KENNEDY SPACE CENTER, Fla. --  In the Vertical Processing Facility, workers remove the wrapping from several components of the STS-109 payload. The purpose of the mission is servicing the Hubble Space Telescope.  The primary servicing tasks of the mission are to replace Solar Array 2 with Solar Array 3, replace the Power Control Unit, remove the Faint Object Camera and install the Advanced Camera for Surveys, install the NICMOS Cooling System, and install New Outer Blanket Insulation on bays 5 through 8.  Mission STS-109 is scheduled for launch in mid-February 2002 KSC-01pp1630

Similar

KENNEDY SPACE CENTER, Fla. -- In the Vertical Processing Facility, workers remove the wrapping from several components of the STS-109 payload. The purpose of the mission is servicing the Hubble Space Telescope. The primary servicing tasks of the mission are to replace Solar Array 2 with Solar Array 3, replace the Power Control Unit, remove the Faint Object Camera and install the Advanced Camera for Surveys, install the NICMOS Cooling System, and install New Outer Blanket Insulation on bays 5 through 8. Mission STS-109 is scheduled for launch in mid-February 2002 KSC-01pp1630

description

Summary

KENNEDY SPACE CENTER, Fla. -- In the Vertical Processing Facility, workers remove the wrapping from several components of the STS-109 payload. The purpose of the mission is servicing the Hubble Space Telescope. The primary servicing tasks of the mission are to replace Solar Array 2 with Solar Array 3, replace the Power Control Unit, remove the Faint Object Camera and install the Advanced Camera for Surveys, install the NICMOS Cooling System, and install New Outer Blanket Insulation on bays 5 through 8. Mission STS-109 is scheduled for launch in mid-February 2002

date_range

Date

22/10/2001
place

Location

create

Source

NASA
copyright

Copyright info

Public Domain Dedication (CC0)

Explore more

kennedy space center
kennedy space center