch Pad 39A. Cleanliness is extremely important for space shuttle Atlantis’ STS-125 mission to Hubble, and the teams have insured that the SLIC  is ready to fly.  The SLIC, which holds battery module assemblies, is built with state-of-the-art, lightweight, composite materials - carbon fiber with a cyanate ester resin and a titanium metal matrix composite. These composites have greater strength-to-mass ratios than the metals typically used in spacecraft design. The carrier is one of four being transferred to Launch Pad 39A. At the pad, the carriers will be loaded into Atlantis’ payload bay.  Launch of Atlantis is targeted for Oct. 10.   Photo credit: NASA/Jack Pfaller KSC-08pd2655

CAPE CANAVERAL, Fla. - In the Payload Hazardous Servicing Facility at ...

CAPE CANAVERAL, Fla. - In the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, a technician works to replace the protective cover on the Super Lightweight Interchangeable Carrier, or SLIC. ... More

CAPE CANAVERAL, Fla. -- In the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, the Alpha Magnetic Spectrometer-2 (AMS) begins a 180-degree rotation to provide better access for work to be performed on its avionics box. Technicians also will install a flight releasable grappling fixture to AMS while it is upside down.            AMS is designed to operate as an external experiment on the International Space Station. It will use the unique environment of space to study the universe and its origin by searching for dark matter. AMS will fly to the station aboard space shuttle Endeavour's STS-134 mission targeted to launch Feb. 27, 2011. Photo credit: NASA/Jack Pfaller KSC-2010-5392

CAPE CANAVERAL, Fla. -- In the Space Station Processing Facility at NA...

CAPE CANAVERAL, Fla. -- In the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, the Alpha Magnetic Spectrometer-2 (AMS) begins a 180-degree rotation to provide better access for work... More

CAPE CANAVERAL, Fla. -- Operations are under way to roll the protective rotating service structure, at left, around space shuttle Endeavour upon its arrival at Launch Pad 39A at NASA's Kennedy Space Center in Florida.    Riding atop a crawler-transporter attached to its external fuel tank and solid rocket boosters, Endeavour's 3.4-mile trek, known as "rollout," began at the Vehicle Assembly Building at 7:56 p.m. EST March 10 and ended at 3:49 a.m. EST, nearly eight hours later. This is Endeavour's final scheduled rollout.  Endeavour and its six-member crew will deliver the Express Logistics Carrier-3, Alpha Magnetic Spectrometer-2 (AMS), a high-pressure gas tank, additional spare parts for the Dextre robotic helper and micrometeoroid debris shields to the International Space Station on the shuttle's final spaceflight, STS-134. Launch is targeted for 7:48 p.m. EDT April 19. For more information, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts134/index.html. Photo credit: NASA/Jack Pfaller KSC-2011-2239

CAPE CANAVERAL, Fla. -- Operations are under way to roll the protectiv...

CAPE CANAVERAL, Fla. -- Operations are under way to roll the protective rotating service structure, at left, around space shuttle Endeavour upon its arrival at Launch Pad 39A at NASA's Kennedy Space Center in F... More

CAPE CANAVERAL, Fla. -- In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, a worker from NASA's Goddard Space Flight Center documents the installation of a pallet support strut on the Super Lightweight Interchangeable Carrier for the Hubble Space Telescope.  The Super Lightweight Interchangeable Carrier, or SLIC, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. SLIC is built with state-of-the-art, lightweight, composite materials - carbon fiber with a cyanate ester resin and a titanium metal matrix composite. These composites have greater strength-to-mass ratios than the metals typically used in spacecraft design. The Orbital Replacement Unit Carrier, or ORUC, and the Flight Support System, or FSS, have also arrived at Kennedy.     The Multi-Use Lightweight Equipment carrier will be delivered in early August. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8.  Photo credit: NASA/Jack Pfaller KSC-08pd2095

CAPE CANAVERAL, Fla. -- In the high bay of the Payload Hazardous Servi...

CAPE CANAVERAL, Fla. -- In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, a worker from NASA's Goddard Space Flight Center documents the installation of a pallet suppor... More

CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, the flatbed trailer leaves the Shuttle Landing Facility with the Node 3 module.  The module will be delivered to the Space Station Processing Facility.  Named Tranquility, the module will be delivered to the International Space Station on the STS-130 mission.  Tranquility will eventually house the life support equipment necessary for the space station's permanent crew of six. It will also accommodate the European Space Agency's Cupola observation module, a seven-window, dome-shaped structure.  Tranquility is targeted for launch aboard space shuttle Endeavour in February 2010.  Photo credit: NASA/Jack Pfaller KSC-2009-3233

CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, the ...

CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, the flatbed trailer leaves the Shuttle Landing Facility with the Node 3 module. The module will be delivered to the Space Station Processing Fa... More

CAPE CANAVERAL, Fla. – In the Space Station Processing Facility at NASA's Kennedy Space Center in Florida,  a crane lifts the plasma contactor unit, or PCU, that will be installed on the Express Logistics Carrier, or ELC.  The PCU is used to disperse electrical charge build-ups on the International Space Station. The carrier is part of the STS-129 payload on space shuttle Atlantis, which will deliver to the International Space Station two spare gyroscopes, two nitrogen tank assemblies, two pump modules, an ammonia tank assembly and a spare latching end effector for the station's robotic arm. STS-129 is targeted to launch Nov. 12.  Photo credit: NASA/Jack Pfaller KSC-2009-5127

CAPE CANAVERAL, Fla. – In the Space Station Processing Facility at NAS...

CAPE CANAVERAL, Fla. – In the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, a crane lifts the plasma contactor unit, or PCU, that will be installed on the Express Logistics Carri... More

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, the sun begins it rise in the East overlooking Launch Pad 39A and space shuttle Discovery, newly arrived for its upcoming launch. First motion on its 3.4-mile trip from the Vehicle Assembly Building was at 7:58 p.m. EST Jan. 31, and was secured or "hard down" on the pad a little before 3 a.m. Feb. 1.        Discovery's next launch opportunity to the International Space Station on the STS-133 mission is targeted for Feb. 24. For more information on STS-133, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts133/. Photo credit: NASA/Jack Pfaller KSC-2011-1319

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, the...

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, the sun begins it rise in the East overlooking Launch Pad 39A and space shuttle Discovery, newly arrived for its upcoming launch. First motion ... More

CAPE CANAVERAL, Fla. – Just before dawn, space shuttle Endeavour, installed on the mobile launcher platform  atop the crawler-transporter, is on Launch Pad 39B at NASA's Kennedy Space Center in Florida.  First motion out of the Vehicle Assembly Building was at 11:57 p.m. EDT April 16.  The shuttle was secure on the pad at 7:17 a.m. EDT April 17. On the left of the shuttle is the White Room at the end of the orbiter access arm, 147 feet above the pad. When in place against the shuttle, the White Room provides access into the crew compartment on the shuttle. Endeavour will be prepared on the pad for liftoff in the unlikely event that a rescue mission is necessary following space shuttle Atlantis' launch on the STS-125 mission to service NASA's  Hubble Space Telescope. After Atlantis is cleared to land, Endeavour will move to Launch Pad 39A for its upcoming STS-127 mission to the International Space Station, targeted to launch June 13.   Photo credit: NASA/Jack Pfaller KSC-2009-2690

CAPE CANAVERAL, Fla. – Just before dawn, space shuttle Endeavour, inst...

CAPE CANAVERAL, Fla. – Just before dawn, space shuttle Endeavour, installed on the mobile launcher platform atop the crawler-transporter, is on Launch Pad 39B at NASA's Kennedy Space Center in Florida. First ... More

CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, workers prepare to store External Tank-135, newly delivered to the transfer aisle of the Vehicle Assembly Building.  The tank arrived in Florida on Dec. 26 aboard the Pegasus barge, towed by a solid rocket booster retrieval ship from NASA's Michoud Assembly Facility near New Orleans.    ET-135 will be used to launch space shuttle Discovery on the STS-131 mission to the International Space Station. Launch is targeted for March 18.  For information on the components of the space shuttle and the STS-131 mission, visit http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts131/index.html. Photo credit: NASA/Jack Pfaller KSC-2010-1008

CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, work...

CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, workers prepare to store External Tank-135, newly delivered to the transfer aisle of the Vehicle Assembly Building. The tank arrived in Florida... More

CAPE CANAVERAL, Fla. -- Lockheed-Martin technicians at Astrotech's payload processing facility in Titusville, Fla. remove the protective wrapping from NASA's Juno spacecraft to begin final testing and preparations for launch.      The solar-powered spacecraft will orbit Jupiter's poles 33 times to find out more about the gas giant's origins, structure, atmosphere and magnetosphere and investigate the existence of a solid planetary core. Juno is scheduled to launch aboard an Atlas V rocket from Cape Canaveral, Fla. Aug. 5. For more information visit, www.nasa.gov/juno. Photo credit: NASA/Jack Pfaller    It will splash down into the Atlantic Ocean where the ship and its crew will recover it and tow it back through Port Canaveral for refurbishing for another launch. The STS-124 mission is the second of three flights launching components to complete the Japan Aerospace Exploration Agency's Kibo laboratory. The shuttle crew will install Kibo's large Japanese Pressurized Module and its remote manipulator system, or RMS. Photo credit: USA/Jeff Suter KSC-2011-2829

CAPE CANAVERAL, Fla. -- Lockheed-Martin technicians at Astrotech's pay...

CAPE CANAVERAL, Fla. -- Lockheed-Martin technicians at Astrotech's payload processing facility in Titusville, Fla. remove the protective wrapping from NASA's Juno spacecraft to begin final testing and preparati... More

CAPE CANAVERAL, Fla. – In NASA Kennedy Space Center's Orbiter Processing Facility 2, workers remove the forward reaction control system, or FRCS, from space shuttle Endeavour's forward fuselage nose area. The FRCS provides the thrust for attitude (rotational) maneuvers (pitch, yaw and roll) and for small velocity changes along the orbiter axis (translation maneuvers). Endeavour is designated as the shuttle for the STS-130 mission, targeted for launch in February 2010.  Photo credit: NASA/Jack Pfaller KSC-2009-4796

CAPE CANAVERAL, Fla. – In NASA Kennedy Space Center's Orbiter Processi...

CAPE CANAVERAL, Fla. – In NASA Kennedy Space Center's Orbiter Processing Facility 2, workers remove the forward reaction control system, or FRCS, from space shuttle Endeavour's forward fuselage nose area. The F... More

KENNEDY SPACE CENTER, FLA. -  NASA managers brief the media about the Space Shuttle Program and mission STS-121 from the press site at NASA's Kennedy Space Center in Florida.  Public Information Officer Jessica Rye moderated.  Seated at her right are Space Shuttle Program Manager Wayne Hale, NASA Launch Director Mike Leinbach and STS-114 External Tank Tiger Team lead Tim Wilson, with the NASA Engineering & Safety Center.  Photo credit: NASA/Jack Pfaller KSC-06pd0376

KENNEDY SPACE CENTER, FLA. - NASA managers brief the media about the ...

KENNEDY SPACE CENTER, FLA. - NASA managers brief the media about the Space Shuttle Program and mission STS-121 from the press site at NASA's Kennedy Space Center in Florida. Public Information Officer Jessica... More

CAPE CANAVERAL, Fla. -  In the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, an overhead crane lifts the Orbital Replacement Unit Carrier, or ORUC, and moves it across the floor to install it in the payload canister.  The carrier is one of four associated with the STS-125 mission to service the Hubble Space Telescope. It will be installed in the payload canister for transfer to Launch Pad 39A. At the pad, all the carriers will be loaded into space shuttle Atlantis’ payload bay. Launch of Atlantis is targeted for Oct. 10.  Photo credit: NASA/Jack Pfaller KSC-08pd2713

CAPE CANAVERAL, Fla. - In the Payload Hazardous Servicing Facility at...

CAPE CANAVERAL, Fla. - In the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, an overhead crane lifts the Orbital Replacement Unit Carrier, or ORUC, and moves it across the floor to instal... More

KENNEDY SPACE CENTER, FLA. -    Inside the Vehicle Assembly Building at NASA's Kennedy Space Center, a solid rocket booster segment (upper left) is mated with the lower segment.  The booster is part of the shuttle stack for Discovery and mission STS-121.  Launch of Discovery is scheduled for no earlier than May.  Photo credit: NASA/Jack Pfaller KSC-06pd0256

KENNEDY SPACE CENTER, FLA. - Inside the Vehicle Assembly Building a...

KENNEDY SPACE CENTER, FLA. - Inside the Vehicle Assembly Building at NASA's Kennedy Space Center, a solid rocket booster segment (upper left) is mated with the lower segment. The booster is part of the shut... More

KENNEDY SPACE CENTER, FLA. -- In the Vehicle Assembly Building at NASA's Kennedy Space Center, a crane lifts a frustum towards platforms separating the transfer aisle from a high bay.   The solid rocket booster segment is being moved into a high bay where it will be added to the stack being prepared for space shuttle mission STS-122, targeted for launch in December. On this mission, Atlantis will carry the Columbus Laboratory, the European Space Agency's largest contribution to the International Space Station.  Columbus is a multifunctional, pressurized laboratory that will be permanently attached to U.S. Node 2, also called Harmony, to carry out experiments in materials science, fluid physics and biosciences, as well as to support a number of technological applications. Photo credit: NASA/Jack Pfaller KSC-07pd2848

KENNEDY SPACE CENTER, FLA. -- In the Vehicle Assembly Building at NASA...

KENNEDY SPACE CENTER, FLA. -- In the Vehicle Assembly Building at NASA's Kennedy Space Center, a crane lifts a frustum towards platforms separating the transfer aisle from a high bay. The solid rocket booster... More

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, thousands of workers, their friends and families, and members of the news media are near the Launch Complex 39 Press Site to watch space shuttle Discovery embark on its final scheduled mission.       Liftoff is set for 4:50 p.m. EST on Feb. 24. Discovery and its six-member STS-133 crew will deliver the Permanent Multipurpose Module, packed with supplies and critical spare parts, as well as Robonaut 2, the dexterous humanoid astronaut helper, to the International Space Station. Discovery, which will fly its 39th mission, is scheduled to be retired following STS-133. This will be the 133rd Space Shuttle Program mission and the 35th shuttle voyage to the space station. For more information on the STS-133 mission, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts133/. Photo credit: NASA/Jack Pfaller KSC-2011-1609

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, tho...

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, thousands of workers, their friends and families, and members of the news media are near the Launch Complex 39 Press Site to watch space shuttl... More

CAPE CANAVERAL, Fla. -   At NASA's Kennedy Space Center in Florida, workers check data on the payload ground handling mechanism, or PGHM, in the Payload Changeout Room on Launch Pad 39A.  The PGHM is being used to transfer the STS-125 mission payload into space shuttle Atlantis’ payload bay. STS-125 is the fifth and final shuttle servicing mission for NASA’s Hubble Space Telescope.  The payload comprises four carriers holding various equipment for the mission. Atlantis is targeted to launch Oct. 14 on the 11-day mission.  Photo credit: NASA/Jack Pfaller KSC-08pd2957

CAPE CANAVERAL, Fla. - At NASA's Kennedy Space Center in Florida, wo...

CAPE CANAVERAL, Fla. - At NASA's Kennedy Space Center in Florida, workers check data on the payload ground handling mechanism, or PGHM, in the Payload Changeout Room on Launch Pad 39A. The PGHM is being used... More

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility 1 at NASA’s Kennedy Space Center in Florida, workers monitor the progress of space shuttle Atlantis as it backs out of its hangar for its move to the Vehicle Assembly Building.    The rollover began about 7 a.m. EDT and was complete at 8:25 a.m. when Atlantis was towed into the VAB's transfer aisle.  Next, Atlantis will be lifted over a transom and lowered into the VAB's high bay 1, where it will be attached to its external fuel tank and solid rocket boosters. Rollout of the shuttle stack to Kennedy’s Launch Pad 39A, a significant milestone in launch processing activities, is planned for Oct. 13.  Liftoff of Atlantis on its STS-129 mission to the International Space Station is targeted for 4:04 p.m. EST during a 10-minute launch window on Nov. 12.  For information on the STS-129 mission and crew, visit http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts129/index.html. Photo credit: NASA/Jack Pfaller KSC-2009-5320

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility 1 at NASA’s Kenn...

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility 1 at NASA’s Kennedy Space Center in Florida, workers monitor the progress of space shuttle Atlantis as it backs out of its hangar for its move to the Vehicl... More

CAPE CANAVERAL, Fla. -  In the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, the open doors of the payload canister reveal the first of the carriers associated with the STS-125 mission to service the Hubble Space Telescope that have been installed in it. Four carriers in all will be transferred to Launch Pad 39A. At the pad, all the carriers will be loaded into space shuttle Atlantis’ payload bay. Launch of Atlantis is targeted for Oct. 10.  Photo credit: NASA/Jack Pfaller KSC-08pd2708

CAPE CANAVERAL, Fla. - In the Payload Hazardous Servicing Facility at...

CAPE CANAVERAL, Fla. - In the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, the open doors of the payload canister reveal the first of the carriers associated with the STS-125 mission to... More

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility Bay 1 at NASA's Kennedy Space Center in Florida, heat lamps assist United Space Alliance technician Jeff Holmes in a putty repair on some of the high-temperature reusable surface insulation tiles, or HRSI tiles, on the lower forward fuselage of space shuttle Atlantis.    An average of 125 tiles are replaced after each mission either due to handling damage or accumulated repairs.  These black tiles are optimized for maximum emissivity, which means they lose heat faster than white tiles.  This property is required to maximize heat rejection during the hot phase of reentry.  Atlantis next is slated to deliver an Integrated Cargo Carrier and Russian-built Mini Research Module to the International Space Station on the STS-132 mission.  Launch is targeted for May 14, 2010.  Photo credit: NASA/Jack Pfaller KSC-2009-6812

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility Bay 1 at NASA's ...

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility Bay 1 at NASA's Kennedy Space Center in Florida, heat lamps assist United Space Alliance technician Jeff Holmes in a putty repair on some of the high-temper... More

CAPE CANAVERAL, Fla. -  In the Canister Rotation Facility at NASA's Kennedy Space Center, workers get ready to lift the payload canister to a vertical position for the trip to Launch Pad 39A. The canister’s cargo consists of four carriers holding various equipment for the STS-125 mission aboard space shuttle Atlantis to service NASA’s Hubble Space Telescope.  At the pad, the cargo will be moved into the Payload Changeout Room.  The changeout room is the enclosed, environmentally controlled portion of the rotating service structure that supports cargo delivery to the pad and subsequent vertical installation into the shuttle’s payload bay. Launch of Atlantis is targeted for Oct. 10.   Photo credit: NASA/Jack Pfaller KSC-08pd2773

CAPE CANAVERAL, Fla. - In the Canister Rotation Facility at NASA's Ke...

CAPE CANAVERAL, Fla. - In the Canister Rotation Facility at NASA's Kennedy Space Center, workers get ready to lift the payload canister to a vertical position for the trip to Launch Pad 39A. The canister’s car... More

CAPE CANAVERAL, Fla. -  In the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, a technician uncovers the Super Lightweight Interchangeable Carrier, or SLIC.  Contamination discovered Sept. 17 during preparations to deliver NASA's Hubble Space Telescope servicing payload to Launch Pad 39A will be removed. Cleanliness is extremely important for space shuttle Atlantis’ STS-125 mission to Hubble, and the teams have insured that the SLIC is ready to fly. The SLIC, which holds battery module assemblies for servicing of the Hubble Space Telescope on the STS-125 mission, is built with state-of-the-art, lightweight, composite materials - carbon fiber with a cyanate ester resin and a titanium metal matrix composite. These composites have greater strength-to-mass ratios than the metals typically used in spacecraft design. The carrier is one of four being transferred to Launch Pad 39A. At the pad, the carriers will be loaded into Atlantis’ payload bay.  Launch of Atlantis is targeted for Oct. 10.   Photo credit: NASA/Jack Pfaller KSC-08pd2643

CAPE CANAVERAL, Fla. - In the Payload Hazardous Servicing Facility at...

CAPE CANAVERAL, Fla. - In the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, a technician uncovers the Super Lightweight Interchangeable Carrier, or SLIC. Contamination discovered Sept. ... More

CAPE CANAVERAL, Fla. - Space shuttle workers await landing of shuttle Atlantis on Runway 33 at the Shuttle Landing Facility at NASA's Kennedy Space Center in Florida.  After 11 days in space, Atlantis completed the 4.5-million mile STS-129 mission on orbit 171.    Main gear touchdown was at 9:44:23 a.m. EST. Nose gear touchdown was at 9:44:36 a.m., and wheels stop was at 9:45:05 a.m. Aboard Atlantis are Commander Charles O. Hobaugh; Pilot Barry E. Wilmore; Mission Specialists Leland Melvin, Randy Bresnik, Mike Foreman and Robert L. Satcher Jr.; and Expedition 20 and 21 Flight Engineer Nicole Stott who spent 87 days aboard the International Space Station. STS-129 is the final space shuttle Expedition crew rotation flight on the manifest. On STS-129, the crew delivered 14 tons of cargo to the orbiting laboratory, including two ExPRESS Logistics Carriers containing spare parts to sustain station operations after the shuttles are retired next year. For information on the STS-129 mission and crew, visit http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts129/index.html. Photo credit: NASA/Jack Pfaller KSC-2009-6583

CAPE CANAVERAL, Fla. - Space shuttle workers await landing of shuttle ...

CAPE CANAVERAL, Fla. - Space shuttle workers await landing of shuttle Atlantis on Runway 33 at the Shuttle Landing Facility at NASA's Kennedy Space Center in Florida. After 11 days in space, Atlantis completed... More

CAPE CANAVERAL, Fla. - At NASA's Kennedy Space Center in Florida, the Forward Reaction Control System, or FRCS, for space shuttle Discovery arrives at Orbiter Processing Facility Bay 3.    Discovery is being prepared for the STS-131 mission, the 33rd flight to the International Space Station.  The FRCS provides the thrust for attitude (rotational) maneuvers (pitch, yaw and roll) and for small velocity changes along the orbiter axis (translation maneuvers).  The seven-member STS-131 crew will deliver a Multi-Purpose Logistics Module filled with resupply stowage platforms and racks to be transferred to locations around the station.  Three spacewalks will include work to attach a spare ammonia tank assembly to the station's exterior and return a European experiment from outside the station's Columbus module.  Discovery's launch is targeted for March 18, 2010.  For information on the STS-131 mission and crew, visit http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts131/index.html.  Photo credit: NASA/Jack Pfaller KSC-2009-6706

CAPE CANAVERAL, Fla. - At NASA's Kennedy Space Center in Florida, the ...

CAPE CANAVERAL, Fla. - At NASA's Kennedy Space Center in Florida, the Forward Reaction Control System, or FRCS, for space shuttle Discovery arrives at Orbiter Processing Facility Bay 3. Discovery is being pr... More

CAPE CANAVERAL, Fla. –  In Orbiter Processing Facility bay 3 at NASA's Kennedy Space Center in Florida, technicians secure the remote manipulator system, or RMS, removed from space shuttle Discovery onto a storage platform.  The RMS is used to grab, or grapple, the payload as well as retrieve, repair and deploy satellites; provide a mobile extension ladder for spacewalking crewmembers; and be used as an inspection aid to allow flight crew members to view the orbiter’s or payload’s surfaces through a TV camera on the arm. Discovery is targeted to launch Aug. 6 on the STS-128 mission.  Photo credit: NASA/Jack Pfaller KSC-2009-2968

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility bay 3 at NASA's...

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility bay 3 at NASA's Kennedy Space Center in Florida, technicians secure the remote manipulator system, or RMS, removed from space shuttle Discovery onto a stor... More

CAPE CANAVERAL, Fla. –   After rolling out of the Orbiter Processing Facility bay 1 at NASA's Kennedy Space Center, space shuttle Atlantis begins the short transfer to the Vehicle Assembly Building.  In the VAB, Atlantis will be attached to its external fuel tank and twin solid rocket boosters. After additional preparations are made, the shuttle will be rolled out to Launch Pad 39A to prepare for launch on the STS-125 mission targeted for Oct. 8.   Photo credit: NASA/Jack Pfaller KSC-08pd2478

CAPE CANAVERAL, Fla. – After rolling out of the Orbiter Processing F...

CAPE CANAVERAL, Fla. – After rolling out of the Orbiter Processing Facility bay 1 at NASA's Kennedy Space Center, space shuttle Atlantis begins the short transfer to the Vehicle Assembly Building. In the VAB... More

CAPE CANAVERAL, Fla. – In Orbiter Processing Bay 2 at NASA's Kennedy Space Center in Florida, technicians using a Hyster forklift remove main engine no. 2 from space shuttle Endeavour.  Engine removal is part of the post-landing processing. Endeavour returned from the STS-127 mission July 31.  Endeavour's next mission is STS-130 targeted for February 2010.  Endeavour will deliver to the International Space Station the Tranquility pressurized module that will provide room for many of the station's life support systems.  Photo credit: NASA/Jack Pfaller KSC-2009-4702

CAPE CANAVERAL, Fla. – In Orbiter Processing Bay 2 at NASA's Kennedy S...

CAPE CANAVERAL, Fla. – In Orbiter Processing Bay 2 at NASA's Kennedy Space Center in Florida, technicians using a Hyster forklift remove main engine no. 2 from space shuttle Endeavour. Engine removal is part o... More

KENNEDY SPACE CENTER, FLA. -    Inside the Vehicle Assembly Building at NASA's Kennedy Space Center, a solid rocket booster segment is being lifted by a 325-ton crane for stacking.  The booster is part of the shuttle stack for Discovery and mission STS-121.  Launch of Discovery is scheduled for no earlier than May. Photo credit: NASA/Jack Pfaller KSC-06pd0255

KENNEDY SPACE CENTER, FLA. - Inside the Vehicle Assembly Building a...

KENNEDY SPACE CENTER, FLA. - Inside the Vehicle Assembly Building at NASA's Kennedy Space Center, a solid rocket booster segment is being lifted by a 325-ton crane for stacking. The booster is part of the s... More

CAPE CANAVERAL, Fla. - Space shuttle Atlantis rumbles off Launch Pad 39A at NASA's Kennedy Space Center in Florida on the STS-132 mission to the International Space Station at 2:20 p.m. EDT on May 14.      The Russian-built Mini Research Module-1 known as Rassvet, or "dawn," is inside the shuttle's cargo bay. It will provide additional storage space and a new docking port for Russian Soyuz and Progress spacecraft. The laboratory will be attached to the bottom port of the station's Zarya module.  The mission's three spacewalks will focus on storing spare components outside the station, including six batteries, a communications antenna and parts for the Canadian Dextre robotic arm.  STS-132 is the 132nd shuttle flight, the 32nd for Atlantis and the 34th shuttle mission dedicated to station assembly and maintenance. For more information on the STS-132 mission objectives, payload and crew, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts132/index.html. Photo Credit: NASA/Jack Pfaller KSC-20103367

CAPE CANAVERAL, Fla. - Space shuttle Atlantis rumbles off Launch Pad 3...

CAPE CANAVERAL, Fla. - Space shuttle Atlantis rumbles off Launch Pad 39A at NASA's Kennedy Space Center in Florida on the STS-132 mission to the International Space Station at 2:20 p.m. EDT on May 14. The ... More

CAPE CANAVERAL, Fla. – In the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center in Florida,  an overhead crane lowers the Flight Support System, or FSS, carrier with the Soft Capture Mechanism into the payload canister. The canister will deliver the FSS and other carriers to Launch Pad 39A for installation in space shuttle Atlantis' payload bay. Atlantis' 11-day STS-125 mission to service NASA's Hubble Space Telescope is targeted for launch May 12.  It will include five spacewalks in which astronauts will refurbish and upgrade the telescope with state-of-the-art science instruments. As a result, Hubble's capabilities will be expanded and its operational lifespan extended through at least 2014.  Photo credit: NASA/Jack Pfaller KSC-2009-2722

CAPE CANAVERAL, Fla. – In the Payload Hazardous Servicing Facility at ...

CAPE CANAVERAL, Fla. – In the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center in Florida, an overhead crane lowers the Flight Support System, or FSS, carrier with the Soft Capture Mechanism... More

KENNEDY SPACE CENTER, FLA. --  From the Shuttle Landing Facility runway at NASA's Kennedy Space Center, space shuttle Atlantis is towed to the Orbiter Processing Facility, or OPF, where processing Atlantis for another flight will take place. Towing normally begins within four hours after landing and is completed within six hours unless removal of time-sensitive experiments is required on the runway. In the OPF, turnaround processing procedures on Atlantis will include various post-flight deservicing and maintenance functions, which are carried out in parallel with payload removal and the installation of equipment needed for the next mission.  After a round trip of nearly 5.3 million miles, Atlantis and crew returned to Earth with a landing at 9:07 a.m. EST to complete the STS-122 mission.   Photo credit: NASA/Jack Pfaller KSC-08pd0425

KENNEDY SPACE CENTER, FLA. -- From the Shuttle Landing Facility runwa...

KENNEDY SPACE CENTER, FLA. -- From the Shuttle Landing Facility runway at NASA's Kennedy Space Center, space shuttle Atlantis is towed to the Orbiter Processing Facility, or OPF, where processing Atlantis for ... More

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility 1 at NASA's Kennedy Space Center, a worker from United Space Alliance gives the signal that the payload bay doors on space shuttle Atlantis are closed. The payload bay has been thoroughly cleaned and is ready to receive the carriers transporting the instruments and equipment needed to service the Hubble Space Telescope.  Atlantis is targeted to launch Oct. 8 on the STS-125 mission to service Hubble. The mission crew will perform history-making, on-orbit “surgery” on two important science instruments aboard the telescope. After capturing the telescope, two teams of spacewalking astronauts will perform the repairs during five planned spacewalks. Photo credit: NASA/Jack Pfaller KSC-08pd2126

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility 1 at NASA's Kenn...

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility 1 at NASA's Kennedy Space Center, a worker from United Space Alliance gives the signal that the payload bay doors on space shuttle Atlantis are closed. The ... More

CAPE CANAVERAL, Fla. – Space shuttle Atlantis is lowered by the yellow crane above it into High Bay 1 in the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida. Next, Atlantis will be positioned on a mobile launcher platform in the bay where it will be attached to an external fuel tank and pair of solid rocket boosters.    Rollout of the completed shuttle stack to Kennedy’s Launch Pad 39A, a significant milestone in launch processing activities, is planned for Oct. 13. Liftoff of Atlantis on its STS-129 mission to the International Space Station is targeted for 4:04 p.m. EST Nov. 12 during a 10-minute launch window. For information on the STS-129 mission and crew, visit http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts129/index.html. Photo credit: NASA/Jack Pfaller KSC-2009-5358

CAPE CANAVERAL, Fla. – Space shuttle Atlantis is lowered by the yellow...

CAPE CANAVERAL, Fla. – Space shuttle Atlantis is lowered by the yellow crane above it into High Bay 1 in the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida. Next, Atlantis will be positione... More

CAPE CANAVERAL, Fla. – In Orbiter Processing Bay 2 at NASA's Kennedy Space Center in Florida, technicians using a Hyster forklift have removed main engine no. 2 from space shuttle Endeavour.  Engine removal is part of the post-landing processing. Endeavour returned from the STS-127 mission July 31.  Endeavour's next mission is STS-130 targeted for February 2010.  Endeavour will deliver to the International Space Station the Tranquility pressurized module that will provide room for many of the station's life support systems.  Photo credit: NASA/Jack Pfaller KSC-2009-4705

CAPE CANAVERAL, Fla. – In Orbiter Processing Bay 2 at NASA's Kennedy S...

CAPE CANAVERAL, Fla. – In Orbiter Processing Bay 2 at NASA's Kennedy Space Center in Florida, technicians using a Hyster forklift have removed main engine no. 2 from space shuttle Endeavour. Engine removal is ... More

CAPE CANAVERAL, Fla. – Student investigators Cameron Zandstra, Jack Barth and JP Peerbolte are interviewed by the media in the NASA Newsroom at Kennedy Space Center in Florida during prelaunch activities for the SpaceX demonstration test flight.  The team members are seventh- and eighth-grade students at Highland Christian School in Lake County, Ind.  Their experiment, “The Effect of Microgravity on the Quality and Nutritional Value of the Seed Sprout of Germinated 92M72 Genetically-Modified Soy Bean,” is one of 15 in the Student Spaceflight Experiments Program, or SSEP, being ferried to the International Space Station inside the Dragon capsule.    The launch will be the second demonstration test flight for SpaceX for NASA's Commercial Orbital Transportation Services program, or COTS.  SSEP, which began operation in June 2010 through a partnership of the National Center for Earth and Space Science Education with NanoRacks LLC, is a U.S. national science, technology, engineering and mathematics STEM education initiative that gives students across a community the opportunity to propose and design real experiments to fly in low Earth orbit. SSEP experiments flew on space shuttle missions STS-134 and STS-135 in 2011, the final flights of space shuttles Endeavour and Atlantis. For more information on SSEP, visit http://www.nasa.gov/audience/foreducators/station-here-we-come.html.  Photo credit: NASA/Gianni Woods KSC-2012-2864

CAPE CANAVERAL, Fla. – Student investigators Cameron Zandstra, Jack Ba...

CAPE CANAVERAL, Fla. – Student investigators Cameron Zandstra, Jack Barth and JP Peerbolte are interviewed by the media in the NASA Newsroom at Kennedy Space Center in Florida during prelaunch activities for th... More

CAPE CANAVERAL, Fla. –   In the Vehicle Assembly Building at NASA's Kennedy Space Center, external fuel tank 129 is lowered into high bay 1 between the solid rocket boosters at left for mating on the mobile launcher platform. The external tank-SRB stack will then be mated in two weeks to space shuttle Endeavour for the STS-126 mission.  The STS-126 mission will deliver a Multi-Purpose Logistics Module to the International Space Station.  Launch is targeted for Nov. 10. Photo credit: NASA/Jack Pfaller KSC-08pd2523

CAPE CANAVERAL, Fla. – In the Vehicle Assembly Building at NASA's Ke...

CAPE CANAVERAL, Fla. – In the Vehicle Assembly Building at NASA's Kennedy Space Center, external fuel tank 129 is lowered into high bay 1 between the solid rocket boosters at left for mating on the mobile lau... More

KENNEDY SPACE CENTER, FLA. -   The Liberty Star (left) tows the Pegasus barge through Port Canaveral, the last leg of its journey from the Michoud Assembly Facility in New Orleans to Kennedy Space Center. The barge carries the redesigned external fuel tank that will launch Space Shuttle Atlantis on the next shuttle mission, STS-115. A tugboat will continue the journey upriver to the Turn Basin where, after off-loading, the tank will be moved into the Vehicle Assembly Building and lifted into a checkout cell for further work. The tank, designated ET-118, will fly with many major safety changes, including the removal of the protuberance air load ramps.  Photo credit: NASA/Jack Pfaller KSC-06pd1013

KENNEDY SPACE CENTER, FLA. - The Liberty Star (left) tows the Pegasu...

KENNEDY SPACE CENTER, FLA. - The Liberty Star (left) tows the Pegasus barge through Port Canaveral, the last leg of its journey from the Michoud Assembly Facility in New Orleans to Kennedy Space Center. The b... More

KENNEDY SPACE CENTER, FLA. --  From the Shuttle Landing Facility runway at NASA's Kennedy Space Center,  space shuttle Atlantis is towed to theOrbiter Processing Facility, or OPF, where processing Atlantis for another flight will take place. Towing normally begins within four hours after landing and is completed within six hours unless removal of time-sensitive experiments is required on the runway. In the OPF, turnaround processing procedures on Atlantis will include various post-flight deservicing and maintenance functions, which are carried out in parallel with payload removal and the installation of equipment needed for the next mission.  After a round trip of nearly 5.3 million miles, Atlantis and crew returned to Earth with a landing at 9:07 a.m. EST to complete the STS-122 mission.   Photo credit: NASA/Jack Pfaller KSC-08pd0424

KENNEDY SPACE CENTER, FLA. -- From the Shuttle Landing Facility runwa...

KENNEDY SPACE CENTER, FLA. -- From the Shuttle Landing Facility runway at NASA's Kennedy Space Center, space shuttle Atlantis is towed to theOrbiter Processing Facility, or OPF, where processing Atlantis for ... More

KENNEDY SPACE CENTER, FLA.  - In the Vehicle Assembly Building's transfer aisle at NASA's Kennedy Space Center, external tank No. 119 is suspended in a vertical position. The tank will lifted into high bay 3 for stacking with solid rocket boosters. The tank and boosters will launch Space Shuttle Discovery on mission STS-121 in July.  Photo credit: NASA/Jack Pfaller KSC-06pd0720

KENNEDY SPACE CENTER, FLA. - In the Vehicle Assembly Building's trans...

KENNEDY SPACE CENTER, FLA. - In the Vehicle Assembly Building's transfer aisle at NASA's Kennedy Space Center, external tank No. 119 is suspended in a vertical position. The tank will lifted into high bay 3 fo... More

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility Bay 1 at NASA's Kennedy Space Center in Florida,  United Space Alliance technician Jeff Holmes makes a putty repair on some of the high-temperature reusable surface insulation tiles, or HRSI tiles, on the lower forward fuselage of space shuttle Atlantis.    An average of 125 tiles are replaced after each mission either due to handling damage or accumulated repairs.  These black tiles are optimized for maximum emissivity, which means they lose heat faster than white tiles.  This property is required to maximize heat rejection during the hot phase of reentry.  Atlantis next is slated to deliver an Integrated Cargo Carrier and Russian-built Mini Research Module to the International Space Station on the STS-132 mission.  Launch is targeted for May 14, 2010.  Photo credit: NASA/Jack Pfaller KSC-2009-6810

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility Bay 1 at NASA's ...

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility Bay 1 at NASA's Kennedy Space Center in Florida, United Space Alliance technician Jeff Holmes makes a putty repair on some of the high-temperature reusable... More

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, space shuttle Discovery is illuminated by bright xenon lights on Launch Pad 39A after the rotating service structure was moved away. The structure provides weather protection and access to the shuttle while it awaits lift off on the pad. RSS "rollback," as it's called, began at 8:02 p.m. EST on Feb. 23 and wrapped up at 8:37 p.m.           Scheduled to lift off Feb. 24 at 4:50 p.m. EST, Discovery and its six-member crew will deliver the Permanent Multipurpose Module, packed with supplies and critical spare parts, as well as Robonaut 2, the dexterous humanoid astronaut helper, to the International Space Station. Discovery, which will fly its 39th mission, is scheduled to be retired following STS-133. This will be the 133rd Space Shuttle Program mission and the 35th shuttle voyage to the space station. For more information on the STS-133 mission, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts133/. Photo credit: NASA/Jack Pfaller KSC-2011-1585

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, spa...

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, space shuttle Discovery is illuminated by bright xenon lights on Launch Pad 39A after the rotating service structure was moved away. The struct... More

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, shuttle Discovery pauses in between Orbiter Processing Facility-3 and the Vehicle Assembly Building (VAB) during a move called "rollover." Once inside the VAB, the shuttle will be joined to its solid rocket boosters and external fuel tank. Later this month, Discovery is scheduled to "rollout" to Launch Pad 39A for its launch to the International Space Station on the STS-133 mission.    Targeted to liftoff Nov. 1, Discovery will take the Permanent Multipurpose Module (PMM) packed with supplies and critical spare parts, as well as Robonaut 2 (R2) to the station. Photo credit: NASA/Jack Pfaller KSC-2010-4587

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, shu...

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, shuttle Discovery pauses in between Orbiter Processing Facility-3 and the Vehicle Assembly Building (VAB) during a move called "rollover." Once... More

CAPE CANAVERAL, Fla. – In Orbiter Processing Bay 2 at NASA's Kennedy Space Center in Florida, technicians begin removing main engine no. 1 from space shuttle Endeavour with the Hyster forklift.  Engine removal is part of the post-landing processing; engine no. 2 was removed Aug. 17. Endeavour returned from the STS-127 mission July 31. Endeavour's next mission is STS-130 targeted for February 2010.  Endeavour will deliver to the International Space Station the Tranquility pressurized module that will provide room for many of the station's life support systems.   Photo credit: NASA/Jack Pfaller KSC-2009-4766

CAPE CANAVERAL, Fla. – In Orbiter Processing Bay 2 at NASA's Kennedy S...

CAPE CANAVERAL, Fla. – In Orbiter Processing Bay 2 at NASA's Kennedy Space Center in Florida, technicians begin removing main engine no. 1 from space shuttle Endeavour with the Hyster forklift. Engine removal ... More

KENNEDY SPACE CENTER, FLA.  —   In the Space Station Processing Facility at NASA Kennedy Space Center, workers inside the multi-purpose logistics module Leonardo stand by as a supply rack is inserted through the opening.  The module is being prepared for the second return-to-flight mission, STS-121, on space shuttle Discovery, carrying more than two tons of equipment and supplies to the International Space Station.  This will be the fourth trip to the station for Leonardo, the first of three Italian-built logistics modules. Equipment and supplies no longer needed on the station will be moved to Leonardo before it is unberthed on Flight Day 10 and put back into Discovery's cargo bay for return to Earth. This second return-to-flight test mission is to carry on analysis of safety improvements that debuted on the first return-to-flight mission, STS-114, and build upon those tests.  The launch is targeted for a date no earlier than May.  Photo credit:  NASA/Jack Pfaller KSC-06pd0130

KENNEDY SPACE CENTER, FLA. — In the Space Station Processing Facili...

KENNEDY SPACE CENTER, FLA. — In the Space Station Processing Facility at NASA Kennedy Space Center, workers inside the multi-purpose logistics module Leonardo stand by as a supply rack is inserted through th... More

KENNEDY SPACE CENTER, FLA. --  The Freedom Star, one of NASA's solid rocket booster retrieval ships, tows a solid rocket booster alongside, heading for Hangar AF at Cape Canaveral Air Force Station. The booster is from space shuttle Endeavour, which launched the STS-123 mission on March 11. The space shuttle’s solid rocket booster casings and associated flight hardware are recovered at sea. The boosters impact the Atlantic Ocean approximately seven minutes after liftoff. The splashdown area is a square of about 6 by 9 nautical miles located about 140 nautical miles downrange from the launch pad. The retrieval ships are stationed approximately 8 to 10 nautical miles from the impact area at the time of splashdown. As soon as the boosters enter the water, the ships accelerate to a speed of 15 knots and quickly close on the boosters, which they tow back to port.  After transfer to a position alongside the ship, the booster will be towed  to Hangar AF at Cape Canaveral Air Force Station. There, the expended boosters are disassembled, refurbished and reloaded with solid propellant for reuse.   Photo credit: NASA/Jack Pfaller KSC-08pd0740

KENNEDY SPACE CENTER, FLA. -- The Freedom Star, one of NASA's solid r...

KENNEDY SPACE CENTER, FLA. -- The Freedom Star, one of NASA's solid rocket booster retrieval ships, tows a solid rocket booster alongside, heading for Hangar AF at Cape Canaveral Air Force Station. The booster... More

CAPE CANAVERAL, Fla. -  At NASA's Kennedy Space Center, the payload canister is in the Canister Rotation Facility where it will be lifted to a vertical position.  The canister transporter will then carry the canister and its cargo to Launch Pad 39A.  The cargo consists of four carriers holding various equipment for the STS-125 mission aboard space shuttle Atlantis to service NASA’s Hubble Space Telescope.  At the pad, the cargo will be moved into the Payload Changeout Room.  The changeout room is the enclosed, environmentally controlled portion of the rotating service structure that supports cargo delivery to the pad and subsequent vertical installation into the shuttle’s payload bay. Launch of Atlantis is targeted for Oct. 10.   Photo credit: NASA/Jack Pfaller KSC-08pd2769

CAPE CANAVERAL, Fla. - At NASA's Kennedy Space Center, the payload ca...

CAPE CANAVERAL, Fla. - At NASA's Kennedy Space Center, the payload canister is in the Canister Rotation Facility where it will be lifted to a vertical position. The canister transporter will then carry the ca... More

CAPE CANAVERAL, Fla. – Tugboats safely deliver the Pegasus barge, carrying external tank 134, to the dock in the turn basin near the Vehicle Assembly Building, or VAB, at NASA's Kennedy Space Center in Florida. Pegasus arrived in Florida after an ocean voyage towed by a solid rocket booster retrieval ship from NASA's Michoud Assembly Facility near New Orleans. After Pegasus docks in the turn basin, the fuel tank will be offloaded and transported into the VAB.    ET-134 will be used to launch space shuttle Endeavour on the STS-130 mission to the International Space Station. Launch is targeted for Feb. 4, 2010.  For information on the components of the space shuttle and the STS-130 mission, visit http://www.nasa.gov/shuttle. Photo credit: NASA/Jack Pfaller KSC-2009-5818

CAPE CANAVERAL, Fla. – Tugboats safely deliver the Pegasus barge, carr...

CAPE CANAVERAL, Fla. – Tugboats safely deliver the Pegasus barge, carrying external tank 134, to the dock in the turn basin near the Vehicle Assembly Building, or VAB, at NASA's Kennedy Space Center in Florida.... More

CAPE CANAVERAL, Fla. -  In the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, an overhead crane moves the Orbital Replacement Unit Carrier, or ORUC, above the payload canister for installation.  The carrier is one of four associated with the STS-125 mission to service the Hubble Space Telescope. It will be installed in the payload canister for transfer to Launch Pad 39A. At the pad, all the carriers will be loaded into space shuttle Atlantis’ payload bay. Launch of Atlantis is targeted for Oct. 10.  Photo credit: NASA/Jack Pfaller KSC-08pd2714

CAPE CANAVERAL, Fla. - In the Payload Hazardous Servicing Facility at...

CAPE CANAVERAL, Fla. - In the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, an overhead crane moves the Orbital Replacement Unit Carrier, or ORUC, above the payload canister for installa... More

CAPE CANAVERAL, Fla. – In the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, the Kibo Experiment Logistics Module Exposed Section, or ELM-ES, is ready to be moved to a workstand. The ELM-ES is one of the final components of the Japan Aerospace Exploration Agency's Kibo laboratory for the International Space Station.  It can provide payload storage space and can carry up to three payloads at launch. The ELM-ES will be carried aboard space shuttle Endeavour on the STS-127 mission targeted for launch Aug. 6.  Photo credit: NASA/Jack Pfaller KSC-2009-2625

CAPE CANAVERAL, Fla. – In the Space Station Processing Facility at NAS...

CAPE CANAVERAL, Fla. – In the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, the Kibo Experiment Logistics Module Exposed Section, or ELM-ES, is ready to be moved to a workstand. T... More

CAPE CANAVERAL, Fla. –  In the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, workers are constructing flight support system (FSS) access scaffolding that will be used to prepare the Hubble Space Telescope, or HST, carriers for the STS-125 servicing mission 4.  The FSS will berth, secure and furnish power to Hubble and also contains the soft capture mechanism to be attached to the telescope. Upon completion of STS-125, the Hubble will provide even deeper and more detailed views of the Universe. The STS-125 mission will be the final space shuttle mission to the Hubble Space Telescope. Photo credit: NASA/Jack Pfaller KSC-08pd1913

CAPE CANAVERAL, Fla. – In the Payload Hazardous Servicing Facility at...

CAPE CANAVERAL, Fla. – In the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, workers are constructing flight support system (FSS) access scaffolding that will be used to prepare the Hubbl... More

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, STS-134 Mission Specialists Michael Fincke, Andrew Fuestel, Pilot Gregory C. Johnson, Commander Mark Kelly and Mission Specialist Greg Chamitoff (in blue flight suits) join the Air Force C-5M flight crew that delivered the Alpha Magnetic Spectrometer, or AMS, to the Shuttle Landing Facility, in a group photo opportunity.        AMS, a state-of-the-art particle physics detector, is designed to operate as an external module on the International Space Station. It will use the unique environment of space to study the universe and its origin by searching for dark matter. AMS will fly to the International Space Station aboard space shuttle Endeavour's STS-134 mission, targeted to launch Feb. 26, 2011. Photo credit: NASA/Jack Pfaller KSC-2010-4484

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, STS...

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, STS-134 Mission Specialists Michael Fincke, Andrew Fuestel, Pilot Gregory C. Johnson, Commander Mark Kelly and Mission Specialist Greg Chamitof... More

CAPE CANAVERAL, Fla. – In the airlock of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, workers from NASA's Goddard Space Flight Center prepare to remove the Cosmic Origins Spectrograph, or COS, from its transportation canister.  The COS will be installed on the Hubble Space Telescope on space shuttle Atlantis' STS-125 mission.  COS will be the most sensitive ultraviolet spectrograph ever flown on Hubble and will probe the "cosmic web" - the large-scale structure of the universe whose form is determined by the gravity of dark matter and is traced by galaxies and intergalactic gas.  COS's far-ultraviolet channel has a sensitivity 30 times greater than that of previous spectroscopic instruments for the detection of extremely low light levels.  Launch of STS-125 is targeted for Oct. 8.  Photo credit: NASA/Jack Pfaller KSC-08pd2184

CAPE CANAVERAL, Fla. – In the airlock of the Payload Hazardous Servici...

CAPE CANAVERAL, Fla. – In the airlock of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, workers from NASA's Goddard Space Flight Center prepare to remove the Cosmic Origins Spectrograp... More

CAPE CANAVERAL, Fla. –  In the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, the crane lowers the Multi-Purpose Logistics Module Leonardo toward the payload canister. The canister will transport the module to Launch Pad 39A for installation in space shuttle Discovery for the STS-128 mission.   The module will carry science and storage racks to the International Space Station. Launch is targeted for Aug. 18.  Photo credit: NASA/Jack  Pfaller KSC-2009-4234

CAPE CANAVERAL, Fla. – In the Space Station Processing Facility at NA...

CAPE CANAVERAL, Fla. – In the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, the crane lowers the Multi-Purpose Logistics Module Leonardo toward the payload canister. The canister... More

CAPE CANAVERAL, Fla. –  In NASA Kennedy Space Center's Orbiter Processing Facility bay 2, workers watch the movement of space shuttle Endeavour's Orbiter Boom Sensor System as it is lowered into the payload bay.  The OBSS is a 50-foot boom with a laser and cameras on it that astronauts use to inspect a shuttle's heat shield while in orbit. After returning from the STS-127 mission July 31, 2009, Endeavour now is being processed for the STS-130 mission targeted for Feb. 4, 2010. Endeavour will deliver to the International Space Station the Tranquility pressurized module that will provide room for many of the station's life support systems.  Photo credit: NASA/Jack Pfaller KSC-2009-4991

CAPE CANAVERAL, Fla. – In NASA Kennedy Space Center's Orbiter Process...

CAPE CANAVERAL, Fla. – In NASA Kennedy Space Center's Orbiter Processing Facility bay 2, workers watch the movement of space shuttle Endeavour's Orbiter Boom Sensor System as it is lowered into the payload bay... More

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, space shuttle Endeavour enters the transfer aisle of the Vehicle Assembly Building (VAB). In the VAB, Endeavour will be lifted into a high bay where it will be attached to its external fuel tank and solid rocket boosters for its final mission, STS-134.    Endeavour and its STS-134 crew will deliver the Express Logistics Carrier-3, Alpha Magnetic Spectrometer, a high-pressure gas tank, additional spare parts for Dextre and micrometeoroid debris shields to the International Space Station. Launch is targeted for April 19 at 7:48 p.m. EDT. For more information visit, http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts134/index.html. Photo credit: NASA/Jack Pfaller KSC-2011-1904

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, spa...

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, space shuttle Endeavour enters the transfer aisle of the Vehicle Assembly Building (VAB). In the VAB, Endeavour will be lifted into a high bay ... More

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, space shuttle Endeavour is stationed in the transfer aisle of the Vehicle Assembly Building (VAB). In the VAB, Endeavour will be lifted into a high bay where it will be attached to its external fuel tank and solid rocket boosters for its final mission, STS-134.  Endeavour and its STS-134 crew will deliver the Express Logistics Carrier-3, Alpha Magnetic Spectrometer, a high-pressure gas tank, additional spare parts for Dextre and micrometeoroid debris shields to the International Space Station. Launch is targeted for April 19 at 7:48 p.m. EDT. For more information visit, http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts134/index.html. Photo credit: NASA/Jack Pfaller KSC-2011-1905

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, spa...

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, space shuttle Endeavour is stationed in the transfer aisle of the Vehicle Assembly Building (VAB). In the VAB, Endeavour will be lifted into a ... More

Previous

of 18

Next