transition, orbiter

1,135 media by topicpage 1 of 12
CAPE CANAVERAL, Fla. - In Orbiter Processing Facility Bay 2 at NASA’s Kennedy Space Center in Florida, a technician spray paints simulated thrusters on the space shuttle Endeavour.      The work is part of Transition and Retirement of the remaining space shuttles, Endeavour and Atlantis. Endeavour is being prepared for public display at the California Science Center in Los Angeles. Its ferry flight to California is targeted for mid-September. Endeavour was the last space shuttle added to NASA’s orbiter fleet. Over the course of its 19-year career, Endeavour spent 299 days in space during 25 missions. For more information, visit http://www.nasa.gov/transition Photo credit: NASA/Jim Grossmann KSC-2012-3548

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility Bay 2 at NASA’s ...

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility Bay 2 at NASA’s Kennedy Space Center in Florida, a technician spray paints simulated thrusters on the space shuttle Endeavour. The work is part of Tran... More

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility Bay 2 at NASA’s Kennedy Space Center in Florida, the tail cone has been placed in position surrounding the replica main engines on the space shuttle Endeavour. The tail cone covers the main engines in the aft providing aerodynamic stability during the cross-country ferry flight.      The work is part of Transition and Retirement of the remaining space shuttles, Endeavour and Atlantis. Endeavour is being prepared for public display at the California Science Center in Los Angeles. Its ferry flight to California is targeted for mid-September. Endeavour was the last space shuttle added to NASA’s orbiter fleet. Over the course of its 19-year career, Endeavour spent 299 days in space during 25 missions. For more information, visit http://www.nasa.gov/transition Photo credit: NASA/ Jim Grossmann KSC-2012-4285

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility Bay 2 at NASA’s ...

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility Bay 2 at NASA’s Kennedy Space Center in Florida, the tail cone has been placed in position surrounding the replica main engines on the space shuttle Endeavo... More

CAPE CANAVERAL, Fla. – The space shuttle Endeavour approaches sister shuttle Atlantis for a brief photo opportunity at the Kennedy Space Center in Florida. Endeavour moved from Bay 2 of the Orbiter Processing Facility to switch places with Atlantis which had been in Vehicle Assembly Building VAB. In the VAB, Endeavour will undergo final preparations for its cross-country ferry flight targeted for mid-September. The work is part of Transition and Retirement of the remaining space shuttles, Endeavour and Atlantis. Endeavour is being prepared for public display at the California Science Center in Los Angeles. Endeavour was the last space shuttle added to NASA’s orbiter fleet. Over the course of its 19-year career, Endeavour spent 299 days in space during 25 missions. For more information, visit http://www.nasa.gov/transition Photo credit: NASA/Dimitri Gerondidakis KSC-2012-4481

CAPE CANAVERAL, Fla. – The space shuttle Endeavour approaches sister s...

CAPE CANAVERAL, Fla. – The space shuttle Endeavour approaches sister shuttle Atlantis for a brief photo opportunity at the Kennedy Space Center in Florida. Endeavour moved from Bay 2 of the Orbiter Processing F... More

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility Bay 2 at NASA’s Kennedy Space Center in Florida, the tail cone is moved into position for attachment to the space shuttle Endeavour. The tail cone covers the main engines in the aft providing aerodynamic stability during the cross-country ferry flight.      The work is part of Transition and Retirement of the remaining space shuttles, Endeavour and Atlantis. Endeavour is being prepared for public display at the California Science Center in Los Angeles. Its ferry flight to California is targeted for mid-September. Endeavour was the last space shuttle added to NASA’s orbiter fleet. Over the course of its 19-year career, Endeavour spent 299 days in space during 25 missions. For more information, visit http://www.nasa.gov/transition Photo credit: NASA/ Jim Grossmann KSC-2012-4272

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility Bay 2 at NASA’s ...

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility Bay 2 at NASA’s Kennedy Space Center in Florida, the tail cone is moved into position for attachment to the space shuttle Endeavour. The tail cone covers th... More

CAPE CANAVERAL, Fla. – At NASA’s Kennedy Space Center in Florida, space shuttle Atlantis is towed from the Vehicle Assembly Building toward Orbiter Processing Facility-1 OPF-1. In the background, space shuttle Discovery faces Atlantis after it was completely towed out from OPF-1.      The work is part of the Space Shuttle Program’s transition and retirement processing of the three space shuttles. Atlantis is being prepared for display at the Kennedy Space Center Visitor Complex and is scheduled to rollover to the complex in November. Photo credit: NASA/Tim Jacobs KSC-2012-1728

CAPE CANAVERAL, Fla. – At NASA’s Kennedy Space Center in Florida, spac...

CAPE CANAVERAL, Fla. – At NASA’s Kennedy Space Center in Florida, space shuttle Atlantis is towed from the Vehicle Assembly Building toward Orbiter Processing Facility-1 OPF-1. In the background, space shuttle ... More

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians on a Hyster forklift guide replica shuttle main engine 2, or RSME 2, closer for installation on space shuttle Endeavour. The orbiter is surrounded by work platforms allowing access to all areas of the spacecraft.    The work is part of Transition and Retirement of the remaining space shuttles, Endeavour and Atlantis. Endeavour is being prepared for public display at the California Science Center in Los Angeles. Its ferry flight to California is targeted for mid-September. Endeavour was the last space shuttle added to NASA’s orbiter fleet. Over the course of its 19-year career, Endeavour spent 299 days in space during 25 missions. For more information, visit http://www.nasa.gov/shuttle.  Photo credit: NASA/David Lee KSC-2012-3826

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility-2 at NASA’s ...

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians on a Hyster forklift guide replica shuttle main engine 2, or RSME 2, clos... More

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians close space shuttle Atlantis’ aft doors for the final time.    The orbiter is undergoing final preparations for its transfer to the Kennedy Space Center Visitor complex targeted for November. The work is part of Transition and Retirement of the remaining shuttle. Atlantis is being prepared for public display at the visitor complex. Over the course of its 26-year career, Atlantis spent 293 days in space during 33 missions. For more information, visit http://www.nasa.gov/transition. Photo credit: NASA/Dimitri Gerondidakis KSC-2012-5615

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility-2 at NASA’s ...

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians close space shuttle Atlantis’ aft doors for the final time. The orbite... More

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians inspect space shuttle Endeavour’s payload bay doors after they were closed for the final time.     The work is part of Transition and Retirement of the remaining space shuttles, Endeavour and Atlantis. Endeavour is being prepared for public display at the California Science Center in Los Angeles. Its ferry flight to California is targeted for mid-September. Endeavour was the last space shuttle added to NASA’s orbiter fleet. Over the course of its 19-year career, Endeavour spent 299 days in space during 25 missions. For more information, visit http://www.nasa.gov/shuttle.  Photo credit: NASA/Kim Shiflett KSC-2012-3429

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility-2 at NASA’s ...

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians inspect space shuttle Endeavour’s payload bay doors after they were close... More

CAPE CANAVERAL, Fla. - Crews in Orbiter Processing Facility-2 at NASA's Kennedy Space Center in Florida remove space shuttle Discovery's right-hand inner heat shield from engine No. 1. The removal is part of Discovery's transition and retirement processing. Work performed on Discovery is expected to help rocket designers build next-generation spacecraft and prepare the shuttle for future public display.Photo credit: NASA/Jack Pfaller KSC-2011-2396

CAPE CANAVERAL, Fla. - Crews in Orbiter Processing Facility-2 at NASA'...

CAPE CANAVERAL, Fla. - Crews in Orbiter Processing Facility-2 at NASA's Kennedy Space Center in Florida remove space shuttle Discovery's right-hand inner heat shield from engine No. 1. The removal is part of Di... More

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-1 at NASA's Kennedy Space Center in Florida, workers are disconnecting and dismantling components on shuttle Endeavour. Seen here is the view from inside the spacecraft's airlock looking toward the payload bay.          The work is part of Endeavour's transition and retirement processing. The spacecraft is being prepared for public display at the California Science Center in Los Angeles. Endeavour flew 25 missions, spent 299 days in space, orbited Earth 4,671 times and traveled 122,883,151 miles over the course of its 19-year career. Endeavour's STS-134 and final mission was completed after landing on June 1, 2011. Photo credit: NASA/Kim Shiflett KSC-2011-4911

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-1 at NASA's Ken...

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-1 at NASA's Kennedy Space Center in Florida, workers are disconnecting and dismantling components on shuttle Endeavour. Seen here is the view from inside t... More

CAPE CANAVERAL, Fla. – The space shuttle Atlantis is towed from the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida. Atlantis is switching places with Endeavour which had been in Bay 2 of the Orbiter Processing Facility OPF. In the OPF, Atlantis will undergo final preparations for its transfer to the Kennedy Space Center Visitor Complex targeted for November. The work is part of Transition and Retirement of the remaining space shuttles, Atlantis and Endeavour. Atlantis is being prepared for public display at Kennedy's Visitor Complex. Over the course of its 26-year career, Atlantis spent 293 days in space during 33 missions. For more information, visit http://www.nasa.gov/transition Photo credit: NASA/Kim Shiflett KSC-2012-4521

CAPE CANAVERAL, Fla. – The space shuttle Atlantis is towed from the Ve...

CAPE CANAVERAL, Fla. – The space shuttle Atlantis is towed from the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida. Atlantis is switching places with Endeavour which had been in Bay 2 of th... More

CAPE CANAVERAL, Fla. – Inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians use a crane to pick up the right side tail cone for buildup on space shuttle Endeavour. The tail cone protects space shuttle main engines during ferry flights on top of the Shuttle Carrier Aircraft, or SCA.    The work is part of Transition and Retirement of the remaining space shuttles, Endeavour and Atlantis. Endeavour is being prepared for public display at the California Science Center in Los Angeles. Its ferry flight to California is targeted for mid-September. Endeavour was the last space shuttle added to NASA’s orbiter fleet. Over the course of its 19-year career, Endeavour spent 299 days in space during 25 missions. For more information, visit http://www.nasa.gov/shuttle.  Photo credit: NASA/Kim Shiflett KSC-2012-2835

CAPE CANAVERAL, Fla. – Inside the Vehicle Assembly Building at NASA’s ...

CAPE CANAVERAL, Fla. – Inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians use a crane to pick up the right side tail cone for buildup on space shut... More

CAPE CANAVERAL, Fla. -- Space shuttle Atlantis is parked in the transfer aisle of the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida, following its move from Orbiter Processing Facility-2.    Atlantis will be stored temporarily in the VAB while transition and retirement processing resumes on shuttle Endeavour in the processing hangar. Endeavour is being prepared for public display at the California Science Center in Los Angeles. A groundbreaking was held Jan. 18 for Atlantis' future home -- a 65,000-square-foot exhibit in Shuttle Plaza at the Kennedy Space Center Visitor Complex. For additional information, visit http://www.nasa.gov/shuttle.  Photo credit: NASA/Jim Grossmann KSC-2012-1098

CAPE CANAVERAL, Fla. -- Space shuttle Atlantis is parked in the transf...

CAPE CANAVERAL, Fla. -- Space shuttle Atlantis is parked in the transfer aisle of the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida, following its move from Orbiter Processing Facili... More

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility-1 at NASA's Kennedy Space Center in Florida, Center Director Robert Cabana, second from right, joins space shuttle support personnel in a ceremony following the final power down of space shuttle Discovery during Space Shuttle Program transition and retirement activities. "Power down" followed the final closure of Discovery's payload bay doors.    Discovery is being prepared for public display at the Smithsonian’s National Air and Space Museum Steven F. Udvar-Hazy Center in Chantilly, Va., in 2012.  For more information, visit http://www.nasa.gov/shuttle.  Photo credit: NASA/Jim Grossmann KSC-2011-8324

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility-1 at NASA's Kenn...

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility-1 at NASA's Kennedy Space Center in Florida, Center Director Robert Cabana, second from right, joins space shuttle support personnel in a ceremony following... More

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility Bay 2 at NASA’s Kennedy Space Center in Florida, a United Space Alliance technician monitors the nose landing gear during weight and center of gravity checks on the space shuttle Endeavour.      The work is part of Transition and Retirement of the remaining space shuttles, Endeavour and Atlantis. Endeavour is being prepared for public display at the California Science Center in Los Angeles. Its ferry flight to California is targeted for mid-September. Endeavour was the last space shuttle added to NASA’s orbiter fleet. Over the course of its 19-year career, Endeavour spent 299 days in space during 25 missions. For more information, visit http://www.nasa.gov/transition Photo credit: NASA/ Jim Grossmann KSC-2012-4426

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility Bay 2 at NASA’s ...

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility Bay 2 at NASA’s Kennedy Space Center in Florida, a United Space Alliance technician monitors the nose landing gear during weight and center of gravity check... More

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, one of space shuttle Endeavour’s payload bay doors is closed. Endeavour’s payload bay doors will be closed for the final time.    The work is part of Transition and Retirement of the remaining space shuttles, Endeavour and Atlantis. Endeavour is being prepared for public display at the California Science Center in Los Angeles. Its ferry flight to California is targeted for mid-September. Endeavour was the last space shuttle added to NASA’s orbiter fleet. Over the course of its 19-year career, Endeavour spent 299 days in space during 25 missions. For more information, visit http://www.nasa.gov/shuttle.  Photo credit: NASA/Kim Shiflett KSC-2012-3423

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility-2 at NASA’s ...

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, one of space shuttle Endeavour’s payload bay doors is closed. Endeavour’s payload bay doors will be closed ... More

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility Bay 2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians install a heat shield around one of space shuttle Endeavour’s replica shuttle main engines.      The work is part of Transition and Retirement of the remaining space shuttles, Endeavour and Atlantis. Endeavour is being prepared for public display at the California Science Center in Los Angeles. Its ferry flight to California is targeted for mid-September. Endeavour was the last space shuttle added to NASA’s orbiter fleet. Over the course of its 19-year career, Endeavour spent 299 days in space during 25 missions. For more information, visit http://www.nasa.gov/transition Photo credit: NASA/ Frankie Martin KSC-2012-3961

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility Bay 2 at NASA’s ...

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility Bay 2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians install a heat shield around one of space shuttle Endeavour’s replica shu... More

CAPE CANAVERAL, Fla. -- Inside Orbiter Processing Facility-1 at NASA’s Kennedy Space Center in Florida, the tail cone is installed around space shuttle Discovery’s three replica shuttle main engines for protection.    The work is part of the Space Shuttle Program’s transition and retirement processing of shuttle Discovery. Discovery is being prepared for display at the Smithsonian’s National Air and Space Museum, Steven F. Udvar-Hazy Center in Chantilly, Va. For more information, visit http://www.nasa.gov/shuttle.  Photo credit: NASA/Jim Grossmann KSC-2012-1039

CAPE CANAVERAL, Fla. -- Inside Orbiter Processing Facility-1 at NASA’s...

CAPE CANAVERAL, Fla. -- Inside Orbiter Processing Facility-1 at NASA’s Kennedy Space Center in Florida, the tail cone is installed around space shuttle Discovery’s three replica shuttle main engines for protect... More

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, a United Space Alliance technician monitors the progress as an overhead crane moves one of Endeavour’s main propulsion system tanks away from the mid-body of the orbiter. The tanks will be retained for possible future use on the agency’s Space Launch System Program.      The work is part of Endeavour’s transition and retirement processing. The spacecraft is being prepared for public display at the California Science Center in Los Angeles. Endeavour flew 25 missions, spent 299 days in space, orbited Earth 4,671 times and traveled 122, 883, 151 miles over the course of its 19-year career. For more information, visit http://www.nasa.gov/shuttle. Photo credit: Dimitri Gerondidakis KSC-2012-1883

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-2 at NASA’s Ken...

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, a United Space Alliance technician monitors the progress as an overhead crane moves one of Endeavour’s main pr... More

CAPE CANAVERAL, Fla. – The space shuttle Endeavour backs out of Bay 2 of the Orbiter Processing Facility at the Kennedy Space Center in Florida. Endeavour will be moved to the Vehicle Assembly Building to undergo final preparations for its cross-country ferry flight targeted for mid-September. The work is part of Transition and Retirement of the remaining space shuttles, Endeavour and Atlantis. Endeavour is being prepared for public display at the California Science Center in Los Angeles. Endeavour was the last space shuttle added to NASA’s orbiter fleet. Over the course of its 19-year career, Endeavour spent 299 days in space during 25 missions. For more information, visit http://www.nasa.gov/transition. Photo credit: NASA/Dimitri Gerondidakis KSC-2012-4474

CAPE CANAVERAL, Fla. – The space shuttle Endeavour backs out of Bay 2 ...

CAPE CANAVERAL, Fla. – The space shuttle Endeavour backs out of Bay 2 of the Orbiter Processing Facility at the Kennedy Space Center in Florida. Endeavour will be moved to the Vehicle Assembly Building to under... More

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility-2 at NASA's Kennedy Space Center in Florida, the flight deck of space shuttle Endeavour is illuminated during Space Shuttle Program transition and retirement activities.    Endeavour is being prepared for public display at the California Science Center in Los Angeles. Over the course of its 19-year career, Endeavour spent 299 days in space during 25 missions. For more information, visit http://www.nasa.gov/shuttle.  Photo credit: NASA/Dimitri Gerondidakis KSC-2012-1969

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility-2 at NASA's Kenn...

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility-2 at NASA's Kennedy Space Center in Florida, the flight deck of space shuttle Endeavour is illuminated during Space Shuttle Program transition and retiremen... More

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-1 at NASA's Kennedy Space Center in Florida, workers are disconnecting and dismantling components on shuttle Endeavour. Seen here is the spacecraft's docking port in the payload bay.    The work is part of Endeavour's transition and retirement processing. The spacecraft is being prepared for public display at the California Science Center in Los Angeles. Endeavour flew 25 missions, spent 299 days in space, orbited Earth 4,671 times and traveled 122,883,151 miles over the course of its 19-year career. Endeavour's STS-134 and final mission was completed after landing on June 1, 2011. Photo credit: NASA/Kim Shiflett KSC-2011-4918

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-1 at NASA's Ken...

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-1 at NASA's Kennedy Space Center in Florida, workers are disconnecting and dismantling components on shuttle Endeavour. Seen here is the spacecraft's docki... More

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility Bay 2 at NASA’s Kennedy Space Center in Florida, replica shuttle main engines 3 RSME has been installed on the space shuttle Endeavour. The orbiter is surrounded by work platforms allowing access to all areas of the spacecraft.      The work is part of Transition and Retirement of the remaining space shuttles, Endeavour and Atlantis. Endeavour is being prepared for public display at the California Science Center in Los Angeles. Its ferry flight to California is targeted for mid-September. Endeavour was the last space shuttle added to NASA’s orbiter fleet. Over the course of its 19-year career, Endeavour spent 299 days in space during 25 missions. For more information, visit http://www.nasa.gov/transition Photo credit: NASA/ Dimitri Gerondidakis KSC-2012-3784

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility Bay 2 at NASA’s ...

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility Bay 2 at NASA’s Kennedy Space Center in Florida, replica shuttle main engines 3 RSME has been installed on the space shuttle Endeavour. The orbiter is surro... More

CAPE CANAVERAL, Fla. -- Engine No. 2, one of three space shuttle main engines removed from Endeavour in the Orbiter Processing Facility-1, has arrived at the Space Shuttle Main Engine Processing Facility at NASA's Kennedy Space Center in Florida.        The removal is part of Endeavour's transition and retirement processing. Endeavour is being prepared for public display at the California Science Center in Los Angeles. Endeavour flew 25 missions, spent 299 days in space, orbited Earth 4,671 times and traveled 122,883,151 miles over the course of its 19-year career.  Photo credit: NASA/Jim Grossmann KSC-2011-4550

CAPE CANAVERAL, Fla. -- Engine No. 2, one of three space shuttle main ...

CAPE CANAVERAL, Fla. -- Engine No. 2, one of three space shuttle main engines removed from Endeavour in the Orbiter Processing Facility-1, has arrived at the Space Shuttle Main Engine Processing Facility at NAS... More

CAPE CANAVERAL, Fla. – Jeremy Schwarz, left, quality assurance technician, and Mike Williams, right, a thermal protection system technician, both with United Space Alliance, prepare the right wing of space shuttle Endeavour for tile bonding. Endeavour is inside Orbiter Processing Facility-2 at NASA's Kennedy Space Center in Florida.    Ongoing transition and retirement activities are preparing the spacecraft for public display at the California Science Center in Los Angeles. Endeavour flew 25 missions during its 19-year career. Photo credit: NASA/Cory Huston KSC-2012-1938

CAPE CANAVERAL, Fla. – Jeremy Schwarz, left, quality assurance technic...

CAPE CANAVERAL, Fla. – Jeremy Schwarz, left, quality assurance technician, and Mike Williams, right, a thermal protection system technician, both with United Space Alliance, prepare the right wing of space shut... More

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-1 at NASA’s Kennedy Space Center in Florida, the main engines have been removed from shuttle Endeavour and work begins to remove the orbital maneuvering system, or OMS, pods from the spacecraft.   The work is part of Endeavour’s transition and retirement processing. The spacecraft is being prepared for public display at the California Science Center in Los Angeles. Endeavour flew 25 missions, spent 299 days in space, orbited Earth 4,671 times and traveled 122, 883, 151 miles over the course of its 19-year career. Endeavour’s STS-134 and final mission was completed after landing on June 1, 2011. Photo credit: Frank Michaux KSC-2011-6007

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-1 at NASA’s Ken...

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-1 at NASA’s Kennedy Space Center in Florida, the main engines have been removed from shuttle Endeavour and work begins to remove the orbital maneuvering sy... More

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility-1 at NASA’s Kennedy Space Center in Florida, the left orbital maneuvering system, or OMS, pod has been installed onto space shuttle Atlantis. The OMS provided the shuttle with thrust for orbit insertion, rendezvous and deorbit, and could provide up to 1,000 pounds of propellant to the aft reaction control system.    The OMS is housed in two independent pods located on each side of the shuttle’s aft fuselage. Each pod contains one OMS engine and the hardware needed to pressurize, store and distribute the propellants to perform the velocity maneuvers. Atlantis’ OMS pods were removed and sent to White Sands Test Facility in New Mexico to be cleaned of residual toxic propellant. The work is part of the Space Shuttle Program’s transition and retirement processing of the space shuttle fleet. A groundbreaking was held Jan. 18 for Atlantis’ future home, a 65,000-square-foot exhibit hall in Shuttle Plaza at the Kennedy Space Center Visitor Complex. Atlantis is scheduled to roll over to the visitor complex in November in preparation for the exhibit’s grand opening in July 2013. For more information, visit http://www.nasa.gov/transition. Photo credit: NASA/Ben Smegelsky KSC-2012-3348

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility-1 at NASA’s ...

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility-1 at NASA’s Kennedy Space Center in Florida, the left orbital maneuvering system, or OMS, pod has been installed onto space shuttle Atlantis. The OMS pr... More

CAPE CANAVERAL, Fla. – The space shuttle Endeavour backs out of Bay 2 of the Orbiter Processing Facility at the Kennedy Space Center in Florida. Endeavour will be moved to the Vehicle Assembly Building to undergo final preparations for its cross-country ferry flight targeted for mid-September. The work is part of Transition and Retirement of the remaining space shuttles, Endeavour and Atlantis. Endeavour is being prepared for public display at the California Science Center in Los Angeles. Endeavour was the last space shuttle added to NASA’s orbiter fleet. Over the course of its 19-year career, Endeavour spent 299 days in space during 25 missions. For more information, visit http://www.nasa.gov/transition. Photo credit: NASA/Dimitri Gerondidakis KSC-2012-4471

CAPE CANAVERAL, Fla. – The space shuttle Endeavour backs out of Bay 2 ...

CAPE CANAVERAL, Fla. – The space shuttle Endeavour backs out of Bay 2 of the Orbiter Processing Facility at the Kennedy Space Center in Florida. Endeavour will be moved to the Vehicle Assembly Building to under... More

CAPE CANAVERAL, Fla. – The space shuttle Atlantis begins backing out of the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida. Atlantis is switching places with Endeavour which had been in Bay 2 of the Orbiter Processing Facility OPF. In the OPF, Atlantis will undergo final preparations for its transfer to the Kennedy Space Center Visitor Complex targeted for November. The work is part of Transition and Retirement of the remaining space shuttles, Atlantis and Endeavour. Atlantis is being prepared for public display at Kennedy's Visitor Complex. Over the course of its 26-year career, Atlantis spent 293 days in space during 33 missions. For more information, visit http://www.nasa.gov/transition Photo credit: NASA/Kim Shiflett KSC-2012-4499

CAPE CANAVERAL, Fla. – The space shuttle Atlantis begins backing out o...

CAPE CANAVERAL, Fla. – The space shuttle Atlantis begins backing out of the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida. Atlantis is switching places with Endeavour which had been in Bay... More

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians reinstall the food pantry locker in space shuttle Endeavour’s middeck during processing for the shuttle’s retirement.      Endeavour is being prepared for public display at the California Science Center in Los Angeles. Its ferry flight to California is targeted for mid-September. Endeavour, designated OV-105, was the last space shuttle added to NASA’s orbiter fleet. Over the course of its 19-year career, Endeavour spent 299 days in space during 25 missions. For more information, visit http://www.nasa.gov/transition.  Photo credit: NASA/Dimitri Gerondidakis KSC-2012-3307

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility-2 at NASA’s Kenn...

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians reinstall the food pantry locker in space shuttle Endeavour’s middeck during ... More

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility-1 at NASA's Kennedy Space Center in Florida, an employee guides a replica shuttle main engine (RSME) toward installation on space shuttle Discovery.     This is the first of three replica engines to be installed. The work is part of the Space Shuttle Program’s transition and retirement processing of Discovery. Discovery is being prepared for display at the Smithsonian’s National Air and Space Museum, Steven F. Udvar-Hazy Center in Chantilly, Va. For more information, visit http://www.nasa.gov/shuttle.  Photo credit: NASA/Jim Grossmann KSC-2011-8168

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility-1 at NASA's ...

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility-1 at NASA's Kennedy Space Center in Florida, an employee guides a replica shuttle main engine (RSME) toward installation on space shuttle Discovery. ... More

CAPE CANAVERAL, Fla. – A replica shuttle main engine (RSME) is poised for installation on space shuttle Discovery in Orbiter Processing Facility-1 at NASA’s Kennedy Space Center in Florida.    The RSME is one of three that will be installed on Discovery during Space Shuttle Program transition and retirement activities. The replicas are being built in the Pratt & Whitney Rocketdyne engine shop at Kennedy to replace the shuttle engines which will be placed in storage to support NASA's Space Launch System, under development. Discovery is being prepared for display at the Smithsonian’s National Air and Space Museum Steven F. Udvar-Hazy Center in Chantilly, Va. For more information, visit http://www.nasa.gov/shuttle.  Photo credit: NASA/Jim Grossmann KSC-2011-8188

CAPE CANAVERAL, Fla. – A replica shuttle main engine (RSME) is poised ...

CAPE CANAVERAL, Fla. – A replica shuttle main engine (RSME) is poised for installation on space shuttle Discovery in Orbiter Processing Facility-1 at NASA’s Kennedy Space Center in Florida. The RSME is one o... More

CAPE CANAVERAL, Fla. – At NASA’s Kennedy Space Center in Florida, space shuttle Endeavour is being towed from the Vehicle Assembly Building to Orbiter Processing Facility-2 (OPF-2).    Shuttle Endeavour will remain in OPF-2 so that the orbiter maneuvering system (OMS) pods and forward reaction control system can be installed. Technicians also will offload water and Freon gas from lines located in Endeavour’s midbody. The work is part of Endeavour’s transition and retirement processing. The spacecraft is being prepared for public display at the California Science Center in Los Angeles. Endeavour flew 25 missions, spent 299 days in space, orbited Earth 4,671 times and traveled 122, 883, 151 miles over the course of its 19-year career. Endeavour’s STS-134 and final mission was completed after landing on June 1, 2011. Photo credit: Kim Shiflett KSC-2012-1197

CAPE CANAVERAL, Fla. – At NASA’s Kennedy Space Center in Florida, spac...

CAPE CANAVERAL, Fla. – At NASA’s Kennedy Space Center in Florida, space shuttle Endeavour is being towed from the Vehicle Assembly Building to Orbiter Processing Facility-2 (OPF-2). Shuttle Endeavour will re... More

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-2, or OPF-2, at NASA's Kennedy Space Center in Florida, workers prepare to tow space shuttle Discovery to the Vehicle Assembly Building, or VAB.  Protective plastic covers the nose of Discovery where its forward reaction control system (FRCS) once resided.  Discovery's FRCS was removed and shipped to White Sands Space Harbor in New Mexico for a full cleaning and deservicing before it is returned to Kennedy and reinstalled.    Discovery will be stored inside the VAB for approximately one month while shuttle Atlantis undergoes processing in OPF-2 following its final mission, STS-135. Discovery flew its 39th and final mission, STS-133, in February and March 2011, and currently is being prepared for public display at the Smithsonian's National Air and Space Museum Steven F. Udvar-Hazy Center in Virginia. For more information about Discovery's Transition and Retirement, visit   www.nasa.gov/mission_pages/shuttle/launch/discovery_rss_collection_archive_1.html.  Photo credit: NASA/Jim Grossmann KSC-2011-5525

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-2, or OPF-2, at...

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-2, or OPF-2, at NASA's Kennedy Space Center in Florida, workers prepare to tow space shuttle Discovery to the Vehicle Assembly Building, or VAB. Protectiv... More

CAPE CANAVERAL, Fla. – Inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians prepare the right side tail cone for buildup on space shuttle Endeavour. The tail cone protects space shuttle main engines during ferry flights on top of the Shuttle Carrier Aircraft, or SCA.    The work is part of Transition and Retirement of the remaining space shuttles, Endeavour and Atlantis. Endeavour is being prepared for public display at the California Science Center in Los Angeles. Its ferry flight to California is targeted for mid-September. Endeavour was the last space shuttle added to NASA’s orbiter fleet. Over the course of its 19-year career, Endeavour spent 299 days in space during 25 missions. For more information, visit http://www.nasa.gov/shuttle.  Photo credit: NASA/Kim Shiflett KSC-2012-2833

CAPE CANAVERAL, Fla. – Inside the Vehicle Assembly Building at NASA’s ...

CAPE CANAVERAL, Fla. – Inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians prepare the right side tail cone for buildup on space shuttle Endeavour. ... More

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, technicians monitor the progress as a large crane lifts and moves the forward reaction control system (FRCS) for installation on space shuttle Endeavour.     The work is part of the Space Shuttle Program transition and retirement processing of Endeavour. The FRCS helped maneuver a shuttle while it was in orbit. The FRCS was removed from Endeavour and sent to White Sands Test Facility in N.M. to be cleaned of its toxic propellants. Endeavour is being prepared for display at the California Science Center in Los Angeles.  Photo credit: NASA/Dimitri Gerondidakis KSC-2012-1274

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility-2 at NASA’s Kenn...

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, technicians monitor the progress as a large crane lifts and moves the forward reaction control system (FRCS) fo... More

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility Bay 2 at NASA’s Kennedy Space Center in Florida, the space shuttle Endeavour's hatch has been locked and sealed in final preparation for its cross-country ferry flight to California.      The work is part of Transition and Retirement of the remaining space shuttles, Endeavour and Atlantis. Endeavour is being prepared for public display at the California Science Center in Los Angeles. Its ferry flight to California is targeted for mid-September. Endeavour was the last space shuttle added to NASA’s orbiter fleet. Over the course of its 19-year career, Endeavour spent 299 days in space during 25 missions. For more information, visit http://www.nasa.gov/transition Photo credit: NASA/ Jim Grossmann KSC-2012-4398

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility Bay 2 at NASA’s ...

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility Bay 2 at NASA’s Kennedy Space Center in Florida, the space shuttle Endeavour's hatch has been locked and sealed in final preparation for its cross-country f... More

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-1 at NASA's Kennedy Space Center in Florida, technicians carefully remove engine No. 2, one of three space shuttle main engines from Endeavour, using a specially designed engine installer, called a Hyster forklift.      The removal is part of Endeavour's transition and retirement processing. Endeavour is being prepared for public display at the California Science Center in Los Angeles. Endeavour flew 25 missions, spent 299 days in space, orbited Earth 4,671 times and traveled 122,883,151 miles over the course of its 19-year career.  Photo credit: NASA/Jim Grossmann KSC-2011-4539

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-1 at NASA's Ken...

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-1 at NASA's Kennedy Space Center in Florida, technicians carefully remove engine No. 2, one of three space shuttle main engines from Endeavour, using a spe... More

CAPE CANAVERAL, Fla. -- The tail cone for space shuttle Discovery’s three replica shuttle main engines (RSMEs) is being transported from the Vehicle Assembly Building to Orbiter Processing Facility-1 at NASA’s Kennedy Space Center in Florida. The tail cone will be installed around Discovery’s RSMEs for protection.    The work is part of the Space Shuttle Program’s transition and retirement processing of shuttle Discovery. Discovery is being prepared for display at the Smithsonian’s National Air and Space Museum, Steven F. Udvar-Hazy Center in Chantilly, Va. For more information, visit http://www.nasa.gov/shuttle.  Photo credit: NASA/Jim Grossmann KSC-2012-1028

CAPE CANAVERAL, Fla. -- The tail cone for space shuttle Discovery’s th...

CAPE CANAVERAL, Fla. -- The tail cone for space shuttle Discovery’s three replica shuttle main engines (RSMEs) is being transported from the Vehicle Assembly Building to Orbiter Processing Facility-1 at NASA’s ... More

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians have removed the auxiliary power units from space shuttle Endeavour and are inspecting them and preparing them for transport.      The work is part of Endeavour’s transition and retirement processing. The spacecraft is being prepared for public display at the California Science Center in Los Angeles. Endeavour flew 25 missions, spent 299 days in space, orbited Earth 4,671 times and traveled 122, 883, 151 miles over the course of its 19-year career. For more information, visit http://www.nasa.gov/shuttle. Photo credit: NASA/Dimitri Gerondidakis KSC-2012-1894

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-2 at NASA’s Ken...

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians have removed the auxiliary power units from space shuttle Endeavour and are ... More

CAPE CANAVERAL, Fla. - Working at the main landing gear, a technician supports weight and center-of-gravity checks of space shuttle Atlantis in Orbiter Processing Facility Bay 1 at NASA’s Kennedy Space Center in Florida.    The work is part of the Space Shuttle Program’s transition and retirement processing of the shuttle fleet. A groundbreaking was held Jan. 18, 2012, for Atlantis' future home, a 65,000-square-foot exhibit hall in Shuttle Plaza at the Kennedy Space Center Visitor Complex. Atlantis is scheduled to roll over to the visitor complex during November in preparation for the exhibit's grand opening in July 2013. For more information, visit http://www.nasa.gov/transition. Photo credit: NASA/Kim Shiflett KSC-2012-3559

CAPE CANAVERAL, Fla. - Working at the main landing gear, a technician ...

CAPE CANAVERAL, Fla. - Working at the main landing gear, a technician supports weight and center-of-gravity checks of space shuttle Atlantis in Orbiter Processing Facility Bay 1 at NASA’s Kennedy Space Center i... More

CAPE CANAVERAL, Fla. -- Inside Orbiter Processing Facility-1 at NASA’s Kennedy Space Center in Florida, a technician monitors the progress as the tail cone is installed around space shuttle Discovery’s three replica shuttle main engines for protection.    The work is part of the Space Shuttle Program’s transition and retirement processing of shuttle Discovery. Discovery is being prepared for display at the Smithsonian’s National Air and Space Museum, Steven F. Udvar-Hazy Center in Chantilly, Va. For more information, visit http://www.nasa.gov/shuttle.  Photo credit: NASA/Jim Grossmann KSC-2012-1035

CAPE CANAVERAL, Fla. -- Inside Orbiter Processing Facility-1 at NASA’s...

CAPE CANAVERAL, Fla. -- Inside Orbiter Processing Facility-1 at NASA’s Kennedy Space Center in Florida, a technician monitors the progress as the tail cone is installed around space shuttle Discovery’s three re... More

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-1 at NASA's Kennedy Space Center in Florida, technicians remove engine No. 1, one of three space shuttle main engines from shuttle Endeavour using a specially designed engine installer, called a Hyster forklift.          The work is part of Endeavour's transition and retirement processing. The spacecraft is being prepared for public display at the California Science Center in Los Angeles. Endeavour flew 25 missions, spent 299 days in space, orbited Earth 4,671 times and traveled 122,883,151 miles over the course of its 19-year career. Endeavour's STS-134 and final mission was completed after landing on June 1, 2011. Photo credit: NASA/Chris Chamberland KSC-2011-4695

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-1 at NASA's Ken...

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-1 at NASA's Kennedy Space Center in Florida, technicians remove engine No. 1, one of three space shuttle main engines from shuttle Endeavour using a specia... More

CAPE CANAVERAL, Fla. – At NASA’s Kennedy Space Center in Florida, space shuttle Discovery has been completely backed out of Orbiter Processing Facility-1 in preparation for its move to the Vehicle Assembly Building VAB. The aft view of Discovery reveals the tail cone that covers the three replica shuttle main engines.     The work is part of the Space Shuttle Program’s transition and retirement processing of shuttle Discovery, which is being prepared for display at Smithsonian’s National Air and Space Museum, Steven F. Udvar-Hazy Center in Chantilly, Va. Discovery will remain in high bay 4 of the VAB until its scheduled transport atop a NASA Shuttle Carrier Aircraft modified 747 jet to Dulles International Airport in Virginia on April 17. Discovery will then be transported to the Smithsonian on April 19. For more information, visit http://www.nasa.gov/shuttle.  Photo credit: NASA/Jim Grossmann KSC-2012-1705

CAPE CANAVERAL, Fla. – At NASA’s Kennedy Space Center in Florida, spac...

CAPE CANAVERAL, Fla. – At NASA’s Kennedy Space Center in Florida, space shuttle Discovery has been completely backed out of Orbiter Processing Facility-1 in preparation for its move to the Vehicle Assembly Buil... More

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility Bay 2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians lift a heat shield for installation around one of space shuttle Endeavour’s replica shuttle main engines.      The work is part of Transition and Retirement of the remaining space shuttles, Endeavour and Atlantis. Endeavour is being prepared for public display at the California Science Center in Los Angeles. Its ferry flight to California is targeted for mid-September. Endeavour was the last space shuttle added to NASA’s orbiter fleet. Over the course of its 19-year career, Endeavour spent 299 days in space during 25 missions. For more information, visit http://www.nasa.gov/transition Photo credit: NASA/ Frankie Martin KSC-2012-3967

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility Bay 2 at NASA’s ...

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility Bay 2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians lift a heat shield for installation around one of space shuttle Endeavour... More

CAPE CANAVERAL, Fla. – A technician controls a special crane as it lifts a newly removed fuel cell from space shuttle Endeavour's payload bay. The operation took place inside Orbiter Processing Facility-2 at NASA's Kennedy Space Center in Florida.    All three of Endeavour's fuel cells were removed and will be drained of fluids. The hydrogen and oxygen dewars which feed reactants to the fuel cells remain in Endeavour's midbody and will be purged with inert gases and vented down. The work is part of the Space Shuttle Program's transition and retirement processing of shuttle Endeavour, which is being prepared for public display at the California Science Center in Los Angeles. Its ferry flight to California is targeted for mid-September. Endeavour was the last space shuttle added to NASA's orbiter fleet. Over the course of its 19-year career, Endeavour spent 299 days in space during 25 missions. For more information, visit http://www.nasa.gov/shuttle. Photo credit: NASA/Glenn Benson KSC-2012-3109

CAPE CANAVERAL, Fla. – A technician controls a special crane as it lif...

CAPE CANAVERAL, Fla. – A technician controls a special crane as it lifts a newly removed fuel cell from space shuttle Endeavour's payload bay. The operation took place inside Orbiter Processing Facility-2 at NA... More

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, a technician assists as a special crane lifts one of the three fuel cells away from space shuttle Atlantis’ payload bay.    The fuel cells will be drained of all fluids. The hydrogen and oxygen dewars which feed reactants to the fuel cells remain in Atlantis’ mid-body and will be purged with inert gases and vented down. The work is part of the Space Shuttle Program’s transition and retirement processing of shuttle Atlantis. The orbiter is being prepared for display at the Kennedy Space Center Visitor Complex.  Photo credit: NASA/Kim Shiflett KSC-2011-8279

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility-2 at NASA’s ...

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, a technician assists as a special crane lifts one of the three fuel cells away from space shuttle Atlantis’... More

CAPE CANAVERAL, Fla. - Working at the main landing gear, technicians complete weight and center-of-gravity checks of space shuttle Atlantis in Orbiter Processing Facility Bay 1 at NASA’s Kennedy Space Center in Florida.    The work is part of the Space Shuttle Program’s transition and retirement processing of the shuttle fleet. A groundbreaking was held Jan. 18, 2012, for Atlantis' future home, a 65,000-square-foot exhibit hall in Shuttle Plaza at the Kennedy Space Center Visitor Complex. Atlantis is scheduled to roll over to the visitor complex during November in preparation for the exhibit's grand opening in July 2013. For more information, visit http://www.nasa.gov/transition. Photo credit: NASA/Kim Shiflett KSC-2012-3557

CAPE CANAVERAL, Fla. - Working at the main landing gear, technicians c...

CAPE CANAVERAL, Fla. - Working at the main landing gear, technicians complete weight and center-of-gravity checks of space shuttle Atlantis in Orbiter Processing Facility Bay 1 at NASA’s Kennedy Space Center in... More

CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, United Space Alliance technicians prepare a mock air lock for installation in the payload bay of the space shuttle Atlantis in Bay 2 of the Orbiter Processing Facility. Atlantis is undergoing final preparations for its transfer to the Kennedy Space Center Visitor Complex targeted for November.      The work is part of Transition and Retirement of the remaining space shuttles, Atlantis and Endeavour. Atlantis is being prepared for public display at Kennedy's Visitor Complex. Over the course of its 26-year career, Atlantis spent 293 days in space during 33 missions. For more information, visit http://www.nasa.gov/transition Photo credit: NASA/Jim Grossmann KSC-2012-4817

CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, Unit...

CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, United Space Alliance technicians prepare a mock air lock for installation in the payload bay of the space shuttle Atlantis in Bay 2 of the Orbi... More

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians monitor the progress as a large crane is lowered toward the right orbital maneuvering system OMS pod that will be installed on space shuttle Endeavour.      The OMS pod underwent complete deservicing and cleaning at White Sands Space Harbor in New Mexico, part of the transition and retirement processing of each shuttle. Endeavour is being prepared for public display at the California Science Center in Los Angeles. Over the course of its 19-year career, Endeavour spent 299 days in space during 25 missions. For more information, visit http://www.nasa.gov/shuttle.  Photo credit: NASA/Kim Shiflett KSC-2012-1900

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility-2 at NASA’s Kenn...

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians monitor the progress as a large crane is lowered toward the right orbital man... More

CAPE CANAVERAL, Fla. - Looking along the underbelly toward the main landing gear of the space shuttle Atlantis, technicians monitor weight and center-of-gravity checks in Orbiter Processing Facility Bay 1 at NASA’s Kennedy Space Center in Florida.    The work is part of the Space Shuttle Program’s transition and retirement processing of the shuttle fleet. A groundbreaking was held Jan. 18, 2012, for Atlantis' future home, a 65,000-square-foot exhibit hall in Shuttle Plaza at the Kennedy Space Center Visitor Complex. Atlantis is scheduled to roll over to the visitor complex during November in preparation for the exhibit's grand opening in July 2013. For more information, visit http://www.nasa.gov/transition. Photo credit: NASA/Kim Shiflett KSC-2012-3555

CAPE CANAVERAL, Fla. - Looking along the underbelly toward the main la...

CAPE CANAVERAL, Fla. - Looking along the underbelly toward the main landing gear of the space shuttle Atlantis, technicians monitor weight and center-of-gravity checks in Orbiter Processing Facility Bay 1 at NA... More

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility-1 at NASA’s Kennedy Space Center in Florida, technicians sitting on the Hyster forklift monitor the progress as they guide replica shuttle main engine RSME number 1 toward space shuttle Atlantis. Three RSMEs will be installed on Atlantis.     The work is part of the Space Shuttle Program’s transition and retirement processing of the space shuttle fleet. A groundbreaking was held Jan. 18 for Atlantis’ future home, a 65,000-square-foot exhibit hall in Shuttle Plaza at the Kennedy Space Center Visitor Complex. Atlantis is scheduled to roll over to the visitor complex in November in preparation for the exhibit’s grand opening in July 2013. For more information, visit http://www.nasa.gov/transition. Photo credit: NASA/Jim Grossmann KSC-2012-3458

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility-1 at NASA’s Kenn...

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility-1 at NASA’s Kennedy Space Center in Florida, technicians sitting on the Hyster forklift monitor the progress as they guide replica shuttle main engine RSME ... More

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility Bay 2 at NASA’s Kennedy Space Center in Florida, simulated thrusters are being painted on the space shuttle Endeavour.    The work is part of Transition and Retirement of the remaining space shuttles, Endeavour and Atlantis. Endeavour is being prepared for public display at the California Science Center in Los Angeles. Its ferry flight to California is targeted for mid-September. Endeavour was the last space shuttle added to NASA’s orbiter fleet. Over the course of its 19-year career, Endeavour spent 299 days in space during 25 missions. For more information, visit http://www.nasa.gov/transition Photo credit: NASA/Jim Grossmann KSC-2012-3547

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility Bay 2 at NASA’s ...

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility Bay 2 at NASA’s Kennedy Space Center in Florida, simulated thrusters are being painted on the space shuttle Endeavour. The work is part of Transition and... More

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, space shuttle Discovery backs out of its processing bay, Orbiter Processing Facility-2, or OPF-2, to begin the move to the Vehicle Assembly Building, or VAB.    Discovery will be stored inside the VAB for approximately one month while shuttle Atlantis undergoes processing in OPF-2 following its final mission, STS-135. Discovery flew its 39th and final mission, STS-133, in February and March 2011, and currently is being prepared for public display at the Smithsonian's National Air and Space Museum Steven F. Udvar-Hazy Center in Virginia. For more information about Discovery's Transition and Retirement, visit   www.nasa.gov/mission_pages/shuttle/launch/discovery_rss_collection_archive_1.html.  Photo credit: NASA/Jim Grossmann KSC-2011-5527

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, spa...

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, space shuttle Discovery backs out of its processing bay, Orbiter Processing Facility-2, or OPF-2, to begin the move to the Vehicle Assembly Bui... More

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, space shuttle Discovery -- its nose encased in protective plastic, its cockpit windows covered, and strongbacks attached to its payload bay doors -- awaits entry into the Vehicle Assembly Building, or VAB, after rolling from Orbiter Processing Facility-2, or OPF-2.    Discovery will be stored inside the VAB for approximately one month while shuttle Atlantis undergoes processing in OPF-2 following its final mission, STS-135. Discovery flew its 39th and final mission, STS-133, in February and March 2011, and currently is being prepared for public display at the Smithsonian's National Air and Space Museum Steven F. Udvar-Hazy Center in Virginia. For more information about Discovery's Transition and Retirement, visit   www.nasa.gov/mission_pages/shuttle/launch/discovery_rss_collection_archive_1.html.  Photo credit: NASA/Frankie Martin KSC-2011-5550

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, spa...

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, space shuttle Discovery -- its nose encased in protective plastic, its cockpit windows covered, and strongbacks attached to its payload bay doo... More

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility Bay 2 at NASA’s Kennedy Space Center in Florida, United Space Alliance senior aerospace technician Bobby Wright prepares two launch and entry seats to be moved from the space shuttle Endeavour's mid-deck to the flight deck. The orbiter is undergoing final preparations for its cross-country ferry flight to California. The work is part of Transition and Retirement of the remaining space shuttles, Endeavour and Atlantis. Endeavour is being prepared for public display at the California Science Center in Los Angeles. Its ferry flight to California is targeted for mid-September. Endeavour was the last space shuttle added to NASA’s orbiter fleet. Over the course of its 19-year career, Endeavour spent 299 days in space during 25 missions. For more information, visit http://www.nasa.gov/transition Photo credit: NASA/ Jim Grossmann KSC-2012-4347

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility Bay 2 at NASA’s ...

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility Bay 2 at NASA’s Kennedy Space Center in Florida, United Space Alliance senior aerospace technician Bobby Wright prepares two launch and entry seats to be mo... More

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility-1 at NASA’s Kennedy Space Center in Florida, space shuttle Discovery is being readied for its move to the Vehicle Assembly Building VAB. The aft view of Discovery reveals the tail cone that covers the three replica shuttle main engines.    The work is part of the Space Shuttle Program’s transition and retirement processing of shuttle Discovery, which is being prepared for display at Smithsonian’s National Air and Space Museum, Steven F. Udvar-Hazy Center in Chantilly, Va. Discovery will remain in high bay 4 of the VAB until its scheduled transport atop a NASA Shuttle Carrier Aircraft modified 747 jet to Dulles International Airport in Virginia on April 17. Discovery will then be transported to the Smithsonian on April 19. For more information, visit http://www.nasa.gov/shuttle.  Photo credit: NASA/Jim Grossmann KSC-2012-1698

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility-1 at NASA’s ...

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility-1 at NASA’s Kennedy Space Center in Florida, space shuttle Discovery is being readied for its move to the Vehicle Assembly Building VAB. The aft view of... More

CAPE CANAVERAL, Fla. -- Inside Orbiter Processing Facility-1 at NASA’s Kennedy Space Center in Florida, technicians ready the forward reaction control system (FRCS) for installation on space shuttle Discovery.    The FRCS was returned from White Sands Space Harbor in New Mexico where it underwent a complete deservicing and cleaning. The work is part of the Space Shuttle Program’s transition and retirement processing of shuttle Discovery. Discovery is being prepared for display at Smithsonian’s National Air and Space Museum, Steven F. Udvar-Hazy Center in Chantilly, Va. For more information, visit http://www.nasa.gov/shuttle.  Photo credit: NASA/Jim Grossmann KSC-2011-7672

CAPE CANAVERAL, Fla. -- Inside Orbiter Processing Facility-1 at NASA’s...

CAPE CANAVERAL, Fla. -- Inside Orbiter Processing Facility-1 at NASA’s Kennedy Space Center in Florida, technicians ready the forward reaction control system (FRCS) for installation on space shuttle Discovery. ... More

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility-1 at NASA’s Kennedy Space Center in Florida,  United Space Alliance technicians monitor the progress as a large crane lifts the right orbital maneuvering system, or OMS, pod for installation on space shuttle Atlantis. It is the last time an OMS pod will be installed on Atlantis. The OMS provided the shuttle with thrust for orbit insertion, rendezvous and deorbit, and could provide up to 1,000 pounds of propellant to the aft reaction control system.    The OMS is housed in two independent pods located on each side of the shuttle’s aft fuselage. Each pod contains one OMS engine and the hardware needed to pressurize, store and distribute the propellants to perform the velocity maneuvers. Atlantis’ OMS pods were removed and sent to the test facility at White Sands Space Harbor in New Mexico to be cleaned of residual toxic propellant. The work is part of the Space Shuttle Program’s transition and retirement processing of the space shuttle fleet. A groundbreaking was held Jan. 18 for Atlantis’ future home, a 65,000-square-foot exhibit hall in Shuttle Plaza at the Kennedy Space Center Visitor Complex. Atlantis is scheduled to roll over to the visitor complex in November in preparation for the exhibit’s grand opening in July 2013. For more information, visit http://www.nasa.gov/transition. Photo credit: NASA/Dimitri Gerondidakis KSC-2012-3406

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility-1 at NASA’s ...

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility-1 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians monitor the progress as a large crane lifts the right orbital maneuverin... More

CAPE CANAVERAL, Fla. -- Inside Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, technicians remove the top emergency escape window from space shuttle Atlantis.     The window is being removed in order to gain access to remove hazardous pyrotechnics from the shuttle. The window will be shipped to Johnson Space Center in Houston for inspections and a replacement outer pane will be installed in its place. The work is part of the Space Shuttle Program’s transition and retirement processing of shuttle Atlantis. The shuttle is being prepared for display at the Kennedy Space Center Visitor Complex in Florida.  Photo credit: NASA/Kim Shiflett KSC-2012-1003

CAPE CANAVERAL, Fla. -- Inside Orbiter Processing Facility-2 at NASA’s...

CAPE CANAVERAL, Fla. -- Inside Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, technicians remove the top emergency escape window from space shuttle Atlantis. The window is being re... More

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility-1 at NASA’s Kennedy Space Center in Florida, a long-angle view reveals the underside of space shuttle Discovery where the ferry flight doors are being installed.     The work is part of the Space Shuttle Program’s transition and retirement processing of shuttle Discovery, which is being prepared for display at Smithsonian’s National Air and Space Museum, Steven F. Udvar-Hazy Center in Chantilly, Va. Discovery is scheduled to be transported atop a NASA Shuttle Carrier Aircraft modified 747 jet to Dulles International Airport in Virginia on April 17 and then moved to the Smithsonian for permanent public display on April 19. For more information, visit http://www.nasa.gov/shuttle.  Photo credit: NASA/Jim Grossmann KSC-2012-1651

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility-1 at NASA’s ...

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility-1 at NASA’s Kennedy Space Center in Florida, a long-angle view reveals the underside of space shuttle Discovery where the ferry flight doors are being i... More

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility-2 at NASA's Kennedy Space Center in Florida, United Space Alliance senior aerospace technician and spacecraft operator Charles J. Beason toggles the switches on space shuttle Endeavour’s flight deck during Space Shuttle Program transition and retirement activities.     Endeavour is being prepared for public display at the California Science Center in Los Angeles. Over the course of its 19-year career, Endeavour spent 299 days in space during 25 missions. For more information, visit http://www.nasa.gov/shuttle.  Photo credit: NASA/Dimitri Gerondidakis KSC-2012-1971

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility-2 at NASA's Kenn...

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility-2 at NASA's Kennedy Space Center in Florida, United Space Alliance senior aerospace technician and spacecraft operator Charles J. Beason toggles the switche... More

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility-1 at NASA’s Kennedy Space Center in Florida, United Launch Alliance technicians provide assistance as a large crane is lowered toward the right orbital maneuvering system, or OMS, pod for space shuttle Atlantis. It will be the last time an OMS pod is installed on Atlantis. The OMS provided the shuttle with thrust for orbit insertion, rendezvous and deorbit, and could provide up to 1,000 pounds of propellant to the aft reaction control system.    The OMS is housed in two independent pods located on each side of the shuttle’s aft fuselage. Each pod contains one OMS engine and the hardware needed to pressurize, store and distribute the propellants to perform the velocity maneuvers. Atlantis’ OMS pods were removed and sent to the test facility at White Sands Space Harbor in New Mexico to be cleaned of residual toxic propellant. The work is part of the Space Shuttle Program’s transition and retirement processing of the space shuttle fleet. A groundbreaking was held Jan. 18 for Atlantis’ future home, a 65,000-square-foot exhibit hall in Shuttle Plaza at the Kennedy Space Center Visitor Complex. Atlantis is scheduled to roll over to the visitor complex in November in preparation for the exhibit’s grand opening in July 2013. For more information, visit http://www.nasa.gov/transition. Photo credit: NASA/Dimitri Gerondidakis KSC-2012-3400

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility-1 at NASA’s ...

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility-1 at NASA’s Kennedy Space Center in Florida, United Launch Alliance technicians provide assistance as a large crane is lowered toward the right orbital ... More

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, space shuttle Discovery rolls along the towway from Orbiter Processing Facility-2, or OPF-2, to the Vehicle Assembly Building, or VAB.  Railings, called strongbacks, are installed along Discovery's payload bay doors to assist with opening and closing of the doors when the shuttle's hydraulic system is not operational and support the doors while they are open.    Discovery will be stored inside the VAB for approximately one month while shuttle Atlantis undergoes processing in OPF-2 following its final mission, STS-135. Discovery flew its 39th and final mission, STS-133, in February and March 2011, and currently is being prepared for public display at the Smithsonian's National Air and Space Museum Steven F. Udvar-Hazy Center in Virginia. For more information about Discovery's Transition and Retirement, visit   www.nasa.gov/mission_pages/shuttle/launch/discovery_rss_collection_archive_1.html.  Photo credit: NASA/Frankie Martin KSC-2011-5540

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, spa...

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, space shuttle Discovery rolls along the towway from Orbiter Processing Facility-2, or OPF-2, to the Vehicle Assembly Building, or VAB. Railing... More

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, a large crane lowers the left orbital maneuvering system OMS pod on to space shuttle Endeavour so that United Space Alliance technicians can complete the installation.     The OMS pod underwent complete deservicing and cleaning at White Sands Space Harbor in New Mexico, part of the transition and retirement processing of each shuttle. Endeavour is being prepared for public display at the California Science Center in Los Angeles. Over the course of its 19-year career, Endeavour spent 299 days in space during 25 missions. For more information, visit http://www.nasa.gov/shuttle.  Photo credit: NASA/Dimitri Gerondidakis KSC-2012-1873

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-2 at NASA’s Ken...

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, a large crane lowers the left orbital maneuvering system OMS pod on to space shuttle Endeavour so that United ... More

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility-1 at NASA’s Kennedy Space Center in Florida, technicians install a ferry flight door on space shuttle Discovery.    The work is part of the Space Shuttle Program’s transition and retirement processing of shuttle Discovery, which is being prepared for display at Smithsonian’s National Air and Space Museum, Steven F. Udvar-Hazy Center in Chantilly, Va. Discovery is scheduled to be transported atop a NASA Shuttle Carrier Aircraft modified 747 jet to Dulles International Airport in Virginia on April 17 and then moved to the Smithsonian for permanent public display on April 19. For more information, visit http://www.nasa.gov/shuttle.  Photo credit: NASA/Jim Grossmann KSC-2012-1654

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility-1 at NASA’s ...

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility-1 at NASA’s Kennedy Space Center in Florida, technicians install a ferry flight door on space shuttle Discovery. The work is part of the Space Shuttl... More

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility-1 at NASA’s Kennedy Space Center in Florida, technicians monitor the progress as a large crane lifts a dome heat shield that will be installed around one of space shuttle Discovery’s three replica shuttle main engines.    The dome heat shields are composed of two, semi-circle-shaped sections of thermal protection system tiles that surround the engines. The work is part of the Space Shuttle Program’s transition and retirement processing of shuttle Discovery. Discovery is being prepared for display at the Smithsonian’s National Air and Space Museum, Steven F. Udvar-Hazy Center in Chantilly, Va. For more information, visit http://www.nasa.gov/shuttle.  Photo credit: NASA/Kim Shiflett KSC-2011-8305

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility-1 at NASA’s ...

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility-1 at NASA’s Kennedy Space Center in Florida, technicians monitor the progress as a large crane lifts a dome heat shield that will be installed around on... More

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility-1 at NASA’s Kennedy Space Center in Florida, technicians complete the work to install the ferry flight doors on space shuttle Discovery.    The work is part of the Space Shuttle Program’s transition and retirement processing of shuttle Discovery, which is being prepared for display at Smithsonian’s National Air and Space Museum, Steven F. Udvar-Hazy Center in Chantilly, Va. Discovery is scheduled to be transported atop a NASA Shuttle Carrier Aircraft modified 747 jet to Dulles International Airport in Virginia on April 17 and then moved to the Smithsonian for permanent public display on April 19. For more information, visit http://www.nasa.gov/shuttle.  Photo credit: NASA/Jim Grossmann KSC-2012-1655

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility-1 at NASA’s ...

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility-1 at NASA’s Kennedy Space Center in Florida, technicians complete the work to install the ferry flight doors on space shuttle Discovery. The work is ... More

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility Bay 2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians prepare a heat shield for installation around space shuttle Endeavour’s replica shuttle main engines.      The work is part of Transition and Retirement of the remaining space shuttles, Endeavour and Atlantis. Endeavour is being prepared for public display at the California Science Center in Los Angeles. Its ferry flight to California is targeted for mid-September. Endeavour was the last space shuttle added to NASA’s orbiter fleet. Over the course of its 19-year career, Endeavour spent 299 days in space during 25 missions. For more information, visit http://www.nasa.gov/transition Photo credit: NASA/ Jim Grossmann KSC-2012-3971

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility Bay 2 at NASA’s ...

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility Bay 2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians prepare a heat shield for installation around space shuttle Endeavour’s r... More

CAPE CANAVERAL, Fla. -  In Orbiter Processing Facility bay 3 at NASA's Kennedy Space Center in Florida, boundary layer transition, or BLT, tile is being affixed to space shuttle Discovery before its launch on the STS-119 mission in February 2009.  The specially modified tiles and instrumentation package will monitor the heating effects of early re-entry boundary layer transition at high mach numbers.  These data support analytical modeling and design efforts for both the space shuttles and NASA next-generation spacecraft, the Orion crew exploration vehicle. On the STS-119 mission, Discovery also will carry the S6 truss segment to complete the 361-foot-long backbone of the International Space Station. The truss includes the fourth pair of solar array wings and electronics that convert sunlight to power for the orbiting laboratory.  Photo credit: NASA/Tim Jacobs KSC-08pd3288

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility bay 3 at NASA's...

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility bay 3 at NASA's Kennedy Space Center in Florida, boundary layer transition, or BLT, tile is being affixed to space shuttle Discovery before its launch on t... More

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility-1 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians prepare to install window No. 4 on space shuttle Atlantis.     The work is part of the Space Shuttle Program’s transition and retirement processing of space shuttles Atlantis and Endeavour. Atlantis is being prepared for display at the Kennedy Space Center Visitor Complex and is scheduled to roll over to the complex in November. The visitor complex is targeting a July 2013 grand opening for Atlantis’ new home. Photo credit: NASA/Jim Grossmann KSC-2012-2682

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility-1 at NASA’s ...

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility-1 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians prepare to install window No. 4 on space shuttle Atlantis. The work i... More

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility Bay 2 at NASA’s Kennedy Space Center in Florida, Kennedy Space Center Director Bob Cabana, far right, watches as, left to right, United Space Alliance quality inspector Ken Carson, along with technicians Gary Hamilton and Joe Walsh remove protective covers in preparation to close the space shuttle Endeavour's hatch. The orbiter is undergoing final preparations for its cross-country ferry flight to California.      The work is part of Transition and Retirement of the remaining space shuttles, Endeavour and Atlantis. Endeavour is being prepared for public display at the California Science Center in Los Angeles. Its ferry flight to California is targeted for mid-September. Endeavour was the last space shuttle added to NASA’s orbiter fleet. Over the course of its 19-year career, Endeavour spent 299 days in space during 25 missions. For more information, visit http://www.nasa.gov/transition Photo credit: NASA/ Jim Grossmann KSC-2012-4393

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility Bay 2 at NASA’s ...

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility Bay 2 at NASA’s Kennedy Space Center in Florida, Kennedy Space Center Director Bob Cabana, far right, watches as, left to right, United Space Alliance quali... More

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility-1 at NASA’s Kennedy Space Center in Florida,  preparations are underway to install the right orbital maneuvering system, or OMS, pod on space shuttle Atlantis. It will be the last time an OMS pod is installed on Atlantis. The OMS provided the shuttle with thrust for orbit insertion, rendezvous and deorbit, and could provide up to 1,000 pounds of propellant to the aft reaction control system.    The OMS is housed in two independent pods located on each side of the shuttle’s aft fuselage. Each pod contains one OMS engine and the hardware needed to pressurize, store and distribute the propellants to perform the velocity maneuvers. Atlantis’ OMS pods were removed and sent to the test facility at White Sands Space Harbor in New Mexico to be cleaned of residual toxic propellant. The work is part of the Space Shuttle Program’s transition and retirement processing of the space shuttle fleet. A groundbreaking was held Jan. 18 for Atlantis’ future home, a 65,000-square-foot exhibit hall in Shuttle Plaza at the Kennedy Space Center Visitor Complex. Atlantis is scheduled to roll over to the visitor complex in November in preparation for the exhibit’s grand opening in July 2013. For more information, visit http://www.nasa.gov/transition. Photo credit: NASA/Dimitri Gerondidakis KSC-2012-3398

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility-1 at NASA’s ...

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility-1 at NASA’s Kennedy Space Center in Florida, preparations are underway to install the right orbital maneuvering system, or OMS, pod on space shuttle At... More

CAPE CANAVERAL, Fla. – Space shuttle Discovery sports two replica shuttle main engines (RSMEs) in Orbiter Processing Facility-1 at NASA’s Kennedy Space Center in Florida.  Three RSMEs will be installed on Discovery during Space Shuttle Program transition and retirement activities. The replicas are being built in the Pratt & Whitney Rocketdyne engine shop at Kennedy to replace the shuttle engines which will be placed in storage to support NASA's Space Launch System, under development. Discovery is being prepared for display at the Smithsonian’s National Air and Space Museum Steven F. Udvar-Hazy Center in Chantilly, Va. For more information, visit http://www.nasa.gov/shuttle.  Photo credit: NASA/Jim Grossmann KSC-2011-8190

CAPE CANAVERAL, Fla. – Space shuttle Discovery sports two replica shut...

CAPE CANAVERAL, Fla. – Space shuttle Discovery sports two replica shuttle main engines (RSMEs) in Orbiter Processing Facility-1 at NASA’s Kennedy Space Center in Florida. Three RSMEs will be installed on Disco... More

CAPE CANAVERAL, Fla. -- The tail cone for space shuttle Discovery’s three replica shuttle main engines (RSMEs) is being transported to Orbiter processing Facility-1 at NASA’s Kennedy Space Center in Florida. The tail cone will be installed around Discovery’s RSMEs for protection.    The work is part of the Space Shuttle Program’s transition and retirement processing of shuttle Discovery. Discovery is being prepared for display at the Smithsonian’s National Air and Space Museum, Steven F. Udvar-Hazy Center in Chantilly, Va. For more information, visit http://www.nasa.gov/shuttle.  Photo credit: NASA/Jim Grossmann KSC-2012-1029

CAPE CANAVERAL, Fla. -- The tail cone for space shuttle Discovery’s th...

CAPE CANAVERAL, Fla. -- The tail cone for space shuttle Discovery’s three replica shuttle main engines (RSMEs) is being transported to Orbiter processing Facility-1 at NASA’s Kennedy Space Center in Florida. Th... More

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians monitor the progress as space shuttle Endeavour’s payload bay doors begin to close for the final time.    The work is part of Transition and Retirement of the remaining space shuttles, Endeavour and Atlantis. Endeavour is being prepared for public display at the California Science Center in Los Angeles. Its ferry flight to California is targeted for mid-September. Endeavour was the last space shuttle added to NASA’s orbiter fleet. Over the course of its 19-year career, Endeavour spent 299 days in space during 25 missions. For more information, visit http://www.nasa.gov/shuttle.  Photo credit: NASA/Kim Shiflett KSC-2012-3421

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility-2 at NASA’s ...

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians monitor the progress as space shuttle Endeavour’s payload bay doors begin... More

CAPE CANAVERAL, Fla. – At NASA’s Kennedy Space Center in Florida, space shuttle Atlantis foreground is towed in to Orbiter Processing Facility-1 after being towed from the Vehicle Assembly Building VAB. Workers will continue to prepare Atlantis for display at the Kennedy Space Center Visitor Complex. Meanwhile, space shuttle Discovery is on the move from OPF-1 to the Vehicle Assembly Building VAB. The aft view of Discovery reveals the tail cone that covers the three replica shuttle main engines.       The work is part of the Space Shuttle Program’s transition and retirement processing of shuttle Discovery, which is being prepared for display at Smithsonian’s National Air and Space Museum, Steven F. Udvar-Hazy Center in Chantilly, Va. Discovery will remain in high bay 4 of the VAB until its scheduled transport atop a NASA Shuttle Carrier Aircraft modified 747 jet to Dulles International Airport in Virginia on April 17. Discovery will then be transported to the Smithsonian on April 19. For more information, visit http://www.nasa.gov/shuttle.  Photo credit: NASA/Jim Grossmann KSC-2012-1710

CAPE CANAVERAL, Fla. – At NASA’s Kennedy Space Center in Florida, spac...

CAPE CANAVERAL, Fla. – At NASA’s Kennedy Space Center in Florida, space shuttle Atlantis foreground is towed in to Orbiter Processing Facility-1 after being towed from the Vehicle Assembly Building VAB. Workers... More

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility-1 at NASA’s Kennedy Space Center in Florida, technicians prepare to re-install the three fuel cells in space shuttle Discovery’s mid-body.    The fuel cells were removed and drained of all fluids. The hydrogen and oxygen dewars which feed reactants to the fuel cells remain in Discovery’s mid-body and have been purged with inert gases and vented down. The work is part of the Space Shuttle Program’s transition and retirement processing of shuttle Discovery. Discovery is being prepared for display at the Smithsonian’s National Air and Space Museum, Steven F. Udvar-Hazy Center in Chantilly, Va. For more information, visit http://www.nasa.gov/shuttle.  Photo credit: NASA/Dimitri Gerondidakis KSC-2011-8199

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility-1 at NASA’s ...

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility-1 at NASA’s Kennedy Space Center in Florida, technicians prepare to re-install the three fuel cells in space shuttle Discovery’s mid-body. The fuel c... More

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians lift the hatch of space shuttle Endeavour’s airlock for its final closure during processing for the shuttle’s retirement.    Endeavour is being prepared for public display at the California Science Center in Los Angeles. Its ferry flight to California is targeted for mid-September. Endeavour, designated OV-105, was the last space shuttle added to NASA’s orbiter fleet. Over the course of its 19-year career, Endeavour spent 299 days in space during 25 missions. For more information, visit http://www.nasa.gov/transition.  Photo credit: NASA/Dimitri Gerondidakis KSC-2012-3295

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility-2 at NASA’s Kenn...

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians lift the hatch of space shuttle Endeavour’s airlock for its final closure dur... More

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility-1 at NASA’s Kennedy Space Center in Florida, the left orbital maneuvering system, or OMS, pod has been installed onto space shuttle Atlantis. The OMS provided the shuttle with thrust for orbit insertion, rendezvous and deorbit, and could provide up to 1,000 pounds of propellant to the aft reaction control system.    The OMS is housed in two independent pods located on each side of the shuttle’s aft fuselage. Each pod contains one OMS engine and the hardware needed to pressurize, store and distribute the propellants to perform the velocity maneuvers. Atlantis’ OMS pods were removed and sent to White Sands Test Facility in New Mexico to be cleaned of residual toxic propellant. The work is part of the Space Shuttle Program’s transition and retirement processing of the space shuttle fleet. A groundbreaking was held Jan. 18 for Atlantis’ future home, a 65,000-square-foot exhibit hall in Shuttle Plaza at the Kennedy Space Center Visitor Complex. Atlantis is scheduled to roll over to the visitor complex in November in preparation for the exhibit’s grand opening in July 2013. For more information, visit http://www.nasa.gov/transition. Photo credit: NASA/Ben Smegelsky KSC-2012-3351

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility-1 at NASA’s ...

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility-1 at NASA’s Kennedy Space Center in Florida, the left orbital maneuvering system, or OMS, pod has been installed onto space shuttle Atlantis. The OMS pr... More

CAPE CANAVERAL, Fla. – Inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians prepare the right side tail cone for buildup on space shuttle Endeavour. The tail cone protects space shuttle main engines during ferry flights on top of the Shuttle Carrier Aircraft, or SCA.     The work is part of Transition and Retirement of the remaining space shuttles, Endeavour and Atlantis. Endeavour is being prepared for public display at the California Science Center in Los Angeles. Its ferry flight to California is targeted for mid-September. Endeavour was the last space shuttle added to NASA’s orbiter fleet. Over the course of its 19-year career, Endeavour spent 299 days in space during 25 missions. For more information, visit http://www.nasa.gov/shuttle.  Photo credit: NASA/Kim Shiflett KSC-2012-2838

CAPE CANAVERAL, Fla. – Inside the Vehicle Assembly Building at NASA’s ...

CAPE CANAVERAL, Fla. – Inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians prepare the right side tail cone for buildup on space shuttle Endeavour. ... More

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians monitor the progress as a Hyster forklift moves replica shuttle main engine 2, or RSME 2, closer for installation on space shuttle Endeavour. The orbiter is surrounded by work platforms allowing access to all areas of the spacecraft.    The work is part of Transition and Retirement of the remaining space shuttles, Endeavour and Atlantis. Endeavour is being prepared for public display at the California Science Center in Los Angeles. Its ferry flight to California is targeted for mid-September. Endeavour was the last space shuttle added to NASA’s orbiter fleet. Over the course of its 19-year career, Endeavour spent 299 days in space during 25 missions. For more information, visit http://www.nasa.gov/shuttle.  Photo credit: NASA/David Lee KSC-2012-3823

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility-2 at NASA’s ...

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians monitor the progress as a Hyster forklift moves replica shuttle main engi... More

CAPE CANAVERAL, Fla. - Space shuttle Discovery's forward reaction control system (FRCS), which helped steer the shuttle in orbit, is moved to a transporter in Orbiter Processing Facility-2 at NASA's Kennedy Space Center in Florida. To maneuver, the FRCS used hypergolic fuel and oxidizer, which were purged from Discovery after its final spaceflight, STS-133. Next, the FRCS will be shipped to a maintenance facility at White Sands Space Harbor in New Mexico, where additional inspections will be performed and its components made safe to go on public display. The transition and retirement processing is expected to help rocket designers build next-generation spacecraft and prepare the shuttle for display.          Photo credit: NASA/Jim Grossmann KSC-2011-2428

CAPE CANAVERAL, Fla. - Space shuttle Discovery's forward reaction cont...

CAPE CANAVERAL, Fla. - Space shuttle Discovery's forward reaction control system (FRCS), which helped steer the shuttle in orbit, is moved to a transporter in Orbiter Processing Facility-2 at NASA's Kennedy Spa... More

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility Bay 2 at NASA’s Kennedy Space Center in Florida, the tail cone is moved into position for attachment to the space shuttle Endeavour. The tail cone covers the main engines in the aft providing aerodynamic stability during the cross-country ferry flight.      The work is part of Transition and Retirement of the remaining space shuttles, Endeavour and Atlantis. Endeavour is being prepared for public display at the California Science Center in Los Angeles. Its ferry flight to California is targeted for mid-September. Endeavour was the last space shuttle added to NASA’s orbiter fleet. Over the course of its 19-year career, Endeavour spent 299 days in space during 25 missions. For more information, visit http://www.nasa.gov/transition Photo credit: NASA/ Jim Grossmann KSC-2012-4271

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility Bay 2 at NASA’s ...

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility Bay 2 at NASA’s Kennedy Space Center in Florida, the tail cone is moved into position for attachment to the space shuttle Endeavour. The tail cone covers th... More

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility-2 at NASA's Kennedy Space Center in Florida, the camera captures a section of space shuttle Atlantis' flight deck. Preparations are under way for the shuttle's final power down during Space Shuttle Program transition and retirement activities. Atlantis is being prepared for public display in 2013 at the Kennedy Space Center Visitor Complex.  For more information, visit http://www.nasa.gov/shuttle.  Photo credit: NASA/Jim Grossmann KSC-2011-8371

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility-2 at NASA's Kenn...

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility-2 at NASA's Kennedy Space Center in Florida, the camera captures a section of space shuttle Atlantis' flight deck. Preparations are under way for the shuttl... More

CAPE CANAVERAL, Fla. – At NASA’s Kennedy Space Center in Florida, workers monitor the progress as space shuttle Atlantis is towed toward Orbiter Processing Facility-1 after being towed from the Vehicle Assembly Building.       The work is part of the Space Shuttle Program’s transition and retirement processing of the three space shuttles. Atlantis is being prepared for display at the Kennedy Space Center Visitor Complex and is scheduled to rollover to the complex in November. Photo credit: NASA/Tim Jacobs KSC-2012-1735

CAPE CANAVERAL, Fla. – At NASA’s Kennedy Space Center in Florida, work...

CAPE CANAVERAL, Fla. – At NASA’s Kennedy Space Center in Florida, workers monitor the progress as space shuttle Atlantis is towed toward Orbiter Processing Facility-1 after being towed from the Vehicle Assembly... More

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility-2 at NASA's Kennedy Space Center in Florida, a Ku-band antenna is stowed at the forward end of space shuttle Endeavour’s payload bay in preparation for final closure of the shuttle’s payload bay doors.    The antenna, which resembles a mini-satellite dish, was used to transmit audio, video and data between the shuttle and ground stations on Earth.  Endeavour is being prepared for public display at the California Science Center in Los Angeles. Its ferry flight to California is targeted for mid-September. Endeavour was the last space shuttle added to NASA’s orbiter fleet.  Over the course of its 19-year career, Endeavour spent 299 days in space during 25 missions. For more information, visit http://www.nasa.gov/transition. Photo credit: NASA/Cory Huston KSC-2012-2714

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility-2 at NASA's Kenn...

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility-2 at NASA's Kennedy Space Center in Florida, a Ku-band antenna is stowed at the forward end of space shuttle Endeavour’s payload bay in preparation for fina... More

CAPE CANAVERAL, Fla. - Crews in Orbiter Processing Facility-2 at NASA's Kennedy Space Center in Florida remove space shuttle Discovery's right-hand inner heat shield from engine No. 1. The removal is part of Discovery's transition and retirement processing. Work performed on Discovery is expected to help rocket designers build next-generation spacecraft and prepare the shuttle for future public display.Photo credit: NASA/Jack Pfaller KSC-2011-2392

CAPE CANAVERAL, Fla. - Crews in Orbiter Processing Facility-2 at NASA'...

CAPE CANAVERAL, Fla. - Crews in Orbiter Processing Facility-2 at NASA's Kennedy Space Center in Florida remove space shuttle Discovery's right-hand inner heat shield from engine No. 1. The removal is part of Di... More

CAPE CANAVERAL, Fla. -- The tail cone for space shuttle Discovery’s three replica shuttle main engines (RSMEs) arrives at Orbiter Processing Facility-1 at NASA’s Kennedy Space Center in Florida. The tail cone will be installed around Discovery’s RSMEs for protection.    The work is part of the Space Shuttle Program’s transition and retirement processing of shuttle Discovery. Discovery is being prepared for display at the Smithsonian’s National Air and Space Museum, Steven F. Udvar-Hazy Center in Chantilly, Va. For more information, visit http://www.nasa.gov/shuttle.  Photo credit: NASA/Jim Grossmann KSC-2012-1031

CAPE CANAVERAL, Fla. -- The tail cone for space shuttle Discovery’s th...

CAPE CANAVERAL, Fla. -- The tail cone for space shuttle Discovery’s three replica shuttle main engines (RSMEs) arrives at Orbiter Processing Facility-1 at NASA’s Kennedy Space Center in Florida. The tail cone w... More

CAPE CANAVERAL, Fla. – Inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians use a crane to pick up the right side tail cone for buildup on space shuttle Endeavour. The tail cone protects space shuttle main engines during ferry flights on top of the Shuttle Carrier Aircraft, or SCA.     The work is part of Transition and Retirement of the remaining space shuttles, Endeavour and Atlantis. Endeavour is being prepared for public display at the California Science Center in Los Angeles. Its ferry flight to California is targeted for mid-September. Endeavour was the last space shuttle added to NASA’s orbiter fleet. Over the course of its 19-year career, Endeavour spent 299 days in space during 25 missions. For more information, visit http://www.nasa.gov/shuttle.  Photo credit: NASA/Kim Shiflett KSC-2012-2837

CAPE CANAVERAL, Fla. – Inside the Vehicle Assembly Building at NASA’s ...

CAPE CANAVERAL, Fla. – Inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians use a crane to pick up the right side tail cone for buildup on space shut... More

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians prepare a large crane that will lift the right orbital maneuvering system OMS pod for installation on space shuttle Endeavour.     The OMS pod underwent complete deservicing and cleaning at White Sands Space Harbor in New Mexico, part of the transition and retirement processing of each shuttle. Endeavour is being prepared for public display at the California Science Center in Los Angeles. Over the course of its 19-year career, Endeavour spent 299 days in space during 25 missions. For more information, visit http://www.nasa.gov/shuttle.  Photo credit: NASA/Kim Shiflett KSC-2012-1897

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility-2 at NASA’s Kenn...

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians prepare a large crane that will lift the right orbital maneuvering system OMS... More

CAPE CANAVERAL, Fla. -- Outside Orbiter Processing Facility-2, or OPF-2, at NASA's Kennedy Space Center in Florida, media are on hand to cover the move of space shuttle Discovery to the Vehicle Assembly Building, or VAB.    Discovery will be stored inside the VAB for approximately one month while shuttle Atlantis undergoes processing in OPF-2 following its final mission, STS-135. Discovery flew its 39th and final mission, STS-133, in February and March 2011, and currently is being prepared for public display at the Smithsonian's National Air and Space Museum Steven F. Udvar-Hazy Center in Virginia. For more information about Discovery's Transition and Retirement, visit   www.nasa.gov/mission_pages/shuttle/launch/discovery_rss_collection_archive_1.html.  Photo credit: NASA/Ken Thornsley KSC-2011-5571

CAPE CANAVERAL, Fla. -- Outside Orbiter Processing Facility-2, or OPF-...

CAPE CANAVERAL, Fla. -- Outside Orbiter Processing Facility-2, or OPF-2, at NASA's Kennedy Space Center in Florida, media are on hand to cover the move of space shuttle Discovery to the Vehicle Assembly Buildin... More

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility-1 at NASA’s Kennedy Space Center in Florida, operations are under way to remove the fuel line that supplied liquid hydrogen propellant to space shuttle Atlantis’ main engine No. 2.    The liquid hydrogen lines will be placed in storage to preserve the option to reuse them on NASA’s Space Launch System heavy-lift vehicle, under development. The work is part of the Space Shuttle Program’s transition and retirement processing of shuttle Atlantis.  A groundbreaking was held Jan. 18 for Atlantis' future home, a 65,000-square-foot exhibit hall in Shuttle Plaza at the Kennedy Space Center Visitor Complex. Atlantis is scheduled to roll over to the visitor complex in November in preparation for the exhibit’s grand opening in July 2013. For more information, visit http://www.nasa.gov/shuttle.  Photo credit: NASA/Ben Smegelsky KSC-2012-2694

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility-1 at NASA’s Kenn...

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility-1 at NASA’s Kennedy Space Center in Florida, operations are under way to remove the fuel line that supplied liquid hydrogen propellant to space shuttle Atla... More

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility Bay 2 at NASA’s Kennedy Space Center in Florida, a United Space Alliance technician installs an outer heat shield carrier panel on the space shuttle Endeavour.      The work is part of Transition and Retirement of the remaining space shuttles, Endeavour and Atlantis. Endeavour is being prepared for public display at the California Science Center in Los Angeles. Its ferry flight to California is targeted for mid-September. Endeavour was the last space shuttle added to NASA’s orbiter fleet. Over the course of its 19-year career, Endeavour spent 299 days in space during 25 missions. For more information, visit http://www.nasa.gov/transition Photo credit: NASA/ Frankie Martin KSC-2012-4124

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility Bay 2 at NASA’s ...

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility Bay 2 at NASA’s Kennedy Space Center in Florida, a United Space Alliance technician installs an outer heat shield carrier panel on the space shuttle Endeavo... More

CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, United Space Alliance technicians monitor operations as a crane is used to lift a mock air lock being prepared for installation in the payload bay of the space shuttle Atlantis in Bay 2 of the Orbiter Processing Facility. Atlantis is undergoing final preparations for its transfer to the Kennedy Space Center Visitor Complex targeted for November.      The work is part of Transition and Retirement of the remaining space shuttles, Atlantis and Endeavour. Atlantis is being prepared for public display at Kennedy's Visitor Complex. Over the course of its 26-year career, Atlantis spent 293 days in space during 33 missions. For more information, visit http://www.nasa.gov/transition Photo credit: NASA/Jim Grossmann KSC-2012-4821

CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, Unit...

CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, United Space Alliance technicians monitor operations as a crane is used to lift a mock air lock being prepared for installation in the payload b... More

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility Bay 2 at NASA’s Kennedy Space Center in Florida, heat shields are being installed around space shuttle Endeavour’s replica shuttle main engines.      The work is part of Transition and Retirement of the remaining space shuttles, Endeavour and Atlantis. Endeavour is being prepared for public display at the California Science Center in Los Angeles. Its ferry flight to California is targeted for mid-September. Endeavour was the last space shuttle added to NASA’s orbiter fleet. Over the course of its 19-year career, Endeavour spent 299 days in space during 25 missions. For more information, visit http://www.nasa.gov/transition Photo credit: NASA/ Jim Grossmann KSC-2012-3976

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility Bay 2 at NASA’s ...

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility Bay 2 at NASA’s Kennedy Space Center in Florida, heat shields are being installed around space shuttle Endeavour’s replica shuttle main engines. The wo... More

CAPE CANAVERAL, Fla. - Technicians complete the removal of main engine No. 1 from space shuttle Discovery using a specially designed engine installer, called a Hyster forklift. The work is taking place in Orbiter Processing Facility-2 at NASA's Kennedy Space Center in Florida. The removal is part of Discovery's transition and retirement processing. Work performed on Discovery is expected to help rocket designers build next-generation spacecraft and prepare the shuttle for future public display.    Photo credit: NASA/Jack Pfaller KSC-2011-2675

CAPE CANAVERAL, Fla. - Technicians complete the removal of main engine...

CAPE CANAVERAL, Fla. - Technicians complete the removal of main engine No. 1 from space shuttle Discovery using a specially designed engine installer, called a Hyster forklift. The work is taking place in Orbit... More

CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, United Space Alliance technicians install a mock air lock in the payload bay of the space shuttle Atlantis in Bay 2 of the Orbiter Processing Facility. Atlantis is undergoing final preparations for its transfer to the Kennedy Space Center Visitor Complex targeted for November.      The work is part of Transition and Retirement of the remaining space shuttles, Atlantis and Endeavour. Atlantis is being prepared for public display at Kennedy's Visitor Complex. Over the course of its 26-year career, Atlantis spent 293 days in space during 33 missions. For more information, visit http://www.nasa.gov/transition Photo credit: NASA/Jim Grossmann KSC-2012-4825

CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, Unit...

CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, United Space Alliance technicians install a mock air lock in the payload bay of the space shuttle Atlantis in Bay 2 of the Orbiter Processing Fa... More

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility-1 at NASA’s Kennedy Space Center in Florida, an orbital maneuvering system, or OMS, pod is lifted toward space shuttle Atlantis on which it will be installed.      The orbital maneuvering system provided the shuttle with thrust for orbit insertion, rendezvous and deorbit, and could provide up to 1,000 pounds of propellant to the aft reaction control system. The OMS is housed in two independent pods located on each side of the shuttle's aft fuselage. Each pod contains one OMS engine and the hardware needed to pressurize, store and distribute the propellants to perform the velocity maneuvers. Atlantis’ OMS pods were removed and sent to White Sands Test Facility in New Mexico to be cleaned of residual toxic propellant. The work is part of the Space Shuttle Program’s transition and retirement processing of the shuttle fleet.  A groundbreaking was held Jan. 18 for Atlantis' future home, a 65,000-square-foot exhibit hall in Shuttle Plaza at the Kennedy Space Center Visitor Complex. Atlantis is scheduled to roll over to the visitor complex in November in preparation for the exhibit’s grand opening in July 2013. For more information, visit http://www.nasa.gov/transition.  Photo credit: NASA/Kim Shiflett KSC-2012-3334

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility-1 at NASA’s Kenn...

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility-1 at NASA’s Kennedy Space Center in Florida, an orbital maneuvering system, or OMS, pod is lifted toward space shuttle Atlantis on which it will be installe... More

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, a large crane lowers the left orbital maneuvering system OMS pod on to space shuttle Endeavour so that United Space Alliance technicians can complete the installation.     The OMS pod underwent complete deservicing and cleaning at White Sands Space Harbor in New Mexico, part of the transition and retirement processing of each shuttle. Endeavour is being prepared for public display at the California Science Center in Los Angeles. Over the course of its 19-year career, Endeavour spent 299 days in space during 25 missions. For more information, visit http://www.nasa.gov/shuttle.  Photo credit: NASA/Dimitri Gerondidakis KSC-2012-1874

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-2 at NASA’s Ken...

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, a large crane lowers the left orbital maneuvering system OMS pod on to space shuttle Endeavour so that United ... More

Previous

of 12

Next