CAPE CANAVERAL, Fla. –  At NASA's Kennedy Space Center in Florida, STS-119 Mission Specialist Steve Swanson is ready to practice driving the M-113 armored personnel carrier used for emergency escape, if needed, from the launch pad. The crew members are at Kennedy for prelaunch preparation known as terminal countdown demonstration test, or TCDT. The training provides astronauts and ground crews with an opportunity to participate in various simulated countdown activities, including equipment familiarization and a simulated launch countdown.  The crew of space shuttle Discovery is targeted to launch on the STS-119 mission Feb. 12. During Discovery's 14-day mission, the crew will install the S6 truss segment and solar arrays to the starboard side of the International Space Station, completing the station's truss, or backbone. Photo credit: NASA/Kim Shiflett KSC-2009-1207

Similar

CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, STS-119 Mission Specialist Steve Swanson is ready to practice driving the M-113 armored personnel carrier used for emergency escape, if needed, from the launch pad. The crew members are at Kennedy for prelaunch preparation known as terminal countdown demonstration test, or TCDT. The training provides astronauts and ground crews with an opportunity to participate in various simulated countdown activities, including equipment familiarization and a simulated launch countdown. The crew of space shuttle Discovery is targeted to launch on the STS-119 mission Feb. 12. During Discovery's 14-day mission, the crew will install the S6 truss segment and solar arrays to the starboard side of the International Space Station, completing the station's truss, or backbone. Photo credit: NASA/Kim Shiflett KSC-2009-1207

description

Summary

CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, STS-119 Mission Specialist Steve Swanson is ready to practice driving the M-113 armored personnel carrier used for emergency escape, if needed, from the launch pad. The crew members are at Kennedy for prelaunch preparation known as terminal countdown demonstration test, or TCDT. The training provides astronauts and ground crews with an opportunity to participate in various simulated countdown activities, including equipment familiarization and a simulated launch countdown. The crew of space shuttle Discovery is targeted to launch on the STS-119 mission Feb. 12. During Discovery's 14-day mission, the crew will install the S6 truss segment and solar arrays to the starboard side of the International Space Station, completing the station's truss, or backbone. Photo credit: NASA/Kim Shiflett

The Space Shuttle program was the United States government's manned launch vehicle program from 1981 to 2011, administered by NASA and officially beginning in 1972. The Space Shuttle system—composed of an orbiter launched with two reusable solid rocket boosters and a disposable external fuel tank— carried up to eight astronauts and up to 50,000 lb (23,000 kg) of payload into low Earth orbit (LEO). When its mission was complete, the orbiter would re-enter the Earth's atmosphere and lands as a glider. Although the concept had been explored since the late 1960s, the program formally commenced in 1972 and was the focus of NASA's manned operations after the final Apollo and Skylab flights in the mid-1970s. It started with the launch of the first shuttle Columbia on April 12, 1981, on STS-1. and finished with its last mission, STS-135 flown by Atlantis, in July 2011.

date_range

Date

1960 - 1969
place

Location

create

Source

NASA
copyright

Copyright info

Public Domain Dedication (CC0)

Explore more

tcdt
tcdt