move, sts

1,332 media by topicpage 1 of 14
KENNEDY SPACE CENTER, FLA. - An overhead crane is attached to the Multi-Purpose Logistics Module Raffaello in order to move it to another work stand in the Space Station Processing Facility.  Raffaello is the second MPLM built by the Italian Space Agency, serving as a reusable logistics carrier and primary delivery system to resupply and return station cargo requiring a pressurized environment.  It is being moved to allow the third MPLM, Donatello, to be brought in for routine testing.  Donatello has been stored in the Operations and Checkout Building.  This is the first time all three MPLMs are in the SSPF; the other one is the Leonardo.  Raffaello is scheduled to fly on Space Shuttle Atlantis on mission STS-114.

KENNEDY SPACE CENTER, FLA. - An overhead crane is attached to the Mult...

KENNEDY SPACE CENTER, FLA. - An overhead crane is attached to the Multi-Purpose Logistics Module Raffaello in order to move it to another work stand in the Space Station Processing Facility. Raffaello is the s... More

KENNEDY SPACE CENTER, FLA. - The Multi-Purpose Logistics Module Raffaello is lifted from its stand in the Space Station Processing Facility to move to another work stand.  Raffaello is the second MPLM built by the Italian Space Agency, serving as a reusable logistics carrier and primary delivery system to resupply and return station cargo requiring a pressurized environment.  It is being moved to allow the third MPLM, Donatello, to be brought in for routine testing.  Donatello has been stored in the Operations and Checkout Building.  This is the first time all three MPLMs are in the SSPF; the other one is the Leonardo.  Raffaello is scheduled to fly on Space Shuttle Atlantis on mission STS-114.

KENNEDY SPACE CENTER, FLA. - The Multi-Purpose Logistics Module Raffae...

KENNEDY SPACE CENTER, FLA. - The Multi-Purpose Logistics Module Raffaello is lifted from its stand in the Space Station Processing Facility to move to another work stand. Raffaello is the second MPLM built by ... More

CAPE CANAVERAL, Fla. -- A canister, carrying the Alpha Magnetic Spectrometer-2 (AMS) and Express Logistics Carrier-3 for space shuttle Endeavour's STS-134 mission, arrives at Launch Pad 39A at NASA's Kennedy Space Center in Florida. Next, crews at the pad will move the payload into the Payload Ground Handling Mechanism (PGHM), and the rotating service structure (RSS) that protects the shuttle from the elements and provides access to its components will be rotated back into place. The payload is scheduled to be installed into the shuttle's cargo bay March 25.      Endeavour and its six-member STS-134 crew are targeted to lift off April 19 at 7:48 p.m. EDT to deliver the payload to the International Space Station. This is Endeavour's final scheduled mission. For more information visit, www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts134/index.html. Photo credit: NASA/Cory Huston KSC-2011-2386

CAPE CANAVERAL, Fla. -- A canister, carrying the Alpha Magnetic Spectr...

CAPE CANAVERAL, Fla. -- A canister, carrying the Alpha Magnetic Spectrometer-2 (AMS) and Express Logistics Carrier-3 for space shuttle Endeavour's STS-134 mission, arrives at Launch Pad 39A at NASA's Kennedy Sp... More

KENNEDY SPACE CENTER, FLA. --   STS-113 Commander James Wetherbee checks the cockpit window from inside Endeavour.  The check is part of Crew Equipment Interface Test activities, which include familiarization with equipment for the mission. The primary payloads on mission STS-113 are the first port truss segment, P1 Truss, to be attached to the central truss segment, S0, on the International Space Station, and the Crew and Equipment Translation Aid (CETA) Cart B that can be used by spacewalkers to move along the truss with equipment.  Once delivered, the P1 truss will remain stowed until flight 12A.1.  The mission will also deliver the Expedition 6 crew to the Station and return Expedition 5 to Earth.  Space Shuttle Endeavour is scheduled to launch Nov. 10 on the 11-day mission. KSC-02pd1325

KENNEDY SPACE CENTER, FLA. -- STS-113 Commander James Wetherbee chec...

KENNEDY SPACE CENTER, FLA. -- STS-113 Commander James Wetherbee checks the cockpit window from inside Endeavour. The check is part of Crew Equipment Interface Test activities, which include familiarization w... More

KENNEDY SPACE CENTER, FLA. --  Viewed from the Shuttle Landing Facility at NASA's Kennedy Space Center, space shuttle Discovery has cleared the clouds over the seaside launch pad and hurtles toward space.  Liftoff was on time at 11:38:19 a.m. EDT.  Discovery carries the Italian-built U.S. Node 2, called Harmony.  During the 14-day STS-120 mission, the crew will install Harmony and move the P6 solar arrays to their permanent position and deploy them. Discovery is expected to complete its mission and return home at 4:47 a.m. EST on Nov. 6. Photo credit: NASA/Chuck Tintera KSC-07pd2956

KENNEDY SPACE CENTER, FLA. -- Viewed from the Shuttle Landing Facilit...

KENNEDY SPACE CENTER, FLA. -- Viewed from the Shuttle Landing Facility at NASA's Kennedy Space Center, space shuttle Discovery has cleared the clouds over the seaside launch pad and hurtles toward space. Lift... More

CAPE CANAVERAL, Fla. -- Space shuttle Atlantis, attached to its external fuel tank and solid rocket boosters atop a mobile launcher platform, makes its final debut outside the Vehicle Assembly Building. "Rollout," as it's called, to Launch Pad 39A at NASA's Kennedy Space Center in Florida began at 8:42 p.m. EDT. It will take the crawler-transporter about six hours to carry the shuttle stack to its seaside launch pad. The milestone move paves the way for the launch of the STS-135 mission to the International Space Station, targeted for July 8.        STS-135 will be the 33rd flight of Atlantis, the 37th shuttle mission to the space station, and the 135th and final mission of NASA's Space Shuttle Program. For more information visit, www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Kim Shiflett KSC-2011-4105

CAPE CANAVERAL, Fla. -- Space shuttle Atlantis, attached to its extern...

CAPE CANAVERAL, Fla. -- Space shuttle Atlantis, attached to its external fuel tank and solid rocket boosters atop a mobile launcher platform, makes its final debut outside the Vehicle Assembly Building. "Rollou... More

CAPE CANAVERAL, Fla. -- Thousands of spectators came out to watch space shuttle Atlantis' historic final journey from the Vehicle Assembly Building to Launch Pad 39A at NASA's Kennedy Space Center in Florida. First motion was at 8:42 p.m. EDT. It will take the crawler-transporter about six hours to carry the shuttle, attached to its external fuel tank and solid rocket boosters, to the seaside launch pad. The milestone move paves the way for the launch of the STS-135 mission to the International Space Station, targeted for July 8.        STS-135 will be the 33rd flight of Atlantis, the 37th shuttle mission to the space station, and the 135th and final mission of NASA's Space Shuttle Program. For more information visit, www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Jim Grossmann KSC-2011-4123

CAPE CANAVERAL, Fla. -- Thousands of spectators came out to watch spac...

CAPE CANAVERAL, Fla. -- Thousands of spectators came out to watch space shuttle Atlantis' historic final journey from the Vehicle Assembly Building to Launch Pad 39A at NASA's Kennedy Space Center in Florida. F... More

KENNEDY SPACE CENTER, FLA. -- At Launch Complex 39, members of the STS-117 crew are instructed in the operation of an M-113 armored personnel carrier by the astronaut rescue team. The astronauts on the STS-117 crew are participating in M-113 armored personnel carrier training during Terminal Countdown Demonstration Test (TCDT) activities, a dress rehearsal for their launch, targeted for March 15. The M-113 could be used to move the crew away from the launch pad quickly in the event of an emergency. The TCDT also includes pad emergency egress training and a simulated launch countdown. The mission payload aboard Space Shuttle Atlantis is the S3/S4 integrated truss structure, along with a third set of solar arrays and batteries. The crew of six astronauts will install the truss to continue assembly of the station. Photo credit: NASA/Kim Shiflett KSC-07pd0477

KENNEDY SPACE CENTER, FLA. -- At Launch Complex 39, members of the STS...

KENNEDY SPACE CENTER, FLA. -- At Launch Complex 39, members of the STS-117 crew are instructed in the operation of an M-113 armored personnel carrier by the astronaut rescue team. The astronauts on the STS-117 ... More

CAPE CANAVERAL, Fla. - In the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida, external fuel tank, ET-138, for space shuttle Atlantis' STS-135 mission, is positioned between the twin solid rocket boosters on the mobile launcher platform in high bay-1. Shuttle Atlantis' move, or "rollover," from Orbiter Processing Facility-1 to the VAB is targeted for May 10. Once there it will be mated with the external tank and boosters. Atlantis and its crew of four will deliver the Raffaello multipurpose logistics module packed with supplies and spare parts to the International Space Station. STS-135 is targeted to launch June 28, and will be the last spaceflight for the Space Shuttle Program. Photo credit: NASA/Jack Pfaller KSC-2011-3053

CAPE CANAVERAL, Fla. - In the Vehicle Assembly Building (VAB) at NASA'...

CAPE CANAVERAL, Fla. - In the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida, external fuel tank, ET-138, for space shuttle Atlantis' STS-135 mission, is positioned between the twin s... More

KENNEDY SPACE CENTER, FLA. - The Space Shuttle orbiter Atlantis is turned into position outside the Orbiter Processing Facility (OPF) for its tow to the Vehicle Assembly Building (VAB). The move will allow work to be performed in the OPF that can only be accomplished while the bay is empty. Work scheduled in the processing facility includes annual validation of the bay's cranes, work platforms, lifting mechanisms, and jack stands. Atlantis will remain in the VAB for about 10 days, then return to the OPF as work resumes to prepare it for launch in September 2004 on the first return-to-flight mission, STS-114.

KENNEDY SPACE CENTER, FLA. - The Space Shuttle orbiter Atlantis is tur...

KENNEDY SPACE CENTER, FLA. - The Space Shuttle orbiter Atlantis is turned into position outside the Orbiter Processing Facility (OPF) for its tow to the Vehicle Assembly Building (VAB). The move will allow work... More

CAPE CANAVERAL, Fla. –– On Launch Pad 39B at NASA's Kennedy Space Center in Florida, space shuttle Endeavour has joined space shuttle Atlantis on Launch Pad 39A. In the background is the Atlantic Ocean. This is probably the final time two shuttles will be on launch pads at the same time with the space shuttle fleet set for retirement in 2010. Endeavour will be prepared on the pad for liftoff in the unlikely event that a rescue mission is necessary following space shuttle Atlantis' launch on the STS-125 mission to service NASA's  Hubble Space Telescope. After Atlantis is cleared to land, Endeavour will move to Launch Pad 39A for its upcoming STS-127 mission to the International Space Station, targeted to launch June 13.   Photo credit: NASA/Dimitri Gerondidakis KSC-2009-2769

CAPE CANAVERAL, Fla. –– On Launch Pad 39B at NASA's Kennedy Space Cent...

CAPE CANAVERAL, Fla. –– On Launch Pad 39B at NASA's Kennedy Space Center in Florida, space shuttle Endeavour has joined space shuttle Atlantis on Launch Pad 39A. In the background is the Atlantic Ocean. This is... More

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-1 at NASA's Kennedy Space Center in Florida, technicians prepare to move an aft access platform into place behind shuttle Atlantis, following the installation of the spacecraft's three main engines. Shown is the right-hand orbital maneuvering system (OMS) pod and engine taken from the right-hand access arm.            Atlantis is being prepared for the "launch on need," or potential rescue mission, for the final planned shuttle flight, Endeavour's STS-134 mission. For more information, visit www.nasa.gov/shuttle. Photo credit: NASA/Kim Shiflett KSC-2010-5830

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-1 at NASA's Ken...

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-1 at NASA's Kennedy Space Center in Florida, technicians prepare to move an aft access platform into place behind shuttle Atlantis, following the installat... More

CAPE CANAVERAL, Fla. - Workers move the Orbiter Transporter System (OTS) into Orbiter Processing Facility-1 at NASA's Kennedy Space Center in Florida. The OTS will be moved under shuttle Atlantis for its rollover to the nearby Vehicle Assembly Building (VAB).            Once inside the VAB, Atlantis will be joined to its solid rocket boosters and external fuel tank on the mobile launcher platform. Later this month, Atlantis is scheduled to "rollout" to Launch Pad 39A on the STS-135 mission, which will deliver the Raffaello multi-purpose logistics module packed with supplies and spare parts to the International Space Station. STS-135, targeted to launch June 28, will be the 33rd flight of Atlantis, the 37th shuttle mission to the station, and the 135th and final mission of NASA's Space Shuttle Program. For more information, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. NASA/Jack Pfaller KSC-2011-3350

CAPE CANAVERAL, Fla. - Workers move the Orbiter Transporter System (OT...

CAPE CANAVERAL, Fla. - Workers move the Orbiter Transporter System (OTS) into Orbiter Processing Facility-1 at NASA's Kennedy Space Center in Florida. The OTS will be moved under shuttle Atlantis for its rollov... More

CAPE CANAVERAL, Fla. –  After moving out of high bay 1 in the Vehicle Assembly Building at NASA's Kennedy Space Center, space shuttle Atlantis' external fuel tank-solid rocket booster stack, atop a mobile launcher platform, rolls into high bay 3.  The move makes room in high bay 1 for the ET-SRB stack for space shuttle Endeavour.  Atlantis is targeted for launch on the STS-125 mission on May 12 to service NASA's Hubble Space Telescope.  Endeavour will fly on the STS-127 mission to the International Space Station and bring the final segments for Japan's Kibo laboratory. Photo credit: NASA/Dimitri Gerondidakis KSC-2009-1525

CAPE CANAVERAL, Fla. – After moving out of high bay 1 in the Vehicle ...

CAPE CANAVERAL, Fla. – After moving out of high bay 1 in the Vehicle Assembly Building at NASA's Kennedy Space Center, space shuttle Atlantis' external fuel tank-solid rocket booster stack, atop a mobile launc... More

CAPE CANAVERAL, Fla. -  At Launch Pad 39A at NASA’s Kennedy Space Center in Florida, technicians work to move the Hubble payload canister into the payload changeout room for space shuttle Atlantis’ STS-125 mission.  The canister arrived at the pad on Saturday evening, however, early Sunday morning technicians were unable to place the canister into the pad’s payload changeout room. Teflon pads on “shoes” attached to the outside of the payload canister that help the canister move along guide rails didn’t fit properly. The shoes were removed and several options were considered, including slightly shaving down the pads so the shoes will fit onto the rails.  STS-125 is the fifth and final shuttle Hubble Space Telescope servicing mission. Atlantis’ launch is targeted for Oct. 10. Photo credit: NASA/Kim Shiflett. KSC-08pd2758

CAPE CANAVERAL, Fla. - At Launch Pad 39A at NASA’s Kennedy Space Cent...

CAPE CANAVERAL, Fla. - At Launch Pad 39A at NASA’s Kennedy Space Center in Florida, technicians work to move the Hubble payload canister into the payload changeout room for space shuttle Atlantis’ STS-125 miss... More

KENNEDY SPACE CENTER, FLA. -   After rollback of the rotating service structure (RSS) on Launch Pad 39B, Space Shuttle Discovery stands bathed in lights from the RSS and fixed service structure.  The rollback was in preparation for launch July 1 on mission STS-121.  Extending toward the cockpit of the shuttle is the orbiter access arm with the White Room extended.  The White Room provides access into the orbiter for the astronauts.  The RSS provides protected access to the orbiter for changeout and servicing of payloads at the pad. The structure is supported by a rotating bridge that pivots about a vertical axis on the west side of the pad's flame trench. The hinge column rests on the pad surface and is braced to the fixed service structure. Support for the outer end of the bridge is provided by two eight-wheel, motor-driven trucks that move along circular twin rails installed flush with the pad surface. The track crosses the flame trench on a permanent bridge.  The RSS is 102 feet long, 50 feet wide and 130 feet high. The structure has orbiter access platforms at five levels to provide access to the payload bay while the orbiter is being serviced in the RSS. Each platform has independent extendable planks that can be arranged to conform to a payload's configuration.  This mission is the 115th shuttle flight and the 18th U.S. flight to the International Space Station. Photo credit: NASA/Kim Shiflett KSC-06pd1308

KENNEDY SPACE CENTER, FLA. - After rollback of the rotating service ...

KENNEDY SPACE CENTER, FLA. - After rollback of the rotating service structure (RSS) on Launch Pad 39B, Space Shuttle Discovery stands bathed in lights from the RSS and fixed service structure. The rollback w... More

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, shuttle Discovery is ushered into the Vehicle Assembly Building (VAB) from Orbiter Processing Facility-3 during a move known as "rollover." Once inside the VAB, the shuttle will be joined to its solid rocket boosters and external fuel tank. Later this month, Discovery is scheduled to "rollout" to Launch Pad 39A for its launch to the International Space Station on the STS-133 mission.    Targeted to liftoff Nov. 1, Discovery will take the Permanent Multipurpose Module (PMM) packed with supplies and critical spare parts, as well as Robonaut 2 (R2) to the station. Photo credit: NASA/ Dimitri Gerondidakis KSC-2010-4605

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, shu...

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, shuttle Discovery is ushered into the Vehicle Assembly Building (VAB) from Orbiter Processing Facility-3 during a move known as "rollover." Onc... More

KENNEDY SPACE CENTER, FLA. --  At NASA's Kennedy Space Center, the STS-120 crew don their launch and entry suits before heading to Launch Pad 39A for launch aboard space shuttle Discovery to the International Space Station.  Seen here is Pilot George Zamka, who is making his first shuttle flight.  Discovery is scheduled for liftoff at 11:38 a.m. EDT.  The mission will be the 23rd assembly flight to the space station and the 34th flight for Discovery.  Payload on the mission is the Italian-built U.S. Node 2, called Harmony.  During the 14-day mission, the crew will install Harmony and move the P6 solar arrays to their permanent position and deploy them.  Discovery is expected to complete its mission and return home at 4:47 a.m. EST on Nov. 6. Photo credit: NASA/Kim Shiflett KSC-07pd2937

KENNEDY SPACE CENTER, FLA. -- At NASA's Kennedy Space Center, the STS...

KENNEDY SPACE CENTER, FLA. -- At NASA's Kennedy Space Center, the STS-120 crew don their launch and entry suits before heading to Launch Pad 39A for launch aboard space shuttle Discovery to the International S... More

KENNEDY SPACE CENTER, FLA. -- In the Operations and Checkout Building, an overhead crane lifts the Joint Airlock Module to move and place it into the payload canister at left for transfer to the Space Station Processing Facility. There the module will undergo more preflight processing for the STS-104 mission scheduled for launch aboard Space Shuttle Atlantis May 17, 2001. The Joint Airlock Module is the gateway from which crew members aboard the International Space Station will enter and exit the 470-ton orbiting research facility KSC-00pp1501

KENNEDY SPACE CENTER, FLA. -- In the Operations and Checkout Building,...

KENNEDY SPACE CENTER, FLA. -- In the Operations and Checkout Building, an overhead crane lifts the Joint Airlock Module to move and place it into the payload canister at left for transfer to the Space Station P... More

Cape Canaveral, Fla. -- Space shuttle Atlantis made its historic final journey to Launch Pad 39A after its 3.4 mile trek from NASA Kennedy Space Center's Vehicle Assembly Building. Atlantis was secured or "hard down," at its seaside launch pad at 3:29 a.m. EDT on Wednesday, June 1.          The milestone move, known as "rollout," paves the way for the launch of the STS-135 mission to the International Space Station, targeted for July 8. STS-135 will be the 33rd flight of Atlantis, the 37th shuttle mission to the space station, and the 135th and final mission of NASA's Space Shuttle Program. For more information visit: www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Terry Zaperach KSC-2011-4220

Cape Canaveral, Fla. -- Space shuttle Atlantis made its historic final...

Cape Canaveral, Fla. -- Space shuttle Atlantis made its historic final journey to Launch Pad 39A after its 3.4 mile trek from NASA Kennedy Space Center's Vehicle Assembly Building. Atlantis was secured or "hard... More

KENNEDY SPACE CENTER, FLA. -   After rollback of the rotating service structure (RSS) on Launch Pad 39B, Space Shuttle Discovery stands bathed in lights from the RSS and fixed service structure.  The rollback was in preparation for launch July 1 on mission STS-121.  Extending toward the cockpit of the shuttle is the orbiter access arm with the White Room extended.  The White Room provides access into the orbiter for the astronauts.  The RSS provides protected access to the orbiter for changeout and servicing of payloads at the pad. The structure is supported by a rotating bridge that pivots about a vertical axis on the west side of the pad's flame trench. The hinge column rests on the pad surface and is braced to the fixed service structure. Support for the outer end of the bridge is provided by two eight-wheel, motor-driven trucks that move along circular twin rails installed flush with the pad surface. The track crosses the flame trench on a permanent bridge.  The RSS is 102 feet long, 50 feet wide and 130 feet high. The structure has orbiter access platforms at five levels to provide access to the payload bay while the orbiter is being serviced in the RSS. Each platform has independent extendable planks that can be arranged to conform to a payload's configuration.  This mission is the 115th shuttle flight and the 18th U.S. flight to the International Space Station. Photo credit: NASA/Kim Shiflett KSC-06pd1307

KENNEDY SPACE CENTER, FLA. - After rollback of the rotating service ...

KENNEDY SPACE CENTER, FLA. - After rollback of the rotating service structure (RSS) on Launch Pad 39B, Space Shuttle Discovery stands bathed in lights from the RSS and fixed service structure. The rollback w... More

KENNEDY SPACE CENTER, FLA. -- Cameras are prepared to record the launch of Space Shuttle Atlantis from Launch Pad 39A following sunrise on a cloudy Florida day. Rollback of the pad's rotating service structure, or RSS, is one of the milestones in preparation for the launch of mission STS-117 on June 8. Rollback started at 10:56 p.m. EDT June 7 and was complete at 11:34 p.m. The RSS, the massive structure to the left of the shuttle, provides protected access to the orbiter for changeout and servicing of payloads at the pad. The structure is supported by a rotating bridge that pivots about a vertical axis on the side of the pad's flame trench. The hinge column rests on the pad surface and is braced to the fixed service structure. Support for the outer end of the bridge is provided by two eight-wheel, motor-driven trucks that move along circular twin rails installed flush with the pad surface. The track crosses the flame trench on a permanent bridge. The RSS is 102 feet long, 50 feet wide and 130 feet high. The structure has orbiter access platforms at five levels to provide access to the payload bay while the orbiter is being serviced in the RSS. Each platform has independent extendable planks that can be arranged to conform to a payload's configuration. This mission is the 118th shuttle flight and the 21st U.S. flight to the International Space Station and will deliver and install the S3/S4 truss segment, deploy a set of solar arrays and prepare them for operation. Photo credit: NASA/Ken Thornsley KSC-07pd1399

KENNEDY SPACE CENTER, FLA. -- Cameras are prepared to record the launc...

KENNEDY SPACE CENTER, FLA. -- Cameras are prepared to record the launch of Space Shuttle Atlantis from Launch Pad 39A following sunrise on a cloudy Florida day. Rollback of the pad's rotating service structure,... More

CAPE CANAVERAL, Fla. -- Workers monitor space shuttle Discovery as it arrives at Launch Pad 39A from the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida. It took the shuttle, attached to its external fuel tank, twin solid rocket boosters and mobile launcher platform, about seven hours to complete the move atop a crawler-transporter. This is the second time Discovery has rolled out to the pad for the STS-133 mission, and comes after a thorough check and modifications to the shuttle's external tank.             Targeted to liftoff Feb. 24, Discovery will take the Permanent Multipurpose Module (PMM) packed with supplies and critical spare parts, as well as Robonaut 2 (R2) to the International Space Station. For more information on STS-133, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts133/. Photo credit: NASA/Kim Shiflett KSC-2011-1282

CAPE CANAVERAL, Fla. -- Workers monitor space shuttle Discovery as it ...

CAPE CANAVERAL, Fla. -- Workers monitor space shuttle Discovery as it arrives at Launch Pad 39A from the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida. It took the shuttle, attached to its... More

KENNEDY SPACE CENTER, FLA. --  Nearby water reflects the brilliant light of flames beneath space shuttle Discovery as it leaps through the clouds into a blue sky heading for the International Space Station on mission STS-120.   Billows of clouds and smoke stream across Launch Pad 39A at NASA's Kennedy Space Center.   Liftoff was on time at 11:38:19 a.m. EDT.   Discovery carries the Italian-built U.S. Node 2, called Harmony.  During the 14-day STS-120 mission, the crew will install Harmony and move the P6 solar arrays to their permanent position and deploy them. Discovery is expected to complete its mission and return home at 4:47 a.m. EST on Nov. 6. Photo credit: NASA/Sandra Joseph, Tony Gray & Robert Murray KSC-07pd2961

KENNEDY SPACE CENTER, FLA. -- Nearby water reflects the brilliant lig...

KENNEDY SPACE CENTER, FLA. -- Nearby water reflects the brilliant light of flames beneath space shuttle Discovery as it leaps through the clouds into a blue sky heading for the International Space Station on m... More

KENNEDY SPACE CENTER, FLA. -- STS-120 Commander Pam Melroy and Pilot George Zamka return to crew quarters after disembarking from a Shuttle Training Aircraft, or STA, on the tarmac at Kennedy Space Center's Shuttle Landing Facility.  They were training for their upcoming space shuttle mission by practicing landings using an STA.  Melroy is the second woman to command a shuttle mission. Also assigned to STS-120 are Mission Specialists Scott Parazynski, Stephanie Wilson, Doug Wheelock, Paolo Nespoli and Daniel Tani. Nespoli represents the European Space Agency. Tani will remain on the International Space Station as an Expedition 16 flight engineer after the STS-120 mission is complete. The mission will be the 23rd shuttle flight to the International Space Station, delivering the Italian-built U.S. Node 2, called Harmony. The crew arrived at Kennedy on Oct. 19 to prepare for launch aboard space shuttle Discovery at 11:38 a.m. EDT Oct. 23. The 14-day mission includes five spacewalks -- four by shuttle crew members and one by the station's Expedition 16 crew -- to install Harmony and move the P6 solar arrays to their permanent position and deploy them. Discovery is expected to complete its mission and return home on Nov. 6.  Photo credit: NASA/Kim Shiflett KSC-07pd2898

KENNEDY SPACE CENTER, FLA. -- STS-120 Commander Pam Melroy and Pilot G...

KENNEDY SPACE CENTER, FLA. -- STS-120 Commander Pam Melroy and Pilot George Zamka return to crew quarters after disembarking from a Shuttle Training Aircraft, or STA, on the tarmac at Kennedy Space Center's Shu... More

KENNEDY SPACE CENTER, FLA. -- Alan Thirkettle, the International Space Station Program Manager for ESA, the European Space Agency, and Mauro Piermaria, the ESPERIA mission manager for ASI, the Italian Space Agency, participate in a news briefing on the launch readiness of space shuttle mission STS-120.  The STS-120 mission will be the 23rd shuttle flight to the International Space Station, delivering the Italian-built U.S. Node 2, called Harmony. The seven-member crew includes ESA astronaut Paolo Nespoli from Italy. The 14-day mission includes five spacewalks -- four by shuttle crew members and one by the station's Expedition 16 crew -- to install Harmony and move the P6 solar arrays to their permanent position and deploy them. Launch aboard space shuttle Discovery is planned for 11:38 a.m. EDT Oct. 23, and Discovery is scheduled to complete its mission and return home on Nov. 6.  Photo credit: NASA/George Shelton KSC-07pd2913

KENNEDY SPACE CENTER, FLA. -- Alan Thirkettle, the International Space...

KENNEDY SPACE CENTER, FLA. -- Alan Thirkettle, the International Space Station Program Manager for ESA, the European Space Agency, and Mauro Piermaria, the ESPERIA mission manager for ASI, the Italian Space Age... More

CAPE CANAVERAL, Fla. - Backdropped by a beautiful blue sky and the crystal-clear Atlantic Ocean, space shuttle Endeavour is revealed on Launch Pad 39A at NASA's Kennedy Space Center in Florida following the move of the rotating service structure (RSS). The structure provides weather protection and access to the shuttle while it awaits lift off on the pad. RSS "rollback," as it's called, began at 11:44 a.m. EDT on May 15 and was completed at 12:24 p.m.     STS-134 will deliver the Alpha Magnetic Spectrometer-2 (AMS), Express Logistics Carrier-3, a high-pressure gas tank and additional spare parts for the Dextre robotic helper to the International Space Station. May 16 at 8:56 a.m. will be the second launch attempt for Endeavour. The first attempt on April 29 was scrubbed because of an issue associated with a faulty power distribution box called the aft load control assembly-2 (ALCA-2). STS-134 will be the final spaceflight for Endeavour. For more information visit, www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts134/index.html. Photo credit: NASA/Kim Shiflett KSC-2011-3532

CAPE CANAVERAL, Fla. - Backdropped by a beautiful blue sky and the cry...

CAPE CANAVERAL, Fla. - Backdropped by a beautiful blue sky and the crystal-clear Atlantic Ocean, space shuttle Endeavour is revealed on Launch Pad 39A at NASA's Kennedy Space Center in Florida following the mov... More

KENNEDY SPACE CENTER, FLA. -- As part of Crew Equipment Interface Test activities, STS-113 Mission Specialists John Herrington (left) and Michael Lopez-Alegria (center) practice working with equipment in Endeavour. The primary payloads on mission STS-113 are the first port truss segment, P1 Truss, to be attached to the central truss segment, S0, on the International Space Station, and the Crew and Equipment Translation Aid (CETA) Cart B that can be used by spacewalkers to move along the truss with equipment.  Once delivered, the P1 truss will remain stowed until flight 12A.1. The mission will also deliver the Expedition 6 crew to the Station and return Expedition 5 to Earth.   Space Shuttle Endeavour is scheduled to launch Nov. 10 on the 11-day mission. KSC-02pd1330

KENNEDY SPACE CENTER, FLA. -- As part of Crew Equipment Interface Test...

KENNEDY SPACE CENTER, FLA. -- As part of Crew Equipment Interface Test activities, STS-113 Mission Specialists John Herrington (left) and Michael Lopez-Alegria (center) practice working with equipment in Endeav... More

KENNEDY SPACE CENTER, FLA. --  At NASA's Kennedy Space Center, the STS-120 crew don their launch and entry suits before heading to Launch Pad 39A for launch aboard space shuttle Discovery to the International Space Station.  Seen here is Commander Pamela Melroy, who is making her third shuttle flight.  She is only the second woman to command a shuttle mission.  Discovery is scheduled for liftoff at 11:38 a.m. EDT.  The mission will be the 23rd assembly flight to the space station and the 34th flight for Discovery.  Payload on the mission is the Italian-built U.S. Node 2, called Harmony.  During the 14-day mission, the crew will install Harmony and move the P6 solar arrays to their permanent position and deploy them.  Discovery is expected to complete its mission and return home at 4:47 a.m. EST on Nov. 6. Photo credit: NASA/Kim Shiflett KSC-07pd2936

KENNEDY SPACE CENTER, FLA. -- At NASA's Kennedy Space Center, the STS...

KENNEDY SPACE CENTER, FLA. -- At NASA's Kennedy Space Center, the STS-120 crew don their launch and entry suits before heading to Launch Pad 39A for launch aboard space shuttle Discovery to the International S... More

CAPE CANAVERAL, Fla. – Space shuttle Discovery, mounted to a Shuttle Carrier Aircraft, or SCA, takes off from NASA Kennedy Space Center’s Shuttle Landing Facility runway 15 in Florida at 7 a.m. EDT and makes a flyby near the 525-foot-tall Vehicle Assembly Building. The duo is beginning its ferry flight to the Washington Dulles International Airport in Virginia that also includes a flyby of the Space Coast and Washington, D.C. Also flying along with the pair is a T-38 training jet.     Discovery is leaving Kennedy after more than 28 years of service beginning with its arrival on the space coast Nov. 9, 1983. Discovery first launched to space Aug. 30, 1984, on the STS-41D mission. Discovery is the agency’s most-flown shuttle with 39 missions, more than 148 million miles and a total of one year in space. Discovery is set to move to the Smithsonian’s National Air and Space Museum, Steven F. Udvar-Hazy Center in Chantilly, Va., on April 19 where it will be place on public display. For more information on the SCA, visit http://www.nasa.gov/centers/dryden/news/FactSheets/FS-013-DFRC.html. For more information on shuttle transition and retirement activities, visit http://www.nasa.gov/transition.   Photo credit: NASA/Tim Powers and Rick Wetherington KSC-2012-2459

CAPE CANAVERAL, Fla. – Space shuttle Discovery, mounted to a Shuttle C...

CAPE CANAVERAL, Fla. – Space shuttle Discovery, mounted to a Shuttle Carrier Aircraft, or SCA, takes off from NASA Kennedy Space Center’s Shuttle Landing Facility runway 15 in Florida at 7 a.m. EDT and makes a ... More

CAPE CANAVERAL, Fla. -- Space shuttle Endeavour, attached to its external fuel tank and solid rocket boosters atop a crawler-transporter, is ready for its slow move from High Bay 3 in the Vehicle Assembly Building to Launch Pad 39A at NASA's Kennedy Space Center in Florida. The 3.4-mile trek, known as "rollout," will take about seven hours to complete. This is the final scheduled rollout for Endeavour.      Endeavour and its six STS-134 crew members will deliver the Express Logistics Carrier-3, Alpha Magnetic Spectrometer-2 (AMS), a high-pressure gas tank, additional spare parts for the Dextre robotic helper and micrometeoroid debris shields to the International Space Station on the shuttle's final spaceflight. Launch is targeted for April 19 at 7:48 p.m. EDT. For more information visit, www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts134/index.html. Photo credit: NASA/Jim Grossmann KSC-2011-2214

CAPE CANAVERAL, Fla. -- Space shuttle Endeavour, attached to its exter...

CAPE CANAVERAL, Fla. -- Space shuttle Endeavour, attached to its external fuel tank and solid rocket boosters atop a crawler-transporter, is ready for its slow move from High Bay 3 in the Vehicle Assembly Build... More

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility 1 at NASA’s Kennedy Space Center in Florida, workers monitor the progress of space shuttle Atlantis as it backs out of its hangar for its move to the Vehicle Assembly Building.    The rollover began about 7 a.m. EDT and was complete at 8:25 a.m. when Atlantis was towed into the VAB's transfer aisle.  Next, Atlantis will be lifted over a transom and lowered into the VAB's high bay 1, where it will be attached to its external fuel tank and solid rocket boosters. Rollout of the shuttle stack to Kennedy’s Launch Pad 39A, a significant milestone in launch processing activities, is planned for Oct. 13.  Liftoff of Atlantis on its STS-129 mission to the International Space Station is targeted for 4:04 p.m. EST during a 10-minute launch window on Nov. 12.  For information on the STS-129 mission and crew, visit http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts129/index.html. Photo credit: NASA/Jack Pfaller KSC-2009-5320

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility 1 at NASA’s Kenn...

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility 1 at NASA’s Kennedy Space Center in Florida, workers monitor the progress of space shuttle Atlantis as it backs out of its hangar for its move to the Vehicl... More

CAPE CANAVERAL, Fla. -- Space shuttle Discovery arrives at Launch Pad 39A from the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida. It took the shuttle, attached to its external fuel tank, twin solid rocket boosters and mobile launcher platform, about seven hours to complete the move atop a crawler-transporter. This is the second time Discovery has rolled out to the pad for the STS-133 mission, and comes after a thorough check and modifications to the shuttle's external tank.               Targeted to liftoff Feb. 24, Discovery will take the Permanent Multipurpose Module (PMM) packed with supplies and critical spare parts, as well as Robonaut 2 (R2) to the International Space Station. For more information on STS-133, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts133/. Photo credit: NASA/Kim Shiflett KSC-2011-1281

CAPE CANAVERAL, Fla. -- Space shuttle Discovery arrives at Launch Pad ...

CAPE CANAVERAL, Fla. -- Space shuttle Discovery arrives at Launch Pad 39A from the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida. It took the shuttle, attached to its external fuel tank, t... More

CAPE CANAVERAL, Fla. -  At NASA's Kennedy Space Center in Florida, space shuttle Endeavour rolls up the ramp toward Launch Pad 39A.  At right are the open rotating service structure and the fixed service structure with the 80-foot-tall lightning mast on top.  The shuttle moved off Launch Pad 39B starting at 8:28 am. EDT and completed its move to Launch Pad 39A at 4:37 p.m. Endeavour is targeted to launch Nov. 14 on the STS-126 mission. On this 27th mission to the International Space Station, Endeavour will carry the Lightweight Multi-Purpose Experiment Support Structure Carrier and the Multi-Purpose Logistics Module Leonardo that will hold supplies and equipment, including additional crew quarters, additional exercise equipment, spare hardware and equipment for the regenerative life support system.  Photo credit: NASA/Troy Cryder KSC-08pd3356

CAPE CANAVERAL, Fla. - At NASA's Kennedy Space Center in Florida, spa...

CAPE CANAVERAL, Fla. - At NASA's Kennedy Space Center in Florida, space shuttle Endeavour rolls up the ramp toward Launch Pad 39A. At right are the open rotating service structure and the fixed service struct... More

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, space shuttle Discovery backs out of its processing bay, Orbiter Processing Facility-2, or OPF-2, to begin the move to the Vehicle Assembly Building, or VAB.    Discovery will be stored inside the VAB for approximately one month while shuttle Atlantis undergoes processing in OPF-2 following its final mission, STS-135. Discovery flew its 39th and final mission, STS-133, in February and March 2011, and currently is being prepared for public display at the Smithsonian's National Air and Space Museum Steven F. Udvar-Hazy Center in Virginia. For more information about Discovery's Transition and Retirement, visit   www.nasa.gov/mission_pages/shuttle/launch/discovery_rss_collection_archive_1.html.  Photo credit: NASA/Jim Grossmann KSC-2011-5527

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, spa...

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, space shuttle Discovery backs out of its processing bay, Orbiter Processing Facility-2, or OPF-2, to begin the move to the Vehicle Assembly Bui... More

CAPE CANAVERAL, Fla. -- Technicians prepare shuttle Atlantis for its final planned move from Orbiter Processing Facility-1 to the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida.               The move called "rollover" is a major milestone in processing for the STS-135 mission to the International Space Station. Inside the VAB, the shuttle will be attached to its external fuel tank and solid rocket boosters. Commander Chris Ferguson, Pilot Doug Hurley and Mission Specialists Sandra Magnus and Rex Walheim are targeted to launch in early July, taking with them the Raffaello multipurpose logistics module packed with supplies, logistics and spare parts. The STS-135 mission also will fly a system to investigate the potential for robotically refueling existing spacecraft and return a failed ammonia pump module to help NASA better understand the failure mechanism and improve pump designs for future systems. STS-135 will be the 33rd flight of Atlantis, the 37th shuttle mission to the space station, and the 135th and final mission of NASA's Space Shuttle Program. For more information visit, www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Frankie Martin KSC-2011-3652

CAPE CANAVERAL, Fla. -- Technicians prepare shuttle Atlantis for its f...

CAPE CANAVERAL, Fla. -- Technicians prepare shuttle Atlantis for its final planned move from Orbiter Processing Facility-1 to the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida. ... More

CAPE CANAVERAL, Fla. -- Team members stationed at consoles in the Launch Control Center at NASA's Kennedy Space Center in Florida monitor space shuttle Discovery's external fuel tank as it is loaded with more than 535,000 gallons of cryogenic propellants. From back, are Assistant Launch Orbiter Test Conductor Mark Taffet, Launch Orbiter Test Conductor John Kracsun, STS-133 NASA Test Director Steve Payne, NASA Commentator Allard Beutel, NASA Test Director Jeremy Graeber and STS-133 Assistant NASA Test Director Jeff Spaulding. During today's tanking test, the team is paying particular attention to the external tank's ribbed intertank region. Beginning tomorrow, engineers will evaluate data on 21-foot-long, U-shaped aluminum brackets, called stringers, and the newly replaced ground umbilical carrier plate (GUCP).                Discovery's first launch attempt for STS-133 was scrubbed in early November due to a hydrogen gas leak at the GUCP. In order to perform additional analysis on the tank, Discovery will be rolled back to the Vehicle Assembly Building, a move that is planned for next week. The next launch opportunity is no earlier than Feb. 3, 2011. For more information on STS-133, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts133/. Photo credit: NASA/Cory Huston KSC-2010-5880

CAPE CANAVERAL, Fla. -- Team members stationed at consoles in the Laun...

CAPE CANAVERAL, Fla. -- Team members stationed at consoles in the Launch Control Center at NASA's Kennedy Space Center in Florida monitor space shuttle Discovery's external fuel tank as it is loaded with more t... More

CAPE CANAVERAL, Fla. -- Space shuttle Atlantis, attached to its external fuel tank and solid rocket boosters atop a mobile launcher platform, awaits its final journey from the Vehicle Assembly Building to Launch Pad 39A at NASA's Kennedy Space Center in Florida. "Rollout," as it's called, began at 8:42 p.m. EDT. It will take the crawler-transporter about six hours to carry the shuttle stack to its seaside launch pad. The milestone move paves the way for the launch of the STS-135 mission to the International Space Station, targeted for July 8.        STS-135 will be the 33rd flight of Atlantis, the 37th shuttle mission to the space station, and the 135th and final mission of NASA's Space Shuttle Program. For more information visit, www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Kim Shiflett KSC-2011-4094

CAPE CANAVERAL, Fla. -- Space shuttle Atlantis, attached to its extern...

CAPE CANAVERAL, Fla. -- Space shuttle Atlantis, attached to its external fuel tank and solid rocket boosters atop a mobile launcher platform, awaits its final journey from the Vehicle Assembly Building to Launc... More

KENNEDY SPACE CENTER, FLA. --  In the Space Station Processing Facility, overhead cranes move the U.S. Lab Destiny from its test and integration stand to the Launch Package Integration Stand (LPIS) for a weight and center of gravity determination. Destiny is the payload aboard Space Shuttle Atlantis on mission STS-98 to the International Space Station. The lab is fitted with five system racks and will already have experiments installed inside for the flight. The launch is scheduled for January 2001 KSC00pp1933

KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facilit...

KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility, overhead cranes move the U.S. Lab Destiny from its test and integration stand to the Launch Package Integration Stand (LPIS) for a weight... More

CAPE CANAVERAL, Fla. - In the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida, external fuel tank, ET-138, for space shuttle Atlantis' STS-135 mission, is lowered into high bay-1 for joining with the twin solid rocket boosters on the mobile launcher platform. Shuttle Atlantis' move, or "rollover," from Orbiter Processing Facility-1 to the VAB is targeted for May 10. Once there it will be mated with the external tank and boosters. Atlantis and its crew of four will deliver the Raffaello multipurpose logistics module packed with supplies and spare parts to the International Space Station. STS-135 is targeted to launch June 28, and will be the last spaceflight for the Space Shuttle Program. Photo credit: NASA/Jack Pfaller KSC-2011-3041

CAPE CANAVERAL, Fla. - In the Vehicle Assembly Building (VAB) at NASA'...

CAPE CANAVERAL, Fla. - In the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida, external fuel tank, ET-138, for space shuttle Atlantis' STS-135 mission, is lowered into high bay-1 for j... More

CAPE CANAVERAL, Fla. –– Space shuttle Atlantis on Launch Pad 39A is viewed across the lagoon at NASA's Kennedy Space Center in Florida.  Atlantis is targeted to launch May 12 on the STS-125 mission to upgrade NASA's Hubble Space Telescope.  Endeavour will be prepared on the pad for liftoff in the unlikely event that a rescue mission is necessary following space shuttle Atlantis' launch May 12 on the STS-125 mission to upgrade NASA's Hubble Space Telescope. After Atlantis is cleared to land, Endeavour will move to Launch Pad 39A for its upcoming STS-127 mission to the International Space Station, targeted to launch June 13. Photo credit: NASA/Jack Pfaller KSC-2009-2753

CAPE CANAVERAL, Fla. –– Space shuttle Atlantis on Launch Pad 39A is vi...

CAPE CANAVERAL, Fla. –– Space shuttle Atlantis on Launch Pad 39A is viewed across the lagoon at NASA's Kennedy Space Center in Florida. Atlantis is targeted to launch May 12 on the STS-125 mission to upgrade N... More

KENNEDY SPACE CENTER, FLA. -- STS-120 Commander Pam Melroy and Pilot George Zamka return to crew quarters after disembarking from the Shuttle Training Aircraft, or STAs, behind them on the tarmac at NASA Kennedy Space Center's Shuttle Landing Facility.  They were training for their upcoming space shuttle mission by practicing landings in the STAs.  Melroy is the second woman to command a shuttle mission. Also assigned to STS-120 are Mission Specialists Scott Parazynski, Stephanie Wilson, Doug Wheelock, Paolo Nespoli and Daniel Tani. Nespoli represents the European Space Agency. Tani will remain on the International Space Station as an Expedition 16 flight engineer after the STS-120 mission is complete. The mission will be the 23rd shuttle flight to the International Space Station, delivering the Italian-built U.S. Node 2, called Harmony. The crew arrived at Kennedy on Oct. 19 to prepare for launch aboard space shuttle Discovery at 11:38 a.m. EDT Oct. 23. The 14-day mission includes five spacewalks -- four by shuttle crew members and one by the station's Expedition 16 crew -- to install Harmony and move the P6 solar arrays to their permanent position and deploy them. Discovery is scheduled to complete its mission and return home on Nov. 6.  Photo credit: NASA/Kim Shiflett KSC-07pd2909

KENNEDY SPACE CENTER, FLA. -- STS-120 Commander Pam Melroy and Pilot G...

KENNEDY SPACE CENTER, FLA. -- STS-120 Commander Pam Melroy and Pilot George Zamka return to crew quarters after disembarking from the Shuttle Training Aircraft, or STAs, behind them on the tarmac at NASA Kenned... More

CAPE CANAVERAL, Fla. –  Space shuttle Endeavour is ready for the rollover from Orbiter Processing Facility 2 to the Vehicle Assembly Building at NASA's Kennedy Space Center, Fla. The first motion of the shuttle out of its hangar was at 6:56 a.m. EDT.  In the VAB, Endeavour will be lifted into High Bay 1 and mated to the external fuel tank and solid rocket boosters already installed on the mobile launcher platform. Endeavour is scheduled to roll out to Launch Pad 39B in about a week.  Endeavour will be prepared on the pad for liftoff in the unlikely event that a rescue mission is necessary following space shuttle Atlantis' launch on the STS-125 mission to service the Hubble Space Telescope. After Atlantis is cleared to land, Endeavour will move to Launch Pad 39A for its upcoming STS-127 mission to the International Space Station, targeted to launch in mid-June.   Photo credit: NASA/Jim Grossmann KSC-2009-2568

CAPE CANAVERAL, Fla. – Space shuttle Endeavour is ready for the rollo...

CAPE CANAVERAL, Fla. – Space shuttle Endeavour is ready for the rollover from Orbiter Processing Facility 2 to the Vehicle Assembly Building at NASA's Kennedy Space Center, Fla. The first motion of the shuttle... More

CAPE CANAVERAL, Fla. – Media snap photos as space shuttle Discovery, mounted to a Shuttle Carrier Aircraft, slowly rolls along the runway of the Shuttle Landing Facility at NASA's Kennedy Space Center in Florida. The duo is set to begin their 3 1/2 hour ferry flight to the Washington Dulles International Airport in Virginia at about 7 a.m. EDT. Above the two craft is a NASA helicopter covering the departure. Discovery is leaving Kennedy after more than 28 years of service beginning with its arrival on the space coast Nov. 9, 1983. Discovery first launched to space Aug. 30, 1984, on the STS-41D mission. Discovery is the agency's most-flown shuttle with 39 missions, more than 148 million miles and a total of one year in space.       Discovery is set to move to the Smithsonian's National Air and Space Museum Steven F. Udvar-Hazy Center on April 19 where it will be placed on public display. For more information on the SCA, visit http://www.nasa.gov/centers/dryden/news/FactSheets/FS-013-DFRC.html. For more information on shuttle transition and retirement activities, visit http://www.nasa.gov/transition. Photo credit: NASA/Frankie Martin KSC-2012-2422

CAPE CANAVERAL, Fla. – Media snap photos as space shuttle Discovery, m...

CAPE CANAVERAL, Fla. – Media snap photos as space shuttle Discovery, mounted to a Shuttle Carrier Aircraft, slowly rolls along the runway of the Shuttle Landing Facility at NASA's Kennedy Space Center in Florid... More

KENNEDY SPACE CENTER, FLA. --   Nearby water reflects the light from Space shuttle Discovery as it heads for blue sky atop twin columns of fire, hurling swirls of smoke and steam across Launch Pad 39A at NASA's Kennedy Space Center.  Launching on mission STS-120 to the International Space Station, liftoff was on time at 11:38:19 a.m. EDT.  Discovery carries the Italian-built U.S. Node 2, called Harmony.  During the 14-day STS-120 mission, the crew will install Harmony and move the P6 solar arrays to their permanent position and deploy them. Discovery is expected to complete its mission and return home at 4:47 a.m. EST on Nov. 6. Photo courtesy of Nikon/Scott Andrews KSC-07pd2969

KENNEDY SPACE CENTER, FLA. -- Nearby water reflects the light from S...

KENNEDY SPACE CENTER, FLA. -- Nearby water reflects the light from Space shuttle Discovery as it heads for blue sky atop twin columns of fire, hurling swirls of smoke and steam across Launch Pad 39A at NASA's... More

CAPE CANAVERAL, Fla. – Just before dawn, space shuttle Endeavour, installed on the mobile launcher platform  atop the crawler-transporter, is on Launch Pad 39B at NASA's Kennedy Space Center in Florida.  First motion out of the Vehicle Assembly Building was at 11:57 p.m. EDT April 16.  The shuttle was secure on the pad at 7:17 a.m. EDT April 17. On the left of the shuttle is the White Room at the end of the orbiter access arm, 147 feet above the pad. When in place against the shuttle, the White Room provides access into the crew compartment on the shuttle. Endeavour will be prepared on the pad for liftoff in the unlikely event that a rescue mission is necessary following space shuttle Atlantis' launch on the STS-125 mission to service NASA's  Hubble Space Telescope. After Atlantis is cleared to land, Endeavour will move to Launch Pad 39A for its upcoming STS-127 mission to the International Space Station, targeted to launch June 13.   Photo credit: NASA/Jack Pfaller KSC-2009-2690

CAPE CANAVERAL, Fla. – Just before dawn, space shuttle Endeavour, inst...

CAPE CANAVERAL, Fla. – Just before dawn, space shuttle Endeavour, installed on the mobile launcher platform atop the crawler-transporter, is on Launch Pad 39B at NASA's Kennedy Space Center in Florida. First ... More

CAPE CANAVERAL, Fla. -- Bathed in bright xenon lights, space shuttle Discovery makes its nighttime trek, known as "rollout," from the Vehicle Assembly Building to Launch Pad 39A at NASA's Kennedy Space Center in Florida. It will take the shuttle, attached to its external fuel tank, twin solid rocket boosters and mobile launcher platform, about six hours to complete the move atop a crawler-transporter. Rollout sets the stage for Discovery's STS-133 crew to practice countdown and launch procedures during the Terminal Countdown Demonstration Test in mid-October.      Targeted to liftoff Nov. 1, Discovery will take the Permanent Multipurpose Module (PMM) packed with supplies and critical spare parts, as well as Robonaut 2 (R2) to the International Space Station. Photo credit: NASA/Jim Grossmann KSC-2010-4709

CAPE CANAVERAL, Fla. -- Bathed in bright xenon lights, space shuttle D...

CAPE CANAVERAL, Fla. -- Bathed in bright xenon lights, space shuttle Discovery makes its nighttime trek, known as "rollout," from the Vehicle Assembly Building to Launch Pad 39A at NASA's Kennedy Space Center i... More

KENNEDY SPACE CENTER, FLA. - Expedition 5 crew member Peggy Whitson undergoes a suit check as part of Terminal Countdown Demonstration Test activities at KSC.  The TCDT includes emergency egress training at the pad and a simulated launch countdown.  Expedition 5 will travel to the International Space Station on mission STS-111 as the replacement crew for Expedition 4, who will return to Earth aboard Endeavour.  Known as Utilization Flight -2, the mission includes attaching a Canadian-built mobile base system to the International Space Station that will enable the Canadarm2 robotic arm to move along a railway on the Station's truss to build and maintain the outpost.  The crew will also replace a faulty wrist/roll joint on the Canadarm2 as well as unload almost three tons of experiments and supplies from the Italian-built Multi-Purpose Logistics Module Leonardo.  Launch of Space Shuttle Endeavour on mission STS-111 is scheduled for May 30, 2002 KSC-02pd0675

KENNEDY SPACE CENTER, FLA. - Expedition 5 crew member Peggy Whitson un...

KENNEDY SPACE CENTER, FLA. - Expedition 5 crew member Peggy Whitson undergoes a suit check as part of Terminal Countdown Demonstration Test activities at KSC. The TCDT includes emergency egress training at the... More

KENNEDY SPACE CENTER, FLA. --   Atop twin columns of fire, space shuttle Discovery hurtles past the lightning rod atop the fixed service structure on Launch Pad 39A at NASA's Kennedy Space Center. Smoke and steam from liftoff billow across the pad.  Liftoff was on time at 11:38:19 a.m. EDT.  Discovery carries the Italian-built U.S. Node 2, called Harmony.  During the 14-day STS-120 mission, the crew will install Harmony and move the P6 solar arrays to their permanent position and deploy them. Discovery is expected to complete its mission and return home at 4:47 a.m. EST on Nov. 6. Photo credit: NASA/Sandra Joseph, Tony Gray & Robert Murray KSC-07pd2966

KENNEDY SPACE CENTER, FLA. -- Atop twin columns of fire, space shutt...

KENNEDY SPACE CENTER, FLA. -- Atop twin columns of fire, space shuttle Discovery hurtles past the lightning rod atop the fixed service structure on Launch Pad 39A at NASA's Kennedy Space Center. Smoke and ste... More

CAPE CANAVERAL, Fla. –   In the airlock of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, workers prepare to move the ground support equipment for the STS-125 Hubble Servicing Mission delivered July 16.  The GSE are carriers, or pallets, that will hold equipment in space shuttle Atlantis’ payload bay.  This carrier will be moved to a work stand. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the servicing mission.  The three payload carriers or pallets are the Flight Support System, the Super Lightweight Interchangeable Carrier and the Orbital Replacement Unit Carrier.  At the end of July, a fourth and final carrier, the Multi-Use Lightweight Equipment carrier will join the others in the Payload Hazardous Servicing Facility where the Hubble payload is being prepared for launch. Photo credit: NASA/Cory Huston KSC-08pd2004

CAPE CANAVERAL, Fla. – In the airlock of the Payload Hazardous Servi...

CAPE CANAVERAL, Fla. – In the airlock of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, workers prepare to move the ground support equipment for the STS-125 Hubble Servicing Mission ... More

CAPE CANAVERAL, Fla. -- Shuttle Atlantis' three main engines take center stage in this image as Atlantis is being moved to the Vehicle Assembly Building (VAB) from Orbiter Processing Faciity-1 at NASA's Kennedy Space Center in Florida.      The move called "rollover" is a major milestone in processing for the STS-135 mission to the International Space Station. Inside the VAB, the shuttle will be attached to its external fuel tank and solid rocket boosters. Commander Chris Ferguson, Pilot Doug Hurley and Mission Specialists Sandra Magnus and Rex Walheim are targeted to launch in early July, taking with them the Raffaello multipurpose logistics module packed with supplies, logistics and spare parts. The STS-135 mission also will fly a system to investigate the potential for robotically refueling existing spacecraft and return a failed ammonia pump module to help NASA better understand the failure mechanism and improve pump designs for future systems. STS-135 will be the 33rd flight of Atlantis, the 37th shuttle mission to the space station, and the 135th and final mission of NASA's Space Shuttle Program. For more information visit, www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Frankie Martin KSC-2011-3657

CAPE CANAVERAL, Fla. -- Shuttle Atlantis' three main engines take cent...

CAPE CANAVERAL, Fla. -- Shuttle Atlantis' three main engines take center stage in this image as Atlantis is being moved to the Vehicle Assembly Building (VAB) from Orbiter Processing Faciity-1 at NASA's Kennedy... More

CAPE CANAVERAL, Fla. -- Employees check out space shuttle Atlantis after it was uncovered on Launch Pad 39A at NASA's Kennedy Space Center in Florida following the move of the rotating service structure (RSS). The structure provides weather protection and access to the shuttle while it awaits liftoff on the pad. RSS "rollback" marks a major milestone in Atlantis' STS-135 mission countdown.        Atlantis and its crew of four; Commander Chris Ferguson, Pilot Doug Hurley and Mission Specialists Sandy Magnus and Rex Walheim, are scheduled to lift off at 11:26 a.m. EDT on July 8 to deliver the Raffaello multi-purpose logistics module packed with supplies and spare parts to the International Space Station. Atlantis also will fly the Robotic Refueling Mission experiment that will investigate the potential for robotically refueling existing satellites in orbit. In addition, Atlantis will return with a failed ammonia pump module to help NASA better understand the failure mechanism and improve pump designs for future systems. STS-135 will be the 33rd flight of Atlantis, the 37th shuttle mission to the space station, and the 135th and final mission of NASA's Space Shuttle Program. For more information visit, www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Troy Cryder KSC-2011-5147

CAPE CANAVERAL, Fla. -- Employees check out space shuttle Atlantis aft...

CAPE CANAVERAL, Fla. -- Employees check out space shuttle Atlantis after it was uncovered on Launch Pad 39A at NASA's Kennedy Space Center in Florida following the move of the rotating service structure (RSS). ... More

CAPE CANAVERAL, Fla. -- Space shuttle Endeavour glistens in the sun on Launch Pad 39A at NASA's Kennedy Space Center in Florida. The rotating service structure (RSS) that protects the shuttle from the elements and provides access to its components is open to allow crews to move the primary payload for Endeavour's STS-134 mission into the pad's structure before installing it into the spacecraft's cargo bay.          Endeavour and its six-member STS-134 crew are targeted to lift off April 19 at 7:48 p.m. EDT to deliver the Alpha Magnetic Spectrometer-2 (AMS) and Express Logistics Carrier-3 to the International Space Station. This is Endeavour's final scheduled mission. For more information visit, www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts134/index.html. Photo credit: NASA/Frank Michaux KSC-2011-2402

CAPE CANAVERAL, Fla. -- Space shuttle Endeavour glistens in the sun on...

CAPE CANAVERAL, Fla. -- Space shuttle Endeavour glistens in the sun on Launch Pad 39A at NASA's Kennedy Space Center in Florida. The rotating service structure (RSS) that protects the shuttle from the elements ... More

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, space shuttle Endeavour is illuminated by bright xenon lights on Launch Pad 39A after the rotating service structure (RSS) was moved away. The structure provides weather protection and access to the shuttle while it awaits lift off on the pad. RSS "rollback," as it's called, began at 11:52 p.m. EDT on April 28. The move was scheduled to begin at 7 p.m., but storms over Kennedy delayed pad operations for a few hours. STS-134 will deliver the Express Logistics Carrier-3, Alpha Magnetic Spectrometer-2 (AMS), a high-pressure gas tank and additional spare parts for the Dextre robotic helper to the International Space Station. Endeavour was scheduled to launch at 3:47 p.m. on April 29, but that attempt was scrubbed for at least 72 hours while engineers assess an issue associated with the shuttle's Auxiliary Power Unit 1. STS-134 will be the final spaceflight for Endeavour. For more information visit, www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts134/index.html. Photo credit: NASA/Ken Thornsley KSC-2011-3184

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, spa...

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, space shuttle Endeavour is illuminated by bright xenon lights on Launch Pad 39A after the rotating service structure (RSS) was moved away. The ... More

CAPE CANAVERAL, Fla. – Space shuttle Discovery, mounted to a Shuttle Carrier Aircraft, or SCA, takes off from NASA Kennedy Space Center’s Shuttle Landing Facility runway 15 in Florida at 7 a.m. EDT. The duo is beginning its ferry flight to the Washington Dulles International Airport in Virginia that also includes a flyby of the Space Coast and Washington, D.C. Also flying along with the pair is a T-38 training jet.     Discovery is leaving Kennedy after more than 28 years of service beginning with its arrival on the space coast Nov. 9, 1983. Discovery first launched to space Aug. 30, 1984, on the STS-41D mission. Discovery is the agency’s most-flown shuttle with 39 missions, more than 148 million miles and a total of one year in space. Discovery is set to move to the Smithsonian’s National Air and Space Museum, Steven F. Udvar-Hazy Center in Chantilly, Va., on April 19 where it will be place on public display. For more information on the SCA, visit http://www.nasa.gov/centers/dryden/news/FactSheets/FS-013-DFRC.html. For more information on shuttle transition and retirement activities, visit http://www.nasa.gov/transition.   Photo credit: NASA/Tim Powers and Rick Wetherington KSC-2012-2458

CAPE CANAVERAL, Fla. – Space shuttle Discovery, mounted to a Shuttle C...

CAPE CANAVERAL, Fla. – Space shuttle Discovery, mounted to a Shuttle Carrier Aircraft, or SCA, takes off from NASA Kennedy Space Center’s Shuttle Landing Facility runway 15 in Florida at 7 a.m. EDT. The duo is ... More

CAPE CANAVERAL, Fla. – In the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, the payload transportation canister containing the International Space Station's Node 3, named Tranquility, is lowered onto a transporter for its move to Launch Pad 39A.    The primary payload for space shuttle Endeavour's STS-130 mission, Tranquility is a pressurized module that will provide room for many of the space station's life support systems. Attached to one end of Tranquility is a cupola, a unique work area with six windows on its sides and one on top.  The cupola resembles a circular bay window and will provide a vastly improved view of the station's exterior. The multi-directional view will allow the crew to monitor spacewalks and docking operations, as well as provide a spectacular view of Earth and other celestial objects. The module was built in Turin, Italy, by Thales Alenia Space for the European Space Agency.  Launch of STS-130 is targeted for Feb. 7. For information on the STS-130 mission and crew, visit http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts130/index.html.  Photo credit: NASA/Dimitri Gerondidakis KSC-2010-1240

CAPE CANAVERAL, Fla. – In the Space Station Processing Facility at NAS...

CAPE CANAVERAL, Fla. – In the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, the payload transportation canister containing the International Space Station's Node 3, named Tranquil... More

CAPE CANAVERAL, Fla. -- Outside Orbiter Processing Facility-2, or OPF-2, at NASA's Kennedy Space Center in Florida, media are on hand to cover the move of space shuttle Discovery to the Vehicle Assembly Building, or VAB.    Discovery will be stored inside the VAB for approximately one month while shuttle Atlantis undergoes processing in OPF-2 following its final mission, STS-135. Discovery flew its 39th and final mission, STS-133, in February and March 2011, and currently is being prepared for public display at the Smithsonian's National Air and Space Museum Steven F. Udvar-Hazy Center in Virginia. For more information about Discovery's Transition and Retirement, visit   www.nasa.gov/mission_pages/shuttle/launch/discovery_rss_collection_archive_1.html.  Photo credit: NASA/Ken Thornsley KSC-2011-5571

CAPE CANAVERAL, Fla. -- Outside Orbiter Processing Facility-2, or OPF-...

CAPE CANAVERAL, Fla. -- Outside Orbiter Processing Facility-2, or OPF-2, at NASA's Kennedy Space Center in Florida, media are on hand to cover the move of space shuttle Discovery to the Vehicle Assembly Buildin... More

KENNEDY SPACE CENTER, FLA. - STS-113 Commander James Wetherbee (left) andPilot Paul Lockhart (right) look over equipment inside Endeavour as part of Crew Equipment Interface Test activities. The primary payloads on mission STS-113 are the first port truss segment, P1 Truss, to be attached to the central truss segment, S0, on the International Space Station, and the Crew and Equipment Translation Aid (CETA) Cart B that can be used by spacewalkers to move along the truss with equipment.  Once delivered, the P1 truss will remain stowed until flight 12A.1. The mission will also deliver the Expedition 6 crew to the Station and return Expedition 5 to Earth.   Space Shuttle Endeavour is scheduled to launch Nov. 10 on the 11-day mission. KSC-02pd1327

KENNEDY SPACE CENTER, FLA. - STS-113 Commander James Wetherbee (left) ...

KENNEDY SPACE CENTER, FLA. - STS-113 Commander James Wetherbee (left) andPilot Paul Lockhart (right) look over equipment inside Endeavour as part of Crew Equipment Interface Test activities. The primary payload... More

CAPE CANAVERAL, Fla. – Space shuttle Discovery, mounted to a Shuttle Carrier Aircraft, rises just after 7 a.m. EDT from the Shuttle Landing Facility at NASA's Kennedy Space Center in Florida. The duo is beginning their 3 1/2 hour ferry flight to the Washington Dulles International Airport in Virginia. Discovery is leaving Kennedy after more than 28 years of service beginning with its arrival on the space coast Nov. 9, 1983. Discovery first launched to space Aug. 30, 1984, on the STS-41D mission. Discovery is the agency's most-flown shuttle with 39 missions, more than 148 million miles and a total of one year in space.     Discovery is set to move to the Smithsonian's National Air and Space Museum Steven F. Udvar-Hazy Center on April 19 where it will be placed on public display. For more information on the SCA, visit http://www.nasa.gov/centers/dryden/news/FactSheets/FS-013-DFRC.html. For more information on shuttle transition and retirement activities, visit http://www.nasa.gov/transition. Photo credit: NASA/Jim Grossmann KSC-2012-2387

CAPE CANAVERAL, Fla. – Space shuttle Discovery, mounted to a Shuttle C...

CAPE CANAVERAL, Fla. – Space shuttle Discovery, mounted to a Shuttle Carrier Aircraft, rises just after 7 a.m. EDT from the Shuttle Landing Facility at NASA's Kennedy Space Center in Florida. The duo is beginni... More

STS117-S-006 (8 June 2007) --- After suiting up, the STS-117 crewmembers exit the Operations and Checkout Building to board the Astrovan, which will take them to launch pad 39A at Kennedy Space Center. On the right (front to back) are astronauts Rick Sturckow, commander; Steven Swanson, Clayton Anderson and Jim Reilly (center back), all mission specialists. On the left (front to back) are astronauts Lee Archambault, pilot; Patrick Forrester and John "Danny" Olivas, both mission specialists. Anderson will join Expedition 15 in progress to serve as a flight engineer aboard the International Space Station. Atlantis will link up with the International Space Station on Sunday, June 10, to begin a joint mission that will increase the complex's power generation capability. Using the shuttle and station robotic arms and conducting three scheduled spacewalks, the astronauts will install another set of giant solar array wings on the station and retract another array, preparing it for a future move. STS117-S-006

STS117-S-006 (8 June 2007) --- After suiting up, the STS-117 crewmembe...

STS117-S-006 (8 June 2007) --- After suiting up, the STS-117 crewmembers exit the Operations and Checkout Building to board the Astrovan, which will take them to launch pad 39A at Kennedy Space Center. On the r... More

KENNEDY SPACE CENTER, FLA. --  Trailing a column of fire, space shuttle Discovery hurtles toward space on mission STS-120 to the International Space Station as it breaks free from Launch Pad 39A at NASA's Kennedy Space Center.  Liftoff was on time at 11:38:19 a.m. EDT.  Discovery carries the Italian-built U.S. Node 2, called Harmony.  During the 14-day STS-120 mission, the crew will install Harmony and move the P6 solar arrays to their permanent position and deploy them. Discovery is expected to complete its mission and return home at 4:47 a.m. EST on Nov. 6. Photo credit: NASA/Sandra Joseph, Tony Gray & Robert Murray KSC-07pd2958

KENNEDY SPACE CENTER, FLA. -- Trailing a column of fire, space shuttl...

KENNEDY SPACE CENTER, FLA. -- Trailing a column of fire, space shuttle Discovery hurtles toward space on mission STS-120 to the International Space Station as it breaks free from Launch Pad 39A at NASA's Kenne... More

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility-1 at NASA's Kennedy Space Center in Florida, this image shows in detail a view of the hydraulic system connected to the underside of shuttle Atlantis that will lift the vehicle off the floor to enable the orbiter transport system, or OTS, to be rolled underneath for its move, or "rollover," to the Vehicle Assembly Building. Once there Atlantis will be joined with the external fuel tank and solid rocket boosters on the mobile launcher platform. Atlantis is being prepared for the STS-135 mission, which will deliver the Raffaello multipurpose logistics module packed with supplies, logistics and spare parts to the International Space Station. STS-135 is targeted to launch June 28, and will be the last spaceflight for the Space Shuttle Program. Photo credit: NASA/Jim Grossmann KSC-2011-2968

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility-1 at NASA's Kenn...

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility-1 at NASA's Kennedy Space Center in Florida, this image shows in detail a view of the hydraulic system connected to the underside of shuttle Atlantis that w... More

KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility, the p5 truss for mission STS-116 is being readied for a move to the payload canister. The truss will be transported to Launch Pad 39B where it will wait for installation in Space Shuttle Discovery’s payload bay. The third port truss segment, the P5 will be attached to the P3/P4 truss on the International Space Station during the 11-day mission. The window for launch of mission STS-116 opens Dec. 7.   Photo credit: NASA/George Shelton KSC-06pd2402

KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility...

KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility, the p5 truss for mission STS-116 is being readied for a move to the payload canister. The truss will be transported to Launch Pad 39B wher... More

CAPE CANAVERAL, Fla. – In the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida, preparations are under way to move space shuttle Endeavour, attached to its external tank and solid rocket boosters, from High Bay 1 to Launch Pad 39A. First motion was at 4:13 a.m. EST Jan. 6. The 3.4-mile trip, known as rollout, takes about six hours.    Rollout is a significant milestone in launch processing activities. The primary payload for the STS-130 mission is the International Space Station's Node 3, Tranquility, a pressurized module that will provide room for many of the station's life support systems. Attached to one end of Tranquility is a cupola, a unique work area with six windows on its sides and one on top.  The cupola resembles a circular bay window and will provide a vastly improved view of the station's exterior. The multi-directional view will allow the crew to monitor spacewalks and docking operations, as well as provide a spectacular view of Earth and other celestial objects. The module was built in Turin, Italy, by Thales Alenia Space for the European Space Agency.  Space shuttle Endeavour's STS-130 mission is targeted for launch at 4:39 a.m. EST Feb. 7. For information on the STS-130 mission and crew, visit http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts130/index.html.  Photo credit: NASA/Amanda Diller KSC-2010-1025

CAPE CANAVERAL, Fla. – In the Vehicle Assembly Building at NASA's Kenn...

CAPE CANAVERAL, Fla. – In the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida, preparations are under way to move space shuttle Endeavour, attached to its external tank and solid rocket boos... More

KENNEDY SPACE CENTER, FLA. --  Viewed from the Shuttle Landing Facility at NASA's Kennedy Space Center, space shuttle Discovery hurtles through the clouds trailing a column of fire and smoke.  Liftoff was on time at 11:38:19 a.m. EDT. Discovery carries the Italian-built U.S. Node 2, called Harmony.  During the 14-day STS-120 mission, the crew will install Harmony and move the P6 solar arrays to their permanent position and deploy them. Discovery is expected to complete its mission and return home at 4:47 a.m. EST on Nov. 6. Photo credit: NASA/Chuck Tintera KSC-07pd2955

KENNEDY SPACE CENTER, FLA. -- Viewed from the Shuttle Landing Facilit...

KENNEDY SPACE CENTER, FLA. -- Viewed from the Shuttle Landing Facility at NASA's Kennedy Space Center, space shuttle Discovery hurtles through the clouds trailing a column of fire and smoke. Liftoff was on ti... More

KENNEDY SPACE CENTER, FLA. -- On a cloudy Florida day, Space Shuttle Atlantis awaits launch atop a mobile launch platform at Launch Pad 39A. At the right of the pad is the 290-foot tall, 300,000-gallon water tank that is part of the sound suppression system during launches. In the foreground is the crawlerway. a 130-foot-wide roadway with a 5-percent grade leading to the top of the launch pad. Rollback of the pad's rotating service structure, or RSS, is one of the milestones in preparation for the launch of mission STS-117 on June 8. Rollback started at 10:56 p.m. EDT June 7 and was complete at 11:34 p.m. The RSS, the massive structure to the left of the shuttle, provides protected access to the orbiter for changeout and servicing of payloads at the pad. The structure is supported by a rotating bridge that pivots about a vertical axis on the side of the pad's flame trench. The hinge column rests on the pad surface and is braced to the fixed service structure. Support for the outer end of the bridge is provided by two eight-wheel, motor-driven trucks that move along circular twin rails installed flush with the pad surface. The track crosses the flame trench on a permanent bridge. The RSS is 102 feet long, 50 feet wide and 130 feet high. The structure has orbiter access platforms at five levels to provide access to the payload bay while the orbiter is being serviced in the RSS. Each platform has independent extendable planks that can be arranged to conform to a payload's configuration. This mission is the 118th shuttle flight and the 21st U.S. flight to the International Space Station and will deliver and install the S3/S4 truss segment, deploy a set of solar arrays and prepare them for operation. Photo credit: NASA/Ken Thornsley KSC-07pd1403

KENNEDY SPACE CENTER, FLA. -- On a cloudy Florida day, Space Shuttle A...

KENNEDY SPACE CENTER, FLA. -- On a cloudy Florida day, Space Shuttle Atlantis awaits launch atop a mobile launch platform at Launch Pad 39A. At the right of the pad is the 290-foot tall, 300,000-gallon water ta... More

KENNEDY SPACE CENTER, FLA. --   In the Vehicle Assembly Building at KSC, a crane lifts external tank No. 120 into the upper regions.  The tank is being lifted for a move into a checkout cell.  The tank will be prepared for stacking with solid rocket boosters to launch Space Shuttle Discovery on mission STS-120 in October. The mission is the 23rd to the International Space Station and will launch an Italian-built, U.S. multi-port module known as Harmony for the station.  Christened after a school contest, Harmony will provide attachment points for European and Japanese laboratory modules. NASA/George Shelton KSC-07pd2151

KENNEDY SPACE CENTER, FLA. -- In the Vehicle Assembly Building at KS...

KENNEDY SPACE CENTER, FLA. -- In the Vehicle Assembly Building at KSC, a crane lifts external tank No. 120 into the upper regions. The tank is being lifted for a move into a checkout cell. The tank will be ... More

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, shuttle Discovery pauses in between Orbiter Processing Facility-3 and the Vehicle Assembly Building (VAB) during a move called "rollover." Once inside the VAB, the shuttle will be joined to its solid rocket boosters and external fuel tank. Later this month, Discovery is scheduled to "rollout" to Launch Pad 39A for its launch to the International Space Station on the STS-133 mission.    Targeted to liftoff Nov. 1, Discovery will take the Permanent Multipurpose Module (PMM) packed with supplies and critical spare parts, as well as Robonaut 2 (R2) to the station. Photo credit: NASA/Jack Pfaller KSC-2010-4587

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, shu...

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, shuttle Discovery pauses in between Orbiter Processing Facility-3 and the Vehicle Assembly Building (VAB) during a move called "rollover." Once... More

KENNEDY SPACE CENTER, FLA. -  In preparation for the July 1 launch of Space Shuttle Discovery on mission STS-121, the Launch Pad 39B rotating service structure (RSS) enclosing the shuttle rolls away.  Above the golden external tank is the vent hood (known as the "beanie cap") at the end of the gaseous oxygen vent arm. Vapors are created as the liquid oxygen in the external tank boil off. The hood vents the gaseous oxygen vapors away from the space shuttle vehicle. The RSS provides protected access to the orbiter for changeout and servicing of payloads at the pad. The structure is supported by a rotating bridge that pivots about a vertical axis on the west side of the pad's flame trench. The hinge column rests on the pad surface and is braced to the fixed service structure. Support for the outer end of the bridge is provided by two eight-wheel, motor-driven trucks that move along circular twin rails installed flush with the pad surface. The track crosses the flame trench on a permanent bridge.  The RSS is 102 feet long, 50 feet wide and 130 feet high. The structure has orbiter access platforms at five levels to provide access to the payload bay while the orbiter is being serviced in the RSS. Each platform has independent extendable planks that can be arranged to conform to a payload's configuration.  This mission is the 115th shuttle flight and the 18th U.S. flight to the International Space Station. Photo credit: NASA/Kim Shiflett KSC-06pd1302

KENNEDY SPACE CENTER, FLA. - In preparation for the July 1 launch of ...

KENNEDY SPACE CENTER, FLA. - In preparation for the July 1 launch of Space Shuttle Discovery on mission STS-121, the Launch Pad 39B rotating service structure (RSS) enclosing the shuttle rolls away. Above the... More

CAPE CANAVERAL, Fla. -- STS-134 Pilot Greg H. Johnson talks to media as the space shuttle that will take Johnson and his crewmates to the International Space Station slowly rolls past. Endeavour began its move from High Bay 3 in the Vehicle Assembly Building to Launch Pad 39A at NASA's Kennedy Space Center in Florida at 7:56 p.m. EST. The 3.4-mile trek, known as "rollout," will take about seven hours to complete. This is the final scheduled rollout for Endeavour, which is attached to its external fuel tank and solid rocket boosters atop a crawler-transporter.      STS-134 crew members will deliver the Express Logistics Carrier-3, Alpha Magnetic Spectrometer-2 (AMS), a high-pressure gas tank, additional spare parts for the Dextre robotic helper and micrometeoroid debris shields to the orbiting outpost on the shuttle's final spaceflight. Launch is targeted for April 19 at 7:48 p.m. EDT. For more information visit, www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts134/index.html. Photo credit: NASA/Debbie Odom KSC-2011-2215

CAPE CANAVERAL, Fla. -- STS-134 Pilot Greg H. Johnson talks to media a...

CAPE CANAVERAL, Fla. -- STS-134 Pilot Greg H. Johnson talks to media as the space shuttle that will take Johnson and his crewmates to the International Space Station slowly rolls past. Endeavour began its move ... More

STS 41-C crew move to transfer van for trip to Launch Pad 39B

STS 41-C crew move to transfer van for trip to Launch Pad 39B

41C-3061 (6 April 1984) --- The five-member astronauts crew for NASA's STS-41C Space Shuttle mission head for the transfer van that will transport them to Launch Pad 39B at the Kennedy Space Center. Astronaut ... More

STS-37 crewmembers move CETA electrical cart along rail in JSC's WETF pool

STS-37 crewmembers move CETA electrical cart along rail in JSC's WETF ...

STS-37 Atlantis, Orbiter Vehicle (OV) 104, Mission Specialist (MS) Jerry L. Ross generates electrical power using hand pedals to move crew and equipment translation aid (CETA) cart along a rail during underwate... More

McDonnell Douglas-SPACEHAB technicians oversee the move of a Russian-made oxygen generator to a SPACEHAB Double Module, at rear, in the SPACEHAB Payload Processing Facility. In foreground, from left, are Marc Tuttle, Dan Porter and Mike Vawter. The oxygen generator, manufactured in Russia by RSC Energia, will be carried aboard the Space Shuttle Atlantis on Mission STS-84 for the Shuttle’s scheduled docking with the Russian Space Station Mir next month. The nearly 300-pound generator will replace one of two Mir units that have been malfunctioning recently. The generator functions by electrolysis, which separates water into its oxygen and hydrogen components. The hydrogen is vented and the oxygen is used for breathing by the Mir crew. The generator is 4.2 feet in length and 1.4 feet in diameter. STS-84, which is planned to include a Mir crew exchange of astronaut C. Michael Foale for Jerry M. Linenger, is targeted for a May 15 liftoff KSC-97pc672

McDonnell Douglas-SPACEHAB technicians oversee the move of a Russian-m...

McDonnell Douglas-SPACEHAB technicians oversee the move of a Russian-made oxygen generator to a SPACEHAB Double Module, at rear, in the SPACEHAB Payload Processing Facility. In foreground, from left, are Marc T... More

KENNEDY SPACE CENTER, FLA. -- McDonnell Douglas-SPACEHAB technicians oversee the move of a Russian-made oxygen generator to a SPACEHAB Double Module, at rear, in the SPACEHAB Payload Processing Facility. With faces visible in center foreground, from left, are Mark Halavin and Marc Tuttle; Mike Vawter is at far right. The oxygen generator, manufactured in Russia by RSC Energia, will be carried aboard the Space Shuttle Atlantis on Mission STS-84 for the Shuttle’s scheduled docking with the Russian Space Station Mir next month. The nearly 300-pound generator will replace one of two Mir units that have been malfunctioning recently. The generator functions by electrolysis, which separates water into its oxygen and hydrogen components. The hydrogen is vented and the oxygen is used for breathing by the Mir crew. The generator is 4.2 feet in length and 1.4 feet in diameter. STS-84, which is planned to include a Mir crew exchange of astronaut C. Michael Foale for Jerry M. Linenger, is targeted for a May 15 liftoff. It will be the sixth Shuttle-Mir docking KSC-97pc673

KENNEDY SPACE CENTER, FLA. -- McDonnell Douglas-SPACEHAB technicians o...

KENNEDY SPACE CENTER, FLA. -- McDonnell Douglas-SPACEHAB technicians oversee the move of a Russian-made oxygen generator to a SPACEHAB Double Module, at rear, in the SPACEHAB Payload Processing Facility. With f... More

In preparation for Space Shuttle Mission STS-87, the United States Microgravity Payload-4 undergoes final processing in the Space Station Processing Facility before its move to Launch Complex 39B. STS-87 will be the fourth flight of the United States Microgravity Payload and the Spartan-201 deployable satellite KSC-97PC1571

In preparation for Space Shuttle Mission STS-87, the United States Mic...

In preparation for Space Shuttle Mission STS-87, the United States Microgravity Payload-4 undergoes final processing in the Space Station Processing Facility before its move to Launch Complex 39B. STS-87 will b... More

In preparation for Space Shuttle Mission STS-87, the United States Microgravity Payload-4 undergoes final processing in the Space Station Processing Facility before its move to Launch Complex 39B. STS-87 will be the fourth flight of the United States Microgravity Payload and the Spartan-201 deployable satellite KSC-97PC1570

In preparation for Space Shuttle Mission STS-87, the United States Mic...

In preparation for Space Shuttle Mission STS-87, the United States Microgravity Payload-4 undergoes final processing in the Space Station Processing Facility before its move to Launch Complex 39B. STS-87 will b... More

In preparation for Space Shuttle Mission STS-87, the United States Microgravity Payload-4 undergoes final processing in the Space Station Processing Facility before its move to Launch Complex 39B. STS-87 will be the fourth flight of the United States Microgravity Payload and the Spartan-201 deployable satellite KSC-97PC1568

In preparation for Space Shuttle Mission STS-87, the United States Mic...

In preparation for Space Shuttle Mission STS-87, the United States Microgravity Payload-4 undergoes final processing in the Space Station Processing Facility before its move to Launch Complex 39B. STS-87 will b... More

In preparation for Space Shuttle Mission STS-87, the United States Microgravity Payload-4 undergoes final processing in the Space Station Processing Facility before its move to Launch Complex 39B. STS-87 will be the fourth flight of the United States Microgravity Payload and the Spartan-201 deployable satellite KSC-97PC1569

In preparation for Space Shuttle Mission STS-87, the United States Mic...

In preparation for Space Shuttle Mission STS-87, the United States Microgravity Payload-4 undergoes final processing in the Space Station Processing Facility before its move to Launch Complex 39B. STS-87 will b... More

KENNEDY SPACE CENTER, FLA. -- The alpha-magnetic spectrometer (AMS-1) is lifted in KSC’s MultiPayload Processing Facility in preparation for a move to the Space Station Processing Facility via the Payload Environmental Transportation System. The STS-91 payload arrived at KSC in January and is scheduled to be flown on the 9th and final Mir docking mission, scheduled for launch in May. The objectives of the AMS-1 investigation are to search for anti-matter and dark matter in space and to study astrophysics. The STS-91 flight crew includes Commander Charles Precourt; Pilot Dominic Gorie; and Mission Specialists Wendy B. Lawrence; Franklin Chang-Diaz, Ph.D.; Janet Kavandi, Ph.D.; and Valery Ryumin, with the Russian Space Agency. After docking with the Russian Space Station Mir, Mission Specialist Andrew Thomas, Ph.D., will join the STS-91 crew and return to Earth aboard Discovery KSC-98pc376

KENNEDY SPACE CENTER, FLA. -- The alpha-magnetic spectrometer (AMS-1) ...

KENNEDY SPACE CENTER, FLA. -- The alpha-magnetic spectrometer (AMS-1) is lifted in KSC’s MultiPayload Processing Facility in preparation for a move to the Space Station Processing Facility via the Payload Envir... More

KENNEDY SPACE CENTER, FLA. -- The alpha-magnetic spectrometer (AMS-1) is lifted in KSC’s MultiPayload Processing Facility in preparation for a move to the Space Station Processing Facility via the Payload Environmental Transportation System. The STS-91 payload arrived at KSC in January and is scheduled to be flown on the 9th and final Mir docking mission, scheduled for launch in May. The objectives of the AMS-1 investigation are to search for anti-matter and dark matter in space and to study astrophysics. The STS-91 flight crew includes Commander Charles Precourt; Pilot Dominic Gorie; and Mission Specialists Wendy B. Lawrence; Franklin Chang-Diaz, Ph.D.; Janet Kavandi, Ph.D.; and Valery Ryumin, with the Russian Space Agency. After docking with the Russian Space Station Mir, Mission Specialist Andrew Thomas, Ph.D., will join the STS-91 crew and return to Earth aboard Discovery KSC-98pc375

KENNEDY SPACE CENTER, FLA. -- The alpha-magnetic spectrometer (AMS-1) ...

KENNEDY SPACE CENTER, FLA. -- The alpha-magnetic spectrometer (AMS-1) is lifted in KSC’s MultiPayload Processing Facility in preparation for a move to the Space Station Processing Facility via the Payload Envir... More

KENNEDY SPACE CENTER, FLA. -- Boeing technicians move a piece of hardware into position on Node 1 of the International Space Station (ISS) in KSC's Space Station Processing Facility in preparation for mating with Pressurized Mating Adapter (PMA)-2. The node is the first element of the ISS to be manufactured in the United States and is currently scheduled to lift off aboard the Space Shuttle Endeavour on STS-88 later this year, along with PMAs 1 and 2. The 18-foot-in-diameter, 22-foot-long aluminum module was manufactured by the Boeing Co. at Marshall Space Flight Center. Once in space, Node 1 will function as a connecting passageway to the living and working areas of the ISS. It has six hatches that will serve as docking ports to the U.S. laboratory module, U.S. habitation module, an airlock and other space station elements KSC-98pc539

KENNEDY SPACE CENTER, FLA. -- Boeing technicians move a piece of hardw...

KENNEDY SPACE CENTER, FLA. -- Boeing technicians move a piece of hardware into position on Node 1 of the International Space Station (ISS) in KSC's Space Station Processing Facility in preparation for mating wi... More

Space Shuttle Discovery sits atop a mobile launcher platform at Launch Complex 39A after its move this morning from Vehicle Assembly Building high bay 1 where it was mated to the first Space Shuttle super lightweight external tank/solid rocket booster stack. Discovery will be launched on mission STS-91, concluding Phase I of the joint U.S.-Russian International Space Station Program, on June 2 with a launch window opening around 6:10 p.m. EDT. This will be the ninth Shuttle docking with the Russian Space Station Mir, but the first Mir docking for Discovery. The STS-91 flight crew includes Commander Charles Precourt; Pilot Dominic Gorie; and Mission Specialists Wendy B. Lawrence; Franklin Chang-Diaz, Ph.D.; Janet Kavandi, Ph.D.; and Valery Ryumin, with the Russian Space Agency. Andrew Thomas, Ph.D., will be returning to Earth with the crew after living more than four months aboard Mir KSC-98dc551

Space Shuttle Discovery sits atop a mobile launcher platform at Launch...

Space Shuttle Discovery sits atop a mobile launcher platform at Launch Complex 39A after its move this morning from Vehicle Assembly Building high bay 1 where it was mated to the first Space Shuttle super light... More

KENNEDY SPACE CENTER, FLA. -- Space Shuttle Discovery sits atop a mobile launcher platform at Launch Complex 39A after its move this morning from Vehicle Assembly Building high bay 1 where it was mated to the first Space Shuttle super lightweight external tank/solid rocket booster stack. Discovery will be launched on mission STS-91, concluding Phase I of the joint U.S.-Russian International Space Station Program, on June 2 with a launch window opening around 6:10 p.m. EDT. This will be the ninth Shuttle docking with the Russian Space Station Mir, but the first Mir docking for Discovery. The STS-91 flight crew includes Commander Charles Precourt; Pilot Dominic Gorie; and Mission Specialists Wendy B. Lawrence; Franklin Chang-Diaz, Ph.D.; Janet Kavandi, Ph.D.; and Valery Ryumin, with the Russian Space Agency. Andrew Thomas, Ph.D., will be returning to Earth with the crew after living more than four months aboard Mir KSC-98pc570

KENNEDY SPACE CENTER, FLA. -- Space Shuttle Discovery sits atop a mobi...

KENNEDY SPACE CENTER, FLA. -- Space Shuttle Discovery sits atop a mobile launcher platform at Launch Complex 39A after its move this morning from Vehicle Assembly Building high bay 1 where it was mated to the f... More

Space Shuttle Discovery sits atop a mobile launcher platform at Launch Complex 39A after its move this morning from Vehicle Assembly Building high bay 1 where it was mated to the first Space Shuttle super lightweight external tank/solid rocket booster stack. Discovery will be launched on mission STS-91, concluding Phase I of the joint U.S.-Russian International Space Station Program, on June 2 with a launch window opening around 6:10 p.m. EDT. This will be the ninth Shuttle docking with the Russian Space Station Mir, but the first Mir docking for Discovery. The STS-91 flight crew includes Commander Charles Precourt; Pilot Dominic Gorie; and Mission Specialists Wendy B. Lawrence; Franklin Chang-Diaz, Ph.D.; Janet Kavandi, Ph.D.; and Valery Ryumin, with the Russian Space Agency. Andrew Thomas, Ph.D., will be returning to Earth with the crew after living more than four months aboard Mir KSC-98dc550

Space Shuttle Discovery sits atop a mobile launcher platform at Launch...

Space Shuttle Discovery sits atop a mobile launcher platform at Launch Complex 39A after its move this morning from Vehicle Assembly Building high bay 1 where it was mated to the first Space Shuttle super light... More

Space Shuttle Discovery sits atop a mobile launcher platform at Launch Complex 39A after its move this morning from Vehicle Assembly Building high bay 1, where it was mated to the first Space Shuttle super lightweight external tank/solid rocket booster stack. This unusual image was taken from the 95-foot level of the pad as the Orbiter Access Arm supporting the white room (arm on right) and the External Tank Gaseous Oxygen Vent Arm were moved into place on the orbiter and its stack. Discovery will be launched on mission STS-91, concluding Phase I of the joint U.S.-Russian International Space Station Program, on June 2 with a launch window opening around 6:10 p.m. EDT. This will be the ninth Shuttle docking with the Russian Space Station Mir, but the first Mir docking for Discovery. The STS-91 flight crew includes Commander Charles Precourt; Pilot Dominic Gorie; and Mission Specialists Wendy B. Lawrence; Franklin Chang-Diaz, Ph.D.; Janet Kavandi, Ph.D.; and Valery Ryumin, with the Russian Space Agency. Andrew Thomas, Ph.D., will be returning to Earth with the crew after living more than four months aboard Mir KSC-98dc552

Space Shuttle Discovery sits atop a mobile launcher platform at Launch...

Space Shuttle Discovery sits atop a mobile launcher platform at Launch Complex 39A after its move this morning from Vehicle Assembly Building high bay 1, where it was mated to the first Space Shuttle super ligh... More

KENNEDY SPACE CENTER, FLA. -- Space Shuttle Discovery sits atop a mobile launcher platform at Launch Complex 39A after its move this morning from Vehicle Assembly Building high bay 1, where it was mated to the first Space Shuttle super lightweight external tank/solid rocket booster stack. The Orbiter Access Arm, with the white room located at its outer end, is being positioned into place on the orbiter. This white room provides personnel entry into the orbiter while it is on the pad. Discovery will be launched on mission STS-91, concluding Phase I of the joint U.S.-Russian International Space Station Program, on June 2 with a launch window opening around 6:10 p.m. EDT. This will be the ninth Shuttle docking with the Russian Space Station Mir, but the first Mir docking for Discovery. The STS-91 flight crew includes Commander Charles Precourt; Pilot Dominic Gorie; and Mission Specialists Wendy B. Lawrence; Franklin Chang-Diaz, Ph.D.; Janet Kavandi, Ph.D.; and Valery Ryumin, with the Russian Space Agency. Andrew Thomas, Ph.D., will be returning to Earth with the crew after living more than four months aboard Mir KSC-98pc569

KENNEDY SPACE CENTER, FLA. -- Space Shuttle Discovery sits atop a mobi...

KENNEDY SPACE CENTER, FLA. -- Space Shuttle Discovery sits atop a mobile launcher platform at Launch Complex 39A after its move this morning from Vehicle Assembly Building high bay 1, where it was mated to the ... More

Participants in the ribbon cutting for KSC's new 34,600-square-foot Space Shuttle Main Engine Processing Facility (SSMEPF) pose in front of a Space Shuttle Main Engine on display for the ceremony. From left, they are Ed Adamek, vice president and associate program manager for Ground Operations of United Space Alliance; John Plowden, vice president of Rocketdyne; Donald R. McMonagle, manager of Launch Integration; U.S. Congressman Dave Weldon; KSC Center Director Roy D. Bridges Jr.; Wade Ivey of Ivey Construction, Inc.; and Robert B. Sieck, director of Shuttle Processing. A major addition to the existing Orbiter Processing Facility Bay 3, the SSMEPF replaces the Shuttle Main Engine Shop located in the Vehicle Assembly Building (VAB). The decision to move the shop out of the VAB was prompted by safety considerations and recent engine processing improvements. The first three main engines to be processed in the new facility will fly on Shuttle Endeavour's STS-88 mission in December 1998 KSC-98pc784

Participants in the ribbon cutting for KSC's new 34,600-square-foot Sp...

Participants in the ribbon cutting for KSC's new 34,600-square-foot Space Shuttle Main Engine Processing Facility (SSMEPF) pose in front of a Space Shuttle Main Engine on display for the ceremony. From left, th... More

Participants in the ribbon cutting for KSC's new 34,600-square-foot Space Shuttle Main Engine Processing Facility (SSMEPF) gather to talk inside the facility following the ceremony. From left, they are Robert B. Sieck, director of Shuttle Processing; KSC Center Director Roy D. Bridges Jr.; U.S. Congressman Dave Weldon; John Plowden, vice president of Rocketdyne; and Donald R. McMonagle, manager of Launch Integration. A major addition to the existing Orbiter Processing Facility Bay 3, the SSMEPF replaces the Shuttle Main Engine Shop located in the Vehicle Assembly Building (VAB). The decision to move the shop out of the VAB was prompted by safety considerations and recent engine processing improvements. The first three main engines to be processed in the new facility will fly on Shuttle Endeavour's STS-88 mission in December 1998 KSC-98pc785

Participants in the ribbon cutting for KSC's new 34,600-square-foot Sp...

Participants in the ribbon cutting for KSC's new 34,600-square-foot Space Shuttle Main Engine Processing Facility (SSMEPF) gather to talk inside the facility following the ceremony. From left, they are Robert B... More

James W. Tibble (pointing at engine), an Engine Systems/Ground Support Equipment team manager for Rocketdyne, discusses the operation of a Space Shuttle Main Engine with Robert B. Sieck, director of Shuttle Processing; U.S. Congressman Dave Weldon; and KSC Center Director Roy D. Bridges Jr. Following the ribbon cutting ceremony for KSC's new 34,600-square-foot Space Shuttle Main Engine Processing Facility (SSMEPF), KSC employees and media explored the facility. A major addition to the existing Orbiter Processing Facility Bay 3, the SSMEPF replaces the Shuttle Main Engine Shop located in the Vehicle Assembly Building (VAB). The decision to move the shop out of the VAB was prompted by safety considerations and recent engine processing improvements. The first three main engines to be processed in the new facility will fly on Shuttle Endeavour's STS-88 mission in December 1998 KSC-98pc786

James W. Tibble (pointing at engine), an Engine Systems/Ground Support...

James W. Tibble (pointing at engine), an Engine Systems/Ground Support Equipment team manager for Rocketdyne, discusses the operation of a Space Shuttle Main Engine with Robert B. Sieck, director of Shuttle Pro... More

KSC Center Director Roy D. Bridges Jr. and U.S. Congressman Dave Weldon (holding scissors) cut the ribbon at a ceremony on July 6 to open KSC's new 34,600-square-foot Space Shuttle Main Engine Processing Facility (SSMEPF). Joining in the ribbon cutting are (left) Ed Adamek, vice president and associate program manager for Ground Operations of United Space Alliance; Marvin L. Jones, director of Installation Operations; Donald R. McMonagle, manager of Launch Integration; (right) Wade Ivey of Ivey Construction, Inc.; Robert B. Sieck, director of Shuttle Processing; and John Plowden, vice president of Rocketdyne. A major addition to the existing Orbiter Processing Facility Bay 3, the SSMEPF replaces the Shuttle Main Engine Shop located in the Vehicle Assembly Building (VAB). The decision to move the shop out of the VAB was prompted by safety considerations and recent engine processing improvements. The first three main engines to be processed in the new facility will fly on Shuttle Endeavour's STS-88 mission in December 1998 KSC-98pc783

KSC Center Director Roy D. Bridges Jr. and U.S. Congressman Dave Weldo...

KSC Center Director Roy D. Bridges Jr. and U.S. Congressman Dave Weldon (holding scissors) cut the ribbon at a ceremony on July 6 to open KSC's new 34,600-square-foot Space Shuttle Main Engine Processing Facili... More

Boeing technicians move a Control Moment Gyroscope (CMG) to the Integrated Truss Structure (ITS) Z1 in the Space Station Processing Facility at KSC. Gyroscopes are used for stabilization of the International Space Station (ISS). The CMG and Z1, part of the construction of the ISS, will be carried on STS-92, the third U.S. flight planned for on-orbit construction of the ISS. STS-92 is scheduled for liftoff on June 17, 1999, aboard the Space Shuttle Atlantis KSC-98pc869

Boeing technicians move a Control Moment Gyroscope (CMG) to the Integr...

Boeing technicians move a Control Moment Gyroscope (CMG) to the Integrated Truss Structure (ITS) Z1 in the Space Station Processing Facility at KSC. Gyroscopes are used for stabilization of the International Sp... More

KENNEDY SPACE CENTER, FLA. -- The first Multi-Purpose Logistics Module (MPLM), destined for use in constructing the International Space Station (ISS), rests on the truck that will move it to the Space Station ProcessingFacility. Named the Leonardo, the MPLM arrived aboard the Airbus Beluga transporter, at left. Leonardo is scheduled to be launched on STS-100 in December 1999. Three modules are being provided by Alenia Aerospazio, in Italy, and will be operated by NASA and supported by ASI, the Italian space agency. The MPLMs will be carried in the payload bay of a Shuttle orbiter, and will provide storage and additional work space for up to two astronauts when docked to the ISS. The second MPLM, to be handed over in April 1999, is named Raffaello. A third module, to be named Donatello, is due to be delivered in October 2000 for launch in January 2001 KSC-98pc881

KENNEDY SPACE CENTER, FLA. -- The first Multi-Purpose Logistics Module...

KENNEDY SPACE CENTER, FLA. -- The first Multi-Purpose Logistics Module (MPLM), destined for use in constructing the International Space Station (ISS), rests on the truck that will move it to the Space Station P... More

During Crew Equipment Interface Test (CEIT), STS-95 crew members watch as workers move the Spartan payload inside the Multi-Payload Processing Facility. At far right is Mission Specialist Scott E. Parazynski. The CEIT gives astronauts an opportunity for a hands-on look at the payloads and equipment with which they will be working on orbit. The launch of the STS-95 mission is scheduled for Oct. 29, 1998. The mission includes research payloads such as the Spartan solar-observing deployable spacecraft, the Hubble Space Telescope Orbital Systems Test Platform, the International Extreme Ultraviolet Hitchhiker, as well as the SPACEHAB single module with experiments on space flight and the aging process KSC-98pc1032

During Crew Equipment Interface Test (CEIT), STS-95 crew members watch...

During Crew Equipment Interface Test (CEIT), STS-95 crew members watch as workers move the Spartan payload inside the Multi-Payload Processing Facility. At far right is Mission Specialist Scott E. Parazynski. T... More

KENNEDY SPACE CENTER, FLA. -- The Spartan solar-observing deployable spacecraft is lifted from its work stand to move it to a payload canister in the Multi-Payload Processing Facility at KSC. Spartan is one of the payloads for the STS-95 mission, scheduled to launch Oct. 29. Spartan is a solar physics spacecraft designed to perform remote sensing of the hot outer layers of the sun's atmosphere or corona. The objective of the observations is to investigate the mechanisms causing the heating of the solar corona and the acceleration of the solar wind which originates in the corona. Other research payloads include the Hubble Space Telescope Orbital Systems Test Platform, the International Extreme Ultraviolet Hitchhiker, and the SPACEHAB single module with experiments on space flight and the aging process KSC-98pc1131

KENNEDY SPACE CENTER, FLA. -- The Spartan solar-observing deployable s...

KENNEDY SPACE CENTER, FLA. -- The Spartan solar-observing deployable spacecraft is lifted from its work stand to move it to a payload canister in the Multi-Payload Processing Facility at KSC. Spartan is one of ... More

KENNEDY SPACE CENTER, FLA. -- The International Extreme Ultraviolet Hitchhiker (IEH-3), one of the payloads for the STS-95 mission, is prepared for its move to a payload canister in the Multi-Payload Processing Facility. The mission is scheduled for liftoff on Space Shuttle Discovery on Oct. 29. IEH-3 comprises several experiments that will study the Jovian planetary system, hot stars, planetary and reflection nebulae, other stellar objects and their environments through remote observation of EUV/FUV emissions; study spacecraft interactions, Shuttle glow, thruster firings, and contamination; and measure the solar constant and identify variations in the value during a solar cycle. Other research payloads include the Hubble Space Telescope Orbital Systems Test Platform, the Spartan solar-observing deployable spacecraft, and the SPACEHAB single module with experiments on space flight and the aging process KSC-98pc1134

KENNEDY SPACE CENTER, FLA. -- The International Extreme Ultraviolet Hi...

KENNEDY SPACE CENTER, FLA. -- The International Extreme Ultraviolet Hitchhiker (IEH-3), one of the payloads for the STS-95 mission, is prepared for its move to a payload canister in the Multi-Payload Processing... More

KENNEDY SPACE CENTER, FLA. -- Inside the Payload Changeout Room (PCR) in the Rotating Service Structure (RSS) at Launch Pad 39-B, technicians in clean suits and tethers prepare to move the payloads for mission STS-95 through the open doors of the payload bay (right) of Space Shuttle Discovery. At the top of the RSS is the Spacehab module; below it are the Spartan solar-observing deployable spacecraft, the Hubble Space Telescope Orbiting Systems Test Platform (HOST), and International Extreme Ultraviolet Hitchhiker (IEH-3). The PCR is an environmentally controlled facility with seals around the mating surface that fit against the orbiter or payload canister and permit the payload bay or canister doors to be opened and cargo removed without exposing it to outside air and contaminants. Payloads are installed vertically in the orbiter using the extendable payload ground handling mechanism. Fixed and extendable work platforms provide work access in the PCR. The SPACEHAB single module involves experiments on space flight and the aging process. Spartan is a solar physics spacecraft designed to perform remote sensing of the hot outer layers of the sun's atmosphere or corona. HOST carries four experiments to validate components planned for installation during the third Hubble Space Telescope servicing mission and to evaluate new technologies in an Earth-orbiting environment. IEH-3 comprises several experiments that will study the Jovian planetary system, hot stars, planetary and reflection nebulae, other stellar objects and their environments through remote observation of EUV/FUV emissions; study spacecraft interactions, Shuttle glow, thruster firings, and contamination; and measure the solar constant and identify variations in the value during a solar cycle. Mission STS-95 is scheduled to launch Oct. 29, 1998 KSC-98pc1183

KENNEDY SPACE CENTER, FLA. -- Inside the Payload Changeout Room (PCR) ...

KENNEDY SPACE CENTER, FLA. -- Inside the Payload Changeout Room (PCR) in the Rotating Service Structure (RSS) at Launch Pad 39-B, technicians in clean suits and tethers prepare to move the payloads for mission ... More

KENNEDY SPACE CENTER,FLA. -- Inside the Payload Changeout Room (PCR) in the Rotating Service Structure (RSS) at Launch Pad 39-B, technicians in clean suits and tethers prepare to move the payloads for mission STS-95 through the open doors of the payload bay (left) of Space Shuttle Discovery. At the top of the RSS is the Spacehab module; below it are the Spartan solar-observing deployable spacecraft, the Hubble Space Telescope Orbiting Systems Test Platform (HOST), and the International Extreme Ultraviolet Hitchhiker (IEH-3). The PCR is an environmentally controlled facility with seals around the mating surface that fit against the orbiter or payload canister and permit the payload bay or canister doors to be opened and cargo removed without exposing it to outside air and contaminants. Payloads are installed vertically in the orbiter using the extendable payload ground handling mechanism. Fixed and extendable work platforms provide work access in the PCR. The SPACEHAB single module involves experiments on space flight and the aging process. Spartan is a solar physics spacecraft designed to perform remote sensing of the hot outer layers of the sun's atmosphere or corona. HOST carries four experiments to validate components planned for installation during the third Hubble Space Telescope servicing mission and to evaluate new technologies in an Earth-orbiting environment. IEH-3 comprises several experiments that will study the Jovian planetary system, hot stars, planetary and reflection nebulae, other stellar objects and their environments through remote observation of EUV/FUV emissions; study spacecraft interactions, Shuttle glow, thruster firings, and contamination; and measure the solar constant and identify variations in the value during a solar cycle. Mission STS-95 is scheduled to launch Oct. 29, 1998 KSC-98pc1184

KENNEDY SPACE CENTER,FLA. -- Inside the Payload Changeout Room (PCR) i...

KENNEDY SPACE CENTER,FLA. -- Inside the Payload Changeout Room (PCR) in the Rotating Service Structure (RSS) at Launch Pad 39-B, technicians in clean suits and tethers prepare to move the payloads for mission S... More

KENNEDY SPACE CENTER, FLA. -- Inside the Payload Changeout Room (PCR) in the Rotating Service Structure (RSS) at Launch Pad 39-B, technicians in clean suits move the payloads for mission STS-95 to the payload bay of Space Shuttle Discovery. At the top of the RSS is the Spacehab module; below it are the Spartan solar-observing deployable spacecraft, the Hubble Space Telescope Orbiting Systems Test Platform (HOST), and the International Extreme Ultraviolet Hitchhiker (IEH-3). The PCR is an environmentally controlled facility with seals around the mating surface that fit against the orbiter or payload canister and permit the payload bay or canister doors to be opened and cargo removed without exposing it to outside air and contaminants. Payloads are installed vertically in the orbiter using the extendable payload ground handling mechanism. Fixed and extendable work platforms provide work access in the PCR. The SPACEHAB single module involves experiments on space flight and the aging process. Spartan is a solar physics spacecraft designed to perform remote sensing of the hot outer layers of the sun's atmosphere or corona. HOST carries four experiments to validate components planned for installation during the third Hubble Space Telescope servicing mission and to evaluate new technologies in an Earth-orbiting environment. IEH-3 comprises several experiments that will study the Jovian planetary system, hot stars, planetary and reflection nebulae, other stellar objects and their environments through remote observation of EUV/FUV emissions; study spacecraft interactions, Shuttle glow, thruster firings, and contamination; and measure the solar constant and identify variations in the value during a solar cycle. Mission STS-95 is scheduled to launch Oct. 29, 1998 KSC-98pc1185

KENNEDY SPACE CENTER, FLA. -- Inside the Payload Changeout Room (PCR) ...

KENNEDY SPACE CENTER, FLA. -- Inside the Payload Changeout Room (PCR) in the Rotating Service Structure (RSS) at Launch Pad 39-B, technicians in clean suits move the payloads for mission STS-95 to the payload b... More

KENNEDY SPACE CENTER, FLA. -- Inside the payload bay of Space Shuttle orbiter Endeavour, workers and STS-88 crew members on a movable work platform or bucket move closer to the rear of the orbiter's crew compartment. While Endeavour is being prepared for flight inside Orbiter Processing Facility Bay 1, the STS-88 crew members are participating in a Crew Equipment Interface Test (CEIT) to familiarize themselves with the orbiter's midbody and crew compartments. A KSC worker (left) maneuvers the platform to give Mission Specialists Jerry L. Ross and James H. Newman (right) a closer look. Looking on is Wayne Wedlake of United Space Alliance at Johnson Space Center. Targeted for liftoff on Dec. 3, 1998, STS-88 will be the first Space Shuttle launch for assembly of the International Space Station (ISS). The primary payload is the Unity connecting module which will be mated to the Russian-built Zarya control module, expected to be already on orbit after a November launch from Russia. After the mating, Ross and Newman are scheduled to perform three spacewalks to connect power, data and utility lines and install exterior equipment. The first major U.S.-built component of ISS, Unity will serve as a connecting passageway to living and working areas of the space station. Unity has two attached pressurized mating adapters (PMAs) and one stowage rack installed inside. PMA-1 provides the permanent connection point between Unity and Zarya; PMA-2 will serve as a Space Shuttle docking port. Zarya is a self-supporting active vehicle, providing propulsive control capability and power during the early assembly stages. It also has fuel storage capability KSC-98pc1216

KENNEDY SPACE CENTER, FLA. -- Inside the payload bay of Space Shuttle ...

KENNEDY SPACE CENTER, FLA. -- Inside the payload bay of Space Shuttle orbiter Endeavour, workers and STS-88 crew members on a movable work platform or bucket move closer to the rear of the orbiter's crew compar... More

KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility (SSPF), the Unity connecting module, part of the International Space Station, sits on a workstand before its move to a new location in the SSPF. As the primary payload on mission STS-88, scheduled to launch Dec. 3, 1998, Unity will be mated to the Russian-built Zarya control module which should already be in orbit at that time. In the SSPF, Unity is undergoing testing such as the Pad Demonstration Test to verify the compatibility of the module with the Space Shuttle, as well as the ability of the astronauts to send and receive commands to Unity from the flight deck of the orbiter, and the common berthing mechanism to which other space station elements will dock. Unity is expected to be ready for installation into the Shuttle's payload canister on Oct. 25, and transported to Launch Pad 39-A on Oct. 27 KSC-98pc1327

KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility...

KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility (SSPF), the Unity connecting module, part of the International Space Station, sits on a workstand before its move to a new location in the ... More

Previous

of 14

Next