visibility Similar

code Related

Trenton Falls Hydroelectric Station, Powerhouse & Substation, On west bank of West Canada Creek, along Trenton Falls Road, 1.25 miles north of New York Route 28, Trenton Falls, Oneida County, NY

Trenton Falls Hydroelectric Station, Powerhouse & Substation, On west bank of West Canada Creek, along Trenton Falls Road, 1.25 miles north of New York Route 28, Trenton Falls, Oneida County, NY

Trenton Falls Hydroelectric Station, Powerhouse & Substation, On west bank of West Canada Creek, along Trenton Falls Road, 1.25 miles north of New York Route 28, Trenton Falls, Oneida County, NY

Trenton Falls Hydroelectric Station, Powerhouse & Substation, On west bank of West Canada Creek, along Trenton Falls Road, 1.25 miles north of New York Route 28, Trenton Falls, Oneida County, NY

Trenton Falls Hydroelectric Station, Powerhouse & Substation, On west bank of West Canada Creek, along Trenton Falls Road, 1.25 miles north of New York Route 28, Trenton Falls, Oneida County, NY

Trenton Falls Hydroelectric Station, Powerhouse & Substation, On west bank of West Canada Creek, along Trenton Falls Road, 1.25 miles north of New York Route 28, Trenton Falls, Oneida County, NY

Trenton Falls Hydroelectric Station, Powerhouse & Substation, On west bank of West Canada Creek, along Trenton Falls Road, 1.25 miles north of New York Route 28, Trenton Falls, Oneida County, NY

Trenton Falls Hydroelectric Station, Powerhouse & Substation, On west bank of West Canada Creek, along Trenton Falls Road, 1.25 miles north of New York Route 28, Trenton Falls, Oneida County, NY

Trenton Falls Hydroelectric Station, Powerhouse & Substation, On west bank of West Canada Creek, along Trenton Falls Road, 1.25 miles north of New York Route 28, Trenton Falls, Oneida County, NY

Trenton Falls Hydroelectric Station, On west bank of West Canada Creek, along Trenton Fally Road, 1.25 miles north of New York Route 28, Trenton Falls, Oneida County, NY

description

Summary

Significance: Strongly influenced by the earliest Niagara hydroelectric project, the 1901 Trenton Falls Station was installed in a spectacular gorge and was probably the highest-head contemporary plant in the eastern United States. A distinctly transitional station, Trenton Falls combined European-style turbines which soon proved outmoded with prescient, long-lived choices in electric generating and control equipment. The new powerhouse, added to the old one in 1919, reflected a generation of rapid development in hydroelectric station design and equipment. Together, the two powerhouses survive as a powerful example of technological and architectural change over a short period of time. The largely-original 56-foot-high dam evokes the regional magnitude of the station when first built.

Unprocessed Field note material exists for this structure: N502

Survey number: HAER NY-155

Niagara Falls is a group of three waterfalls at the southern end of Niagara Gorge, spanning the border between the US state of New York and the Canadian province of Ontario. The largest of the three is Horseshoe Falls, also known as Canadian Falls, which straddles the international border between Canada and the United States. The smaller American Falls and Bridal Veil Falls lie entirely within the United States. Bridal Veil Falls are separated from Horseshoe Falls by Goat Island and from American Falls by Luna Island, with both islands situated in New York as well. Located on the Niagara River, which drains Lake Erie into Lake Ontario, the combined falls have the highest flow rate of any waterfall in North America that has a vertical drop of more than 50 meters (160 ft). Niagara Falls is famed both for its beauty and as a valuable source of hydroelectric power. In 1881, the Niagara River's first hydroelectric generating station was built. The water fell 86 feet (26 m) and generated direct current electricity, which ran the machinery of local mills and lit up some of the village streets. In 1893, Westinghouse Electric designed a system to generate alternating current. In 1896, giant underground conduits leading to turbines generating upwards of 100,000 horsepower (75 MW), we installed.

Nothing Found.

label_outline

Tags

trenton falls trenton falls bank west bank canada west canada creek miles new york route oneida oneida county historic american engineering record photo trenton falls hydroelectric station ultra high resolution high resolution niagara library of congress
date_range

Date

1901
person

Contributors

Historic American Engineering Record, creator
collections

in collections

Niagara Falls

“Their roar is around me. I am on the brink of the great waters -and their anthem voice goes up amid the rainbow and the mist.” - Grenville Mellen
place

Location

Trenton Falls ,  43.23718, -75.43447
create

Source

Library of Congress
link

Link

http://www.loc.gov/
copyright

Copyright info

No known restrictions on images made by the U.S. Government; images copied from other sources may be restricted. http://www.loc.gov/rr/print/res/114_habs.html

label_outline Explore Trenton Falls Hydroelectric Station, West Canada Creek, New York Route

Topics

trenton falls trenton falls bank west bank canada west canada creek miles new york route oneida oneida county historic american engineering record photo trenton falls hydroelectric station ultra high resolution high resolution niagara library of congress