visibility Similar

POST FLIGHT INSPECTION CLEARWATER FLORIDA

US COAST GUARD Woodshop 101 PORTSMOUTH VIRGINIA

Office of the Administrator (Stephen L. Johnson) - Administrator Stephen L. Johnson touring the National Association of Home Builders (NAHB) [412-APD-316-2007-08-16_NAHB-Visit_012.jpg]

Coast Guard Petty Officers 3rd Class Nikkolas Bott-Henderson

Seaman Recruit Michael Snook, left, and Seaman Recruit

Private First Class Rhiannon Moon works on the T-55

KENNEDY SPACE CENTER, FLA. - On a tour of the Orbiter Processing Facility, members of the Stafford-Covey Return to Flight Task Group (RTFTG) look at a Reinforced Carbon-Carbon panels with a T-seal held by Tom Roberts, with United Space Alliance. From left are Richard O. Covey, former Space Shuttle commander, Dr. Kathryn Clark, James Adamson, Joe Engle, William Wegner and Dr. Amy Donahue. Chairing the task group are Covey and Thomas P. Stafford, Apollo commander. Chartered by NASA Administrator Sean O’Keefe, the task group will perform an independent assessment of NASA’s implementation of the final recommendations by the Columbia Accident Investigation Board.

KENNEDY SPACE CENTER, FLA. - Standing near Endeavour in the Orbiter Processing Facility are (left to right) Joy Huff, with KSC Space Shuttle Processing; Kathy Laufenberg, with United Space Alliance; Center Director Jim Kennedy; and Bruce Buckingham, assistant to Deputy Director Woodrow Whitlow Jr. Kennedy and Whitlow are touring the OPF, viewing the work being done on Endeavour, which is in its Orbiter Major Modification period.

Air Commandos with the 801st Special Operations Aircraft

code Related

KENNEDY SPACE CENTER, FLA. - In the RLV Hangar, Shuttle Test Director Steve Altemus (right), a member of the Columbia Reconstruction Project Team, explains the fixture which holds the leading edge panels recovered from the left wing of Space Shuttle Columbia to NASA Administrator Sean O'Keefe (left). To date, more than 70,000 items have been delivered to KSC for use in the ongoing mishap investigation. KSC-03pd1305

KENNEDY SPACE CENTER, FLA. - In the RLV Hangar, Shuttle Test Director Steve Altemus (left), a member of the Columbia Reconstruction Project Team, discusses the status of the investigation into the Space Shuttle Columbia accident with NASA Administrator Sean O'Keefe (right). To date, more than 70,000 items have been delivered to KSC for use in the ongoing mishap investigation. KSC-03pd1304

KENNEDY SPACE CENTER, FLA. - In the RLV Hangar, Shuttle Test Director Steve Altemus (left), a member of the Columbia Reconstruction Project Team, discusses a piece of debris from the Space Shuttle Columbia with NASA Administrator Sean O'Keefe (right). To date, more than 70,000 items have been delivered to KSC for use in the ongoing mishap investigation. KSC-03pd1303

KENNEDY SPACE CENTER, FLA. - In the RLV Hangar, NASA Administrator Sean O'Keefe (left) looks over pieces of debris from the Space Shuttle Columbia with Shuttle Test Director Steve Altemus, a member of the Columbia Reconstruction Project Team. To date, more than 70,000 items have been delivered to KSC for use in the ongoing mishap investigation. KSC-03pd1307

KENNEDY SPACE CENTER, FLA. - In the RLV Hangar, NASA Administrator Sean O'Keefe (left) listens to a report from Shuttle Test Director Steve Altemus, a member of the Columbia Reconstruction Project Team, on the status of the investigation into the Space Shuttle Columbia accident. To date, more than 70,000 items have been delivered to KSC for use in the ongoing mishap investigation. KSC-03pd1299

KENNEDY SPACE CENTER, FLA. - In the RLV Hangar, NASA Administrator Sean O'Keefe (left) looks over pieces of debris from the Space Shuttle Columbia with Shuttle Test Director Steve Altemus, a member of the Columbia Reconstruction Project Team. To date, more than 70,000 items have been delivered to KSC for use in the ongoing mishap investigation. KSC-03pd1300

KENNEDY SPACE CENTER, FLA. - In the RLV Hangar, NASA Administrator Sean O'Keefe (left) looks over pieces of debris from the Space Shuttle Columbia with Shuttle Test Director Steve Altemus, a member of the Columbia Reconstruction Project Team. To date, more than 70,000 items have been delivered to KSC for use in the ongoing mishap investigation. KSC-03pd1293

KENNEDY SPACE CENTER, FLA. - In the RLV Hangar, NASA Administrator Sean O'Keefe (left) is briefed on the status of the investigation into the Space Shuttle Columbia accident by Shuttle Launch Director Mike Leinbach (center) and Shuttle Test Director Steve Altemus (right), both members of the Columbia Reconstruction Project Team. To date, more than 70,000 items have been delivered to KSC for use in the ongoing mishap investigation. KSC-03pd1296

KENNEDY SPACE CENTER, FLA. - In the RLV Hangar, NASA Administrator Sean O'Keefe (left) is briefed on the status of the Space Shuttle Columbia accident investigation by Steve Altemus, a member of the Columbia Reconstruction Project Team. To date, more than 70,000 items have been delivered to KSC for use in the ongoing mishap investigation. KSC-03pd1295

KENNEDY SPACE CENTER, FLA. - In the RLV Hangar, Shuttle Test Director Steve Altemus (right), a member of the Columbia Reconstruction Project Team, explains the fixture which holds the leading edge panels recovered from the left wing of Space Shuttle Columbia to NASA Administrator Sean O'Keefe (left). To date, more than 70,000 items have been delivered to KSC for use in the ongoing mishap investigation. KSC-03pd1306

description

Summary

KENNEDY SPACE CENTER, FLA. - In the RLV Hangar, Shuttle Test Director Steve Altemus (right), a member of the Columbia Reconstruction Project Team, explains the fixture which holds the leading edge panels recovered from the left wing of Space Shuttle Columbia to NASA Administrator Sean O'Keefe (left). To date, more than 70,000 items have been delivered to KSC for use in the ongoing mishap investigation.

The Space Shuttle program was the United States government's manned launch vehicle program from 1981 to 2011, administered by NASA and officially beginning in 1972. The Space Shuttle system—composed of an orbiter launched with two reusable solid rocket boosters and a disposable external fuel tank— carried up to eight astronauts and up to 50,000 lb (23,000 kg) of payload into low Earth orbit (LEO). When its mission was complete, the orbiter would re-enter the Earth's atmosphere and lands as a glider. Although the concept had been explored since the late 1960s, the program formally commenced in 1972 and was the focus of NASA's manned operations after the final Apollo and Skylab flights in the mid-1970s. It started with the launch of the first shuttle Columbia on April 12, 1981, on STS-1. and finished with its last mission, STS-135 flown by Atlantis, in July 2011.

Nothing Found.

label_outline

Tags

kennedy space center rlv hangar rlv hangar test director steve altemus shuttle test director steve altemus member columbia reconstruction project team columbia reconstruction project team fixture edge panels edge panels space shuttle columbia administrator sean nasa administrator sean keefe items mishap investigation mishap investigation space shuttle high resolution sean o keefe nasa florida cape canaveral
date_range

Date

28/04/2003
collections

in collections

Space Shuttle Program

place

Location

create

Source

NASA
link

Link

https://images.nasa.gov/
copyright

Copyright info

Public Domain Dedication (CC0)

label_outline Explore Shuttle Test Director Steve Altemus, Altemus, Mishap Investigation

KENNEDY SPACE CENTER, FLA. - A member of the Columbia Reconstruction Project Team cleans a piece of debris from Columbia. The items at KSC number more than 82,000, weigh 84,800 pounds or 38 percent of the total dry weight of Columbia. Of those items, 78,760 have been identified, with 753 placed on the left wing grid in the RLV Hangar. KSC-03pd1547

181015-N-SO730-0153 NORFOLK, Va. (Oct. 15, 2018) Crew

A CH-53E, Super Stallion, with Marine Heavy Helicopter

KENNEDY SPACE CENTER, FLA. -- In the RLV Hangar, the floor grid is marked with a growing number of pieces of Columbia debris. The Columbia Reconstruction Project Team will attempt to reconstruct the orbiter as part of the investigation into the accident that caused the destruction of Columbia and loss of its crew as it returned to Earth on mission STS-107. KSC-03pd0586

US Air Force (USAF) AIRMAN First Class (A1C) Lamar Brown (left) and STAFF Sergeant (SSGT) Donavan Baldwin (right), Firefighters, 6th Air Mobility Wing (AMW) Fire Department, MacDill Air Force Base (AFB), Florida (FL), transport a simulated injured victim to the triage area during a Major Accident Response Exercise (MARE) test for first responders simulating an aircraft mishap on the South Ramp at MacDill AFB in preparation for an upcoming Airfest

170809-N-WF272-412 CORAL SEA (Aug. 9, 2017) Marines

KENNEDY SPACE CENTER, FLA. - Members of the Columbia Reconstruction Project Team carry part of the final shipment of debris. The recovery efforts have been concluded in East Texas. Prior to this final shipment, the total number of items at KSC is 82,567, weighing 84,800 pounds or 38 percent of the total dry weight of Columbia. Of those items, 78,760 have been identified, with 753 placed on the left wing grid in the RLV Hangar. KSC-03pd1412

Mark Lynch, right, an employee from Naval Sea Systems Command (NAVSEA), explains to shows U.S. Navy Store Keeper 1ST Class Sean Mahoney, from the Ticonderoga Class Guided Missile Cruiser USS COWPENS (CG 63), how to identify and minimize hazardous materials, during training at Commander Fleet Activities Yokosuka, Japan, on April 25, 2006. The Navy, the Industrial Supply Center Yokosuka and NAVSEA are working to transfer responsibility for hazardous materials from ship to shore as part of the Navy's distance support initiative in order to support the new littoral combat ships. (U.S. Navy photo by Philip Molter) (Released)

A 23rd Bomb Squadron aircrew member exits an egress

Weapons specialists, Technical Sergeant Sean O'hara and STAFF Sergeant Jeremy Pow, members of the 169th Fighter Wing (FW) of the South Carolina Air National Guard, McEntire Air National Guard Station, load AGM-65 Maverick missiles onto an F-16 aircraft. The 169th FW is deployed to Hill Air Force Base, Utah to participate in Combat Hammer. It's flying squadron, the 157th Fighter Squadron (FS), is one of several units operating in this 'live-fire' weapons testing mission. The 157th FS will fire AGM-88 Highspeed Anti-Radiation Missiles (HARM) and AGM-65G Maverick missiles to test their pilots abilities, their unit tactics, and the effectiveness of missile systems

Seamen's Identification Card for Charles Fernald Altemus

Kentucky Air National Guard (KYANG) Lieutenant (LT) Sean McClaine, assigned to the 123rd Special Operations Squadron (SOS), approaches a Canadian Armed Forces (CAF) C-130 Hercules cargo aircraft assigned to the 436th Squadron, 8th Wing, on an assault landing strip at Fort McCoy, Wisconsin (WI), during Patriot Exercise 2005. Patriot Exercise 2005 is the largest annual exercise held across the United States. (SUBSTANDARD)

Topics

kennedy space center rlv hangar rlv hangar test director steve altemus shuttle test director steve altemus member columbia reconstruction project team columbia reconstruction project team fixture edge panels edge panels space shuttle columbia administrator sean nasa administrator sean keefe items mishap investigation mishap investigation space shuttle high resolution sean o keefe nasa florida cape canaveral