Contractors finish replacing a culvert on an installation
Summary
Contractors finish replacing a culvert on an installation road Oct. 20, 2017, at Fort McCoy, Wis. Numerous culverts were replaced throughout the post’s cantonment area in September and October to improve groundwater flow and reduce the chance for any types of flooding. The work was coordinated by the Fort McCoy Directorate of Public Works. (U.S. Army Photo by Scott T. Sturkol, Public Affairs Office, Fort McCoy, Wis.)
Tags
Date
20/10/2017
Location
Source
Defense Visual Information Distribution Service
Copyright info
Public Domain Dedication. Public Use Notice of Limitations: https://www.dvidshub.net/about/copyright