CAPE CANAVERAL, Fla. -- A canister, carrying the Alpha Magnetic Spectrometer-2 (AMS) and Express Logistics Carrier-3 for space shuttle Endeavour's STS-134 mission, arrives at Launch Pad 39A at NASA's Kennedy Space Center in Florida. Next, crews at the pad will move the payload into the Payload Ground Handling Mechanism (PGHM), and the rotating service structure (RSS) that protects the shuttle from the elements and provides access to its components will be rotated back into place. The payload is scheduled to be installed into the shuttle's cargo bay March 25.      Endeavour and its six-member STS-134 crew are targeted to lift off April 19 at 7:48 p.m. EDT to deliver the payload to the International Space Station. This is Endeavour's final scheduled mission. For more information visit, www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts134/index.html. Photo credit: NASA/Cory Huston KSC-2011-2386

Similar

CAPE CANAVERAL, Fla. -- A canister, carrying the Alpha Magnetic Spectrometer-2 (AMS) and Express Logistics Carrier-3 for space shuttle Endeavour's STS-134 mission, arrives at Launch Pad 39A at NASA's Kennedy Space Center in Florida. Next, crews at the pad will move the payload into the Payload Ground Handling Mechanism (PGHM), and the rotating service structure (RSS) that protects the shuttle from the elements and provides access to its components will be rotated back into place. The payload is scheduled to be installed into the shuttle's cargo bay March 25. Endeavour and its six-member STS-134 crew are targeted to lift off April 19 at 7:48 p.m. EDT to deliver the payload to the International Space Station. This is Endeavour's final scheduled mission. For more information visit, www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts134/index.html. Photo credit: NASA/Cory Huston KSC-2011-2386

description

Summary

CAPE CANAVERAL, Fla. -- A canister, carrying the Alpha Magnetic Spectrometer-2 (AMS) and Express Logistics Carrier-3 for space shuttle Endeavour's STS-134 mission, arrives at Launch Pad 39A at NASA's Kennedy Space Center in Florida. Next, crews at the pad will move the payload into the Payload Ground Handling Mechanism (PGHM), and the rotating service structure (RSS) that protects the shuttle from the elements and provides access to its components will be rotated back into place. The payload is scheduled to be installed into the shuttle's cargo bay March 25. Endeavour and its six-member STS-134 crew are targeted to lift off April 19 at 7:48 p.m. EDT to deliver the payload to the International Space Station. This is Endeavour's final scheduled mission. For more information visit, www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts134/index.html. Photo credit: NASA/Cory Huston

The Space Shuttle program was the United States government's manned launch vehicle program from 1981 to 2011, administered by NASA and officially beginning in 1972. The Space Shuttle system—composed of an orbiter launched with two reusable solid rocket boosters and a disposable external fuel tank— carried up to eight astronauts and up to 50,000 lb (23,000 kg) of payload into low Earth orbit (LEO). When its mission was complete, the orbiter would re-enter the Earth's atmosphere and lands as a glider. Although the concept had been explored since the late 1960s, the program formally commenced in 1972 and was the focus of NASA's manned operations after the final Apollo and Skylab flights in the mid-1970s. It started with the launch of the first shuttle Columbia on April 12, 1981, on STS-1. and finished with its last mission, STS-135 flown by Atlantis, in July 2011.

date_range

Date

1960 - 1969
place

Location

create

Source

NASA
copyright

Copyright info

Public Domain Dedication (CC0)

Explore more

ov 105 retire final mission iss national lab sts 134 crf lc 39
ov 105 retire final mission iss national lab sts 134 crf lc 39