spacecraft

26,156 media by topicpage 1 of 262
Grand Rounds Scenic Byway - Huge Lego Spaceship in the Mall of America

Grand Rounds Scenic Byway - Huge Lego Spaceship in the Mall of America

The original finding aid described this photograph as: Original Caption: A lego spaceman hovers in the air above mall walkers. Location: Location: Minnesota (44.854° N 93.243° W) Status: Public domain. Photo... More

Space shuttle STS-127 - LAUNCH - Public domain NASA photogrpaph

Space shuttle STS-127 - LAUNCH - Public domain NASA photogrpaph

Description: SEQUENTIAL STILL COVERAGE OF LIFTOFF. FRAME VEHICLE AND LAUNCHER PLUS ONE VEHICLE LENGTH. Item: DD083-39A Date Taken: 7/15/2009 Image Type: DIGITAL STILLS STS127 LAUNCH AND LANDING

Space Shuttle Discovery, STS-51 G Launch

Space Shuttle Discovery, STS-51 G Launch

(June 17, 1985) On June 17, 1985, Space Shuttle Discovery's STS-51 G mission launched on a Comsat deployment mission. It deployed three communication satellites. The mission lasted a little over seven days. ..I... More

Rendezvous Docking Simulator, NASA Gemini program

Rendezvous Docking Simulator, NASA Gemini program

(February 7, 1964) Multiple exposure of Rendezvous Docking Simulator. The Gemini spacecraft was supported in a gimbal system by an overhead crane and gantry arrangement which provided 6 degrees of freedom - rol... More

Astronaut Edward White Ready For Gemini IV Liftoff

Astronaut Edward White Ready For Gemini IV Liftoff

(June 3, 1965) Astronaut Edward H. White II, pilot for NASA's Gemini IV mission is shown in the crew's ready room at Launch Complex 16, suited and ready to ride the van to Launch Complex 19 for insertion in the... More

ASTRONAUT JAMES A. LOVELL, JR.. NASA public domain image colelction.

ASTRONAUT JAMES A. LOVELL, JR.. NASA public domain image colelction.

Astronaut James A. Lovell Jr., pilot for the National Aeronautics and Space Administration Gemini-7 spaceflight, walks to the elevator at Pad 19 one hour and 40 minutes before launch of the spacecraft. Moments ... More

NASA's Lunar Reconnaissance Orbiter (LRO) spacecraft  LCROSS IMPACT EVENT at Goddard Space Flight Center

NASA's Lunar Reconnaissance Orbiter (LRO) spacecraft LCROSS IMPACT EV...

The original finding aid described this as: Description: NASA's Lunar Reconnaissance Orbiter (LRO) spacecraft LCROSS IMPACT EVENT at Goddard Space Flight Center. Lunar CRater Observation and Sensing Satellite ... More

NASA's Lunar Reconnaissance Orbiter (LRO) spacecraft  LCROSS IMPACT EVENT at Goddard Space Flight Center

NASA's Lunar Reconnaissance Orbiter (LRO) spacecraft LCROSS IMPACT EV...

The original finding aid described this as: Description: NASA's Lunar Reconnaissance Orbiter (LRO) spacecraft LCROSS IMPACT EVENT at Goddard Space Flight Center. Lunar CRater Observation and Sensing Satellite ... More

NASA's Lunar Reconnaissance Orbiter (LRO) spacecraft  LCROSS IMPACT EVENT at Goddard Space Flight Center

NASA's Lunar Reconnaissance Orbiter (LRO) spacecraft LCROSS IMPACT EV...

The original finding aid described this as: Description: NASA's Lunar Reconnaissance Orbiter (LRO) spacecraft LCROSS IMPACT EVENT at Goddard Space Flight Center. Lunar CRater Observation and Sensing Satellite ... More

NASA's Lunar Reconnaissance Orbiter (LRO) spacecraft  LCROSS IMPACT EVENT at Goddard Space Flight Center

NASA's Lunar Reconnaissance Orbiter (LRO) spacecraft LCROSS IMPACT EV...

The original finding aid described this as: Description: NASA's Lunar Reconnaissance Orbiter (LRO) spacecraft LCROSS IMPACT EVENT at Goddard Space Flight Center. Lunar CRater Observation and Sensing Satellite ... More

NASA's Lunar Reconnaissance Orbiter (LRO) spacecraft  LCROSS IMPACT EVENT at Goddard Space Flight Center

NASA's Lunar Reconnaissance Orbiter (LRO) spacecraft LCROSS IMPACT EV...

The original finding aid described this as: Description: NASA's Lunar Reconnaissance Orbiter (LRO) spacecraft LCROSS IMPACT EVENT at Goddard Space Flight Center. Lunar CRater Observation and Sensing Satellite ... More

"Time tested and best on earth" up to date.

"Time tested and best on earth" up to date.

Public domain photograph of American trade card, no copyright restrictions image - Picryl description

Katapultstol från rymsfarkosten Vostok.

Katapultstol från rymsfarkosten Vostok.

Katapultstol från rymsfarkosten Vostok. Public domain photograph - Sweden in 20th century, no copyright restrictions image - Picryl description

Huvudet av rymdfarkosten "Vostok" på utställingen "Folkekonomiens presentationer i SSSR" i Moskva.

Huvudet av rymdfarkosten "Vostok" på utställingen "Folkekonomiens pres...

Huvudet av rymdfarkosten "Vostok" på utställingen "Folkekonomiens presentationer i SSSR" i Moskva.

Rymdfarkost "Vostoh" (med raketförarens sista stag). Rymdfarkosterna av denna typ har flugit 259 varv kring jorden (omkring 10,5 milj km) med kosmonauterna: JA Gagarin, GS Titov, AG Nikolajev, PR Popovitj, VF Bukovsky, VV Nikolajeva-Teresjkova. Vikt med raketförarnas sista steg = 6,17 ton. Exakta vikten av sista steget = 4725 kg, tillbehör = 2 ton. Kabinens >> diameter = 2,3 meter. Apparatens längd = 7,35 inkl raketens sista steg.

Rymdfarkost "Vostoh" (med raketförarens sista stag). Rymdfarkosterna a...

Rymdfarkost "Vostoh" (med raketförarens sista stag). Rymdfarkosterna av denna typ har flugit 259 varv kring jorden (omkring 10,5 milj km) med kosmonauterna: JA Gagarin, GS Titov, AG Nikolajev, PR Popovitj, VF B... More

Rymdfarkosten "Vostok" på utställingen "Folkekonomiens presentationer i SSSR" i Moskva.

Rymdfarkosten "Vostok" på utställingen "Folkekonomiens presentationer ...

Rymdfarkosten "Vostok" på utställingen "Folkekonomiens presentationer i SSSR" i Moskva.

Tête á Tête on the 968th Floor of a Skyscraper (Tête á Tête am Wolkenkratzer 968 Etage)

Tête á Tête on the 968th Floor of a Skyscraper (Tête á Tête am Wolkenk...

Moriz Jung (Austrian (born Czechoslovakia) Moravia 1885–1915 Manilowa (Carpathians))

STS098-715-008 - STS-098 - Earth observations taken during STS-98 mission

STS098-715-008 - STS-098 - Earth observations taken during STS-98 miss...

The original finding aid described this as: Description: Earth observations taken during the STS-98 mission from the space shuttle Atlantis. Subject Terms: STS-98, ATLANTIS (ORBITER), EARTH OBSERVATIONS (FROM... More

STS098-307-029 - STS-098 - Earth observations taken during STS-98 mission

STS098-307-029 - STS-098 - Earth observations taken during STS-98 miss...

The original finding aid described this as: Description: Earth observations taken during the STS-98 mission from the space shuttle Atlantis. Subject Terms: STS-98, ATLANTIS (ORBITER), EARTH OBSERVATIONS (FROM... More

Marisco Ltd. workers repair the aging hull of the decommissioned Balao-class submarine USS Bowfin (SS 287).

Marisco Ltd. workers repair the aging hull of the decommissioned Balao...

Pearl Harbor, Hawaii (Oct. 05, 2004) Marisco Ltd. workers repair the aging hull of the decommissioned Balao-class submarine USS Bowfin (SS 287) at their shipyard near the former Naval Air Station Barber's Point... More

Production. B-17 heavy bomber. The tail and rudder of a mighty B-17F (Flying Fortress) bomber near completion at the Boeing plant in Seattle.  The Flying Fortress has performed with great credit in the South Pacific, over Germany and elsewhere. It is a four-engine, heavy bomber capable of flying high altitudes

Production. B-17 heavy bomber. The tail and rudder of a mighty B-17F (...

Picryl description: Public domain image of a bomber aircraft, military aviation, air forces, free to use, no copyright restrictions.

Frimärke ur Gösta Bodmans filatelistiska motivsamling, påbörjad 1950.Frimärke från Ryssland, 1962. Motiv av jordglob och rymdskepp. "Gagarin: den första kosmonauten. 1-årsminne av Jurin Gagarins rymdresa runt jorden 12-4-1961 - 12-4-1962".

Frimärke ur Gösta Bodmans filatelistiska motivsamling, påbörjad 1950.F...

Frimärke ur Gösta Bodmans filatelistiska motivsamling, påbörjad 1950.Frimärke från Ryssland, 1962. Motiv av jordglob och rymdskepp. "Gagarin: den första kosmonauten. 1-årsminne av Jurin Gagarins rymdresa runt j... More

Frimärke ur Gösta Bodmans filatelistiska motivsamling, påbörjad 1950.Frimärke från Ryssland, 1960. Motiv av Kremlin med Sovjetstjärnan. "Rymdskeppet Sputnik II över Moskwa och jorden med rymdhundarna Belka och Strelka som apssagerare 19-20 augusti 1960".

Frimärke ur Gösta Bodmans filatelistiska motivsamling, påbörjad 1950.F...

Frimärke ur Gösta Bodmans filatelistiska motivsamling, påbörjad 1950.Frimärke från Ryssland, 1960. Motiv av Kremlin med Sovjetstjärnan. "Rymdskeppet Sputnik II över Moskwa och jorden med rymdhundarna Belka och ... More

The First Redstone Rocket Firing

The First Redstone Rocket Firing

Full Description: (August 20, 1953) The first Redstone was fired at Cape Canaveral, Florida on August 20, 1953. Redstone was the first major rocket development program for United States by the Peenemuende group... More

Launch of the Gemini 5 spacecraft from Pad 19 at 9 a.m. Aug. 21, 1965.

Launch of the Gemini 5 spacecraft from Pad 19 at 9 a.m. Aug. 21, 1965.

S65-50774 (21 Aug. 1965) --- The National Aeronautics and Space Administration launched the Gemini-5 spacecraft from Pad 19 at 9 a.m. (EST) Aug. 21, 1965, on a planned eight-day orbital mission. Astronaut L. Go... More

NASA Jupiter rocket - Early Rockets, Army ballistic missile agency

NASA Jupiter rocket - Early Rockets, Army ballistic missile agency

The Jupiter rocket was designed and developed by the Army Ballistic Missile Agency (ABMA). ABMA launched the Jupiter-A at Cape Canaveral, Florida, on March 1, 1957. The Jupiter vehicle was a direct derivative o... More

Pioneer I on the Launch Pad. NASA public domain image. Kennedy space center.

Pioneer I on the Launch Pad. NASA public domain image. Kennedy space c...

Thor-Able I with the Pioneer I spacecraft atop, prior to launch at Eastern Test Range at what is now Kennedy Space Center. Pioneer I launched on October 11, 1958, the first spacecraft launched by the 11 day old... More

Photograph of John Glenn in Space during Mercury-Atlas 6

Photograph of John Glenn in Space during Mercury-Atlas 6

Original caption: CAPE CANAVERAL, FLA. - Astronaut John Glenn photographed in space by an automatic sequence motion picture camera. Glenn is in a state of weightlessness traveling at 17,500 MPH as these pictur... More

Jerrie Cobb Poses beside Mercury Capsule

Jerrie Cobb Poses beside Mercury Capsule

Jerrie Cobb poses next to a Mercury spaceship capsule. Although she never flew in space, Cobb, along with twenty-four other women, underwent physical tests similar to those taken by the Mercury astronauts with ... More

View of Explorer VII. NASA public domain image colelction.

View of Explorer VII. NASA public domain image colelction.

A Juno II launched an Explorer VII satellite on October 13, 1959. Explorer VII, with a total weight of 91.5 pounds, carried a scientific package for detecting micrometeors, measuring the Earth's radiation balan... More

Luna 1 coat of arms. NASA public domain image colelction.

Luna 1 coat of arms. NASA public domain image colelction.

Description: Luna 1 was the first spacecraft to reach the Moon, and the first of a series of Soviet automatic interplanetary stations successfully launched in the direction of the Moon. The spacecraft was spher... More

Sam the Monkey After His Ride in the Little Joe 2 Spacecraft

Sam the Monkey After His Ride in the Little Joe 2 Spacecraft

(December 4, 1959) Sam, the Rhesus monkey, after his ride in the Little Joe-2 (LJ-2) spacecraft. A U.S. Navy destroyer safely recovered Sam after he experienced three minutes of weightlessness during the flight... More

Little Joe Launch Vehicle, NASA Mercury project

Little Joe Launch Vehicle, NASA Mercury project

Launching of the Little Joe launch vehicle on November 4, 1959 took place at Wallops Island, Va. This was the first attempt to launch an instrumented capsule with a Little Joe booster. Only the LJ1A and the LJ6... More

Juno II (AM-11) launch vehicle. NASA public domain image colelction.

Juno II (AM-11) launch vehicle. NASA public domain image colelction.

A Juno II launched an Explorer VII satellite on October 13, 1959. Explorer VII, with a total weight of 91.5 pounds, carried a scientific package for detecting micrometeors, measuring the Earth's radiation balan... More

Researcher Examines Pellets for Micrometeorite Impact Studies

Researcher Examines Pellets for Micrometeorite Impact Studies

A researcher at the NASA Lewis Research Center manipulates cartridge pellets and a strain gauge target as part of a study on the impact of micrometeorites striking space vehicles. Early in the space program NAS... More

KENNEDY SPACE CENTER, Fla. -- Workers off-load NASA's Genesis spacecraft which arrived at the Shuttle Landing Facility at 3:30 a.m. aboard an Air Force C-17 aircraft.; Lockheed Martin Astronautics built the Genesis spacecraft for NASA in Denver, Colo.; The spacecraft will undergo final launch preparations in the Payload Hazardous Servicing Facility in KSC's industrial area. Genesis will capture samples of the ions and elements in the solar wind and return them to Earth for scientists to use to determine the exact composition of the Sun and the solar system's origin. Launch aboard a Boeing Delta II rocket is scheduled for July 30 at 12:36 p.m. EDT.; NASA's Genesis project in managed by the Jet Propulsion Laboratory in Pasadena, Calif KSC-01pp1049

KENNEDY SPACE CENTER, Fla. -- Workers off-load NASA's Genesis spacecra...

KENNEDY SPACE CENTER, Fla. -- Workers off-load NASA's Genesis spacecraft which arrived at the Shuttle Landing Facility at 3:30 a.m. aboard an Air Force C-17 aircraft.; Lockheed Martin Astronautics built the Gen... More

CAPE CANAVERAL, Fla. - Ares IX upper stage segments’ ballast assemblies are positioned along the floor of high bay 4 in the Vehicle Assembly Building at NASA’s Kennedy Space Center, part of the preparations for the test of the Ares IX rocket. These ballast assemblies will be installed in the upper stage 1 and 7 segments and will mimic the mass of the fuel.  Their total weight is approximately 160,000 pounds.  The test launch of the Ares IX in 2009 will be the first designed to determine the flight-worthiness of the Ares I rocket.  Ares I is an in-line, two-stage rocket that will transport the Orion crew exploration vehicle to low-Earth orbit. The Ares I first stage will be a five-segment solid rocket booster based on the four-segment design used for the space shuttle. Ares I’s fifth booster segment allows the launch vehicle to lift more weight and reach a higher altitude before the first stage separates from the upper stage, which ignites in midflight to propel the Orion spacecraft to Earth orbit.  Photo credit: NASA/Kim Shiflett KSC-08pd3248

CAPE CANAVERAL, Fla. - Ares IX upper stage segments’ ballast assemblie...

CAPE CANAVERAL, Fla. - Ares IX upper stage segments’ ballast assemblies are positioned along the floor of high bay 4 in the Vehicle Assembly Building at NASA’s Kennedy Space Center, part of the preparations for... More

Workers in KSC’s Spacecraft Assembly and Encapsulation Facility (SAEF-2) prepare the Tracking and Data Relay Satellite (TDRS-H) above them for electrical testing. The TDRS is scheduled to be launched from CCAFS June 29 aboard an Atlas IIA/Centaur rocket. One of three satellites (labeled H, I and J) being built in the Hughes Space and Communications Company Integrated Satellite Factory in El Segundo, Calif., the latest TDRS uses an innovative springback antenna design. A pair of 15-foot-diameter, flexible mesh antenna reflectors fold up for launch, then spring back into their original cupped circular shape on orbit. The new satellites will augment the TDRS system’s existing Sand Ku-band frequencies by adding Ka-band capability. TDRS will serve as the sole means of continuous, high-data-rate communication with the space shuttle, with the International Space Station upon its completion, and with dozens of unmanned scientific satellites in low earth orbit KSC00pp0713

Workers in KSC’s Spacecraft Assembly and Encapsulation Facility (SAEF-...

Workers in KSC’s Spacecraft Assembly and Encapsulation Facility (SAEF-2) prepare the Tracking and Data Relay Satellite (TDRS-H) above them for electrical testing. The TDRS is scheduled to be launched from CCAFS... More

Project Mercury Retro and Posigrade Package

Project Mercury Retro and Posigrade Package

The Retro and Posigrade Package for the Mercury spacecraft. This was used to de-orbit the spacecraft at the end of mission...Image # : C1960-54344

KENNEDY SPACE CENTER, FLA. -- The flag at right identifies Space Shuttle Discovery on Launch Pad 39A after its rollout and before the Rotating Service Structure is moved around it. Scheduled to launch Oct. 5 at 9:38 p.m. EDT on mission STS-92, Discovery will be making the 100th Space Shuttle mission launched from Kennedy Space Center. Discovery also will be making its 28th flight into space, more than any of the other orbiters to date. STS-92 is a mission to the International Space Station, carrying the Z1 truss, which is the first of 10 trusses on the Station, and the third Pressurized Mating Adapter KSC00pp1415

KENNEDY SPACE CENTER, FLA. -- The flag at right identifies Space Shutt...

KENNEDY SPACE CENTER, FLA. -- The flag at right identifies Space Shuttle Discovery on Launch Pad 39A after its rollout and before the Rotating Service Structure is moved around it. Scheduled to launch Oct. 5 at... More

CAPE CANAVERAL, Fla. -- A Hyster forklift moves NASA's Juno spacecraft into Astrotech's payload processing facility in Titusville, Fla. to begin final testing and preparations for launch.        The solar-powered spacecraft will orbit Jupiter's poles 33 times to find out more about the gas giant's origins, structure, atmosphere and magnetosphere and investigate the existence of a solid planetary core. Juno is scheduled to launch aboard an Atlas V rocket from Cape Canaveral, Fla. Aug. 5. For more information visit, www.nasa.gov/juno. Photo credit: NASA/Jack Pfaller    It will splash down into the Atlantic Ocean where the ship and its crew will recover it and tow it back through Port Canaveral for refurbishing for another launch. The STS-124 mission is the second of three flights launching components to complete the Japan Aerospace Exploration Agency's Kibo laboratory. The shuttle crew will install Kibo's large Japanese Pressurized Module and its remote manipulator system, or RMS. Photo credit: USA/Jeff Suter KSC-2011-2818

CAPE CANAVERAL, Fla. -- A Hyster forklift moves NASA's Juno spacecraft...

CAPE CANAVERAL, Fla. -- A Hyster forklift moves NASA's Juno spacecraft into Astrotech's payload processing facility in Titusville, Fla. to begin final testing and preparations for launch. The solar-power... More

CAPE CANAVERAL, Fla. -- NASA and Sierra Nevada Space Systems (SNSS) of Sparks, Nev., sign a Space Act Agreement that will offer the company technical capabilities from Kennedy Space Center's uniquely skilled work force. Sitting, from left, are Kennedy Public Affairs Director Lisa Malone; NASA Administrator Charlie Bolden; Kennedy Center Director Bob Cabana; and Mark Sirangelo, head of Sierra Nevada. Standing, from left, are Frank DiBello, president of Space Florida; Joyce Riquelme, manager of Kennedy's Center Planning and Development Office; John Curry, director of Sierra Nevada's Systems Integration, Test and Operations; Kennedy Deputy Director Janet Petro; Jim Voss, vice president of Sierra Nevada's Space Exploration Systems; and Merri Sanchez, senior director of Sierra Nevada's Space Exploration Systems. Kennedy will help Sierra Nevada with the ground operations support of its lifting body reusable spacecraft called "Dream Chaser," which resembles a smaller version of the space shuttle orbiter.          The spacecraft would carry as many as seven astronauts to the space station. Through the new agreement, Kennedy's work force will use its experience of processing the shuttle fleet for 30 years to help Sierra Nevada define and execute Dream Chaser's launch preparations and post-landing activities. In 2010 and 2011, Sierra Nevada was awarded grants as part of the initiative to stimulate the private sector in developing and demonstrating human spaceflight capabilities for NASA's Commercial Crew Program. The goal of the program, which is based in Florida at Kennedy, is to facilitate the development of a U.S. commercial crew space transportation capability by achieving safe, reliable and cost-effective access to and from the space station and future low Earth orbit destinations. Photo credit: NASA/Jim Grossmann KSC-2011-5116

CAPE CANAVERAL, Fla. -- NASA and Sierra Nevada Space Systems (SNSS) of...

CAPE CANAVERAL, Fla. -- NASA and Sierra Nevada Space Systems (SNSS) of Sparks, Nev., sign a Space Act Agreement that will offer the company technical capabilities from Kennedy Space Center's uniquely skilled wo... More

CAPE CANAVERAL, Fla. – In the Space Shuttle Main Engine Processing Facility at NASA’s Kennedy Space Center in Florida, a transportation canister is nearly closed around a Pratt Whitney Rocketdyne space shuttle main engine (SSME).    This is the second of the 15 engines used during the Space Shuttle Program to be prepared for transfer to NASA's Stennis Space Center in Mississippi. The engines will be stored at Stennis for future use on NASA's new heavy-lift rocket, the Space Launch System (SLS), which will carry NASA's new Orion spacecraft, cargo, equipment and science experiments to space.  For more information, visit http://www.nasa.gov/shuttle.  Photo credit: NASA/Gianni Woods KSC-2012-1026

CAPE CANAVERAL, Fla. – In the Space Shuttle Main Engine Processing Fac...

CAPE CANAVERAL, Fla. – In the Space Shuttle Main Engine Processing Facility at NASA’s Kennedy Space Center in Florida, a transportation canister is nearly closed around a Pratt Whitney Rocketdyne space shuttle ... More

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians on a Hyster forklift guide replica shuttle main engine 2, or RSME 2, closer for installation on space shuttle Endeavour. The orbiter is surrounded by work platforms allowing access to all areas of the spacecraft.    The work is part of Transition and Retirement of the remaining space shuttles, Endeavour and Atlantis. Endeavour is being prepared for public display at the California Science Center in Los Angeles. Its ferry flight to California is targeted for mid-September. Endeavour was the last space shuttle added to NASA’s orbiter fleet. Over the course of its 19-year career, Endeavour spent 299 days in space during 25 missions. For more information, visit http://www.nasa.gov/shuttle.  Photo credit: NASA/David Lee KSC-2012-3826

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility-2 at NASA’s ...

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians on a Hyster forklift guide replica shuttle main engine 2, or RSME 2, clos... More

CAPE CANAVERAL, Fla. – As seen on Google Maps, Firing Room 4 inside the Launch Control Center at NASA's Kennedy Space Center was one of the four control rooms used by NASA and contractor launch teams to oversee a space shuttle countdown. This firing room was the most advanced of the control rooms used for shuttle missions and was the primary firing room for the shuttle's final series of launches before retirement. It is furnished in a more contemporary style with wood cabinets and other features, although it retains many of the computer systems the shuttle counted on to operate safely. Specialized operators worked at consoles tailored to keep track of the status of shuttle systems while the spacecraft was processed in the Orbiter Processing Facility, being stacked inside the Vehicle Assembly Building and standing at the launch pad before liftoff. The firing rooms, including 3, were also used during NASA's Apollo Program. Google precisely mapped the space center and some of its historical facilities for the company's map page. The work allows Internet users to see inside buildings at Kennedy as they were used during the space shuttle era. Photo credit: Google/Wendy Wang KSC-2013-3235

CAPE CANAVERAL, Fla. – As seen on Google Maps, Firing Room 4 inside th...

CAPE CANAVERAL, Fla. – As seen on Google Maps, Firing Room 4 inside the Launch Control Center at NASA's Kennedy Space Center was one of the four control rooms used by NASA and contractor launch teams to oversee... More

CAPE CANAVERAL, Fla. -- Space shuttle Endeavour is firmly attached to its external fuel tank and solid rocket boosters in a high bay of the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida. Endeavour is targeted to roll out to Kennedy's Launch Pad 39A for its final mission, STS-134, on March 9. Endeavour and the six-member crew will deliver the Express Logistics Carrier-3, Alpha Magnetic Spectrometer-2 (AMS), a high-pressure gas tank, additional spare parts for the Dextre robotic helper and micrometeoroid debris shields to the International Space Station. Endeavour's final launch is targeted for April 19 at 7:48 p.m. EDT. For more information visit, http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts134/index.html. Photo credit: NASA/Kim Shiflett KSC-2011-2041

CAPE CANAVERAL, Fla. -- Space shuttle Endeavour is firmly attached to ...

CAPE CANAVERAL, Fla. -- Space shuttle Endeavour is firmly attached to its external fuel tank and solid rocket boosters in a high bay of the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida. E... More

KENNEDY SPACE CENTER, FLA. --  Workers lower the suspended TDRS-J spacecraft onto a workstand in the Spacecraft Assembly and Encapsulation Facility-2 (SAEF-2) for final checkout and processing before launch, currently targeted for Nov. 20. TDRS-J is the third in the current series of three Tracking and Data Relay Satellites designed to replenish the existing on-orbit fleet of six spacecraft, the first of which was launched in 1983. The Tracking and Data Relay Satellite System is the primary source of space-to-ground voice, data and telemetry for the Space Shuttle. It also provides communications with the International Space Station and scientific spacecraft in low-earth orbit, such as the Hubble Space Telescope, and launch support for some expendable vehicles. This new advanced series of satellites will extend the availability of TDRS communications services until approximately 2017. KSC-02pp1642

KENNEDY SPACE CENTER, FLA. -- Workers lower the suspended TDRS-J spac...

KENNEDY SPACE CENTER, FLA. -- Workers lower the suspended TDRS-J spacecraft onto a workstand in the Spacecraft Assembly and Encapsulation Facility-2 (SAEF-2) for final checkout and processing before launch, cu... More

KENNEDY SPACE CENTER, FLA. -   Sitting on top of the mobile launcher platform, Space Shuttle Atlantis rolls out to Launch Pad 39B via the crawlerway.  First motion out of the Vehicle Assembly Building was 1:05 a.m.  The slow speed of the crawler results in a 6-hour trek to the pad approximately 4 miles away.  Atlantis' launch window begins Aug. 27 for an 11-day mission to the International Space Station. The STS-115 crew of six astronauts will continue construction of the station and install their cargo, the Port 3/4 truss segment with its two large solar arrays.   Photo credit: NASA/Troy Cryder KSC-06pd1706

KENNEDY SPACE CENTER, FLA. - Sitting on top of the mobile launcher p...

KENNEDY SPACE CENTER, FLA. - Sitting on top of the mobile launcher platform, Space Shuttle Atlantis rolls out to Launch Pad 39B via the crawlerway. First motion out of the Vehicle Assembly Building was 1:05 ... More

JSC2010-E-046777 (5 April 2010) --- Astronaut Rick Sturckow, spacecraft communicator (CAPCOM) for the STS-131 mission, is pictured at his console in the space shuttle flight control room in the Johnson Space Center's Mission Control Center during launch countdown activities a few hundred miles away in Florida, site of space shuttle Discovery's STS-131 launch. jsc2010e046777

JSC2010-E-046777 (5 April 2010) --- Astronaut Rick Sturckow, spacecraf...

JSC2010-E-046777 (5 April 2010) --- Astronaut Rick Sturckow, spacecraft communicator (CAPCOM) for the STS-131 mission, is pictured at his console in the space shuttle flight control room in the Johnson Space Ce... More

CAPE CANAVERAL, Fla. -- Space shuttle Discovery is attached to Launch Pad 39A as the sun rises over NASA's Kennedy Space Center in Florida. It took the spacecraft about six hours to make the journey, known as "rollout," from the Vehicle Assembly Building to the pad. Rollout sets the stage for Discovery's STS-133 crew to practice countdown and launch procedures during the Terminal Countdown Demonstration Test in mid-October.      Targeted to liftoff Nov. 1, Discovery will take the Permanent Multipurpose Module (PMM) packed with supplies and critical spare parts, as well as Robonaut 2 (R2) to the International Space Station. Photo credit: NASA/Jack Pfaller KSC-2010-4736

CAPE CANAVERAL, Fla. -- Space shuttle Discovery is attached to Launch ...

CAPE CANAVERAL, Fla. -- Space shuttle Discovery is attached to Launch Pad 39A as the sun rises over NASA's Kennedy Space Center in Florida. It took the spacecraft about six hours to make the journey, known as "... More

CAPE CANAVERAL, Fla. -- The Commercial Crew and Cargo Processing Facility, or C3PF, at NASA's Kennedy Space Center in Florida is going through major renovations to support the manufacturing of The Boeing Company's CST-100 spacecraft. Known throughout the space shuttle era as Orbiter Processing Facilty-3, or OPF-3, the facility's orbiter-specific platforms were removed recently to make room for a clean-floor factory-like facility. The modernization will allow Boeing to process its new fleet of low-Earth-orbit bound spacecraft, which is under development in collaboration with NASA's Commercial Crew Program, or CCP. Boeing is leasing the excess government facility for next-generation commercial activities through a land-use agreement with Space Florida.    To learn more about CCP and its industry partners, visit www.nasa.gov/commercialcrew. Photo credit: Dimitri Gerondidakis KSC-2012-6485

CAPE CANAVERAL, Fla. -- The Commercial Crew and Cargo Processing Facil...

CAPE CANAVERAL, Fla. -- The Commercial Crew and Cargo Processing Facility, or C3PF, at NASA's Kennedy Space Center in Florida is going through major renovations to support the manufacturing of The Boeing Compan... More

CAPE CANAVERAL, Fla. - Crews in Orbiter Processing Facility-2 at NASA's Kennedy Space Center in Florida remove space shuttle Discovery's right-hand inner heat shield from engine No. 1. The removal is part of Discovery's transition and retirement processing. Work performed on Discovery is expected to help rocket designers build next-generation spacecraft and prepare the shuttle for future public display.Photo credit: NASA/Jack Pfaller KSC-2011-2396

CAPE CANAVERAL, Fla. - Crews in Orbiter Processing Facility-2 at NASA'...

CAPE CANAVERAL, Fla. - Crews in Orbiter Processing Facility-2 at NASA's Kennedy Space Center in Florida remove space shuttle Discovery's right-hand inner heat shield from engine No. 1. The removal is part of Di... More

KENNEDY SPACE CENTER, Fla. -- Space Shuttle Discovery begins rolling into the fog that shrouds Kennedy Space Center. Discovery is on its way from the Vehicle Assembly Building to Launch Pad 39B and mission STS-102 to the International Space Station. Its payload is the Multi-Purpose Logistics Module Leonardo, a “moving van,” to carry laboratory racks filled with equipment, experiments and supplies to and from the Space Station aboard the Space Shuttle. The flight will also carry the Expedition Two crew up to the Space Station, replacing Expedition One, who will return to Earth on Discovery.  Launch is scheduled for March 8 at 6:45 a.m. EST KSC01padig067

KENNEDY SPACE CENTER, Fla. -- Space Shuttle Discovery begins rolling i...

KENNEDY SPACE CENTER, Fla. -- Space Shuttle Discovery begins rolling into the fog that shrouds Kennedy Space Center. Discovery is on its way from the Vehicle Assembly Building to Launch Pad 39B and mission STS-... More

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-1 at NASA's Kennedy Space Center in Florida, workers are disconnecting and dismantling components on shuttle Endeavour. Seen here is the view from inside the spacecraft's airlock looking toward the payload bay.          The work is part of Endeavour's transition and retirement processing. The spacecraft is being prepared for public display at the California Science Center in Los Angeles. Endeavour flew 25 missions, spent 299 days in space, orbited Earth 4,671 times and traveled 122,883,151 miles over the course of its 19-year career. Endeavour's STS-134 and final mission was completed after landing on June 1, 2011. Photo credit: NASA/Kim Shiflett KSC-2011-4911

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-1 at NASA's Ken...

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-1 at NASA's Kennedy Space Center in Florida, workers are disconnecting and dismantling components on shuttle Endeavour. Seen here is the view from inside t... More

KENNEDY SPACE CENTER, FLA. -- At Launch Complex 36-A, Cape Canaveral Air Force Station, a Lockheed Martin Atlas Centaur IIA (AC-144) rocket is lifted up the launch tower. The rocket will be used in the launch of TDRS-J, scheduled for  Nov. 20.  The third in a series of telemetry satellites, TDRS-J will help replenish the current constellation of geosynchronous TDRS satellites. The TDRS System is the primary source of space-to-ground voice, data and telemetry for the Space Shuttle. It also provides communications with the International Space Station and scientific spacecraft in low-Earth orbit such as the Hubble Space Telescope. This new advanced series of satellites will extend the availability of TDRS communications services until about 2017. KSC-02pd1525

KENNEDY SPACE CENTER, FLA. -- At Launch Complex 36-A, Cape Canaveral A...

KENNEDY SPACE CENTER, FLA. -- At Launch Complex 36-A, Cape Canaveral Air Force Station, a Lockheed Martin Atlas Centaur IIA (AC-144) rocket is lifted up the launch tower. The rocket will be used in the launch o... More

CAPE CANAVERAL, Fla. –   A second shipping container of major flight hardware for space shuttle Atlantis' STS-125 mission to NASA's Hubble Space Telescope arrives at the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center to begin preparations for its targeted October launch. The container holds the Super Lightweight Interchangeable Carrier, or SLIC, and the Orbital Replacement Unit Carrier, or ORUC. The payload carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the servicing mission.  The three payload carriers or pallets are the Flight Support System, the SLIC and the ORUC.  At the end of July, a fourth and final carrier, the Multi-Use Lightweight Equipment carrier will join the others in the Payload Hazardous Servicing Facility where the Hubble payload is being prepared for launch. Photo credit: NASA/Amanda Diller KSC-08pd2021

CAPE CANAVERAL, Fla. – A second shipping container of major flight h...

CAPE CANAVERAL, Fla. – A second shipping container of major flight hardware for space shuttle Atlantis' STS-125 mission to NASA's Hubble Space Telescope arrives at the Payload Hazardous Servicing Facility at ... More

The logo for the Tracking and Data Relay Satellite (TDRS-H) is predominantly displayed on the fairing that will encapsulate the satellite for launch. The fairing is in KSC’s Spacecraft Assembly and Encapsulation Facility (SAEF-2) where TDRS is undergoing testing. The TDRS is scheduled to be launched from CCAFS June 29 aboard an Atlas IIA/Centaur rocket. One of three satellites (labeled H, I and J) being built in the Hughes Space and Communications Company Integrated Satellite Factory in El Segundo, Calif., the latest TDRS uses an innovative springback antenna design. A pair of 15-foot-diameter, flexible mesh antenna reflectors fold up for launch, then spring back into their original cupped circular shape on orbit. The new satellites will augment the TDRS system’s existing Sand Ku-band frequencies by adding Ka-band capability. TDRS will serve as the sole means of continuous, high-data-rate communication with the space shuttle, with the International Space Station upon its completion, and with dozens of unmanned scientific satellites in low earth orbit KSC-00pp0714

The logo for the Tracking and Data Relay Satellite (TDRS-H) is predomi...

The logo for the Tracking and Data Relay Satellite (TDRS-H) is predominantly displayed on the fairing that will encapsulate the satellite for launch. The fairing is in KSC’s Spacecraft Assembly and Encapsulatio... More

KENNEDY SPACE CENTER, Fla. --  Space Shuttle Endeavour sits on Launch Pad 39A waiting for the Rotating Service Structure to be rolled back into its protective position. The launch of Space Shuttle Endeavour on mission STS-99 was delayed when NASA managers decided to replace the Enhanced Master Events Controller that became suspect during the Jan. 31 launch countdown. The next scheduled launch is NET Feb. 9 KSC-00pp0142

KENNEDY SPACE CENTER, Fla. -- Space Shuttle Endeavour sits on Launch ...

KENNEDY SPACE CENTER, Fla. -- Space Shuttle Endeavour sits on Launch Pad 39A waiting for the Rotating Service Structure to be rolled back into its protective position. The launch of Space Shuttle Endeavour on ... More

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-1 at NASA's Kennedy Space Center in Florida, technicians prepare to move an aft access platform into place behind shuttle Atlantis, following the installation of the spacecraft's three main engines. Shown is the right-hand orbital maneuvering system (OMS) pod and engine taken from the right-hand access arm.            Atlantis is being prepared for the "launch on need," or potential rescue mission, for the final planned shuttle flight, Endeavour's STS-134 mission. For more information, visit www.nasa.gov/shuttle. Photo credit: NASA/Kim Shiflett KSC-2010-5830

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-1 at NASA's Ken...

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-1 at NASA's Kennedy Space Center in Florida, technicians prepare to move an aft access platform into place behind shuttle Atlantis, following the installat... More

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, a United Space Alliance technician monitors the progress as an overhead crane moves one of Endeavour’s main propulsion system tanks away from the mid-body of the orbiter. The tanks will be retained for possible future use on the agency’s Space Launch System Program.      The work is part of Endeavour’s transition and retirement processing. The spacecraft is being prepared for public display at the California Science Center in Los Angeles. Endeavour flew 25 missions, spent 299 days in space, orbited Earth 4,671 times and traveled 122, 883, 151 miles over the course of its 19-year career. For more information, visit http://www.nasa.gov/shuttle. Photo credit: Dimitri Gerondidakis KSC-2012-1883

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-2 at NASA’s Ken...

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, a United Space Alliance technician monitors the progress as an overhead crane moves one of Endeavour’s main pr... More

CAPE CANAVERAL, Fla. - The giant external fuel tank and twin solid rocket boosters attached to space shuttle Endeavour bask in the sunlight as the rotating service structure (RSS) moves away on Launch Pad 39A at NASA's Kennedy Space Center in Florida. The structure provides weather protection and access to the shuttle while it awaits lift off on the pad. RSS "rollback," as it's called, began at 11:44 a.m. EDT on May 15 and was completed at 12:24 p.m.           STS-134 will deliver the Alpha Magnetic Spectrometer-2 (AMS), Express Logistics Carrier-3, a high-pressure gas tank and additional spare parts for the Dextre robotic helper to the International Space Station. May 16 at 8:56 a.m. will be the second launch attempt for Endeavour. The first attempt on April 29 was scrubbed because of an issue associated with a faulty power distribution box called the aft load control assembly-2 (ALCA-2). STS-134 will be the final spaceflight for Endeavour. For more information visit, www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts134/index.html. Photo credit: NASA/Jack Pfaller KSC-2011-3551

CAPE CANAVERAL, Fla. - The giant external fuel tank and twin solid roc...

CAPE CANAVERAL, Fla. - The giant external fuel tank and twin solid rocket boosters attached to space shuttle Endeavour bask in the sunlight as the rotating service structure (RSS) moves away on Launch Pad 39A a... More

CAPE CANAVERAL, Fla. -- In the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, an overhead crane moves the Raffaello multi-purpose logistics module, or MPLM, toward a payload canister.    Commander Chris Ferguson, Pilot Doug Hurley and Mission Specialists Sandra Magnus and Rex Walheim are targeted to lift off on space shuttle Atlantis July 8, taking with them the MPLM packed with supplies, logistics and spare parts to the International Space Station. The STS-135 mission also will fly a system to investigate the potential for robotically refueling existing spacecraft and return a failed ammonia pump module to help NASA better understand the failure mechanism and improve pump designs for future systems. STS-135 will be the 33rd flight of Atlantis, the 37th shuttle mission to the space station, and the 135th and final mission of NASA's Space Shuttle Program. For more information, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Jim Grossmann KSC-2011-4412

CAPE CANAVERAL, Fla. -- In the Space Station Processing Facility at NA...

CAPE CANAVERAL, Fla. -- In the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, an overhead crane moves the Raffaello multi-purpose logistics module, or MPLM, toward a payload canist... More

KENNEDY SPACE CENTER, FLA. --  The blue cones of light, known as shock or mach diamonds, beneath Space Shuttle Discovery's main engines confirm its rapid rise into the night sky after liftoff on mission STS-116. Mach diamonds are a formation of shock waves in the exhaust plume of an aerospace propulsion system. Liftoff occurred on time at 8:47 p.m. EST.  This was the second launch attempt for mission STS-116.  The first launch attempt on Dec. 7 was postponed due a low cloud ceiling over Kennedy Space Center. This is Discovery's 33rd mission and the first night launch since 2003.   The 20th shuttle mission to the International Space Station, STS-116 carries another truss segment, P5. It will serve as a spacer, mated to the P4 truss that was attached in September.  After installing the P5, the crew will reconfigure and redistribute the power generated by two pairs of U.S. solar arrays. Landing is expected Dec. 21 at KSC.   Photo credit: NASA/Tony Gray & Don Kight KSC-06pp2766

KENNEDY SPACE CENTER, FLA. -- The blue cones of light, known as shock...

KENNEDY SPACE CENTER, FLA. -- The blue cones of light, known as shock or mach diamonds, beneath Space Shuttle Discovery's main engines confirm its rapid rise into the night sky after liftoff on mission STS-116... More

KENNEDY SPACE CENTER, Fla. --  The early morning sun falls on Launch Pad 39A and Space Shuttle Discovery, which is waiting for launch on mission STS-92 Oct. 5, 2000. Leading to the pad (from the foreground) is the ramp leading from the crawlerway, the specially built road that provides the Shuttles access to the pads from the Vehicle Assembly Building. At the right of the pad is the 300,000-gallon water tank that is part of the sound suppression system during launches. Beyond is the Atlantic Ocean. At the far left can be seen Launch Pad 39B with its water tank KSC-00pp1298

KENNEDY SPACE CENTER, Fla. -- The early morning sun falls on Launch P...

KENNEDY SPACE CENTER, Fla. -- The early morning sun falls on Launch Pad 39A and Space Shuttle Discovery, which is waiting for launch on mission STS-92 Oct. 5, 2000. Leading to the pad (from the foreground) is ... More

In the Spacecraft Assembly and Encapsulation Facility, the Tracking and Data Relay Satellite (TDRS-H) at right sits while one-half of the fairing (left) is moved closer to it. After encapsulation in the fairing, TDRS will be transported to Launch Pad 36A, Cape Canaveral Air Force Station for launch scheduled June 29 aboard an Atlas IIA/Centaur rocket. One of three satellites (labeled H, I and J) being built in the Hughes Space and Communications Company Integrated Satellite Factory in El Segundo, Calif., the latest TDRS uses an innovative springback antenna design. A pair of 15-foot-diameter, flexible mesh antenna reflectors fold up for launch, then spring back into their original cupped circular shape on orbit. The new satellites will augment the TDRS system’s existing Sand Ku-band frequencies by adding Ka-band capability. TDRS will serve as the sole means of continuous, high-data-rate communication with the space shuttle, with the International Space Station upon its completion, and with dozens of unmanned scientific satellites in low earth orbit KSC00pp0749

In the Spacecraft Assembly and Encapsulation Facility, the Tracking an...

In the Spacecraft Assembly and Encapsulation Facility, the Tracking and Data Relay Satellite (TDRS-H) at right sits while one-half of the fairing (left) is moved closer to it. After encapsulation in the fairing... More

CAPE CANAVERAL, Fla. –  On Launch Pad 39A at NASA's Kennedy Space Center in Florida, the rotating service structure is open, revealing space shuttle Atlantis on the pad for the STS-125 mission, the fifth and final shuttle servicing mission for NASA’s Hubble Space Telescope.  On the RSS, the payload canister is in position at the payload changeout room to receive the Hubble hardware.  The payload comprises four carriers holding various equipment for the mission.  The hardware will be transported back to Kennedy’s Payload Hazardous Servicing Facility where it will be stored until a new target launch date can be set for Atlantis’ STS-125 mission in 2009.  Atlantis’ October target launch date was delayed after a device on board Hubble used in the storage and transmission of science data to Earth shut down on Sept. 27.  Replacing the broken device will be added to Atlantis’ servicing mission to the telescope. Photo credit: NASA/Tim Jacobs KSC-08pd3113

CAPE CANAVERAL, Fla. – On Launch Pad 39A at NASA's Kennedy Space Cent...

CAPE CANAVERAL, Fla. – On Launch Pad 39A at NASA's Kennedy Space Center in Florida, the rotating service structure is open, revealing space shuttle Atlantis on the pad for the STS-125 mission, the fifth and fi... More

CAPE CANAVERAL, Fla. – A C-17 aircraft arrives on the Shuttle Landing Facility parking apron at NASA's Kennedy Space Center in Florida. The aircraft is delivering the MAVEN spacecraft for processing ahead of a launch later this year on a United Launch Alliance Atlas V rocket.      MAVEN, short for Mars Atmosphere and Volatile Evolution, will orbit Mars to study the Red Planet's upper atmosphere in unprecedented detail. Photo credit: NASA/Tim Jacobs KSC-2013-3165

CAPE CANAVERAL, Fla. – A C-17 aircraft arrives on the Shuttle Landing ...

CAPE CANAVERAL, Fla. – A C-17 aircraft arrives on the Shuttle Landing Facility parking apron at NASA's Kennedy Space Center in Florida. The aircraft is delivering the MAVEN spacecraft for processing ahead of a ... More

CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, members of the news media are briefed on the agency's Space Launch System SLS Program Todd May, program manager for Space Launch Systems SLS at NASA's Marshall Space Flight Center in Huntsville, Alabama. The briefing took place in the spaceport's Booster Fabrication Facility BFF. During the Space Shuttle Program, the facility was used for processing forward segments and aft skirts for the solid rocket boosters. The BFF will serve a similar role for the SLS.      Orion is the exploration spacecraft designed to carry astronauts to destinations not yet explored by humans, including an asteroid and Mars. It will have emergency abort capability, sustain the crew during space travel and provide safe re-entry from deep space return velocities. The first unpiloted flight test of Orion is scheduled to launch Dec. 4, 2014 atop a United Launch Alliance Delta IV Heavy rocket, and in 2018 on NASA’s Space Launch System rocket. For more information, visit www.nasa.gov/orion Photo credit: NASA/Kim Shiflett KSC-2014-4616

CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, memb...

CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, members of the news media are briefed on the agency's Space Launch System SLS Program Todd May, program manager for Space Launch Systems SLS at ... More

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-1 at NASA's Kennedy Space Center in Florida, workers are disconnecting and dismantling components on shuttle Endeavour. Seen here is the spacecraft's docking port in the payload bay.    The work is part of Endeavour's transition and retirement processing. The spacecraft is being prepared for public display at the California Science Center in Los Angeles. Endeavour flew 25 missions, spent 299 days in space, orbited Earth 4,671 times and traveled 122,883,151 miles over the course of its 19-year career. Endeavour's STS-134 and final mission was completed after landing on June 1, 2011. Photo credit: NASA/Kim Shiflett KSC-2011-4918

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-1 at NASA's Ken...

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-1 at NASA's Kennedy Space Center in Florida, workers are disconnecting and dismantling components on shuttle Endeavour. Seen here is the spacecraft's docki... More

CAPE CANAVERAL, Fla. -- Sunrise at NASA's Kennedy Space Center in Florida finds space shuttle Atlantis on Launch Pad 39A after the payload canister carrying the Raffaello multi-purpose logistics module (MPLM) was lifted into the payload changeout room on the rotating service structure.            Commander Chris Ferguson, Pilot Doug Hurley and Mission Specialists Sandra Magnus and Rex Walheim are targeted to lift off on space shuttle Atlantis July 8, taking with them the MPLM packed with supplies, logistics and spare parts to the International Space Station. The STS-135 mission also will fly a system to investigate the potential for robotically refueling existing satellites and return a failed ammonia pump module to help NASA better understand the failure mechanism and improve pump designs for future systems. STS-135 will be the 33rd flight of Atlantis, the 37th shuttle mission to the space station, and the 135th and final mission of NASA's Space Shuttle Program. For more information visit, www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Kim Shiflett KSC-2011-4505

CAPE CANAVERAL, Fla. -- Sunrise at NASA's Kennedy Space Center in Flor...

CAPE CANAVERAL, Fla. -- Sunrise at NASA's Kennedy Space Center in Florida finds space shuttle Atlantis on Launch Pad 39A after the payload canister carrying the Raffaello multi-purpose logistics module (MPLM) w... More

CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, space shuttle Atlantis, attached to its external tank and solid rocket boosters atop a mobile launcher platform, arrives at Launch Complex 39A. First motion on the 3.4-mile trip from the Vehicle Assembly Building, known as rollout, was at 6:38 a.m. EDT Oct. 14. The rollout took about six hours, and the shuttle was secure on the pad at 1:31 p.m.    Liftoff of Atlantis on its STS-129 mission to the International Space Station is targeted for Nov. 12. For information on the STS-129 mission and crew, visit http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts129/index.html. Photo credit: NASA/Kim Shiflett KSC-2009-5438

CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, spac...

CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, space shuttle Atlantis, attached to its external tank and solid rocket boosters atop a mobile launcher platform, arrives at Launch Complex 39A. ... More

CAPE CANAVERAL, Fla. -  A waning full moon bears witness to space shuttle Endeavour’s rollout from the Vehicle Assembly Building at NASA’s Kennedy Space Center, traveling at less than 1 mph atop a massive crawler-transporter. Endeavour completed the 4.2-mile journey to Launch Pad 39B on Sept. 19 at 6:59 a.m. EDT. For the first time since July 2001, two shuttles are on the launch pads at the same time at the center. Endeavour will stand by at pad B in the unlikely event that a rescue mission is necessary during space shuttle Atlantis' upcoming mission to repair NASA's Hubble Space Telescope, targeted to launch Oct. 10. After Endeavour is cleared from its duty as a rescue spacecraft, it will be moved to Launch Pad 39A for the STS-126 mission to the International Space Station. That flight is targeted for launch Nov. 12. Photo credit: NASA/Dimitri Gerondidakis KSC-08pd2659

CAPE CANAVERAL, Fla. - A waning full moon bears witness to space shut...

CAPE CANAVERAL, Fla. - A waning full moon bears witness to space shuttle Endeavour’s rollout from the Vehicle Assembly Building at NASA’s Kennedy Space Center, traveling at less than 1 mph atop a massive crawl... More

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility Bay 2 at NASA’s Kennedy Space Center in Florida, replica shuttle main engines 3 RSME has been installed on the space shuttle Endeavour. The orbiter is surrounded by work platforms allowing access to all areas of the spacecraft.      The work is part of Transition and Retirement of the remaining space shuttles, Endeavour and Atlantis. Endeavour is being prepared for public display at the California Science Center in Los Angeles. Its ferry flight to California is targeted for mid-September. Endeavour was the last space shuttle added to NASA’s orbiter fleet. Over the course of its 19-year career, Endeavour spent 299 days in space during 25 missions. For more information, visit http://www.nasa.gov/transition Photo credit: NASA/ Dimitri Gerondidakis KSC-2012-3784

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility Bay 2 at NASA’s ...

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility Bay 2 at NASA’s Kennedy Space Center in Florida, replica shuttle main engines 3 RSME has been installed on the space shuttle Endeavour. The orbiter is surro... More

KENNEDY SPACE CENTER, FLA. --  Workers make adjustments on the first part of the fairing around the TDRS-J satellite before encapsulation continues. The satellite is scheduled to be launched aboard a Lockheed Martin Atlas IIA-Centaur rocket from Launch Complex 36-A, Cape Canaveral Air Force Station, Fla., on Dec. 4.  The third in a series of telemetry satellites, TDRS-J will help replenish the current constellation of geosynchronous TDRS satellites. The TDRS System is the primary source of space-to-ground voice, data and telemetry for the Space Shuttle. It also provides communications with the International Space Station and scientific spacecraft in low-Earth orbit such as the Hubble Space Telescope. This new advanced series of satellites will extend the availability of TDRS communications services until about 2017. KSC-02pd1776

KENNEDY SPACE CENTER, FLA. -- Workers make adjustments on the first p...

KENNEDY SPACE CENTER, FLA. -- Workers make adjustments on the first part of the fairing around the TDRS-J satellite before encapsulation continues. The satellite is scheduled to be launched aboard a Lockheed M... More

CAPE CANAVERAL, Fla. – Jeremy Schwarz, left, quality assurance technician, and Mike Williams, right, a thermal protection system technician, both with United Space Alliance, prepare the right wing of space shuttle Endeavour for tile bonding. Endeavour is inside Orbiter Processing Facility-2 at NASA's Kennedy Space Center in Florida.    Ongoing transition and retirement activities are preparing the spacecraft for public display at the California Science Center in Los Angeles. Endeavour flew 25 missions during its 19-year career. Photo credit: NASA/Cory Huston KSC-2012-1938

CAPE CANAVERAL, Fla. – Jeremy Schwarz, left, quality assurance technic...

CAPE CANAVERAL, Fla. – Jeremy Schwarz, left, quality assurance technician, and Mike Williams, right, a thermal protection system technician, both with United Space Alliance, prepare the right wing of space shut... More

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-1 at NASA’s Kennedy Space Center in Florida, the main engines have been removed from shuttle Endeavour and work begins to remove the orbital maneuvering system, or OMS, pods from the spacecraft.   The work is part of Endeavour’s transition and retirement processing. The spacecraft is being prepared for public display at the California Science Center in Los Angeles. Endeavour flew 25 missions, spent 299 days in space, orbited Earth 4,671 times and traveled 122, 883, 151 miles over the course of its 19-year career. Endeavour’s STS-134 and final mission was completed after landing on June 1, 2011. Photo credit: Frank Michaux KSC-2011-6007

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-1 at NASA’s Ken...

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-1 at NASA’s Kennedy Space Center in Florida, the main engines have been removed from shuttle Endeavour and work begins to remove the orbital maneuvering sy... More

A locker installed on the middeck of space shuttle Atlantis as the spacecraft is prepared for public display. The work is taking place as Atlantis sits inside Orbiter Processing Facility-1 at NASA's Kennedy Space Center in Florida. Photo credit: NASA/Dmitri Gerondidakis KSC-2012-3186

A locker installed on the middeck of space shuttle Atlantis as the spa...

A locker installed on the middeck of space shuttle Atlantis as the spacecraft is prepared for public display. The work is taking place as Atlantis sits inside Orbiter Processing Facility-1 at NASA's Kennedy Spa... More

KENNEDY SPACE CENTER, FLA. -- Sitting atop the Mobile Launcher Platform, Space Shuttle Atlantis inches its way to the launch pad.  The Shuttle and MLP rest on top of the crawler-transporter beneath it, which moves about 1 mile per hour. Atlantis is scheduled for launch April 4 on mission STS-110, which will install the S0 truss, the framework that eventually will hold the power and cooling systems needed for future international research laboratories on the International Space Station.  The  Canadarm2 robotic arm will be used exclusively to hoist the 13-ton truss from the payload bay to the Station.  The S0 truss will be the first major U.S. component launched to the Station since the addition of the Quest airlock in July 2001.  The four spacewalks planned for the construction will all originate from the airlock.  The mission will be Atlantis' 25th trip to space KSC-02pd0275

KENNEDY SPACE CENTER, FLA. -- Sitting atop the Mobile Launcher Platfor...

KENNEDY SPACE CENTER, FLA. -- Sitting atop the Mobile Launcher Platform, Space Shuttle Atlantis inches its way to the launch pad. The Shuttle and MLP rest on top of the crawler-transporter beneath it, which mo... More

CAPE CANAVERAL, Fla. – At NASA’s Kennedy Space Center in Florida, a full-size mock-up of the Orion spacecraft and launch abort system were transported to the Kennedy Space Center Visitor Complex. In the background are full-size replicas of the external fuel tank and solid rocket boosters that mark the entranceway to the new Space Shuttle Atlantis exhibit. Crane operators and technicians practice de-stacking operations on mock-ups of Orion and the launch abort system in the Vehicle Assembly Building in order to keep processing procedures and skills current.    Orion is the exploration spacecraft designed to carry crews to space beyond low Earth orbit. It will provide emergency abort capability, sustain the crew during the space travel and provide safe re-entry from deep space return velocities. Orion’s first unpiloted test flight is scheduled to launch in 2014 atop a Delta IV rocket. A second uncrewed flight test is scheduled for 2017 on NASA’s Space Launch System rocket. For more information, visit http://www.nasa.gov/orion. Photo credit: NASA/Jim Grossmann KSC-2013-2903

CAPE CANAVERAL, Fla. – At NASA’s Kennedy Space Center in Florida, a fu...

CAPE CANAVERAL, Fla. – At NASA’s Kennedy Space Center in Florida, a full-size mock-up of the Orion spacecraft and launch abort system were transported to the Kennedy Space Center Visitor Complex. In the backgro... More

CAPE CANAVERAL, Fla. – At NASA’s Kennedy Space Center in Florida, space shuttle Endeavour is being towed from the Vehicle Assembly Building to Orbiter Processing Facility-2 (OPF-2).    Shuttle Endeavour will remain in OPF-2 so that the orbiter maneuvering system (OMS) pods and forward reaction control system can be installed. Technicians also will offload water and Freon gas from lines located in Endeavour’s midbody. The work is part of Endeavour’s transition and retirement processing. The spacecraft is being prepared for public display at the California Science Center in Los Angeles. Endeavour flew 25 missions, spent 299 days in space, orbited Earth 4,671 times and traveled 122, 883, 151 miles over the course of its 19-year career. Endeavour’s STS-134 and final mission was completed after landing on June 1, 2011. Photo credit: Kim Shiflett KSC-2012-1197

CAPE CANAVERAL, Fla. – At NASA’s Kennedy Space Center in Florida, spac...

CAPE CANAVERAL, Fla. – At NASA’s Kennedy Space Center in Florida, space shuttle Endeavour is being towed from the Vehicle Assembly Building to Orbiter Processing Facility-2 (OPF-2). Shuttle Endeavour will re... More

KENNEDY SPACE CENTER, FLA. -- Workers in the Spacecraft Assembly and Encapsulation Facility-2 (SAEF-2) make final adjustments on the nose fairing surrounding the Tracking and Data Relay Satellite-I (TDRS-I). The second in a new series of telemetry satellites, TDRS-I replenishes the existing on-orbit fleet of six spacecraft. The TDRS System is the primary source of space-to-ground voice, data and telemetry for the Space Shuttle. It also provides communications with the International Space Station and scientific spacecraft in low-Earth orbit such as the Hubble Space Telescope. This new advanced series of satellites will extend the availability of TDRS communications services until about 2017. Launch of TDRS-I is scheduled for March 8 aboard a Lockheed Martin Atlas IIA rocket from Pad 36-A, Cape Canaveral Air Force Station KSC-02pd0174

KENNEDY SPACE CENTER, FLA. -- Workers in the Spacecraft Assembly and E...

KENNEDY SPACE CENTER, FLA. -- Workers in the Spacecraft Assembly and Encapsulation Facility-2 (SAEF-2) make final adjustments on the nose fairing surrounding the Tracking and Data Relay Satellite-I (TDRS-I). Th... More

KENNEDY SPACE CENTER, FLA. -  A crane is lifted from the SLF to attach to the container with the TDRS-J spacecraft inside (at left). The container will be placed on a transporter and taken to the Spacecraft Assembly and Encapsulation Facility-2 (SAEF-2). TDRS-J is the third in the current series of three Tracking and Data Relay Satellites designed to replenish the existing on-orbit fleet of six spacecraft, the first of which was launched in 1983. The Tracking and Data Relay Satellite System is the primary source of space-to-ground voice, data and telemetry for the Space Shuttle. It also provides communications with the International Space Station and scientific spacecraft in low-earth orbit such as the Hubble Space Telescope, and launch support for some expendable vehicles. This new advanced series of satellites will extend the availability of TDRS communications services until approximately 2017. KSC-02pd1574

KENNEDY SPACE CENTER, FLA. - A crane is lifted from the SLF to attach...

KENNEDY SPACE CENTER, FLA. - A crane is lifted from the SLF to attach to the container with the TDRS-J spacecraft inside (at left). The container will be placed on a transporter and taken to the Spacecraft Ass... More

CAPE CANAVERAL, Fla. -- Viewed from the Launch Pad 39A flame trench, crawler-transporter No. 2 moves under a space shuttle era mobile launcher platform at NASA's Kennedy Space Center in Florida. The activity was part of testing to check out recently completed modifications to ensure its ability to carry launch vehicles such as the space agency's Space Launch System heavy-lift rocket to the pad.      NASA's Ground Systems Development and Operations Program is leading the 20-year life-extension project for the crawler. A pair of behemoth machines called crawler-transporters has carried the load of taking rockets and spacecraft to the launch pad for more than 40 years at NASA’s Kennedy Space Center in Florida. Each weighing six and a half million pounds and larger in size than a professional baseball infield, the crawler-transporters are powered by locomotive and large electrical power generator engines. The crawler-transporters will stand ready to keep up the work for the next generation of launch vehicles to lift astronauts into space. For more information, visit http://www.nasa.gov/exploration/systems/ground/index.html Photo credit: NASA/ Jim Grossmann KSC-2012-6273

CAPE CANAVERAL, Fla. -- Viewed from the Launch Pad 39A flame trench, c...

CAPE CANAVERAL, Fla. -- Viewed from the Launch Pad 39A flame trench, crawler-transporter No. 2 moves under a space shuttle era mobile launcher platform at NASA's Kennedy Space Center in Florida. The activity wa... More

CAPE CANAVERAL, Fla. -- The first of four new emergency egress vehicles, called Mine-Resistant Ambush-Protection, or MRAP, vehicles arrived at Kennedy Space Center in Florida from the U.S. Army Red River Depot in Texarkana, Texas. Each vehicle will be processed in and then transported to the Rotation, Processing and Surge Facility near the Vehicle Assembly Building for temporary storage.    The Ground Systems Development and Operations Program at Kennedy led the efforts to an emergency egress vehicle that future astronauts could quickly use to leave the Launch Complex 39 area in case of an emergency. During crewed launches of NASA’s Space Launch System and Orion spacecraft, the MRAP will be stationed by the slidewire termination area at the pad. In case of an emergency, the crew will ride a slidewire to the ground and immediately board the MRAP for safe egress from the pad. The new vehicles replace the M-113 vehicles that were used during the Space Shuttle Program. Photo credit: NASA/Jim Grossmann KSC-2013-4300

CAPE CANAVERAL, Fla. -- The first of four new emergency egress vehicle...

CAPE CANAVERAL, Fla. -- The first of four new emergency egress vehicles, called Mine-Resistant Ambush-Protection, or MRAP, vehicles arrived at Kennedy Space Center in Florida from the U.S. Army Red River Depot ... More

CAPE CANAVERAL, Fla. – As seen on Google Maps, Firing Room 3 inside the Launch Control Center at NASA's Kennedy Space Center was one of the four control rooms used by NASA and contractor launch teams to oversee a space shuttle countdown. This firing room is furnished in the classic style with the same metal computer cabinets and some of the same monitors in place when the first shuttle mission launched April 12, 1981. Specialized operators worked at consoles tailored to keep track of the status of shuttle systems while the spacecraft was processed in the Orbiter Processing Facility, being stacked inside the Vehicle Assembly Building and standing at the launch pad before liftoff. The firing rooms, including 3, were also used during NASA's Apollo Program. Google precisely mapped the space center and some of its historical facilities for the company's map page. The work allows Internet users to see inside buildings at Kennedy as they were used during the space shuttle era. Photo credit: Google/Wendy Wang KSC-2013-3234

CAPE CANAVERAL, Fla. – As seen on Google Maps, Firing Room 3 inside th...

CAPE CANAVERAL, Fla. – As seen on Google Maps, Firing Room 3 inside the Launch Control Center at NASA's Kennedy Space Center was one of the four control rooms used by NASA and contractor launch teams to oversee... More

CAPE CANAVERAL, Fla. -- Workers monitor space shuttle Discovery as it arrives at Launch Pad 39A from the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida. It took the shuttle, attached to its external fuel tank, twin solid rocket boosters and mobile launcher platform, about seven hours to complete the move atop a crawler-transporter. This is the second time Discovery has rolled out to the pad for the STS-133 mission, and comes after a thorough check and modifications to the shuttle's external tank.             Targeted to liftoff Feb. 24, Discovery will take the Permanent Multipurpose Module (PMM) packed with supplies and critical spare parts, as well as Robonaut 2 (R2) to the International Space Station. For more information on STS-133, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts133/. Photo credit: NASA/Kim Shiflett KSC-2011-1282

CAPE CANAVERAL, Fla. -- Workers monitor space shuttle Discovery as it ...

CAPE CANAVERAL, Fla. -- Workers monitor space shuttle Discovery as it arrives at Launch Pad 39A from the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida. It took the shuttle, attached to its... More

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians have removed the auxiliary power units from space shuttle Endeavour and are inspecting them and preparing them for transport.      The work is part of Endeavour’s transition and retirement processing. The spacecraft is being prepared for public display at the California Science Center in Los Angeles. Endeavour flew 25 missions, spent 299 days in space, orbited Earth 4,671 times and traveled 122, 883, 151 miles over the course of its 19-year career. For more information, visit http://www.nasa.gov/shuttle. Photo credit: NASA/Dimitri Gerondidakis KSC-2012-1894

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-2 at NASA’s Ken...

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians have removed the auxiliary power units from space shuttle Endeavour and are ... More

The Mars Odyssey spacecraft is removed from the Air Force C-17 cargo airplane that brought it from Denver, Colo.., location of the Lockheed Martin plant where the spacecraft was built. Mars Odyssey will be moved on a transport trailer from KSC’s Shuttle Landing Facility to the Spacecraft Assembly and Encapsulation Facility 2 (SAEF-2) located in the KSC Industrial Area. In the SAEF it will undergo final assembly and checkout. This includes installation of two of the three science instruments, integration of the three-panel solar array, and a spacecraft functional test. It will be fueled and then mated to an upper stage booster, the final activities before going to the launch pad. Launch is planned for April 7, 2001 the first day of a 21-day planetary window. Mars Odyssey will be inserted into an interplanetary trajectory by a Boeing Delta II launch vehicle from Pad A at Complex 17 at the Cape Canaveral Air Force Station, Fla. The spacecraft will arrive at Mars on Oct. 20, 2001, for insertion into an initial elliptical capture orbit. Its final operational altitude will be a 250-mile-high, Sun-synchronous polar orbit. Mars Odyssey will spend two years mapping the planet's surface and measuring its environment KSC01pp0033

The Mars Odyssey spacecraft is removed from the Air Force C-17 cargo a...

The Mars Odyssey spacecraft is removed from the Air Force C-17 cargo airplane that brought it from Denver, Colo.., location of the Lockheed Martin plant where the spacecraft was built. Mars Odyssey will be move... More

CAPE CANAVERAL, Fla. -- This is a version of space shuttle Atlantis' orbiter tribute, or OV-104, which hangs in Firing Room 4 of the Launch Control Center at NASA's Kennedy Space Center in Florida. In the lower-left corner, it features Atlantis soaring above Earth and threaded through the design are the mission patches for each of Atlantis’ flights. Atlantis' accomplishments include seven missions to the Russian space station Mir and several assembly, construction and resupply missions to the International Space Station. Atlantis also flew the last Hubble Space Telescope servicing mission on STS-125. In the tribute, the planet Venus represents the Magellan probe being deployed during STS-30, and Jupiter represents the Galileo probe being deployed during STS-34. The inset photos illustrate various aspects of shuttle processing as well as significant achievements, such as the glass cockpit and the first shuttle docking with Mir during STS-71. The inset photo in the upper-left corner shows a rainbow over Atlantis on Launch Pad 39A and shuttle Endeavour on Launch Pad 39B at Kennedy. Endeavour was the assigned vehicle had Atlantis’ STS-125 mission needed rescue, and this was the last time both launch pads were occupied at the same time. The stars in the background represent the many people who have worked with Atlantis and their contributions to the vehicle’s success. Graphic design credit: NASA/Amy Lombardo. NASA publication number: SP-2010-08-161-KSC KSC-2010-4450A

CAPE CANAVERAL, Fla. -- This is a version of space shuttle Atlantis' o...

CAPE CANAVERAL, Fla. -- This is a version of space shuttle Atlantis' orbiter tribute, or OV-104, which hangs in Firing Room 4 of the Launch Control Center at NASA's Kennedy Space Center in Florida. In the lower... More

CAPE CANAVERAL, Fla. -- Technicians in the Astrotech payload processing facility in Titusville, Fla. install thermal insulation on NASA's Juno magnetometer boom. The boom structure is attached to Juno's solar array #1 that will help power the NASA spacecraft on its mission to Jupiter.      The solar-powered spacecraft will orbit Jupiter's poles 33 times to find out more about the gas giant's origins, structure, atmosphere and magnetosphere and investigate the existence of a solid planetary core. Juno is scheduled to launch aboard an Atlas V rocket from Cape Canaveral, Fla. Aug. 5. For more information visit, www.nasa.gov/juno. Photo credit: NASA/Jack Pfaller    It will splash down into the Atlantic Ocean where the ship and its crew will recover it and tow it back through Port Canaveral for refurbishing for another launch. The STS-124 mission is the second of three flights launching components to complete the Japan Aerospace Exploration Agency's Kibo laboratory. The shuttle crew will install Kibo's large Japanese Pressurized Module and its remote manipulator system, or RMS. Photo credit: USA/Jeff Suter KSC-2011-2821

CAPE CANAVERAL, Fla. -- Technicians in the Astrotech payload processin...

CAPE CANAVERAL, Fla. -- Technicians in the Astrotech payload processing facility in Titusville, Fla. install thermal insulation on NASA's Juno magnetometer boom. The boom structure is attached to Juno's solar a... More

KENNEDY SPACE CENTER, FLA. -- Workers monitor the progress of Space Shuttle Atlantis as it moves through the doors of the Vehicle Assembly Building along the crawlerway toward Launch Pad 39A. First motion out of the VAB was at 4:43 a.m. EST.  Rollout is a milestone for Atlantis' launch to the International Space Station on mission STS-122, targeted for Dec. 6. On this mission, Atlantis will deliver the Columbus module to the International Space Station. The European Space Agency's largest contribution to the station, Columbus is a multifunctional, pressurized laboratory that will be permanently attached to U.S. Node 2, called Harmony. The module is approximately 23 feet long and 15 feet wide, allowing it to hold 10 large racks of experiments. The laboratory will expand the research facilities aboard the station, providing crew members and scientists from around the world the ability to conduct a variety of experiments in the physical, materials and life sciences.   Photo credit: NASA/Kim Shiflett KSC-07pd3259

KENNEDY SPACE CENTER, FLA. -- Workers monitor the progress of Space Sh...

KENNEDY SPACE CENTER, FLA. -- Workers monitor the progress of Space Shuttle Atlantis as it moves through the doors of the Vehicle Assembly Building along the crawlerway toward Launch Pad 39A. First motion out o... More

CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, space shuttle Endeavour passes the fork in the crawlerway between Launch Pad 39B, at right, and Launch Pad 39A.  First motion of the 3.4-mile rollaround was at 3:16 a.m. EDT.  Endeavour was on standby on Pad 39B to be used in the unlikely event that a rescue mission was necessary during space shuttle Atlantis' STS-125 mission to NASA's Hubble Space Telescope. The payload on the STS-127 mission includes the Japan Aerospace Exploration Agency's Kibo Exposed Facility and the Experiment Logistics Module Exposed Section of the International Space Station. They will be installed on the Kibo laboratory already on the station. Launch of STS-127 is targeted for June 13. Photo credit: NASA/Kim Shiflett KSC-2009-3330

CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, spac...

CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, space shuttle Endeavour passes the fork in the crawlerway between Launch Pad 39B, at right, and Launch Pad 39A. First motion of the 3.4-mile ro... More

KENNEDY SPACE CENTER, FLA. -- Space Shuttle Atlantis, secured atop a mobile launch platform, ascends the five percent grade to the top of the hardstand on Launch Pad 39A. The rotating service structure, adjoined to the fixed service structure at left, has been rolled back in preparation for the shuttle's arrival. First motion out of the Vehicle Assembly Building was at 4:43 a.m. EST, and the shuttle was hard down on the pad at 11:51 a.m.  Rollout is a milestone for Atlantis' launch to the International Space Station on mission STS-122, targeted for Dec. 6. On this mission, Atlantis will deliver the Columbus module to the International Space Station. The European Space Agency's largest contribution to the station, Columbus is a multifunctional, pressurized laboratory that will be permanently attached to U.S. Node 2, called Harmony. The module is approximately 23 feet long and 15 feet wide, allowing it to hold 10 large racks of experiments. The laboratory will expand the research facilities aboard the station, providing crew members and scientists from around the world the ability to conduct a variety of experiments in the physical, materials and life sciences.   Photo credit: NASA/Kim Shiflett KSC-07pd3269

KENNEDY SPACE CENTER, FLA. -- Space Shuttle Atlantis, secured atop a m...

KENNEDY SPACE CENTER, FLA. -- Space Shuttle Atlantis, secured atop a mobile launch platform, ascends the five percent grade to the top of the hardstand on Launch Pad 39A. The rotating service structure, adjoine... More

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-1 at NASA's Kennedy Space Center in Florida, technicians remove engine No. 1, one of three space shuttle main engines from shuttle Endeavour using a specially designed engine installer, called a Hyster forklift.          The work is part of Endeavour's transition and retirement processing. The spacecraft is being prepared for public display at the California Science Center in Los Angeles. Endeavour flew 25 missions, spent 299 days in space, orbited Earth 4,671 times and traveled 122,883,151 miles over the course of its 19-year career. Endeavour's STS-134 and final mission was completed after landing on June 1, 2011. Photo credit: NASA/Chris Chamberland KSC-2011-4695

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-1 at NASA's Ken...

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-1 at NASA's Kennedy Space Center in Florida, technicians remove engine No. 1, one of three space shuttle main engines from shuttle Endeavour using a specia... More

CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, this aerial view of the mobile launcher park site area north of the 525-foot-tall Vehicle Assembly Building shows a new mobile launcher, or ML, for the Constellation Program under construction.  In the background are the Atlantic Ocean and Launch Complex 41 on Cape Canaveral Air Force Station, at upper left, from which Atlas V rockets are launched.    When completed, the tower will be approximately 345 feet tall and have multiple platforms for personnel access. Its base is being made lighter than space shuttle mobile launcher platforms so the crawler-transporter can pick up the heavier load of the tower and a taller rocket.  For information on the Constellation Program, visit http://www.nasa.gov/constellation. Photo credit: NASA/Cory Huston KSC-2009-6975

CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, this...

CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, this aerial view of the mobile launcher park site area north of the 525-foot-tall Vehicle Assembly Building shows a new mobile launcher, or ML, ... More

CAPE CANAVERAL, Fla. – A forklift operator offloads NASA's Radiation Belt Storm Probe B, enclosed in a protective shipping container, from a flatbed truck at the Astrotech payload processing facility near NASA’s Kennedy Space Center in Florida where Applied Physics Laboratory technicians will begin spacecraft testing and prelaunch preparations.  The twin RBSP spacecraft arrived at Kennedy’s Shuttle Landing Facility in the cargo bay of a U.S. Air Force C-17 aircraft earlier in the day.          The RBSP mission will help us understand the sun’s influence on Earth and near-Earth space by studying the Earth’s radiation belts on various scales of space and time. The RBSP instruments will provide the measurements needed to characterize and quantify the plasma processes that produce very energetic ions and relativistic electrons. The mission is part of NASA’s broader Living With a Star Program that was conceived to explore fundamental processes that operate throughout the solar system, and in particular those that generate hazardous space weather effects in the vicinity of Earth and phenomena that could impact solar system exploration. RBSP is scheduled to begin its mission of exploration of Earth's Van Allen Radiation Belts and the extremes of space weather after launch. Launch aboard a United Launch Alliance Atlas V rocket is scheduled for August 23.  For more information, visit http://www.nasa.gov/rbsp.  Photo credit: NASA/Kim Shiflett KSC-2012-2638

CAPE CANAVERAL, Fla. – A forklift operator offloads NASA's Radiation B...

CAPE CANAVERAL, Fla. – A forklift operator offloads NASA's Radiation Belt Storm Probe B, enclosed in a protective shipping container, from a flatbed truck at the Astrotech payload processing facility near NASA’... More

KENNEDY SPACE CENTER, Fla. --  In the glow of a setting sun, Space Shuttle Endeavour is revealed after the rollback of the Rotating Service Structure (left) on Launch Pad 39A. At the top of the external tank can be seen the “beanie cap,” a venting apparatus at the end of the Gaseous Oxygen Vent Arm. Endeavour is expected to lift off on mission STS-100 on April 19, carrying the Multi-Purpose Logistics Module Raffaello and the Canadian robotic arm, SSRMS, with a crew of seven to the International Space Station KSC-01pp0909

KENNEDY SPACE CENTER, Fla. -- In the glow of a setting sun, Space Shu...

KENNEDY SPACE CENTER, Fla. -- In the glow of a setting sun, Space Shuttle Endeavour is revealed after the rollback of the Rotating Service Structure (left) on Launch Pad 39A. At the top of the external tank ca... More

KENNEDY SPACE CENTER, FLA. --  Space Shuttle Discovery rolls toward Launch Pad 39B.  Launch Pad 39A is in the background.  The shuttle rests on a mobile launcher platform that sits atop a crawler-transporter.  First motion from NASA's Vehicle Assembly Building was at 12:45 p.m. EDT.  The rollout is an important step before launch of Discovery on mission STS-121 to the International Space Station. Discovery's launch is targeted for July 1 in a launch window that extends to July 19. During the 12-day mission, Discovery's crew will test new hardware and techniques to improve shuttle safety, as well as deliver supplies and make repairs to the station.  Photo credit: NASA/George Shelton KSC-06pd0883

KENNEDY SPACE CENTER, FLA. -- Space Shuttle Discovery rolls toward La...

KENNEDY SPACE CENTER, FLA. -- Space Shuttle Discovery rolls toward Launch Pad 39B. Launch Pad 39A is in the background. The shuttle rests on a mobile launcher platform that sits atop a crawler-transporter. ... More

Television Infrared Observation Satellite TIROS

Television Infrared Observation Satellite TIROS

Scientist giving a vibration test to TIROS, Television Infrared Observation Satellite, at the Astro-Electronic Products Division of RCA in Princeton, New Jersey. TIROS was NASA's first experimental step to dete... More

CAPE CANAVERAL, Fla. -- In High Bay 3 of the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida, a large yellow, metal sling lowers shuttle Discovery to its external fuel tank and solid rocket boosters. The lift and mate operation began Sept. 9 and wrapped up early Sept. 10. Discovery is scheduled to roll out to Launch Pad 39A later this month in preparation for its launch to the International Space Station on the STS-133 mission.    Targeted to lift off Nov. 1, Discovery will take the Permanent Multipurpose Module (PMM) packed with supplies and critical spare parts, as well as Robonaut 2 (R2) to the station. Photo credit: NASA/Jack Pfaller KSC-2010-4626

CAPE CANAVERAL, Fla. -- In High Bay 3 of the Vehicle Assembly Building...

CAPE CANAVERAL, Fla. -- In High Bay 3 of the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida, a large yellow, metal sling lowers shuttle Discovery to its external fuel tank and solid rocket ... More

Previous

of 262

Next