KENNEDY SPACE CENTER, FLA. -    Inside the payload changeout room on Launch Pad 39B, STS-121 Mission Specialist Piers Sellers takes a close look at part of the payload for the mission.  He is dressed in a clean room suit, appropriate for the environmentally clean or "white room" condition in which the payload resides before being transferred to the shuttle's payload bay. The payload includes the multi-purpose logistics module Leonardo, which is carrying supplies and equipment for the International Space Station, the lightweight multi-purpose experiment support structure carrier and the integrated cargo carrier. Crew members are at NASA's Kennedy Space Center for Terminal Countdown Demonstration Test activities, which include equipment familiarization and a simulated launch countdown.  Mission STS-121 is scheduled for launch on Space Shuttle Discovery on July 1.  Photo credit: NASA/Kim Shiflett KSC-06pd1121

Similar

KENNEDY SPACE CENTER, FLA. - Inside the payload changeout room on Launch Pad 39B, STS-121 Mission Specialist Piers Sellers takes a close look at part of the payload for the mission. He is dressed in a clean room suit, appropriate for the environmentally clean or "white room" condition in which the payload resides before being transferred to the shuttle's payload bay. The payload includes the multi-purpose logistics module Leonardo, which is carrying supplies and equipment for the International Space Station, the lightweight multi-purpose experiment support structure carrier and the integrated cargo carrier. Crew members are at NASA's Kennedy Space Center for Terminal Countdown Demonstration Test activities, which include equipment familiarization and a simulated launch countdown. Mission STS-121 is scheduled for launch on Space Shuttle Discovery on July 1. Photo credit: NASA/Kim Shiflett KSC-06pd1121

description

Summary

KENNEDY SPACE CENTER, FLA. - Inside the payload changeout room on Launch Pad 39B, STS-121 Mission Specialist Piers Sellers takes a close look at part of the payload for the mission. He is dressed in a clean room suit, appropriate for the environmentally clean or "white room" condition in which the payload resides before being transferred to the shuttle's payload bay. The payload includes the multi-purpose logistics module Leonardo, which is carrying supplies and equipment for the International Space Station, the lightweight multi-purpose experiment support structure carrier and the integrated cargo carrier. Crew members are at NASA's Kennedy Space Center for Terminal Countdown Demonstration Test activities, which include equipment familiarization and a simulated launch countdown. Mission STS-121 is scheduled for launch on Space Shuttle Discovery on July 1. Photo credit: NASA/Kim Shiflett

The Space Shuttle program was the United States government's manned launch vehicle program from 1981 to 2011, administered by NASA and officially beginning in 1972. The Space Shuttle system—composed of an orbiter launched with two reusable solid rocket boosters and a disposable external fuel tank— carried up to eight astronauts and up to 50,000 lb (23,000 kg) of payload into low Earth orbit (LEO). When its mission was complete, the orbiter would re-enter the Earth's atmosphere and lands as a glider. Although the concept had been explored since the late 1960s, the program formally commenced in 1972 and was the focus of NASA's manned operations after the final Apollo and Skylab flights in the mid-1970s. It started with the launch of the first shuttle Columbia on April 12, 1981, on STS-1. and finished with its last mission, STS-135 flown by Atlantis, in July 2011.

date_range

Date

16/06/2006
place

Location

create

Source

NASA
copyright

Copyright info

Public Domain Dedication (CC0)

Explore more

tcdt crew 121 39 b pcr
tcdt crew 121 39 b pcr