visibility Similar

NASA’s Lunar Prospector is readied for launch as its gantry-like service tower is rolled back at Cape Canaveral Air Station’s Launch Complex 46. Lunar Prospector, built for the NASA Ames Research Center by Lockheed Martin, is a spin-stabilized spacecraft designed to provide NASA with the first global maps of the Moon’s surface and its gravitational magnetic fields, as well as look for the possible presence of ice near the lunar poles. It will orbit the Moon at an altitude of approximately 63 miles during a one-year mission. The launch of Lunar Prospector is scheduled for Jan. 5, 1998 at 8:31 p.m. EST KSC-lp0012

Saturn V Apollo 4 - Saturn Apollo Program

A large white rocket sitting on top of a parking lot. Rocket breadcrumb kourou.

STS112-S-008. NASA public domain image colelction.

CAPE CANAVERAL, Fla. – On Launch Pad 37 at Cape Canaveral Air Force Station in Florida, the GOES-O and Delta IV upper stage are being raised to vertical. They will be moved into the mobile service tower for prelaunch preparations. GOES–O is one of a series of Geostationary Operational Environmental Satellites. The multi-mission GOES series N-P will be a vital contributor to weather, solar and space operations and science. NASA and the National Oceanic and Atmospheric Administration, or NOAA, are actively engaged in a cooperative program to expand the existing GOES system with the launch of the GOES N-P satellites. Launch of the GOES-O is targeted for no earlier than April 2009. Photo credit: NASA/Jim Grossmann KSC-2009-1853

KENNEDY SPACE CENTER, Fla. -- The Space Shuttle orbiter Endeavour touches down on Runway 15 of the KSC Shuttle Landing Facility (SLF) to complete the nearly nine-day STS-89 mission. Main gear touchdown was at 5:35:09 p.m. EST on Jan. 31, 1998. The wheels stopped at 5:36:19 EST, completing a total mission time of eight days, 19 hours, 48 minutes and four seconds. The 89th Space Shuttle mission was the 42nd (and 13th consecutive) landing of the orbiter at KSC, and STS-89 was the eighth of nine planned dockings of the Space Shuttle with the Russian Space Station Mir. STS-89 Mission Specialist Andrew Thomas, Ph.D., succeeded NASA astronaut and Mir 24 crew member David Wolf, M.D., who was on the Russian space station since late September 1997. Dr. Wolf returned to Earth on Endeavour with the remainder of the STS-89 crew, including Commander Terrence Wilcutt; Pilot Joe Edwards Jr.; and Mission Specialists James Reilly, Ph.D.; Michael Anderson; Bonnie Dunbar, Ph.D.; and Salizhan Sharipov with the Russian Space Agency. Dr. Thomas is scheduled to remain on Mir until the STS-91 Shuttle mission returns in June 1998. In addition to the docking and crew exchange, STS-89 included the transfer of science, logistical equipment and supplies between the two orbiting spacecrafts KSC-98pc255

An Air Force and Lockheed Martin ATLAS IIA sits poised on Space Launch Complex 36A. This ATLAS IIA Space Launch Vehicle, designated AC-129 is carrying an INMARSAT-3 F3 satellite

STS-120 - LAUNCH - Public domain NASA photogrpaph

KENNEDY SPACE CENTER, FLA. -- On Launch Pad 36-A, Cape Canaveral Air Force Station, this Lockheed Martin Atlas/Centaur rocket waits for launch to carry the Tracking and Data Relay Satellite-I (TDRS-I) into orbit. The second in a new series of telemetry satellites, TDRS-I replenishes the existing on-orbit fleet of six spacecraft. The TDRS System is the primary source of space-to-ground voice, data and telemetry for the Space Shuttle. It also provides communications with the International Space Station and scientific spacecraft in low-Earth orbit such as the Hubble Space Telescope. This new advanced series of satellites will extend the availability of TDRS communications services until about 2017. Launch of TDRS-I atop the Atlas rocket is scheduled between 5:39 - 6:19 p.m. EST KSC-02pd0254

code Related

View of Apollo 16 space vehicle on way from VAB to Pad A, Launch Complex 39

description

Summary

S72-19795 (13 Dec. 1971) --- A large crowd of spectators look on as the 363-feet tall Apollo 16 (Spacecraft 113/Lunar Module 11/Saturn 511) space vehicle moves out of the Vehicle Assembly Building (VAB) at the Kennedy Space Center's (KSC) Launch Complex 39 toward Pad A. The Saturn V stack and its mobile launch tower are atop a huge crawler-transporter. The prime crew men of the scheduled Apollo 16 lunar landing mission are astronauts John W. Young, commander; Thomas K. Mattingly, command module pilot; and Charles M. Duke Jr., lunar module pilot.

label_outline

Tags

n a johnson space center apollo apollo program view space space vehicle vab complex launch complex launch pad vehicle assembly building saturn moon rocket high resolution space vehicle moves command module pilot pad module pilot lunar module saturn v stack vehicle saturn crew men astronauts john commander rocket launch nasa
date_range

Date

11/02/1972
place

Location

create

Source

NASA
link

Link

https://images.nasa.gov/
copyright

Copyright info

Public Domain Dedication (CC0)

label_outline Explore Saturn V Stack, Crew Men, Astronauts John

CAPE CANAVERAL, Fla. – As part of NASA's Ground Systems Development and Operations Program at the Kennedy Space Center in Florida, a large space shuttle-era work platform is being lowered and removed from high bay 3 of the Vehicle Assembly Building, or VAB. The work is part of a center-wide modernization and refurbishment initiative to accommodate NASA’s Space Launch System and a variety of other spacecraft instead of the whole building supporting one design. The Ground Systems Development and Operations Program is developing the necessary ground systems, infrastructure and operational approaches required to safely process, assemble, transport and launch the next generation of rockets and spacecraft in support of NASA’s exploration objectives. Future work also will replace the antiquated communications, power and vehicle access resources with modern efficient systems. Some of the utilities and systems slated for replacement have been used since the VAB opened in 1965. For more information, visit http://www.nasa.gov/exploration/systems/ground/index.html Photo credit: NASA/Jim Grossmann KSC-2012-5965

Straight on medium close-up from the waist up at USAF SENIOR AIRMAN Jeremy Lock, Aerial Photographer assigned to the 30th Communications Squadron at Vandenberg Air Force Base, California. SRA Lock is tasked to photograph Intercontinental Ballistic Missile (ICBM) and Space Vehicle launches as well as other activities that affect the base populous

KENNEDY SPACE CENTER, FLA. - Members of a hurricane assessment team from Johnson Space Center and Marshall Space Flight Center look at damage on the roof of the Vehicle Assembly Building (VAB) a week after Hurricane Frances hit the east coast of Central Florida and Kennedy Space Center. The VAB lost 820, 4- x 16-foot panels from the side walls, or more than 52,000 square feet of its surface. KSC-04pd1767

CAPE CANAVERAL, Fla. - In the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida, external fuel tank, ET-138, for space shuttle Atlantis' STS-135 mission, is lowered into high bay-1 for joining with the twin solid rocket boosters on the mobile launcher platform. Shuttle Atlantis' move, or "rollover," from Orbiter Processing Facility-1 to the VAB is targeted for May 10. Once there it will be mated with the external tank and boosters. Atlantis and its crew of four will deliver the Raffaello multipurpose logistics module packed with supplies and spare parts to the International Space Station. STS-135 is targeted to launch June 28, and will be the last spaceflight for the Space Shuttle Program. Photo credit: NASA/Jack Pfaller KSC-2011-3043

CAPE CANAVERAL, Fla. -- Seen through the open bay door of the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida, space shuttle Discovery is being prepared for its move to Orbiter Processing Facility-1 (OPF-1). Discovery is switching places with shuttle Endeavour which has been undergoing decommissioning activities in OPF-1. Both shuttles will stop briefly outside OPF-3 for a "nose-to-nose" photo opportunity. Discovery then will be rolled into OPF-1 and Endeavour into the VAB. In OPF-1, Discovery will undergo further preparations for public display at the Smithsonian's National Air and Space Museum Steven F. Udvar-Hazy Center in Virginia. Endeavour will be stored in the VAB until October when it will be moved into OPF-2 for further work to get it ready for public display at the California Science Center in Los Angeles. For more information, visit http://www.nasa.gov/shuttle. Photo credit: NASA/Dimitri Gerondidakis KSC-2011-6415

S109E5008 - STS-109 - STS-109 MS Massimino and Grunsfeld on aft flight deck

STS062-112-002 - STS-062 - STS-62 crew portraits

Feature 259: 301-313 West Maple Avenue (in 2011)

160920-N-VK873-211 ATLANTIC OCEAN (Sept. 20, 2016)

170420-N-AF077-011 ARABIAN GULF (April 20, 2017) Ship's

High angle view of Apollo 14 space vehicle on way to Pad A

Apollo 17 Rolls to the Launch Pad

Topics

n a johnson space center apollo apollo program view space space vehicle vab complex launch complex launch pad vehicle assembly building saturn moon rocket high resolution space vehicle moves command module pilot pad module pilot lunar module saturn v stack vehicle saturn crew men astronauts john commander rocket launch nasa