space alliance technicians

272 media by topicpage 1 of 3
CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians on a Hyster forklift guide replica shuttle main engine 2, or RSME 2, closer for installation on space shuttle Endeavour. The orbiter is surrounded by work platforms allowing access to all areas of the spacecraft.    The work is part of Transition and Retirement of the remaining space shuttles, Endeavour and Atlantis. Endeavour is being prepared for public display at the California Science Center in Los Angeles. Its ferry flight to California is targeted for mid-September. Endeavour was the last space shuttle added to NASA’s orbiter fleet. Over the course of its 19-year career, Endeavour spent 299 days in space during 25 missions. For more information, visit http://www.nasa.gov/shuttle.  Photo credit: NASA/David Lee KSC-2012-3826

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility-2 at NASA’s ...

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians on a Hyster forklift guide replica shuttle main engine 2, or RSME 2, clos... More

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians close space shuttle Atlantis’ aft doors for the final time.    The orbiter is undergoing final preparations for its transfer to the Kennedy Space Center Visitor complex targeted for November. The work is part of Transition and Retirement of the remaining shuttle. Atlantis is being prepared for public display at the visitor complex. Over the course of its 26-year career, Atlantis spent 293 days in space during 33 missions. For more information, visit http://www.nasa.gov/transition. Photo credit: NASA/Dimitri Gerondidakis KSC-2012-5615

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility-2 at NASA’s ...

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians close space shuttle Atlantis’ aft doors for the final time. The orbite... More

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility 1 at NASA's Kennedy Space Center in Florida, United Space Alliance technicians, lying on a work platform, remove window #8 from the top of the crew module of space shuttle Atlantis.    Inspection and maintenance of the crew module windows is standard procedure between shuttle missions.  Atlantis is next slated to deliver an Integrated Cargo Carrier and Russian-built Mini Research Module to the International Space Station on the STS-132 mission.  The second in a series of new pressurized components for Russia, the module will be permanently attached to the Zarya module. Three spacewalks are planned to store spare components outside the station, including six spare batteries, a boom assembly for the Ku-band antenna and spares for the Canadian Dextre robotic arm extension. A radiator, airlock and European robotic arm for the Russian Multi-purpose Laboratory Module also are payloads on the flight.  Launch is targeted for May 14.  Photo credit: NASA/Glenn Benson KSC-2010-1082

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility 1 at NASA's Kenn...

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility 1 at NASA's Kennedy Space Center in Florida, United Space Alliance technicians, lying on a work platform, remove window #8 from the top of the crew module o... More

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians inspect space shuttle Endeavour’s payload bay doors after they were closed for the final time.     The work is part of Transition and Retirement of the remaining space shuttles, Endeavour and Atlantis. Endeavour is being prepared for public display at the California Science Center in Los Angeles. Its ferry flight to California is targeted for mid-September. Endeavour was the last space shuttle added to NASA’s orbiter fleet. Over the course of its 19-year career, Endeavour spent 299 days in space during 25 missions. For more information, visit http://www.nasa.gov/shuttle.  Photo credit: NASA/Kim Shiflett KSC-2012-3429

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility-2 at NASA’s ...

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians inspect space shuttle Endeavour’s payload bay doors after they were close... More

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility Bay 2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians install a heat shield around one of space shuttle Endeavour’s replica shuttle main engines.      The work is part of Transition and Retirement of the remaining space shuttles, Endeavour and Atlantis. Endeavour is being prepared for public display at the California Science Center in Los Angeles. Its ferry flight to California is targeted for mid-September. Endeavour was the last space shuttle added to NASA’s orbiter fleet. Over the course of its 19-year career, Endeavour spent 299 days in space during 25 missions. For more information, visit http://www.nasa.gov/transition Photo credit: NASA/ Frankie Martin KSC-2012-3961

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility Bay 2 at NASA’s ...

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility Bay 2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians install a heat shield around one of space shuttle Endeavour’s replica shu... More

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians reinstall the food pantry locker in space shuttle Endeavour’s middeck during processing for the shuttle’s retirement.      Endeavour is being prepared for public display at the California Science Center in Los Angeles. Its ferry flight to California is targeted for mid-September. Endeavour, designated OV-105, was the last space shuttle added to NASA’s orbiter fleet. Over the course of its 19-year career, Endeavour spent 299 days in space during 25 missions. For more information, visit http://www.nasa.gov/transition.  Photo credit: NASA/Dimitri Gerondidakis KSC-2012-3307

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility-2 at NASA’s Kenn...

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians reinstall the food pantry locker in space shuttle Endeavour’s middeck during ... More

CAPE CANAVERAL, Fla. – Inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians prepare the right side tail cone for buildup on space shuttle Endeavour. The tail cone protects space shuttle main engines during ferry flights on top of the Shuttle Carrier Aircraft, or SCA.    The work is part of Transition and Retirement of the remaining space shuttles, Endeavour and Atlantis. Endeavour is being prepared for public display at the California Science Center in Los Angeles. Its ferry flight to California is targeted for mid-September. Endeavour was the last space shuttle added to NASA’s orbiter fleet. Over the course of its 19-year career, Endeavour spent 299 days in space during 25 missions. For more information, visit http://www.nasa.gov/shuttle.  Photo credit: NASA/Kim Shiflett KSC-2012-2833

CAPE CANAVERAL, Fla. – Inside the Vehicle Assembly Building at NASA’s ...

CAPE CANAVERAL, Fla. – Inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians prepare the right side tail cone for buildup on space shuttle Endeavour. ... More

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians have removed the auxiliary power units from space shuttle Endeavour and are inspecting them and preparing them for transport.      The work is part of Endeavour’s transition and retirement processing. The spacecraft is being prepared for public display at the California Science Center in Los Angeles. Endeavour flew 25 missions, spent 299 days in space, orbited Earth 4,671 times and traveled 122, 883, 151 miles over the course of its 19-year career. For more information, visit http://www.nasa.gov/shuttle. Photo credit: NASA/Dimitri Gerondidakis KSC-2012-1894

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-2 at NASA’s Ken...

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians have removed the auxiliary power units from space shuttle Endeavour and are ... More

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility Bay 2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians lift a heat shield for installation around one of space shuttle Endeavour’s replica shuttle main engines.      The work is part of Transition and Retirement of the remaining space shuttles, Endeavour and Atlantis. Endeavour is being prepared for public display at the California Science Center in Los Angeles. Its ferry flight to California is targeted for mid-September. Endeavour was the last space shuttle added to NASA’s orbiter fleet. Over the course of its 19-year career, Endeavour spent 299 days in space during 25 missions. For more information, visit http://www.nasa.gov/transition Photo credit: NASA/ Frankie Martin KSC-2012-3967

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility Bay 2 at NASA’s ...

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility Bay 2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians lift a heat shield for installation around one of space shuttle Endeavour... More

KENNEDY SPACE CENTER, FLA. -- In the Vehicle Assembly Building at NASA's Kennedy Space Center, United Space Alliance technicians get ready to lower the external tank to be mated with the solid rocket boosters on the mobile launcher platform.  The boosters-tank configuration will be used on space shuttle Atlantis for mission STS-122, which is targeted for launch on Dec. 6. Photo credit:  Kim Shiflett KSC-07pd2872

KENNEDY SPACE CENTER, FLA. -- In the Vehicle Assembly Building at NASA...

KENNEDY SPACE CENTER, FLA. -- In the Vehicle Assembly Building at NASA's Kennedy Space Center, United Space Alliance technicians get ready to lower the external tank to be mated with the solid rocket boosters o... More

CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, United Space Alliance technicians prepare a mock air lock for installation in the payload bay of the space shuttle Atlantis in Bay 2 of the Orbiter Processing Facility. Atlantis is undergoing final preparations for its transfer to the Kennedy Space Center Visitor Complex targeted for November.      The work is part of Transition and Retirement of the remaining space shuttles, Atlantis and Endeavour. Atlantis is being prepared for public display at Kennedy's Visitor Complex. Over the course of its 26-year career, Atlantis spent 293 days in space during 33 missions. For more information, visit http://www.nasa.gov/transition Photo credit: NASA/Jim Grossmann KSC-2012-4817

CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, Unit...

CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, United Space Alliance technicians prepare a mock air lock for installation in the payload bay of the space shuttle Atlantis in Bay 2 of the Orbi... More

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians monitor the progress as a large crane is lowered toward the right orbital maneuvering system OMS pod that will be installed on space shuttle Endeavour.      The OMS pod underwent complete deservicing and cleaning at White Sands Space Harbor in New Mexico, part of the transition and retirement processing of each shuttle. Endeavour is being prepared for public display at the California Science Center in Los Angeles. Over the course of its 19-year career, Endeavour spent 299 days in space during 25 missions. For more information, visit http://www.nasa.gov/shuttle.  Photo credit: NASA/Kim Shiflett KSC-2012-1900

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility-2 at NASA’s Kenn...

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians monitor the progress as a large crane is lowered toward the right orbital man... More

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility-1 at NASA’s Kennedy Space Center in Florida,  United Space Alliance technicians monitor the progress as a large crane lifts the right orbital maneuvering system, or OMS, pod for installation on space shuttle Atlantis. It is the last time an OMS pod will be installed on Atlantis. The OMS provided the shuttle with thrust for orbit insertion, rendezvous and deorbit, and could provide up to 1,000 pounds of propellant to the aft reaction control system.    The OMS is housed in two independent pods located on each side of the shuttle’s aft fuselage. Each pod contains one OMS engine and the hardware needed to pressurize, store and distribute the propellants to perform the velocity maneuvers. Atlantis’ OMS pods were removed and sent to the test facility at White Sands Space Harbor in New Mexico to be cleaned of residual toxic propellant. The work is part of the Space Shuttle Program’s transition and retirement processing of the space shuttle fleet. A groundbreaking was held Jan. 18 for Atlantis’ future home, a 65,000-square-foot exhibit hall in Shuttle Plaza at the Kennedy Space Center Visitor Complex. Atlantis is scheduled to roll over to the visitor complex in November in preparation for the exhibit’s grand opening in July 2013. For more information, visit http://www.nasa.gov/transition. Photo credit: NASA/Dimitri Gerondidakis KSC-2012-3406

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility-1 at NASA’s ...

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility-1 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians monitor the progress as a large crane lifts the right orbital maneuverin... More

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, a large crane lowers the left orbital maneuvering system OMS pod on to space shuttle Endeavour so that United Space Alliance technicians can complete the installation.     The OMS pod underwent complete deservicing and cleaning at White Sands Space Harbor in New Mexico, part of the transition and retirement processing of each shuttle. Endeavour is being prepared for public display at the California Science Center in Los Angeles. Over the course of its 19-year career, Endeavour spent 299 days in space during 25 missions. For more information, visit http://www.nasa.gov/shuttle.  Photo credit: NASA/Dimitri Gerondidakis KSC-2012-1873

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-2 at NASA’s Ken...

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, a large crane lowers the left orbital maneuvering system OMS pod on to space shuttle Endeavour so that United ... More

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility Bay 2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians prepare a heat shield for installation around space shuttle Endeavour’s replica shuttle main engines.      The work is part of Transition and Retirement of the remaining space shuttles, Endeavour and Atlantis. Endeavour is being prepared for public display at the California Science Center in Los Angeles. Its ferry flight to California is targeted for mid-September. Endeavour was the last space shuttle added to NASA’s orbiter fleet. Over the course of its 19-year career, Endeavour spent 299 days in space during 25 missions. For more information, visit http://www.nasa.gov/transition Photo credit: NASA/ Jim Grossmann KSC-2012-3971

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility Bay 2 at NASA’s ...

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility Bay 2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians prepare a heat shield for installation around space shuttle Endeavour’s r... More

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility-1 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians prepare to install window No. 4 on space shuttle Atlantis.     The work is part of the Space Shuttle Program’s transition and retirement processing of space shuttles Atlantis and Endeavour. Atlantis is being prepared for display at the Kennedy Space Center Visitor Complex and is scheduled to roll over to the complex in November. The visitor complex is targeting a July 2013 grand opening for Atlantis’ new home. Photo credit: NASA/Jim Grossmann KSC-2012-2682

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility-1 at NASA’s ...

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility-1 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians prepare to install window No. 4 on space shuttle Atlantis. The work i... More

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians monitor the progress as space shuttle Endeavour’s payload bay doors begin to close for the final time.    The work is part of Transition and Retirement of the remaining space shuttles, Endeavour and Atlantis. Endeavour is being prepared for public display at the California Science Center in Los Angeles. Its ferry flight to California is targeted for mid-September. Endeavour was the last space shuttle added to NASA’s orbiter fleet. Over the course of its 19-year career, Endeavour spent 299 days in space during 25 missions. For more information, visit http://www.nasa.gov/shuttle.  Photo credit: NASA/Kim Shiflett KSC-2012-3421

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility-2 at NASA’s ...

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians monitor the progress as space shuttle Endeavour’s payload bay doors begin... More

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians lift the hatch of space shuttle Endeavour’s airlock for its final closure during processing for the shuttle’s retirement.    Endeavour is being prepared for public display at the California Science Center in Los Angeles. Its ferry flight to California is targeted for mid-September. Endeavour, designated OV-105, was the last space shuttle added to NASA’s orbiter fleet. Over the course of its 19-year career, Endeavour spent 299 days in space during 25 missions. For more information, visit http://www.nasa.gov/transition.  Photo credit: NASA/Dimitri Gerondidakis KSC-2012-3295

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility-2 at NASA’s Kenn...

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians lift the hatch of space shuttle Endeavour’s airlock for its final closure dur... More

CAPE CANAVERAL, Fla. – Inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians prepare the right side tail cone for buildup on space shuttle Endeavour. The tail cone protects space shuttle main engines during ferry flights on top of the Shuttle Carrier Aircraft, or SCA.     The work is part of Transition and Retirement of the remaining space shuttles, Endeavour and Atlantis. Endeavour is being prepared for public display at the California Science Center in Los Angeles. Its ferry flight to California is targeted for mid-September. Endeavour was the last space shuttle added to NASA’s orbiter fleet. Over the course of its 19-year career, Endeavour spent 299 days in space during 25 missions. For more information, visit http://www.nasa.gov/shuttle.  Photo credit: NASA/Kim Shiflett KSC-2012-2838

CAPE CANAVERAL, Fla. – Inside the Vehicle Assembly Building at NASA’s ...

CAPE CANAVERAL, Fla. – Inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians prepare the right side tail cone for buildup on space shuttle Endeavour. ... More

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians monitor the progress as a Hyster forklift moves replica shuttle main engine 2, or RSME 2, closer for installation on space shuttle Endeavour. The orbiter is surrounded by work platforms allowing access to all areas of the spacecraft.    The work is part of Transition and Retirement of the remaining space shuttles, Endeavour and Atlantis. Endeavour is being prepared for public display at the California Science Center in Los Angeles. Its ferry flight to California is targeted for mid-September. Endeavour was the last space shuttle added to NASA’s orbiter fleet. Over the course of its 19-year career, Endeavour spent 299 days in space during 25 missions. For more information, visit http://www.nasa.gov/shuttle.  Photo credit: NASA/David Lee KSC-2012-3823

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility-2 at NASA’s ...

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians monitor the progress as a Hyster forklift moves replica shuttle main engi... More

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians prepare a large crane that will lift the right orbital maneuvering system OMS pod for installation on space shuttle Endeavour.     The OMS pod underwent complete deservicing and cleaning at White Sands Space Harbor in New Mexico, part of the transition and retirement processing of each shuttle. Endeavour is being prepared for public display at the California Science Center in Los Angeles. Over the course of its 19-year career, Endeavour spent 299 days in space during 25 missions. For more information, visit http://www.nasa.gov/shuttle.  Photo credit: NASA/Kim Shiflett KSC-2012-1897

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility-2 at NASA’s Kenn...

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians prepare a large crane that will lift the right orbital maneuvering system OMS... More

CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, United Space Alliance technicians monitor operations as a crane is used to lift a mock air lock being prepared for installation in the payload bay of the space shuttle Atlantis in Bay 2 of the Orbiter Processing Facility. Atlantis is undergoing final preparations for its transfer to the Kennedy Space Center Visitor Complex targeted for November.      The work is part of Transition and Retirement of the remaining space shuttles, Atlantis and Endeavour. Atlantis is being prepared for public display at Kennedy's Visitor Complex. Over the course of its 26-year career, Atlantis spent 293 days in space during 33 missions. For more information, visit http://www.nasa.gov/transition Photo credit: NASA/Jim Grossmann KSC-2012-4821

CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, Unit...

CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, United Space Alliance technicians monitor operations as a crane is used to lift a mock air lock being prepared for installation in the payload b... More

CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, United Space Alliance technicians install a mock air lock in the payload bay of the space shuttle Atlantis in Bay 2 of the Orbiter Processing Facility. Atlantis is undergoing final preparations for its transfer to the Kennedy Space Center Visitor Complex targeted for November.      The work is part of Transition and Retirement of the remaining space shuttles, Atlantis and Endeavour. Atlantis is being prepared for public display at Kennedy's Visitor Complex. Over the course of its 26-year career, Atlantis spent 293 days in space during 33 missions. For more information, visit http://www.nasa.gov/transition Photo credit: NASA/Jim Grossmann KSC-2012-4825

CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, Unit...

CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, United Space Alliance technicians install a mock air lock in the payload bay of the space shuttle Atlantis in Bay 2 of the Orbiter Processing Fa... More

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, a large crane lowers the left orbital maneuvering system OMS pod on to space shuttle Endeavour so that United Space Alliance technicians can complete the installation.     The OMS pod underwent complete deservicing and cleaning at White Sands Space Harbor in New Mexico, part of the transition and retirement processing of each shuttle. Endeavour is being prepared for public display at the California Science Center in Los Angeles. Over the course of its 19-year career, Endeavour spent 299 days in space during 25 missions. For more information, visit http://www.nasa.gov/shuttle.  Photo credit: NASA/Dimitri Gerondidakis KSC-2012-1874

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-2 at NASA’s Ken...

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, a large crane lowers the left orbital maneuvering system OMS pod on to space shuttle Endeavour so that United ... More

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians assist with removal of the large crane that was used to lower the right orbital maneuvering system OMS pod onto space shuttle Endeavour.          The OMS pod underwent complete deservicing and cleaning at White Sands Space Harbor in New Mexico, part of the transition and retirement processing of each shuttle. Endeavour is being prepared for public display at the California Science Center in Los Angeles. Over the course of its 19-year career, Endeavour spent 299 days in space during 25 missions. For more information, visit http://www.nasa.gov/shuttle.  Photo credit: NASA/Kim Shiflett KSC-2012-1926

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility-2 at NASA’s Kenn...

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians assist with removal of the large crane that was used to lower the right orbit... More

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians monitor the progress as the large crane that was used to lower the right orbital maneuvering system OMS pod onto space shuttle Endeavour is moved away.          The OMS pod underwent complete deservicing and cleaning at White Sands Space Harbor in New Mexico, part of the transition and retirement processing of each shuttle. Endeavour is being prepared for public display at the California Science Center in Los Angeles. Over the course of its 19-year career, Endeavour spent 299 days in space during 25 missions. For more information, visit http://www.nasa.gov/shuttle.  Photo credit: NASA/Kim Shiflett KSC-2012-1927

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility-2 at NASA’s Kenn...

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians monitor the progress as the large crane that was used to lower the right orbi... More

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians monitor the progress as a large crane lifts the right orbital maneuvering system OMS pod for installation on space shuttle Endeavour.        The OMS pod underwent complete deservicing and cleaning at White Sands Space Harbor in New Mexico, part of the transition and retirement processing of each shuttle. Endeavour is being prepared for public display at the California Science Center in Los Angeles. Over the course of its 19-year career, Endeavour spent 299 days in space during 25 missions. For more information, visit http://www.nasa.gov/shuttle.  Photo credit: NASA/Kim Shiflett KSC-2012-1903

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility-2 at NASA’s Kenn...

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians monitor the progress as a large crane lifts the right orbital maneuvering sys... More

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, a view from above shows United Space Alliance technicians assisting with the removal of the large crane that was used to lower the right orbital maneuvering system OMS pod onto space shuttle Endeavour.          The OMS pod underwent complete deservicing and cleaning at White Sands Space Harbor in New Mexico, part of the transition and retirement processing of each shuttle. Endeavour is being prepared for public display at the California Science Center in Los Angeles. Over the course of its 19-year career, Endeavour spent 299 days in space during 25 missions. For more information, visit http://www.nasa.gov/shuttle.  Photo credit: NASA/Kim Shiflett KSC-2012-1925

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility-2 at NASA’s Kenn...

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, a view from above shows United Space Alliance technicians assisting with the removal of the large crane that wa... More

CAPE CANAVERAL, Fla. -- NASA astronaut Megan McArthur, center, takes part in a crew equipment interface test CEIT in order to become familiar with the Space Exploration Technologies Corp. SpaceX Dragon capsule prior to its scheduled April 30 liftoff. The interface test inside a processing hangar at Cape Canaveral Air Force Station's Space Launch Complex-40 was part of prelaunch preparations for the company's next demonstration test flight for NASA's Commercial Orbital Transportation Services COTS program. Under COTS, NASA has partnered with two private companies to launch cargo safely to the International Space Station. United Space Alliance technicians, Dan Nelson, left, and Chris Hardcastle, right, show McArthur two power connectors that are similar to the ones astronauts will use to provide power to Dragon once at the station.    CEIT is an activity that dates back to NASA's Space Shuttle Program, providing astronauts on Earth an opportunity to work with the actual hardware they would use in space. This exercise gave astronauts and engineers the opportunity to assess the compatibility of the equipment and systems aboard Dragon with the procedures to be used by the flight crew and flight controllers once the capsule is berthed at the space station. For more information, visit www.nasa.gov/exploration/commercial/cargo/spacex_index.html. Image courtesy: SpaceX/Paul Bonness KSC-2012-1933

CAPE CANAVERAL, Fla. -- NASA astronaut Megan McArthur, center, takes p...

CAPE CANAVERAL, Fla. -- NASA astronaut Megan McArthur, center, takes part in a crew equipment interface test CEIT in order to become familiar with the Space Exploration Technologies Corp. SpaceX Dragon capsule ... More

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians monitor the progress as a large crane lifts the right orbital maneuvering system OMS pod high in the air for installation on space shuttle Endeavour.        The OMS pod underwent complete deservicing and cleaning at White Sands Space Harbor in New Mexico, part of the transition and retirement processing of each shuttle. Endeavour is being prepared for public display at the California Science Center in Los Angeles. Over the course of its 19-year career, Endeavour spent 299 days in space during 25 missions. For more information, visit http://www.nasa.gov/shuttle.  Photo credit: NASA/Kim Shiflett KSC-2012-1904

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility-2 at NASA’s Kenn...

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians monitor the progress as a large crane lifts the right orbital maneuvering sys... More

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians monitor the progress as a large crane lowers the right orbital maneuvering system OMS pod for installation on space shuttle Endeavour.        The OMS pod underwent complete deservicing and cleaning at White Sands Space Harbor in New Mexico, part of the transition and retirement processing of each shuttle. Endeavour is being prepared for public display at the California Science Center in Los Angeles. Over the course of its 19-year career, Endeavour spent 299 days in space during 25 missions. For more information, visit http://www.nasa.gov/shuttle.  Photo credit: NASA/Kim Shiflett KSC-2012-1909

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility-2 at NASA’s Kenn...

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians monitor the progress as a large crane lowers the right orbital maneuvering sy... More

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians assist with the installation of the right orbital maneuvering system OMS pod on space shuttle Endeavour.        The OMS pod underwent complete deservicing and cleaning at White Sands Space Harbor in New Mexico, part of the transition and retirement processing of each shuttle. Endeavour is being prepared for public display at the California Science Center in Los Angeles. Over the course of its 19-year career, Endeavour spent 299 days in space during 25 missions. For more information, visit http://www.nasa.gov/shuttle.  Photo credit: NASA/Kim Shiflett KSC-2012-1924

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility-2 at NASA’s Kenn...

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians assist with the installation of the right orbital maneuvering system OMS pod ... More

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians begin to bond and seal the tiles around the access panels to space shuttle Endeavour’s forward reaction control system, or FRCS.    The FRCS helped a shuttle maneuver while in orbit. Endeavour’s FRCS was removed and sent to White Sands Test Facility in New Mexico to be cleaned of its toxic propellants and was reinstalled on the shuttle in February.  Endeavour is being prepared for public display at the California Science Center in Los Angeles. Over the course of its 19-year career, Endeavour spent 299 days in space during 25 missions. For more information, visit http://www.nasa.gov/shuttle.  Photo credit: NASA/Frankie Martin KSC-2012-1935

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility-2 at NASA’s Kenn...

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians begin to bond and seal the tiles around the access panels to space shuttle En... More

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians assist with removal of the large crane that was used to lift and move the right orbital maneuvering system OMS pod for installation on space shuttle Endeavour.        The OMS pod underwent complete deservicing and cleaning at White Sands Space Harbor in New Mexico, part of the transition and retirement processing of each shuttle. Endeavour is being prepared for public display at the California Science Center in Los Angeles. Over the course of its 19-year career, Endeavour spent 299 days in space during 25 missions. For more information, visit http://www.nasa.gov/shuttle.  Photo credit: NASA/Kim Shiflett KSC-2012-1910

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility-2 at NASA’s Kenn...

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians assist with removal of the large crane that was used to lift and move the rig... More

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians monitor the progress as a large crane lifts the right orbital maneuvering system OMS pod for installation on space shuttle Endeavour.        The OMS pod underwent complete deservicing and cleaning at White Sands Space Harbor in New Mexico, part of the transition and retirement processing of each shuttle. Endeavour is being prepared for public display at the California Science Center in Los Angeles. Over the course of its 19-year career, Endeavour spent 299 days in space during 25 missions. For more information, visit http://www.nasa.gov/shuttle.  Photo credit: NASA/Kim Shiflett KSC-2012-1902

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility-2 at NASA’s Kenn...

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians monitor the progress as a large crane lifts the right orbital maneuvering sys... More

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians remove the main propulsion system tanks from space shuttle Endeavour’s mid-body. The tanks will be retained for possible future use on the agency’s Space Launch System Program.      The work is part of Endeavour’s transition and retirement processing. The spacecraft is being prepared for public display at the California Science Center in Los Angeles. Endeavour flew 25 missions, spent 299 days in space, orbited Earth 4,671 times and traveled 122, 883, 151 miles over the course of its 19-year career. For more information, visit http://www.nasa.gov/shuttle. Photo credit: Dimitri Gerondidakis KSC-2012-1880

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-2 at NASA’s Ken...

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians remove the main propulsion system tanks from space shuttle Endeavour’s mid-b... More

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians remove one of the auxiliary power units from space shuttle Endeavour.    The work is part of Endeavour’s transition and retirement processing. The spacecraft is being prepared for public display at the California Science Center in Los Angeles. Endeavour flew 25 missions, spent 299 days in space, orbited Earth 4,671 times and traveled 122, 883, 151 miles over the course of its 19-year career. For more information, visit http://www.nasa.gov/shuttle. Photo credit: NASA/Dimitri Gerondidakis KSC-2012-1888

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-2 at NASA’s Ken...

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians remove one of the auxiliary power units from space shuttle Endeavour. The... More

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians begin to remove the main propulsion system tanks from space shuttle Endeavour’s mid-body. The tanks will be retained for possible future use on the agency’s Space Launch System Program.       The work is part of Endeavour’s transition and retirement processing. The spacecraft is being prepared for public display at the California Science Center in Los Angeles. Endeavour flew 25 missions, spent 299 days in space, orbited Earth 4,671 times and traveled 122, 883, 151 miles over the course of its 19-year career. For more information, visit http://www.nasa.gov/shuttle. Photo credit: Dimitri Gerondidakis KSC-2012-1879

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-2 at NASA’s Ken...

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians begin to remove the main propulsion system tanks from space shuttle Endeavou... More

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians have removed several auxiliary power units from space shuttle Endeavour and are preparing them for transport.      The work is part of Endeavour’s transition and retirement processing. The spacecraft is being prepared for public display at the California Science Center in Los Angeles. Endeavour flew 25 missions, spent 299 days in space, orbited Earth 4,671 times and traveled 122, 883, 151 miles over the course of its 19-year career. For more information, visit http://www.nasa.gov/shuttle. Photo credit: NASA/Dimitri Gerondidakis KSC-2012-1893

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-2 at NASA’s Ken...

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians have removed several auxiliary power units from space shuttle Endeavour and ... More

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians secure several of space shuttle Endeavour’s main propulsion system tanks after they were removed from the orbiter’s mid-body. The tanks will be retained for possible future use on the agency’s Space Launch System Program.      The work is part of Endeavour’s transition and retirement processing. The spacecraft is being prepared for public display at the California Science Center in Los Angeles. Endeavour flew 25 missions, spent 299 days in space, orbited Earth 4,671 times and traveled 122, 883, 151 miles over the course of its 19-year career. For more information, visit http://www.nasa.gov/shuttle. Photo credit: Dimitri Gerondidakis KSC-2012-1886

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-2 at NASA’s Ken...

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians secure several of space shuttle Endeavour’s main propulsion system tanks aft... More

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-2 at NASA's Kennedy Space Center in Florida, United Space Alliance technicians prepare to lift the left orbital maneuvering system OMS pod of space shuttle Endeavour.  The OMS pod is being reinstalled on Endeavour following a complete deservicing and cleaning at White Sands Space Harbor in New Mexico, part of the shuttle’s transition and retirement processing.    Endeavour is being prepared for public display at the California Science Center in Los Angeles. Over the course of its 19-year career, Endeavour spent 299 days in space during 25 missions.  For more information, visit http://www.nasa.gov/shuttle.  Photo credit: NASA/Dimitri Gerondidakis KSC-2012-1831

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-2 at NASA's Ken...

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-2 at NASA's Kennedy Space Center in Florida, United Space Alliance technicians prepare to lift the left orbital maneuvering system OMS pod of space shuttle... More

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-2 at NASA's Kennedy Space Center in Florida, United Space Alliance technicians lift and rotate the left orbital maneuvering system OMS pod of space shuttle Endeavour above its transporter.  The OMS pod is being reinstalled on Endeavour following a complete deservicing and cleaning at White Sands Space Harbor in New Mexico, part of the shuttle’s transition and retirement processing.    Endeavour is being prepared for public display at the California Science Center in Los Angeles. Over the course of its 19-year career, Endeavour spent 299 days in space during 25 missions.  For more information, visit http://www.nasa.gov/shuttle.  Photo credit: NASA/Dimitri Gerondidakis KSC-2012-1837

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-2 at NASA's Ken...

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-2 at NASA's Kennedy Space Center in Florida, United Space Alliance technicians lift and rotate the left orbital maneuvering system OMS pod of space shuttle... More

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, a main propulsion system tank will be removed from space shuttle Endeavour’s mid-body by United Space Alliance technicians. The main propulsion system tanks will be retained for possible future use on the agency’s Space Launch System Program.       The work is part of Endeavour’s transition and retirement processing. The spacecraft is being prepared for public display at the California Science Center in Los Angeles. Endeavour flew 25 missions, spent 299 days in space, orbited Earth 4,671 times and traveled 122, 883, 151 miles over the course of its 19-year career. For more information, visit http://www.nasa.gov/shuttle. Photo credit: Dimitri Gerondidakis KSC-2012-1878

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-2 at NASA’s Ken...

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, a main propulsion system tank will be removed from space shuttle Endeavour’s mid-body by United Space Alliance... More

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-2 at NASA's Kennedy Space Center in Florida, United Space Alliance technicians rotate the left orbital maneuvering system OMS pod of space shuttle Endeavour as it is lifted from its transporter.  The OMS pod is being reinstalled on Endeavour following a complete deservicing and cleaning at White Sands Space Harbor in New Mexico, part of the shuttle’s transition and retirement processing.    Endeavour is being prepared for public display at the California Science Center in Los Angeles. Over the course of its 19-year career, Endeavour spent 299 days in space during 25 missions.  For more information, visit http://www.nasa.gov/shuttle.  Photo credit: NASA/Dimitri Gerondidakis KSC-2012-1836

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-2 at NASA's Ken...

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-2 at NASA's Kennedy Space Center in Florida, United Space Alliance technicians rotate the left orbital maneuvering system OMS pod of space shuttle Endeavou... More

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians have removed one of the auxiliary power units from space shuttle Endeavour and are moving it to a transporter.     The work is part of Endeavour’s transition and retirement processing. The spacecraft is being prepared for public display at the California Science Center in Los Angeles. Endeavour flew 25 missions, spent 299 days in space, orbited Earth 4,671 times and traveled 122, 883, 151 miles over the course of its 19-year career. For more information, visit http://www.nasa.gov/shuttle. Photo credit: NASA/Dimitri Gerondidakis KSC-2012-1892

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-2 at NASA’s Ken...

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians have removed one of the auxiliary power units from space shuttle Endeavour a... More

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians have removed one of the auxiliary power units from space shuttle Endeavour and are placing it on a special cart.     The work is part of Endeavour’s transition and retirement processing. The spacecraft is being prepared for public display at the California Science Center in Los Angeles. Endeavour flew 25 missions, spent 299 days in space, orbited Earth 4,671 times and traveled 122, 883, 151 miles over the course of its 19-year career. For more information, visit http://www.nasa.gov/shuttle. Photo credit: NASA/Dimitri Gerondidakis KSC-2012-1889

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-2 at NASA’s Ken...

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians have removed one of the auxiliary power units from space shuttle Endeavour a... More

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians monitor the progress as an overhead crane lowers one of Endeavour’s main propulsion system tanks after it was removed from the orbiter’s mid-body. The tanks will be retained for possible future use on the agency’s Space Launch System Program.      The work is part of Endeavour’s transition and retirement processing. The spacecraft is being prepared for public display at the California Science Center in Los Angeles. Endeavour flew 25 missions, spent 299 days in space, orbited Earth 4,671 times and traveled 122, 883, 151 miles over the course of its 19-year career. For more information, visit http://www.nasa.gov/shuttle. Photo credit: Dimitri Gerondidakis KSC-2012-1885

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-2 at NASA’s Ken...

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians monitor the progress as an overhead crane lowers one of Endeavour’s main pro... More

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-2 at NASA's Kennedy Space Center in Florida, United Space Alliance technicians prepare to install the left orbital maneuvering system OMS pod on space shuttle Endeavour.  The OMS pod underwent complete deservicing and cleaning at White Sands Space Harbor in New Mexico, part of the transition and retirement processing of each shuttle.  Endeavour is being prepared for public display at the California Science Center in Los Angeles. Over the course of its 19-year career, Endeavour spent 299 days in space during 25 missions.  For more information, visit http://www.nasa.gov/shuttle.  Photo credit: NASA/Dimitri Gerondidakis KSC-2012-1830

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-2 at NASA's Ken...

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-2 at NASA's Kennedy Space Center in Florida, United Space Alliance technicians prepare to install the left orbital maneuvering system OMS pod on space shut... More

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians secure several of space shuttle Endeavour’s main propulsion system tanks after they were removed from the orbiter’s mid-body. The tanks will be retained for possible future use on the agency’s Space Launch System Program.      The work is part of Endeavour’s transition and retirement processing. The spacecraft is being prepared for public display at the California Science Center in Los Angeles. Endeavour flew 25 missions, spent 299 days in space, orbited Earth 4,671 times and traveled 122, 883, 151 miles over the course of its 19-year career. For more information, visit http://www.nasa.gov/shuttle. Photo credit: Dimitri Gerondidakis KSC-2012-1887

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-2 at NASA’s Ken...

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians secure several of space shuttle Endeavour’s main propulsion system tanks aft... More

CAPE CANAVERAL, Fla. --In Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, a crane lifts away one of space shuttle Endeavour’s main propulsion system tanks from the mid-body after it was removed by United Space Alliance technicians. The tanks will be retained for possible future use on the agency’s Space Launch System Program.      The work is part of Endeavour’s transition and retirement processing. The spacecraft is being prepared for public display at the California Science Center in Los Angeles. Endeavour flew 25 missions, spent 299 days in space, orbited Earth 4,671 times and traveled 122, 883, 151 miles over the course of its 19-year career. For more information, visit http://www.nasa.gov/shuttle. Photo credit: Dimitri Gerondidakis KSC-2012-1882

CAPE CANAVERAL, Fla. --In Orbiter Processing Facility-2 at NASA’s Kenn...

CAPE CANAVERAL, Fla. --In Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, a crane lifts away one of space shuttle Endeavour’s main propulsion system tanks from the mid-body after it was... More

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians attach one of space shuttle Endeavour’s main propulsion system tanks from the mid-body to an overhead crane for removal. The tanks will be retained for possible future use on the agency’s Space Launch System Program.      The work is part of Endeavour’s transition and retirement processing. The spacecraft is being prepared for public display at the California Science Center in Los Angeles. Endeavour flew 25 missions, spent 299 days in space, orbited Earth 4,671 times and traveled 122, 883, 151 miles over the course of its 19-year career. For more information, visit http://www.nasa.gov/shuttle. Photo credit: Dimitri Gerondidakis KSC-2012-1881

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-2 at NASA’s Ken...

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians attach one of space shuttle Endeavour’s main propulsion system tanks from th... More

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians monitor the progress as a large crane is prepared to lift the right orbital maneuvering system OMS pod for installation on space shuttle Endeavour.      The OMS pod underwent complete deservicing and cleaning at White Sands Space Harbor in New Mexico, part of the transition and retirement processing of each shuttle. Endeavour is being prepared for public display at the California Science Center in Los Angeles. Over the course of its 19-year career, Endeavour spent 299 days in space during 25 missions. For more information, visit http://www.nasa.gov/shuttle.  Photo credit: NASA/Kim Shiflett KSC-2012-1898

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility-2 at NASA’s Kenn...

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians monitor the progress as a large crane is prepared to lift the right orbital m... More

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-2 at NASA's Kennedy Space Center in Florida, United Space Alliance technicians begin to install space shuttle Endeavour’s left orbital maneuvering system OMS pod.  The OMS pod underwent complete deservicing and cleaning at White Sands Space Harbor in New Mexico, part of the transition and retirement processing of each shuttle.  Endeavour is being prepared for public display at the California Science Center in Los Angeles. Over the course of its 19-year career, Endeavour spent 299 days in space during 25 missions.  For more information, visit http://www.nasa.gov/shuttle.  Photo credit: NASA/Dimitri Gerondidakis KSC-2012-1844

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-2 at NASA's Ken...

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-2 at NASA's Kennedy Space Center in Florida, United Space Alliance technicians begin to install space shuttle Endeavour’s left orbital maneuvering system O... More

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians monitor the progress as a large crane is lowered toward the right orbital maneuvering system OMS pod that will be installed on space shuttle Endeavour.      The OMS pod underwent complete deservicing and cleaning at White Sands Space Harbor in New Mexico, part of the transition and retirement processing of each shuttle. Endeavour is being prepared for public display at the California Science Center in Los Angeles. Over the course of its 19-year career, Endeavour spent 299 days in space during 25 missions. For more information, visit http://www.nasa.gov/shuttle.  Photo credit: NASA/Kim Shiflett KSC-2012-1899

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility-2 at NASA’s Kenn...

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians monitor the progress as a large crane is lowered toward the right orbital man... More

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-2 at NASA's Kennedy Space Center in Florida, United Space Alliance technicians secure a crane to the left orbital maneuvering system OMS pod of space shuttle Endeavour.  The OMS pod is being reinstalled on Endeavour following a complete deservicing and cleaning at White Sands Space Harbor in New Mexico, part of the shuttle’s transition and retirement processing.    Endeavour is being prepared for public display at the California Science Center in Los Angeles. Over the course of its 19-year career, Endeavour spent 299 days in space during 25 missions.  For more information, visit http://www.nasa.gov/shuttle.  Photo credit: NASA/Dimitri Gerondidakis KSC-2012-1834

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-2 at NASA's Ken...

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-2 at NASA's Kennedy Space Center in Florida, United Space Alliance technicians secure a crane to the left orbital maneuvering system OMS pod of space shutt... More

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians have removed one of the auxiliary power units from space shuttle Endeavour and have transported it to an area inside OPF-2.    The work is part of Endeavour’s transition and retirement processing. The spacecraft is being prepared for public display at the California Science Center in Los Angeles. Endeavour flew 25 missions, spent 299 days in space, orbited Earth 4,671 times and traveled 122, 883, 151 miles over the course of its 19-year career. For more information, visit http://www.nasa.gov/shuttle. Photo credit: NASA/Dimitri Gerondidakis KSC-2012-1891

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-2 at NASA’s Ken...

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians have removed one of the auxiliary power units from space shuttle Endeavour a... More

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-2 at NASA's Kennedy Space Center in Florida, United Space Alliance technicians attach a crane to the left orbital maneuvering system OMS pod of space shuttle Endeavour.  The OMS pod is being reinstalled on Endeavour following a complete deservicing and cleaning at White Sands Space Harbor in New Mexico, part of the shuttle’s transition and retirement processing.    Endeavour is being prepared for public display at the California Science Center in Los Angeles. Over the course of its 19-year career, Endeavour spent 299 days in space during 25 missions.  For more information, visit http://www.nasa.gov/shuttle.  Photo credit: NASA/Dimitri Gerondidakis KSC-2012-1833

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-2 at NASA's Ken...

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-2 at NASA's Kennedy Space Center in Florida, United Space Alliance technicians attach a crane to the left orbital maneuvering system OMS pod of space shutt... More

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-2 at NASA's Kennedy Space Center in Florida, United Space Alliance technicians lift the left orbital maneuvering system OMS pod of space shuttle Endeavour from its transporter.  The OMS pod is being reinstalled on Endeavour following a complete deservicing and cleaning at White Sands Space Harbor in New Mexico, part of the shuttle’s transition and retirement processing.    Endeavour is being prepared for public display at the California Science Center in Los Angeles. Over the course of its 19-year career, Endeavour spent 299 days in space during 25 missions.  For more information, visit http://www.nasa.gov/shuttle.  Photo credit: NASA/Dimitri Gerondidakis KSC-2012-1835

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-2 at NASA's Ken...

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-2 at NASA's Kennedy Space Center in Florida, United Space Alliance technicians lift the left orbital maneuvering system OMS pod of space shuttle Endeavour ... More

KENNEDY SPACE CENTER, FLA. -- United Space Alliance technicians (left to right) Tod Biddle, Bob Wright and Mark Noel (hidden) remove the coverings from a site near the tail of Space Shuttle Atlantis to reveal the power drive unit (PDU) inside. The PDU controls the rudder/speed brake on the orbiter. Shuttle managers decided to replace the faulty PDU, about the size of an office copy machine, at the launch pad. If successful, launch preparations will continue as planned, with liftoff targeted for April 24 at 4:15 p.m. on mission STS-101. The mission is the third assembly flight for the International Space Station, carrying logistics and supplies to the Space Station, plus the crew will be preparing the Station for the arrival of the Zvezda Service Module, expected to be launched by Russia in July 2000. The crew will conduct one space walk to perform maintenance on the Space Station KSC00pp0485

KENNEDY SPACE CENTER, FLA. -- United Space Alliance technicians (left ...

KENNEDY SPACE CENTER, FLA. -- United Space Alliance technicians (left to right) Tod Biddle, Bob Wright and Mark Noel (hidden) remove the coverings from a site near the tail of Space Shuttle Atlantis to reveal t... More

KENNEDY SPACE CENTER, FLA. -- United Space Alliance technicians (left to right) Tod Biddle, Bob Wright and Mark Noel (hidden) remove the coverings from a site near the tail of Space Shuttle Atlantis to reveal the power drive unit (PDU) inside. The PDU controls the rudder/speed brake on the orbiter. Shuttle managers decided to replace the faulty PDU, about the size of an office copy machine, at the launch pad. If successful, launch preparations will continue as planned, with liftoff targeted for April 24 at 4:15 p.m. on mission STS-101. The mission is the third assembly flight for the International Space Station, carrying logistics and supplies to the Space Station, plus the crew will be preparing the Station for the arrival of the Zvezda Service Module, expected to be launched by Russia in July 2000. The crew will conduct one space walk to perform maintenance on the Space Station KSC-00pp0485

KENNEDY SPACE CENTER, FLA. -- United Space Alliance technicians (left ...

KENNEDY SPACE CENTER, FLA. -- United Space Alliance technicians (left to right) Tod Biddle, Bob Wright and Mark Noel (hidden) remove the coverings from a site near the tail of Space Shuttle Atlantis to reveal t... More

KENNEDY SPACE CENTER, FLA. -- United Space Alliance technicians at Launch Pad 39A look at the site of the power drive unit (PDU) for the rudder/speed brake on Shuttle Atlantis. From left are Mark Noel, Tod Biddle and Bob Wright. Shuttle managers decided to replace the faulty PDU, about the size of an office copy machine, at the launch pad. If successful, launch preparations will continue as planned, with liftoff targeted for April 24 at 4:15 p.m. on mission STS-101. The mission is the third assembly flight for the International Space Station, carrying logistics and supplies to the Space Station, plus the crew will be preparing the Station for the arrival of the Zvezda Service Module, expected to be launched by Russia in July 2000. The crew will conduct one space walk to perform maintenance on the Space Station KSC-00pp0483

KENNEDY SPACE CENTER, FLA. -- United Space Alliance technicians at Lau...

KENNEDY SPACE CENTER, FLA. -- United Space Alliance technicians at Launch Pad 39A look at the site of the power drive unit (PDU) for the rudder/speed brake on Shuttle Atlantis. From left are Mark Noel, Tod Bidd... More

KENNEDY SPACE CENTER, FLA. -- United Space Alliance technicians at Launch Pad 39A look at the site of the power drive unit (PDU) for the rudder/speed brake on Shuttle Atlantis. From left are Mark Noel, Tod Biddle and Bob Wright. Shuttle managers decided to replace the faulty PDU, about the size of an office copy machine, at the launch pad. If successful, launch preparations will continue as planned, with liftoff targeted for April 24 at 4:15 p.m. on mission STS-101. The mission is the third assembly flight for the International Space Station, carrying logistics and supplies to the Space Station, plus the crew will be preparing the Station for the arrival of the Zvezda Service Module, expected to be launched by Russia in July 2000. The crew will conduct one space walk to perform maintenance on the Space Station KSC00pp0483

KENNEDY SPACE CENTER, FLA. -- United Space Alliance technicians at Lau...

KENNEDY SPACE CENTER, FLA. -- United Space Alliance technicians at Launch Pad 39A look at the site of the power drive unit (PDU) for the rudder/speed brake on Shuttle Atlantis. From left are Mark Noel, Tod Bidd... More

KENNEDY SPACE CENTER, FLA. -  -  NASA Administrator Sean O’Keefe (right) looks at equipment moved from the Thermal Protection System Facility to the RLV Hangar.  At left are United Space Alliance technicians Shelly Kipp and Eric Moss.  O’Keefe and NASA Associate Administrator of  Space Operations Mission Directorate William Readdy are visiting KSC to survey the damage sustained by KSC facilities from Hurricane Frances. The Thermal Protection System Facility (TPSF), which creates the TPS tiles, blankets and all the internal thermal control systems for the Space Shuttles, is almost totally unserviceable at this time after losing approximately 35 percent of its roof in the storm, which blew across Central Florida Sept. 4-5. Undamaged equipment was removed from the TPSF and stored in the hangar. The Labor Day storm also caused significant damage to the Vehicle Assembly Building and Processing Control Center.  Additionally, the Operations and Checkout Building, Vertical Processing Facility, Hangar AE, Hangar S and Hangar AF Small Parts Facility each received substantial damage. However, well-protected and unharmed were NASA’s three Space Shuttle orbiters - Discovery, Atlantis and Endeavour - along with the Shuttle launch pads, all of the critical flight hardware for the orbiters and the International Space Station, and NASA’s Swift spacecraft that is awaiting launch in October. KSC-04pd1843

KENNEDY SPACE CENTER, FLA. - - NASA Administrator Sean O’Keefe (righ...

KENNEDY SPACE CENTER, FLA. - - NASA Administrator Sean O’Keefe (right) looks at equipment moved from the Thermal Protection System Facility to the RLV Hangar. At left are United Space Alliance technicians Sh... More

KENNEDY SPACE CENTER, FLA. -  United Space Alliance technicians start the lift of Rudder Speed Brake actuator No. 4 to Space Shuttle orbiter Discovery in the Orbiter Processing Facility. Discovery has been assigned to the first Return to Flight mission, STS-114, a logistics flight to the International Space Station. KSC-04pd0832

KENNEDY SPACE CENTER, FLA. - United Space Alliance technicians start ...

KENNEDY SPACE CENTER, FLA. - United Space Alliance technicians start the lift of Rudder Speed Brake actuator No. 4 to Space Shuttle orbiter Discovery in the Orbiter Processing Facility. Discovery has been assi... More

KENNEDY SPACE CENTER, FLA. - In the Orbiter Processing Facility (OPF), United Space Alliance technicians replace the attachment points for the spars on the interior of a wing of Space Shuttle Atlantis. Reinforced Carbon Carbon (RCC) panels are mechanically attached to the wing with a series of floating joints - spars - to reduce loading on the panels caused by wing deflections. The aluminum and the metallic attachments are protected from exceeding temperature limits by internal insulation.  The next launch of Atlantis will be on mission STS-114, a utilization and logistics flight to the International Space Station.

KENNEDY SPACE CENTER, FLA. - In the Orbiter Processing Facility (OPF),...

KENNEDY SPACE CENTER, FLA. - In the Orbiter Processing Facility (OPF), United Space Alliance technicians replace the attachment points for the spars on the interior of a wing of Space Shuttle Atlantis. Reinforc... More

KENNEDY SPACE CENTER, FLA. -  United Space Alliance technicians verify the alignment of Rudder Speed Brake actuator No.4 as it is attached to Space Shuttle orbiter Discovery in the Orbiter Processing Facility. Discovery has been assigned to the first Return to Flight mission, STS-114, a logistics flight to the International Space Station. KSC-04pd0836

KENNEDY SPACE CENTER, FLA. - United Space Alliance technicians verify...

KENNEDY SPACE CENTER, FLA. - United Space Alliance technicians verify the alignment of Rudder Speed Brake actuator No.4 as it is attached to Space Shuttle orbiter Discovery in the Orbiter Processing Facility. ... More

KENNEDY SPACE CENTER, FLA. -   In NASA’s Orbiter Processing Facility Bay 3, United Space Alliance technicians are inspecting tile repair on Discovery’s underside.  Discovery processing is under way for the second return to flight test mission, STS-121. KSC-05pd2358

KENNEDY SPACE CENTER, FLA. - In NASA’s Orbiter Processing Facility B...

KENNEDY SPACE CENTER, FLA. - In NASA’s Orbiter Processing Facility Bay 3, United Space Alliance technicians are inspecting tile repair on Discovery’s underside. Discovery processing is under way for the seco... More

KENNEDY SPACE CENTER, FLA. --In bay 3 of the Orbiter Processing Facility, United Space Alliance technicians reassemble space shuttle Discovery's right main-gear strut back together.  The components were removed in order to replace a hydraulic seal inside.  Engineers determined an observed leak of hydraulic fluid in the main landing gear strut exceeded specification and could not be reduced to an acceptable rate. Thus, the leaky seal and three other seals were replaced.  Prior to discovery of the leak, the vehicle had been scheduled to roll over Sept. 19 from the OPF to the Vehicle Assembly Building. A new rollover date will be set for Discovery, which is targeted for launch on Oct. 23.  Photo credit: NASA/George Shelton KSC-07pd2506

KENNEDY SPACE CENTER, FLA. --In bay 3 of the Orbiter Processing Facili...

KENNEDY SPACE CENTER, FLA. --In bay 3 of the Orbiter Processing Facility, United Space Alliance technicians reassemble space shuttle Discovery's right main-gear strut back together. The components were removed... More

KENNEDY SPACE CENTER, FLA. -- In bay 3 of the Orbiter Processing Facility, United Space Alliance technicians make final adjustments on space shuttle Discovery's starboard landing gear.  The components were removed in order to replace a hydraulic seal in the right main-gear strut.  Engineers determined an observed leak of hydraulic fluid in the main landing gear strut exceeded specification and could not be reduced to an acceptable rate. Thus, the leaky seal and three other seals were replaced.  Prior to discovery of the leak, the vehicle had been scheduled to roll over Sept. 19 from the OPF to the Vehicle Assembly Building. A new rollover date will be set for Discovery, which is targeted for launch on Oct. 23.  Photo credit: NASA/George Shelton KSC-07pd2509

KENNEDY SPACE CENTER, FLA. -- In bay 3 of the Orbiter Processing Facil...

KENNEDY SPACE CENTER, FLA. -- In bay 3 of the Orbiter Processing Facility, United Space Alliance technicians make final adjustments on space shuttle Discovery's starboard landing gear. The components were remo... More

KENNEDY SPACE CENTER, FLA. -- In the Orbiter Processing Facility, United Space Alliance technicians provide lights over the space shuttle Atlantis' cockpit.  STS-122 Commander Stephen Frick is inside checking the cockpit for launch readiness.  The crew is at Kennedy Space Center to take part in a crew equipment interface test, which helps familiarize them with equipment and payloads for the mission.  Among the activities standard to a CEIT are harness training, inspection of the thermal protection system and camera operation for planned extravehicular activities, or EVAs.  The mission will carry and install the Columbus Lab,  a multifunctional, pressurized laboratory that will be permanently attached to Node 2 of the space station to carry out experiments in materials science, fluid physics and biosciences, as well as to perform a number of technological applications. It is Europe’s largest contribution to the construction of the International Space Station and will support scientific and technological research in a microgravity environment.  STS-122 is targeted for launch in December.   Photo credit: NASA/Kim Shiflett KSC-07pd2646

KENNEDY SPACE CENTER, FLA. -- In the Orbiter Processing Facility, Unit...

KENNEDY SPACE CENTER, FLA. -- In the Orbiter Processing Facility, United Space Alliance technicians provide lights over the space shuttle Atlantis' cockpit. STS-122 Commander Stephen Frick is inside checking t... More

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility 2 at NASA's Kennedy Space Center, United Space Alliance technicians inspect the reinforced carbon-carbon, or RCC, panels on Endeavour's wing leading edge using thermography to detect structural abnormalities. Endeavour will deliver a multi-purpose logistics module to the International Space Station on its STS-126 mission. Launch is targeted for Nov. 10.  Photo credit: NASA/Amanda Diller KSC-08pd2054

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility 2 at NASA's ...

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility 2 at NASA's Kennedy Space Center, United Space Alliance technicians inspect the reinforced carbon-carbon, or RCC, panels on Endeavour's wing leading edg... More

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility 2 at NASA's Kennedy Space Center, United Space Alliance technicians inspect a reinforced carbon-carbon panel on Endeavour's wing leading edge using thermography to detect structural abnormalities.  Endeavour will deliver a multi-purpose logistics module to the International Space Station on its STS-126 mission. Launch is targeted for Nov. 10.  Photo credit: NASA/Amanda Diller KSC-08pd2057

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility 2 at NASA's ...

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility 2 at NASA's Kennedy Space Center, United Space Alliance technicians inspect a reinforced carbon-carbon panel on Endeavour's wing leading edge using ther... More

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility 2 at NASA's Kennedy Space Center, United Space Alliance technicians secure the U.S. flag in space shuttle Endeavour's payload bay during processing.  Endeavour will deliver a multi-purpose logistics module to the International Space Station on its STS-126 mission. Launch is targeted for Nov. 10.  Photo credit: NASA/Amanda Diller KSC-08pd2059

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility 2 at NASA's ...

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility 2 at NASA's Kennedy Space Center, United Space Alliance technicians secure the U.S. flag in space shuttle Endeavour's payload bay during processing. En... More

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility 2 at NASA's Kennedy Space Center, United Space Alliance technicians inspect a reinforced carbon-carbon panel on Endeavour's wing leading edge using thermography to detect structural abnormalities.  Endeavour will deliver a multi-purpose logistics module to the International Space Station on its STS-126 mission. Launch is targeted for Nov. 10.  Photo credit: NASA/Amanda Diller KSC-08pd2056

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility 2 at NASA's ...

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility 2 at NASA's Kennedy Space Center, United Space Alliance technicians inspect a reinforced carbon-carbon panel on Endeavour's wing leading edge using ther... More

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility 2 at NASA's Kennedy Space Center, United Space Alliance technicians secure the U.S. flag in space shuttle Endeavour's payload bay during processing.  Endeavour will deliver a multi-purpose logistics module to the International Space Station on its STS-126 mission. Launch is targeted for Nov. 10.  Photo credit: NASA/Amanda Diller KSC-08pd2058

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility 2 at NASA's ...

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility 2 at NASA's Kennedy Space Center, United Space Alliance technicians secure the U.S. flag in space shuttle Endeavour's payload bay during processing. En... More

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility 2 at NASA's Kennedy Space Center, United Space Alliance technicians install Boeing Replacement Insulation 18, or BRI-18, tile on space shuttle Endeavour during processing activities. BRI-18 is the strongest material used for thermal insulation on the orbiters and, when coated to produce toughened unipiece fibrous insulation, provides a tile with extremely high-impact resistance. It is replacing other tiles on areas of the vehicle where impact risk is high, such as the landing gear doors, the wing leading edge and the external tank doors. Endeavour will deliver a multi-purpose logistics module to the International Space Station on its STS-126 mission. Launch is targeted for Nov. 10.  Photo credit: NASA/Jack Pfaller KSC-08pd2145

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility 2 at NASA's ...

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility 2 at NASA's Kennedy Space Center, United Space Alliance technicians install Boeing Replacement Insulation 18, or BRI-18, tile on space shuttle Endeavour... More

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility 2 at NASA's Kennedy Space Center, United Space Alliance technicians install Boeing Replacement Insulation 18, or BRI-18, tile on space shuttle Endeavour during processing activities. BRI-18 is the strongest material used for thermal insulation on the orbiters and, when coated to produce toughened unipiece fibrous insulation, provides a tile with extremely high-impact resistance. It is replacing other tiles on areas of the vehicle where impact risk is high, such as the landing gear doors, the wing leading edge and the external tank doors. Endeavour will deliver a multi-purpose logistics module to the International Space Station on its STS-126 mission. Launch is targeted for Nov. 10.  Photo credit: NASA/Jack Pfaller KSC-08pd2148

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility 2 at NASA's ...

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility 2 at NASA's Kennedy Space Center, United Space Alliance technicians install Boeing Replacement Insulation 18, or BRI-18, tile on space shuttle Endeavour... More

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility 2 at NASA's Kennedy Space Center, United Space Alliance technicians install Boeing Replacement Insulation 18, or BRI-18, tile on space shuttle Endeavour during processing activities. BRI-18 is the strongest material used for thermal insulation on the orbiters and, when coated to produce toughened unipiece fibrous insulation, provides a tile with extremely high-impact resistance. It is replacing other tiles on areas of the vehicle where impact risk is high, such as the landing gear doors, the wing leading edge and the external tank doors. Endeavour will deliver a multi-purpose logistics module to the International Space Station on its STS-126 mission. Launch is targeted for Nov. 10.  Photo credit: NASA/Jack Pfaller KSC-08pd2151

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility 2 at NASA's ...

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility 2 at NASA's Kennedy Space Center, United Space Alliance technicians install Boeing Replacement Insulation 18, or BRI-18, tile on space shuttle Endeavour... More

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility 2 at NASA's Kennedy Space Center, United Space Alliance technicians install Boeing Replacement Insulation 18, or BRI-18, tile on space shuttle Endeavour during processing activities. BRI-18 is the strongest material used for thermal insulation on the orbiters and, when coated to produce toughened unipiece fibrous insulation, provides a tile with extremely high-impact resistance. It is replacing other tiles on areas of the vehicle where impact risk is high, such as the landing gear doors, the wing leading edge and the external tank doors. Endeavour will deliver a multi-purpose logistics module to the International Space Station on its STS-126 mission. Launch is targeted for Nov. 10.  Photo credit: NASA/Jack Pfaller KSC-08pd2146

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility 2 at NASA's ...

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility 2 at NASA's Kennedy Space Center, United Space Alliance technicians install Boeing Replacement Insulation 18, or BRI-18, tile on space shuttle Endeavour... More

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility 2 at NASA's Kennedy Space Center, United Space Alliance technicians install Boeing Replacement Insulation 18, or BRI-18, tile on space shuttle Endeavour during processing activities. BRI-18 is the strongest material used for thermal insulation on the orbiters and, when coated to produce toughened unipiece fibrous insulation, provides a tile with extremely high-impact resistance. It is replacing other tiles on areas of the vehicle where impact risk is high, such as the landing gear doors, the wing leading edge and the external tank doors. Endeavour will deliver a multi-purpose logistics module to the International Space Station on its STS-126 mission. Launch is targeted for Nov. 10.  Photo credit: NASA/Jack Pfaller KSC-08pd2149

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility 2 at NASA's ...

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility 2 at NASA's Kennedy Space Center, United Space Alliance technicians install Boeing Replacement Insulation 18, or BRI-18, tile on space shuttle Endeavour... More

CAPE CANAVERAL, Fla. –  United Space Alliance technicians remove and replace all the hub tiles on space shuttle Discovery before its STS-119 mission targeted for Feb. 12.   Hub tiles, heat protection tiles, are difficult to install because of their location on the inboard side of the inboard elevons. On the STS-119 mission, Discovery will carry the S6 truss segment to complete the 361-foot-long backbone of the International Space Station. The truss includes the fourth pair of solar array wings and electronics that convert sunlight to power for the orbiting laboratory. Photo credit: NASA/Dimitri Gerondidakis KSC-08pd3452

CAPE CANAVERAL, Fla. – United Space Alliance technicians remove and r...

CAPE CANAVERAL, Fla. – United Space Alliance technicians remove and replace all the hub tiles on space shuttle Discovery before its STS-119 mission targeted for Feb. 12. Hub tiles, heat protection tiles, are... More

CAPE CANAVERAL, Fla. –  United Space Alliance technicians remove and replace all the hub tiles on space shuttle Discovery before its STS-119 mission targeted for Feb. 12.   Hub tiles, heat protection tiles, are difficult to install because of their location on the inboard side of the inboard elevons. On the STS-119 mission, Discovery will carry the S6 truss segment to complete the 361-foot-long backbone of the International Space Station. The truss includes the fourth pair of solar array wings and electronics that convert sunlight to power for the orbiting laboratory. Photo credit: NASA/Dimitri Gerondidakis KSC-08pd3450

CAPE CANAVERAL, Fla. – United Space Alliance technicians remove and r...

CAPE CANAVERAL, Fla. – United Space Alliance technicians remove and replace all the hub tiles on space shuttle Discovery before its STS-119 mission targeted for Feb. 12. Hub tiles, heat protection tiles, are... More

CAPE CANAVERAL, Fla. –  United Space Alliance technicians remove and replace all the hub tiles on space shuttle Discovery before its STS-119 mission targeted for Feb. 12.   Hub tiles, heat protection tiles, are difficult to install because of their location on the inboard side of the inboard elevons. On the STS-119 mission, Discovery will carry the S6 truss segment to complete the 361-foot-long backbone of the International Space Station. The truss includes the fourth pair of solar array wings and electronics that convert sunlight to power for the orbiting laboratory. Photo credit: NASA/Dimitri Gerondidakis KSC-08pd3453

CAPE CANAVERAL, Fla. – United Space Alliance technicians remove and r...

CAPE CANAVERAL, Fla. – United Space Alliance technicians remove and replace all the hub tiles on space shuttle Discovery before its STS-119 mission targeted for Feb. 12. Hub tiles, heat protection tiles, are... More

CAPE CANAVERAL, Fla. –  United Space Alliance technicians remove and replace all the hub tiles on space shuttle Discovery before its STS-119 mission targeted for Feb. 12.   Hub tiles, heat protection tiles, are difficult to install because of their location on the inboard side of the inboard elevons. On the STS-119 mission, Discovery will carry the S6 truss segment to complete the 361-foot-long backbone of the International Space Station. The truss includes the fourth pair of solar array wings and electronics that convert sunlight to power for the orbiting laboratory. Photo credit: NASA/Dimitri Gerondidakis KSC-08pd3454

CAPE CANAVERAL, Fla. – United Space Alliance technicians remove and r...

CAPE CANAVERAL, Fla. – United Space Alliance technicians remove and replace all the hub tiles on space shuttle Discovery before its STS-119 mission targeted for Feb. 12. Hub tiles, heat protection tiles, are... More

CAPE CANAVERAL, Fla. –  United Space Alliance technicians remove and replace all the hub tiles on space shuttle Discovery before its STS-119 mission targeted for Feb. 12.   Hub tiles, heat protection tiles, are difficult to install because of their location on the inboard side of the inboard elevons. On the STS-119 mission, Discovery will carry the S6 truss segment to complete the 361-foot-long backbone of the International Space Station. The truss includes the fourth pair of solar array wings and electronics that convert sunlight to power for the orbiting laboratory. Photo credit: NASA/Dimitri Gerondidakis KSC-08pd3451

CAPE CANAVERAL, Fla. – United Space Alliance technicians remove and r...

CAPE CANAVERAL, Fla. – United Space Alliance technicians remove and replace all the hub tiles on space shuttle Discovery before its STS-119 mission targeted for Feb. 12. Hub tiles, heat protection tiles, are... More

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility Bay 1 at NASA's Kennedy Space Center in Florida, United Space Alliance technicians back one of three main engines on space shuttle Atlantis away from the shuttle using a specially designed Hyster engine lift.    Inspection and maintenance of each main engine is standard procedure following a shuttle mission.  Atlantis next is slated to deliver an Integrated Cargo Carrier and Russian-built Mini Research Module to the International Space Station on the STS-132 mission.  The second in a series of new pressurized components for Russia, the module will be permanently attached to the Zarya module. Three spacewalks are planned to store spare components outside the station, including six spare batteries, a boom assembly for the Ku-band antenna and spares for the Canadian Dextre robotic arm extension. A radiator, airlock and European robotic arm for the Russian Multi-purpose Laboratory Module also are payloads on the flight.  Launch is targeted for May 14, 2010.  Photo credit: NASA/Glenn Benson KSC-2009-6728

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility Bay 1 at NASA's ...

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility Bay 1 at NASA's Kennedy Space Center in Florida, United Space Alliance technicians back one of three main engines on space shuttle Atlantis away from the sh... More

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility Bay 1 at NASA's Kennedy Space Center in Florida, United Space Alliance technicians remove one of three main engines from space shuttle Atlantis using a specially designed Hyster engine lift.    Inspection and maintenance of each main engine is standard procedure following a shuttle mission.  Atlantis next is slated to deliver an Integrated Cargo Carrier and Russian-built Mini Research Module to the International Space Station on the STS-132 mission.  The second in a series of new pressurized components for Russia, the module will be permanently attached to the Zarya module. Three spacewalks are planned to store spare components outside the station, including six spare batteries, a boom assembly for the Ku-band antenna and spares for the Canadian Dextre robotic arm extension. A radiator, airlock and European robotic arm for the Russian Multi-purpose Laboratory Module also are payloads on the flight.  Launch is targeted for May 14, 2010.  Photo credit: NASA/Glenn Benson KSC-2009-6725

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility Bay 1 at NASA's ...

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility Bay 1 at NASA's Kennedy Space Center in Florida, United Space Alliance technicians remove one of three main engines from space shuttle Atlantis using a spec... More

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility Bay 3 at NASA's Kennedy Space Center in Florida, United Space Alliance technicians prepare to lift space shuttle Discovery's Forward Reaction Control System, or FRCS, from its transporter.     The FRCS is being reinstalled in the forward fuselage nose area of the shuttle after refurbishment.  The FRCS provides the thrust for attitude (rotational) maneuvers (pitch, yaw and roll) and for small velocity changes along the orbiter axis (translation maneuvers).  Discovery is being prepared for the STS-131 mission, the 33rd flight to the International Space Station.  The seven-member STS-131 crew will deliver a Multi-Purpose Logistics Module filled with resupply stowage platforms and racks to be transferred to locations around the station.  Three spacewalks will include work to attach a spare ammonia tank assembly to the station's exterior and return a European experiment from outside the station's Columbus module.  Discovery's launch is targeted for March 18, 2010.  For information on the STS-131 mission and crew, visit http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts131/index.html.  Photo credit: NASA/Amanda Diller KSC-2009-6716

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility Bay 3 at NASA's ...

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility Bay 3 at NASA's Kennedy Space Center in Florida, United Space Alliance technicians prepare to lift space shuttle Discovery's Forward Reaction Control System... More

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility Bay 3 at NASA's Kennedy Space Center in Florida, United Space Alliance technicians lower space shuttle Discovery's Forward Reaction Control System, or FRCS, into position over the shuttle's frame.    The FRCS is being reinstalled in the forward fuselage nose area of the shuttle after refurbishment.  The FRCS provides the thrust for attitude (rotational) maneuvers (pitch, yaw and roll) and for small velocity changes along the orbiter axis (translation maneuvers).  Discovery is being prepared for the STS-131 mission, the 33rd flight to the International Space Station.  The seven-member STS-131 crew will deliver a Multi-Purpose Logistics Module filled with resupply stowage platforms and racks to be transferred to locations around the station.  Three spacewalks will include work to attach a spare ammonia tank assembly to the station's exterior and return a European experiment from outside the station's Columbus module.  Discovery's launch is targeted for March 18, 2010.  For information on the STS-131 mission and crew, visit http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts131/index.html.  Photo credit: NASA/Amanda Diller KSC-2009-6719

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility Bay 3 at NASA's ...

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility Bay 3 at NASA's Kennedy Space Center in Florida, United Space Alliance technicians lower space shuttle Discovery's Forward Reaction Control System, or FRCS,... More

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility Bay 1 at NASA's Kennedy Space Center in Florida, United Space Alliance technicians monitor the removal of one of three main engines from space shuttle Atlantis from their stations on a specially designed Hyster engine lift.    Inspection and maintenance of each main engine is standard procedure following a shuttle mission.  Atlantis next is slated to deliver an Integrated Cargo Carrier and Russian-built Mini Research Module to the International Space Station on the STS-132 mission.  The second in a series of new pressurized components for Russia, the module will be permanently attached to the Zarya module. Three spacewalks are planned to store spare components outside the station, including six spare batteries, a boom assembly for the Ku-band antenna and spares for the Canadian Dextre robotic arm extension. A radiator, airlock and European robotic arm for the Russian Multi-purpose Laboratory Module also are payloads on the flight.  Launch is targeted for May 14, 2010.  Photo credit: NASA/Glenn Benson KSC-2009-6726

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility Bay 1 at NASA's ...

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility Bay 1 at NASA's Kennedy Space Center in Florida, United Space Alliance technicians monitor the removal of one of three main engines from space shuttle Atlan... More

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility Bay 3 at NASA's Kennedy Space Center in Florida, United Space Alliance technicians prepare lift space shuttle Discovery's Forward Reaction Control System, or FRCS, from its transporter.    The FRCS is being reinstalled in the forward fuselage nose area of the shuttle after refurbishment.  The FRCS provides the thrust for attitude (rotational) maneuvers (pitch, yaw and roll) and for small velocity changes along the orbiter axis (translation maneuvers).  Discovery is being prepared for the STS-131 mission, the 33rd flight to the International Space Station.  The seven-member STS-131 crew will deliver a Multi-Purpose Logistics Module filled with resupply stowage platforms and racks to be transferred to locations around the station.  Three spacewalks will include work to attach a spare ammonia tank assembly to the station's exterior and return a European experiment from outside the station's Columbus module.  Discovery's launch is targeted for March 18, 2010.  For information on the STS-131 mission and crew, visit http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts131/index.html.  Photo credit: NASA/Amanda Diller KSC-2009-6717

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility Bay 3 at NASA's ...

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility Bay 3 at NASA's Kennedy Space Center in Florida, United Space Alliance technicians prepare lift space shuttle Discovery's Forward Reaction Control System, o... More

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility Bay 1 at NASA's Kennedy Space Center in Florida, United Space Alliance technicians prepare to remove one of three main engines from space shuttle Atlantis using a specially designed Hyster engine lift.    Inspection and maintenance of each main engine is standard procedure following a shuttle mission.  Atlantis is next slated to deliver an Integrated Cargo Carrier and Russian-built Mini Research Module to the International Space Station on the STS-132 mission.  The second in a series of new pressurized components for Russia, the module will be permanently attached to the Zarya module. Three spacewalks are planned to store spare components outside the station, including six spare batteries, a boom assembly for the Ku-band antenna and spares for the Canadian Dextre robotic arm extension. A radiator, airlock and European robotic arm for the Russian Multi-purpose Laboratory Module also are payloads on the flight.  Launch is targeted for May 14, 2010.  Photo credit: NASA/Glenn Benson KSC-2009-6723

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility Bay 1 at NASA's ...

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility Bay 1 at NASA's Kennedy Space Center in Florida, United Space Alliance technicians prepare to remove one of three main engines from space shuttle Atlantis u... More

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility Bay 1 at NASA's Kennedy Space Center in Florida, United Space Alliance technicians attach a specially designed Hyster engine lift to one of three main engines on space shuttle Atlantis as they prepare to remove it.    Inspection and maintenance of each main engine is standard procedure following a shuttle mission.  Atlantis is next slated to deliver an Integrated Cargo Carrier and Russian-built Mini Research Module to the International Space Station on the STS-132 mission.  The second in a series of new pressurized components for Russia, the module will be permanently attached to the Zarya module. Three spacewalks are planned to store spare components outside the station, including six spare batteries, a boom assembly for the Ku-band antenna and spares for the Canadian Dextre robotic arm extension. A radiator, airlock and European robotic arm for the Russian Multi-purpose Laboratory Module also are payloads on the flight.  Launch is targeted for May 14, 2010.  Photo credit: NASA/Glenn Benson KSC-2009-6724

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility Bay 1 at NASA's ...

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility Bay 1 at NASA's Kennedy Space Center in Florida, United Space Alliance technicians attach a specially designed Hyster engine lift to one of three main engin... More

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility Bay 3 at NASA's Kennedy Space Center in Florida, United Space Alliance technicians align space shuttle Discovery's Forward Reaction Control System, or FRCS, into position on the shuttle's frame.    The FRCS is being reinstalled in the forward fuselage nose area of the shuttle after refurbishment.  The FRCS provides the thrust for attitude (rotational) maneuvers (pitch, yaw and roll) and for small velocity changes along the orbiter axis (translation maneuvers).  Discovery is being prepared for the STS-131 mission, the 33rd flight to the International Space Station.  The seven-member STS-131 crew will deliver a Multi-Purpose Logistics Module filled with resupply stowage platforms and racks to be transferred to locations around the station.  Three spacewalks will include work to attach a spare ammonia tank assembly to the station's exterior and return a European experiment from outside the station's Columbus module.  Discovery's launch is targeted for March 18, 2010.  For information on the STS-131 mission and crew, visit http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts131/index.html.  Photo credit: NASA/Amanda Diller KSC-2009-6720

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility Bay 3 at NASA's ...

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility Bay 3 at NASA's Kennedy Space Center in Florida, United Space Alliance technicians align space shuttle Discovery's Forward Reaction Control System, or FRCS,... More

CAPE CANAVERAL, Fla. – In the transfer aisle of the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida, United Space Alliance technicians prepare to steady space shuttle Endeavour as it is lifted.    Next, Endeavour will be hoisted over a transom and lowered into High Bay 1, where it will be attached to its external fuel tank and solid rocket boosters. Rollout of the shuttle stack to Kennedy’s Launch Pad 39A, a significant milestone in launch processing activities, is planned for early January 2010. The Italian-built Tranquility module, the primary payload for Endeavour's STS-130 mission, will be installed in the payload bay after the shuttle arrives at the pad.  Launch is targeted for early February. For information on the STS-130 mission and crew, visit http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts130/index.html.  Photo credit: NASA/Dimitri Gerondidakis KSC-2009-6767

CAPE CANAVERAL, Fla. – In the transfer aisle of the Vehicle Assembly B...

CAPE CANAVERAL, Fla. – In the transfer aisle of the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida, United Space Alliance technicians prepare to steady space shuttle Endeavour as it is lift... More

CAPE CANAVERAL, Fla. – In the transfer aisle of the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida, United Space Alliance technicians verify that space shuttle Endeavour is securely attached to the yellow framework of a sling.    Next, Endeavour will be hoisted over a transom and lowered into High Bay 1, where it will be attached to its external fuel tank and solid rocket boosters. Rollout of the shuttle stack to Kennedy’s Launch Pad 39A, a significant milestone in launch processing activities, is planned for early January 2010. The Italian-built Tranquility module, the primary payload for Endeavour's STS-130 mission, will be installed in the payload bay after the shuttle arrives at the pad.  Launch is targeted for early February. For information on the STS-130 mission and crew, visit http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts130/index.html.  Photo credit: NASA/Dimitri Gerondidakis KSC-2009-6765

CAPE CANAVERAL, Fla. – In the transfer aisle of the Vehicle Assembly B...

CAPE CANAVERAL, Fla. – In the transfer aisle of the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida, United Space Alliance technicians verify that space shuttle Endeavour is securely attache... More

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility-1 at NASA's Kennedy Space Center in Florida, United Space Alliance technicians cover a reinforced carbon carbon panel, or RCC panel, removed from a wing leading edge of space shuttle Atlantis.    Inspection and maintenance of the RCC panels and the wing leading edge are standard procedure between shuttle missions.  The RCC panels, components of the shuttle's thermal protection system, are placed in protective coverings while the structural edge of the wing -- the orange and green area behind the panels -- undergoes spar corrosion inspection to verify the structural integrity of the wing. Atlantis is next slated to deliver an Integrated Cargo Carrier and Russian-built Mini Research Module to the International Space Station on the STS-132 mission.  The second in a series of new pressurized components for Russia, the module will be permanently attached to the Zarya module. Three spacewalks are planned to store spare components outside the station, including six spare batteries, a boom assembly for the Ku-band antenna and spares for the Canadian Dextre robotic arm extension. A radiator, airlock and European robotic arm for the Russian Multi-purpose Laboratory Module also are payloads on the flight.  Launch is targeted for May 14, 2010.  Photo credit: NASA/Glenn Benson KSC-2010-1085

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility-1 at NASA's Kenn...

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility-1 at NASA's Kennedy Space Center in Florida, United Space Alliance technicians cover a reinforced carbon carbon panel, or RCC panel, removed from a wing lea... More

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility-1 at NASA's Kennedy Space Center in Florida, United Space Alliance technicians remove a reinforced carbon carbon panel, or RCC panel, from a wing leading edge of space shuttle Atlantis.    Inspection and maintenance of the RCC panels and the wing leading edge are standard procedure between shuttle missions.  The RCC panels, components of the shuttle's thermal protection system, are placed in protective coverings while the structural edge of the wing -- the orange and green area behind the panels -- undergoes spar corrosion inspection to verify the structural integrity of the wing. Atlantis is next slated to deliver an Integrated Cargo Carrier and Russian-built Mini Research Module to the International Space Station on the STS-132 mission.  The second in a series of new pressurized components for Russia, the module will be permanently attached to the Zarya module. Three spacewalks are planned to store spare components outside the station, including six spare batteries, a boom assembly for the Ku-band antenna and spares for the Canadian Dextre robotic arm extension. A radiator, airlock and European robotic arm for the Russian Multi-purpose Laboratory Module also are payloads on the flight.  Launch is targeted for May 14, 2010.  Photo credit: NASA/Glenn Benson KSC-2010-1084

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility-1 at NASA's Kenn...

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility-1 at NASA's Kennedy Space Center in Florida, United Space Alliance technicians remove a reinforced carbon carbon panel, or RCC panel, from a wing leading ed... More

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility-1 at NASA's Kennedy Space Center in Florida, United Space Alliance technicians prepare to cover a reinforced carbon carbon panel, or RCC panel, removed from a wing leading edge of space shuttle Atlantis.    Inspection and maintenance of the RCC panels and the wing leading edge are standard procedure between shuttle missions.  The RCC panels, components of the shuttle's thermal protection system, are placed in protective coverings while the structural edge of the wing -- the orange and green area behind the panels -- undergoes spar corrosion inspection to verify the structural integrity of the wing. Atlantis is next slated to deliver an Integrated Cargo Carrier and Russian-built Mini Research Module to the International Space Station on the STS-132 mission.  The second in a series of new pressurized components for Russia, the module will be permanently attached to the Zarya module. Three spacewalks are planned to store spare components outside the station, including six spare batteries, a boom assembly for the Ku-band antenna and spares for the Canadian Dextre robotic arm extension. A radiator, airlock and European robotic arm for the Russian Multi-purpose Laboratory Module also are payloads on the flight.  Launch is targeted for May 14, 2010.  Photo credit: NASA/Glenn Benson KSC-2010-1087

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility-1 at NASA's Kenn...

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility-1 at NASA's Kennedy Space Center in Florida, United Space Alliance technicians prepare to cover a reinforced carbon carbon panel, or RCC panel, removed from... More

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility 1 at NASA's Kennedy Space Center in Florida, United Space Alliance technicians perform a push test on an external tank door on space shuttle Atlantis.    Two umbilical doors, located on the shuttle's aft fuselage, close after external tank separation following launch. The test confirms that the door's actuators are functioning properly and that signals sent from the actuators correctly indicate that the doors have closed, creating the necessary thermal barrier for reentry.  Atlantis is next slated to deliver an Integrated Cargo Carrier and Russian-built Mini Research Module to the International Space Station on the STS-132 mission.  The second in a series of new pressurized components for Russia, the module will be permanently attached to the Zarya module. Three spacewalks are planned to store spare components outside the station, including six spare batteries, a boom assembly for the Ku-band antenna and spares for the Canadian Dextre robotic arm extension. A radiator, airlock and European robotic arm for the Russian Multi-purpose Laboratory Module also are payloads on the flight.  Launch is targeted for May 14, 2010.  Photo credit: NASA/Troy Cryder KSC-2010-1073

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility 1 at NASA's Kenn...

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility 1 at NASA's Kennedy Space Center in Florida, United Space Alliance technicians perform a push test on an external tank door on space shuttle Atlantis. Tw... More

Previous

of 3

Next