visibility Similar

An area of the 1600 block of the cantonment area of

An area of the 1600 block of the cantonment area of

170831-N-WH681-028 ATLANTIC OCEAN (Aug. 31, 2017) Sailors

Maxwell AFB, Ala. - On going construction on the Air

Maxwell AFB, Ala. - On going construction on the Air

An overall view of the Space Transportation System (STS) construction site

Cape Canaveral, Fla. -- A large crane dismantles another section of the fixed service structure (FSS) on Launch Pad 39B at NASA's Kennedy Space Center in Florida. Work to remove the rotating service structure (RSS) also continues at the pad. The FSS and RSS were designed to support the unique needs of the Space Shuttle Program. In 2009, the pad was no longer needed for the shuttle program, so it is being restructured for future use. Its new design will feature a "clean pad" for rockets to come with their own launcher, making it more versatile for a number of vehicles. The new lightning protection system, which was in place for the October 2009 launch of Ares I-X, will remain. For information on NASA's future plans, visit www.nasa.gov. Photo credit: NASA/Kim Shiflett KSC-2011-2768

CAPE CANAVERAL, Fla. - Construction continues on the Doppler weather radar facility for the 45th Weather Squadron being built in an area near S.R. 520 in Orange County, Florida. The new site will replace one at Patrick Air Force Base and will be used by NASA's Kennedy Space Center, the 45th Space Wing and their customers. The site will be able to monitor weather conditions directly above the launch pads at Kennedy. The weather radar is essential in issuing lightning and other severe weather warnings and vital in evaluating lightning launch commit criteria. The new radar, replacing what was installed 25 years ago at Patrick Air Force Base, includes Doppler capability to detect winds and identify the type, size and number of precipitation particles. The site is ideally distant from the launch pads and has unobstructed views of Cape Canaveral Air Force Station and Kennedy. The radar will be used by forecasters at the USAF 45th Weather Squadron. Photo credit: NASA/Troy Cryder KSC-08pd3029

code Related

Maxwell AFB, Ala. - Ongoing Construction on the Air

description

Summary

Maxwell AFB, Ala. - Ongoing Construction on the Air Traffic Control Tower 30 Sep,2020. Photo altered to protect the privacy of non DOD personnel. (U.S. Air Force photo by William Birchfield/Released)

label_outline

Tags

control tower construction maxwell afb william birchfield air university public affairs montgomery ongoing construction dvids high resolution alabama
date_range

Date

30/09/2020
create

Source

Defense Visual Information Distribution Service
link

Link

https://www.dvidshub.net/
copyright

Copyright info

Public Domain Dedication. Public Use Notice of Limitations: https://www.dvidshub.net/about/copyright

label_outline Explore Ongoing Construction, William Birchfield, Control Tower

Topics

control tower construction maxwell afb william birchfield air university public affairs montgomery ongoing construction dvids high resolution alabama