CAPE CANAVERAL, Fla. --  At SPACEHAB in Titusville, Fla., STS-127 crew members look at the SGANT (Space to Ground Antenna) at left and the pump module assembly at right, all attached to the Integrated Cargo Carrier-VLD (Vertical Light Deployment), part of the payload for the mission. The crew members are at Kennedy for a crew equipment interface test, or CEIT, which provides experience handling tools, equipment and hardware they will use on the mission. The payload will be launched to the International Space Station aboard space shuttle Endeavour on the STS-127 mission, targeted for launch on May 15, 2009. Photo credit: NASA/Dimitrios Gerondidakis KSC-08pd4034

Similar

CAPE CANAVERAL, Fla. -- At SPACEHAB in Titusville, Fla., STS-127 crew members look at the SGANT (Space to Ground Antenna) at left and the pump module assembly at right, all attached to the Integrated Cargo Carrier-VLD (Vertical Light Deployment), part of the payload for the mission. The crew members are at Kennedy for a crew equipment interface test, or CEIT, which provides experience handling tools, equipment and hardware they will use on the mission. The payload will be launched to the International Space Station aboard space shuttle Endeavour on the STS-127 mission, targeted for launch on May 15, 2009. Photo credit: NASA/Dimitrios Gerondidakis KSC-08pd4034

description

Summary

CAPE CANAVERAL, Fla. -- At SPACEHAB in Titusville, Fla., STS-127 crew members look at the SGANT (Space to Ground Antenna) at left and the pump module assembly at right, all attached to the Integrated Cargo Carrier-VLD (Vertical Light Deployment), part of the payload for the mission. The crew members are at Kennedy for a crew equipment interface test, or CEIT, which provides experience handling tools, equipment and hardware they will use on the mission. The payload will be launched to the International Space Station aboard space shuttle Endeavour on the STS-127 mission, targeted for launch on May 15, 2009. Photo credit: NASA/Dimitrios Gerondidakis

The Space Shuttle program was the United States government's manned launch vehicle program from 1981 to 2011, administered by NASA and officially beginning in 1972. The Space Shuttle system—composed of an orbiter launched with two reusable solid rocket boosters and a disposable external fuel tank— carried up to eight astronauts and up to 50,000 lb (23,000 kg) of payload into low Earth orbit (LEO). When its mission was complete, the orbiter would re-enter the Earth's atmosphere and lands as a glider. Although the concept had been explored since the late 1960s, the program formally commenced in 1972 and was the focus of NASA's manned operations after the final Apollo and Skylab flights in the mid-1970s. It started with the launch of the first shuttle Columbia on April 12, 1981, on STS-1. and finished with its last mission, STS-135 flown by Atlantis, in July 2011.

date_range

Date

1970 - 1979
place

Location

Cape Canaveral, FL
create

Source

NASA
copyright

Copyright info

Public Domain Dedication (CC0)

Explore more

kennedy space center
kennedy space center