visibility Similar

code Related

LCC FIRING ROOM-1 REMODELING PROGRESS 2010-5256

description

Summary

LCC FIRING ROOM-1 REMODELING PROGRESS

label_outline

Tags

kennedy space center lcc room progress high resolution nasa
date_range

Date

18/10/2010
place

Location

Kennedy Space Center / Cape Canaveral Air Force Station Fire Station 2 ,  28.52650, -80.67093
create

Source

NASA
link

Link

https://images.nasa.gov/
copyright

Copyright info

Public Domain Dedication (CC0)

label_outline Explore Room, Progress, Nasa

New Cafeteria Construction - Construction of new cafeteria, HUD Headquarters: progress views

The air conditioning machinery room aboard the guided missile frigate NICHOLAS (FFG-47)

Melbourne, Australia. United States Army hospital. Sergeant Alfred Baron, Newark, New Jersey (left) and Technical Sergeant Richard Perry, Mansfield Ohio, in medical store room

Two crewmen work in the catapult control room aboard the nuclear-powered aircraft carrier USS THEODORE ROOSEVELT (CVN 71)

Secretary Shaun Donovan in New Orleans, Louisiana [area, where he participated in activities marking the fifth anniversary of Hurricane Katrina, including testimony at a Senate Subcommittee on Disaster Recovery hearing at Chalmette Elementary School; tours of damaged, rebuilding, and restored residential and commercial districts, in the company of New Orleans Mayor Mitch Landrieu, Louisiana Senator Mary Landrieu, and other national, state, and local officials; and remarks on recovery progress at reconstruction sites run by the St. Bernard Project and other non-profit organizations]

URBAN BUESCHER AND ANGEL TORRES WITH SUPERMATIC - COLORADO - VERSAMAT FILM PROCESSING EQUIPMENT FOR THE ICE PROGRAM

On March 27, 2006, U.S. Army Soldiers from the 3rd Platoon, 463rd Military Police went to Khadi Miya Traffic Police Station check the on going progress of Iraqi Police. During the visit Iraqi Police's conducted Tactical Control Point's, vehicle search training, digital fingerprint scanning with voice identification and daily operations. U.S. Army spc. Patrick Hart operated the Digital Fingerpring Scanner.(U.S. Army photo by STAFF SGT. Kevin L. Moses Sr.) (Released)

US Navy Information Systems Technician 3rd Class Eric Lummus, an Automated Data Processing team member, works on the network server onboard the Amphibious Command Ship USS BLUE RIDGE (LCC 19) during Exercise Ulchi Focus Lens. BLUE RIDGE is currently deployed in Southeast Asia supporting Exercise Ulchi Focus Lens and the 7th Fleet's interoperability and training commitments in maritime operations. (U.S. Navy photo by Mass Communication SPECIALIST 3rd Class Tucker M. Yates) (Released)

Farrans Construction started building the estimated thirty-one million dollar, 416 room, one to one dormitory on Royal Air Force, Lakenheath, United Kingdom. A one to one room consists of a separate bedroom and bathroom with a connected kitchen. Construction started on 4 November 1997, estimated completion date is 17 July 2000. (long view)

Office of Multimedia Operations and Services - State Department Bullit Room [412-APD-910-DXS6333.jpg]

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians close space shuttle Atlantis’ aft doors for the final time. The orbiter is undergoing final preparations for its transfer to the Kennedy Space Center Visitor complex targeted for November. The work is part of Transition and Retirement of the remaining shuttle. Atlantis is being prepared for public display at the visitor complex. Over the course of its 26-year career, Atlantis spent 293 days in space during 33 missions. For more information, visit http://www.nasa.gov/transition. Photo credit: NASA/Dimitri Gerondidakis KSC-2012-5615

CONTROL PANELS IN VARIOUS BUILDINGS

Topics

kennedy space center lcc room progress high resolution nasa