vab, sts

998 media by topicpage 1 of 10
CAPE CANAVERAL, Fla. - In the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida, external fuel tank, ET-138, for space shuttle Atlantis' STS-135 mission, is positioned between the twin solid rocket boosters on the mobile launcher platform in high bay-1. Shuttle Atlantis' move, or "rollover," from Orbiter Processing Facility-1 to the VAB is targeted for May 10. Once there it will be mated with the external tank and boosters. Atlantis and its crew of four will deliver the Raffaello multipurpose logistics module packed with supplies and spare parts to the International Space Station. STS-135 is targeted to launch June 28, and will be the last spaceflight for the Space Shuttle Program. Photo credit: NASA/Jack Pfaller KSC-2011-3053

CAPE CANAVERAL, Fla. - In the Vehicle Assembly Building (VAB) at NASA'...

CAPE CANAVERAL, Fla. - In the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida, external fuel tank, ET-138, for space shuttle Atlantis' STS-135 mission, is positioned between the twin s... More

KENNEDY SPACE CENTER, FLA. --  After leaving the Orbiter Processing Facility bay 2,  the orbiter Endeavour, atop its transporter, rolls toward the Vehicle Assembly Building.  In the VAB, it will be stacked with the external tank and solid rocket boosters atop the mobile launcher platform for its launch on mission STS-118. The mission will be Endeavour's first flight in more than four years. The shuttle has undergone extensive modifications, including the addition of safety upgrades already added to shuttles Discovery and Atlantis. Endeavour also features new hardware, such as the Station-to-Shuttle Power Transfer System that will allow the docked shuttle to draw electrical power from the station and extend its visits to the orbiting lab.  Endeavour is targeted for launch on Aug. 7.   Photo credit: NASA/Kim Shiflett KSC-07pd1709

KENNEDY SPACE CENTER, FLA. -- After leaving the Orbiter Processing Fa...

KENNEDY SPACE CENTER, FLA. -- After leaving the Orbiter Processing Facility bay 2, the orbiter Endeavour, atop its transporter, rolls toward the Vehicle Assembly Building. In the VAB, it will be stacked with... More

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, this overhead image shows the Space Shuttle Program's last external fuel tank, ET-122, after it was delivered to the transfer aisle of the Vehicle Assembly Building (VAB).          The tank traveled 900 miles by sea, carried in the Pegasus Barge, from NASA's Michoud Assembly Facility in New Orleans. Once inside the VAB, it eventually will be attached to space shuttle Endeavour for the STS-134 mission to the International Space Station targeted to launch Feb. 2011. STS-134 currently is scheduled to be the last mission in the shuttle program. The tank, which is the largest element of the space shuttle stack, was damaged during Hurricane Katrina in August 2005 and restored to flight configuration by Lockheed Martin Space Systems Company employees. Photo credit: NASA/Kevin O'Connell KSC-2010-4912

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, thi...

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, this overhead image shows the Space Shuttle Program's last external fuel tank, ET-122, after it was delivered to the transfer aisle of the Vehi... More

KENNEDY SPACE CENTER, FLA. - The Space Shuttle orbiter Atlantis is turned into position outside the Orbiter Processing Facility (OPF) for its tow to the Vehicle Assembly Building (VAB). The move will allow work to be performed in the OPF that can only be accomplished while the bay is empty. Work scheduled in the processing facility includes annual validation of the bay's cranes, work platforms, lifting mechanisms, and jack stands. Atlantis will remain in the VAB for about 10 days, then return to the OPF as work resumes to prepare it for launch in September 2004 on the first return-to-flight mission, STS-114.

KENNEDY SPACE CENTER, FLA. - The Space Shuttle orbiter Atlantis is tur...

KENNEDY SPACE CENTER, FLA. - The Space Shuttle orbiter Atlantis is turned into position outside the Orbiter Processing Facility (OPF) for its tow to the Vehicle Assembly Building (VAB). The move will allow work... More

CAPE CANAVERAL, Fla. –  Space shuttle Discovery rolls to the Vehicle Assembly Building at NASA's Kennedy Space Center, Fla. The first motion of the shuttle out from Orbiter Processing Facility 3 was at 7:22 a.m. EDT. In the VAB, Discovery will be lifted into High Bay 1 and mated to the external fuel tank and solid rocket boosters already installed on the mobile launcher platform.  The shuttle is scheduled to roll out to Launch Pad 39A the first week of   August to prepare for the STS-128 mission to the International Space Station.  Discovery will carry the Leonardo Multi-Purpose Logistics Module containing life support racks and science racks and the Lightweight Multi-Purpose Experiment Support Structure Carrier in its payload bay.  Launch of Discovery is targeted for late August.  Photo credit: NASA/Kim Shiflett KSC-2009-4241

CAPE CANAVERAL, Fla. – Space shuttle Discovery rolls to the Vehicle A...

CAPE CANAVERAL, Fla. – Space shuttle Discovery rolls to the Vehicle Assembly Building at NASA's Kennedy Space Center, Fla. The first motion of the shuttle out from Orbiter Processing Facility 3 was at 7:22 a.m... More

KENNEDY SPACE CENTER, FLA. -- Space Shuttle Atlantis, atop a mobile launch platform, passes by the turn basin in Launch Complex 39 toward Pad A as the sun rises on a balmy Florida morning. First motion out of the VAB was at 4:43 a.m. EST.  Rollout is a milestone for Atlantis' launch to the International Space Station on mission STS-122, targeted for Dec. 6. On this mission, Atlantis will deliver the Columbus module to the International Space Station. The European Space Agency's largest contribution to the station, Columbus is a multifunctional, pressurized laboratory that will be permanently attached to U.S. Node 2, called Harmony. The module is approximately 23 feet long and 15 feet wide, allowing it to hold 10 large racks of experiments. The laboratory will expand the research facilities aboard the station, providing crew members and scientists from around the world the ability to conduct a variety of experiments in the physical, materials and life sciences.   Photo credit: NASA/Kim Shiflett KSC-07pd3262

KENNEDY SPACE CENTER, FLA. -- Space Shuttle Atlantis, atop a mobile la...

KENNEDY SPACE CENTER, FLA. -- Space Shuttle Atlantis, atop a mobile launch platform, passes by the turn basin in Launch Complex 39 toward Pad A as the sun rises on a balmy Florida morning. First motion out of t... More

CAPE CANAVERAL, Fla. - Workers move the Orbiter Transporter System (OTS) into Orbiter Processing Facility-1 at NASA's Kennedy Space Center in Florida. The OTS will be moved under shuttle Atlantis for its rollover to the nearby Vehicle Assembly Building (VAB).            Once inside the VAB, Atlantis will be joined to its solid rocket boosters and external fuel tank on the mobile launcher platform. Later this month, Atlantis is scheduled to "rollout" to Launch Pad 39A on the STS-135 mission, which will deliver the Raffaello multi-purpose logistics module packed with supplies and spare parts to the International Space Station. STS-135, targeted to launch June 28, will be the 33rd flight of Atlantis, the 37th shuttle mission to the station, and the 135th and final mission of NASA's Space Shuttle Program. For more information, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. NASA/Jack Pfaller KSC-2011-3350

CAPE CANAVERAL, Fla. - Workers move the Orbiter Transporter System (OT...

CAPE CANAVERAL, Fla. - Workers move the Orbiter Transporter System (OTS) into Orbiter Processing Facility-1 at NASA's Kennedy Space Center in Florida. The OTS will be moved under shuttle Atlantis for its rollov... More

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, shuttle Discovery is ushered into the Vehicle Assembly Building (VAB) from Orbiter Processing Facility-3 during a move known as "rollover." Once inside the VAB, the shuttle will be joined to its solid rocket boosters and external fuel tank. Later this month, Discovery is scheduled to "rollout" to Launch Pad 39A for its launch to the International Space Station on the STS-133 mission.    Targeted to liftoff Nov. 1, Discovery will take the Permanent Multipurpose Module (PMM) packed with supplies and critical spare parts, as well as Robonaut 2 (R2) to the station. Photo credit: NASA/ Dimitri Gerondidakis KSC-2010-4605

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, shu...

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, shuttle Discovery is ushered into the Vehicle Assembly Building (VAB) from Orbiter Processing Facility-3 during a move known as "rollover." Onc... More

KENNEDY SPACE CENTER, FLA. - As the orbiter Discovery, sitting on an orbiter transporter, moves away from NASA's Orbiter Processing Facility toward the Vehicle Assembly Building (VAB), workers accompany the vehicle.  The rollover to the VAB marks the start of the journey to the launch pad and, ultimately, launch.  Once inside the VAB, Discovery will be raised to vertical and lifted up and over into high bay 3 for stacking with its redesigned external tank and twin solid rocket boosters.  The rollout of Space Shuttle Discovery to Launch Pad 39B is expected in approximately a week.  Launch of Discovery on mission STS-121 is scheduled to take place in a window extending July 1 to July 19. Photo credit: NASA/Jim Grossmann KSC-06pd0818

KENNEDY SPACE CENTER, FLA. - As the orbiter Discovery, sitting on an o...

KENNEDY SPACE CENTER, FLA. - As the orbiter Discovery, sitting on an orbiter transporter, moves away from NASA's Orbiter Processing Facility toward the Vehicle Assembly Building (VAB), workers accompany the veh... More

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-2, or OPF-2, at NASA's Kennedy Space Center in Florida, workers prepare to tow space shuttle Discovery to the Vehicle Assembly Building, or VAB.  Protective plastic covers the nose of Discovery where its forward reaction control system (FRCS) once resided.  Discovery's FRCS was removed and shipped to White Sands Space Harbor in New Mexico for a full cleaning and deservicing before it is returned to Kennedy and reinstalled.    Discovery will be stored inside the VAB for approximately one month while shuttle Atlantis undergoes processing in OPF-2 following its final mission, STS-135. Discovery flew its 39th and final mission, STS-133, in February and March 2011, and currently is being prepared for public display at the Smithsonian's National Air and Space Museum Steven F. Udvar-Hazy Center in Virginia. For more information about Discovery's Transition and Retirement, visit   www.nasa.gov/mission_pages/shuttle/launch/discovery_rss_collection_archive_1.html.  Photo credit: NASA/Jim Grossmann KSC-2011-5525

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-2, or OPF-2, at...

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-2, or OPF-2, at NASA's Kennedy Space Center in Florida, workers prepare to tow space shuttle Discovery to the Vehicle Assembly Building, or VAB. Protectiv... More

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-3 at NASA's Kennedy Space Center in Florida, workers discuss moving, or "rolling over," shuttle Discovery to the nearby Vehicle Assembly Building (VAB). Once inside the VAB, the shuttle will be joined to its solid rocket boosters and external fuel tank. Later this month, Discovery is scheduled to "rollout" to Launch Pad 39A for its launch to the International Space Station on the STS-133 mission.    Targeted to liftoff Nov. 1, Discovery will take the Permanent Multipurpose Module (PMM) packed with supplies and critical spare parts, as well as Robonaut 2 (R2) to the station. Photo credit: NASA/Jack Pfaller KSC-2010-4583

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-3 at NASA's Ken...

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-3 at NASA's Kennedy Space Center in Florida, workers discuss moving, or "rolling over," shuttle Discovery to the nearby Vehicle Assembly Building (VAB). On... More

KENNEDY SPACE CENTER, FLA. -- Workers monitor the progress of Space Shuttle Atlantis as it moves through the doors of the Vehicle Assembly Building along the crawlerway toward Launch Pad 39A. First motion out of the VAB was at 4:43 a.m. EST.  Rollout is a milestone for Atlantis' launch to the International Space Station on mission STS-122, targeted for Dec. 6. On this mission, Atlantis will deliver the Columbus module to the International Space Station. The European Space Agency's largest contribution to the station, Columbus is a multifunctional, pressurized laboratory that will be permanently attached to U.S. Node 2, called Harmony. The module is approximately 23 feet long and 15 feet wide, allowing it to hold 10 large racks of experiments. The laboratory will expand the research facilities aboard the station, providing crew members and scientists from around the world the ability to conduct a variety of experiments in the physical, materials and life sciences.   Photo credit: NASA/Kim Shiflett KSC-07pd3259

KENNEDY SPACE CENTER, FLA. -- Workers monitor the progress of Space Sh...

KENNEDY SPACE CENTER, FLA. -- Workers monitor the progress of Space Shuttle Atlantis as it moves through the doors of the Vehicle Assembly Building along the crawlerway toward Launch Pad 39A. First motion out o... More

CAPE CANAVERAL, Fla. -- This panoramic image shows tug boats maneuvering the Pegasus Barge carrying the Space Shuttle Program's last external fuel tank, ET-122, through the Turn Basin at NASA's Kennedy Space Center in Florida. Once docked, the tank will be offloaded from the barge and transported to the Vehicle Assembly Building (VAB). NASA's Liberty Star solid rocket booster retrieval ship is also seen (left) docked at the Turn Basin.        The tank traveled 900 miles by sea, carried in the barge, from NASA's Michoud Assembly Facility in New Orleans. Once inside the VAB, it eventually will be attached to space shuttle Endeavour for the STS-134 mission to the International Space Station targeted to launch Feb. 2011. STS-134 currently is scheduled to be the last mission in the shuttle program. The tank, which is the largest element of the space shuttle stack, was damaged during Hurricane Katrina in August 2005 and restored to flight configuration by Lockheed Martin Space Systems Company employees. Photo credit: NASA/Frankie Martin KSC-2010-4903

CAPE CANAVERAL, Fla. -- This panoramic image shows tug boats maneuveri...

CAPE CANAVERAL, Fla. -- This panoramic image shows tug boats maneuvering the Pegasus Barge carrying the Space Shuttle Program's last external fuel tank, ET-122, through the Turn Basin at NASA's Kennedy Space Ce... More

KENNEDY SPACE CENTER, FLA. -   External tank No. 123 makes the turn toward the Vehicle Assembly Building after being offloaded from the Pegasus barge in the turn basin at the Launch Complex 39 Area.  Once inside the VAB, the tank will be lifted into a checkout cell for further work.  Shipped from NASA's Michoud Assembly Facility in New Orleans, the tank has undergone major safety changes, including removal of the protuberance air load ramps.  It is designated to launch Space Shuttle Discovery on mission STS-116 in December.  Mission STS-116 will deliver the P5 truss segment, a SPACEHAB module and other key components to the International Space Station.  Launch is currently scheduled no earlier than Dec. 14.  Photo credit: NASA/Jack Pfaller KSC-06pd2180

KENNEDY SPACE CENTER, FLA. - External tank No. 123 makes the turn to...

KENNEDY SPACE CENTER, FLA. - External tank No. 123 makes the turn toward the Vehicle Assembly Building after being offloaded from the Pegasus barge in the turn basin at the Launch Complex 39 Area. Once insid... More

KENNEDY SPACE CENTER, FLA. --  Space Shuttle Atlantis, mounted on a mobile launch platform atop a crawler transporter, begins the climb to the top of Launch Pad 39A.  First motion of the shuttle out of the Vehicle Assembly Building was at 5:02 a.m. EDT. In late February, while Atlantis was on the launch pad, Atlantis' external tank received hail damage during a severe thunderstorm that passed through the Kennedy Space Center Launch Complex 39 area. The hail caused visible divots in the giant tank's foam insulation, as well as minor surface damage to about 26 heat shield tiles on the shuttle's left wing. The shuttle was returned to the VAB for repairs. The launch of Space Shuttle Atlantis on mission STS-117 is now targeted for June 8. A flight readiness review will be held on May 30 and 31.  Photo credit: NASA/Jim Grossmann KSC-07pd1192

KENNEDY SPACE CENTER, FLA. -- Space Shuttle Atlantis, mounted on a mo...

KENNEDY SPACE CENTER, FLA. -- Space Shuttle Atlantis, mounted on a mobile launch platform atop a crawler transporter, begins the climb to the top of Launch Pad 39A. First motion of the shuttle out of the Vehi... More

KENNEDY SPACE CENTER, FLA. --  The orbiter Discovery backs out of the Orbiter Processing Facility bay 3 for the short rollover to the Vehicle Assembly Building. First motion was at 9:23 p.m. Oct. 31.  In the VAB the orbiter will be mated to its large external tank and twin solid rocket boosters already stacked on the mobile launcher platform.  Space Shuttle Discovery is scheduled to roll out to Launch Pad 39B no earlier than Nov. 7 for mission STS-116.  The mission is No. 20 to the International Space Station and construction flight 12A.1. The mission payload is the SPACEHAB module, the P5 integrated truss structure and other key components. The launch window for mission STS-116 opens Dec. 7. Photo credit: NASA/Kim Shiflett KSC-06pd2413

KENNEDY SPACE CENTER, FLA. -- The orbiter Discovery backs out of the ...

KENNEDY SPACE CENTER, FLA. -- The orbiter Discovery backs out of the Orbiter Processing Facility bay 3 for the short rollover to the Vehicle Assembly Building. First motion was at 9:23 p.m. Oct. 31. In the VA... More

CAPE CANAVERAL, Fla. - In the Vehicle Assembly Building's high bay 3 at NASA's Kennedy Space Center in Florida, a worker closely observes space shuttle Atlantis as it rolls in after leaving Launch Pad 39A.  In the VAB, Atlantis will await launch on its STS-125 mission to repair NASA's Hubble Space Telescope.  First motion of Atlantis off the pad was at 6:48 a.m. EDT. Atlantis' targeted launch on Oct. 14 was delayed when a system that transfers science data from the orbiting observatory to Earth malfunctioned on Sept. 27. The new target launch date is under review.  Photo credit: NASA/Kim Shiflett KSC-08pd3279

CAPE CANAVERAL, Fla. - In the Vehicle Assembly Building's high bay 3 a...

CAPE CANAVERAL, Fla. - In the Vehicle Assembly Building's high bay 3 at NASA's Kennedy Space Center in Florida, a worker closely observes space shuttle Atlantis as it rolls in after leaving Launch Pad 39A. In ... More

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, space shuttle Discovery backs out of its processing bay, Orbiter Processing Facility-2, or OPF-2, to begin the move to the Vehicle Assembly Building, or VAB.    Discovery will be stored inside the VAB for approximately one month while shuttle Atlantis undergoes processing in OPF-2 following its final mission, STS-135. Discovery flew its 39th and final mission, STS-133, in February and March 2011, and currently is being prepared for public display at the Smithsonian's National Air and Space Museum Steven F. Udvar-Hazy Center in Virginia. For more information about Discovery's Transition and Retirement, visit   www.nasa.gov/mission_pages/shuttle/launch/discovery_rss_collection_archive_1.html.  Photo credit: NASA/Jim Grossmann KSC-2011-5527

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, spa...

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, space shuttle Discovery backs out of its processing bay, Orbiter Processing Facility-2, or OPF-2, to begin the move to the Vehicle Assembly Bui... More

CAPE CANAVERAL, Fla. -- Technicians prepare shuttle Atlantis for its final planned move from Orbiter Processing Facility-1 to the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida.               The move called "rollover" is a major milestone in processing for the STS-135 mission to the International Space Station. Inside the VAB, the shuttle will be attached to its external fuel tank and solid rocket boosters. Commander Chris Ferguson, Pilot Doug Hurley and Mission Specialists Sandra Magnus and Rex Walheim are targeted to launch in early July, taking with them the Raffaello multipurpose logistics module packed with supplies, logistics and spare parts. The STS-135 mission also will fly a system to investigate the potential for robotically refueling existing spacecraft and return a failed ammonia pump module to help NASA better understand the failure mechanism and improve pump designs for future systems. STS-135 will be the 33rd flight of Atlantis, the 37th shuttle mission to the space station, and the 135th and final mission of NASA's Space Shuttle Program. For more information visit, www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Frankie Martin KSC-2011-3652

CAPE CANAVERAL, Fla. -- Technicians prepare shuttle Atlantis for its f...

CAPE CANAVERAL, Fla. -- Technicians prepare shuttle Atlantis for its final planned move from Orbiter Processing Facility-1 to the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida. ... More

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, space shuttle Discovery -- its nose encased in protective plastic, its cockpit windows covered, and strongbacks attached to its payload bay doors -- awaits entry into the Vehicle Assembly Building, or VAB, after rolling from Orbiter Processing Facility-2, or OPF-2.    Discovery will be stored inside the VAB for approximately one month while shuttle Atlantis undergoes processing in OPF-2 following its final mission, STS-135. Discovery flew its 39th and final mission, STS-133, in February and March 2011, and currently is being prepared for public display at the Smithsonian's National Air and Space Museum Steven F. Udvar-Hazy Center in Virginia. For more information about Discovery's Transition and Retirement, visit   www.nasa.gov/mission_pages/shuttle/launch/discovery_rss_collection_archive_1.html.  Photo credit: NASA/Frankie Martin KSC-2011-5550

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, spa...

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, space shuttle Discovery -- its nose encased in protective plastic, its cockpit windows covered, and strongbacks attached to its payload bay doo... More

CAPE CANAVERAL, Fla. - In the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida, external fuel tank, ET-138, for space shuttle Atlantis' STS-135 mission, is lowered into high bay-1 for joining with the twin solid rocket boosters on the mobile launcher platform. Shuttle Atlantis' move, or "rollover," from Orbiter Processing Facility-1 to the VAB is targeted for May 10. Once there it will be mated with the external tank and boosters. Atlantis and its crew of four will deliver the Raffaello multipurpose logistics module packed with supplies and spare parts to the International Space Station. STS-135 is targeted to launch June 28, and will be the last spaceflight for the Space Shuttle Program. Photo credit: NASA/Jack Pfaller KSC-2011-3041

CAPE CANAVERAL, Fla. - In the Vehicle Assembly Building (VAB) at NASA'...

CAPE CANAVERAL, Fla. - In the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida, external fuel tank, ET-138, for space shuttle Atlantis' STS-135 mission, is lowered into high bay-1 for j... More

CAPE CANAVERAL, Fla. -- This overhead view shows the Space Shuttle Program's last external fuel tank, ET-122 (right), as it is being transported to the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida.          The tank traveled 900 miles by sea, carried in the Pegasus Barge, from NASA's Michoud Assembly Facility in New Orleans. Once inside the VAB, it eventually will be attached to space shuttle Endeavour for the STS-134 mission to the International Space Station targeted to launch Feb. 2011. STS-134 currently is scheduled to be the last mission in the shuttle program. The tank, which is the largest element of the space shuttle stack, was damaged during Hurricane Katrina in August 2005 and restored to flight configuration by Lockheed Martin Space Systems Company employees. Photo credit: NASA/Kevin O'Connell KSC-2010-4907

CAPE CANAVERAL, Fla. -- This overhead view shows the Space Shuttle Pro...

CAPE CANAVERAL, Fla. -- This overhead view shows the Space Shuttle Program's last external fuel tank, ET-122 (right), as it is being transported to the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Ce... More

CAPE CANAVERAL, Fla. -- This panoramic image shows the Launch Complex 39 area at NASA's Kennedy Space Center in Florida. In the far background is the Pegasus Barge carrying the Space Shuttle Program's last external fuel tank, ET-122, into Kennedy's Turn Basin. Once docked, the tank will be offloaded from the barge and transported to the Vehicle Assembly Building (VAB). NASA's Liberty Star solid rocket booster retrieval ship also is docked at the Turn Basin.          The tank traveled 900 miles by sea, carried in the barge, from NASA's Michoud Assembly Facility in New Orleans. Once inside the VAB, it eventually will be attached to space shuttle Endeavour for the STS-134 mission to the International Space Station targeted to launch Feb. 2011. STS-134 currently is scheduled to be the last mission in the shuttle program. The tank, which is the largest element of the space shuttle stack, was damaged during Hurricane Katrina in August 2005 and restored to flight configuration by Lockheed Martin Space Systems Company employees. Photo credit: NASA/Frankie Martin KSC-2010-4900

CAPE CANAVERAL, Fla. -- This panoramic image shows the Launch Complex ...

CAPE CANAVERAL, Fla. -- This panoramic image shows the Launch Complex 39 area at NASA's Kennedy Space Center in Florida. In the far background is the Pegasus Barge carrying the Space Shuttle Program's last exte... More

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, space shuttle Discovery rolls along the towway from Orbiter Processing Facility-2, or OPF-2, to the Vehicle Assembly Building, or VAB.  Railings, called strongbacks, are installed along Discovery's payload bay doors to assist with opening and closing of the doors when the shuttle's hydraulic system is not operational and support the doors while they are open.    Discovery will be stored inside the VAB for approximately one month while shuttle Atlantis undergoes processing in OPF-2 following its final mission, STS-135. Discovery flew its 39th and final mission, STS-133, in February and March 2011, and currently is being prepared for public display at the Smithsonian's National Air and Space Museum Steven F. Udvar-Hazy Center in Virginia. For more information about Discovery's Transition and Retirement, visit   www.nasa.gov/mission_pages/shuttle/launch/discovery_rss_collection_archive_1.html.  Photo credit: NASA/Frankie Martin KSC-2011-5540

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, spa...

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, space shuttle Discovery rolls along the towway from Orbiter Processing Facility-2, or OPF-2, to the Vehicle Assembly Building, or VAB. Railing... More

KENNEDY SPACE CENTER, FLA. -- The orbiter Endeavour, atop its transporter, rolls into the gaping doorway of the Vehicle Assembly Building.  In the VAB, it will be stacked with the external tank and solid rocket boosters atop the mobile launcher platform for its launch on mission STS-118.  The mission will be Endeavour's first flight in more than four years. The shuttle has undergone extensive modifications, including the addition of safety upgrades already added to shuttles Discovery and Atlantis. Endeavour also features new hardware, such as the Station-to-Shuttle Power Transfer System that will allow the docked shuttle to draw electrical power from the station and extend its visits to the orbiting lab.  Endeavour is targeted for launch on Aug. 7.   Photo credit: NASA/George Shelton KSC-07pd1707

KENNEDY SPACE CENTER, FLA. -- The orbiter Endeavour, atop its transpor...

KENNEDY SPACE CENTER, FLA. -- The orbiter Endeavour, atop its transporter, rolls into the gaping doorway of the Vehicle Assembly Building. In the VAB, it will be stacked with the external tank and solid rocket... More

CAPE CANAVERAL, Fla. –  Space shuttle Endeavour is ready for the rollover from Orbiter Processing Facility 2 to the Vehicle Assembly Building at NASA's Kennedy Space Center, Fla. The first motion of the shuttle out of its hangar was at 6:56 a.m. EDT.  In the VAB, Endeavour will be lifted into High Bay 1 and mated to the external fuel tank and solid rocket boosters already installed on the mobile launcher platform. Endeavour is scheduled to roll out to Launch Pad 39B in about a week.  Endeavour will be prepared on the pad for liftoff in the unlikely event that a rescue mission is necessary following space shuttle Atlantis' launch on the STS-125 mission to service the Hubble Space Telescope. After Atlantis is cleared to land, Endeavour will move to Launch Pad 39A for its upcoming STS-127 mission to the International Space Station, targeted to launch in mid-June.   Photo credit: NASA/Jim Grossmann KSC-2009-2568

CAPE CANAVERAL, Fla. – Space shuttle Endeavour is ready for the rollo...

CAPE CANAVERAL, Fla. – Space shuttle Endeavour is ready for the rollover from Orbiter Processing Facility 2 to the Vehicle Assembly Building at NASA's Kennedy Space Center, Fla. The first motion of the shuttle... More

CAPE CANAVERAL, Fla. -  Space shuttle Endeavour is hard down on Launch Pad 39B.  The shuttle and mobile launcher platform it sits on rest atop the crawler-transporter that carried them from the Vehicle Assembly Building. First motion out of the VAB was at 11:15 p.m. Sept. 18.  At left of the shuttle is the open rotating service structure with the payload changeout room revealed. Endeavour completed the 4.2-mile journey to Launch Pad 39B on Sept. 19 at 6:59 a.m. EDT. For the first time since July 2001, two shuttles are on the launch pads at the same time at the center. Endeavour will stand by at pad B in the unlikely event that a rescue mission is necessary during space shuttle Atlantis' upcoming mission to repair NASA's Hubble Space Telescope, targeted to launch Oct. 10. After Endeavour is cleared from its duty as a rescue spacecraft, it will be moved to Launch Pad 39A for the STS-126 mission to the International Space Station. That flight is targeted for launch Nov. 12. Photo credit: NASA/Dimitri Gerondidakis KSC-08pd2675

CAPE CANAVERAL, Fla. - Space shuttle Endeavour is hard down on Launch...

CAPE CANAVERAL, Fla. - Space shuttle Endeavour is hard down on Launch Pad 39B. The shuttle and mobile launcher platform it sits on rest atop the crawler-transporter that carried them from the Vehicle Assembly... More

KENNEDY SPACE CENTER, FLA. -- This 30-second timed exposure captures the bright lights around the Vehicle Assembly Building (VAB) plus the equally bright moon (upper right) as Space Shuttle Atlantis (far left) rolls out of the east side bay 1.  The Launch Control Center sits between the Shuttle and the VAB.  The full stack of Shuttle, solid rocket boosters and external tank are taking part in a fit check for the newly renovated crawlerway and high bay 2, which is on the west side.  The major modifications to the crawlerway and VAB provide Shuttle flight hardware more storage space and protection - "Safe Haven" - from hurricanes or tropical storms.  Atlantis began moving out of VAB high bay 1 at 2:59 a.m. EDT.  After the successful Safe Haven fit check, Shuttle Atlantis is scheduled to roll out to Launch Pad 39B in preparation for the STS-106 launch on Sept. 8. KSC-00pp1127

KENNEDY SPACE CENTER, FLA. -- This 30-second timed exposure captures t...

KENNEDY SPACE CENTER, FLA. -- This 30-second timed exposure captures the bright lights around the Vehicle Assembly Building (VAB) plus the equally bright moon (upper right) as Space Shuttle Atlantis (far left) ... More

KENNEDY SPACE CENTER, FLA. -- Inside the Orbiter Processing Facility, space shuttle Endeavour settles on its transporter for the trip to the Vehicle Assembly Building.  In high bay 1 of the VAB, Endeavour will be attached to its external fuel tank and solid rocket boosters in preparation for its upcoming mission, STS-123, to the International Space Station targeted for March 11.  The mission will deliver the first section of the Japan Aerospace Exploration Agency's Kibo laboratory and the Canadian Space Agency's two-armed robotic system, Dextre.   Photo credit: NASA/Jim Grossmann KSC-08pd0264

KENNEDY SPACE CENTER, FLA. -- Inside the Orbiter Processing Facility, ...

KENNEDY SPACE CENTER, FLA. -- Inside the Orbiter Processing Facility, space shuttle Endeavour settles on its transporter for the trip to the Vehicle Assembly Building. In high bay 1 of the VAB, Endeavour will ... More

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility 1 at NASA’s Kennedy Space Center in Florida, workers monitor the progress of space shuttle Atlantis as it backs out of its hangar for its move to the Vehicle Assembly Building.    The rollover began about 7 a.m. EDT and was complete at 8:25 a.m. when Atlantis was towed into the VAB's transfer aisle.  Next, Atlantis will be lifted over a transom and lowered into the VAB's high bay 1, where it will be attached to its external fuel tank and solid rocket boosters. Rollout of the shuttle stack to Kennedy’s Launch Pad 39A, a significant milestone in launch processing activities, is planned for Oct. 13.  Liftoff of Atlantis on its STS-129 mission to the International Space Station is targeted for 4:04 p.m. EST during a 10-minute launch window on Nov. 12.  For information on the STS-129 mission and crew, visit http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts129/index.html. Photo credit: NASA/Jack Pfaller KSC-2009-5320

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility 1 at NASA’s Kenn...

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility 1 at NASA’s Kennedy Space Center in Florida, workers monitor the progress of space shuttle Atlantis as it backs out of its hangar for its move to the Vehicl... More

KENNEDY SPACE CENTER, FLA. --  Under a feather-painted sky, Space Shuttle Atlantis, mounted on a mobile launch platform atop a crawler transporter, creeps up the ramp to Launch Pad 39A.  This is the second rollout for the shuttle.  First motion out of the Vehicle Assembly Building was at 5:02 a.m. EDT. In late February, while Atlantis was on the launch pad, Atlantis' external tank received hail damage during a severe thunderstorm that passed through the Kennedy Space Center Launch Complex 39 area. The hail caused visible divots in the giant tank's foam insulation, as well as minor surface damage to about 26 heat shield tiles on the shuttle's left wing. The shuttle was returned to the VAB for repairs. The launch of Space Shuttle Atlantis on mission STS-117 is now targeted for June 8. A flight readiness review will be held on May 30 and 31.  Photo credit: NASA/Troy Cryder KSC-07pd1196

KENNEDY SPACE CENTER, FLA. -- Under a feather-painted sky, Space Shut...

KENNEDY SPACE CENTER, FLA. -- Under a feather-painted sky, Space Shuttle Atlantis, mounted on a mobile launch platform atop a crawler transporter, creeps up the ramp to Launch Pad 39A. This is the second roll... More

CAPE CANAVERAL, Fla. -- Shuttle Atlantis' three main engines take center stage in this image as Atlantis is being moved to the Vehicle Assembly Building (VAB) from Orbiter Processing Faciity-1 at NASA's Kennedy Space Center in Florida.      The move called "rollover" is a major milestone in processing for the STS-135 mission to the International Space Station. Inside the VAB, the shuttle will be attached to its external fuel tank and solid rocket boosters. Commander Chris Ferguson, Pilot Doug Hurley and Mission Specialists Sandra Magnus and Rex Walheim are targeted to launch in early July, taking with them the Raffaello multipurpose logistics module packed with supplies, logistics and spare parts. The STS-135 mission also will fly a system to investigate the potential for robotically refueling existing spacecraft and return a failed ammonia pump module to help NASA better understand the failure mechanism and improve pump designs for future systems. STS-135 will be the 33rd flight of Atlantis, the 37th shuttle mission to the space station, and the 135th and final mission of NASA's Space Shuttle Program. For more information visit, www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Frankie Martin KSC-2011-3657

CAPE CANAVERAL, Fla. -- Shuttle Atlantis' three main engines take cent...

CAPE CANAVERAL, Fla. -- Shuttle Atlantis' three main engines take center stage in this image as Atlantis is being moved to the Vehicle Assembly Building (VAB) from Orbiter Processing Faciity-1 at NASA's Kennedy... More

KENNEDY SPACE CENTER, FLA. --  Space Shuttle Discovery nears its destination on its rollout to Launch Pad 39B.  Discovery rests on top of the mobile launcher platform, which is carried by the crawler-transporter underneath.  First motion of the shuttle leaving NASA's Vehicle Assembly Building was at 12:45 p.m. EDT. The 4.2-mile journey from the VAB to the pad takes approximately 8 hours.  The rollout is an important step before launch of Discovery on mission STS-121 to the International Space Station.  Discovery's launch is targeted for July 1 in a launch window that extends to July 19. During the 12-day mission, Discovery's crew will test new hardware and techniques to improve shuttle safety, as well as deliver supplies and make repairs to the station.  Photo credit: NASA/Dimitri Gerondidakis KSC-06pd0905

KENNEDY SPACE CENTER, FLA. -- Space Shuttle Discovery nears its desti...

KENNEDY SPACE CENTER, FLA. -- Space Shuttle Discovery nears its destination on its rollout to Launch Pad 39B. Discovery rests on top of the mobile launcher platform, which is carried by the crawler-transporte... More

CAPE CANAVERAL, Fla. –   After rolling out of the Orbiter Processing Facility bay 1 at NASA's Kennedy Space Center, space shuttle Atlantis begins the short transfer to the Vehicle Assembly Building.  In the VAB, Atlantis will be attached to its external fuel tank and twin solid rocket boosters. After additional preparations are made, the shuttle will be rolled out to Launch Pad 39A to prepare for launch on the STS-125 mission targeted for Oct. 8.   Photo credit: NASA/Jack Pfaller KSC-08pd2478

CAPE CANAVERAL, Fla. – After rolling out of the Orbiter Processing F...

CAPE CANAVERAL, Fla. – After rolling out of the Orbiter Processing Facility bay 1 at NASA's Kennedy Space Center, space shuttle Atlantis begins the short transfer to the Vehicle Assembly Building. In the VAB... More

CAPE CANAVERAL, Fla. –At NASA's Kennedy Space Center in Florida, the crawler-transporter delivers space shuttle Discovery atop the mobile launcher platform onto Launch Pad 39A.  Traveling from the Vehicle Assembly Building, the shuttle took nearly 12 hours on the journey as technicians stopped several times to clear mud from the crawler's treads and bearings caused by the waterlogged crawlerway.  First motion out of the VAB was at 2:07 a.m. EDT Aug. 4. Rollout was delayed approximately 2 hours due to lightning in the area.  In the background is the blue water of the Atlantic Ocean.  At left is the White Room at the end of the orbiter access arm.  When in place against shuttle, the White Room provides entry into the cockpit.  Discovery's 13-day flight will deliver a new crew member and 33,000 pounds of equipment to the International Space Station. The equipment includes science and storage racks, a freezer to store research samples, a new sleeping compartment and the COLBERT treadmill.  Launch of Discovery on its STS-128 mission is targeted for late August.   Photo credit: NASA/Troy Cryder KSC-2009-4423

CAPE CANAVERAL, Fla. –At NASA's Kennedy Space Center in Florida, the c...

CAPE CANAVERAL, Fla. –At NASA's Kennedy Space Center in Florida, the crawler-transporter delivers space shuttle Discovery atop the mobile launcher platform onto Launch Pad 39A. Traveling from the Vehicle Assem... More

KENNEDY SPACE CENTER, FLA. --  External tank No. 124 is moved from its checkout cell in the Vehicle Assembly Building to high bay 1 where it will be mated with the solid rocket boosters for mission STS-117.  The boosters are already in place on the mobile launcher platform in the VAB.  The mission is targeted to launch on March 16 aboard Space Shuttle Atlantis.  Photo credit: NASA/Kim Shiflett KSC-07pd0138

KENNEDY SPACE CENTER, FLA. -- External tank No. 124 is moved from its...

KENNEDY SPACE CENTER, FLA. -- External tank No. 124 is moved from its checkout cell in the Vehicle Assembly Building to high bay 1 where it will be mated with the solid rocket boosters for mission STS-117. Th... More

CAPE CANAVERAL, Fla. -- Outside Orbiter Processing Facility-2, or OPF-2, at NASA's Kennedy Space Center in Florida, media are on hand to cover the move of space shuttle Discovery to the Vehicle Assembly Building, or VAB.    Discovery will be stored inside the VAB for approximately one month while shuttle Atlantis undergoes processing in OPF-2 following its final mission, STS-135. Discovery flew its 39th and final mission, STS-133, in February and March 2011, and currently is being prepared for public display at the Smithsonian's National Air and Space Museum Steven F. Udvar-Hazy Center in Virginia. For more information about Discovery's Transition and Retirement, visit   www.nasa.gov/mission_pages/shuttle/launch/discovery_rss_collection_archive_1.html.  Photo credit: NASA/Ken Thornsley KSC-2011-5571

CAPE CANAVERAL, Fla. -- Outside Orbiter Processing Facility-2, or OPF-...

CAPE CANAVERAL, Fla. -- Outside Orbiter Processing Facility-2, or OPF-2, at NASA's Kennedy Space Center in Florida, media are on hand to cover the move of space shuttle Discovery to the Vehicle Assembly Buildin... More

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, Mobile Launcher Platform-3 (MLP), which supported space shuttle Atlantis for its final flight to the International Space Station on the STS-135 mission, is taking its last journey from Launch Pad 39A to the Vehicle Assembly Building (VAB). A massive crawler-transporter positioned under the MLP -- the last mobile launcher platform to launch a shuttle, begins the trek back to the VAB. A water truck leads the way spraying water on the dry crawlerway to reduce dust particles in the air.                     For more than 40 years, the MLPs have traveled between the massive VAB to both launch pads at Launch Complex 39, and then returned to the VAB for future use. MLP-3 was first used to launch Columbia on the STS-32 mission on Jan. 9, 1990. Photo credit: NASA/Kim Shiflett KSC-2011-5590

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, Mob...

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, Mobile Launcher Platform-3 (MLP), which supported space shuttle Atlantis for its final flight to the International Space Station on the STS-135... More

CAPE CANAVERAL, Fla. – Space shuttle Atlantis is lowered by the yellow crane above it into High Bay 1 in the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida. Next, Atlantis will be positioned on a mobile launcher platform in the bay where it will be attached to an external fuel tank and pair of solid rocket boosters.    Rollout of the completed shuttle stack to Kennedy’s Launch Pad 39A, a significant milestone in launch processing activities, is planned for Oct. 13. Liftoff of Atlantis on its STS-129 mission to the International Space Station is targeted for 4:04 p.m. EST Nov. 12 during a 10-minute launch window. For information on the STS-129 mission and crew, visit http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts129/index.html. Photo credit: NASA/Jack Pfaller KSC-2009-5358

CAPE CANAVERAL, Fla. – Space shuttle Atlantis is lowered by the yellow...

CAPE CANAVERAL, Fla. – Space shuttle Atlantis is lowered by the yellow crane above it into High Bay 1 in the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida. Next, Atlantis will be positione... More

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, shuttle Discovery pauses in between Orbiter Processing Facility-3 and the Vehicle Assembly Building (VAB) during a move called "rollover." Once inside the VAB, the shuttle will be joined to its solid rocket boosters and external fuel tank. Later this month, Discovery is scheduled to "rollout" to Launch Pad 39A for its launch to the International Space Station on the STS-133 mission.    Targeted to liftoff Nov. 1, Discovery will take the Permanent Multipurpose Module (PMM) packed with supplies and critical spare parts, as well as Robonaut 2 (R2) to the station. Photo credit: NASA/Jack Pfaller KSC-2010-4587

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, shu...

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, shuttle Discovery pauses in between Orbiter Processing Facility-3 and the Vehicle Assembly Building (VAB) during a move called "rollover." Once... More

CAPE CANAVERAL, Fla. – Tugboats safely deliver the Pegasus barge, carrying external tank 134, to the dock in the turn basin near the Vehicle Assembly Building, or VAB, at NASA's Kennedy Space Center in Florida. Pegasus arrived in Florida after an ocean voyage towed by a solid rocket booster retrieval ship from NASA's Michoud Assembly Facility near New Orleans. After Pegasus docks in the turn basin, the fuel tank will be offloaded and transported into the VAB.    ET-134 will be used to launch space shuttle Endeavour on the STS-130 mission to the International Space Station. Launch is targeted for Feb. 4, 2010.  For information on the components of the space shuttle and the STS-130 mission, visit http://www.nasa.gov/shuttle. Photo credit: NASA/Jack Pfaller KSC-2009-5818

CAPE CANAVERAL, Fla. – Tugboats safely deliver the Pegasus barge, carr...

CAPE CANAVERAL, Fla. – Tugboats safely deliver the Pegasus barge, carrying external tank 134, to the dock in the turn basin near the Vehicle Assembly Building, or VAB, at NASA's Kennedy Space Center in Florida.... More

KENNEDY SPACE CENTER, FLA. -- Near sunset, Space Shuttle Endeavour, atop the mobile launcher platform, begins moving through the doors of the Vehicle Assembly Building for rollout to Launch Pad 39A. First motion out of the VAB was at 8:10 p.m.  July 10, and the shuttle was hard down on the pad at 3:02 a.m. July 11.  Seen below the orbiter's wings and attached to the launcher platform are the tail masts, which provide several umbilical connections to the orbiter, including a liquid-oxygen line through one and a liquid-hydrogen line through another.  Endeavour is scheduled to launch on mission STS-118 on Aug. 7.  During the mission, Endeavour will carry into orbit the S5 truss, SPACEHAB module and external stowage platform 3. The mission is the 22nd flight to the International Space Station and will mark the first flight of Mission Specialist Barbara Morgan, the teacher-turned-astronaut whose association with NASA began more than 20 years ago.  STS-118 will be the first flight since 2002 for Endeavour, which has undergone extensive modifications, including the addition of safety upgrades already added to orbiters Discovery and Atlantis.  Photo credit: NASA/Tom Farrar KSC-07pd1853

KENNEDY SPACE CENTER, FLA. -- Near sunset, Space Shuttle Endeavour, at...

KENNEDY SPACE CENTER, FLA. -- Near sunset, Space Shuttle Endeavour, atop the mobile launcher platform, begins moving through the doors of the Vehicle Assembly Building for rollout to Launch Pad 39A. First motio... More

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, space shuttle Discovery -- its space shuttle main engines long since removed -- approaches the Vehicle Assembly Building, or VAB, from Orbiter Processing Facility-2, or OPF-2.    Discovery will be stored inside the VAB for approximately one month while shuttle Atlantis undergoes processing in OPF-2 following its final mission, STS-135. Discovery flew its 39th and final mission, STS-133, in February and March 2011, and currently is being prepared for public display at the Smithsonian's National Air and Space Museum Steven F. Udvar-Hazy Center in Virginia. For more information about Discovery's Transition and Retirement, visit   www.nasa.gov/mission_pages/shuttle/launch/discovery_rss_collection_archive_1.html.  Photo credit: NASA/Frankie Martin KSC-2011-5547

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, spa...

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, space shuttle Discovery -- its space shuttle main engines long since removed -- approaches the Vehicle Assembly Building, or VAB, from Orbiter ... More

KENNEDY SPACE CENTER, FLA. --   Inside the Vehicle Assembly Building, the external tank for Endeavour is being lowered toward the mobile launcher platform for mating with the solid rocket boosters. Endeavour is currently targeted for rollover to the VAB July 5.  On the lower end of the tank is seen the bipod fittings that connect the external tank to the orbiter through the shuttle's two forward attachment struts.  Endeavour is the designated orbiter for mission STS-118, targeted for launch on Aug. 9 to the International Space Station. The mission will continue space station construction by delivering a third starboard truss segment, S5, as well as carrying the external stowage platform 3.  Photo credit: NASA/Amanda Diller KSC-07pd1542

KENNEDY SPACE CENTER, FLA. -- Inside the Vehicle Assembly Building, ...

KENNEDY SPACE CENTER, FLA. -- Inside the Vehicle Assembly Building, the external tank for Endeavour is being lowered toward the mobile launcher platform for mating with the solid rocket boosters. Endeavour is... More

STS-132 ET-136 OFFLOAD FROM BARGE AND XFER TO VAB 2010-1971

STS-132 ET-136 OFFLOAD FROM BARGE AND XFER TO VAB 2010-1971

STS-132 ET-136 OFFLOAD FROM BARGE AND XFER TO VAB

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, space shuttle Endeavour enters the transfer aisle of the Vehicle Assembly Building (VAB). In the VAB, Endeavour will be lifted into a high bay where it will be attached to its external fuel tank and solid rocket boosters for its final mission, STS-134.    Endeavour and its STS-134 crew will deliver the Express Logistics Carrier-3, Alpha Magnetic Spectrometer, a high-pressure gas tank, additional spare parts for Dextre and micrometeoroid debris shields to the International Space Station. Launch is targeted for April 19 at 7:48 p.m. EDT. For more information visit, http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts134/index.html. Photo credit: NASA/Jack Pfaller KSC-2011-1904

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, spa...

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, space shuttle Endeavour enters the transfer aisle of the Vehicle Assembly Building (VAB). In the VAB, Endeavour will be lifted into a high bay ... More

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, space shuttle Endeavour is stationed in the transfer aisle of the Vehicle Assembly Building (VAB). In the VAB, Endeavour will be lifted into a high bay where it will be attached to its external fuel tank and solid rocket boosters for its final mission, STS-134.  Endeavour and its STS-134 crew will deliver the Express Logistics Carrier-3, Alpha Magnetic Spectrometer, a high-pressure gas tank, additional spare parts for Dextre and micrometeoroid debris shields to the International Space Station. Launch is targeted for April 19 at 7:48 p.m. EDT. For more information visit, http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts134/index.html. Photo credit: NASA/Jack Pfaller KSC-2011-1905

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, spa...

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, space shuttle Endeavour is stationed in the transfer aisle of the Vehicle Assembly Building (VAB). In the VAB, Endeavour will be lifted into a ... More

STS-131 DISCOVERY ROLLOVER FROM OPF-3 TO VAB 2010-1876

STS-131 DISCOVERY ROLLOVER FROM OPF-3 TO VAB 2010-1876

STS-131 DISCOVERY ROLLOVER FROM OPF-3 TO VAB

CAPE CANAVERAL, Fla. – The STS-1, orbiter Columbia, arrives at Launch Complex 39A after being rolled out of the VAB. Photo credit: NASA KSC-80PC-0737

CAPE CANAVERAL, Fla. – The STS-1, orbiter Columbia, arrives at Launch ...

CAPE CANAVERAL, Fla. – The STS-1, orbiter Columbia, arrives at Launch Complex 39A after being rolled out of the VAB. Photo credit: NASA

CAPE CANAVERAL, Fla. – STS-1, orbiter Columbia, sits at Launch Complex 39A after being rolled out of the VAB.    Photo credit: NASA KSC-80PC-0741

CAPE CANAVERAL, Fla. – STS-1, orbiter Columbia, sits at Launch Complex...

CAPE CANAVERAL, Fla. – STS-1, orbiter Columbia, sits at Launch Complex 39A after being rolled out of the VAB. Photo credit: NASA

Space Shuttle Columbia, STS-2 - PREPS - KSC

Space Shuttle Columbia, STS-2 - PREPS - KSC

S81-35998 (10 Aug. 1981) --- The orbiter Columbia creeps toward the vehicle assembly building (VAB) during its tow-over from the orbiter processing facility before dawn today. Columbia was backed out of its han... More

STS-27 external tank (ET) transfer into KSC's VAB

STS-27 external tank (ET) transfer into KSC's VAB

S88-37367 (March 28, 1988) --- The external tank (ET) for STS-27 arrived at Kennedy Space Center (KSC) today via ocean going barge and was moved into the Vehicle Assembly Building (VAB) where preparations will... More

STS-26 Discovery, Orbiter Vehicle (OV) 103, rollover at KSC

STS-26 Discovery, Orbiter Vehicle (OV) 103, rollover at KSC

S88-42092 (15 July 1988) --- STS-26 Discovery, Orbiter Vehicle (OV) 103, rollover at Kennedy Space Center (KSC) is closely monitored by engineers and technicians in the late stages of the move from the orbiter ... More

STS-26 Discovery, Orbiter Vehicle (OV) 103, ET/SRB mating in KSC VAB

STS-26 Discovery, Orbiter Vehicle (OV) 103, ET/SRB mating in KSC VAB

S88-41541 (7 July 1988) --- STS-26 Discovery, Orbiter Vehicle (OV) 103, is suspended by overhead crane and large frame attached to vehicle at four points. A ground-level view shows OV-103 during operations to a... More

STS-26 Discovery, OV-103, rolls out of KSC VAB into darkness of the night

STS-26 Discovery, OV-103, rolls out of KSC VAB into darkness of the ni...

STS-26 Discovery, Orbiter Vehicle (OV) 103, mated with the external tank (ET) and solid rocket boosters (SRBs), is framed by Kennedy Space Center's (KSC's) vehicle assembly building (VAB) doorway as it rolled o... More

STS-27 Atlantis, OV-104, ET/SRB mating operations at KSC VAB

STS-27 Atlantis, OV-104, ET/SRB mating operations at KSC VAB

STS-27 Atlantis, Orbiter Vehicle (OV) 104, is suspended via overhead crane, attached at four points, in the Kennedy Space Center (KSC) Vehicle Assembly Building (VAB). Below OV-104 on the mobile launcher platfo... More

STS-29 Discovery, OV-103, roll out from KSC Vehicle Assembly Building (VAB)

STS-29 Discovery, OV-103, roll out from KSC Vehicle Assembly Building ...

S89-28111 (3 Feb 1989) --- The Space Shuttle Discovery, atop a mobile launch platform, is rolled through the doors of the huge vehicle assembly building (VAB) at 6 a.m., Feb. 3, 1989 on its way to Launch Comple... More

STS-28 Columbia, OV-102, ET/SRB mating preparations at KSC VAB

STS-28 Columbia, OV-102, ET/SRB mating preparations at KSC VAB

S89-39624 (3 July 1989) --- Following rollover from the Orbiter Processing Facility, the orbiter Columbia is prepared for mating with the ET/SRB stack in the Vehicle Assembly Building transfer aisle as work con... More

STS-36 Atlantis, OV-104, leaves VAB during its rollout to KSC LC Pad 39A

STS-36 Atlantis, OV-104, leaves VAB during its rollout to KSC LC Pad 3...

Atlantis, Orbiter Vehicle (OV) 104, is blocked by its large orange external tank (ET) as it leaves Vehicle Assembly Building (VAB) during its rollout to Kennedy Space Center (KSC) Launch Complex (LC) Pad 39A. T... More

STS-35 Columbia, OV-102, rolls back to KSC VAB after hydrogen leak discovered

STS-35 Columbia, OV-102, rolls back to KSC VAB after hydrogen leak dis...

S90-42289 ( 3 July 1990) --- Kennedy Space Center (KSC) workers watch as Columbia, Orbiter Vehicle (OV) 102, along with its external tank (ET) and two solid rocket boosters (SRBs) atop the giant crawler transpo... More

CAPE CANAVERAL, Fla. – The space shuttle Discovery heads out of the VAB to Launch Pad 39B. Discovery is set to leftoff on shuttle mission STS-41, carrying a five-member crew and the Ulysses solar explorer during a launch period extending from Oct. 5 through Oct. 23, 1990.    Photo credit: NASA KSC-90PC-1339

CAPE CANAVERAL, Fla. – The space shuttle Discovery heads out of the VA...

CAPE CANAVERAL, Fla. – The space shuttle Discovery heads out of the VAB to Launch Pad 39B. Discovery is set to leftoff on shuttle mission STS-41, carrying a five-member crew and the Ulysses solar explorer durin... More

CAPE CANAVERAL, Fla. – The orbiter Discovery, its wheels retracted atop the orbiter transporter, rolls over from the OPF high bay to the VAB. Discovery is slated to lift off in March on mission STS-39, a DoD flight carrying a crew of seven.    Photo credit: NASA KSC-91PC-0219

CAPE CANAVERAL, Fla. – The orbiter Discovery, its wheels retracted ato...

CAPE CANAVERAL, Fla. – The orbiter Discovery, its wheels retracted atop the orbiter transporter, rolls over from the OPF high bay to the VAB. Discovery is slated to lift off in March on mission STS-39, a DoD fl... More

CAPE CANAVERAL, Fla. – The orbiter Discovery heads for the VAB atop the specially designed orbiter transporter. Once inside the VAB, Discovery will be mated with the external tank/solid rocket booster assembly. The fully assembled shuttle will then be rolled to Pad 39A, where liftoff on mission STS-42 is set for early 1992.    Photo credit: NASA KSC-91PC-2003

CAPE CANAVERAL, Fla. – The orbiter Discovery heads for the VAB atop th...

CAPE CANAVERAL, Fla. – The orbiter Discovery heads for the VAB atop the specially designed orbiter transporter. Once inside the VAB, Discovery will be mated with the external tank/solid rocket booster assembly.... More

STS-55 Columbia, OV-102, mated to the ET and SRBs is rolled out of KSC's VAB

STS-55 Columbia, OV-102, mated to the ET and SRBs is rolled out of KSC...

S93-29846 (2 Feb 1993) --- The orbiter Columbia is rolled out of the Vehicle Assembly Building (VAB). Having completed its assembly with the external tank and solid rocket boosters, the Space Shuttle will be r... More

STS-51 preparation: ACTS, ORFEUS, Discovery in VAB

STS-51 preparation: ACTS, ORFEUS, Discovery in VAB

S93-38577 (1 June 1993) --- The orbiter Discovery is rolled into the Vehicle Assembly Building (VAB) for mating with the external tank and twin solid rocket boosters. Discovery is being prepared for mission S... More

Earth observations taken during STS-77 mission

Earth observations taken during STS-77 mission

STS077-713-010 (19-29 May 1996) --- Like a number of Shuttle flight crews that preceded them, the members of the crew aboard the Space Shuttle Endeavour made eastern Florida one of their photographic targets. ... More

KENNEDY SPACE CENTER, FLA. -- Atlantis rolls to the VAB for stacking before rollout to Pad 39A in preparation for STS-79. KSC-96pc0973

KENNEDY SPACE CENTER, FLA. -- Atlantis rolls to the VAB for stacking b...

KENNEDY SPACE CENTER, FLA. -- Atlantis rolls to the VAB for stacking before rollout to Pad 39A in preparation for STS-79.

KENNEDY SPACE CENTER, FLA. -  As the sun begins to rise in the early-morning sky after its departure from Launch Pad 39A, the Space Shuttle Atlantis slowly travels on the crawlerway toward the Vehicle Assembly Building.  This marks the second rollback for Atlantis since July because of hurricane threats.  Atlantis, which is targeted fo liftoff later this month on the STS-79 Shuttle mission, is returning to the VAB because of the threat from Hurricane Fran.  The threat of Hurricane Bertha forced the rollback of Atlantis in July.  Atlantis currently is scheduled for launch on the fourth Shuttle-Mir docking mission around mid-September. KSC-96pc1038

KENNEDY SPACE CENTER, FLA. - As the sun begins to rise in the early-m...

KENNEDY SPACE CENTER, FLA. - As the sun begins to rise in the early-morning sky after its departure from Launch Pad 39A, the Space Shuttle Atlantis slowly travels on the crawlerway toward the Vehicle Assembly ... More

KENNEDY SPACE CENTER, FLA. -- The orbiter Columbia completes the short journey from Orbiter Processing Facility Bay 1 to the Vehicle Assembly Building (VAB). During its approximately one-week stay inside the VAB, the spaceplane will be mated to the external tank and twin solid rocket boosters, and electrical and mechanical interfaces will be verified. Rollout to Launch Pad 39B is planned for Oct. 16, where the two primary payloads of the upcoming STS-80 mission -- the Wake Shield Facility-3 (WSF-3) and Orbiting and Retrievable Far and Extreme Ultraviolet Spectrograph-Shuttle Pallet Satellite-2 (ORFEUS-SPAS-2) -- will be installed. Liftoff on the final Shuttle flight of 1996 is targeted for no earlier than Nov 8 at 2:47 p.m. EST. KSC-96pc1160

KENNEDY SPACE CENTER, FLA. -- The orbiter Columbia completes the short...

KENNEDY SPACE CENTER, FLA. -- The orbiter Columbia completes the short journey from Orbiter Processing Facility Bay 1 to the Vehicle Assembly Building (VAB). During its approximately one-week stay inside the VA... More

KENNEDY SPACE CENTER, FLA. -- The orbiter Columbia completes the short journey from Orbiter Processing Facility Bay 1 to the Vehicle Assembly Building (VAB). During its approximately one-week stay inside the VAB, the spaceplane will be mated to the external tank and twin solid rocket boosters, and electrical and mechanical interfaces will be verified. Rollout to Launch Pad 39B is planned for Oct. 16, where the two primary payloads of the upcoming STS-80 mission -- the Wake Shield Facility-3 (WSF-3) and Orbiting and Retrievable Far and Extreme Ultraviolet Spectrograph-Shuttle Pallet Satellite-2 (ORFEUS-SPAS-2) -- will be installed. Liftoff on the final Shuttle flight of 1996 is targeted for no earlier than Nov 8 at 2:47 p.m. EST KSC-96pc1159

KENNEDY SPACE CENTER, FLA. -- The orbiter Columbia completes the short...

KENNEDY SPACE CENTER, FLA. -- The orbiter Columbia completes the short journey from Orbiter Processing Facility Bay 1 to the Vehicle Assembly Building (VAB). During its approximately one-week stay inside the VA... More

KENNEDY SPACE CENTER, FLA. -- The orbiter Columbia completes the short journey from Orbiter Processing Facility Bay 1 to the Vehicle Assembly Building (VAB). During its approximately one-week stay inside the VAB, the spaceplane will be mated to the external tank and twin solid rocket boosters, and electrical and mechanical interfaces will be verified. Rollout to Launch Pad 39B is planned for Oct. 16, where the two primary payloads of the upcoming STS-80 mission -- the Wake Shield Facility-3 (WSF-3) and Orbiting and Retrievable Far and Extreme Ultraviolet Spectrograph-Shuttle Pallet Satellite-2 (ORFEUS-SPAS-2) -- will be installed. Liftoff on the final Shuttle flight of 1996 is targeted for no earlier than Nov 8 at 2:47 p.m. EST KSC-96pc1158

KENNEDY SPACE CENTER, FLA. -- The orbiter Columbia completes the short...

KENNEDY SPACE CENTER, FLA. -- The orbiter Columbia completes the short journey from Orbiter Processing Facility Bay 1 to the Vehicle Assembly Building (VAB). During its approximately one-week stay inside the VA... More

KENNEDY SPACE CENTER, FLA. -- With the Mate/Demate Device (MDD) on the left and the Vehicle Assembly Building (VAB) on the right, the Space Shuttle orbiter Atlantis approaches Runway 33 at KSC’s Shuttle Landing Facility for a scheduled touchdown at about 9:23 a.m. EST Jan. 22. When the orbiter lands, it will conclude the fifth Shuttle-Mir docking mission and return NASA astronaut John Blaha to Earth after four months in space. At main gear touchdown, the STS-81 mission duration will be 10 days, 4 hours, 55 minutes. This is the 34th KSC landing in Shuttle history. Mission Commander Michael A. Baker is steering Atlantis to a perfect landing, with help from Pilot Brent W. Jett, Jr. Other returning STS-81 crew members are Mission Specialists John M. Grunsfeld, Peter J. K. "Jeff" Wisoff and Marsha S. Ivins. Atlantis also brought back experiment samples from the Russian space station Mir for analysis on Earth KSC-97pc193

KENNEDY SPACE CENTER, FLA. -- With the Mate/Demate Device (MDD) on the...

KENNEDY SPACE CENTER, FLA. -- With the Mate/Demate Device (MDD) on the left and the Vehicle Assembly Building (VAB) on the right, the Space Shuttle orbiter Atlantis approaches Runway 33 at KSC’s Shuttle Landing... More

KENNEDY SPACE CENTER, FLA. -- The Space Shuttle Orbiter Columbia glides in for a touchdown on Runway 33 at KSC’s Shuttle Landing Facility that will conclude the Microgravity Science Laboratory-1 (MSL-1) mission. Columbia was scheduled to touch down at 2:33 p.m. EDT, April 8. The Vehicle Assembly Building (VAB) is to the right, while the Mate/Demate Device (MDD) is to the left. A NASA Shuttle Training Aircraft (STA) that acts as a chase plane during landings passes by overhead. With Columbia’s on-time main gear touchdown, the STS-83 mission duration will be 3 days, 23 hours, 12 minutes. The planned 16-day mission was cut short by a faulty fuel cell. This is only the third time in Shuttle program history that an orbiter was brought home early due to mechanical problems. This was also the 36th KSC landing since the program began in 1981 KSC-97pc605

KENNEDY SPACE CENTER, FLA. -- The Space Shuttle Orbiter Columbia glide...

KENNEDY SPACE CENTER, FLA. -- The Space Shuttle Orbiter Columbia glides in for a touchdown on Runway 33 at KSC’s Shuttle Landing Facility that will conclude the Microgravity Science Laboratory-1 (MSL-1) mission... More

While KSC workers in the Launch Complex 39  Area watch, The Space Shuttle Orbiter Columbia rolls over to the Vehicle Assembly  Building (VAB) June 4 from Orbiter Processing Facility (OPF)1 atop its transporter in  preparation for the STS-94 mission. Once inside the VAB, Columbia will be hoisted to be  mated with its solid rocket boosters and external tank. Columbia was moved to the OPF  April 8 after the completion of the STS-83 mission.  KSC payloads processing employees  then began work to reservice the Microgravity Science Laboratory-1 (MSL-1) Spacelab  module in the orbiter’s payload bay for the STS-94 mission. This was the first time that  this type of payload was reserviced without removing it from the payload bay. This new  procedure pioneers processing efforts for possible quick  relaunch turnaround times for  future payloads. The MSL-1 module will fly again with the full complement of  STS-83  experiments after that mission was cut short due to indications of a faulty fuel cell.  During the scheduled 16-day STS-94 mission, the experiments will be used to test some  of the hardware, facilities and procedures that are planned for use on the International  Space Station while the flight crew conducts combustion, protein crystal growth and  materials processing experiments KSC-97PC879

While KSC workers in the Launch Complex 39 Area watch, The Space Shut...

While KSC workers in the Launch Complex 39 Area watch, The Space Shuttle Orbiter Columbia rolls over to the Vehicle Assembly Building (VAB) June 4 from Orbiter Processing Facility (OPF)1 atop its transporter ... More

The Space Shuttle Orbiter Columbia is reflected  in a nearby pond as it rolls over to the Vehicle Assembly Building (VAB) June 4 from  Orbiter Processing Facility (OPF) 1 atop its transporter in preparation for the STS-94  mission. Once inside the VAB, Columbia will be hoisted to be mated with its solid rocket  boosters and external tank. Columbia was moved to the OPF April 8 after the completion  of the STS-83 mission.  KSC payloads processing employees then began work to  reservice the Microgravity Science Laboratory-1 (MSL-1) Spacelab module in the  orbiter’s payload bay for the STS-94 mission. This was the first time that this type of  payload was reserviced without removing it from the payload bay. This new procedure  pioneers processing efforts for possible quick  relaunch turnaround times for future  payloads. The MSL-1 module will fly again with the full complement of  STS-83  experiments after that mission was cut short due to indications of a faulty fuel cell.  During the scheduled 16-day STS-94 mission, the experiments will be used to test some  of the hardware, facilities and procedures that are planned for use on the International  Space Station while the flight crew conducts combustion, protein crystal growth and  materials processing experiments KSC-97PC880

The Space Shuttle Orbiter Columbia is reflected in a nearby pond as i...

The Space Shuttle Orbiter Columbia is reflected in a nearby pond as it rolls over to the Vehicle Assembly Building (VAB) June 4 from Orbiter Processing Facility (OPF) 1 atop its transporter in preparation for... More

Carried atop an orbiter transporter, the Space Shuttle orbiter Atlantis makes the short journey from Orbiter Processing Facility Bay 3 to the Vehicle Assembly Building (VAB). This photo was taken from the roof of the 525-foot-tall VAB. The "rollover" of the orbiter is one of the prelaunch milestones. Atlantis is being readied for the next mission, STS-86, which is targeted for a September launch. STS-86 will be the seventh of nine planned dockings of the Space Shuttle orbiter with the Russian Space Station Mir KSC-97PC1221

Carried atop an orbiter transporter, the Space Shuttle orbiter Atlanti...

Carried atop an orbiter transporter, the Space Shuttle orbiter Atlantis makes the short journey from Orbiter Processing Facility Bay 3 to the Vehicle Assembly Building (VAB). This photo was taken from the roof ... More

Carried atop an orbiter transporter, the Space Shuttle orbiter Atlantis rolls out of Orbiter Processing Facility Bay 3, in background, en route to the Vehicle Assembly Building (VAB). This photo was taken from the roof of the VAB. The "rollover" of the orbiter is one of the prelaunch milestones. Atlantis is being readied for the next mission, STS-86, which is targeted for a September launch. STS-86 will be the seventh of nine planned dockings of the Space Shuttle orbiter with the Russian Space Station Mir KSC-97PC1225

Carried atop an orbiter transporter, the Space Shuttle orbiter Atlanti...

Carried atop an orbiter transporter, the Space Shuttle orbiter Atlantis rolls out of Orbiter Processing Facility Bay 3, in background, en route to the Vehicle Assembly Building (VAB). This photo was taken from ... More

Carried atop an orbiter transporter, the Space Shuttle orbiter Atlantis makes the short journey from Orbiter Processing Facility Bay 3 to the Vehicle Assembly Building (VAB). This photo was taken from the roof of the 525-foot-tall VAB. The "rollover" of the orbiter is one of the prelaunch milestones. Atlantis is being readied for the next mission, STS-86, which is targeted for a September launch. STS-86 will be the seventh of nine planned dockings of the Space Shuttle orbiter with the Russian Space Station Mir KSC-97PC1222

Carried atop an orbiter transporter, the Space Shuttle orbiter Atlanti...

Carried atop an orbiter transporter, the Space Shuttle orbiter Atlantis makes the short journey from Orbiter Processing Facility Bay 3 to the Vehicle Assembly Building (VAB). This photo was taken from the roof ... More

Carried atop an orbiter transporter, the Space Shuttle orbiter Atlantis rolls into the transfer aisle of the Vehicle Assembly Building (VAB) . The "rollover" of the orbiter from the Orbiter Processing Facility to the nearby VAB is one of the prelaunch milestones. Atlantis is being readied for the next mission, STS-86, which is targeted for a September launch. STS-86 will be the seventh of nine planned dockings of the Space Shuttle orbiter with the Russian Space Station Mir KSC-97PC1226

Carried atop an orbiter transporter, the Space Shuttle orbiter Atlanti...

Carried atop an orbiter transporter, the Space Shuttle orbiter Atlantis rolls into the transfer aisle of the Vehicle Assembly Building (VAB) . The "rollover" of the orbiter from the Orbiter Processing Facility ... More

KENNEDY SPACE CENTER, FLA. -- With Commander Curtis L. Brown, Jr. and Pilot Kent V. Rominger at the controls and the Mate/Demate Device (MDD) and the Vehicle Assembly Building (VAB) in the background, the Space Shuttle orbiter Discovery touches down on Runway 33 at KSC’s Shuttle Landing Facility at 7:07:59 a.m. EDT Aug. 19 to complete the 11-day, 20-hour and 27-minute-long STS-85 mission. The first landing opportunity on Aug. 18 was waved off due to the potential for ground fog. Also onboard the orbiter are Payload Commander N. Jan Davis, Mission Specialist Robert L. Curbeam, Jr., Mission Specialist Stephen K. Robinson and Payload Specialist Bjarni V. Tryggvason. During the 86th Space Shuttle mission, the crew deployed the Cryogenic Infrared Spectrometers and Telescopes for the Atmosphere-Shuttle Pallet Satellite-2 (CRISTA-SPAS-2) free-flyer to conduct research on the Earth’s middle atmosphere, retrieving it on flight day 9. The crew also conducted investigations with the Manipulator Flight Demonstration (MFD), Technology Applications and Science-1 (TAS-1) and International Extreme Ultraviolet Hitchhiker-2 (IEH-2) experiments. Robinson also made observations of the comet HaleBopp with the Southwest Ultraviolet Imaging System (SWIS) while other members of the crew conducted biological experiments in the orbiter’s crew cabin. This was the 39th landing at KSC in the history of the Space Shuttle program and the 11th touchdown for Discovery at the space center KSC-97PC1260

KENNEDY SPACE CENTER, FLA. -- With Commander Curtis L. Brown, Jr. and ...

KENNEDY SPACE CENTER, FLA. -- With Commander Curtis L. Brown, Jr. and Pilot Kent V. Rominger at the controls and the Mate/Demate Device (MDD) and the Vehicle Assembly Building (VAB) in the background, the Space... More

KENNEDY SPACE CENTER, FLA. -- With Commander Curtis L. Brown, Jr. and Pilot Kent V. Rominger at the controls and the Vehicle Assembly Building (VAB) in the background, the Space Shuttle orbiter Discovery touches down on Runway 33 at KSC’s Shuttle Landing Facility at 7:07:59 a.m. EDT Aug. 19 to complete the 11-day, 20-hour and 27-minute-long STS-85 mission. The first landing opportunity on Aug. 18 was waved off due to the potential for ground fog. Also onboard the orbiter are Payload Commander N. Jan Davis, Mission Specialist Robert L. Curbeam, Jr., Mission Specialist Stephen K. Robinson and Payload Specialist Bjarni V. Tryggvason. During the 86th Space Shuttle mission, the crew deployed the Cryogenic Infrared Spectrometers and Telescopes for the Atmosphere-Shuttle Pallet Satellite-2 (CRISTA-SPAS-2) free-flyer to conduct research on the Earth’s middle atmosphere, retrieving it on flight day 9. The crew also conducted investigations with the Manipulator Flight Demonstration (MFD), Technology Applications and Science-1 (TAS-1) and International Extreme Ultraviolet Hitchhiker-2 (IEH-2) experiments. Robinson also made observations of the comet HaleBopp with the Southwest Ultraviolet Imaging System (SWIS) while other members of the crew conducted biological experiments in the orbiter’s crew cabin. This was the 39th landing at KSC in the history of the Space Shuttle program and the 11th touchdown for Discovery at the space center KSC-97PC1255

KENNEDY SPACE CENTER, FLA. -- With Commander Curtis L. Brown, Jr. and ...

KENNEDY SPACE CENTER, FLA. -- With Commander Curtis L. Brown, Jr. and Pilot Kent V. Rominger at the controls and the Vehicle Assembly Building (VAB) in the background, the Space Shuttle orbiter Discovery touche... More

KENNEDY SPACE CENTER, Fla. -- The orbiter drag chute deploys after the Space Shuttle orbiter Atlantis lands on Runway 15 of the KSC Shuttle Landing Facility (SLF) at the conclusion of the nearly 11-day STS-86 mission. The Vehicle Assembly Building (VAB) can be seen in the background. Main gear touchdown was at 5:55:09 p.m. EDT, Oct. 6, 1997, with an unofficial mission-elapsed time of 10 days, 19 hours, 20 minutes and 50 seconds. The first two KSC landing opportunities on Sunday were waved off because of weather concerns. The 87th Space Shuttle mission was the 40th landing of the Shuttle at KSC. On Sunday evening, the Space Shuttle program reached a milestone: The total flight time of the Shuttle passed the two-year mark. STS86 was the seventh of nine planned dockings of the Space Shuttle with the Russian Space Station Mir. STS-86 Mission Specialist David A. Wolf replaced NASA astronaut and Mir 24 crew member C. Michael Foale, who has been on the Mir since mid-May. Foale returned to Earth on Atlantis with the remainder of the STS-86 crew. The other crew members are Commander James D. Wetherbee, Pilot Michael J. Bloomfield, and Mission Specialists Wendy B. Lawrence, Scott E. Parazynski, Vladimir Georgievich Titov of the Russian Space Agency, and Jean-Loup J.M. Chretien of the French Space Agency, CNES. Wolf is scheduled to remain on the Mir until the STS-89 Shuttle mission in January. Besides the docking and crew exchange, STS-86 included the transfer of more than three-and-a-half tons of science/logistical equipment and supplies between the two orbiting spacecraft. Parazynski and Titov also conducted a spacewalk while Atlantis and the Mir were docked KSC-97PC1498

KENNEDY SPACE CENTER, Fla. -- The orbiter drag chute deploys after the...

KENNEDY SPACE CENTER, Fla. -- The orbiter drag chute deploys after the Space Shuttle orbiter Atlantis lands on Runway 15 of the KSC Shuttle Landing Facility (SLF) at the conclusion of the nearly 11-day STS-86 m... More

The orbiter Endeavour awaits further processing in the transfer aisle of the Vehicle Assembly Building (VAB). It had been undergoing preparations for the STS-89 mission in Orbiter Processing Facility Bay 1. In the VAB, Endeavour will be mated to the external tank/solid rocket booster stack slated for use on the STS-89 mission. The STS-89 launch is targeted for Jan. 20, 1998 KSC-97PC1795

The orbiter Endeavour awaits further processing in the transfer aisle ...

The orbiter Endeavour awaits further processing in the transfer aisle of the Vehicle Assembly Building (VAB). It had been undergoing preparations for the STS-89 mission in Orbiter Processing Facility Bay 1. In ... More

The orbiter Endeavour awaits further processing in the transfer aisle of the Vehicle Assembly Building (VAB). It had been undergoing preparations for the STS-89 mission in Orbiter Processing Facility Bay 1. In the VAB, Endeavour will be mated to the external tank/solid rocket booster stack slated for use on the STS-89 mission. The STS-89 launch is targeted for Jan. 20, 1998 KSC-97PC1794

The orbiter Endeavour awaits further processing in the transfer aisle ...

The orbiter Endeavour awaits further processing in the transfer aisle of the Vehicle Assembly Building (VAB). It had been undergoing preparations for the STS-89 mission in Orbiter Processing Facility Bay 1. In ... More

KENNEDY SPACE CENTER, FLA. -- The Space Shuttle orbiter Columbia was transferred from Orbiter Processing Facility Bay 3 today to the Vehicle Assembly Building (VAB), where it will be mated to its external tank and solid rocket boosters. Here it is shown in the transfer aisle of the VAB. Columbia is being prepared for the STS-90 mission, carrying the Neurolab payload. Investigations during the Neurolab mission will focus on the effects of microgravity on the nervous system. The mission is a joint venture of six space agencies and seven U.S. research agencies. Investigator teams from nine countries will conduct 31 studies in the microgravity environment of space. The launch is targeted for April 16 at 2:19 p.m. EDT KSC-98pc373

KENNEDY SPACE CENTER, FLA. -- The Space Shuttle orbiter Columbia was t...

KENNEDY SPACE CENTER, FLA. -- The Space Shuttle orbiter Columbia was transferred from Orbiter Processing Facility Bay 3 today to the Vehicle Assembly Building (VAB), where it will be mated to its external tank ... More

KENNEDY SPACE CENTER, FLA. -- The Space Shuttle orbiter Columbia was transferred from Orbiter Processing Facility Bay 3 today to the Vehicle Assembly Building (VAB), where it will be mated to its external tank and solid rocket boosters. Here it is shown on its way to the VAB. Columbia is being prepared for the STS-90 mission, carrying the Neurolab payload. Investigations during the Neurolab mission will focus on the effects of microgravity on the nervous system. The mission is a joint venture of six space agencies and seven U.S. research agencies. Investigator teams from nine countries will conduct 31 studies in the microgravity environment of space. The launch is targeted for April 16 at 2:19 p.m. EDT KSC-98pc372

KENNEDY SPACE CENTER, FLA. -- The Space Shuttle orbiter Columbia was t...

KENNEDY SPACE CENTER, FLA. -- The Space Shuttle orbiter Columbia was transferred from Orbiter Processing Facility Bay 3 today to the Vehicle Assembly Building (VAB), where it will be mated to its external tank ... More

The orbiter Discovery rolls out of KSC's Orbiter Processing Facility Bay 2 en route to the Vehicle Assembly Building (VAB). Once inside the VAB, Discovery will be hoisted upright into a vertical position to be mated with an orange external tank and two white solid rocket boosters. Once mated, the orbiter becomes the Space Shuttle Discovery, slated for launch on STS-91, the ninth and final docking mission with the Russian Space Station Mir. The six-member crew of STS-91 will dock with Mir and pick up Mission Specialist Andrew Thomas, Ph.D., who will have been on Mir about four months, to return him to Earth. STS-91 is scheduled to launch June 2 at about 6:04 p.m. EDT KSC-98pc535

The orbiter Discovery rolls out of KSC's Orbiter Processing Facility B...

The orbiter Discovery rolls out of KSC's Orbiter Processing Facility Bay 2 en route to the Vehicle Assembly Building (VAB). Once inside the VAB, Discovery will be hoisted upright into a vertical position to be ... More

Astronaut Fernando (Frank) Caldeiro poses in front of the orbiter Discovery as it rolls out of KSC's Orbiter Processing Facility Bay 2 en route to the Vehicle Assembly Building (VAB). Once inside the VAB, Discovery will be hoisted upright into a vertical position to be mated with an orange external tank and two white solid rocket boosters. Once mated, the orbiter becomes the Space Shuttle Discovery, slated for launch on STS-91, the ninth and final docking mission with the Russian Space Station Mir. The six-member crew of STS-91 will dock with Mir and pick up Mission Specialist Andrew Thomas, Ph.D., who will have been on Mir about four months, to return him to Earth. STS-91 is scheduled to launch June 2 at about 6:04 p.m. EDT KSC-98pc534

Astronaut Fernando (Frank) Caldeiro poses in front of the orbiter Disc...

Astronaut Fernando (Frank) Caldeiro poses in front of the orbiter Discovery as it rolls out of KSC's Orbiter Processing Facility Bay 2 en route to the Vehicle Assembly Building (VAB). Once inside the VAB, Disco... More

The orbiter Discovery is backed out of KSC's Orbiter Processing Facility Bay 2 en route to the Vehicle Assembly Building (VAB). Once inside the VAB, Discovery will be hoisted upright into a vertical position to be mated with an orange external tank and two white solid rocket boosters. Once mated, the orbiter becomes the Space Shuttle Discovery, slated for launch on STS-91, the ninth and final docking mission with the Russian Space Station Mir. The six-member crew of STS-91 will dock with Mir and pick up Mission Specialist Andrew Thomas, Ph.D., who will have been on Mir about four months, to return him to Earth. STS-91 is scheduled to launch June 2 at about 6:04 p.m. EDT KSC-98pc533

The orbiter Discovery is backed out of KSC's Orbiter Processing Facili...

The orbiter Discovery is backed out of KSC's Orbiter Processing Facility Bay 2 en route to the Vehicle Assembly Building (VAB). Once inside the VAB, Discovery will be hoisted upright into a vertical position to... More

The orbiter Discovery approaches KSC's 525-foot-high Vehicle Assembly Building (VAB) after leaving the Orbiter Processing Facility Bay 2. Once inside the VAB, Discovery will be hoisted upright into a vertical position to be mated with an orange external tank and two white solid rocket boosters. Once mated, the orbiter becomes the Space Shuttle Discovery, slated for launch on STS-91, the ninth and final docking mission with the Russian Space Station Mir. The six-member crew of STS-91 will dock with Mir and pick up Mission Specialist Andrew Thomas, Ph.D., who will have been on Mir about four months, to return him to Earth. STS-91 is scheduled to launch June 2 at about 6:04 p.m. EDT KSC-98pc536

The orbiter Discovery approaches KSC's 525-foot-high Vehicle Assembly ...

The orbiter Discovery approaches KSC's 525-foot-high Vehicle Assembly Building (VAB) after leaving the Orbiter Processing Facility Bay 2. Once inside the VAB, Discovery will be hoisted upright into a vertical p... More

KENNEDY SPACE CENTER, FLA. -- Space Shuttle Discovery is silhouetted against the early morning sky as it is makes its 3.4 mile trek atop a crawler/transporter to Launch Complex 39A from the Vehicle Assembly Building (VAB). There, in high bay 1, Discovery was mated to the first Space Shuttle super lightweight external tank/solid rocket booster stack. Discovery will be launched on mission STS-91, concluding Phase I of the joint U.S.-Russian International Space Station Program, on June 2 with a launch window opening around 6:10 p.m. EDT. This will be the ninth Shuttle docking with the Russian Space Station Mir, but the first Mir docking for Discovery. The STS-91 flight crew includes Commander Charles Precourt; Pilot Dominic Gorie; and Mission Specialists Wendy B. Lawrence; Franklin Chang-Diaz, Ph.D.; Janet Kavandi, Ph.D.; and Valery Ryumin, with the Russian Space Agency. Andrew Thomas, Ph.D., will be returning to Earth with the crew after living more than four months aboard Mir KSC-98pc568

KENNEDY SPACE CENTER, FLA. -- Space Shuttle Discovery is silhouetted a...

KENNEDY SPACE CENTER, FLA. -- Space Shuttle Discovery is silhouetted against the early morning sky as it is makes its 3.4 mile trek atop a crawler/transporter to Launch Complex 39A from the Vehicle Assembly Bui... More

Participants in the ribbon cutting for KSC's new 34,600-square-foot Space Shuttle Main Engine Processing Facility (SSMEPF) pose in front of a Space Shuttle Main Engine on display for the ceremony. From left, they are Ed Adamek, vice president and associate program manager for Ground Operations of United Space Alliance; John Plowden, vice president of Rocketdyne; Donald R. McMonagle, manager of Launch Integration; U.S. Congressman Dave Weldon; KSC Center Director Roy D. Bridges Jr.; Wade Ivey of Ivey Construction, Inc.; and Robert B. Sieck, director of Shuttle Processing. A major addition to the existing Orbiter Processing Facility Bay 3, the SSMEPF replaces the Shuttle Main Engine Shop located in the Vehicle Assembly Building (VAB). The decision to move the shop out of the VAB was prompted by safety considerations and recent engine processing improvements. The first three main engines to be processed in the new facility will fly on Shuttle Endeavour's STS-88 mission in December 1998 KSC-98pc784

Participants in the ribbon cutting for KSC's new 34,600-square-foot Sp...

Participants in the ribbon cutting for KSC's new 34,600-square-foot Space Shuttle Main Engine Processing Facility (SSMEPF) pose in front of a Space Shuttle Main Engine on display for the ceremony. From left, th... More

Participants in the ribbon cutting for KSC's new 34,600-square-foot Space Shuttle Main Engine Processing Facility (SSMEPF) gather to talk inside the facility following the ceremony. From left, they are Robert B. Sieck, director of Shuttle Processing; KSC Center Director Roy D. Bridges Jr.; U.S. Congressman Dave Weldon; John Plowden, vice president of Rocketdyne; and Donald R. McMonagle, manager of Launch Integration. A major addition to the existing Orbiter Processing Facility Bay 3, the SSMEPF replaces the Shuttle Main Engine Shop located in the Vehicle Assembly Building (VAB). The decision to move the shop out of the VAB was prompted by safety considerations and recent engine processing improvements. The first three main engines to be processed in the new facility will fly on Shuttle Endeavour's STS-88 mission in December 1998 KSC-98pc785

Participants in the ribbon cutting for KSC's new 34,600-square-foot Sp...

Participants in the ribbon cutting for KSC's new 34,600-square-foot Space Shuttle Main Engine Processing Facility (SSMEPF) gather to talk inside the facility following the ceremony. From left, they are Robert B... More

James W. Tibble (pointing at engine), an Engine Systems/Ground Support Equipment team manager for Rocketdyne, discusses the operation of a Space Shuttle Main Engine with Robert B. Sieck, director of Shuttle Processing; U.S. Congressman Dave Weldon; and KSC Center Director Roy D. Bridges Jr. Following the ribbon cutting ceremony for KSC's new 34,600-square-foot Space Shuttle Main Engine Processing Facility (SSMEPF), KSC employees and media explored the facility. A major addition to the existing Orbiter Processing Facility Bay 3, the SSMEPF replaces the Shuttle Main Engine Shop located in the Vehicle Assembly Building (VAB). The decision to move the shop out of the VAB was prompted by safety considerations and recent engine processing improvements. The first three main engines to be processed in the new facility will fly on Shuttle Endeavour's STS-88 mission in December 1998 KSC-98pc786

James W. Tibble (pointing at engine), an Engine Systems/Ground Support...

James W. Tibble (pointing at engine), an Engine Systems/Ground Support Equipment team manager for Rocketdyne, discusses the operation of a Space Shuttle Main Engine with Robert B. Sieck, director of Shuttle Pro... More

KSC Center Director Roy D. Bridges Jr. and U.S. Congressman Dave Weldon (holding scissors) cut the ribbon at a ceremony on July 6 to open KSC's new 34,600-square-foot Space Shuttle Main Engine Processing Facility (SSMEPF). Joining in the ribbon cutting are (left) Ed Adamek, vice president and associate program manager for Ground Operations of United Space Alliance; Marvin L. Jones, director of Installation Operations; Donald R. McMonagle, manager of Launch Integration; (right) Wade Ivey of Ivey Construction, Inc.; Robert B. Sieck, director of Shuttle Processing; and John Plowden, vice president of Rocketdyne. A major addition to the existing Orbiter Processing Facility Bay 3, the SSMEPF replaces the Shuttle Main Engine Shop located in the Vehicle Assembly Building (VAB). The decision to move the shop out of the VAB was prompted by safety considerations and recent engine processing improvements. The first three main engines to be processed in the new facility will fly on Shuttle Endeavour's STS-88 mission in December 1998 KSC-98pc783

KSC Center Director Roy D. Bridges Jr. and U.S. Congressman Dave Weldo...

KSC Center Director Roy D. Bridges Jr. and U.S. Congressman Dave Weldon (holding scissors) cut the ribbon at a ceremony on July 6 to open KSC's new 34,600-square-foot Space Shuttle Main Engine Processing Facili... More

KENNEDY SPACE CENTER, FLA. -- On a beautiful Florida morning, a crawler transporter moves Space Shuttle Discovery (right, nearly hidden behind its external tank and solid rocket boosters) from Pad 39B back to the Vehicle Assembly Building (VAB) at left to repair damage to the external tank's foam insulation caused by hail. The external tank-solid rocket booster stack for mission STS-93 was moved out of High Bay 1, which awaits Discovery's arrival with its door open. The necessary repair work could not be performed at the pad due to limited access to the damaged areas. The work is expected to take two to three days, allowing Discovery to roll back to Pad 39B by midweek for launch of mission STS-96, the 94th launch in the Space Shuttle Program. This is only the 13th time since 1981 that a Shuttle has had to roll back from the pad. Liftoff will occur no earlier than May 27. STS-96 is a logistics and resupply mission for the International Space Station, carrying such payloads as a Russian crane, the Strela; a U.S.-built crane; the Spacehab Oceaneering Space System Box (SHOSS), a logistics items carrier; and STARSHINE, a student-shared experiment KSC-99pp0530

KENNEDY SPACE CENTER, FLA. -- On a beautiful Florida morning, a crawle...

KENNEDY SPACE CENTER, FLA. -- On a beautiful Florida morning, a crawler transporter moves Space Shuttle Discovery (right, nearly hidden behind its external tank and solid rocket boosters) from Pad 39B back to t... More

KENNEDY SPACE CENTER, FLA. -- Inside High Bay 1 of the Vehicle Assembly Building (VAB) Mike Sestile, with United Space Alliance, draws circles around divots in the foam insulation on the top of the external tank of Space Shuttle Discovery. About 150 divots were caused by hail during recent storms. The Shuttle was rolled back from Pad 39B to the VAB for repairs because access to all of the damaged areas was not possible at the pad. The work is expected to take two to three days, allowing Discovery to roll back to the pad as early as May 20 for launch of mission STS-96, the 94th launch in the Space Shuttle Program. Liftoff will occur no earlier than May 27. STS-96 is a logistics and resupply mission for the International Space Station, carrying such payloads as a Russian crane, the Strela; a U.S.-built crane; the Spacehab Oceaneering Space System Box (SHOSS), a logistics items carrier; and STARSHINE, a student-shared experiment KSC-99pp0539

KENNEDY SPACE CENTER, FLA. -- Inside High Bay 1 of the Vehicle Assembl...

KENNEDY SPACE CENTER, FLA. -- Inside High Bay 1 of the Vehicle Assembly Building (VAB) Mike Sestile, with United Space Alliance, draws circles around divots in the foam insulation on the top of the external tan... More

KENNEDY SPACE CENTER, FLA. -- Standing inside a protective tent around the external tank of Space Shuttle Discovery in the Vehicle Assembly Building (VAB), United Space Alliance technician Don Pataky repairs divots caused by hail storms. The Shuttle was rolled back from Pad 39B to the VAB for repairs because access to all of the damaged areas was not possible at the pad. The work is expected to take two to three days, allowing Discovery to roll back to the pad late this week for launch of mission STS-96, the 94th launch in the Space Shuttle Program. Liftoff will occur no earlier than May 27. STS-96 is a logistics and resupply mission for the International Space Station, carrying such payloads as a Russian crane, the Strela; a U.S.-built crane; the Spacehab Oceaneering Space System Box (SHOSS), a logistics items carrier; and STARSHINE, a student-shared experiment KSC-99pp0552

KENNEDY SPACE CENTER, FLA. -- Standing inside a protective tent around...

KENNEDY SPACE CENTER, FLA. -- Standing inside a protective tent around the external tank of Space Shuttle Discovery in the Vehicle Assembly Building (VAB), United Space Alliance technician Don Pataky repairs di... More

KENNEDY SPACE CENTER, FLA. -- A crawler transporter moves Space Shuttle Discovery, hidden by its external tank and solid rocket boosters, from Pad 39B back to the Vehicle Assembly Building (VAB) for repair of damage to the external tank foam insulation caused by hail. The external tank/solid rocket booster stack for mission STS-93 was moved out of High Bay 1 to make room for Discovery and can be seen on the horizon between Discovery and the VAB. The necessary repair work could not be performed at the pad due to limited access to the damaged areas. The work is expected to take two to three days, allowing Discovery to roll back to Pad 39B by midweek for launch of mission STS-96, the 94th launch in the Space Shuttle Program. This is only the 13th time since 1981 that a Shuttle has had to roll back from the pad. Liftoff will occur no earlier than May 27. STS-96 is a logistics and resupply mission for the International Space Station, carrying such payloads as a Russian crane, the Strela; a U.S.-built crane; the Spacehab Oceaneering Space System Box (SHOSS), a logistics items carrier; and STARSHINE, a student-shared experiment KSC-99pp0529

KENNEDY SPACE CENTER, FLA. -- A crawler transporter moves Space Shuttl...

KENNEDY SPACE CENTER, FLA. -- A crawler transporter moves Space Shuttle Discovery, hidden by its external tank and solid rocket boosters, from Pad 39B back to the Vehicle Assembly Building (VAB) for repair of d... More

KENNEDY SPACE CENTER, FLA. -- Inside High Bay 1 of the Vehicle Assembly Building (VAB) John Blue, with United Space Alliance, and Jorge Rivera, with NASA, look at the dings in the foam insulation on the external tank of Space Shuttle Discovery. About 150 dings were caused by hail during recent storms. The Shuttle was rolled back from Pad 39B to the VAB for repairs because access to all of the damaged areas was not possible at the pad. The work is expected to take two to three days, allowing Discovery to roll back to the pad as early as May 20 for launch of mission STS-96, the 94th launch in the Space Shuttle Program. Liftoff will occur no earlier than May 27. STS-96 is a logistics and resupply mission for the International Space Station, carrying such payloads as a Russian crane, the Strela; a U.S.-built crane; the Spacehab Oceaneering Space System Box (SHOSS), a logistics items carrier; and STARSHINE, a student-shared experiment KSC-99pp0537

KENNEDY SPACE CENTER, FLA. -- Inside High Bay 1 of the Vehicle Assembl...

KENNEDY SPACE CENTER, FLA. -- Inside High Bay 1 of the Vehicle Assembly Building (VAB) John Blue, with United Space Alliance, and Jorge Rivera, with NASA, look at the dings in the foam insulation on the externa... More

Previous

of 10

Next