S125E009618 - STS-125 - Engineering Analysis Image - Contingency Cross-Tie QD Failure

Similar

S125E009618 - STS-125 - Engineering Analysis Image - Contingency Cross-Tie QD Failure

description

Summary

The original finding aid described this as:

Description: Documentation of the Contingency Water Cross Tie Potable Quick Disconnect (QD) failure reported on Flight Day 8 of the STS-125 mission. The Supply Water Dumpline Purge Device could not be removed from the Contingency Water Cross Tie Potable QD that is located on the outboard wall of the Waste Collection System (WCS). Image taken for engineering analysis.

Subject Terms: STS-125, Water, Damage Assessment

Date Taken: 5/18/2009

Categories: Flight Station

Interior_Exterior: Interior

Ground_Orbit: On-orbit

Original: Digital Still

Preservation File Format: TIFF
STS-125

date_range

Date

2009
create

Source

The U.S. National Archives
copyright

Copyright info

No known copyright restrictions

Explore more

analysis
analysis