Inside the Operations and Checkout Building, the P-1 truss, a component of the International Space Station, is lifted out of its canister to move to a work stand where it will undergo processing. Scheduled to fly in spring of 2002, the P-1 is part of a total 10-truss, girder-like structure on the Station that will ultimately extend the length of a football field. Astronauts will attach the 14-by-15 foot structure to the port side of the center truss, S0, during the spring assembly flight. The 33,000-pound P-1 will house the thermal radiator rotating joint (TRRJ) that will rotate the Station’s radiators away from the sun to increase their maximum cooling efficiency KSC-00pp1049
Summary
Inside the Operations and Checkout Building, the P-1 truss, a component of the International Space Station, is lifted out of its canister to move to a work stand where it will undergo processing. Scheduled to fly in spring of 2002, the P-1 is part of a total 10-truss, girder-like structure on the Station that will ultimately extend the length of a football field. Astronauts will attach the 14-by-15 foot structure to the port side of the center truss, S0, during the spring assembly flight. The 33,000-pound P-1 will house the thermal radiator rotating joint (TRRJ) that will rotate the Station’s radiators away from the sun to increase their maximum cooling efficiency
Tags
Date
27/07/2000
Location
Kennedy Space Center, FL
Source
NASA
Copyright info
Public Domain Dedication (CC0)