Team Redstone inaugurates a solar energy and battery
Summary
Team Redstone inaugurates a solar energy and battery storage facility during a ribbon cutting ceremony Feb. 23, 2018, at Redstone Arsenal, Alabama. The project and battery storage system generates on-site, fuel free power for use by Redstone Arsenal and its tenants, and it's capable of storing power to offset demand during peak consumption. (U.S. Army photo by Sgt. 1st Class Teddy Wade)
Tags
Date
23/02/2018
Source
Defense Visual Information Distribution Service
Copyright info
Public Domain Dedication. Public Use Notice of Limitations: https://www.dvidshub.net/about/copyright