STS119-S-059 (28 March 2009) --- Space Shuttle Discovery approaches landing on Runway 15 of the Shuttle Landing Facility at NASA's Kennedy Space Center, concluding the 13-day, 5.3-million mile journey of the STS-119 mission to the International Space Station. Onboard are NASA astronauts Lee Archambault, commander; Tony Antonelli, pilot; Steve Swanson, Richard Arnold, Joseph Acaba, John Phillips and Sandra Magnus, all mission specialists. The main landing gear touched down at 3:13:17 p.m. (EDT) on March 28, 2009. The nose gear touched down at 3:13:40 p.m. and wheels stop was at 3:14:45 p.m. During the mission, Discovery?s crew delivered and installed the final pair of large power-generating solar array wings and the S6 truss segment to the starboard, or right, side of the station and accomplished important tasks to prepare the station for future upgrades and additions later this year. sts119-s-059

Similar

STS119-S-059 (28 March 2009) --- Space Shuttle Discovery approaches landing on Runway 15 of the Shuttle Landing Facility at NASA's Kennedy Space Center, concluding the 13-day, 5.3-million mile journey of the STS-119 mission to the International Space Station. Onboard are NASA astronauts Lee Archambault, commander; Tony Antonelli, pilot; Steve Swanson, Richard Arnold, Joseph Acaba, John Phillips and Sandra Magnus, all mission specialists. The main landing gear touched down at 3:13:17 p.m. (EDT) on March 28, 2009. The nose gear touched down at 3:13:40 p.m. and wheels stop was at 3:14:45 p.m. During the mission, Discovery?s crew delivered and installed the final pair of large power-generating solar array wings and the S6 truss segment to the starboard, or right, side of the station and accomplished important tasks to prepare the station for future upgrades and additions later this year. sts119-s-059

description

Summary

STS119-S-059 (28 March 2009) --- Space Shuttle Discovery approaches landing on Runway 15 of the Shuttle Landing Facility at NASA's Kennedy Space Center, concluding the 13-day, 5.3-million mile journey of the STS-119 mission to the International Space Station. Onboard are NASA astronauts Lee Archambault, commander; Tony Antonelli, pilot; Steve Swanson, Richard Arnold, Joseph Acaba, John Phillips and Sandra Magnus, all mission specialists. The main landing gear touched down at 3:13:17 p.m. (EDT) on March 28, 2009. The nose gear touched down at 3:13:40 p.m. and wheels stop was at 3:14:45 p.m. During the mission, Discovery?s crew delivered and installed the final pair of large power-generating solar array wings and the S6 truss segment to the starboard, or right, side of the station and accomplished important tasks to prepare the station for future upgrades and additions later this year.

The Space Shuttle program was the United States government's manned launch vehicle program from 1981 to 2011, administered by NASA and officially beginning in 1972. The Space Shuttle system—composed of an orbiter launched with two reusable solid rocket boosters and a disposable external fuel tank— carried up to eight astronauts and up to 50,000 lb (23,000 kg) of payload into low Earth orbit (LEO). When its mission was complete, the orbiter would re-enter the Earth's atmosphere and lands as a glider. Although the concept had been explored since the late 1960s, the program formally commenced in 1972 and was the focus of NASA's manned operations after the final Apollo and Skylab flights in the mid-1970s. It started with the launch of the first shuttle Columbia on April 12, 1981, on STS-1. and finished with its last mission, STS-135 flown by Atlantis, in July 2011.

date_range

Date

1960 - 1969
place

Location

create

Source

NASA
copyright

Copyright info

Public Domain Dedication (CC0)

Explore more

johnson space center
johnson space center