visibility Similar

STS069-390-022 - STS-069 - Astronauts Voss and Gernhardt prepare for EVA

STS-82 Suit-up for Post Insertion Training in Crew Compartment Trainer 2

STS100-336-025 - STS-100 - MS Hadfield maneuvers around PMA2 during the first EVA of STS-100

Love during EVA 1. NASA public domain image colelction.

Expedition 37 Preflight. NASA public domain image colelction.

STS070-330-030 - STS-070 - Kregel and Currie perform inflight maintenance (IFM) on vacuum cleaner cable

41D-04-028 - STS-41D - STS-41D crew activities

STS076-309-018 - STS-076 - Astronauts Linda Godwin and Ron Sega open MAR stowage locker

KENNEDY SPACE CENTER, FLA. -- In the Orbiter Processing Facility Bay 1, STS-88 Mission Specialists Sergei Krikalev (left), a cosmonaut from Russia; and Jerry L. Ross examine equipment that will be aboard Space Shuttle Endeavour. Launch of mission STS-88 is targeted for Dec. 3, 1998. The STS-88 crew members are participating in a Crew Equipment Interface Test (CEIT), familiarizing themselves with the orbiter's midbody and crew compartments. Other crew members are Commander Robert D. Cabana, Pilot Frederick W. "Rick" Sturckow and Mission Specialists Nancy J. Currie and James H. Newman. STS-88 will be the first Space Shuttle launch for assembly of the International Space Station (ISS). The primary payload is the Unity connecting module which will be mated to the Russian-built Zarya control module, expected to be already on orbit after a November launch from Russia. The first major U.S.-built component of ISS, Unity will serve as a connecting passageway to living and working areas of the space station. Unity has two attached pressurized mating adapters (PMAs) and one stowage rack installed inside. PMA-1 provides the permanent connection point between Unity and Zarya; PMA-2 will serve as a Space Shuttle docking port. Zarya is a self-supporting active vehicle, providing propulsive control capability and power during the early assembly stages. It also has fuel storage capability KSC-98pc1214

code Related

STS-98 Mission Specialist Marsha Ivins has help getting into her launch and entry suit in the Operations and Checkout Building. STS-98 is the seventh construction flight to the International Space Station. Atlantis is carrying the U.S. Laboratory Destiny, a key module in the growth of the Space Station. Destiny will be attached to the Unity node on the Space Station using the Shuttle’s robotic arm. Three spacewalks, by Curbeam and Jones, are required to complete the planned construction work during the 11-day mission. Launch is targeted for 6:11 p.m. EST and the planned landing at KSC Feb. 18 about 1:39 p.m. This mission marks the seventh Shuttle flight to the Space Station, the 23rd flight of Atlantis and the 102nd flight overall in NASA’s Space Shuttle program KSC01pp0267

In the White Room before launch, STS-98 Mission Specialist Marsha Ivins gets a hug from a closeout crew member before she enters Space Shuttle Atlantis. The White Room is an environmentally controlled room at the end of the Orbiter Access Arm. Atlantis is carrying the U.S. Laboratory Destiny, a key module in the growth of the Space Station. Destiny will be attached to the Unity node on the Space Station using the Shuttle’s robotic arm. Three spacewalks are required to complete the planned construction work during the 11-day mission. This mission marks the seventh Shuttle flight to the Space Station, the 23rd flight of Atlantis and the 102nd flight overall in NASA’s Space Shuttle program. The planned landing is at KSC Feb. 18 about 1 p.m KSC01pp0295

STS-98 Mission Specialist Marsha Ivins arrives at the Shuttle Landing Facility in a T-38 jet aircraft. She and other crew members Commander Ken Cockrell, Pilot Mark Polansky and Mission Specialists Robert Curbeam and Thomas Jones have returned to KSC to prepare for their launch to the International Space Station. The seventh construction flight to the Space Station, STS-98 will carry the U.S. Laboratory Destiny, a key module for space experiments. The 11-day mission includes three spacewalks to complete outside assembly and connection of electrical and plumbing lines between the laboratory, Station and a relocated Shuttle docking port. STS-98 is Ivins’ fifth space flight. Launch is targeted for Feb. 7 at 6:11 p.m. EST KSC01pp0225

STS-98 Mission Specialist Marsha Ivins arrives at the Shuttle Landing Facility in a T-38 jet aircraft. She and other crew members Commander Ken Cockrell, Pilot Mark Polansky and Mission Specialists Robert Curbeam and Thomas Jones have returned to KSC to prepare for their launch to the International Space Station. The seventh construction flight to the Space Station, STS-98 will carry the U.S. Laboratory Destiny, a key module for space experiments. The 11-day mission includes three spacewalks to complete outside assembly and connection of electrical and plumbing lines between the laboratory, Station and a relocated Shuttle docking port. STS-98 is Ivins’ fifth space flight. Launch is targeted for Feb. 7 at 6:11 p.m. EST KSC01pp0224

Suiting up in the Operations and Checkout Building, STS-98 Mission Specialist Robert Curbeam has a thumbs-up for launch. STS-98 is the seventh construction flight to the International Space Station. Atlantis is carrying the U.S. Laboratory Destiny, a key module in the growth of the Space Station. Destiny will be attached to the Unity node on the Space Station using the Shuttle’s robotic arm. Three spacewalks, by Curbeam and Mission Specialist Thomas Jones, are required to complete the planned construction work during the 11-day mission. Launch is targeted for 6:11 p.m. EST and the planned landing at KSC Feb. 18 about 1:39 p.m. This mission marks the seventh Shuttle flight to the Space Station, the 23rd flight of Atlantis and the 102nd flight overall in NASA’s Space Shuttle program KSC01pp0270

STS-81 Mission Specialist Marsha S. Ivins gets a helping hand from a suit technician as she prepares to don the helmet of her launch/entry suit in the suitup room of the Operations and Checkout (O&C) Building. She is the veteran of three Shuttle flights and became an astronaut in 1984. Among other responsibilities, Ivins will perform photo and video surveys of the Russian Mir space station and operate the Kidsat experiment camera on the orbiter’s aft flight deck. She and five crew members will shortly depart the O&C and head for Launch Pad 39B, where the Space Shuttle Atlantis will lift off during a 7-minute window that opens at 4:27 a.m. EST, January 12 KSC-97pc134

The STS-98 crew eagerly exits the Operations and Checkout Building to head for Space Shuttle Atlantis on Launch Pad 39A. Leading the crew are Pilot Mark Polansky (left) and Commander Ken Cockrell (right). In the center is Mission Specialist Marsha Ivins. Behind her are Mission Specialists Robert Curbeam (left) and Thomas Jones (right). They will be flying the seventh construction flight to the International Space Station. Atlantis is carrying the U.S. Laboratory Destiny, a key module in the growth of the Space Station. Destiny will be attached to the Unity node on the Space Station using the Shuttle’s robotic arm. Three spacewalks are required to complete the planned construction work during the 11-day mission. Launch is targeted for 6:11 p.m. EST and the planned landing at KSC Feb. 18 about 1:39 p.m. This mission marks the seventh Shuttle flight to the Space Station, the 23rd flight of Atlantis and the 102nd flight overall in NASA’s Space Shuttle program KSC01pp0273

The STS-98 crew gathers around a table for a snack before getting ready for launch on Space Shuttle Atlantis. Seated left to right are Mission Specialist Thomas Jones, Pilot Mark Polansky, Commander Ken Cockrell and Mission Specialists Marsha Ivins and Robert Curbeam. STS-98 is the seventh construction flight to the International Space Station. Atlantis is carrying the U.S. Laboratory Destiny, a key module in the growth of the Space Station. Destiny will be attached to the Unity node on the Space Station using the Shuttle’s robotic arm. Three spacewalks, by Curbeam and Jones, are required to complete the planned construction work during the 11-day mission. Launch is targeted for 6:11 p.m. EST and the planned landing at KSC Feb. 18 about 1:39 p.m. This mission marks the seventh Shuttle flight to the Space Station, the 23rd flight of Atlantis and the 102nd flight overall in NASA’s Space Shuttle program KSC01pp0265

The STS-98 crew leaves the Operations and Checkout Building and heads for the “Astrovan” that will take them to Space Shuttle Atlantis on Launch Pad 39A. From left are Mission Specialists Robert Curbeam, Thomas Jones and Marsha Ivins, Pilot Mark Polansky and Commander Ken Cockrell. They will be flying the seventh construction flight to the International Space Station. Atlantis is carrying the U.S. Laboratory Destiny, a key module in the growth of the Space Station. Destiny will be attached to the Unity node on the Space Station using the Shuttle’s robotic arm. Three spacewalks are required to complete the planned construction work during the 11-day mission. Launch is targeted for 6:11 p.m. EST and the planned landing at KSC Feb. 18 about 1:39 p.m. This mission marks the seventh Shuttle flight to the Space Station, the 23rd flight of Atlantis and the 102nd flight overall in NASA’s Space Shuttle program KSC01pp0272

STS-98 Mission Specialist Marsha Ivins is nearly ready for launch in her launch and entry suit. STS-98 is the seventh construction flight to the International Space Station. Atlantis is carrying the U.S. Laboratory Destiny, a key module in the growth of the Space Station. Destiny will be attached to the Unity node on the Space Station using the Shuttle’s robotic arm. Three spacewalks are required to complete the planned construction work during the 11-day mission. Launch is targeted for 6:11 p.m. EST and the planned landing at KSC Feb. 18 about 1:39 p.m. This mission marks the seventh Shuttle flight to the Space Station, the 23rd flight of Atlantis and the 102nd flight overall in NASA’s Space Shuttle program KSC01pp0271

description

Summary

STS-98 Mission Specialist Marsha Ivins is nearly ready for launch in her launch and entry suit. STS-98 is the seventh construction flight to the International Space Station. Atlantis is carrying the U.S. Laboratory Destiny, a key module in the growth of the Space Station. Destiny will be attached to the Unity node on the Space Station using the Shuttle’s robotic arm. Three spacewalks are required to complete the planned construction work during the 11-day mission. Launch is targeted for 6:11 p.m. EST and the planned landing at KSC Feb. 18 about 1:39 p.m. This mission marks the seventh Shuttle flight to the Space Station, the 23rd flight of Atlantis and the 102nd flight overall in NASA’s Space Shuttle program

The Space Shuttle program was the United States government's manned launch vehicle program from 1981 to 2011, administered by NASA and officially beginning in 1972. The Space Shuttle system—composed of an orbiter launched with two reusable solid rocket boosters and a disposable external fuel tank— carried up to eight astronauts and up to 50,000 lb (23,000 kg) of payload into low Earth orbit (LEO). When its mission was complete, the orbiter would re-enter the Earth's atmosphere and lands as a glider. Although the concept had been explored since the late 1960s, the program formally commenced in 1972 and was the focus of NASA's manned operations after the final Apollo and Skylab flights in the mid-1970s. It started with the launch of the first shuttle Columbia on April 12, 1981, on STS-1. and finished with its last mission, STS-135 flown by Atlantis, in July 2011.

label_outline

Tags

kennedy space center sts specialist marsha ivins mission specialist marsha ivins suit entry suit construction construction flight international space station atlantis laboratory destiny laboratory destiny module growth unity node unity node arm spacewalks three spacewalks construction work launch ksc feb mission marks shuttle flight program nasa space shuttle program ksc space shuttle astronaut costume space flight astronauts nasa
date_range

Date

07/02/2001
collections

in collections

Space Shuttle Program

place

Location

Kennedy Space Center / Cape Canaveral Air Force Station Fire Station 2 ,  28.52650, -80.67093
create

Source

NASA
link

Link

https://images.nasa.gov/
copyright

Copyright info

Public Domain Dedication (CC0)

label_outline Explore Nasa Space Shuttle Program Ksc, Ksc Feb, Mission Marks

S98E5291 - STS-098 - Expedition One CDR and Flight Engineer in Node 1/Unity module

STS062-04-009 - STS-062 - MS Ivins and Pilot Allen using Camcorder

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility 1 at NASA's Kennedy Space Center in Florida, United Space Alliance technicians, lying on a work platform, remove window #8 from the top of the crew module of space shuttle Atlantis. Inspection and maintenance of the crew module windows is standard procedure between shuttle missions. Atlantis is next slated to deliver an Integrated Cargo Carrier and Russian-built Mini Research Module to the International Space Station on the STS-132 mission. The second in a series of new pressurized components for Russia, the module will be permanently attached to the Zarya module. Three spacewalks are planned to store spare components outside the station, including six spare batteries, a boom assembly for the Ku-band antenna and spares for the Canadian Dextre robotic arm extension. A radiator, airlock and European robotic arm for the Russian Multi-purpose Laboratory Module also are payloads on the flight. Launch is targeted for May 14. Photo credit: NASA/Glenn Benson KSC-2010-1082

S46-10-015 - STS-046 - STS-46 MS Ivins and MS Nicollier, in LES, on OV-104's aft flight deck

S128E008458 - STS-128 - MPLM Berthing OPS from RWS

KENNEDY SPACE CENTER, FLA. - For the second time in two days, STS-121 Mission Specialist Stephanie Wilson is suiting up for a launch attempt on Space Shuttle Discovery. The first launch attempt July 1 was scrubbed due to weather concerns and postponed 24 hours. The launch is the 115th shuttle flight and the 18th U.S. flight to the International Space Station. During the 12-day mission, the STS-121 crew will test new equipment and procedures to improve shuttle safety, as well as deliver supplies and make repairs to the International Space Station. Photo credit: NASA/Kim Shiflett KSC-06pd1364

STS111-343-023 - STS-111 - Cockrell in Node 1 during STS-111 UF-2 cargo transfer OPS to the ISS

STS062-23-007 - STS-062 - MS Ivins aboard Columbia

S121E05564 - STS-121 - Nadar view of the ISS as the orbiter Discovery moves in for docking during STS-121

STS081-303-005 - STS-081 - MS Ivins in the Spacehab module

S98E5005 - STS-098 - MS Ivins and Curbeam on middeck with stowage bags

S121E05921 - STS-121 - Lindsey and Reiter open the MPLM module during STS-121/ Exp. 13 joint OPS

Topics

kennedy space center sts specialist marsha ivins mission specialist marsha ivins suit entry suit construction construction flight international space station atlantis laboratory destiny laboratory destiny module growth unity node unity node arm spacewalks three spacewalks construction work launch ksc feb mission marks shuttle flight program nasa space shuttle program ksc space shuttle astronaut costume space flight astronauts nasa