Smoothing the ride aboard MCLBB
Summary
Crews work to mill and overlay the parking lot in front of building 204, Public Affairs Office aboard Marine Corps Logistics Base Barstow, Calif., July 19. One to two inches of asphalt are removed, tar is put down then fresh asphalt is placed over the top. Some areas will only have cracks in the surface patched with a rubberized material then a slurry of tar, sand and oil is placed over the top.
Tags
Date
19/07/2017
Source
Defense Visual Information Distribution Service
Copyright info
Public Domain Dedication. Public Use Notice of Limitations: https://www.dvidshub.net/about/copyright