mission specialist steven swanson

16 media by topicpage 1 of 1
KENNEDY SPACE CENTER, FLA. -- The STS-117 crew members arrive at the KSC Shuttle Landing Facility aboard T-38 jet aircraft to prepare for launch on Space Shuttle Atlantis on June 8.  Mission Specialist Steven Swanson is greeted by Shuttle Launch Director Mike Leinbach.  Behind Swanson, at left, is Commander Frederick Sturckow; Mission Specialist Patrick Forrester is at center; Janet Petro, deputy director of Kennedy, is at right.  During the 11-day mission and three spacewalks, the crew will work with flight controllers at NASA's Johnson Space Center in Houston to install a 17-ton segment on the station's girder-like truss and deploy a set of solar arrays, S3/S4. The mission will increase the space station's power capability in preparation for the arrival of new science modules from the European and Japanese space agencies.    Photo credit: NASA/Kim Shiflett KSC-07pd1348

KENNEDY SPACE CENTER, FLA. -- The STS-117 crew members arrive at the K...

KENNEDY SPACE CENTER, FLA. -- The STS-117 crew members arrive at the KSC Shuttle Landing Facility aboard T-38 jet aircraft to prepare for launch on Space Shuttle Atlantis on June 8. Mission Specialist Steven S... More

KENNEDY SPACE CENTER, FLA. -- The STS-117 crew arrives at NASA's Kennedy Space Center to take part in the Terminal Countdown Demonstration Test (TCDT), a preparation for the launch March 15 to the International Space Station. NASA Launch Director Mike Leinbach greets Mission Specialist Steven Swanson at the Shuttle Landing Facility. The TCDT includes emergency egress training and a simulated launch countdown. The mission payload aboard Space Shuttle Atlantis is the S3/S4 integrated truss structure, along with a third set of solar arrays and batteries. The crew of six astronauts will install the truss to continue assembly of the station.  Photo credit: NASA/Kim Shiflett KSC-07pd0457

KENNEDY SPACE CENTER, FLA. -- The STS-117 crew arrives at NASA's Kenne...

KENNEDY SPACE CENTER, FLA. -- The STS-117 crew arrives at NASA's Kennedy Space Center to take part in the Terminal Countdown Demonstration Test (TCDT), a preparation for the launch March 15 to the International... More

KENNEDY SPACE CENTER, FLA. --   In the Orbiter Processing Facility, STS-117 crew members look at one of the wings on the orbiter Atlantis, their vehicle for the mission.  At left is Mission Specialist Steven Swanson; the others kneeling are Pilot Lee Archambault and Mission Specialists John (Danny) Olivas and James Reilly. They and other crew members are at KSC to take part in a Crew Equipment Interface Test that allows them opportunities to become familiar with equipment and hardware for their mission. STS-117 will deliver the S3/S4 and another pair of solar arrays to the space station.  The 21st shuttle mission to the International Space Station, STS-117 is scheduled to launch no earlier than March 16.  Photo credit: NASA/Kim Shiflett KSC-06pd2829

KENNEDY SPACE CENTER, FLA. -- In the Orbiter Processing Facility, ST...

KENNEDY SPACE CENTER, FLA. -- In the Orbiter Processing Facility, STS-117 crew members look at one of the wings on the orbiter Atlantis, their vehicle for the mission. At left is Mission Specialist Steven Sw... More

KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility, STS-117 Mission Specialist Steven Swanson looks under the protective wrapping at the S3/S4 starboard integrated truss segment that is part of the payload on the mission.   He and other crew members are at KSC to take part in a Crew Equipment Interface Test that allows them opportunities to become familiar with equipment and hardware for their mission. STS-117 will deliver the S3/S4 and another pair of solar arrays to the space station.  The 21st shuttle mission to the International Space Station, STS-117 is scheduled to launch no earlier than March 16.  Photo credit: NASA/Kim Shiflett KSC-06pd2823

KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility...

KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility, STS-117 Mission Specialist Steven Swanson looks under the protective wrapping at the S3/S4 starboard integrated truss segment that is part... More

KENNEDY SPACE CENTER, FLA. -- At Launch Complex 39, STS-117 Mission Specialist Steven Swanson is helmeted and ready to practice driving an M-113 armored personnel carrier. The astronauts on the STS-117 crew are participating in M-113 armored personnel carrier training during Terminal Countdown Demonstration Test (TCDT) activities, a dress rehearsal for their launch, targeted for March 15. The M-113 could be used to move the crew away from the launch pad quickly in the event of an emergency. The TCDT also includes pad emergency egress training and a simulated launch countdown. The mission payload aboard Space Shuttle Atlantis is the S3/S4 integrated truss structure, along with a third set of solar arrays and batteries. The crew of six astronauts will install the truss to continue assembly of the station. Photo credit: NASA/Kim Shiflett KSC-07pd0472

KENNEDY SPACE CENTER, FLA. -- At Launch Complex 39, STS-117 Mission Sp...

KENNEDY SPACE CENTER, FLA. -- At Launch Complex 39, STS-117 Mission Specialist Steven Swanson is helmeted and ready to practice driving an M-113 armored personnel carrier. The astronauts on the STS-117 crew are... More

KENNEDY SPACE CENTER, FLA. -- At Launch Complex 39, astronaut rescue team leader Capt. George Hoggard, second from left, greets STS-117 Mission Specialist Steven Swanson as fellow crew members, from left, Mission Specialists James Reilly, Patrick Forrester and Danny Olivas look on. The astronauts on the STS-117 crew are participating in M-113 armored personnel carrier training during Terminal Countdown Demonstration Test (TCDT) activities, a dress rehearsal for their launch, targeted for March 15. The M-113 could be used to move the crew away from the launch pad quickly in the event of an emergency. The TCDT also includes pad emergency egress training and a simulated launch countdown. The mission payload aboard Space Shuttle Atlantis is the S3/S4 integrated truss structure, along with a third set of solar arrays and batteries. The crew of six astronauts will install the truss to continue assembly of the station. Photo credit: NASA/Kim Shiflett KSC-07pd0468

KENNEDY SPACE CENTER, FLA. -- At Launch Complex 39, astronaut rescue t...

KENNEDY SPACE CENTER, FLA. -- At Launch Complex 39, astronaut rescue team leader Capt. George Hoggard, second from left, greets STS-117 Mission Specialist Steven Swanson as fellow crew members, from left, Missi... More

KENNEDY SPACE CENTER, FLA. -- The STS-117 crew arrives at NASA's Kennedy Space Center to take part in the Terminal Countdown Demonstration Test (TCDT), a preparation for the launch March 15 to the International Space Station.  Seen here is Mission Specialist Steven Swanson in a T-38 jet aircraft.  The TCDT includes emergency egress training and a simulated launch countdown. The mission payload aboard Space Shuttle Atlantis is the S3/S4 integrated truss structure, along with a third set of solar arrays and batteries. The crew of six astronauts will install the truss to continue assembly of the station.  Photo credit: NASA/Kim Shiflett KSC-07pd0456

KENNEDY SPACE CENTER, FLA. -- The STS-117 crew arrives at NASA's Kenne...

KENNEDY SPACE CENTER, FLA. -- The STS-117 crew arrives at NASA's Kennedy Space Center to take part in the Terminal Countdown Demonstration Test (TCDT), a preparation for the launch March 15 to the International... More

KENNEDY SPACE CENTER, FLA. --  In the Launch Pad 39A area, Mission STS-117 crew members receive instruction on emergency egress using the slidewire basket system during Terminal Countdown Demonstration Test activities. Here, Mission Specialist Steven Swanson (right) practices exiting from the slidewire basket.   as Mission Specialist Danny Olivas assists. The TCDT also includes M-113 armored personnel carrier training, and a simulated launch countdown. The mission payload aboard Space Shuttle Atlantis is the S3/S4 integrated truss structure, along with a third set of solar arrays and batteries. The crew of six astronauts will install the truss to continue assembly of the International Space Station. Photo credit: NASA/Kim Shiflett KSC-07pd0495

KENNEDY SPACE CENTER, FLA. -- In the Launch Pad 39A area, Mission STS...

KENNEDY SPACE CENTER, FLA. -- In the Launch Pad 39A area, Mission STS-117 crew members receive instruction on emergency egress using the slidewire basket system during Terminal Countdown Demonstration Test act... More

KENNEDY SPACE CENTER, FLA. --  During Terminal Countdown Demonstration Test activities, the Mission STS-117 crew members participate in an emergency egress walkdown at Launch Pad 39A. On the 195-foot level of the fixed service structure inside the white room are Mission Specialist Steven Swanson (kneeling), and standing from left, Pilot Lee Archambault, Commander Rick Sturckow, and Mission Specialists Patrick Forrester, Danny Olivas and James Reilly. The TCDT also includes M-113 armored personnel carrier training, and a simulated launch countdown. The mission payload aboard Space Shuttle Atlantis is the S3/S4 integrated truss structure, along with a third set of solar arrays and batteries. The crew of six astronauts will install the truss to continue assembly of the International Space Station. Photo credit: NASA/Kim Shiflett KSC-07pd0484

KENNEDY SPACE CENTER, FLA. -- During Terminal Countdown Demonstration...

KENNEDY SPACE CENTER, FLA. -- During Terminal Countdown Demonstration Test activities, the Mission STS-117 crew members participate in an emergency egress walkdown at Launch Pad 39A. On the 195-foot level of t... More

KENNEDY SPACE CENTER, FLA. --  Mission STS-117 Mission Specialist Steven Swanson sits inside Space Shuttle Atlantis at Launch Pad 39A to participate in a simulated launch countdown that is part of the prelaunch preparations known as terminal demonstration countdown test (TCDT). The TCDT also includes M-113 armored personnel carrier training and payload familiarization. The STS-117 mission is No. 21 to the International Space Station. Mission payloads aboard Atlantis include the S3/S4 integrated truss structure, a third set of solar arrays and batteries. The crew of six astronauts will install the truss to continue assembly of the station. Launch is scheduled for no earlier than March 15.   Photo credit: NASA/Kim Shiflett. KSC-07pd0534

KENNEDY SPACE CENTER, FLA. -- Mission STS-117 Mission Specialist Stev...

KENNEDY SPACE CENTER, FLA. -- Mission STS-117 Mission Specialist Steven Swanson sits inside Space Shuttle Atlantis at Launch Pad 39A to participate in a simulated launch countdown that is part of the prelaunch... More

KENNEDY SPACE CENTER, FLA. -- In the white room on Launch Pad 39A, Mission STS-117 Mission Specialist Steven Swanson is helped with his gear before entering Space Shuttle Atlantis. The STS-117 crew practices for launch with a simulation of activities, from suit-up to countdown in the orbiter during terminal countdown demonstration test activities. The STS-117 mission is No. 21 to the International Space Station. Mission payloads aboard Atlantis include the S3/S4 integrated truss structure, a third set of solar arrays and batteries. The crew of six astronauts will install the truss to continue assembly of the station. Launch is scheduled for no earlier than March 15.  Photo credit: NASA/Jim Grossmann KSC-07pd0529

KENNEDY SPACE CENTER, FLA. -- In the white room on Launch Pad 39A, Mis...

KENNEDY SPACE CENTER, FLA. -- In the white room on Launch Pad 39A, Mission STS-117 Mission Specialist Steven Swanson is helped with his gear before entering Space Shuttle Atlantis. The STS-117 crew practices fo... More

KENNEDY SPACE CENTER, FLA. --  Mission STS-117 Mission Specialist Steven Swanson has donned his launch suit for a fit check, part of the pre-launch preparations during terminal countdown demonstration test (TCDT) activities. The mission crew is at KSC for the TCDT, which includes a simulated launch countdown. The STS-117 mission is No. 21 to the International Space Station. Mission payloads aboard Atlantis include the S3/S4 integrated truss structure, a third set of solar arrays and batteries. The crew of six astronauts will install the truss to continue assembly of the station. Launch is scheduled for no earlier than March 15. Photo credit: NASA/Kim Shiflett. KSC-07pd0513

KENNEDY SPACE CENTER, FLA. -- Mission STS-117 Mission Specialist Stev...

KENNEDY SPACE CENTER, FLA. -- Mission STS-117 Mission Specialist Steven Swanson has donned his launch suit for a fit check, part of the pre-launch preparations during terminal countdown demonstration test (TCD... More

KENNEDY SPACE CENTER, FLA. --  In the Operations and Checkout Building, the crew members of mission STS-117 are suiting up for a launch attempt at 7:38 p.m. EDT from Launch Pad 39A aboard Space Shuttle Atlantis. Pictured here is Mission Specialist Steven Swanson, who is making his first shuttle flight. The shuttle is delivering a new segment to the starboard side of the International Space Station's backbone, known as the truss. Three spacewalks are planned to install the S3/S4 truss segment, deploy a set of solar arrays and prepare them for operation. STS-117 is the 118th space shuttle flight, the 21st flight to the station, the 28th flight for Atlantis and the first of four flights planned for 2007.    Photo credit: NASA/Kim Shiflett KSC-07pd1411

KENNEDY SPACE CENTER, FLA. -- In the Operations and Checkout Building...

KENNEDY SPACE CENTER, FLA. -- In the Operations and Checkout Building, the crew members of mission STS-117 are suiting up for a launch attempt at 7:38 p.m. EDT from Launch Pad 39A aboard Space Shuttle Atlantis... More

KENNEDY SPACE CENTER, FLA. --  The STS-117 crew members head for the astrovan that will take them to Launch Pad 39A.  From left are Mission Specialists John "Danny" Olivas, James Reilly and Patrick Forrester; astronaut Clayton Anderson; Pilot Lee Archambault; Mission Specialist Steven Swanson; and Commander Frederick Sturckow.  Anderson is joining the Expedition 15 crew on the International Space Station; Flight Engineer Suni Williams will return to Earth in his place.  Liftoff is scheduled for 7:38 p.m. today aboard Space Shuttle Atlantis. The shuttle is delivering a new segment to the starboard side of the International Space Station's backbone, known as the truss. Three spacewalks are planned to install the S3/S4 truss segment, deploy a set of solar arrays and prepare them for operation. STS-117 is the 118th space shuttle flight, the 21st flight to the station, the 28th flight for Atlantis and the first of four flights planned for 2007.    Photo credit: NASA/Kim Shiflett KSC-07pd1425

KENNEDY SPACE CENTER, FLA. -- The STS-117 crew members head for the a...

KENNEDY SPACE CENTER, FLA. -- The STS-117 crew members head for the astrovan that will take them to Launch Pad 39A. From left are Mission Specialists John "Danny" Olivas, James Reilly and Patrick Forrester; a... More

KENNEDY SPACE CENTER, FLA. --   In the Operations and Checkout Building, the crew members of mission STS-117 are suiting up for a launch attempt at 7:38 p.m. EDT from Launch Pad 39A aboard Space Shuttle Atlantis. Pictured here is Mission Specialist Steven Swanson after donning his helmet. The shuttle is delivering a new segment to the starboard side of the International Space Station's backbone, known as the truss. Three spacewalks are planned to install the S3/S4 truss segment, deploy a set of solar arrays and prepare them for operation. STS-117 is the 118th space shuttle flight, the 21st flight to the station, the 28th flight for Atlantis and the first of four flights planned for 2007.    Photo credit: NASA/Kim Shiflett KSC-07pd1415

KENNEDY SPACE CENTER, FLA. -- In the Operations and Checkout Buildin...

KENNEDY SPACE CENTER, FLA. -- In the Operations and Checkout Building, the crew members of mission STS-117 are suiting up for a launch attempt at 7:38 p.m. EDT from Launch Pad 39A aboard Space Shuttle Atlanti... More

KENNEDY SPACE CENTER, FLA. --   In the White Room on Launch Pad 39A, STS-117 Mission Specialist Steven Swanson is helped by the closeout crew to secure his launch suit before climbing into Space Shuttle Atlantis. Behind Swanson is astronaut Clayton Anderson, waiting his turn.  Anderson is joining the Expedition 15 crew on the International Space Station; Flight Engineer Suni Williams will return to Earth in his place. The mission to the space station is scheduled to launch at 7:38 p.m. EDT.  Members of the closeout crew help the astronauts don a parachute pack, strap them into the space shuttle's crew module and take care of any other last-minute needs that arise. The White Room is at the end of the orbiter access arm that extends from the fixed service structure and provides entry into the orbiter. The shuttle is delivering a new segment to the starboard side of the space station's backbone, known as the truss. Three spacewalks are planned to install the S3/S4 truss segment, deploy a set of solar arrays and prepare them for operation. STS-117 is the 118th space shuttle flight, the 21st flight to the station, the 28th flight for Atlantis and the first of four flights planned for 2007.  Photo credit: NASA/Tony Gray & Don Kight KSC-07pp1473

KENNEDY SPACE CENTER, FLA. -- In the White Room on Launch Pad 39A, S...

KENNEDY SPACE CENTER, FLA. -- In the White Room on Launch Pad 39A, STS-117 Mission Specialist Steven Swanson is helped by the closeout crew to secure his launch suit before climbing into Space Shuttle Atlanti... More