Valerie McCormack and Mark Vaughan install coir fiber
Summary
Valerie McCormack and Mark Vaughan install coir fiber wattle, a circular mesh that runs across the entire embankment, while doing work on the river stabilization project at Moccasin Bend in Chattanooga, Tenn., Feb. 27, 2013. A total of 1,500 feet is being installed to mitigate erosion on the embankment. (USACE Photo by Lee Roberts)
Tags
Date
27/02/2013
Source
Defense Visual Information Distribution Service
Copyright info
Public Domain Dedication. Public Use Notice of Limitations: https://www.dvidshub.net/about/copyright