CAPE CANAVERAL, Fla. – Dark clouds fill the sky behind the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida.  NASA managers postponed today’s space shuttle launch because of lightning and thunderstorms within the 20-nautical-mile circle around the launch pad. The fifth launch attempt for the STS-127 mission was scrubbed at 6:39 p.m. EDT. The first two launch attempts on June 13 and June 17 were scrubbed when a hydrogen gas leak occurred during tanking due to a misaligned Ground Umbilical Carrier Plate. Mission managers also decided to delay tanking on July 11 for a launch attempt later in the day to allow engineers and safety personnel time to analyze data captured during lightning strikes near the pad on July 10. Weather concerns caused a scrub July 12 as well. Endeavour will deliver the Japanese Experiment Module's Exposed Facility, or JEM-EF, and the Experiment Logistics Module-Exposed Section, or ELM-ES, in the final of three flights dedicated to the assembly of the Japan Aerospace Exploration Agency's Kibo laboratory complex on the International Space Station.  STS-127 is the 29th flight for the assembly of the space.    Photo credit: NASA/Tim Jacobs KSC-2009-4011

Similar

CAPE CANAVERAL, Fla. – Dark clouds fill the sky behind the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida. NASA managers postponed today’s space shuttle launch because of lightning and thunderstorms within the 20-nautical-mile circle around the launch pad. The fifth launch attempt for the STS-127 mission was scrubbed at 6:39 p.m. EDT. The first two launch attempts on June 13 and June 17 were scrubbed when a hydrogen gas leak occurred during tanking due to a misaligned Ground Umbilical Carrier Plate. Mission managers also decided to delay tanking on July 11 for a launch attempt later in the day to allow engineers and safety personnel time to analyze data captured during lightning strikes near the pad on July 10. Weather concerns caused a scrub July 12 as well. Endeavour will deliver the Japanese Experiment Module's Exposed Facility, or JEM-EF, and the Experiment Logistics Module-Exposed Section, or ELM-ES, in the final of three flights dedicated to the assembly of the Japan Aerospace Exploration Agency's Kibo laboratory complex on the International Space Station. STS-127 is the 29th flight for the assembly of the space. Photo credit: NASA/Tim Jacobs KSC-2009-4011

description

Summary

CAPE CANAVERAL, Fla. – Dark clouds fill the sky behind the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida. NASA managers postponed today’s space shuttle launch because of lightning and thunderstorms within the 20-nautical-mile circle around the launch pad. The fifth launch attempt for the STS-127 mission was scrubbed at 6:39 p.m. EDT. The first two launch attempts on June 13 and June 17 were scrubbed when a hydrogen gas leak occurred during tanking due to a misaligned Ground Umbilical Carrier Plate. Mission managers also decided to delay tanking on July 11 for a launch attempt later in the day to allow engineers and safety personnel time to analyze data captured during lightning strikes near the pad on July 10. Weather concerns caused a scrub July 12 as well. Endeavour will deliver the Japanese Experiment Module's Exposed Facility, or JEM-EF, and the Experiment Logistics Module-Exposed Section, or ELM-ES, in the final of three flights dedicated to the assembly of the Japan Aerospace Exploration Agency's Kibo laboratory complex on the International Space Station. STS-127 is the 29th flight for the assembly of the space. Photo credit: NASA/Tim Jacobs

The Space Shuttle program was the United States government's manned launch vehicle program from 1981 to 2011, administered by NASA and officially beginning in 1972. The Space Shuttle system—composed of an orbiter launched with two reusable solid rocket boosters and a disposable external fuel tank— carried up to eight astronauts and up to 50,000 lb (23,000 kg) of payload into low Earth orbit (LEO). When its mission was complete, the orbiter would re-enter the Earth's atmosphere and lands as a glider. Although the concept had been explored since the late 1960s, the program formally commenced in 1972 and was the focus of NASA's manned operations after the final Apollo and Skylab flights in the mid-1970s. It started with the launch of the first shuttle Columbia on April 12, 1981, on STS-1. and finished with its last mission, STS-135 flown by Atlantis, in July 2011.

date_range

Date

13/07/2009
place

Location

create

Source

NASA
copyright

Copyright info

Public Domain Dedication (CC0)

Explore more

kennedy space center
kennedy space center