KENNEDY SPACE CENTER, Fla. -- In the Vertical Processing Facility, workers remove the wrapping from several components of the STS-109 payload. The purpose of the mission is servicing the Hubble Space Telescope. The primary servicing tasks of the mission are to replace Solar Array 2 with Solar Array 3, replace the Power Control Unit, remove the Faint Object Camera and install the Advanced Camera for Surveys, install the NICMOS Cooling System, and install New Outer Blanket Insulation on bays 5 through 8. Mission STS-109 is scheduled for launch in mid-February 2002 KSC-01pp1630
Summary
KENNEDY SPACE CENTER, Fla. -- In the Vertical Processing Facility, workers remove the wrapping from several components of the STS-109 payload. The purpose of the mission is servicing the Hubble Space Telescope. The primary servicing tasks of the mission are to replace Solar Array 2 with Solar Array 3, replace the Power Control Unit, remove the Faint Object Camera and install the Advanced Camera for Surveys, install the NICMOS Cooling System, and install New Outer Blanket Insulation on bays 5 through 8. Mission STS-109 is scheduled for launch in mid-February 2002
Tags
Date
22/10/2001
Location
Source
NASA
Copyright info
Public Domain Dedication (CC0)