KENNEDY SPACE CENTER, FLA. -- Node 1, the first U.S. element for the International Space Station, and the Pressurized Mating Adapter-1 (PMA-1) continue with prelaunch preparation activities at KSC's Space Station Processing Facility. The node and PMA-1 are seen here on a workstand as a Boeing technician removes cables to get the node ready to be moved the next day to another stand for an interim weight and center of gravity determination. (The final determination is planned to be performed prior to transporting Node 1 to the launch pad.) Upon completing the interim determination, the node and PMA will be hoisted into the Shuttle payload transportation canister and the doors will be closed for a two-week leak check. Node 1 is a connecting passageway to the living and working areas of the space station. Node 1 is scheduled to fly on STS-88 KSC-98pc347

Similar

KENNEDY SPACE CENTER, FLA. -- Node 1, the first U.S. element for the International Space Station, and the Pressurized Mating Adapter-1 (PMA-1) continue with prelaunch preparation activities at KSC's Space Station Processing Facility. The node and PMA-1 are seen here on a workstand as a Boeing technician removes cables to get the node ready to be moved the next day to another stand for an interim weight and center of gravity determination. (The final determination is planned to be performed prior to transporting Node 1 to the launch pad.) Upon completing the interim determination, the node and PMA will be hoisted into the Shuttle payload transportation canister and the doors will be closed for a two-week leak check. Node 1 is a connecting passageway to the living and working areas of the space station. Node 1 is scheduled to fly on STS-88 KSC-98pc347

description

Summary

KENNEDY SPACE CENTER, FLA. -- Node 1, the first U.S. element for the International Space Station, and the Pressurized Mating Adapter-1 (PMA-1) continue with prelaunch preparation activities at KSC's Space Station Processing Facility. The node and PMA-1 are seen here on a workstand as a Boeing technician removes cables to get the node ready to be moved the next day to another stand for an interim weight and center of gravity determination. (The final determination is planned to be performed prior to transporting Node 1 to the launch pad.) Upon completing the interim determination, the node and PMA will be hoisted into the Shuttle payload transportation canister and the doors will be closed for a two-week leak check. Node 1 is a connecting passageway to the living and working areas of the space station. Node 1 is scheduled to fly on STS-88

The Space Shuttle program was the United States government's manned launch vehicle program from 1981 to 2011, administered by NASA and officially beginning in 1972. The Space Shuttle system—composed of an orbiter launched with two reusable solid rocket boosters and a disposable external fuel tank— carried up to eight astronauts and up to 50,000 lb (23,000 kg) of payload into low Earth orbit (LEO). When its mission was complete, the orbiter would re-enter the Earth's atmosphere and lands as a glider. Although the concept had been explored since the late 1960s, the program formally commenced in 1972 and was the focus of NASA's manned operations after the final Apollo and Skylab flights in the mid-1970s. It started with the launch of the first shuttle Columbia on April 12, 1981, on STS-1. and finished with its last mission, STS-135 flown by Atlantis, in July 2011.

date_range

Date

09/03/1998
create

Source

NASA
copyright

Copyright info

Public Domain Dedication (CC0)

Explore more

kennedy space center
kennedy space center