jay greene

5 media by topicpage 1 of 1
Inflight - Mission Control Center

Inflight - Mission Control Center

Day-5 Mission Control Room activities, STS-3 Mission of: Alan Briscoe, at the Instrumentation and Communications Officer (INCO) Console; Astronaut Richard Truly and Briscoe; Astronaut Judy Resnik, Flight Direc... More

Inflight - Mission Control Center

Inflight - Mission Control Center

Day-5 Mission Control Room activities, STS-3 Mission of: Alan Briscoe, at the Instrumentation and Communications Officer (INCO) Console; Astronaut Richard Truly and Briscoe; Astronaut Judy Resnik, Flight Direc... More

Inflight - Mission Control Center

Inflight - Mission Control Center

Day-5 Mission Control Room activities, STS-3 Mission of: Alan Briscoe, at the Instrumentation and Communications Officer (INCO) Console; Astronaut Richard Truly and Briscoe; Astronaut Judy Resnik, Flight Direc... More

KENNEDY SPACE CENTER, FLA. -- Cutting a red ribbon for the unveiling of a newly renovated altitude chamber are (left to right) Tommy Mack, project manager, NASA; Steve Francois, director, Space Station and Shuttle Payloads; Sterling Walker, director, Engineering Development; Roy Bridges, director, Kennedy Space Center; Jay Greene, International Space Station manager for Technical; Michael Terry, project manager, Boeing; and Terry Smith, director of Engineering, Boeing Space Coast Operations. The chamber was reactivated, after a 24-year hiatus, to perform leak tests on International Space Station pressurized modules at the launch site. Originally, two chambers were built to test the Apollo command and lunar service modules. They were last used in 1975 during the Apollo-Soyuz Test Project. After installation of new vacuum pumping equipment and controls, a new control room, and a new rotation handling fixture, the chamber again became operational in February 1999. The chamber, which is 33 feet in diameter and 50 feet tall, is constructed of stainless steel. The first module that will be tested for leaks is the U.S. Laboratory. No date has been determined for the test KSC-99pp0237

KENNEDY SPACE CENTER, FLA. -- Cutting a red ribbon for the unveiling o...

KENNEDY SPACE CENTER, FLA. -- Cutting a red ribbon for the unveiling of a newly renovated altitude chamber are (left to right) Tommy Mack, project manager, NASA; Steve Francois, director, Space Station and Shut... More

KENNEDY SPACE CENTER, FLA. -- At a ribbon-cutting ceremony inside the Operations and Checkout Building high bay, Sterling Walker, director of Engineering Development, introduces the project team members responsible for renovating an altitude chamber formerly used on the Apollo program. In addition, management, media and onlookers are present for the ceremony. Seated in the front row left are (left to right) Terry Smith, director of Engineering, Boeing Space Coast Operations; Steve Francois, director, Space Station and Shuttle Payloads; Jay Greene, International Space Station manager for Technical; and Roy Bridges, center director. The chamber was reactivated, after a 24-year hiatus, to perform leak tests on International Space Station pressurized modules at the launch site. Originally, two chambers were built to test the Apollo command and lunar service modules. They were last used in 1975 during the Apollo-Soyuz Test Project. After installation of new vacuum pumping equipment and controls, a new control room, and a new rotation handling fixture, the chamber again became operational in February 1999. The chamber, which is 33 feet in diameter and 50 feet tall, is constructed of stainless steel. The first module that will be tested for leaks is the U.S. Laboratory. No date has been determined for the test KSC-99pp0236

KENNEDY SPACE CENTER, FLA. -- At a ribbon-cutting ceremony inside the ...

KENNEDY SPACE CENTER, FLA. -- At a ribbon-cutting ceremony inside the Operations and Checkout Building high bay, Sterling Walker, director of Engineering Development, introduces the project team members respons... More