KENNEDY SPACE CENTER, FLA. -- At Launch Pad 39-A, the STS-111 and Expedition Five crews take time out from a tour of the pad with their friends and family to pose for a group portrait.  From left, they are STS-111 Pilot Paul Lockhart, STS-111 Commander Kenneth Cockrell, Expedition Five Commander Valeri Korzun (RSA), Expedition Five astronaut Peggy Whitson, Expedition Five cosmonaut Sergei Treschev (RSA), and STS-111 Mission Specialists Philippe Perrin (CNES) and Franklin Chang-Diaz.  Expedition Five is traveling to the International Space Station on Space Shuttle Endeavour as the replacement crew for Expedition Four, who will return to Earth aboard the orbiter. Known as Utilization Flight 2, STS-111 is carrying supplies and equipment to the Station. The payload includes the Multi-Purpose Logistics Module Leonardo, the Mobile Base System, which will be installed on the Mobile Transporter to complete the Canadian Mobile Servicing System, or MSS, and a replacement wrist/roll joint for Canadarm 2. The mechanical arm will then have the capability to "inchworm" from the U.S. Lab Destiny to the MSS and travel along the truss to work sites. Launch is scheduled for May 30, 2002 KSC-02pd0814

Similar

KENNEDY SPACE CENTER, FLA. -- At Launch Pad 39-A, the STS-111 and Expedition Five crews take time out from a tour of the pad with their friends and family to pose for a group portrait. From left, they are STS-111 Pilot Paul Lockhart, STS-111 Commander Kenneth Cockrell, Expedition Five Commander Valeri Korzun (RSA), Expedition Five astronaut Peggy Whitson, Expedition Five cosmonaut Sergei Treschev (RSA), and STS-111 Mission Specialists Philippe Perrin (CNES) and Franklin Chang-Diaz. Expedition Five is traveling to the International Space Station on Space Shuttle Endeavour as the replacement crew for Expedition Four, who will return to Earth aboard the orbiter. Known as Utilization Flight 2, STS-111 is carrying supplies and equipment to the Station. The payload includes the Multi-Purpose Logistics Module Leonardo, the Mobile Base System, which will be installed on the Mobile Transporter to complete the Canadian Mobile Servicing System, or MSS, and a replacement wrist/roll joint for Canadarm 2. The mechanical arm will then have the capability to "inchworm" from the U.S. Lab Destiny to the MSS and travel along the truss to work sites. Launch is scheduled for May 30, 2002 KSC-02pd0814

description

Summary

KENNEDY SPACE CENTER, FLA. -- At Launch Pad 39-A, the STS-111 and Expedition Five crews take time out from a tour of the pad with their friends and family to pose for a group portrait. From left, they are STS-111 Pilot Paul Lockhart, STS-111 Commander Kenneth Cockrell, Expedition Five Commander Valeri Korzun (RSA), Expedition Five astronaut Peggy Whitson, Expedition Five cosmonaut Sergei Treschev (RSA), and STS-111 Mission Specialists Philippe Perrin (CNES) and Franklin Chang-Diaz. Expedition Five is traveling to the International Space Station on Space Shuttle Endeavour as the replacement crew for Expedition Four, who will return to Earth aboard the orbiter. Known as Utilization Flight 2, STS-111 is carrying supplies and equipment to the Station. The payload includes the Multi-Purpose Logistics Module Leonardo, the Mobile Base System, which will be installed on the Mobile Transporter to complete the Canadian Mobile Servicing System, or MSS, and a replacement wrist/roll joint for Canadarm 2. The mechanical arm will then have the capability to "inchworm" from the U.S. Lab Destiny to the MSS and travel along the truss to work sites. Launch is scheduled for May 30, 2002

The Space Shuttle program was the United States government's manned launch vehicle program from 1981 to 2011, administered by NASA and officially beginning in 1972. The Space Shuttle system—composed of an orbiter launched with two reusable solid rocket boosters and a disposable external fuel tank— carried up to eight astronauts and up to 50,000 lb (23,000 kg) of payload into low Earth orbit (LEO). When its mission was complete, the orbiter would re-enter the Earth's atmosphere and lands as a glider. Although the concept had been explored since the late 1960s, the program formally commenced in 1972 and was the focus of NASA's manned operations after the final Apollo and Skylab flights in the mid-1970s. It started with the launch of the first shuttle Columbia on April 12, 1981, on STS-1. and finished with its last mission, STS-135 flown by Atlantis, in July 2011.

date_range

Date

1960 - 1969
place

Location

create

Source

NASA
copyright

Copyright info

Public Domain Dedication (CC0)

Explore more

kennedy space center
kennedy space center