KENNEDY SPACE CENTER, FLA. -- The Space Shuttle Atlantis completes the trip to Launch Pad 39A from the Vehicle Assembly Building for the third time in the STS-79 mission flow. The Shuttle was rolled back from the pad in July due to the threat from Hurricane Bertha, then rolled back again earlier this week because of Hurricane Fran. The targeted launch date for Atlantis on Mission STS-79 -- the fourth docking between the U.S. Shuttle and Russian Space Station Mir -- is now Sept. 16 at 4:54 a.m. EDT. The three rollout dates for Atlantis to Pad 39A are: July 1, Aug. 20 and Sept. 5 KSC-96PC1044

Similar

KENNEDY SPACE CENTER, Fla. --  The Space Shuttle Endeavour lights up the night sky as it embarks on the first U.S. mission dedicated to the assembly of the International Space Station. Liftoff on Dec. 4 from Launch Pad 39A was at 3:35:34 a.m. EST. During the nearly 12-day mission, the six-member crew will mate in space the first two elements of the International Space Station the already-orbiting Zarya control module with the Unity connecting module carried by Endeavour. Crew members are Commander Robert D. Cabana, Pilot Frederick W. "Rick" Sturckow, and Mission Specialists Nancy J. Currie, Jerry L. Ross, James H. Newman and Sergei Konstantinovich Krikalev, a Russian cosmonaut. This was the second launch attempt for STS-88. The first one on Dec. 3 was scrubbed when launch controllers, following an assessment of a suspect hydraulic system, were unable to resume the countdown clock in time to launch within the remaining launch window.The Space Shuttle Endeavour lights up the night sky as it embarks on the first U.S. mission dedicated to the assembly of the International Space Station. Liftoff on Dec. 4 from Launch Pad 39A was at 3:35:34 a.m. EST. During the nearly 12-day mission, the six-member crew will mate in space the first two elements of the International Space Station the already-orbiting Zarya control module with the Unity connecting module carried by Endeavour. Crew members are Commander Robert D. Cabana, Pilot Frederick W. "Rick" Sturckow, and Mission Specialists Nancy J. Currie, Jerry L. Ross, James H. Newman and Sergei Konstantinovich Krikalev, a Russian cosmonaut. This was the second launch attempt for STS-88. The first one on Dec. 3 was scrubbed when launch controllers, following an assessment of a suspect hydraulic system, were unable to resume the countdown clock in time to launch within the remaining launch window KSC-98pc1788

KENNEDY SPACE CENTER, Fla. -- The Space Shuttle Endeavour lights up the night sky as it embarks on the first U.S. mission dedicated to the assembly of the International Space Station. Liftoff on Dec. 4 from Launch Pad 39A was at 3:35:34 a.m. EST. During the nearly 12-day mission, the six-member crew will mate in space the first two elements of the International Space Station the already-orbiting Zarya control module with the Unity connecting module carried by Endeavour. Crew members are Commander Robert D. Cabana, Pilot Frederick W. "Rick" Sturckow, and Mission Specialists Nancy J. Currie, Jerry L. Ross, James H. Newman and Sergei Konstantinovich Krikalev, a Russian cosmonaut. This was the second launch attempt for STS-88. The first one on Dec. 3 was scrubbed when launch controllers, following an assessment of a suspect hydraulic system, were unable to resume the countdown clock in time to launch within the remaining launch window.The Space Shuttle Endeavour lights up the night sky as it embarks on the first U.S. mission dedicated to the assembly of the International Space Station. Liftoff on Dec. 4 from Launch Pad 39A was at 3:35:34 a.m. EST. During the nearly 12-day mission, the six-member crew will mate in space the first two elements of the International Space Station the already-orbiting Zarya control module with the Unity connecting module carried by Endeavour. Crew members are Commander Robert D. Cabana, Pilot Frederick W. "Rick" Sturckow, and Mission Specialists Nancy J. Currie, Jerry L. Ross, James H. Newman and Sergei Konstantinovich Krikalev, a Russian cosmonaut. This was the second launch attempt for STS-88. The first one on Dec. 3 was scrubbed when launch controllers, following an assessment of a suspect hydraulic system, were unable to resume the countdown clock in time to launch within the remaining launch window KSC-98pc1788

KENNEDY SPACE CENTER, FLA. -- The Space Shuttle Atlantis completes the trip to Launch Pad 39A from the Vehicle Assembly Building for the third time in the STS-79 mission flow. The Shuttle was rolled back from the pad in July due to the threat from Hurricane Bertha, then rolled back again earlier this week because of Hurricane Fran. The targeted launch date for Atlantis on Mission STS-79 -- the fourth docking between the U.S. Shuttle and Russian Space Station Mir -- is now Sept. 16 at 4:54 a.m. EDT. The three rollout dates for Atlantis to Pad 39A are: July 1, Aug. 20 and Sept. 5 KSC-96PC1044

description

Summary

KENNEDY SPACE CENTER, FLA. -- The Space Shuttle Atlantis completes the trip to Launch Pad 39A from the Vehicle Assembly Building for the third time in the STS-79 mission flow. The Shuttle was rolled back from the pad in July due to the threat from Hurricane Bertha, then rolled back again earlier this week because of Hurricane Fran. The targeted launch date for Atlantis on Mission STS-79 -- the fourth docking between the U.S. Shuttle and Russian Space Station Mir -- is now Sept. 16 at 4:54 a.m. EDT. The three rollout dates for Atlantis to Pad 39A are: July 1, Aug. 20 and Sept. 5

The Space Shuttle program was the United States government's manned launch vehicle program from 1981 to 2011, administered by NASA and officially beginning in 1972. The Space Shuttle system—composed of an orbiter launched with two reusable solid rocket boosters and a disposable external fuel tank— carried up to eight astronauts and up to 50,000 lb (23,000 kg) of payload into low Earth orbit (LEO). When its mission was complete, the orbiter would re-enter the Earth's atmosphere and lands as a glider. Although the concept had been explored since the late 1960s, the program formally commenced in 1972 and was the focus of NASA's manned operations after the final Apollo and Skylab flights in the mid-1970s. It started with the launch of the first shuttle Columbia on April 12, 1981, on STS-1. and finished with its last mission, STS-135 flown by Atlantis, in July 2011.

Space Shuttle Atlantis was a space shuttle that was operated by NASA as part of the Space Shuttle program. It was the fourth operational shuttle built, and the last one to be built before the program was retired in 2011. Atlantis was named after the first research vessel operated by the Woods Hole Oceanographic Institution, and it made its first flight in October 1985. Over the course of its career, Atlantis completed 33 missions and spent a total of 307 days in space. Its last mission was STS-135, which was the final mission of the Space Shuttle program. Atlantis is now on display at the Kennedy Space Center Visitor Complex in Florida. Space Shuttle Atlantis (Orbiter Vehicle Designation: OV-104) was one of the four first operational orbiters in the Space Shuttle fleet of NASA, the space agency of the United States. (The other two are Discovery and Endeavour.) Atlantis was the fourth operational shuttle built. Atlantis is named after a two-masted sailing ship that operated from 1930 to 1966 for the Woods Hole Oceanographic Institute. Atlantis performed well in 25 years of service, flying 33 missions.

date_range

Date

20/08/1996
place

Location

create

Source

NASA
copyright

Copyright info

Public Domain Dedication (CC0)

Explore more

kennedy space center
kennedy space center