Production. Steam power plant equipment. A section plate for a new high-pressure boiler is formed on a 6,000-ton hydraulic press. Steam boilers and other power-house equipment to supplement the hydroelectric installations of the Tennessee Valley Authority (TVA) system are produced in the large Chattanooga shops of the Combustion Engineering Company

Similar

Production. Steam power plant equipment. A section plate for a new high-pressure boiler is formed on a 6,000-ton hydraulic press. Steam boilers and other power-house equipment to supplement the hydroelectric installations of the Tennessee Valley Authority (TVA) system are produced in the large Chattanooga shops of the Combustion Engineering Company

description

Summary

Actual size of negative is C (approximately 4 x 5 inches).
Title and other information from caption card.
Transfer; United States. Office of War Information. Overseas Picture Division. Washington Division; 1944.
More information about the FSA/OWI Collection is available at http://hdl.loc.gov/loc.pnp/pp.fsaowi
Film copy on SIS roll 32, frame 630.

date_range

Date

01/01/1942
place

Location

chattanooga
create

Source

Library of Congress
copyright

Copyright info

Public Domain

Explore more

tennessee
tennessee