nitrogen, sts

353 media by topicpage 1 of 4
CAPE CANAVERAL, Fla. - On Launch Pad 39A at NASA's Kennedy Space Center in Florida, STS-129 Mission Specialist Randy Bresnik prepares to enter space shuttle Atlantis with the help of the closeout crew in the White Room.  The six astronauts for space shuttle Atlantis’ STS-129 mission are participating in their launch dress rehearsal, the Terminal Countdown Demonstration Test.    Additional training associated with the test was done last month, but the simulated countdown was postponed because of a scheduling conflict with the launch of NASA’s Ares I-X test rocket.  Launch of Atlantis on its STS-129 mission to the International Space Station is set for Nov. 16.  On STS-129, the crew will deliver to the station two spare gyroscopes, two nitrogen tank assemblies, two pump modules, an ammonia tank assembly and a spare latching end effector for the station's robotic arm.  For information on the STS-129 crew and mission objectives, visit http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts129/index.html. Photo credit: NASA/Jim Grossmann KSC-2009-6065

CAPE CANAVERAL, Fla. - On Launch Pad 39A at NASA's Kennedy Space Cente...

CAPE CANAVERAL, Fla. - On Launch Pad 39A at NASA's Kennedy Space Center in Florida, STS-129 Mission Specialist Randy Bresnik prepares to enter space shuttle Atlantis with the help of the closeout crew in the Wh... More

CAPE CANAVERAL, Fla. - At NASA's Kennedy Space Center in Florida, STS-129 Pilot Barry E. Wilmore, right, arrives at the Shuttle Landing Facility to practice landings in a Shuttle Training Aircraft in preparation for space shuttle Atlantis' STS-129 mission.    The Shuttle Training Aircraft is a Gulfstream II jet, modified to handle like the space shuttle.  On STS-129, the crew will deliver to the International Space Station two spare gyroscopes, two nitrogen tank assemblies, two pump modules, an ammonia tank assembly and a spare latching end effector for the station's robotic arm.  Launch is set for Nov. 16.  For information on the STS-129 mission objectives and crew, visit http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts129/index.html. Photo credit: NASA/Kim Shiflett KSC-2009-6256

CAPE CANAVERAL, Fla. - At NASA's Kennedy Space Center in Florida, STS-...

CAPE CANAVERAL, Fla. - At NASA's Kennedy Space Center in Florida, STS-129 Pilot Barry E. Wilmore, right, arrives at the Shuttle Landing Facility to practice landings in a Shuttle Training Aircraft in preparatio... More

CAPE CANAVERAL, Fla. - At Launch Pad 39A at NASA's Kennedy Space Center in Florida, the rotating service structure has been retracted from space shuttle Atlantis as the countdown progresses toward launch on Nov. 16 at 2:28 p.m. EST of the STS-129 mission.  The movable structure, which provides weather protection and access for technicians to work on the shuttle, began being retracted at 5:20 p.m. EST and was in the park position by 5:56 p.m.     STS-129 crew members are Commander Charles O. Hobaugh; Pilot Barry E. Wilmore; and Mission Specialists Leland Melvin, Randy Bresnik, Mike Foreman and Robert L. Satcher Jr.  On the STS-129 mission to the International Space Station, the crew will deliver two spare gyroscopes, two nitrogen tank assemblies, two pump modules, an ammonia tank assembly and a spare latching end effector for the station's robotic arm.  Atlantis will return to Earth a station crew member, Nicole Stott, who has spent more than two months aboard the orbiting laboratory.  STS-129 is slated to be the final space shuttle Expedition crew rotation flight. For information on the STS-129 mission and crew, visit http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts129/index.html. Photo credit: NASA/Troy Cryder KSC-2009-6299

CAPE CANAVERAL, Fla. - At Launch Pad 39A at NASA's Kennedy Space Cente...

CAPE CANAVERAL, Fla. - At Launch Pad 39A at NASA's Kennedy Space Center in Florida, the rotating service structure has been retracted from space shuttle Atlantis as the countdown progresses toward launch on Nov... More

CAPE CANAVERAL, Fla. - At the Shuttle Landing Facility at NASA's Kennedy Space Center, STS-129 Mission Specialist Robert L. Satcher Jr. addresses the media and others on hand to welcome his crew to Florida.    The six astronauts for space shuttle Atlantis’ STS-129 mission arrived at Kennedy aboard a NASA Shuttle Training Aircraft, a modified Gulfstream II jet, to make final preparations for their launch.  On STS-129, the crew will deliver to the International Space Station two spare gyroscopes, two nitrogen tank assemblies, two pump modules, an ammonia tank assembly and a spare latching end effector for the station's robotic arm.  Launch is set for Nov. 16.  For information on the STS-129 mission objectives and crew, visit http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts129/index.html. Photo credit: NASA/Kim Shiflett KSC-2009-6201

CAPE CANAVERAL, Fla. - At the Shuttle Landing Facility at NASA's Kenne...

CAPE CANAVERAL, Fla. - At the Shuttle Landing Facility at NASA's Kennedy Space Center, STS-129 Mission Specialist Robert L. Satcher Jr. addresses the media and others on hand to welcome his crew to Florida. ... More

CAPE CANAVERAL, Fla. - Twitter followers and media representatives at the NASA Press Site have front-row seats as space shuttle Atlantis launches through the clouds from Launch Pad 39A on a balmy Florida afternoon at NASA's Kennedy Space Center.    Liftoff on its STS-129 mission came at 2:28 p.m. EST Nov. 16.  Aboard are crew members Commander Charles O. Hobaugh; Pilot Barry E. Wilmore; and Mission Specialists Leland Melvin, Randy Bresnik, Mike Foreman and Robert L. Satcher Jr.  On STS-129, the crew will deliver two ExPRESS Logistics Carriers to the International Space Station, the largest of the shuttle's cargo carriers, containing 15 spare pieces of equipment including two gyroscopes, two nitrogen tank assemblies, two pump modules, an ammonia tank assembly and a spare latching end effector for the station's robotic arm.  Atlantis will return to Earth a station crew member, Nicole Stott, who has spent more than two months aboard the orbiting laboratory.  STS-129 is slated to be the final space shuttle Expedition crew rotation flight. For information on the STS-129 mission and crew, visit http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts129/index.html.  Photo credit: NASA/Gianni Woods KSC-2009-6337

CAPE CANAVERAL, Fla. - Twitter followers and media representatives at ...

CAPE CANAVERAL, Fla. - Twitter followers and media representatives at the NASA Press Site have front-row seats as space shuttle Atlantis launches through the clouds from Launch Pad 39A on a balmy Florida aftern... More

CAPE CANAVERAL, Fla. - In the Payload Changeout Room on Launch Pad 39A at NASA's Kennedy Space Center in Florida, members of the STS-129 crew, dressed in clean-room attire known as "bunny suits," pause a moment during their payload familiarization training for a photo. From left are Mission Specialists Robert L. Satcher Jr. and Leland Melvin.    The training affords the crew an opportunity to observe the placement of the Express Logistics Carriers 1 and 2 in space shuttle Atlantis' payload bay before launch.  The six astronauts for space shuttle Atlantis’ STS-129 mission came to Kennedy to participate in their launch dress rehearsal, the Terminal Countdown Demonstration Test.  Additional training associated with the test was done last month, but the simulated countdown was postponed because of a scheduling conflict with the launch of NASA’s Ares I-X test rocket.  Launch of Atlantis on its STS-129 mission to the International Space Station is set for Nov. 16.  On STS-129, the crew will deliver to the station two spare gyroscopes, two nitrogen tank assemblies, two pump modules, an ammonia tank assembly and a spare latching end effector for the station's robotic arm.  For information on the STS-129 crew and mission objectives, visit http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts129/index.html. Photo credit: NASA/Kim Shiflett KSC-2009-6105

CAPE CANAVERAL, Fla. - In the Payload Changeout Room on Launch Pad 39A...

CAPE CANAVERAL, Fla. - In the Payload Changeout Room on Launch Pad 39A at NASA's Kennedy Space Center in Florida, members of the STS-129 crew, dressed in clean-room attire known as "bunny suits," pause a moment... More

CAPE CANAVERAL, Fla. - Like a phoenix rising from the flames, space shuttle Atlantis emerges from the exhaust cloud building on Launch Pad 39A at NASA's Kennedy Space Center in Florida.    Liftoff on its STS-129 mission came at 2:28 p.m. EST Nov. 16.  Aboard are crew members Commander Charles O. Hobaugh; Pilot Barry E. Wilmore; and Mission Specialists Leland Melvin, Randy Bresnik, Mike Foreman and Robert L. Satcher Jr.  On STS-129, the crew will deliver two ExPRESS Logistics Carriers to the International Space Station, the largest of the shuttle's cargo carriers, containing 15 spare pieces of equipment including two gyroscopes, two nitrogen tank assemblies, two pump modules, an ammonia tank assembly and a spare latching end effector for the station's robotic arm.  Atlantis will return to Earth a station crew member, Nicole Stott, who has spent more than two months aboard the orbiting laboratory.  STS-129 is slated to be the final space shuttle Expedition crew rotation flight. For information on the STS-129 mission and crew, visit http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts129/index.html.    Photo credit: NASA/Tom Farrar and Tony Gray KSC-2009-6361

CAPE CANAVERAL, Fla. - Like a phoenix rising from the flames, space sh...

CAPE CANAVERAL, Fla. - Like a phoenix rising from the flames, space shuttle Atlantis emerges from the exhaust cloud building on Launch Pad 39A at NASA's Kennedy Space Center in Florida. Liftoff on its STS-12... More

CAPE CANAVERAL, Fla. - As the sun sets behind Launch Pad 39A at NASA's Kennedy Space Center in Florida, the rotating service structure has been moved away from space shuttle Atlantis during the T-11 hour hold in the launch countdown.  Liftoff of the STS-129 mission is set for 2:28 p.m. EST Nov. 16.  The movable structure, which provides weather protection and access for technicians to work on the shuttle, began being retracted at 5:20 p.m. EST and was in the park position by 5:56 p.m.    STS-129 crew members are Commander Charles O. Hobaugh; Pilot Barry E. Wilmore; and Mission Specialists Leland Melvin, Randy Bresnik, Mike Foreman and Robert L. Satcher Jr.  On the STS-129 mission to the International Space Station, the crew will deliver two spare gyroscopes, two nitrogen tank assemblies, two pump modules, an ammonia tank assembly and a spare latching end effector for the station's robotic arm.  Atlantis will return to Earth a station crew member, Nicole Stott, who has spent more than two months aboard the orbiting laboratory.  STS-129 is slated to be the final space shuttle Expedition crew rotation flight. For information on the STS-129 mission and crew, visit http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts129/index.html. Photo credit: NASA/Troy Cryder KSC-2009-6300

CAPE CANAVERAL, Fla. - As the sun sets behind Launch Pad 39A at NASA's...

CAPE CANAVERAL, Fla. - As the sun sets behind Launch Pad 39A at NASA's Kennedy Space Center in Florida, the rotating service structure has been moved away from space shuttle Atlantis during the T-11 hour hold i... More

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility Bay 3 at NASA's Kennedy Space Center in Florida, a crane lifts the gaseous nitrogen tank from space shuttle Discovery's payload bay with the aid of a "fish pole" lifting fixture.  The tank is being removed during processing for the shuttle's STS-131 mission to the International Space Station.    The tanks are used for atmosphere conditioning and for moving potable water in the crew module.  The seven-member STS-131 crew will deliver a Multi-Purpose Logistics Module filled with science racks to be transferred to laboratories on the station.  Three spacewalks will include work to attach a spare ammonia tank assembly to the station's exterior and return a European experiment from outside the station's Columbus module. This will be the 33rd shuttle mission to the station. Launch is targeted for March 18, 2010.  Photo credit: NASA/Troy Cryder KSC-2009-6101

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility Bay 3 at NASA's ...

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility Bay 3 at NASA's Kennedy Space Center in Florida, a crane lifts the gaseous nitrogen tank from space shuttle Discovery's payload bay with the aid of a "fish ... More

CAPE CANAVERAL, Fla. - STS-129 Commander Charles O. Hobaugh, left, is welcomed by Space Shuttle Launch Director Mike Leinbach at the Shuttle Landing Facility at NASA's Kennedy Space Center in Florida. The six astronauts for space shuttle Atlantis’ STS-129 mission have arrived at Kennedy for their launch dress rehearsal, the Terminal Countdown Demonstration Test.    Additional training associated with the test was done last month, but the simulated countdown was postponed because of a scheduling conflict with the launch of NASA’s Ares I-X test rocket.  Launch of Atlantis on its STS-129 mission to the International Space Station is set for Nov. 16. On STS-129, the crew will deliver to the station two spare gyroscopes, two nitrogen tank assemblies, two pump modules, an ammonia tank assembly and a spare latching end effector for the station's robotic arm.  For information on the STS-129 mission objectives and crew, visit http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts129/index.html. Photo credit: NASA/Troy Cryder KSC-2009-6035

CAPE CANAVERAL, Fla. - STS-129 Commander Charles O. Hobaugh, left, is ...

CAPE CANAVERAL, Fla. - STS-129 Commander Charles O. Hobaugh, left, is welcomed by Space Shuttle Launch Director Mike Leinbach at the Shuttle Landing Facility at NASA's Kennedy Space Center in Florida. The six a... More

CAPE CANAVERAL, Fla. – In the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, a battery charge-discharge unit is lifted by crane high above the hardware on the bay's floor. The unit is being moved toward an EXPRESS Logistics Carrier where it will be installed for flight.  The carrier is part of the STS-129 payload on space shuttle Atlantis, which will deliver to the International Space Station two spare gyroscopes, two nitrogen tank assemblies, two pump modules, an ammonia tank assembly and a spare latching end effector for the station's robotic arm. STS-129 is targeted to launch Nov. 12. Photo credit: NASA/Jim Grossmann KSC-2009-4680

CAPE CANAVERAL, Fla. – In the Space Station Processing Facility at NAS...

CAPE CANAVERAL, Fla. – In the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, a battery charge-discharge unit is lifted by crane high above the hardware on the bay's floor. The unit... More

CAPE CANAVERAL, Fla. - With nearly 7 million pounds of thrust generated with the aid of twin solid rocket boosters, space shuttle Atlantis roars into the blue skies over Launch Pad 39A at NASA's Kennedy Space Center in Florida.     Liftoff on its STS-129 mission came at 2:28 p.m. EST Nov. 16.  Aboard are crew members Commander Charles O. Hobaugh; Pilot Barry E. Wilmore; and Mission Specialists Leland Melvin, Randy Bresnik, Mike Foreman and Robert L. Satcher Jr.  On STS-129, the crew will deliver two ExPRESS Logistics Carriers to the International Space Station, the largest of the shuttle's cargo carriers, containing 15 spare pieces of equipment including two gyroscopes, two nitrogen tank assemblies, two pump modules, an ammonia tank assembly and a spare latching end effector for the station's robotic arm.  Atlantis will return to Earth a station crew member, Nicole Stott, who has spent more than two months aboard the orbiting laboratory.  STS-129 is slated to be the final space shuttle Expedition crew rotation flight. For information on the STS-129 mission and crew, visit http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts129/index.html.    Photo credit: NASA/Rusty Backer and Tom Farrar KSC-2009-6387

CAPE CANAVERAL, Fla. - With nearly 7 million pounds of thrust generate...

CAPE CANAVERAL, Fla. - With nearly 7 million pounds of thrust generated with the aid of twin solid rocket boosters, space shuttle Atlantis roars into the blue skies over Launch Pad 39A at NASA's Kennedy Space C... More

KENNEDY SPACE CENTER, FLA. -  At the SRB Assembly and Refurbishment Facility, STS-114 Mission Specialists Andrew Thomas (center) and Charles Camarda (right) look at a test panel of insulation material (left) cut in a liquid nitrogen process and a round aft heat seal (right) also treated in a liquid nitrogen process. At left is Mike Leppert, Manufacturing Operations project lead with United Space Alliance.  The crew is at KSC for familiarization with Shuttle and mission equipment. The STS-114 mission is Logistics Flight 1, which is scheduled to deliver supplies and equipment, plus the external stowage platform, to the International Space Station. KSC-04pd0388

KENNEDY SPACE CENTER, FLA. - At the SRB Assembly and Refurbishment Fa...

KENNEDY SPACE CENTER, FLA. - At the SRB Assembly and Refurbishment Facility, STS-114 Mission Specialists Andrew Thomas (center) and Charles Camarda (right) look at a test panel of insulation material (left) cu... More

CAPE CANAVERAL, Fla. - With nearly 7 million pounds of thrust generated by twin solid rocket boosters and three main engines, space shuttle Atlantis clears the tower on Launch Pad 39A at NASA's Kennedy Space Center in Florida.     Liftoff on its STS-129 mission came at 2:28 p.m. EST Nov. 16.  Aboard are crew members Commander Charles O. Hobaugh; Pilot Barry E. Wilmore; and Mission Specialists Leland Melvin, Randy Bresnik, Mike Foreman and Robert L. Satcher Jr.  On STS-129, the crew will deliver two ExPRESS Logistics Carriers to the International Space Station, the largest of the shuttle's cargo carriers, containing 15 spare pieces of equipment including two gyroscopes, two nitrogen tank assemblies, two pump modules, an ammonia tank assembly and a spare latching end effector for the station's robotic arm.  Atlantis will return to Earth a station crew member, Nicole Stott, who has spent more than two months aboard the orbiting laboratory.  STS-129 is slated to be the final space shuttle Expedition crew rotation flight. For information on the STS-129 mission and crew, visit http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts129/index.html.    Photo credit: NASA/Tom Farrar and Tony Gray KSC-2009-6392

CAPE CANAVERAL, Fla. - With nearly 7 million pounds of thrust generate...

CAPE CANAVERAL, Fla. - With nearly 7 million pounds of thrust generated by twin solid rocket boosters and three main engines, space shuttle Atlantis clears the tower on Launch Pad 39A at NASA's Kennedy Space Ce... More

CAPE CANAVERAL, Fla. – Inside the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, a strongback crane is lowered toward the EXPRESS Logistics Carrier to lift it to a stand. The carrier is part of the payload on space shuttle Atlantis, which will deliver to the International Space Station components including two spare gyroscopes, two nitrogen tank assemblies, two pump modules, an ammonia tank assembly and a spare latching end effector for the station's robotic arm.  STS-129 is targeted to launch Nov. 12.  Photo credit: NASA/Tim Jacobs KSC-2009-2247

CAPE CANAVERAL, Fla. – Inside the Space Station Processing Facility at...

CAPE CANAVERAL, Fla. – Inside the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, a strongback crane is lowered toward the EXPRESS Logistics Carrier to lift it to a stand. The carri... More

CAPE CANAVERAL, Fla. – In the Space Station Processing Facility at NASA's Kennedy Space Center in Florida,  a crane lifts the plasma contactor unit, or PCU, that will be installed on the Express Logistics Carrier, or ELC.  The PCU is used to disperse electrical charge build-ups on the International Space Station. The carrier is part of the STS-129 payload on space shuttle Atlantis, which will deliver to the International Space Station two spare gyroscopes, two nitrogen tank assemblies, two pump modules, an ammonia tank assembly and a spare latching end effector for the station's robotic arm. STS-129 is targeted to launch Nov. 12.  Photo credit: NASA/Jack Pfaller KSC-2009-5127

CAPE CANAVERAL, Fla. – In the Space Station Processing Facility at NAS...

CAPE CANAVERAL, Fla. – In the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, a crane lifts the plasma contactor unit, or PCU, that will be installed on the Express Logistics Carri... More

KENNEDY SPACE CENTER, FLA. -- At the Space Station Processing Facility, the STS-104 crew look over equipment as part of Crew Equipment Interface Test activities. Starting second from left are Mission Specialists James F. Reilly II, Janet L. Kavandi, Pilot Charles O. Hobaugh, Commander Steven Lindsey and Mission Specialist Michael L. Gernhardt. The STS-104 mission will carry the Joint Airlock Module to the International Space Station. The U.S.-made module will allow astronauts and cosmonauts in residence on the Station to perform future spacewalks without the presence of a Space Shuttle. The module, which comprises a crew lock and an equipment lock, will be connected to the starboard (right) side of Node 1 Unity. Atlantis will also carry oxygen and nitrogen storage tanks, vital to operation of the Joint Airlock, on a Spacelab Logistics Double Pallet in the payload bay. The tanks, to be installed on the perimeter of the Joint Module during the mission’s spacewalks, will support future spacewalk operations and experiments plus agument the resupply system for the Station’s Service Module KSC-01pp0860

KENNEDY SPACE CENTER, FLA. -- At the Space Station Processing Facility...

KENNEDY SPACE CENTER, FLA. -- At the Space Station Processing Facility, the STS-104 crew look over equipment as part of Crew Equipment Interface Test activities. Starting second from left are Mission Specialist... More

CAPE CANAVERAL, Fla. - On Launch Pad 39A at NASA's Kennedy Space Center in Florida, STS-129 Mission Specialist Robert L. Satcher Jr., dressed in his launch-and-entry suit, is strapped into his seat aboard space shuttle Atlantis.  The six astronauts for space shuttle Atlantis’ STS-129 mission are participating in their launch dress rehearsal, the Terminal Countdown Demonstration Test.    Additional training associated with the test was done last month, but the simulated countdown was postponed because of a scheduling conflict with the launch of NASA’s Ares I-X test rocket.  Launch of Atlantis on its STS-129 mission to the International Space Station is set for Nov. 16.  On STS-129, the crew will deliver to the station two spare gyroscopes, two nitrogen tank assemblies, two pump modules, an ammonia tank assembly and a spare latching end effector for the station's robotic arm.  For information on the STS-129 crew and mission objectives, visit http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts129/index.html. Photo credit: NASA/Kim Shiflett KSC-2009-6068

CAPE CANAVERAL, Fla. - On Launch Pad 39A at NASA's Kennedy Space Cente...

CAPE CANAVERAL, Fla. - On Launch Pad 39A at NASA's Kennedy Space Center in Florida, STS-129 Mission Specialist Robert L. Satcher Jr., dressed in his launch-and-entry suit, is strapped into his seat aboard space... More

CAPE CANAVERAL, Fla. – In NASA Kennedy Space Center's Orbiter Processing Facility 1, technicians begin a functional test on the orbital docking system on space shuttle Atlantis.  The STS-129 mission will deliver to the International Space Station two spare gyroscopes, two nitrogen tank assemblies, two pump modules, an ammonia tank assembly and a spare latching end effector for the station's robotic arm. STS-129 is targeted to launch Nov. 12. Photo credit: NASA/Kim Shiflett KSC-2009-4811

CAPE CANAVERAL, Fla. – In NASA Kennedy Space Center's Orbiter Processi...

CAPE CANAVERAL, Fla. – In NASA Kennedy Space Center's Orbiter Processing Facility 1, technicians begin a functional test on the orbital docking system on space shuttle Atlantis. The STS-129 mission will delive... More

CAPE CANAVERAL, Fla. -- In NASA Kennedy Space Center's Space Station Processing Facility, STS-129 Mission Specialist Randy Bresnik gets a close look at hardware installed on the Express Logistics Carrier, or ELC.  The crew is at Kennedy for a Crew Equipment Interface Test, which provides hands-on training and observation of shuttle and flight hardware. The carrier is part of the STS-129 payload on space shuttle Atlantis, which will deliver to the International Space Station two spare gyroscopes, two nitrogen tank assemblies, two pump modules, an ammonia tank assembly and a spare latching end effector for the station's robotic arm. STS-129 is targeted to launch Nov. 12.   Photo credit: NASA/Jim Grossmann KSC-2009-5080

CAPE CANAVERAL, Fla. -- In NASA Kennedy Space Center's Space Station P...

CAPE CANAVERAL, Fla. -- In NASA Kennedy Space Center's Space Station Processing Facility, STS-129 Mission Specialist Randy Bresnik gets a close look at hardware installed on the Express Logistics Carrier, or EL... More

CAPE CANAVERAL, Fla. – In NASA Kennedy Space Center's Space Station Processing Facility, an overhead crane moves the Express Logistics Carrier, or ELC, to a rotation stand.  The carrier is part of the STS-129 payload on space shuttle Atlantis, which will deliver to the International Space Station two spare gyroscopes, two nitrogen tank assemblies, two pump modules, an ammonia tank assembly and a spare latching end effector for the station's robotic arm. STS-129 is targeted to launch Nov. 12.  Photo credit: NASA/Kim Shiflett KSC-2009-4686

CAPE CANAVERAL, Fla. – In NASA Kennedy Space Center's Space Station Pr...

CAPE CANAVERAL, Fla. – In NASA Kennedy Space Center's Space Station Processing Facility, an overhead crane moves the Express Logistics Carrier, or ELC, to a rotation stand. The carrier is part of the STS-129 p... More

CAPE CANAVERAL, Fla. - At NASA's Kennedy Space Center in Florida, a transporter carrying the canister containing the payload for space shuttle Atlantis' STS-129 mission to the International Space Station - Express Logistics Carriers 1 and 2 - moves past the Vehicle Assembly Building on its way to Launch Pad 39A. Once at the pad, the payload will be transferred into the Payload Changeout Room for installation in Atlantis' payload bay.    The STS-129 crew will deliver two spare gyroscopes, two nitrogen tank assemblies, two pump modules, an ammonia tank assembly and a spare latching end effector for the station's robotic arm.  Launch is set for Nov. 16. For information on the STS-129 mission objectives and crew, visit http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts129/index.html. Photo credit: NASA/Amanda Diller KSC-2009-6011

CAPE CANAVERAL, Fla. - At NASA's Kennedy Space Center in Florida, a tr...

CAPE CANAVERAL, Fla. - At NASA's Kennedy Space Center in Florida, a transporter carrying the canister containing the payload for space shuttle Atlantis' STS-129 mission to the International Space Station - Expr... More

CAPE CANAVERAL, Fla. - On Launch Pad 39A at NASA's Kennedy Space Center in Florida, STS-129 Commander Charles O. Hobaugh, dressed in his launch-and-entry suit, is strapped into his seat aboard space shuttle Atlantis.  The six astronauts for space shuttle Atlantis’ STS-129 mission are participating in their launch dress rehearsal, the Terminal Countdown Demonstration Test.    Additional training associated with the test was done last month, but the simulated countdown was postponed because of a scheduling conflict with the launch of NASA’s Ares I-X test rocket.  Launch of Atlantis on its STS-129 mission to the International Space Station is set for Nov. 16.  On STS-129, the crew will deliver to the station two spare gyroscopes, two nitrogen tank assemblies, two pump modules, an ammonia tank assembly and a spare latching end effector for the station's robotic arm.  For information on the STS-129 crew and mission objectives, visit http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts129/index.html. Photo credit: NASA/Kim Shiflett KSC-2009-6071

CAPE CANAVERAL, Fla. - On Launch Pad 39A at NASA's Kennedy Space Cente...

CAPE CANAVERAL, Fla. - On Launch Pad 39A at NASA's Kennedy Space Center in Florida, STS-129 Commander Charles O. Hobaugh, dressed in his launch-and-entry suit, is strapped into his seat aboard space shuttle Atl... More

CAPE CANAVERAL, Fla. - Launch of space shuttle Atlantis from Pad 39A at NASA's Kennedy Space Center in Florida is reflected in the marsh near the pad.     Liftoff on its STS-129 mission came at 2:28 p.m. EST Nov. 16.  Aboard are crew members Commander Charles O. Hobaugh; Pilot Barry E. Wilmore; and Mission Specialists Leland Melvin, Randy Bresnik, Mike Foreman and Robert L. Satcher Jr.  On STS-129, the crew will deliver two ExPRESS Logistics Carriers to the International Space Station, the largest of the shuttle's cargo carriers, containing 15 spare pieces of equipment including two gyroscopes, two nitrogen tank assemblies, two pump modules, an ammonia tank assembly and a spare latching end effector for the station's robotic arm.  Atlantis will return to Earth a station crew member, Nicole Stott, who has spent more than two months aboard the orbiting laboratory.  STS-129 is slated to be the final space shuttle Expedition crew rotation flight. For information on the STS-129 mission and crew, visit http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts129/index.html.    Photo credit: NASA/Tom Farrar and Tony Gray KSC-2009-6374

CAPE CANAVERAL, Fla. - Launch of space shuttle Atlantis from Pad 39A a...

CAPE CANAVERAL, Fla. - Launch of space shuttle Atlantis from Pad 39A at NASA's Kennedy Space Center in Florida is reflected in the marsh near the pad. Liftoff on its STS-129 mission came at 2:28 p.m. EST No... More

CAPE CANAVERAL, Fla. - On Launch Pad 39A at NASA's Kennedy Space Center in Florida, members of the STS-129 crew, dressed in their launch-and-entry suits, enter a slidewire basket as they practice making an emergency exit from space shuttle Atlantis.  The six astronauts for space shuttle Atlantis’ STS-129 mission are participating in their launch dress rehearsal, the Terminal Countdown Demonstration Test.    Additional training associated with the test was done last month, but the simulated countdown was postponed because of a scheduling conflict with the launch of NASA’s Ares I-X test rocket.  Launch of Atlantis on its STS-129 mission to the International Space Station is set for Nov. 16.  On STS-129, the crew will deliver to the station two spare gyroscopes, two nitrogen tank assemblies, two pump modules, an ammonia tank assembly and a spare latching end effector for the station's robotic arm.  For information on the STS-129 crew and mission objectives, visit http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts129/index.html. Photo credit: NASA/Kim Shiflett KSC-2009-6074

CAPE CANAVERAL, Fla. - On Launch Pad 39A at NASA's Kennedy Space Cente...

CAPE CANAVERAL, Fla. - On Launch Pad 39A at NASA's Kennedy Space Center in Florida, members of the STS-129 crew, dressed in their launch-and-entry suits, enter a slidewire basket as they practice making an emer... More

CAPE CANAVERAL, Fla. – Inside the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, a crane carries the EXPRESS Logistics Carrier toward a stand. The carrier is part of the payload on space shuttle Atlantis, which will deliver to the International Space Station components including two spare gyroscopes, two nitrogen tank assemblies, two pump modules, an ammonia tank assembly and a spare latching end effector for the station's robotic arm.  STS-129 is targeted to launch Nov. 12.  Photo credit: NASA/Tim Jacobs KSC-2009-2249

CAPE CANAVERAL, Fla. – Inside the Space Station Processing Facility at...

CAPE CANAVERAL, Fla. – Inside the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, a crane carries the EXPRESS Logistics Carrier toward a stand. The carrier is part of the payload on... More

CAPE CANAVERAL, Fla. - With nearly 7 million pounds of thrust generated with the aid of twin solid rocket boosters, space shuttle Atlantis clears the tower on Launch Pad 39A at NASA's Kennedy Space Center in Florida.     Liftoff on its STS-129 mission came at 2:28 p.m. EST Nov. 16.  Aboard are crew members Commander Charles O. Hobaugh; Pilot Barry E. Wilmore; and Mission Specialists Leland Melvin, Randy Bresnik, Mike Foreman and Robert L. Satcher Jr.  On STS-129, the crew will deliver two ExPRESS Logistics Carriers to the International Space Station, the largest of the shuttle's cargo carriers, containing 15 spare pieces of equipment including two gyroscopes, two nitrogen tank assemblies, two pump modules, an ammonia tank assembly and a spare latching end effector for the station's robotic arm.  Atlantis will return to Earth a station crew member, Nicole Stott, who has spent more than two months aboard the orbiting laboratory.  STS-129 is slated to be the final space shuttle Expedition crew rotation flight. For information on the STS-129 mission and crew, visit http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts129/index.html.    Photo credit: NASA/Rusty Backer and Tom Farrar KSC-2009-6386

CAPE CANAVERAL, Fla. - With nearly 7 million pounds of thrust generate...

CAPE CANAVERAL, Fla. - With nearly 7 million pounds of thrust generated with the aid of twin solid rocket boosters, space shuttle Atlantis clears the tower on Launch Pad 39A at NASA's Kennedy Space Center in Fl... More

STS-46 MS Hoffman & MS Chang-Diaz wear masks during pre-breathe on OV-104

STS-46 MS Hoffman & MS Chang-Diaz wear masks during pre-breathe on OV-...

STS046-33-028 (4 Aug. 1992) --- With the possibility of an extravehicular activity (EVA) being added to the agenda, the two EVA-trained crew members begin their "pre-breathe" period on the space shuttle Atlanti... More

Aurora Australis as seen from STS-62

Aurora Australis as seen from STS-62

STS062-58-025 (4-18 March) --- This photo shows the aurora australis or souther lights. The multi-hued shafts of light, extending upward to 200 miles above the earth's surface, are caused by beams of energetic ... More

KENNEDY SPACE CENTER, FLA. -- Liquid nitrogen lines are being used to freeze portions of Space Shuttle Atlantis' hydraulic lines leading to and from the Power Drive Unit (PDU) to prevent air intrusion during its removal. PDU replacement is expected to occur without impacting the April 24 launch date on mission STS-101 KSC00pp0487

KENNEDY SPACE CENTER, FLA. -- Liquid nitrogen lines are being used to ...

KENNEDY SPACE CENTER, FLA. -- Liquid nitrogen lines are being used to freeze portions of Space Shuttle Atlantis' hydraulic lines leading to and from the Power Drive Unit (PDU) to prevent air intrusion during it... More

KENNEDY SPACE CENTER, FLA. -- Liquid nitrogen lines are being used to freeze portions of Space Shuttle Atlantis' hydraulic lines leading to and from the Power Drive Unit (PDU) to prevent air intrusion during its removal. PDU replacement is expected to occur without impacting the April 24 launch date on mission STS-101 KSC-00pp0487

KENNEDY SPACE CENTER, FLA. -- Liquid nitrogen lines are being used to ...

KENNEDY SPACE CENTER, FLA. -- Liquid nitrogen lines are being used to freeze portions of Space Shuttle Atlantis' hydraulic lines leading to and from the Power Drive Unit (PDU) to prevent air intrusion during it... More

KENNEDY SPACE CENTER, FLA. -- Liquid nitrogen lines are being used to freeze portions of Space Shuttle Atlantis' hydraulic lines leading to and from the Power Drive Unit (PDU) to prevent air intrusion during its removal. PDU replacement is expected to occur without impacting the April 24 launch date on mission STS-101 KSC-00pp0488

KENNEDY SPACE CENTER, FLA. -- Liquid nitrogen lines are being used to ...

KENNEDY SPACE CENTER, FLA. -- Liquid nitrogen lines are being used to freeze portions of Space Shuttle Atlantis' hydraulic lines leading to and from the Power Drive Unit (PDU) to prevent air intrusion during it... More

KENNEDY SPACE CENTER, FLA. -- Liquid nitrogen lines are being used to freeze portions of Space Shuttle Atlantis' hydraulic lines leading to and from the Power Drive Unit (PDU) to prevent air intrusion during its removal. PDU replacement is expected to occur without impacting the April 24 launch date on mission STS-101 KSC00pp0488

KENNEDY SPACE CENTER, FLA. -- Liquid nitrogen lines are being used to ...

KENNEDY SPACE CENTER, FLA. -- Liquid nitrogen lines are being used to freeze portions of Space Shuttle Atlantis' hydraulic lines leading to and from the Power Drive Unit (PDU) to prevent air intrusion during it... More

KENNEDY SPACE CENTER, FLA. -- At the Space Station Processing Facility, STS-104 Mission Specialist James F. Reilly II checks out a piece of equipment. The crew is at KSC to take part in Crew Equipment Interface Test activities. Reilly will perform three spacewalks during the mission, which will carry the Joint Airlock Module to the International Space Station. The U.S.-made module will allow astronauts and cosmonauts in residence on the Station to perform future spacewalks without the presence of a Space Shuttle. The module, which comprises a crew lock and an equipment lock, will be connected to the starboard (right) side of Node 1 Unity. Atlantis will also carry oxygen and nitrogen storage tanks, vital to operation of the Joint Airlock, on a Spacelab Logistics Double Pallet in the payload bay. The tanks, to be installed on the perimeter of the Joint Module during the mission’s spacewalks, will support future spacewalk operations and experiments plus agument the resupply system for the Station’s Service Module KSC-01pp0863

KENNEDY SPACE CENTER, FLA. -- At the Space Station Processing Facility...

KENNEDY SPACE CENTER, FLA. -- At the Space Station Processing Facility, STS-104 Mission Specialist James F. Reilly II checks out a piece of equipment. The crew is at KSC to take part in Crew Equipment Interface... More

KENNEDY SPACE CENTER, FLA. -- Members of the STS-104 crew look over equipment inside the equipment lock component of the Joint Airlock Module. At left is Mission Specialist Janet L. Kavandi, and at right Pilot Charles O. Hobaugh. The crew is at KSC to take part in Crew Equipment Interface Test activities. The mission will carry the Joint Airlock Module to the International Space Station. The U.S.-made module will allow astronauts and cosmonauts in residence on the Station to perform future spacewalks without the presence of a Space Shuttle. The module, which also comprises a crew lock, will be connected to the starboard (right) side of Node 1 Unity. Atlantis will also carry oxygen and nitrogen storage tanks, vital to operation of the Joint Airlock, on a Spacelab Logistics Double Pallet in the payload bay. The tanks, to be installed on the perimeter of the Joint Module during the mission’s spacewalks, will support future spacewalk operations and experiments plus augment the resupply system for the Station’s Service Module KSC-01pp0871

KENNEDY SPACE CENTER, FLA. -- Members of the STS-104 crew look over eq...

KENNEDY SPACE CENTER, FLA. -- Members of the STS-104 crew look over equipment inside the equipment lock component of the Joint Airlock Module. At left is Mission Specialist Janet L. Kavandi, and at right Pilot ... More

KENNEDY SPACE CENTER, FLA. -- Members of the STS-104 crew check out equipment at the Space Station Processing Facility as part of Crew Equipment Interface Test activities. Seen are (from left) Mission Specialist Michael L. Gernhardt, Commander Steven W. Lindsey, Pilot Charles O. Hobaugh and Mission Specialist James F. Reilly II. Not shown is Mission Specialist Janet L. Kavandi. The mission will carry the Joint Airlock Module to the International Space Station. The U.S.-made module will allow astronauts and cosmonauts in residence on the Station to perform future spacewalks without the presence of a Space Shuttle. The module, which comprises a crew lock and an equipment lock, will be connected to the starboard (right) side of Node 1 Unity. Atlantis will also carry oxygen and nitrogen storage tanks, vital to operation of the Joint Airlock, on a Spacelab Logistics Double Pallet in the payload bay. The tanks, to be installed on the perimeter of the Joint Module during the mission’s spacewalks, will support future spacewalk operations and experiments plus augment the resupply system for the Station’s Service Module KSC-01pp0868

KENNEDY SPACE CENTER, FLA. -- Members of the STS-104 crew check out eq...

KENNEDY SPACE CENTER, FLA. -- Members of the STS-104 crew check out equipment at the Space Station Processing Facility as part of Crew Equipment Interface Test activities. Seen are (from left) Mission Specialis... More

KENNEDY SPACE CENTER, FLA. -- Members of the STS-104 crew check out equipment at the Space Station Processing Facility as part of Crew Equipment Interface Test activities. Seen are (from left) Mission Specialist Michael L. Gernhardt, Commander Steven W. Lindsey, Pilot Charles O. Hobaugh and Mission Specialist James F. Reilly II. Not shown is Mission Specialist Janet L. Kavandi. The mission will carry the Joint Airlock Module to the International Space Station. The U.S.-made module will allow astronauts and cosmonauts in residence on the Station to perform future spacewalks without the presence of a Space Shuttle. The module, which comprises a crew lock and an equipment lock, will be connected to the starboard (right) side of Node 1 Unity. Atlantis will also carry oxygen and nitrogen storage tanks, vital to operation of the Joint Airlock, on a Spacelab Logistics Double Pallet in the payload bay. The tanks, to be installed on the perimeter of the Joint Module during the mission’s spacewalks, will support future spacewalk operations and experiments plus augment the resupply system for the Station’s Service Module KSC-01pp0867

KENNEDY SPACE CENTER, FLA. -- Members of the STS-104 crew check out eq...

KENNEDY SPACE CENTER, FLA. -- Members of the STS-104 crew check out equipment at the Space Station Processing Facility as part of Crew Equipment Interface Test activities. Seen are (from left) Mission Specialis... More

KENNEDY SPACE CENTER, FLA. -- Members of the STS-104 crew practice using tools they will work with on their mission. The crew is at KSC to take part in Crew Equipment Interface Test activities. Seen are (from left) Pilot Charles O. Hobaugh and Mission Specialist Michael L. Gernhardt. Also among the crew are Commander Steven W. Lindsey and Mission Specialists Janet L. Kavandi and James F. Reilly. The mission will carry the Joint Airlock Module to the International Space Station. The U.S.-made module will allow astronauts and cosmonauts in residence on the Station to perform future spacewalks without the presence of a Space Shuttle. The module, which comprises a crew lock and an equipment lock, will be connected to the starboard (right) side of Node 1 Unity. Atlantis will also carry oxygen and nitrogen storage tanks, vital to operation of the Joint Airlock, on a Spacelab Logistics Double Pallet in the payload bay. The tanks, to be installed on the perimeter of the Joint Module during the mission’s spacewalks, will support future spacewalk operations and experiments plus augment the resupply system for the Station’s Service Module KSC-01pp0869

KENNEDY SPACE CENTER, FLA. -- Members of the STS-104 crew practice usi...

KENNEDY SPACE CENTER, FLA. -- Members of the STS-104 crew practice using tools they will work with on their mission. The crew is at KSC to take part in Crew Equipment Interface Test activities. Seen are (from l... More

KENNEDY SPACE CENTER, FLA. -- Members of the STS-104 crew check out equipment at the Space Station Processing Facility as part of Crew Equipment Interface Test activities. Shown are Mission Specialist James F. Reilly II (left), Pilot Charles O. Hobaugh (center) and Mission Specialist Michael L. Gernhardt (right). The mission will carry the Joint Airlock Module to the International Space Station. The U.S.-made module will allow astronauts and cosmonauts in residence on the Station to perform future spacewalks without the presence of a Space Shuttle. The module, which comprises a crew lock and an equipment lock, will be connected to the starboard (right) side of Node 1 Unity. Atlantis will also carry oxygen and nitrogen storage tanks, vital to operation of the Joint Airlock, on a Spacelab Logistics Double Pallet in the payload bay. The tanks, to be installed on the perimeter of the Joint Module during the mission’s spacewalks, will support future spacewalk operations and experiments plus augment the resupply system for the Station’s Service Module KSC-01pp0865

KENNEDY SPACE CENTER, FLA. -- Members of the STS-104 crew check out eq...

KENNEDY SPACE CENTER, FLA. -- Members of the STS-104 crew check out equipment at the Space Station Processing Facility as part of Crew Equipment Interface Test activities. Shown are Mission Specialist James F. ... More

KENNEDY SPACE CENTER, FLA. -- At the Space Station Processing Facility, members of the STS-104 crew check out equipment. At left is Mission Specialist Michael L. Gernhardt; and second from right is Mission Specialist James F. Reilly II. The crew is taking part in Crew Equipment Interface Test activities. The mission will carry the Joint Airlock Module to the International Space Station. The U.S.-made module will allow astronauts and cosmonauts in residence on the Station to perform future spacewalks without the presence of a Space Shuttle. The module, which comprises a crew lock and an equipment lock, will be connected to the starboard (right) side of Node 1 Unity. Atlantis will also carry oxygen and nitrogen storage tanks, vital to operation of the Joint Airlock, on a Spacelab Logistics Double Pallet in the payload bay. The tanks, to be installed on the perimeter of the Joint Module during the mission’s spacewalks, will support future spacewalk operations and experiments plus augment the resupply system for the Station’s Service Module KSC-01pp0864

KENNEDY SPACE CENTER, FLA. -- At the Space Station Processing Facility...

KENNEDY SPACE CENTER, FLA. -- At the Space Station Processing Facility, members of the STS-104 crew check out equipment. At left is Mission Specialist Michael L. Gernhardt; and second from right is Mission Spec... More

KENNEDY SPACE CENTER, FLA. -- Members of the STS-104 crew look over equipment inside the equipment lock component of the Joint Airlock Module. At left is Mission Specialist Janet L. Kavandi, and at right Pilot Charles O. Hobaugh. The crew is at KSC to take part in Crew Equipment Interface Test activities. The mission will carry the Joint Airlock Module to the International Space Station. The U.S.-made module will allow astronauts and cosmonauts in residence on the Station to perform future spacewalks without the presence of a Space Shuttle. The module, which also comprises a crew lock, will be connected to the starboard (right) side of Node 1 Unity. Atlantis will also carry oxygen and nitrogen storage tanks, vital to operation of the Joint Airlock, on a Spacelab Logistics Double Pallet in the payload bay. The tanks, to be installed on the perimeter of the Joint Module during the mission’s spacewalks, will support future spacewalk operations and experiments plus augment the resupply system for the Station’s Service Module KSC-01pp0872

KENNEDY SPACE CENTER, FLA. -- Members of the STS-104 crew look over eq...

KENNEDY SPACE CENTER, FLA. -- Members of the STS-104 crew look over equipment inside the equipment lock component of the Joint Airlock Module. At left is Mission Specialist Janet L. Kavandi, and at right Pilot ... More

KENNEDY SPACE CENTER, FLA. -- At the Space Station Processing Facility, the STS-104 crew look over equipment as part of Crew Equipment Interface Test activities. From left are Commander Steven Lindsey, Mission Specialist James F. Reilly II and Mission Specialist Michael L. Gernhardt at far right. Not shown is Pilot Charles O. Hobaugh. The STS-104 mission will carry the Joint Airlock Module to the International Space Station. The U.S.-made module will allow astronauts and cosmonauts in residence on the Station to perform future spacewalks without the presence of a Space Shuttle. The module, which comprises a crew lock and an equipment lock, will be connected to the starboard (right) side of Node 1 Unity. Atlantis will also carry oxygen and nitrogen storage tanks, vital to operation of the Joint Airlock, on a Spacelab Logistics Double Pallet in the payload bay. The tanks, to be installed on the perimeter of the Joint Module during the mission’s spacewalks, will support future spacewalk operations and experiments plus agument the resupply system for the Station’s Service Module KSC-01pp0861

KENNEDY SPACE CENTER, FLA. -- At the Space Station Processing Facility...

KENNEDY SPACE CENTER, FLA. -- At the Space Station Processing Facility, the STS-104 crew look over equipment as part of Crew Equipment Interface Test activities. From left are Commander Steven Lindsey, Mission ... More

KENNEDY SPACE CENTER, FLA. -- An overhead crane in the Operations and Checkout Building lowers one of four gas tanks onto the Spacelab Logistics Double Pallet while workers help guide it. Part of the STS-104 payload, the storage tanks two gaseous oxygen and two gaseous nitrogen comprise the high pressure gas assembly that will be attached to the Joint Airlock Module during two spacewalks. The tanks will support future spacewalk operations from the Station and augment the Service Module gas resupply system KSC-01pp0952

KENNEDY SPACE CENTER, FLA. -- An overhead crane in the Operations and ...

KENNEDY SPACE CENTER, FLA. -- An overhead crane in the Operations and Checkout Building lowers one of four gas tanks onto the Spacelab Logistics Double Pallet while workers help guide it. Part of the STS-104 pa... More

KENNEDY SPACE CENTER, FLA. -- Workers in the Operations and Checkout Building stand by while one of four gas tanks is moved toward the Spacelab Logistics Double Pallet. Part of the STS-104 payload, the storage tanks two gaseous oxygen and two gaseous nitrogen comprise the high pressure gas assembly that will be attached to the Joint Airlock Module during two spacewalks. The tanks will support future spacewalk operations from the Station and augment the Service Module gas resupply system KSC-01pp0951

KENNEDY SPACE CENTER, FLA. -- Workers in the Operations and Checkout B...

KENNEDY SPACE CENTER, FLA. -- Workers in the Operations and Checkout Building stand by while one of four gas tanks is moved toward the Spacelab Logistics Double Pallet. Part of the STS-104 payload, the storage ... More

KENNEDY SPACE CENTER, FLA.  -- In the Operations and Checkout Building, workers check out the placement of one of four gas tanks on the Spacelab Logistics Double Pallet. Part of the STS-104 payload, the storage tanks two gaseous oxygen and two gaseous nitrogen comprise the high pressure gas assembly that will be attached to the Joint Airlock Module during two spacewalks. The tanks will support future spacewalk operations from the Station and augment the Service Module gas resupply system KSC-01pp0953

KENNEDY SPACE CENTER, FLA. -- In the Operations and Checkout Building...

KENNEDY SPACE CENTER, FLA. -- In the Operations and Checkout Building, workers check out the placement of one of four gas tanks on the Spacelab Logistics Double Pallet. Part of the STS-104 payload, the storage... More

KENNEDY SPACE CENTER, FLA. -- With workers keeping a close watch, the overhead crane lowers the high pressure gas assembly two gaseous oxygen and two gaseous nitrogen storage tanks into the payload canister. The joint airlock module is already in the canister. The airlock and tanks are part of the payload on mission STS-104 and are being transferred to orbiter Atlantis’s payload bay. The storage tanks will be attached to the airlock during two spacewalks. The storage tanks will support future spacewalk operations from the Station and augment the Service Module gas resupply system. STS-104 is scheduled for launch June 14 from Launch Pad 39B KSC-01PP1009

KENNEDY SPACE CENTER, FLA. -- With workers keeping a close watch, the ...

KENNEDY SPACE CENTER, FLA. -- With workers keeping a close watch, the overhead crane lowers the high pressure gas assembly two gaseous oxygen and two gaseous nitrogen storage tanks into the payload canister. Th... More

KENNEDY SPACE CENTER, FLA. -- In the Operations and Checkout Building, workers wait in the payload canister as an overhead crane moves the high pressure gas assembly two gaseous oxygen and two gaseous nitrogen storage tanks toward it. The joint airlock module is already in the canister. The airlock and tanks are part of the payload on mission STS-104 and are being transferred to orbiter Atlantis’s payload bay. The storage tanks will be attached to the airlock during two spacewalks. The storage tanks will support future spacewalk operations from the Station and augment the Service Module gas resupply system. STS-104 is scheduled for launch June 14 from Launch Pad 39B KSC-01PP1008

KENNEDY SPACE CENTER, FLA. -- In the Operations and Checkout Building,...

KENNEDY SPACE CENTER, FLA. -- In the Operations and Checkout Building, workers wait in the payload canister as an overhead crane moves the high pressure gas assembly two gaseous oxygen and two gaseous nitrogen ... More

KENNEDY SPACE CENTER, FLA. -- In the Operations and Checkout Building, an overhead crane moves the high pressure gas assembly two gaseous oxygen and two gaseous nitrogen storage tanks to the payload canister for transfer to orbiter Atlantis’s payload bay. The tanks are part of the payload on mission STS-104. They will be attached to the Joint Airlock Module, also part of the payload, during two spacewalks. The storage tanks will support future spacewalk operations from the Station and augment the Service Module gas resupply system. STS-104 is scheduled for launch June 14 from Launch Pad 39B KSC-01pp1007

KENNEDY SPACE CENTER, FLA. -- In the Operations and Checkout Building,...

KENNEDY SPACE CENTER, FLA. -- In the Operations and Checkout Building, an overhead crane moves the high pressure gas assembly two gaseous oxygen and two gaseous nitrogen storage tanks to the payload canister fo... More

KENNEDY SPACE CENTER, Fla. -- Atop the mobile launcher platform, Space Shuttle Atlantis, with its orange external tank and white solid rocket boosters, sits on Launch Pad 39B after rollout from the Vehicle Assembly Building. Seen on either side of the orbiter’s tail are the tail service masts. They support the fluid, gas and electrical requirements of the orbiter’s liquid oxygen and liquid hydrogen aft umbilicals. The Shuttle is targeted for launch no earlier than July 12 on mission STS-104, the 10th flight to the International Space Station. The payload on the 11-day mission is the Joint Airlock Module, which will allow astronauts and cosmonauts in residence on the Station to perform future spacewalks without the presence of a Space Shuttle. The module, which comprises a crew lock and an equipment lock, will be connected to the starboard (right) side of Node 1 Unity. Atlantis will also carry oxygen and nitrogen storage tanks, vital to operation of the Joint Airlock, on a Spacelab Logistics Double Pallet in the payload bay. The tanks, to be installed on the perimeter of the Joint Module during the mission’s spacewalks, will support future spacewalk operations and experiments plus augment the resupply system for the Station’s Service Module KSC-01pp1185

KENNEDY SPACE CENTER, Fla. -- Atop the mobile launcher platform, Space...

KENNEDY SPACE CENTER, Fla. -- Atop the mobile launcher platform, Space Shuttle Atlantis, with its orange external tank and white solid rocket boosters, sits on Launch Pad 39B after rollout from the Vehicle Asse... More

KENNEDY SPACE CENTER, Fla. -- Atop the mobile launcher platform, Space Shuttle Atlantis arrives on Launch Pad 39B after rollout from the Vehicle Assembly Building. Seen on either side of the orbiter’s tail are the tail service masts. They support the fluid, gas and electrical requirements of the orbiter’s liquid oxygen and liquid hydrogen aft umbilicals. The Shuttle is targeted for launch no earlier than July 12 on mission STS-104, the 10th flight to the International Space Station. The payload on the 11-day mission is the Joint Airlock Module, which will allow astronauts and cosmonauts in residence on the Station to perform future spacewalks without the presence of a Space Shuttle. The module, which comprises a crew lock and an equipment lock, will be connected to the starboard (right) side of Node 1 Unity. Atlantis will also carry oxygen and nitrogen storage tanks, vital to operation of the Joint Airlock, on a Spacelab Logistics Double Pallet in the payload bay. The tanks, to be installed on the perimeter of the Joint Module during the mission’s spacewalks, will support future spacewalk operations and experiments plus augment the resupply system for the Station’s Service Module KSC-01pp1184

KENNEDY SPACE CENTER, Fla. -- Atop the mobile launcher platform, Space...

KENNEDY SPACE CENTER, Fla. -- Atop the mobile launcher platform, Space Shuttle Atlantis arrives on Launch Pad 39B after rollout from the Vehicle Assembly Building. Seen on either side of the orbiter’s tail are ... More

KENNEDY SPACE CENTER, Fla. -- Sitting atop the mobile launcher platform, Space Shuttle Atlantis wends its way to Launch Pad 39B. The Shuttle is targeted for launch no earlier than July 12 on mission STS-104, the 10th flight to the International Space Station. The payload on the 11-day mission is the Joint Airlock Module, which will allow astronauts and cosmonauts in residence on the Station to perform future spacewalks without the presence of a Space Shuttle. The module, which comprises a crew lock and an equipment lock, will be connected to the starboard (right) side of Node 1 Unity. Atlantis will also carry oxygen and nitrogen storage tanks, vital to operation of the Joint Airlock, on a Spacelab Logistics Double Pallet in the payload bay. The tanks, to be installed on the perimeter of the Joint Module during the mission’s spacewalks, will support future spacewalk operations and experiments plus augment the resupply system for the Station’s Service Module KSC01padig232

KENNEDY SPACE CENTER, Fla. -- Sitting atop the mobile launcher platfor...

KENNEDY SPACE CENTER, Fla. -- Sitting atop the mobile launcher platform, Space Shuttle Atlantis wends its way to Launch Pad 39B. The Shuttle is targeted for launch no earlier than July 12 on mission STS-104, th... More

KENNEDY SPACE CENTER, Fla. -- After a journey of more than 8 hours from the Vehicle Assembly Building, Space Shuttle Atlantis sits on Launch Pad 39B. At left is the Rotating Service Structure, which will roll on its axis to enclose the Shuttle until launch. Towering above the Fixed Service Structure next to it is the 80-foot tall lightning mast that provides protection from lightning strikes. On the right is the elevated water tank with a capacity of 300,000 gallons. Part of the Sound Suppression Water System, the water in the tank is released just before ignition of the orbiter’s three main engines and twin solid rocket boosters and flow through parallel 7-foot-diameter pipes to the pad area. The Shuttle is targeted for launch no earlier than July 12 on mission STS-104, the 10th flight to the International Space Station. The payload on the 11-day mission is the Joint Airlock Module, which will allow astronauts and cosmonauts in residence on the Station to perform future spacewalks without the presence of a Space Shuttle. The module, which comprises a crew lock and an equipment lock, will be connected to the starboard (right) side of Node 1 Unity. Atlantis will also carry oxygen and nitrogen storage tanks, vital to operation of the Joint Airlock, on a Spacelab Logistics Double Pallet in the payload bay. The tanks, to be installed on the perimeter of the Joint Module during the mission’s spacewalks, will support future spacewalk operations and experiments plus augment the resupply system for the Station’s Service Module KSC01padig234

KENNEDY SPACE CENTER, Fla. -- After a journey of more than 8 hours fro...

KENNEDY SPACE CENTER, Fla. -- After a journey of more than 8 hours from the Vehicle Assembly Building, Space Shuttle Atlantis sits on Launch Pad 39B. At left is the Rotating Service Structure, which will roll o... More

KENNEDY SPACE CENTER, Fla. -- In the Payload Changeout Room, Launch Pad 39B, the Joint Airlock Module (below) and Space Lab Double Pallet (above) are moved into the payload bay of Space Shuttle Atlantis for mission STS-104. The pallet contains two oxygen and two nitrogen High-Pressure Gas Tanks, which will be attached externally to the airlock during two of the STS-104 spacewalks. Once installed and activated, the airlock becomes the primary path for International Space Station spacewalk entry and departure using U.S. spacesuits, which are known as Extravehicular Mobility Units, or EMUs. In addition, the Joint Airlock is designed to support the Russian Orlan spacesuit for EVA activity. Launch of Atlantis is scheduled no earlier than July 12 at  5:04 a.m. EDT KSC-01pp1199

KENNEDY SPACE CENTER, Fla. -- In the Payload Changeout Room, Launch Pa...

KENNEDY SPACE CENTER, Fla. -- In the Payload Changeout Room, Launch Pad 39B, the Joint Airlock Module (below) and Space Lab Double Pallet (above) are moved into the payload bay of Space Shuttle Atlantis for mis... More

KENNEDY SPACE CENTER, Fla. -- The payload canister is lifted up the Rotating Service Structure on Launch Pad 39A. At right is Space Shuttle Discovery. Inside the canister are the primary payloads on mission STS-105, the Multi-Purpose Logistics Module Leonardo and the Integrated Cargo Carrier. The ICC holds several smaller payloads, the Early Ammonia Servicer and two experiment containers. The Early Ammonia Servicer consists of two nitrogen tanks that provide compressed gaseous nitrogen to pressurize the ammonia tank and replenish it in the thermal control subsystems of the Space Station. The ICC and MPLM will be lifted into the payload changeout room and then moved into the Discovery’s payload bay. The STS-105 mission includes a crew changeover on the International Space Station. Expedition Three will be traveling on Discovery to replace Expedition Two, who will return to Earth on board Discovery. Launch of STS-105 is scheduled for Aug. 9 KSC-01pp1390

KENNEDY SPACE CENTER, Fla. -- The payload canister is lifted up the Ro...

KENNEDY SPACE CENTER, Fla. -- The payload canister is lifted up the Rotating Service Structure on Launch Pad 39A. At right is Space Shuttle Discovery. Inside the canister are the primary payloads on mission STS... More

KENNEDY SPACE CENTER, Fla. -- Just before sunrise the payload canister arrives at Launch Pad 39A. In the background is Space Shuttle Discovery, waiting to launch on mission STS-105. Inside the canister are the primary payloads on the mission, the Multi-Purpose Logistics Module Leonardo and the Integrated Cargo Carrier. The ICC holds several smaller payloads, the Early Ammonia Servicer and two experiment containers. The Early Ammonia Servicer consists of two nitrogen tanks that provide compressed gaseous nitrogen to pressurize the ammonia tank and replenish it in the thermal control subsystems of the Space Station. The ICC and MPLM will be lifted into the payload changeout room on the Rotation Service Structure where they will be moved into the Discovery’s payload bay. The STS-105 mission includes a crew changeover on the International Space Station. Expedition Three will be traveling on Discovery to replace Expedition Two, who will return to Earth on board Discovery. Launch of STS-105 is scheduled for Aug. 9 KSC-01pp1389

KENNEDY SPACE CENTER, Fla. -- Just before sunrise the payload canister...

KENNEDY SPACE CENTER, Fla. -- Just before sunrise the payload canister arrives at Launch Pad 39A. In the background is Space Shuttle Discovery, waiting to launch on mission STS-105. Inside the canister are the ... More

KENNEDY SPACE CENTER, FLA. --  United Space Alliance Aft Technician Bobby Wright looks at the gaseous nitrogen pressure regulator in the left Orbital Maneuvering System pod on Space Shuttle Endeavour.  The component showed pressure differentials during the launch count May 30, 2002, and mission managers elected to replace it after the launch was scrubbed due to weather concerns.  The launch of Endeavour on Mission STS-111, Utilization Flight 2 to the International Space Station,  has been rescheduled for June 5, 2002 KSC-02pd0854

KENNEDY SPACE CENTER, FLA. -- United Space Alliance Aft Technician Bo...

KENNEDY SPACE CENTER, FLA. -- United Space Alliance Aft Technician Bobby Wright looks at the gaseous nitrogen pressure regulator in the left Orbital Maneuvering System pod on Space Shuttle Endeavour. The comp... More

KENNEDY SPACE CENTER, FLA. --  Shown in the photo is the gaseous nitrogen pressure regulator in the left Orbital Maneuvering System pod on Space Shuttle Endeavour.  The component showed pressure differentials during the launch count May 30, 2002, and mission managers elected to replace it after the launch was scrubbed due to weather concerns.  The launch of Endeavour on Mission STS-111, Utilization Flight 2 to the International Space Station,  has been rescheduled for June 5, 2002 KSC-02pd0853

KENNEDY SPACE CENTER, FLA. -- Shown in the photo is the gaseous nitro...

KENNEDY SPACE CENTER, FLA. -- Shown in the photo is the gaseous nitrogen pressure regulator in the left Orbital Maneuvering System pod on Space Shuttle Endeavour. The component showed pressure differentials d... More

KENNEDY SPACE CENTER, FLA. -- United Space Alliance Aft Technician Bobby Wright checks is the gaseous nitrogen pressure regulator in the left Orbital Maneuvering System pod on Space Shuttle Endeavour.  The component showed pressure differentials during the launch count May 30, 2002, and mission managers elected to replace it after the launch was scrubbed due to weather concerns.  The launch of Endeavour on Mission STS-111, Utilization Flight 2 to the International Space Station,  has been rescheduled for June 5, 2002 KSC-02pd0855

KENNEDY SPACE CENTER, FLA. -- United Space Alliance Aft Technician Bob...

KENNEDY SPACE CENTER, FLA. -- United Space Alliance Aft Technician Bobby Wright checks is the gaseous nitrogen pressure regulator in the left Orbital Maneuvering System pod on Space Shuttle Endeavour. The comp... More

KENNEDY SPACE CENTER, FLA. -  At the SRB Assembly and Refurbishment Facility, STS-114 crew members look at booster separation motors (BSM) on an aft skirt that has had booster trowlable ablative removed by liquid nitrogen cutting.  The astronauts are learning how the BSMs would be removed from the aft skirt.  From left are Mission Specialist Wendy Lawrence; Commander Eileen Collins; Mission Specialist Andrew Thomas; Pilot James Kelly (background); and Mission Specialists Soichi Noguchi and Stephen Robinson.  Noguchi is with the Japanese Aerospace and Exploration Agency.  The crew is at KSC for familiarization with Shuttle and mission equipment. The STS-114 mission is Logistics Flight 1, which is scheduled to deliver supplies and equipment, plus the external stowage platform, to the International Space Station. KSC-04pd0385

KENNEDY SPACE CENTER, FLA. - At the SRB Assembly and Refurbishment Fa...

KENNEDY SPACE CENTER, FLA. - At the SRB Assembly and Refurbishment Facility, STS-114 crew members look at booster separation motors (BSM) on an aft skirt that has had booster trowlable ablative removed by liqu... More

KENNEDY SPACE CENTER, FLA. -  At the SRB Assembly and Refurbishment Facility, STS-114 Mission Specialists Stephen Robinson and Wendy Lawrence look at a test panel of insulation material cut in a liquid nitrogen process.   The STS-114 crew is at KSC for familiarization with Shuttle and mission equipment. The mission is Logistics Flight 1, which is scheduled to deliver supplies and equipment, plus the external stowage platform, to the International Space Station. KSC-04pd0521

KENNEDY SPACE CENTER, FLA. - At the SRB Assembly and Refurbishment Fa...

KENNEDY SPACE CENTER, FLA. - At the SRB Assembly and Refurbishment Facility, STS-114 Mission Specialists Stephen Robinson and Wendy Lawrence look at a test panel of insulation material cut in a liquid nitrogen... More

KENNEDY SPACE CENTER, FLA. -  At the SRB Assembly and Refurbishment Facility, STS-114 crew members look at the booster separation motors (BSM) on a solid rocket booster aft skirt.  The BSMs have had booster trowlable ablative removed by liquid nitrogen cutting.  The STS-114 crew is at KSC for familiarization with Shuttle and mission equipment. The mission is Logistics Flight 1, which is scheduled to deliver supplies and equipment, plus the external stowage platform, to the International Space Station. KSC-04pd0523

KENNEDY SPACE CENTER, FLA. - At the SRB Assembly and Refurbishment Fa...

KENNEDY SPACE CENTER, FLA. - At the SRB Assembly and Refurbishment Facility, STS-114 crew members look at the booster separation motors (BSM) on a solid rocket booster aft skirt. The BSMs have had booster tro... More

KENNEDY SPACE CENTER, FLA. -   After Discovery's safe landing on Runway 15 at NASA's Shuttle Landing Facility, safety assessment teams dressed in protective attire and with breathing apparatus obtain vapor level readings around the orbiter and test for possible explosive or toxic gases such as hydrogen, hydrazine, monomethyl-hydrazine, nitrogen tetroxide or ammonia . Completing mission STS-121 to the International Space Station, Discovery traveled  5.3 million miles, landing on orbit 202.  Mission elapsed time was 12 days, 18 hours, 37 minutes and 54 seconds.  Main gear touchdown occurred on time at 9:14:43 EDT.  Wheel stop was at 9:15:49 EDT.  The returning crew members are Commander Steven Lindsey, Pilot Mark Kelly and Mission Specialists Piers Sellers, Michael Fossum, Lisa Nowak and Stephanie Wilson.  Mission Specialist Thomas Reiter, who launched with the crew on July 4, remained on the station to join the Expedition 13 crew there.  The landing is the 62nd at Kennedy Space Center and the 32nd for Discovery.  Discovery's landing was as exhilarating as its launch, the first to take place on America's Independence Day. During the mission, the STS-121 crew tested new equipment and procedures to improve shuttle safety, and delivered supplies and made repairs to the International Space Station.  Photo credit: NASA/Ken Thornsley KSC-06pd1591

KENNEDY SPACE CENTER, FLA. - After Discovery's safe landing on Runwa...

KENNEDY SPACE CENTER, FLA. - After Discovery's safe landing on Runway 15 at NASA's Shuttle Landing Facility, safety assessment teams dressed in protective attire and with breathing apparatus obtain vapor leve... More

KENNEDY SPACE CENTER, FLA. --  Space Shuttle Atlantis, mounted on a mobile launch platform, finally rests on the hard stand of Launch Pad 39A after an early morning rollout.  This is the second rollout for the shuttle. Seen on either side of the main engine exhaust hole on the launcher platform are the tail service masts. Their function is to provide umbilical connections for liquid oxygen and liquid hydrogen lines to fuel the external tank from storage tanks adjacent to the launch pad. Other umbilical lines carry helium and nitrogen, as well as ground electrical power and connections for vehicle data and communications. First motion out of the Vehicle Assembly Building was at 5:02 a.m. EDT. In late February, while Atlantis was on the launch pad, Atlantis' external tank received hail damage during a severe thunderstorm that passed through the Kennedy Space Center Launch Complex 39 area. The hail caused visible divots in the giant tank's foam insulation, as well as minor surface damage to about 26 heat shield tiles on the shuttle's left wing. The shuttle was returned to the VAB for repairs. The launch of Space Shuttle Atlantis on mission STS-117 is now targeted for June 8. A flight readiness review will be held on May 30 and 31.  Photo credit: NASA/Troy Cryder KSC-07pd1200

KENNEDY SPACE CENTER, FLA. -- Space Shuttle Atlantis, mounted on a mo...

KENNEDY SPACE CENTER, FLA. -- Space Shuttle Atlantis, mounted on a mobile launch platform, finally rests on the hard stand of Launch Pad 39A after an early morning rollout. This is the second rollout for the ... More

KENNEDY SPACE CENTER, FLA. --In the Space Station Processing Facility at NASA's Kennedy Space Center, the integrated cargo carrier-lite, or ICC-L, is ready to be lifted and placed in the payload canister for mission STS-122.   Joining the primary payload, the Columbus module, the ICC-L is an unpressurized cross-bay carrier providing launch and return transportation with the space shuttle.  It rests on a keel yoke assembly, seen underneath.  The ICC-L carries three elements: a nitrogen tank assembly that is part of the external active thermal control system on the International Space Station, the European technology Exposure Facility composed of nine science instruments and an autonomous temperature measurement unit, and the SOLAR payload designed for sun observation.  The nitrogen tank assembly is mounted underneath.  The exposure facility is seen at left on top, and the SOLAR is on the right.  The SOLAR will be transferred and stowed on the Columbus module during the third spacewalk of the mission.  STS-122 is targeted for launch on Dec. 6 on space shuttle Atlantis.  Photo credit: NASA/Amanda Diller KSC-07pd3228

KENNEDY SPACE CENTER, FLA. --In the Space Station Processing Facility ...

KENNEDY SPACE CENTER, FLA. --In the Space Station Processing Facility at NASA's Kennedy Space Center, the integrated cargo carrier-lite, or ICC-L, is ready to be lifted and placed in the payload canister for mi... More

KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility at NASA's Kennedy Space Center, an overhead crane moves the integrated cargo carrier-lite, or ICC-L, toward the payload canister at right.  The ICC-L is an unpressurized cross-bay carrier providing launch and return transportation with the space shuttle. It rests on a keel yoke assembly, seen underneath.   The ICC-L carries three elements: a nitrogen tank assembly that is part of the external active thermal control system on the International Space Station, the European technology Exposure Facility composed of nine science instruments and an autonomous temperature measurement unit, and the SOLAR payload designed for sun observation. The SOLAR will be transferred and stowed on the Columbus module during the third spacewalk of the mission.  STS-122 is targeted for launch on Dec. 6 on space shuttle Atlantis.  Photo credit: NASA/Amanda Diller KSC-07pd3231

KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility...

KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility at NASA's Kennedy Space Center, an overhead crane moves the integrated cargo carrier-lite, or ICC-L, toward the payload canister at right. ... More

KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility at NASA's Kennedy Space Center, workers maneuver a crane into place above the integrated cargo carrier-lite, or ICC-L.  The carrier will be lifted and placed in the payload canister for mission STS-122.   Joining the primary payload, the Columbus module, the ICC-L is an unpressurized cross-bay carrier providing launch and return transportation with the space shuttle.  The ICC-L carries three elements: a nitrogen tank assembly that is part of the external active thermal control system on the International Space Station, the European technology Exposure Facility composed of nine science instruments and an autonomous temperature measurement unit, and the SOLAR payload designed for sun observation. The SOLAR will be transferred and stowed on the Columbus module during the third spacewalk of the mission.  STS-122 is targeted for launch on Dec. 6 on space shuttle Atlantis.  Photo credit: NASA/Amanda Diller KSC-07pd3229

KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility...

KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility at NASA's Kennedy Space Center, workers maneuver a crane into place above the integrated cargo carrier-lite, or ICC-L. The carrier will be... More

KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility at NASA's Kennedy Space Center, the integrated cargo carrier-lite, or ICC-L, is ready to be lifted and placed in the payload canister for mission STS-122.   Joining the primary payload, the Columbus module, the ICC-L is an unpressurized cross-bay carrier providing launch and return transportation with the space shuttle.  It rests on a keel yoke assembly, seen underneath.  The ICC-L carries three elements: a nitrogen tank assembly that is part of the external active thermal control system on the International Space Station, the European technology Exposure Facility composed of nine science instruments and an autonomous temperature measurement unit, and the SOLAR payload designed for sun observation.  The nitrogen tank assembly is mounted underneath.  The exposure facility is seen at left on top, and the SOLAR is on the right. The SOLAR will be transferred and stowed on the Columbus module during the third spacewalk of the mission.  STS-122 is targeted for launch on Dec. 6 on space shuttle Atlantis.  Photo credit: NASA/Amanda Diller KSC-07pd3226

KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility...

KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility at NASA's Kennedy Space Center, the integrated cargo carrier-lite, or ICC-L, is ready to be lifted and placed in the payload canister for m... More

KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility at NASA's Kennedy Space Center, an overhead crane moves the integrated cargo carrier-lite, or ICC-L, into the payload canister below.  The ICC-L is an unpressurized cross-bay carrier providing launch and return transportation with the space shuttle.  It rests on a keel yoke assembly, seen underneath.  The ICC-L carries three elements: a nitrogen tank assembly that is part of the external active thermal control system on the International Space Station, the European technology Exposure Facility composed of nine science instruments and an autonomous temperature measurement unit, and the SOLAR payload designed for sun observation.  The nitrogen tank assembly is mounted underneath.  The exposure facility is seen at left on top, and the SOLAR is on the right. The SOLAR will be transferred and stowed on the Columbus module during the third spacewalk of the mission.  STS-122 is targeted for launch on Dec. 6 on space shuttle Atlantis.  Photo credit: NASA/Amanda Diller KSC-07pd3233

KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility...

KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility at NASA's Kennedy Space Center, an overhead crane moves the integrated cargo carrier-lite, or ICC-L, into the payload canister below. The ... More

KENNEDY SPACE CENTER, FLA. --In the Space Station Processing Facility at NASA's Kennedy Space Center, workers inside the payload canister remove an overhead crane from the integrated cargo carrier-lite, or ICC-L.  The ICC-L is an unpressurized cross-bay carrier providing launch and return transportation with the space shuttle.  It rests on a keel yoke assembly, seen underneath.  The ICC-L carries three elements: a nitrogen tank assembly that is part of the external active thermal control system on the International Space Station, the European technology Exposure Facility composed of nine science instruments and an autonomous temperature measurement unit, and the SOLAR payload designed for sun observation. The SOLAR will be transferred and stowed on the Columbus module during the third spacewalk of the mission.  STS-122 is targeted for launch on Dec. 6 on space shuttle Atlantis.  Photo credit: NASA/Amanda Diller KSC-07pd3235

KENNEDY SPACE CENTER, FLA. --In the Space Station Processing Facility ...

KENNEDY SPACE CENTER, FLA. --In the Space Station Processing Facility at NASA's Kennedy Space Center, workers inside the payload canister remove an overhead crane from the integrated cargo carrier-lite, or ICC-... More

KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility at NASA's Kennedy Space Center, the integrated cargo carrier-lite, or ICC-L, is ready to be lifted and placed in the payload canister for mission STS-122.   Joining the primary payload, the Columbus module, the ICC-L is an unpressurized cross-bay carrier providing launch and return transportation with the space shuttle. It rests on a keel yoke assembly, seen underneath.  The ICC-L carries three elements: a nitrogen tank assembly that is part of the external active thermal control system on the International Space Station, the European technology Exposure Facility composed of nine science instruments and an autonomous temperature measurement unit, and the SOLAR payload designed for sun observation.  The nitrogen tank assembly is mounted underneath.  The exposure facility is seen at left on top, and the SOLAR is on the right. The SOLAR will be transferred and stowed on the Columbus module during the third spacewalk of the mission.  STS-122 is targeted for launch on Dec. 6 on space shuttle Atlantis.  Photo credit: NASA/Amanda Diller KSC-07pd3225

KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility...

KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility at NASA's Kennedy Space Center, the integrated cargo carrier-lite, or ICC-L, is ready to be lifted and placed in the payload canister for m... More

KENNEDY SPACE CENTER, FLA. --In the Space Station Processing Facility at NASA's Kennedy Space Center, an overhead crane moves the integrated cargo carrier-lite, or ICC-L, toward the payload canister at right.  The ICC-L is an unpressurized cross-bay carrier providing launch and return transportation with the space shuttle.  It rests on a keel yoke assembly, seen underneath.  The ICC-L carries three elements: a nitrogen tank assembly that is part of the external active thermal control system on the International Space Station, the European technology Exposure Facility composed of nine science instruments and an autonomous temperature measurement unit, and the SOLAR payload designed for sun observation. The SOLAR will be transferred and stowed on the Columbus module during the third spacewalk of the mission.  STS-122 is targeted for launch on Dec. 6 on space shuttle Atlantis.  Photo credit: NASA/Amanda Diller KSC-07pd3230

KENNEDY SPACE CENTER, FLA. --In the Space Station Processing Facility ...

KENNEDY SPACE CENTER, FLA. --In the Space Station Processing Facility at NASA's Kennedy Space Center, an overhead crane moves the integrated cargo carrier-lite, or ICC-L, toward the payload canister at right. ... More

KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility at NASA's Kennedy Space Center, an overhead crane moves the integrated cargo carrier-lite, or ICC-L, into the payload canister below.  The ICC-L is an unpressurized cross-bay carrier providing launch and return transportation with the space shuttle.  It rests on a keel yoke assembly, seen underneath.  The ICC-L carries three elements: a nitrogen tank assembly that is part of the external active thermal control system on the International Space Station, the European technology Exposure Facility composed of nine science instruments and an autonomous temperature measurement unit, and the SOLAR payload designed for sun observation.  The nitrogen tank assembly is mounted underneath.  The exposure facility is seen at left on top, and the SOLAR is on the right. The SOLAR will be transferred and stowed on the Columbus module during the third spacewalk of the mission.  STS-122 is targeted for launch on Dec. 6 on space shuttle Atlantis.  Photo credit: NASA/Amanda Diller KSC-07pd3234

KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility...

KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility at NASA's Kennedy Space Center, an overhead crane moves the integrated cargo carrier-lite, or ICC-L, into the payload canister below. The ... More

KENNEDY SPACE CENTER, FLA. --   The inside of Atlantis' payload bay can be seen from inside the payload changeout room. The changeout room is the enclosed, environmentally controlled portion of the rotating service structure that supports cargo delivery to the pad and subsequent vertical installation into the orbiter payload bay.  At the top of the photo is the orbital docking system. At bottom is the integrated cargo carrier - lite, holding three elements: a nitrogen tank assembly that is part of the external active thermal control system on the International Space Station, the European technology Exposure Facility composed of nine science instruments and an autonomous temperature measurement unit, and the SOLAR payload designed for sun observation.  The Columbus Laboratory module will be installed in between. The lab module, built by the European Space Agency, also known as ESA, is approximately 23 feet long and 15 feet wide, allowing it to hold 10 large racks of experiments. Columbus is ESA's largest single contribution to the space station. Columbus will fly to the International Space Station on mission STS-122.  The launch is targeted for Dec. 6.  Photo credit: NASA/Kim Shiflett KSC-07pd3288

KENNEDY SPACE CENTER, FLA. -- The inside of Atlantis' payload bay ca...

KENNEDY SPACE CENTER, FLA. -- The inside of Atlantis' payload bay can be seen from inside the payload changeout room. The changeout room is the enclosed, environmentally controlled portion of the rotating ser... More

KENNEDY SPACE CENTER, FLA. --   The integrated cargo carrier - lite is being transferred to space shuttle Atlantis' payload bay from the payload changeout room on Launch Pad 39A.  The changeout room is the enclosed, environmentally controlled portion of the rotating service structure that supports cargo delivery to the pad and subsequent vertical installation into the orbiter payload bay.  The carrier holds three elements: a nitrogen tank assembly that is part of the external active thermal control system on the International Space Station, the European technology Exposure Facility composed of nine science instruments and an autonomous temperature measurement unit, and the SOLAR payload designed for sun observation.  Also to be transferred is the Columbus Laboratory module.  The lab module, built by the European Space Agency, also known as ESA, is approximately 23 feet long and 15 feet wide, allowing it to hold 10 large racks of experiments. Columbus is ESA's largest single contribution to the space station. Columbus will fly to the International Space Station on mission STS-122.  The launch is targeted for Dec. 6.  Photo credit: NASA/Kim Shiflett KSC-07pd3289

KENNEDY SPACE CENTER, FLA. -- The integrated cargo carrier - lite is...

KENNEDY SPACE CENTER, FLA. -- The integrated cargo carrier - lite is being transferred to space shuttle Atlantis' payload bay from the payload changeout room on Launch Pad 39A. The changeout room is the encl... More

KENNEDY SPACE CENTER, FLA. --  On Launch Pad 39A, space shuttle Atlantis' payload bay doors are closing.  Seen here are the Columbus Laboratory (below), the integrated cargo carrier - lite (middle) and the orbital docking system (above).  Atlantis is being secured for launch on Dec. 6 on mission STS-122 to the International Space Station.  The Columbus laboratory module, built by the European Space Agency, is approximately 23 feet long and 15 feet wide, allowing it to hold 10 large racks of experiments. The carrier  holds three elements: a nitrogen tank assembly that is part of the external active thermal control system on the International Space Station, the European Technology Exposure Facility composed of nine science instruments and an autonomous temperature measurement unit, and the SOLAR payload designed for sun observation.  Photo credit: NASA/George Shelton KSC-07pd3524

KENNEDY SPACE CENTER, FLA. -- On Launch Pad 39A, space shuttle Atlant...

KENNEDY SPACE CENTER, FLA. -- On Launch Pad 39A, space shuttle Atlantis' payload bay doors are closing. Seen here are the Columbus Laboratory (below), the integrated cargo carrier - lite (middle) and the orbi... More

KENNEDY SPACE CENTER, FLA. -- On Launch Pad 39A, space shuttle Atlantis' payload bay doors are closed for launch.  Inside are the Columbus Laboratory, the integrated cargo carrier - lite  and the orbital docking system. Atlantis is being secured for launch on Dec. 6 on mission STS-122 to the International Space Station.  The Columbus laboratory module, built by the European Space Agency, is approximately 23 feet long and 15 feet wide, allowing it to hold 10 large racks of experiments. The carrier  holds three elements: a nitrogen tank assembly that is part of the external active thermal control system on the International Space Station, the European Technology Exposure Facility composed of nine science instruments and an autonomous temperature measurement unit, and the SOLAR payload designed for sun observation.  Photo credit: NASA/George Shelton KSC-07pd3529

KENNEDY SPACE CENTER, FLA. -- On Launch Pad 39A, space shuttle Atlanti...

KENNEDY SPACE CENTER, FLA. -- On Launch Pad 39A, space shuttle Atlantis' payload bay doors are closed for launch. Inside are the Columbus Laboratory, the integrated cargo carrier - lite and the orbital dockin... More

KENNEDY SPACE CENTER, FLA. -- On Launch Pad 39A, one of space shuttle Atlantis' payload bay doors is nearly closed.  Inside can still be seen the Columbus Laboratory (below), the integrated cargo carrier - lite (middle) and the orbital docking system (above). Atlantis is being secured for launch on Dec. 6 on mission STS-122 to the International Space Station.  The Columbus laboratory module, built by the European Space Agency, is approximately 23 feet long and 15 feet wide, allowing it to hold 10 large racks of experiments. The carrier  holds three elements: a nitrogen tank assembly that is part of the external active thermal control system on the International Space Station, the European Technology Exposure Facility composed of nine science instruments and an autonomous temperature measurement unit, and the SOLAR payload designed for sun observation.  Photo credit: NASA/George Shelton KSC-07pd3528

KENNEDY SPACE CENTER, FLA. -- On Launch Pad 39A, one of space shuttle ...

KENNEDY SPACE CENTER, FLA. -- On Launch Pad 39A, one of space shuttle Atlantis' payload bay doors is nearly closed. Inside can still be seen the Columbus Laboratory (below), the integrated cargo carrier - lite... More

KENNEDY SPACE CENTER, FLA. --  On Launch Pad 39A, space shuttle Atlantis' payload bay doors are closing.  Seen here are the Columbus Laboratory (below), the integrated cargo carrier - lite (middle) and the orbital docking system (above). Atlantis is being secured for launch on Dec. 6 on mission STS-122 to the International Space Station.  The Columbus laboratory module, built by the European Space Agency, is approximately 23 feet long and 15 feet wide, allowing it to hold 10 large racks of experiments. The carrier  holds three elements: a nitrogen tank assembly that is part of the external active thermal control system on the International Space Station, the European Technology Exposure Facility composed of nine science instruments and an autonomous temperature measurement unit, and the SOLAR payload designed for sun observation.  Photo credit: NASA/George Shelton KSC-07pd3527

KENNEDY SPACE CENTER, FLA. -- On Launch Pad 39A, space shuttle Atlant...

KENNEDY SPACE CENTER, FLA. -- On Launch Pad 39A, space shuttle Atlantis' payload bay doors are closing. Seen here are the Columbus Laboratory (below), the integrated cargo carrier - lite (middle) and the orbi... More

KENNEDY SPACE CENTER, FLA. --  On Launch Pad 39A, workers check the progress of the closing of the payload bay doors on space shuttle Atlantis.  Seen here are the Columbus Laboratory (below) and the integrated cargo carrier - lite (above).  Atlantis is being secured for launch on Dec. 6 on mission STS-122 to the International Space Station.  The Columbus laboratory module, built by the European Space Agency, is approximately 23 feet long and 15 feet wide, allowing it to hold 10 large racks of experiments. The carrier  holds three elements: a nitrogen tank assembly that is part of the external active thermal control system on the International Space Station, the European Technology Exposure Facility composed of nine science instruments and an autonomous temperature measurement unit, and the SOLAR payload designed for sun observation.  Photo credit: NASA/George Shelton KSC-07pd3525

KENNEDY SPACE CENTER, FLA. -- On Launch Pad 39A, workers check the pr...

KENNEDY SPACE CENTER, FLA. -- On Launch Pad 39A, workers check the progress of the closing of the payload bay doors on space shuttle Atlantis. Seen here are the Columbus Laboratory (below) and the integrated ... More

KENNEDY SPACE CENTER, FLA. --   On Launch Pad 39A, space shuttle Atlantis' payload bay doors are ready for closing.  Seen here are the Columbus Laboratory (below) and the integrated cargo carrier - lite (above).  Atlantis is being secured for launch on Dec. 6 on mission STS-122 to the International Space Station.  The Columbus laboratory module, built by the European Space Agency, is approximately 23 feet long and 15 feet wide, allowing it to hold 10 large racks of experiments. The carrier  holds three elements: a nitrogen tank assembly that is part of the external active thermal control system on the International Space Station, the European Technology Exposure Facility composed of nine science instruments and an autonomous temperature measurement unit, and the SOLAR payload designed for sun observation.  Photo credit: NASA/George Shelton KSC-07pd3521

KENNEDY SPACE CENTER, FLA. -- On Launch Pad 39A, space shuttle Atlan...

KENNEDY SPACE CENTER, FLA. -- On Launch Pad 39A, space shuttle Atlantis' payload bay doors are ready for closing. Seen here are the Columbus Laboratory (below) and the integrated cargo carrier - lite (above)... More

KENNEDY SPACE CENTER, FLA. --  On Launch Pad 39A, space shuttle Atlantis' payload bay doors are ready for closing.  Seen here is the integrated cargo carrier - lite.  Atlantis is being secured for launch on Dec. 6 on mission STS-122 to the International Space Station.  The Columbus laboratory module, built by the European Space Agency, is approximately 23 feet long and 15 feet wide, allowing it to hold 10 large racks of experiments. The carrier  holds three elements: a nitrogen tank assembly that is part of the external active thermal control system on the International Space Station, the European Technology Exposure Facility composed of nine science instruments and an autonomous temperature measurement unit, and the SOLAR payload designed for sun observation.  Photo credit: NASA/George Shelton KSC-07pd3523

KENNEDY SPACE CENTER, FLA. -- On Launch Pad 39A, space shuttle Atlant...

KENNEDY SPACE CENTER, FLA. -- On Launch Pad 39A, space shuttle Atlantis' payload bay doors are ready for closing. Seen here is the integrated cargo carrier - lite. Atlantis is being secured for launch on Dec... More

KENNEDY SPACE CENTER, FLA. --  On Launch Pad 39A, space shuttle Atlantis' payload bay doors are ready for closing.  Seen here is the Columbus Laboratory. Atlantis is being secured for launch on Dec. 6 on mission STS-122 to the International Space Station.  The Columbus laboratory module, built by the European Space Agency, is approximately 23 feet long and 15 feet wide, allowing it to hold 10 large racks of experiments. The carrier  holds three elements: a nitrogen tank assembly that is part of the external active thermal control system on the International Space Station, the European Technology Exposure Facility composed of nine science instruments and an autonomous temperature measurement unit, and the SOLAR payload designed for sun observation.  Photo credit: NASA/George Shelton KSC-07pd3522

KENNEDY SPACE CENTER, FLA. -- On Launch Pad 39A, space shuttle Atlant...

KENNEDY SPACE CENTER, FLA. -- On Launch Pad 39A, space shuttle Atlantis' payload bay doors are ready for closing. Seen here is the Columbus Laboratory. Atlantis is being secured for launch on Dec. 6 on missio... More

KENNEDY SPACE CENTER, FLA. --  On Launch Pad 39A, space shuttle Atlantis' payload bay doors are closing.  Seen here are the Columbus Laboratory (below), the integrated cargo carrier - lite (middle) and the orbital docking system (above). Atlantis is being secured for launch on Dec. 6 on mission STS-122 to the International Space Station.  The Columbus laboratory module, built by the European Space Agency, is approximately 23 feet long and 15 feet wide, allowing it to hold 10 large racks of experiments. The carrier  holds three elements: a nitrogen tank assembly that is part of the external active thermal control system on the International Space Station, the European Technology Exposure Facility composed of nine science instruments and an autonomous temperature measurement unit, and the SOLAR payload designed for sun observation.  Photo credit: NASA/George Shelton KSC-07pd3526

KENNEDY SPACE CENTER, FLA. -- On Launch Pad 39A, space shuttle Atlant...

KENNEDY SPACE CENTER, FLA. -- On Launch Pad 39A, space shuttle Atlantis' payload bay doors are closing. Seen here are the Columbus Laboratory (below), the integrated cargo carrier - lite (middle) and the orbi... More

STS-124 EVA 3 Nitrogen Tank Assembly (NTA) OPS

STS-124 EVA 3 Nitrogen Tank Assembly (NTA) OPS

ISS017-E-009220 (8 June 2008) --- Anchored to a Canadarm2 mobile foot restraint, astronaut Ron Garan, STS-124 mission specialist, participates in the mission's third scheduled session of extravehicular activity... More

CAPE CANAVERAL, Fla. – Inside the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, a crane lowers the EXPRESS Logistics Carrier onto a stand. The carrier is part of the payload on space shuttle Atlantis, which will deliver to the International Space Station components including two spare gyroscopes, two nitrogen tank assemblies, two pump modules, an ammonia tank assembly and a spare latching end effector for the station's robotic arm.  STS-129 is targeted to launch Nov. 12.  Photo credit: NASA/Tim Jacobs KSC-2009-2250

CAPE CANAVERAL, Fla. – Inside the Space Station Processing Facility at...

CAPE CANAVERAL, Fla. – Inside the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, a crane lowers the EXPRESS Logistics Carrier onto a stand. The carrier is part of the payload on sp... More

CAPE CANAVERAL, Fla. – Inside the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, technicians check the EXPRESS Logistics Carrier for the STS-129 mission after its cover was removed.  The carrier is part of the payload on space shuttle Atlantis, which will deliver to the International Space Station components including two spare gyroscopes, two nitrogen tank assemblies, two pump modules, an ammonia tank assembly and a spare latching end effector for the station's robotic arm.  STS-129 is targeted to launch Nov. 12.  Photo credit: NASA/Tim Jacobs KSC-2009-2245

CAPE CANAVERAL, Fla. – Inside the Space Station Processing Facility at...

CAPE CANAVERAL, Fla. – Inside the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, technicians check the EXPRESS Logistics Carrier for the STS-129 mission after its cover was removed... More

CAPE CANAVERAL, Fla. – A C-17 cargo plane arrives at the Shuttle Landing Facility at NASA's Kennedy Space Center in Florida with its cargo of the EXPRESS Logistics Carrier for the STS-129 mission. In the background is the mate/demate device used to separate a space shuttle from the Shuttle Carrier Aircraft. The carrier is part of the payload on space shuttle Atlantis, which will deliver to the International Space Station components including two spare gyroscopes, two nitrogen tank assemblies, two pump modules, an ammonia tank assembly and a spare latching end effector for the station's robotic arm.  STS-129 is targeted to launch Nov. 12.  Photo credit: NASA/Tim Jacobs KSC-2009-2238

CAPE CANAVERAL, Fla. – A C-17 cargo plane arrives at the Shuttle Landi...

CAPE CANAVERAL, Fla. – A C-17 cargo plane arrives at the Shuttle Landing Facility at NASA's Kennedy Space Center in Florida with its cargo of the EXPRESS Logistics Carrier for the STS-129 mission. In the backgr... More

CAPE CANAVERAL, Fla. – The truck carrying the EXPRESS Logistics Carrier for the STS-129 mission arrives at the Space Station Processing Facility at NASA's Kennedy Space Center in Florida.  The carrier is part of the payload on space shuttle Atlantis, which will deliver to the International Space Station components including two spare gyroscopes, two nitrogen tank assemblies, two pump modules, an ammonia tank assembly and a spare latching end effector for the station's robotic arm.  STS-129 is targeted to launch Nov. 12.  Photo credit: NASA/Tim Jacobs KSC-2009-2242

CAPE CANAVERAL, Fla. – The truck carrying the EXPRESS Logistics Carrie...

CAPE CANAVERAL, Fla. – The truck carrying the EXPRESS Logistics Carrier for the STS-129 mission arrives at the Space Station Processing Facility at NASA's Kennedy Space Center in Florida. The carrier is part o... More

CAPE CANAVERAL, Fla. – Inside the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, a strongback crane is being moved to the EXPRESS Logistics Carrier to lift it to a stand. The carrier is part of the payload on space shuttle Atlantis, which will deliver to the International Space Station components including two spare gyroscopes, two nitrogen tank assemblies, two pump modules, an ammonia tank assembly and a spare latching end effector for the station's robotic arm.  STS-129 is targeted to launch Nov. 12.  Photo credit: NASA/Tim Jacobs KSC-2009-2246

CAPE CANAVERAL, Fla. – Inside the Space Station Processing Facility at...

CAPE CANAVERAL, Fla. – Inside the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, a strongback crane is being moved to the EXPRESS Logistics Carrier to lift it to a stand. The carri... More

CAPE CANAVERAL, Fla. – Inside the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, technicians remove the cover from around the EXPRESS Logistics Carrier for the STS-129 mission. The carrier is part of the payload on space shuttle Atlantis, which will deliver to the International Space Station components including two spare gyroscopes, two nitrogen tank assemblies, two pump modules, an ammonia tank assembly and a spare latching end effector for the station's robotic arm.  STS-129 is targeted to launch Nov. 12.  Photo credit: NASA/Tim Jacobs KSC-2009-2244

CAPE CANAVERAL, Fla. – Inside the Space Station Processing Facility at...

CAPE CANAVERAL, Fla. – Inside the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, technicians remove the cover from around the EXPRESS Logistics Carrier for the STS-129 mission. The... More

CAPE CANAVERAL, Fla. – The truck carrying the EXPRESS Logistics Carrier for the STS-129 mission pulls away from the C-17 cargo plane that delivered it to NASA's Kennedy Space Center in Florida. The carrier is part of the payload on space shuttle Atlantis, which will deliver to the International Space Station components including two spare gyroscopes, two nitrogen tank assemblies, two pump modules, an ammonia tank assembly and a spare latching end effector for the station's robotic arm.  STS-129 is targeted to launch Nov. 12.  Photo credit: NASA/Tim Jacobs KSC-2009-2240

CAPE CANAVERAL, Fla. – The truck carrying the EXPRESS Logistics Carrie...

CAPE CANAVERAL, Fla. – The truck carrying the EXPRESS Logistics Carrier for the STS-129 mission pulls away from the C-17 cargo plane that delivered it to NASA's Kennedy Space Center in Florida. The carrier is p... More

CAPE CANAVERAL, Fla. – Inside the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, a crane lifts the EXPRESS Logistics Carrier tomove it to a stand.  The carrier is part of the payload on space shuttle Atlantis, which will deliver to the International Space Station components including two spare gyroscopes, two nitrogen tank assemblies, two pump modules, an ammonia tank assembly and a spare latching end effector for the station's robotic arm.  STS-129 is targeted to launch Nov. 12.  Photo credit: NASA/Tim Jacobs KSC-2009-2248

CAPE CANAVERAL, Fla. – Inside the Space Station Processing Facility at...

CAPE CANAVERAL, Fla. – Inside the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, a crane lifts the EXPRESS Logistics Carrier tomove it to a stand. The carrier is part of the paylo... More

CAPE CANAVERAL, Fla. – On the Shuttle Landing Facility at NASA's Kennedy Space Center in Florida, a truck carrying the EXPRESS Logistics Carrier for the STS-129 mission drives out of the open rear of the C-17 cargo plane. The carrier is part of the payload on space shuttle Atlantis, which will deliver to the International Space Station components including two spare gyroscopes, two nitrogen tank assemblies, two pump modules, an ammonia tank assembly and a spare latching end effector for the station's robotic arm.  STS-129 is targeted to launch Nov. 12.  Photo credit: NASA/Tim Jacobs KSC-2009-2239

CAPE CANAVERAL, Fla. – On the Shuttle Landing Facility at NASA's Kenne...

CAPE CANAVERAL, Fla. – On the Shuttle Landing Facility at NASA's Kennedy Space Center in Florida, a truck carrying the EXPRESS Logistics Carrier for the STS-129 mission drives out of the open rear of the C-17 c... More

CAPE CANAVERAL, Fla. – Inside the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, workers begin removing the shipping container from around the EXPRESS Logistics Carrier for the STS-129 mission. The carrier is part of the payload on space shuttle Atlantis, which will deliver to the International Space Station components including two spare gyroscopes, two nitrogen tank assemblies, two pump modules, an ammonia tank assembly and a spare latching end effector for the station's robotic arm.  STS-129 is targeted to launch Nov. 12.  Photo credit: NASA/Tim Jacobs KSC-2009-2243

CAPE CANAVERAL, Fla. – Inside the Space Station Processing Facility at...

CAPE CANAVERAL, Fla. – Inside the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, workers begin removing the shipping container from around the EXPRESS Logistics Carrier for the STS... More

CAPE CANAVERAL, Fla. – On the Shuttle Landing Facility at NASA's Kennedy Space Center in Florida, a worker removes a cover from the EXPRESS Logistics Carrier for the STS-129 mission.  The truck and carrier arrived on the C-17 cargo plane in the background. The carrier is part of the payload on space shuttle Atlantis, which will deliver to the International Space Station components including two spare gyroscopes, two nitrogen tank assemblies, two pump modules, an ammonia tank assembly and a spare latching end effector for the station's robotic arm.  STS-129 is targeted to launch Nov. 12.  Photo credit: NASA/Tim Jacobs KSC-2009-2241

CAPE CANAVERAL, Fla. – On the Shuttle Landing Facility at NASA's Kenne...

CAPE CANAVERAL, Fla. – On the Shuttle Landing Facility at NASA's Kennedy Space Center in Florida, a worker removes a cover from the EXPRESS Logistics Carrier for the STS-129 mission. The truck and carrier arri... More

CAPE CANAVERAL, Fla. – A closeup of damage found in the Launch Pad 39A flame trench at NASA's Kennedy Space Center in Florida after launch of space shuttle Atlantis on the STS-125 mission May 11. About 25 square feet of Fondue Fyre broke off from the north side of the solid rocket booster flame deflector. The flame trench channels the flames and smoke exhaust of the shuttle's solid rocket boosters away from the space shuttle.   Fondue Fyre is a fire-resistant concrete-like material.  Some pneumatic lines (gaseous nitrogen, pressurized air) in the area also were damaged. Preliminary assessments indicated technicians can make repairs to the pad in time to support space shuttle Endeavour's targeted June 13 launch.  Photo credit: NASA/Kim Shiflett KSC-2009-3136

CAPE CANAVERAL, Fla. – A closeup of damage found in the Launch Pad 39A...

CAPE CANAVERAL, Fla. – A closeup of damage found in the Launch Pad 39A flame trench at NASA's Kennedy Space Center in Florida after launch of space shuttle Atlantis on the STS-125 mission May 11. About 25 squar... More

CAPE CANAVERAL, Fla. – A closeup of damage found in the Launch Pad 39A flame trench at NASA's Kennedy Space Center in Florida after launch of space shuttle Atlantis on the STS-125 mission May 11. About 25 square feet of Fondue Fyre broke off from the north side of the solid rocket booster flame deflector. The flame trench channels the flames and smoke exhaust of the shuttle's solid rocket boosters away from the space shuttle.   Fondue Fyre is a fire-resistant concrete-like material.  Some pneumatic lines (gaseous nitrogen, pressurized air) in the area also were damaged. Preliminary assessments indicated technicians can make repairs to the pad in time to support space shuttle Endeavour's targeted June 13 launch.  Photo credit: NASA/Kim Shiflett KSC-2009-3135

CAPE CANAVERAL, Fla. – A closeup of damage found in the Launch Pad 39A...

CAPE CANAVERAL, Fla. – A closeup of damage found in the Launch Pad 39A flame trench at NASA's Kennedy Space Center in Florida after launch of space shuttle Atlantis on the STS-125 mission May 11. About 25 squar... More

CAPE CANAVERAL, Fla. – In Launch Pad 39A lame trench at NASA's Kennedy Space Center in Florida, workers document damage found  after launch of space shuttle Atlantis on the STS-125 mission May 11. About 25 square feet of Fondue Fyre broke off from the north side of the solid rocket booster flame deflector. The flame trench channels the flames and smoke exhaust of the shuttle's solid rocket boosters away from the space shuttle.    Fondue Fyre is a fire-resistant concrete-like material.  Some pneumatic lines (gaseous nitrogen, pressurized air) in the area also were damaged. Preliminary assessments indicated technicians can make repairs to the pad in time to support space shuttle Endeavour's targeted June 13 launch.  Photo credit: NASA/Kim Shiflett KSC-2009-3138

CAPE CANAVERAL, Fla. – In Launch Pad 39A lame trench at NASA's Kennedy...

CAPE CANAVERAL, Fla. – In Launch Pad 39A lame trench at NASA's Kennedy Space Center in Florida, workers document damage found after launch of space shuttle Atlantis on the STS-125 mission May 11. About 25 squa... More

CAPE CANAVERAL, Fla. – A closeup of damage found in the Launch Pad 39A flame trench at NASA's Kennedy Space Center in Florida after launch of space shuttle Atlantis on the STS-125 mission May 11. About 25 square feet of Fondue Fyre broke off from the north side of the solid rocket booster flame deflector. The flame trench channels the flames and smoke exhaust of the shuttle's solid rocket boosters away from the space shuttle.   Fondue Fyre is a fire-resistant concrete-like material.  Some pneumatic lines (gaseous nitrogen, pressurized air) in the area also were damaged. Preliminary assessments indicated technicians can make repairs to the pad in time to support space shuttle Endeavour's targeted June 13 launch.  Photo credit: NASA/Kim Shiflett KSC-2009-3137

CAPE CANAVERAL, Fla. – A closeup of damage found in the Launch Pad 39A...

CAPE CANAVERAL, Fla. – A closeup of damage found in the Launch Pad 39A flame trench at NASA's Kennedy Space Center in Florida after launch of space shuttle Atlantis on the STS-125 mission May 11. About 25 squar... More

CAPE CANAVERAL, Fla. – A view of the flame trench on Launch Pad 39A at NASA's Kennedy Space Center in Florida where repairs of the Fondue Fyre have been made. After launch of space shuttle Atlantis on the STS-125 mission on May 11, a 25-square-foot area of Fondue Fyre from the north side of the solid rocket booster flame deflector was damaged. Some pneumatic lines (gaseous nitrogen, pressurized air) in the area also were damaged and needed to be repaired. The flame trench channels the flames and smoke exhaust of the shuttle's solid rocket boosters away from the space shuttle during liftoff. Fondue Fyre is a fire-resistant concrete-like material that replaced the original flame trench bricks. It can be sprayed on the surface. Pad 39A will be used for the launch of space shuttle Endeavour on the STS-127 mission targeted for June 13.  Photo credit: NASA/Jim Grossmann KSC-2009-3312

CAPE CANAVERAL, Fla. – A view of the flame trench on Launch Pad 39A at...

CAPE CANAVERAL, Fla. – A view of the flame trench on Launch Pad 39A at NASA's Kennedy Space Center in Florida where repairs of the Fondue Fyre have been made. After launch of space shuttle Atlantis on the STS-1... More

Previous

of 4

Next