CAPE CANAVERAL, Fla. – STS-127 Mission Specialist Dave Wolf takes the wheel of the M-113 armored personnel carrier.  Driving the M-113 is part of the training on emergency egress procedures. The crew members of space shuttle Endeavour's STS-127 mission are taking turns driving the M-113.  An M-113 will be available to transport the crew to safety in the event of a contingency on the pad before their launch. The crew is at NASA's Kennedy Space Center for a launch dress rehearsal called the terminal countdown demonstration test, or TCDT, which includes the emergency egress training and equipment familiarization.  The STS-127 mission is the final of three flights dedicated to the assembly of the Japanese Kibo laboratory complex.  Endeavour's launch is targeted for June 13.  Photo credit: NASA/Kim Shiflett KSC-2009-3373

Similar

CAPE CANAVERAL, Fla. – STS-127 Mission Specialist Dave Wolf takes the wheel of the M-113 armored personnel carrier. Driving the M-113 is part of the training on emergency egress procedures. The crew members of space shuttle Endeavour's STS-127 mission are taking turns driving the M-113. An M-113 will be available to transport the crew to safety in the event of a contingency on the pad before their launch. The crew is at NASA's Kennedy Space Center for a launch dress rehearsal called the terminal countdown demonstration test, or TCDT, which includes the emergency egress training and equipment familiarization. The STS-127 mission is the final of three flights dedicated to the assembly of the Japanese Kibo laboratory complex. Endeavour's launch is targeted for June 13. Photo credit: NASA/Kim Shiflett KSC-2009-3373

description

Summary

CAPE CANAVERAL, Fla. – STS-127 Mission Specialist Dave Wolf takes the wheel of the M-113 armored personnel carrier. Driving the M-113 is part of the training on emergency egress procedures. The crew members of space shuttle Endeavour's STS-127 mission are taking turns driving the M-113. An M-113 will be available to transport the crew to safety in the event of a contingency on the pad before their launch. The crew is at NASA's Kennedy Space Center for a launch dress rehearsal called the terminal countdown demonstration test, or TCDT, which includes the emergency egress training and equipment familiarization. The STS-127 mission is the final of three flights dedicated to the assembly of the Japanese Kibo laboratory complex. Endeavour's launch is targeted for June 13. Photo credit: NASA/Kim Shiflett

The Space Shuttle program was the United States government's manned launch vehicle program from 1981 to 2011, administered by NASA and officially beginning in 1972. The Space Shuttle system—composed of an orbiter launched with two reusable solid rocket boosters and a disposable external fuel tank— carried up to eight astronauts and up to 50,000 lb (23,000 kg) of payload into low Earth orbit (LEO). When its mission was complete, the orbiter would re-enter the Earth's atmosphere and lands as a glider. Although the concept had been explored since the late 1960s, the program formally commenced in 1972 and was the focus of NASA's manned operations after the final Apollo and Skylab flights in the mid-1970s. It started with the launch of the first shuttle Columbia on April 12, 1981, on STS-1. and finished with its last mission, STS-135 flown by Atlantis, in July 2011.

date_range

Date

02/06/2009
create

Source

NASA
copyright

Copyright info

Public Domain Dedication (CC0)

Explore more

tcdt m 113 armored carrier
tcdt m 113 armored carrier