A 24.4 million replacement Fuel Hydrant System was
Summary
A 24.4 million replacement Fuel Hydrant System was constructed at Westover ARB and completed in 2016. This project is to construct pressurized hydrant fuel system with 14 hydrant outlets and two 795-kiloliter above fuel storage tanks.
Tags
Date
30/01/2015
Source
Defense Visual Information Distribution Service
Copyright info
Public Domain Dedication. Public Use Notice of Limitations: https://www.dvidshub.net/about/copyright