visibility Similar

code Related

Defense housing, Erie, Pennsylvania. All walls and ceilings are finished off with a good grade lime plaster. This typifies the permanent character of this defense housing construction. In this operation onlt time-honored hand craftmanship can give high quality results. Teamwork and practiced efficiency however, speed up the process

Defense housing, Erie, Pennsylvania. All walls and ceilings are finished off with a good grade lime plaster. This typifies the permanent character of this defense housing construction. In this operation onlt time-honored hand craftmanship can give high quality results. Teamwork and practiced efficiency however, speed up the process

Defense housing, Erie, Pennsylvania. All walls and ceilings are finished off with a good grade lime plaster. This typifies the permanent character of this defense housing construction. In this operation onlt time-honored hand craftmanship can give high quality results. Teamwork and practiced efficiency however, speed up the process

Defense housing, Erie, Pennsylvania. All walls and ceilings are finished off with a good grade lime plaster. This typifies the permanent character of this defense housing construction. In this operation onlt time-honored hand craftmanship can give high quality results. Teamwork and practiced efficiency however, speed up the process

Defense housing, Erie, Pennsylvania. All walls and ceilings are finished off with a good grade lime plaster. This typifies the permanent character of this defense housing construction. In this operation onlt time-honored hand craftmanship can give high quality results. Teamwork and practiced efficiency however, speed up the process

Defense housing, Erie, Pennsylvania. All walls and ceilings are finished off with a good grade lime plaster. This typifies the permanent character of this defense housing construction. In this operation onlt time-honored hand craftmanship can give high quality results. Teamwork and practiced efficiency however, speed up the process

Defense housing, Erie, Pennsylvania. All walls and ceilings are finished off with a good grade lime plaster. This typifies the permanent character of this defense housing construction. In this operation onlt time-honored hand craftmanship can give high quality results. Teamwork and practiced efficiency however, speed up the process

Defense housing, Erie, Pennsylvania. One part of the crew sheets the flooring as the walls are going up. The progress of the work is checked frequently against the working blueprints

Defense housing, Erie, Pennsylvania. Pre-fabricated sheets of asbestos reinforced with gypsum serve as an economical base for plaster walls and ceilings. These sheets, nailed directly to studs, also afford protection against heat and cold. A crew of fourteen men (ten lathers and four laborers) can lathe a four-unit building in a few hours. A crew of plasters moves in as the crew of lathers moves out. Although defense homes are speedily built, they are soundly constructed. Government inspectors keep a rigid check to see that all construction materials live up to government standards

Defense housing, Erie, Pennsylvania. All walls and ceilings are finished off with a good grade lime plaster. This typifies the permanent character of this defense housing construction. In this operation onlt time-honored hand craftmanship can give high quality results. Teamwork and practiced efficiency however, speed up the process

description

Summary

Public domain photograph of Pennsylvania in 1930s, free to use, no copyright restrictions image - Picryl description

Nothing Found.

label_outline

Tags

pennsylvania erie county erie safety film negatives erie heights defense walls ceilings grade lime plaster grade lime plaster character construction operation onlt operation onlt hand craftmanship hand craftmanship quality results quality results teamwork efficiency process united states history library of congress
date_range

Date

01/01/1941
person

Contributors

Palmer, Alfred T., photographer
United States. Office for Emergency Management.
place

Location

Erie Heights ,  42.08506, -80.10895
create

Source

Library of Congress
link

Link

http://www.loc.gov/
copyright

Copyright info

Public Domain

label_outline Explore Lime, Ceilings, Erie Heights

Two 143-square-meter health clinics are taking shape for the Iraqi Army at Taji Military Base in Iraq. The East Clinic is 75% complete with the crew there installing electrical lights and ceiling tiles. At the West Clinic, floor tiles are being set in place. At both clinics, final grade around the structures is being worked. The $3 million contract was awarded July 7, 2004, with an expected completion date of Aug. 25, 2005. A crew of about 35 Iraqis are working at both projects. Each health clinic will feature five exam rooms and one isolation room. (U.S. Army photo by Norris Jones) (Released)

%th Grade Coastal Program - Public Domain image, National Parks Gallery

A member of the 2nd Battalion, 1ST Marines, plays a the role of patient as medical personnel inspect the ward at Fleet Hospital One, a 250-bed combat zone hospital. The marines are participating in Operation SAFE HAVEN, a combined Navy, Marine Corps, and Army exercise designed to evaluate the efficiency of field hospitals

A group of children sitting at desks in a classroom, West Virginia. Farm Security Administration photograph.

US Navy Lieutenant Junior Grade Tara "Judy" Golden monitors a surveillance system inside an E-2C Hawkeye aircraft from Carrier Airborne Early Warning Squadron One two Six (VAW-126) while patrolling the skies of the Persian Gulf on the last day of Operation SOUTHERN WATCH. The Seahawks are embarked on board USS HARRY S. TRUMAN (CVN 75)

Food storage. Forms for food storage all set. Beginning to pour concrete for walls. Southeast Missouri Farms Project

A Mine Clearing Line Charge, or MICLIC, is fired on a range during a training session. The MICLIC is a rocket propelled line charged capable of breaching obstacles, walls, or minefields. The MICLIC has a 350 foot line charge secured by a 205 foot arresting cable. The line charge contains 1840 pounds of C-4 explosives

Holgate, N.J., April 24, 2013 -- Shorefront homeowners rebuild their deck after it collapsed during Hurricane Sandy. Structurally, the home received no damage from the storm because of its breakaway walls.. Rosanna Arias/FEMA

6th grade students hold a live patient simulator at Alabama's 8th Annual Be Ready Camp. FEMA's Center for Domestic Preparedness brought three simulators for demonstrations on how first responders are trained

KENNEDY SPACE CENTER, FLA. - Members of a hurricane assessment team from Johnson Space Center and Marshall Space Flight Center look at damage on the roof of the Vehicle Assembly Building (VAB) a week after Hurricane Frances hit the east coast of Central Florida and Kennedy Space Center. The VAB lost 820, 4- x 16-foot panels from the side walls, or more than 52,000 square feet of its surface. KSC-04pd1767

Gayety at Bal Boheme Washington, D.C., April 10. Favors were distributed to Guests through the medium of false Champagne bottles hung from the ceilings. Guests who failed to get favors when the bottles were poured, decided to get the bottles themselves. This one succeeded. The rest were quickly pulled back up out of harm's way, 4-10-39

Crash victim Lieutenant Junior Grade Eric Patenkopf is transported by ambulance to the emergency room at the station's hospital facilities. He is attended by AIRMAN First Class Daniel Volz, left. Patenkopf was rescued from the South China Sea after his A-4 Skyhawk aircraft developed engine problems, forcing him to eject

Topics

pennsylvania erie county erie safety film negatives erie heights defense walls ceilings grade lime plaster grade lime plaster character construction operation onlt operation onlt hand craftmanship hand craftmanship quality results quality results teamwork efficiency process united states history library of congress