visibility Similar

code Related

Large pipes are stacked and lay ready for use during

description

Summary

Large pipes are stacked and lay ready for use during the beach renourishment project in Virginia Beach, Virginia, June 19, 2019. The renourishment is part of the Virginia Beach Hurricane and Storm Damage Reduction Project. (U.S. Army photo by Andria Allmond)

label_outline

Tags

usace virginia beach renourishment oceanfront storm protection u s army corps of engineers north atlantic division u s army corps of engineers norfolk district usace nad usace nao city of virginia beach virginia beach hurricane and storm damage reduction project feedthebeach feed the beach andria allmond norfolk district va norfolk district city of virginia beach assist in dredge prep dvids ultra high resolution high resolution us army corps of engineers
date_range

Date

19/06/2019
create

Source

Defense Visual Information Distribution Service
link

Link

https://www.dvidshub.net/
copyright

Copyright info

Public Domain Dedication. Public Use Notice of Limitations: https://www.dvidshub.net/about/copyright

label_outline Explore City Of Virginia Beach, Storm Protection, Oceanfront

Topics

usace virginia beach renourishment oceanfront storm protection u s army corps of engineers north atlantic division u s army corps of engineers norfolk district usace nad usace nao city of virginia beach virginia beach hurricane and storm damage reduction project feedthebeach feed the beach andria allmond norfolk district va norfolk district city of virginia beach assist in dredge prep dvids ultra high resolution high resolution us army corps of engineers