visibility Similar

code Related

An excavator carries a piece of pipe, Jan. 24, to be

description

Summary

An excavator carries a piece of pipe, Jan. 24, to be installed later in the canal feeding water into the Forward Operating Base Kalsu water purification unit. On Jan. 24, the Kalsu Mayor Cell, in conjunction with Kellogg, Brown and Root and Iraqi contractors, began a project to lower and extend the pipe system. The system was lowered almost four feet and extended by 100 feet.

label_outline

Tags

fob kalsu forward operating base kalsu excavator kevin stabinsky pipeline keeps running water at fob kalsu purification unit kalsu mayor cell sgt kevin stabinsky 2nd armored brigade combat team 3rd infantry division public affairs kalsu iraq dvids construction sites iraq war 2003 2011
date_range

Date

28/01/2008
create

Source

Defense Visual Information Distribution Service
link

Link

https://www.dvidshub.net/
copyright

Copyright info

Public Domain Dedication. Public Use Notice of Limitations: https://www.dvidshub.net/about/copyright

label_outline Explore Purification Unit, Fob Kalsu, Kevin Stabinsky

Topics

fob kalsu forward operating base kalsu excavator kevin stabinsky pipeline keeps running water at fob kalsu purification unit kalsu mayor cell sgt kevin stabinsky 2nd armored brigade combat team 3rd infantry division public affairs kalsu iraq dvids construction sites iraq war 2003 2011