KENNEDY SPACE CENTER, FLA. - Atlantis glides into the open doors of the Vehicle Assembly Building into the transfer aisle, concluding its rollover from the Orbiter Processing Facility. In the VAB, the orbiter will be lifted into high bay 3 for mating to the external fuel tank and solid rocket boosters. Atlantis' launch window begins Aug. 28. During its 11-day mission to the International Space Station, the STS-115 crew of six astronauts will install the Port 3/4 truss segment with its two large solar arrays. Photo credit: NASA/Charisse Nahser KSC-06pd1641
Summary
KENNEDY SPACE CENTER, FLA. - Atlantis glides into the open doors of the Vehicle Assembly Building into the transfer aisle, concluding its rollover from the Orbiter Processing Facility. In the VAB, the orbiter will be lifted into high bay 3 for mating to the external fuel tank and solid rocket boosters. Atlantis' launch window begins Aug. 28. During its 11-day mission to the International Space Station, the STS-115 crew of six astronauts will install the Port 3/4 truss segment with its two large solar arrays. Photo credit: NASA/Charisse Nahser
Tags
Date
24/07/2006
Location
Source
NASA
Copyright info
Public Domain Dedication (CC0)