visibility Similar

code Related

Operators in the Plum Brook Reactor Facility Control Room

description

Summary

Donald Rhodes, left, and Clyde Greer, right, monitor the operation of the National Aeronautics and Space Administration’s (NASA) Plum Brook Reactor Facility from the control room. The 60-megawatt test reactor, NASA’s only reactor, was the eighth largest test reactor in the world. The facility was built by the Lewis Research Center in the late 1950s to study the effects of radiation on different materials that could be used to construct nuclear propulsion systems for aircraft or rockets. The reactor went critical for the first time in 1961. For the next two years, two operators were on duty 24 hours per day working on the fission process until the reactor reached its full-power level in 1963. Reactor Operators were responsible for monitoring and controlling the reactor systems. Once the reactor was running under normal operating conditions, the work was relatively uneventful. Normally the reactor was kept at a designated power level within certain limits. Occasionally the operators had to increase the power for a certain test. The shift supervisor and several different people would get together and discuss the change before boosting the power. All operators were required to maintain a Reactor Operator License from the Atomic Energy Commission. The license included six months of training, an eight-hour written exam, a four-hour walkaround, and testing on the reactor controls.

label_outline

Tags

grc glenn research center operators plum brook reactor control room nasa
date_range

Date

21/03/1970
place

Location

Abram Creek ,  41.41783, -81.86653
create

Source

NASA
link

Link

https://images.nasa.gov/
copyright

Copyright info

Public Domain Dedication (CC0)

label_outline Explore Operators, Brook, Plum

Tea Bowl with Crescent Moon, Clouds, and Blossoming Plum

552nd Airborne Warning and Control Wing communications technicians remove a KY-75 control panel from an E-3A Sentry aircraft

Boom Operators point of view showing a US Air Force (USAF) B-2 Spirit aircraft approaching the refueling boom of a Alaskan Air National Guard KC-135 Stratotanker aircraft while conducting refueling operations during Exercise NORTHERN EDGE 02. Northern Edge '02 is an annual joint training exercise held in Alaska designed to exercise joint operations techniques, procedures and enhance interoperability among the services

Civilian protection. Section of the report center in New York City. Large signs readily identify the operators in constant touch with the telephone, electric, gas and water services. Others are connected to emergency food and housing units and the police and fire alarm systems

Stativ, komponent till Reaktor R1.

161020-N-QA919-0123 The AN/SQQ-32 V(4) SONAR System

STS078-440-034 - STS-078 - SAREX, Brady talks to amateur radio operators during STS-78 mission

NASA PLUM BROOK NUCLEAR REACTOR DECOMMISSIONING

LCDR Larry Mayes, blue crew weapons officer, makes entries in a notebook while at battle stations in the missile control center aboard the nuclear-powered strategic missile submarine USS OHIO (SSBN-726)

TEST CHAMBER AND CLEAN ROOM AT THE K FACILITY AT NASA PLUM BROOK STATION

PAPER DRYING PROJECT - B-2 FACILITY NATIONAL RECORD CENTER FIRE - NASA PLUM BROOK STATION SANDUSKY OHIO

HYPERSONIC TEST FACILITY GARRETT ENGINE STRUT AND INSTRUMENT DAMAGE AT NASA PLUM BROOK STATION

Topics

grc glenn research center operators plum brook reactor control room nasa