access, space shuttle

1,258 media by topicpage 1 of 13
CAPE CANAVERAL, Fla. -- A canister, carrying the Alpha Magnetic Spectrometer-2 (AMS) and Express Logistics Carrier-3 for space shuttle Endeavour's STS-134 mission, arrives at Launch Pad 39A at NASA's Kennedy Space Center in Florida. Next, crews at the pad will move the payload into the Payload Ground Handling Mechanism (PGHM), and the rotating service structure (RSS) that protects the shuttle from the elements and provides access to its components will be rotated back into place. The payload is scheduled to be installed into the shuttle's cargo bay March 25.      Endeavour and its six-member STS-134 crew are targeted to lift off April 19 at 7:48 p.m. EDT to deliver the payload to the International Space Station. This is Endeavour's final scheduled mission. For more information visit, www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts134/index.html. Photo credit: NASA/Cory Huston KSC-2011-2386

CAPE CANAVERAL, Fla. -- A canister, carrying the Alpha Magnetic Spectr...

CAPE CANAVERAL, Fla. -- A canister, carrying the Alpha Magnetic Spectrometer-2 (AMS) and Express Logistics Carrier-3 for space shuttle Endeavour's STS-134 mission, arrives at Launch Pad 39A at NASA's Kennedy Sp... More

KENNEDY SPACE CENTER, FLA. -- In Orbiter Processing Facility bay 3, United Space Alliance and B.F. Goodrich technicians work on the starboard landing gear assembly of space shuttle Discovery.  They will replace a leaking dynamic seal in Discovery's right main-gear strut.  The struts act as shock absorbers during the shuttle's landing.  Engineers determined the observed leak of hydraulic fluid in the main landing gear strut exceeded specification and could not be reduced to an acceptable rate. Removing the strut and replacing seals require disconnecting and replacing the brakes and tires, disconnecting and reconnecting instruments and other requirements to allow access to the strut.  Discovery had been scheduled to roll over Sept. 19 from its processing hangar to the Vehicle Assembly Building. A new rollover date will be set after technicians determine how long replacing the seal will take.  Photo credit: NASA/George Shelton KSC-07pd2494

KENNEDY SPACE CENTER, FLA. -- In Orbiter Processing Facility bay 3, Un...

KENNEDY SPACE CENTER, FLA. -- In Orbiter Processing Facility bay 3, United Space Alliance and B.F. Goodrich technicians work on the starboard landing gear assembly of space shuttle Discovery. They will replace... More

KENNEDY SPACE CENTER, FLA. --  Space Shuttle Discovery, on top of the mobile launcher platform and crawler-transporter, reaches Launch Pad 39B for launch of mission STS-116. On the right edge of the photo can be seen the White Room at the end of the orbiter access arm.  On the horizon at left is Launch Pad 39A.  The rollout from the Vehicle Assembly Building began at 12:29 a.m. The mission is No. 20 to the International Space Station and construction flight 12A.1. The mission payload is the SPACEHAB module, the P5 integrated truss structure and other key components. The launch window for mission STS-116 opens Dec. 7. Photo credit: NASA/Amanda Diller KSC-06pd2482

KENNEDY SPACE CENTER, FLA. -- Space Shuttle Discovery, on top of the ...

KENNEDY SPACE CENTER, FLA. -- Space Shuttle Discovery, on top of the mobile launcher platform and crawler-transporter, reaches Launch Pad 39B for launch of mission STS-116. On the right edge of the photo can b... More

CAPE CANAVERAL, Fla. -- NASA and Sierra Nevada Space Systems (SNSS) of Sparks, Nev., sign a Space Act Agreement that will offer the company technical capabilities from Kennedy Space Center's uniquely skilled work force. Sitting, from left, are Kennedy Public Affairs Director Lisa Malone; NASA Administrator Charlie Bolden; Kennedy Center Director Bob Cabana; and Mark Sirangelo, head of Sierra Nevada. Standing, from left, are Frank DiBello, president of Space Florida; Joyce Riquelme, manager of Kennedy's Center Planning and Development Office; John Curry, director of Sierra Nevada's Systems Integration, Test and Operations; Kennedy Deputy Director Janet Petro; Jim Voss, vice president of Sierra Nevada's Space Exploration Systems; and Merri Sanchez, senior director of Sierra Nevada's Space Exploration Systems. Kennedy will help Sierra Nevada with the ground operations support of its lifting body reusable spacecraft called "Dream Chaser," which resembles a smaller version of the space shuttle orbiter.          The spacecraft would carry as many as seven astronauts to the space station. Through the new agreement, Kennedy's work force will use its experience of processing the shuttle fleet for 30 years to help Sierra Nevada define and execute Dream Chaser's launch preparations and post-landing activities. In 2010 and 2011, Sierra Nevada was awarded grants as part of the initiative to stimulate the private sector in developing and demonstrating human spaceflight capabilities for NASA's Commercial Crew Program. The goal of the program, which is based in Florida at Kennedy, is to facilitate the development of a U.S. commercial crew space transportation capability by achieving safe, reliable and cost-effective access to and from the space station and future low Earth orbit destinations. Photo credit: NASA/Jim Grossmann KSC-2011-5116

CAPE CANAVERAL, Fla. -- NASA and Sierra Nevada Space Systems (SNSS) of...

CAPE CANAVERAL, Fla. -- NASA and Sierra Nevada Space Systems (SNSS) of Sparks, Nev., sign a Space Act Agreement that will offer the company technical capabilities from Kennedy Space Center's uniquely skilled wo... More

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians on a Hyster forklift guide replica shuttle main engine 2, or RSME 2, closer for installation on space shuttle Endeavour. The orbiter is surrounded by work platforms allowing access to all areas of the spacecraft.    The work is part of Transition and Retirement of the remaining space shuttles, Endeavour and Atlantis. Endeavour is being prepared for public display at the California Science Center in Los Angeles. Its ferry flight to California is targeted for mid-September. Endeavour was the last space shuttle added to NASA’s orbiter fleet. Over the course of its 19-year career, Endeavour spent 299 days in space during 25 missions. For more information, visit http://www.nasa.gov/shuttle.  Photo credit: NASA/David Lee KSC-2012-3826

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility-2 at NASA’s ...

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians on a Hyster forklift guide replica shuttle main engine 2, or RSME 2, clos... More

CAPE CANAVERAL, Fla. -- The container that carries the Raffaello multi-purpose logistics module (MPLM), secured on its transportation vehicle, begins its journey from the Canister Rotation Facility to Launch Pad 39A at NASA's Kennedy Space Center in Florida. Once there, the canister will be lifted to the payload changeout room. The payload ground-handling mechanism then will be used to transfer Raffaello out of the canister into space shuttle Atlantis' payload bay. Next, the rotating service structure that protects the shuttle from the elements and provides access will be rotated back into place.                Commander Chris Ferguson, Pilot Doug Hurley and Mission Specialists Sandra Magnus and Rex Walheim are targeted to lift off on Atlantis July 8, taking with them the MPLM packed with supplies, logistics and spare parts to the station. The STS-135 mission also will fly a system to investigate the potential for robotically refueling existing satellites and return a failed ammonia pump module to help NASA better understand the failure mechanism and improve pump designs for future systems. STS-135 will be the 33rd flight of Atlantis, the 37th shuttle mission to the space station, and the 135th and final mission of NASA's Space Shuttle Program. For more information visit, www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Frank Michaux KSC-2011-4484

CAPE CANAVERAL, Fla. -- The container that carries the Raffaello multi...

CAPE CANAVERAL, Fla. -- The container that carries the Raffaello multi-purpose logistics module (MPLM), secured on its transportation vehicle, begins its journey from the Canister Rotation Facility to Launch Pa... More

KENNEDY SPACE CENTER, FLA. -- At Launch Pad 39A, a United Space Alliance technician removes foam insulation revealing the fastener holes on the covers over the feed-through connector box on the external tank for space shuttle Atlantis' STS-122 mission.   The covers will be removed for access to the feed-through connectors.  Following the failure of some of the tank's engine cutoff sensors, or ECO sensors, during propellant tanking for launch attempts on Dec. 6 and Dec. 9, a tanking test was conducted on Dec. 18 to aid in troubleshooting the cause. Technicians spliced test wiring into the ECO sensor electrical system and used time domain reflectometry equipment to help locate the electrical anomaly. Results of the tanking test pointed to an open circuit in the feed-through connector wiring, which is located at the base of the tank. The feed-through connector passes the wires from the inside of the tank to the outside.  During the holiday period, workers from Lockheed Martin will begin inspecting and testing the connector.  Shuttle program managers will meet on Dec. 27 to review the test and analysis, and decide on a forward plan.  Photo credit: NASA/Kim Shiflett KSC-07pd3656

KENNEDY SPACE CENTER, FLA. -- At Launch Pad 39A, a United Space Allian...

KENNEDY SPACE CENTER, FLA. -- At Launch Pad 39A, a United Space Alliance technician removes foam insulation revealing the fastener holes on the covers over the feed-through connector box on the external tank fo... More

KENNEDY SPACE CENTER, FLA. -- Robotic arm experts get ready for ultrasound testing on Endeavour's robotic arm.  A scrape of the honeycomb shell around the arm occurred while work platforms were being installed to gain access to repair the oxygen leak in the Shuttle's mid-body.  Launch of Endeavour on mission STS-113 has been postponed until no earlier than Nov. 22. KSC-02pd1737

KENNEDY SPACE CENTER, FLA. -- Robotic arm experts get ready for ultras...

KENNEDY SPACE CENTER, FLA. -- Robotic arm experts get ready for ultrasound testing on Endeavour's robotic arm. A scrape of the honeycomb shell around the arm occurred while work platforms were being installed ... More

CAPE CANAVERAL, Fla. – In the mobile launcher parking area behind the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida, the new mobile launcher, or ML, for the Ares rockets is under  construction.  The ML will be the base to launch the Orion crew exploration vehicle and the cargo vehicle. The base is being made lighter than space shuttle mobile launcher platforms so the crawler-transporter can pick up the added load of the 345-foot tower and taller rocket. When the structural portion of the new mobile launcher is complete, umbilicals, access arms, communications equipment and command/control equipment will be installed. Photo credit: NASA/Kim Shiflett KSC-2009-3140

CAPE CANAVERAL, Fla. – In the mobile launcher parking area behind the ...

CAPE CANAVERAL, Fla. – In the mobile launcher parking area behind the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida, the new mobile launcher, or ML, for the Ares rockets is under construc... More

EDWARDS, Calif. –   Against a setting sun, space shuttle Endeavour undergoes recovery operations on Edwards Air Force Base in California after its landing.  The orbiter convoy normally begins recovery operations in earnest about two hours before the shuttle is scheduled to land. Specially designed vehicles or units and a team of trained personnel “safe” the orbiter and prepare it for towing. Purge and Coolant Umbilical Access Vehicles are moved into position behind the orbiter to get access to the umbilical areas. The flight crew is replaced aboard the orbiter by exchange sup¬port personnel who prepare the orbiter for ground tow operations, install switch guards and remove data packages from any onboard experiments. After a total safety downgrade, vehicle ground personnel make numerous preparations for the towing operation, including install¬ing landing gear lock pins, disconnecting the nose landing gear drag link, positioning the towing vehicle in front of the orbiter and connecting the tow bar. The decision to land Endeavour at Edwards was made due to weather concerns at NASA's Kennedy Space Center in Florida.  In the 52nd landing at Edwards, Endeavour touched down at 4:25 p.m. EST to end the STS-126 mission, completing its 16-day journey of more than 6.6 million miles in space. Endeavour will be returned to Kennedy atop a Shuttle Carrier Aircraft, or SCA, a modified Boeing 747 jetliner.  Photo credit: NASA/Tony Landis, VAFB KSC-08pd3887

EDWARDS, Calif. – Against a setting sun, space shuttle Endeavour und...

EDWARDS, Calif. – Against a setting sun, space shuttle Endeavour undergoes recovery operations on Edwards Air Force Base in California after its landing. The orbiter convoy normally begins recovery operation... More

KENNEDY SPACE CENTER, FLA. -    The morning sky lightens behind Space Shuttle Atlantis while lights on the fixed service structure (FSS) still illuminate the orbiter on Launch Pad 39B. Atlantis was originally scheduled to launch at 12:29 p.m. EDT on this date, but  a 24-hour scrub was called by mission managers due to a concern with Fuel Cell 1.  Seen poised above the orange external tank is the vent hood (known as the "beanie cap") at the end of the gaseous oxygen vent arm. Vapors are created as the liquid oxygen in the external tank boil off. The hood vents the gaseous oxygen vapors away from the space shuttle vehicle. Extending from the FSS to Atlantis is the orbiter access arm with the White Room at the end.  The White Room provides entry into the orbiter through the hatch.  During the STS-115 mission, Atlantis' astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment on the station. The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. This mission is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the International Space Station. STS-115 is scheduled to last 11 days with a planned landing at KSC.   Photo credit: NASA/Troy Cryder KSC-06pd2050

KENNEDY SPACE CENTER, FLA. - The morning sky lightens behind Space ...

KENNEDY SPACE CENTER, FLA. - The morning sky lightens behind Space Shuttle Atlantis while lights on the fixed service structure (FSS) still illuminate the orbiter on Launch Pad 39B. Atlantis was originally s... More

KENNEDY SPACE CENTER, FLA. -   The rotating service structure (left) on Launch Pad 39B is rolled back to reveal Space Shuttle Atlantis.   The RSS provides protected access to the orbiter for changeout and servicing of payloads at the pad and then is rolled away before liftoff.  Atlantis is scheduled to launch Sept. 6 at 12:29 p.m. EDT on mission STS-115.  During the mission, Atlantis' astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment on the station. The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. This mission is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the International Space Station. STS-115 is scheduled to last 11 days with a planned KSC landing at about 8:03 a.m. EDT on Sept. 17.    Photo credit: NASA/George Shelton KSC-06pd2039

KENNEDY SPACE CENTER, FLA. - The rotating service structure (left) o...

KENNEDY SPACE CENTER, FLA. - The rotating service structure (left) on Launch Pad 39B is rolled back to reveal Space Shuttle Atlantis. The RSS provides protected access to the orbiter for changeout and servi... More

CAPE CANAVERAL, Fla. -- On a cloudy and overcast day on Launch Pad 39A at NASA's Kennedy Space Center in Florida, workers monitor the progress of the rotating service structure (RSS) as it rolls away from space shuttle Atlantis. The RSS provides weather protection and access to the shuttle while it awaits liftoff. RSS "rollback" marks a major milestone in Atlantis' STS-135 mission countdown.      Atlantis and its crew of four; Commander Chris Ferguson, Pilot Doug Hurley and Mission Specialists Sandy Magnus and Rex Walheim, are scheduled to lift off at 11:26 a.m. EDT on July 8 to deliver the Raffaello multi-purpose logistics module packed with supplies and spare parts to the International Space Station. Atlantis also will fly the Robotic Refueling Mission experiment that will investigate the potential for robotically refueling existing satellites in orbit. In addition, Atlantis will return with a failed ammonia pump module to help NASA better understand the failure mechanism and improve pump designs for future systems. STS-135 will be the 33rd flight of Atlantis, the 37th shuttle mission to the space station, and the 135th and final mission of NASA's Space Shuttle Program. For more information visit, www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Troy Cryder KSC-2011-5131

CAPE CANAVERAL, Fla. -- On a cloudy and overcast day on Launch Pad 39A...

CAPE CANAVERAL, Fla. -- On a cloudy and overcast day on Launch Pad 39A at NASA's Kennedy Space Center in Florida, workers monitor the progress of the rotating service structure (RSS) as it rolls away from space... More

CAPE CANAVERAL, Fla. - At Launch Pad 39A at NASA's Kennedy Space Center in Florida, the rotating service structure has been retracted from space shuttle Atlantis as the countdown progresses toward launch on Nov. 16 at 2:28 p.m. EST of the STS-129 mission.  The movable structure, which provides weather protection and access for technicians to work on the shuttle, began being retracted at 5:20 p.m. EST and was in the park position by 5:56 p.m.     STS-129 crew members are Commander Charles O. Hobaugh; Pilot Barry E. Wilmore; and Mission Specialists Leland Melvin, Randy Bresnik, Mike Foreman and Robert L. Satcher Jr.  On the STS-129 mission to the International Space Station, the crew will deliver two spare gyroscopes, two nitrogen tank assemblies, two pump modules, an ammonia tank assembly and a spare latching end effector for the station's robotic arm.  Atlantis will return to Earth a station crew member, Nicole Stott, who has spent more than two months aboard the orbiting laboratory.  STS-129 is slated to be the final space shuttle Expedition crew rotation flight. For information on the STS-129 mission and crew, visit http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts129/index.html. Photo credit: NASA/Troy Cryder KSC-2009-6299

CAPE CANAVERAL, Fla. - At Launch Pad 39A at NASA's Kennedy Space Cente...

CAPE CANAVERAL, Fla. - At Launch Pad 39A at NASA's Kennedy Space Center in Florida, the rotating service structure has been retracted from space shuttle Atlantis as the countdown progresses toward launch on Nov... More

CAPE CANAVERAL, Fla. – Outside the massive Vehicle Assembly Building at NASA's Kennedy Space Center in Florida, members of the news media (foreground) wait in the dark for the rollout of the Ares I-X to begin. The rocket will travel the 4.2 miles to Launch Pad 39B atop the crawler-transporter.     The transfer of the pad from the Space Shuttle Program to the Constellation Program took place May 31. Modifications made to the pad include the removal of shuttle unique subsystems, such as the orbiter access arm and a section of the gaseous oxygen vent arm, along with the installation of three 600-foot lightning towers, access platforms, environmental control systems and a vehicle stabilization system.  Part of the Constellation Program, the Ares I-X is the test vehicle for the Ares I. The Ares I-X flight test is targeted for Oct. 27. For information on the Ares I-X vehicle and flight test, visit http://www.nasa.gov/aresIX. Photo credit: NASA/Jack Pfaller KSC-2009-5534

CAPE CANAVERAL, Fla. – Outside the massive Vehicle Assembly Building a...

CAPE CANAVERAL, Fla. – Outside the massive Vehicle Assembly Building at NASA's Kennedy Space Center in Florida, members of the news media (foreground) wait in the dark for the rollout of the Ares I-X to begin. ... More

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-1 at NASA's Kennedy Space Center in Florida, technicians prepare to move an aft access platform into place behind shuttle Atlantis, following the installation of the spacecraft's three main engines. Shown is the right-hand orbital maneuvering system (OMS) pod and engine taken from the right-hand access arm.            Atlantis is being prepared for the "launch on need," or potential rescue mission, for the final planned shuttle flight, Endeavour's STS-134 mission. For more information, visit www.nasa.gov/shuttle. Photo credit: NASA/Kim Shiflett KSC-2010-5830

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-1 at NASA's Ken...

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-1 at NASA's Kennedy Space Center in Florida, technicians prepare to move an aft access platform into place behind shuttle Atlantis, following the installat... More

CAPE CANAVERAL, Fla. - The giant external fuel tank and twin solid rocket boosters attached to space shuttle Endeavour bask in the sunlight as the rotating service structure (RSS) moves away on Launch Pad 39A at NASA's Kennedy Space Center in Florida. The structure provides weather protection and access to the shuttle while it awaits lift off on the pad. RSS "rollback," as it's called, began at 11:44 a.m. EDT on May 15 and was completed at 12:24 p.m.           STS-134 will deliver the Alpha Magnetic Spectrometer-2 (AMS), Express Logistics Carrier-3, a high-pressure gas tank and additional spare parts for the Dextre robotic helper to the International Space Station. May 16 at 8:56 a.m. will be the second launch attempt for Endeavour. The first attempt on April 29 was scrubbed because of an issue associated with a faulty power distribution box called the aft load control assembly-2 (ALCA-2). STS-134 will be the final spaceflight for Endeavour. For more information visit, www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts134/index.html. Photo credit: NASA/Jack Pfaller KSC-2011-3551

CAPE CANAVERAL, Fla. - The giant external fuel tank and twin solid roc...

CAPE CANAVERAL, Fla. - The giant external fuel tank and twin solid rocket boosters attached to space shuttle Endeavour bask in the sunlight as the rotating service structure (RSS) moves away on Launch Pad 39A a... More

KENNEDY SPACE CENTER, FLA. --   On Launch Pad 39A at NASA's Kennedy Space Center, STS-123 Mission Specialist Takao Doi of the Japan Aerospace Exploration Agency is helped with the final flight suit fit check in the White Room before entering space shuttle Endeavour for launch.  In the background is Mission Specialist Robert L. Behnken.  The White Room provides access into the shuttle.  Liftoff was on time at 2:28 a.m. EDT.  The crew will make a record-breaking 16-day mission to the International Space Station and deliver the first section of the Japan Aerospace Exploration Agency's Kibo laboratory and the Canadian Space Agency's two-armed robotic system, Dextre.  Photo credit: NASA/Scott Haun, Richard Prickett KSC-08pd0721

KENNEDY SPACE CENTER, FLA. -- On Launch Pad 39A at NASA's Kennedy Sp...

KENNEDY SPACE CENTER, FLA. -- On Launch Pad 39A at NASA's Kennedy Space Center, STS-123 Mission Specialist Takao Doi of the Japan Aerospace Exploration Agency is helped with the final flight suit fit check in... More

KENNEDY SPACE CENTER, Fla. -- After rollback of the Rotating Service Structure on Launch Pad 39B, Space Shuttle Endeavour is bathed in light.  Twin solid rocket boosters flank the orange external tank behind Endeavour.  Above the external tank is the Gaseous Oxygen Vent Arm that vents gaseous oxygen vapors away from the Shuttle.  The vent hood assembly at the end is often referred to as the "beanie cap."  Stretching to the crew hatch on the side of Endeavour is the Orbiter Access Arm with its environmentally controlled White Room at the end, through which the crew enters the vehicle.  The Shuttle sits on the Mobile Launcher Platform with the two service tail masts on either side of the main engines.  The tail masts support the fluid, gas and electrical requirements of the orbiter's liquid oxygen and liquid hydrogen aft T-0 umbilicals.  Each tail mast is 31 feet (9.4 meters) high, 15 feet (4.6 meters) long and 9 feet (3.1 meters) wide.   Endeavour is scheduled to launch on mission STS-108 Dec. 4 at 5:45  p.m. EST.  On this 12th flight to the International Space Station, known as a Utilization Flight, Endeavour will carry a crew of four plus the Expedition 4 crew, who will replace Expedition 3 aboard the ISS.  The payload includes the Multi-Purpose Logistics Module Raffaello, filled with supplies, equipment and experiments KSC01PD1763

KENNEDY SPACE CENTER, Fla. -- After rollback of the Rotating Service S...

KENNEDY SPACE CENTER, Fla. -- After rollback of the Rotating Service Structure on Launch Pad 39B, Space Shuttle Endeavour is bathed in light. Twin solid rocket boosters flank the orange external tank behind En... More

KENNEDY SPACE CENTER, Fla. --  The early morning sun falls on Launch Pad 39A and Space Shuttle Discovery, which is waiting for launch on mission STS-92 Oct. 5, 2000. Leading to the pad (from the foreground) is the ramp leading from the crawlerway, the specially built road that provides the Shuttles access to the pads from the Vehicle Assembly Building. At the right of the pad is the 300,000-gallon water tank that is part of the sound suppression system during launches. Beyond is the Atlantic Ocean. At the far left can be seen Launch Pad 39B with its water tank KSC-00pp1298

KENNEDY SPACE CENTER, Fla. -- The early morning sun falls on Launch P...

KENNEDY SPACE CENTER, Fla. -- The early morning sun falls on Launch Pad 39A and Space Shuttle Discovery, which is waiting for launch on mission STS-92 Oct. 5, 2000. Leading to the pad (from the foreground) is ... More

Before entering the orbiter Endeavour, STS-99 Mission Specialist Gerhard Thiele of Germany is helped with final suit preparations by Travis Thompson, mechanical technician and a member of the White Room closeout crew. The White Room is an environmental chamber at the end of the orbiter access arm, on the fixed service structure, that provides entry to the orbiter crew compartment. STS-99, known as the Shuttle Radar Topography Mission (SRTM), will chart a new course to produce unrivaled 3-D images of the Earth's surface. The result of the Shuttle Radar Topography Mission could be close to 1 trillion measurements of the Earth's topography. Scheduled for liftoff at 12:30 p.m. EST, the mission is expected to last 11days, with Endeavour landing at KSC Tuesday, Feb. 22, at 4:36 p.m. EST. This is the 97th Shuttle flight and 14th for Shuttle Endeavour KSC-00pp0235

Before entering the orbiter Endeavour, STS-99 Mission Specialist Gerha...

Before entering the orbiter Endeavour, STS-99 Mission Specialist Gerhard Thiele of Germany is helped with final suit preparations by Travis Thompson, mechanical technician and a member of the White Room closeou... More

KENNEDY SPACE CENTER, FLA. -   After rollback of the rotating service structure (RSS) on Launch Pad 39B, Space Shuttle Discovery stands bathed in lights from the RSS and fixed service structure.  The rollback was in preparation for launch July 1 on mission STS-121.  Extending toward the cockpit of the shuttle is the orbiter access arm with the White Room extended.  The White Room provides access into the orbiter for the astronauts.  The RSS provides protected access to the orbiter for changeout and servicing of payloads at the pad. The structure is supported by a rotating bridge that pivots about a vertical axis on the west side of the pad's flame trench. The hinge column rests on the pad surface and is braced to the fixed service structure. Support for the outer end of the bridge is provided by two eight-wheel, motor-driven trucks that move along circular twin rails installed flush with the pad surface. The track crosses the flame trench on a permanent bridge.  The RSS is 102 feet long, 50 feet wide and 130 feet high. The structure has orbiter access platforms at five levels to provide access to the payload bay while the orbiter is being serviced in the RSS. Each platform has independent extendable planks that can be arranged to conform to a payload's configuration.  This mission is the 115th shuttle flight and the 18th U.S. flight to the International Space Station. Photo credit: NASA/Kim Shiflett KSC-06pd1308

KENNEDY SPACE CENTER, FLA. - After rollback of the rotating service ...

KENNEDY SPACE CENTER, FLA. - After rollback of the rotating service structure (RSS) on Launch Pad 39B, Space Shuttle Discovery stands bathed in lights from the RSS and fixed service structure. The rollback w... More

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility Bay 2 at NASA’s Kennedy Space Center in Florida, replica shuttle main engines 3 RSME has been installed on the space shuttle Endeavour. The orbiter is surrounded by work platforms allowing access to all areas of the spacecraft.      The work is part of Transition and Retirement of the remaining space shuttles, Endeavour and Atlantis. Endeavour is being prepared for public display at the California Science Center in Los Angeles. Its ferry flight to California is targeted for mid-September. Endeavour was the last space shuttle added to NASA’s orbiter fleet. Over the course of its 19-year career, Endeavour spent 299 days in space during 25 missions. For more information, visit http://www.nasa.gov/transition Photo credit: NASA/ Dimitri Gerondidakis KSC-2012-3784

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility Bay 2 at NASA’s ...

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility Bay 2 at NASA’s Kennedy Space Center in Florida, replica shuttle main engines 3 RSME has been installed on the space shuttle Endeavour. The orbiter is surro... More

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, a left-side main separation bolt attaches the bottom of space shuttle Discovery to its external fuel tank in the Vehicle Assembly Building. As technicians were attaching the bolt Sept. 10, a bolt nut slipped back into Discovery's aft compartment. To retrieve it, technicians entered Discovery’s aft section through an access door. They then moved the nut back into position to finish attaching the bolt, which is used to separate Discovery from the external tank once the shuttle is in orbit. Discovery is scheduled to roll out to Launch Pad 39A later this month for its STS-133 launch to the International Space Station.    Targeted to lift off Nov. 1, Discovery will take the Permanent Multipurpose Module (PMM) packed with supplies and critical spare parts, as well as Robonaut 2 (R2) to the station. Photo credit: NASA/Dimitri Gerondidakis KSC-2010-4648

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, a l...

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, a left-side main separation bolt attaches the bottom of space shuttle Discovery to its external fuel tank in the Vehicle Assembly Building. As ... More

KENNEDY SPACE CENTER, FLA. --  On Launch Pad 39A at NASA's Kennedy Space Center, the rotating service structure is rolling on its axis to uncover space shuttle Endeavour.  First motion was at 8:23 a.m. and rollback was complete at 8:55 a.m. The structure provides protected access to the orbiter for changeout and servicing of payloads at the pad. The structure is supported by a rotating bridge that pivots about a vertical axis on the west side of the pad's flame trench. After the RSS is rolled back, the orbiter is ready for fuel cell activation and external tank cryogenic propellant loading operations.  The pad is cleared to the perimeter gate for operations to fill the external tank with about 500,000 gallons of cryogenic propellants used by the shuttle’s main engines. This is done at the pad approximately eight hours before the scheduled launch.  Endeavour and its crew will deliver the first section of the Japan Aerospace Exploration Agency's Kibo laboratory and the Canadian Space Agency's two-armed robotic system, Dextre.  Launch is scheduled for 2:28 a.m. EDT March 11.  Photo credit: NASA/Kim Shiflett KSC-08pd0664

KENNEDY SPACE CENTER, FLA. -- On Launch Pad 39A at NASA's Kennedy Spa...

KENNEDY SPACE CENTER, FLA. -- On Launch Pad 39A at NASA's Kennedy Space Center, the rotating service structure is rolling on its axis to uncover space shuttle Endeavour. First motion was at 8:23 a.m. and roll... More

KENNEDY SPACE CENTER, FLA. -- Flags wave near Launch Pad 39A where space shuttle Endeavour waits for liftoff.  The rotating service structure was rolled back starting at 8:23 a.m. and complete at 8:55 a.m.  Above the orange external tank is seen the "beanie cap" at the end of the gaseous oxygen vent arm, extending from the fixed service structure. Vapors are created as the liquid oxygen in the external tank boil off. The hood vents the gaseous oxygen vapors away from the space shuttle vehicle.  Below is the orbiter access arm with the White Room at the end, flush against the shuttle.  The crew gains access into the orbiter through the White Room.  The rotating structure provides protected access to the orbiter for changeout and servicing of payloads at the pad. The structure is supported by a rotating bridge that pivots about a vertical axis on the west side of the pad's flame trench. After the RSS is rolled back, the orbiter is ready for fuel cell activation and external tank cryogenic propellant loading operations.  The pad is cleared to the perimeter gate for operations to fill the external tank with about 500,000 gallons of cryogenic propellants used by the shuttle’s main engines. This is done at the pad approximately eight hours before the scheduled launch.  Endeavour and its crew will deliver the first section of the Japan Aerospace Exploration Agency's Kibo laboratory and the Canadian Space Agency's two-armed robotic system, Dextre.  Launch is scheduled for 2:28 a.m. EDT March 11.  Photo credit: NASA/Kim Shiflett KSC-08pd0673

KENNEDY SPACE CENTER, FLA. -- Flags wave near Launch Pad 39A where spa...

KENNEDY SPACE CENTER, FLA. -- Flags wave near Launch Pad 39A where space shuttle Endeavour waits for liftoff. The rotating service structure was rolled back starting at 8:23 a.m. and complete at 8:55 a.m. Abo... More

KENNEDY SPACE CENTER, FLA. -  The first group of passengers to fly on the ZERO-G aircraft line up.  The Boeing 727-200 aircraft is used for weightless flights by Zero Gravity Corporation, known as ZERO-G, of Fort Lauderdale, Fla.  NASA and ZERO-G demonstrated Nov. 5 the expanded access to and use of the space shuttle's runway and landing facility at Kennedy Space Center for non-NASA activities.  The passengers, called "Flyers," were predominantly teachers who performed simple microgravity experiments they can share with their students back in the classroom. KSC-05pd2481

KENNEDY SPACE CENTER, FLA. - The first group of passengers to fly on ...

KENNEDY SPACE CENTER, FLA. - The first group of passengers to fly on the ZERO-G aircraft line up. The Boeing 727-200 aircraft is used for weightless flights by Zero Gravity Corporation, known as ZERO-G, of Fo... More

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, technicians in the payload changeout room have maneuvered space shuttle Atlantis' cargo, the Raffaello multi-purpose logistics module (MPLM) into the shuttle's payload bay using the payload ground-handling mechanism at Launch Pad 39A. The rotating service structure that protects the shuttle from the elements and provides access has been moved back into place.              STS-135 Commander Chris Ferguson, Pilot Doug Hurley and Mission Specialists Sandy Magnus and Rex Walheim are targeted to lift off on Atlantis July 8, taking with them the MPLM packed with supplies, logistics and spare parts to the station. The STS-135 mission also will fly a system to investigate the potential for robotically refueling existing satellites and return a failed ammonia pump module to help NASA better understand the failure mechanism and improve pump designs for future systems. STS-135 will be the 33rd flight of Atlantis, the 37th shuttle mission to the space station, and the 135th and final mission of NASA's Space Shuttle Program. For more information visit, www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Kim Shiflett KSC-2011-4598

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, tec...

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, technicians in the payload changeout room have maneuvered space shuttle Atlantis' cargo, the Raffaello multi-purpose logistics module (MPLM) in... More

KENNEDY SPACE CENTER, FLA. --   On Launch Pad 39A at NASA's Kennedy Space Center, STS-123 Mission Specialist Mike Foreman is helped with the final flight suit fit check in the White Room before entering space shuttle Endeavour for launch. The White Room provides access into the shuttle.  Liftoff was on time at 2:28 a.m. EDT.  The crew will make a record-breaking 16-day mission to the International Space Station and deliver the first section of the Japan Aerospace Exploration Agency's Kibo laboratory and the Canadian Space Agency's two-armed robotic system, Dextre.  Photo credit: NASA/Scott Haun, Richard Prickett KSC-08pd0722

KENNEDY SPACE CENTER, FLA. -- On Launch Pad 39A at NASA's Kennedy Sp...

KENNEDY SPACE CENTER, FLA. -- On Launch Pad 39A at NASA's Kennedy Space Center, STS-123 Mission Specialist Mike Foreman is helped with the final flight suit fit check in the White Room before entering space s... More

KENNEDY SPACE CENTER, FLA. -   After rollback of the rotating service structure (RSS) on Launch Pad 39B, Space Shuttle Discovery stands bathed in lights from the RSS and fixed service structure.  The rollback was in preparation for launch July 1 on mission STS-121.  Extending toward the cockpit of the shuttle is the orbiter access arm with the White Room extended.  The White Room provides access into the orbiter for the astronauts.  The RSS provides protected access to the orbiter for changeout and servicing of payloads at the pad. The structure is supported by a rotating bridge that pivots about a vertical axis on the west side of the pad's flame trench. The hinge column rests on the pad surface and is braced to the fixed service structure. Support for the outer end of the bridge is provided by two eight-wheel, motor-driven trucks that move along circular twin rails installed flush with the pad surface. The track crosses the flame trench on a permanent bridge.  The RSS is 102 feet long, 50 feet wide and 130 feet high. The structure has orbiter access platforms at five levels to provide access to the payload bay while the orbiter is being serviced in the RSS. Each platform has independent extendable planks that can be arranged to conform to a payload's configuration.  This mission is the 115th shuttle flight and the 18th U.S. flight to the International Space Station. Photo credit: NASA/Kim Shiflett KSC-06pd1307

KENNEDY SPACE CENTER, FLA. - After rollback of the rotating service ...

KENNEDY SPACE CENTER, FLA. - After rollback of the rotating service structure (RSS) on Launch Pad 39B, Space Shuttle Discovery stands bathed in lights from the RSS and fixed service structure. The rollback w... More

KENNEDY SPACE CENTER, FLA. -- Cameras are prepared to record the launch of Space Shuttle Atlantis from Launch Pad 39A following sunrise on a cloudy Florida day. Rollback of the pad's rotating service structure, or RSS, is one of the milestones in preparation for the launch of mission STS-117 on June 8. Rollback started at 10:56 p.m. EDT June 7 and was complete at 11:34 p.m. The RSS, the massive structure to the left of the shuttle, provides protected access to the orbiter for changeout and servicing of payloads at the pad. The structure is supported by a rotating bridge that pivots about a vertical axis on the side of the pad's flame trench. The hinge column rests on the pad surface and is braced to the fixed service structure. Support for the outer end of the bridge is provided by two eight-wheel, motor-driven trucks that move along circular twin rails installed flush with the pad surface. The track crosses the flame trench on a permanent bridge. The RSS is 102 feet long, 50 feet wide and 130 feet high. The structure has orbiter access platforms at five levels to provide access to the payload bay while the orbiter is being serviced in the RSS. Each platform has independent extendable planks that can be arranged to conform to a payload's configuration. This mission is the 118th shuttle flight and the 21st U.S. flight to the International Space Station and will deliver and install the S3/S4 truss segment, deploy a set of solar arrays and prepare them for operation. Photo credit: NASA/Ken Thornsley KSC-07pd1399

KENNEDY SPACE CENTER, FLA. -- Cameras are prepared to record the launc...

KENNEDY SPACE CENTER, FLA. -- Cameras are prepared to record the launch of Space Shuttle Atlantis from Launch Pad 39A following sunrise on a cloudy Florida day. Rollback of the pad's rotating service structure,... More

KENNEDY SPACE CENTER, FLA. -   The media (left)  capture the landing of the Virgin Atlantic Airways GlobalFlyer aircraft at NASA Kennedy Space Center’s Shuttle Landing Facility.  The aircraft, piloted by Steve Fossett, is being relocated from Salina, Kan., to the Shuttle Landing Facility to begin preparations for an attempt to set a new world record for the longest flight made by any aircraft. An exact takeoff date for the record-setting flight has not been determined and is contingent on weather and jet-stream conditions. The window for the attempt opens in mid-January, making the flight possible anytime between then and the end of February.  NASA agreed to let Virgin Atlantic Airways use Kennedy's Shuttle Landing Facility as a takeoff site. The facility use is part of a pilot program to expand runway access for non-NASA activities. KSC-06pd0041

KENNEDY SPACE CENTER, FLA. - The media (left) capture the landing o...

KENNEDY SPACE CENTER, FLA. - The media (left) capture the landing of the Virgin Atlantic Airways GlobalFlyer aircraft at NASA Kennedy Space Center’s Shuttle Landing Facility. The aircraft, piloted by Steve ... More

CAPE CANAVERAL, Fla. - As the sun sets behind Launch Pad 39A at NASA's Kennedy Space Center in Florida, the rotating service structure has been moved away from space shuttle Atlantis during the T-11 hour hold in the launch countdown.  Liftoff of the STS-129 mission is set for 2:28 p.m. EST Nov. 16.  The movable structure, which provides weather protection and access for technicians to work on the shuttle, began being retracted at 5:20 p.m. EST and was in the park position by 5:56 p.m.    STS-129 crew members are Commander Charles O. Hobaugh; Pilot Barry E. Wilmore; and Mission Specialists Leland Melvin, Randy Bresnik, Mike Foreman and Robert L. Satcher Jr.  On the STS-129 mission to the International Space Station, the crew will deliver two spare gyroscopes, two nitrogen tank assemblies, two pump modules, an ammonia tank assembly and a spare latching end effector for the station's robotic arm.  Atlantis will return to Earth a station crew member, Nicole Stott, who has spent more than two months aboard the orbiting laboratory.  STS-129 is slated to be the final space shuttle Expedition crew rotation flight. For information on the STS-129 mission and crew, visit http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts129/index.html. Photo credit: NASA/Troy Cryder KSC-2009-6300

CAPE CANAVERAL, Fla. - As the sun sets behind Launch Pad 39A at NASA's...

CAPE CANAVERAL, Fla. - As the sun sets behind Launch Pad 39A at NASA's Kennedy Space Center in Florida, the rotating service structure has been moved away from space shuttle Atlantis during the T-11 hour hold i... More

CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, this aerial view of the mobile launcher park site area north of the 525-foot-tall Vehicle Assembly Building shows a new mobile launcher, or ML, for the Constellation Program under construction.  In the background are the Atlantic Ocean and Launch Complex 41 on Cape Canaveral Air Force Station, at upper left, from which Atlas V rockets are launched.    When completed, the tower will be approximately 345 feet tall and have multiple platforms for personnel access. Its base is being made lighter than space shuttle mobile launcher platforms so the crawler-transporter can pick up the heavier load of the tower and a taller rocket.  For information on the Constellation Program, visit http://www.nasa.gov/constellation. Photo credit: NASA/Cory Huston KSC-2009-6975

CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, this...

CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, this aerial view of the mobile launcher park site area north of the 525-foot-tall Vehicle Assembly Building shows a new mobile launcher, or ML, ... More

KENNEDY SPACE CENTER, FLA. -  This bird's-eye view of a high bay in the Orbiter Processing Facility (OPF) shows the open payload bay of Space Shuttle Discovery surrounded by the standard platforms and equipment required to process a Space Shuttle orbiter.  The high bay is 197 feet (60 meters) long, 150 feet (46 meters) wide, 95 feet (29 meters) high, and encompasses a 29,000-square-foot (2,694-meter) area.  The 30-ton (27-metric-ton) bridge crane (yellow device, right) has a hook height of approximately 66 feet (20 meters).  Platforms, a main access bridge, and two rolling bridges with trucks provide access to various parts of the orbiter.  In addition to routine servicing and checkout, the inspections and modifications made to enhance Discovery's performance and upgrade its systems were performed in the OPF during its recently completed Orbiter Major Modification (OMM) period.

KENNEDY SPACE CENTER, FLA. - This bird's-eye view of a high bay in th...

KENNEDY SPACE CENTER, FLA. - This bird's-eye view of a high bay in the Orbiter Processing Facility (OPF) shows the open payload bay of Space Shuttle Discovery surrounded by the standard platforms and equipment... More

CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, the sixth tower segment is lifted toward five segments already secured to a new mobile launcher, or ML, being constructed to support the Constellation Program.    When completed, the tower will be approximately 345 feet tall and have multiple platforms for personnel access. The construction is under way at the mobile launcher park site area north of Kennedy's Vehicle Assembly Building. The launcher will provide a base to launch the Ares I rocket, designed to transport the Orion crew exploration vehicle, its crew and cargo to low Earth orbit. Its base is being made lighter than space shuttle mobile launcher platforms so the crawler-transporter can pick up the heavier load of the tower and taller rocket.  For information on the Ares I, visit http://www.nasa.gov/ares. Photo credit: NASA/Jim Grossmann KSC-2009-6788

CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, the ...

CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, the sixth tower segment is lifted toward five segments already secured to a new mobile launcher, or ML, being constructed to support the Constel... More

CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, the tower on a new mobile launcher, or ML, for the Constellation Program grows as the fourth section is lowered into position.    The tower will be approximately 345 feet tall when completed and have multiple platforms for personnel access. The ML is being built at the mobile launcher park site area north of Kennedy's Vehicle Assembly Building. The launcher will provide a base to launch the Ares I, designed to transport the Orion crew exploration vehicle, its crew and cargo to low Earth orbit. The base is being made lighter than space shuttle mobile launcher platforms so the crawler-transporter can pick up the heavier load of the tower and taller rocket.  For information on the Ares I, visit http://www.nasa.gov/ares. Photo credit: NASA/Jack Pfaller KSC-2009-6225

CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, the ...

CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, the tower on a new mobile launcher, or ML, for the Constellation Program grows as the fourth section is lowered into position. The tower will... More

CAPE CANAVERAL, Fla. -- At Launch Pad 39A at NASA's Kennedy Space Center in Florida space shuttle Atlantis is reflected in a pond near the pad after the retraction of the rotating service structure (RSS). The structure provides weather protection and access to the shuttle while it awaits liftoff on the pad. RSS retract marks a major milestone in Atlantis' STS-135 mission countdown.        Atlantis and its crew of four; Commander Chris Ferguson, Pilot Doug Hurley, Mission Specialists Sandy Magnus and Rex Walheim will lift off at 11:26 a.m. EDT on July 8 to deliver the Raffaello multi-purpose logistics module packed with supplies and spare parts for the International Space Station. Atlantis also will fly the Robotic Refueling Mission experiment that will investigate the potential for robotically refueling existing satellites in orbit. In addition, Atlantis will return with a failed ammonia pump module to help NASA better understand the failure mechanism and improve pump designs for future systems. STS-135 is the 33rd flight of Atlantis, the 37th shuttle mission to the space station, and the 135th and final mission of NASA's Space Shuttle Program. For more information, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: Jim Grossmann KSC-2011-5182

CAPE CANAVERAL, Fla. -- At Launch Pad 39A at NASA's Kennedy Space Cent...

CAPE CANAVERAL, Fla. -- At Launch Pad 39A at NASA's Kennedy Space Center in Florida space shuttle Atlantis is reflected in a pond near the pad after the retraction of the rotating service structure (RSS). The s... More

CAPE CANAVERAL, Fla. - Backdropped by a beautiful blue sky and the crystal-clear Atlantic Ocean, space shuttle Endeavour is revealed on Launch Pad 39A at NASA's Kennedy Space Center in Florida following the move of the rotating service structure (RSS). The structure provides weather protection and access to the shuttle while it awaits lift off on the pad. RSS "rollback," as it's called, began at 11:44 a.m. EDT on May 15 and was completed at 12:24 p.m.     STS-134 will deliver the Alpha Magnetic Spectrometer-2 (AMS), Express Logistics Carrier-3, a high-pressure gas tank and additional spare parts for the Dextre robotic helper to the International Space Station. May 16 at 8:56 a.m. will be the second launch attempt for Endeavour. The first attempt on April 29 was scrubbed because of an issue associated with a faulty power distribution box called the aft load control assembly-2 (ALCA-2). STS-134 will be the final spaceflight for Endeavour. For more information visit, www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts134/index.html. Photo credit: NASA/Kim Shiflett KSC-2011-3532

CAPE CANAVERAL, Fla. - Backdropped by a beautiful blue sky and the cry...

CAPE CANAVERAL, Fla. - Backdropped by a beautiful blue sky and the crystal-clear Atlantic Ocean, space shuttle Endeavour is revealed on Launch Pad 39A at NASA's Kennedy Space Center in Florida following the mov... More

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, technicians in the Vehicle Assembly Building inspect space shuttle Discovery, its external fuel tank and solid rocket boosters. As technicians were attaching the left-side main separation bolt on the bottom of the shuttle to the external tank Sept. 10 a bolt nut slipped back into Discovery's aft compartment. To retrieve it, technicians entered Discovery’s aft section through an access door. They then moved the nut back into position to finish attaching the bolt, which is used to separate Discovery from the external tank once the shuttle is in orbit. Discovery is scheduled to roll out to Launch Pad 39A later this month for its STS-133 launch to the International Space Station.    Targeted to lift off Nov. 1, Discovery will take the Permanent Multipurpose Module (PMM) packed with supplies and critical spare parts, as well as Robonaut 2 (R2) to the station. Photo credit: NASA/Dimitri Gerondidakis KSC-2010-4644

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, tec...

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, technicians in the Vehicle Assembly Building inspect space shuttle Discovery, its external fuel tank and solid rocket boosters. As technicians ... More

CAPE CANAVERAL, Fla. – In the White Room on Launch Pad 39A at NASA's Kennedy Space Center in Florida, STS-119 Mission Specialists Koichi Wakata (center) and Steve Swanson are getting into their harnesses, which include a parachute pack, before crawling through the open hatch into space shuttle Discovery. The White Room is at the end of the orbiter access arm on the fixed service structure and provides access into the shuttle. The STS-119 mission is the 28th to the International Space Station and the 125th space shuttle flight.  Discovery will deliver the final pair of power-generating solar array wings and the S6 truss segment.  Installation of S6 will signal the station's readiness to house a six-member crew for conducting increased science. Liftoff is scheduled for 7:43 p.m. EDT. Photo credit: NASA/Tony Gray, Tom Farrar KSC-2009-2056

CAPE CANAVERAL, Fla. – In the White Room on Launch Pad 39A at NASA's K...

CAPE CANAVERAL, Fla. – In the White Room on Launch Pad 39A at NASA's Kennedy Space Center in Florida, STS-119 Mission Specialists Koichi Wakata (center) and Steve Swanson are getting into their harnesses, which... More

CAPE CANAVERAL, Fla. -- Inside Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, technicians remove the top emergency escape window from space shuttle Atlantis.     The window is being removed in order to gain access to remove hazardous pyrotechnics from the shuttle. The window will be shipped to Johnson Space Center in Houston for inspections and a replacement outer pane will be installed in its place. The work is part of the Space Shuttle Program’s transition and retirement processing of shuttle Atlantis. The shuttle is being prepared for display at the Kennedy Space Center Visitor Complex in Florida.  Photo credit: NASA/Kim Shiflett KSC-2012-1003

CAPE CANAVERAL, Fla. -- Inside Orbiter Processing Facility-2 at NASA’s...

CAPE CANAVERAL, Fla. -- Inside Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, technicians remove the top emergency escape window from space shuttle Atlantis. The window is being re... More

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, a crawler-transporter moves toward NASA's new mobile launcher (ML) support structure. The crawler will transport the ML from a construction site, north of the Vehicle Assembly Building, to the Mobile Launcher east park site. Once there, the ML can be outfitted with ground support equipment, such as umbilicals and access arms, for future rocket launches.          It took about two years to construct the 355-foot-tall structure, which will support NASA's future human spaceflight program. The base of the launcher is lighter than space shuttle mobile launcher platforms so the crawler-transporter can pick up the heavier load of the tower and a taller rocket. Photo credit: NASA/Jack Pfaller KSC-2010-4877

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, a c...

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, a crawler-transporter moves toward NASA's new mobile launcher (ML) support structure. The crawler will transport the ML from a construction sit... More

KENNEDY SPACE CENTER, FLA. -    The Virgin Atlantic Airways GlobalFlyer aircraft approaches NASA Kennedy Space Center’s Shuttle Landing Facility for a landing.  The aircraft, piloted by Steve Fossett, is being relocated from Salina, Kan., to the Shuttle Landing Facility to begin preparations for an attempt to set a new world record for the longest flight made by any aircraft. An exact takeoff date for the record-setting flight has not been determined and is contingent on weather and jet-stream conditions. The window for the attempt opens in mid-January, making the flight possible anytime between then and the end of February.  NASA agreed to let Virgin Atlantic Airways use Kennedy's Shuttle Landing Facility as a takeoff site. The facility use is part of a pilot program to expand runway access for non-NASA activities. KSC-06pd0039

KENNEDY SPACE CENTER, FLA. - The Virgin Atlantic Airways GlobalFlye...

KENNEDY SPACE CENTER, FLA. - The Virgin Atlantic Airways GlobalFlyer aircraft approaches NASA Kennedy Space Center’s Shuttle Landing Facility for a landing. The aircraft, piloted by Steve Fossett, is being ... More

CAPE CANAVERAL, Fla. -- In the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, the Alpha Magnetic Spectrometer-2 (AMS) begins a 180-degree rotation to provide better access for work to be performed on its avionics box. Technicians also will install a flight releasable grappling fixture to AMS while it is upside down.            AMS is designed to operate as an external experiment on the International Space Station. It will use the unique environment of space to study the universe and its origin by searching for dark matter. AMS will fly to the station aboard space shuttle Endeavour's STS-134 mission targeted to launch Feb. 27, 2011. Photo credit: NASA/Jack Pfaller KSC-2010-5392

CAPE CANAVERAL, Fla. -- In the Space Station Processing Facility at NA...

CAPE CANAVERAL, Fla. -- In the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, the Alpha Magnetic Spectrometer-2 (AMS) begins a 180-degree rotation to provide better access for work... More

KENNEDY SPACE CENTER, FLA. - After rollback of the rotating service structure, or RSS, on Launch Pad 39A, Space Shuttle Endeavour stands bathed in spotlights. Rollback started at 9 p.m. EDT Aug. 7 and was complete at 10:40 p.m.  Beneath the shuttle is the mobile launcher platform, which spans the flame trench below. The flame deflector system includes an inverted, V-shaped steel structure that receives and deflects the flames from the orbiter main engines on one side; the opposite side deflects the flames from the solid rocket boosters. The RSS provides protected access to the orbiter for changeout and servicing of payloads at the pad. Rollback of the pad's RSS is one of the milestones in preparation for the launch of mission STS-118 at 6:36 p.m. EDT on Aug. 8. Space Shuttle Endeavour's STS-118 mission is the 22nd shuttle flight to the International Space Station. It will continue space station construction by delivering a third starboard truss segment, S5, and other payloads such as the SPACEHAB module and the external stowage platform 3.  Photo credit: NASA/Kim Shiflett KSC-07pd2225

KENNEDY SPACE CENTER, FLA. - After rollback of the rotating service st...

KENNEDY SPACE CENTER, FLA. - After rollback of the rotating service structure, or RSS, on Launch Pad 39A, Space Shuttle Endeavour stands bathed in spotlights. Rollback started at 9 p.m. EDT Aug. 7 and was compl... More

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, a crawler-transporter moves NASA's new mobile launcher (ML) support structure from a construction site, north of the Vehicle Assembly Building, to the Mobile Launcher east park site.          The base of the launcher is lighter than space shuttle mobile launcher platforms so the crawler-transporter can pick up the heavier load of the tower and a taller rocket. Once there, the ML can be outfitted with ground support equipment, such as umbilicals and access arms, for future rocket launches. It took about two years to construct the 355-foot-tall structure, which will support NASA's future human spaceflight program. Photo credit: NASA/Sandra Joseph KSC-2010-4958

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, a c...

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, a crawler-transporter moves NASA's new mobile launcher (ML) support structure from a construction site, north of the Vehicle Assembly Building,... More

KENNEDY SPACE CENTER, Fla.  -- In the White Room on Launch Pad 39A, Mission Specialist Barbara R. Morgan adjusts the collar of her launch and entry suit before she enters Space Shuttle Endeavour.  Morgan, the teacher-turned-astronaut, and the rest of the crew are taking part in a simulated launch countdown, the culmination of terminal countdown demonstration test activities.  The White Room is situated at the end of the orbiter access arm and provides entry into the orbiter. TCDT activities also include M-113 training, payload familiarization and emergency egress training at the pad.  The mission is the 22nd flight to the International Space Station and Space Shuttle Endeavour will carry a payload including the S5 truss, a SPACEHAB module and external stowage platform 3. STS-118 is targeted for launch on Aug. 7.  Photo credit: NASA/Amanda Diller KSC-07pd1993

KENNEDY SPACE CENTER, Fla. -- In the White Room on Launch Pad 39A, Mi...

KENNEDY SPACE CENTER, Fla. -- In the White Room on Launch Pad 39A, Mission Specialist Barbara R. Morgan adjusts the collar of her launch and entry suit before she enters Space Shuttle Endeavour. Morgan, the t... More

KENNEDY SPACE CENTER, FLA. -- The late afternoon sun highlights the external tank and solid rocket booster on Space Shuttle Columbia after rollback of the Rotating Service Structure on Launch Pad 39A. Visible are the orbiter access arm with the White Room extended to Columbia's cockpit, and at the top, the gaseous oxygen vent arm and cap, called the "beanie cap." Columbia is scheduled for launch Jan. 16 at 10:39 a.m. EST on mission STS-107, a research mission. KSC-03pd0077

KENNEDY SPACE CENTER, FLA. -- The late afternoon sun highlights the ex...

KENNEDY SPACE CENTER, FLA. -- The late afternoon sun highlights the external tank and solid rocket booster on Space Shuttle Columbia after rollback of the Rotating Service Structure on Launch Pad 39A. Visible a... More

KENNEDY SPACE CENTER, FLA. --  While in the White Room to complete suiting up before climbing into Space Shuttle Discovery, STS-116 Mission Specialist Nicholas Patrick sends a message home.  In the background is Mission Specialist Christer Fuglesang, who represents the European Space Agency. The White Room is at the end of the orbiter access arm that extends from the fixed service structure and provides entry into the orbiter.  The first launch attempt of STS-116 on Dec. 7 was postponed due a low cloud ceiling over Kennedy Space Center. This second launch attempt is scheduled for 8:47 p.m. This is Discovery's 33rd mission and the first night launch since 2002.   The 20th shuttle mission to the International Space Station, STS-116 carries another truss segment, P5. It will serve as a spacer, mated to the P4 truss that was attached in September.  After installing the P5, the crew will reconfigure and redistribute the power generated by two pairs of U.S. solar arrays. Landing is expected Dec. 21 at KSC.    Photo credit: NASA/Tony Gray & Don Kight KSC-06pp2776

KENNEDY SPACE CENTER, FLA. -- While in the White Room to complete sui...

KENNEDY SPACE CENTER, FLA. -- While in the White Room to complete suiting up before climbing into Space Shuttle Discovery, STS-116 Mission Specialist Nicholas Patrick sends a message home. In the background i... More

CAPE CANAVERAL, Fla. -- After sunset, lights glow on Launch Pad 39A at NASA's Kennedy Space Center in Florida as space shuttle Atlantis awaits delivery of the Raffaello multi-purpose logistics module (MPLM) in its transportation canister. Once delivered, the canister will be lifted to the payload changeout room. The payload ground-handling mechanism then will be used to transfer Raffaello out of the canister into Atlantis' payload bay. Next, the rotating service structure that protects the shuttle from the elements and provides access will be rotated back into place.                Commander Chris Ferguson, Pilot Doug Hurley and Mission Specialists Sandra Magnus and Rex Walheim are targeted to lift off on Atlantis July 8, taking with them the MPLM packed with supplies, logistics and spare parts to the station. The STS-135 mission also will fly a system to investigate the potential for robotically refueling existing satellites and return a failed ammonia pump module to help NASA better understand the failure mechanism and improve pump designs for future systems. STS-135 will be the 33rd flight of Atlantis, the 37th shuttle mission to the space station, and the 135th and final mission of NASA's Space Shuttle Program. For more information visit, www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Frank Michaux KSC-2011-4479

CAPE CANAVERAL, Fla. -- After sunset, lights glow on Launch Pad 39A at...

CAPE CANAVERAL, Fla. -- After sunset, lights glow on Launch Pad 39A at NASA's Kennedy Space Center in Florida as space shuttle Atlantis awaits delivery of the Raffaello multi-purpose logistics module (MPLM) in ... More

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, workers monitor the progress of a crawler-transporter as it moves NASA's new mobile launcher (ML) support structure from a construction site, north of the Vehicle Assembly Building, to the Mobile Launcher east park site.         The base of the launcher is lighter than space shuttle mobile launcher platforms so the crawler-transporter can pick up the heavier load of the tower and a taller rocket. Once there, the ML can be outfitted with ground support equipment, such as umbilicals and access arms, for future rocket launches. It took about two years to construct the 355-foot-tall structure, which will support NASA's future human spaceflight program. Photo credit: NASA/Tony Gray KSC-2010-4969

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, wor...

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, workers monitor the progress of a crawler-transporter as it moves NASA's new mobile launcher (ML) support structure from a construction site, n... More

CAPE CANAVERAL, Fla. – The arms of the vehicle stabilization system are closed around the towering 327-foot-tall Ares I-X rocket, newly arrived on Launch Pad 39B at NASA's Kennedy Space Center in Florida.    The test rocket left the Vehicle Assembly Building at 1:39 a.m. EDT on its 4.2-mile trek to the pad and was "hard down" on the pad’s pedestals at 9:17 a.m.  The transfer of the pad from the Space Shuttle Program to the Constellation Program took place May 31. Modifications made to the pad include the removal of shuttle unique subsystems, such as the orbiter access arm and a section of the gaseous oxygen vent arm, along with the installation of three 600-foot lightning towers, access platforms, environmental control systems and a vehicle stabilization system.  Part of the Constellation Program, the Ares I-X is the test vehicle for the Ares I. The Ares I-X flight test is targeted for Oct. 27. For information on the Ares I-X vehicle and flight test, visit http://www.nasa.gov/aresIX.  Photo credit: NASA/Kim Shiflett KSC-2009-5596

CAPE CANAVERAL, Fla. – The arms of the vehicle stabilization system ar...

CAPE CANAVERAL, Fla. – The arms of the vehicle stabilization system are closed around the towering 327-foot-tall Ares I-X rocket, newly arrived on Launch Pad 39B at NASA's Kennedy Space Center in Florida. Th... More

CAPE CANAVERAL, Fla. – On Launch Pad 39A at NASA's Kennedy Space Center in Florida, the orbiter access arm and White Room are extended toward space shuttle Discovery after rollback of the rotating service structure.  Above the external tank is the oxygen vent hood, called the "beanie cap."  The rollback is in preparation for Discovery's liftoff on the STS-119 mission with a crew of seven. The rotating structure provides protected access to the shuttle for changeout and servicing of payloads at the pad. After the RSS is rolled back, the orbiter is ready for fuel cell activation and external tank cryogenic propellant loading operations. The mission is the 28th to the International Space Station and the 125th space shuttle flight.  Discovery will deliver the final pair of power-generating solar array wings and the S6 truss segment.  Installation of S6 will signal the station's readiness to house a six-member crew for conducting increased science.  Liftoff of Discovery is scheduled for 9:20 p.m. EDT on March 11.   Photo credit: NASA/Kim Shiflett KSC-2009-2020

CAPE CANAVERAL, Fla. – On Launch Pad 39A at NASA's Kennedy Space Cente...

CAPE CANAVERAL, Fla. – On Launch Pad 39A at NASA's Kennedy Space Center in Florida, the orbiter access arm and White Room are extended toward space shuttle Discovery after rollback of the rotating service struc... More

CAPE CANAVERAL, Fla. -- A canister, carrying the Raffaello multi-purpose logistics module (MPLM) for space shuttle Atlantis' STS-135 mission to the International Space Station, arrives at Launch Pad 39A at NASA's Kennedy Space Center in Florida. The canister will be lifted to the payload changeout room. The payload ground-handling mechanism then will be used to transfer Raffaello out of the canister into Atlantis' payload bay. Next, the rotating service structure that protects the shuttle from the elements and provides access will be rotated back into place.          Commander Chris Ferguson, Pilot Doug Hurley and Mission Specialists Sandra Magnus and Rex Walheim are targeted to lift off on Atlantis July 8, taking with them the MPLM packed with supplies, logistics and spare parts to the station. The STS-135 mission also will fly a system to investigate the potential for robotically refueling existing satellites and return a failed ammonia pump module to help NASA better understand the failure mechanism and improve pump designs for future systems. STS-135 will be the 33rd flight of Atlantis, the 37th shuttle mission to the space station, and the 135th and final mission of NASA's Space Shuttle Program. For more information visit, www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Dimitri Gerondidakis KSC-2011-4453

CAPE CANAVERAL, Fla. -- A canister, carrying the Raffaello multi-purpo...

CAPE CANAVERAL, Fla. -- A canister, carrying the Raffaello multi-purpose logistics module (MPLM) for space shuttle Atlantis' STS-135 mission to the International Space Station, arrives at Launch Pad 39A at NASA... More

CAPE CANAVERAL, Fla. – Just before dawn, space shuttle Endeavour, installed on the mobile launcher platform  atop the crawler-transporter, is on Launch Pad 39B at NASA's Kennedy Space Center in Florida.  First motion out of the Vehicle Assembly Building was at 11:57 p.m. EDT April 16.  The shuttle was secure on the pad at 7:17 a.m. EDT April 17. On the left of the shuttle is the White Room at the end of the orbiter access arm, 147 feet above the pad. When in place against the shuttle, the White Room provides access into the crew compartment on the shuttle. Endeavour will be prepared on the pad for liftoff in the unlikely event that a rescue mission is necessary following space shuttle Atlantis' launch on the STS-125 mission to service NASA's  Hubble Space Telescope. After Atlantis is cleared to land, Endeavour will move to Launch Pad 39A for its upcoming STS-127 mission to the International Space Station, targeted to launch June 13.   Photo credit: NASA/Jack Pfaller KSC-2009-2690

CAPE CANAVERAL, Fla. – Just before dawn, space shuttle Endeavour, inst...

CAPE CANAVERAL, Fla. – Just before dawn, space shuttle Endeavour, installed on the mobile launcher platform atop the crawler-transporter, is on Launch Pad 39B at NASA's Kennedy Space Center in Florida. First ... More

CAPE CANAVERAL, Fla. –  In the White Room on Launch Pad 39A at NASA's Kennedy Space Center in Florida, STS-119 Mission Specialist Steve Swanson is helped by the Closeout Crew to put on his harness.  The White Room provides access into space shuttle Discovery.  Swanson and other crew members will conduct a simulated launch countdown as part of the prelaunch preparation known as Terminal Countdown Demonstration Test.  The TCDT also includes equipment familiarization and emergency egress training. Discovery is targeted to launch on the STS-119 mission Feb. 12. During the 14-day mission, the crew will install the S6 truss segment and solar arrays to the starboard side of the International Space Station, completing the station's truss, or backbone. Photo credit: NASA/Jim Grossmann KSC-2009-1270

CAPE CANAVERAL, Fla. – In the White Room on Launch Pad 39A at NASA's ...

CAPE CANAVERAL, Fla. – In the White Room on Launch Pad 39A at NASA's Kennedy Space Center in Florida, STS-119 Mission Specialist Steve Swanson is helped by the Closeout Crew to put on his harness. The White R... More

CAPE CANAVERAL, Fla. - Inside the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida, the 327-foot-tall Ares I-X rocket stands on its mobile launcher platform.    The transfer of the pad from the Space Shuttle Program to the Constellation Program took place May 31. Modifications made to the pad include the removal of shuttle unique subsystems, such as the orbiter access arm and a section of the gaseous oxygen vent arm, along with the installation of three 600-foot lightning towers, access platforms, environmental control systems and a vehicle stabilization system.  Part of the Constellation Program, the Ares I-X is the test vehicle for the Ares I. The Ares I-X flight test is targeted for Oct. 27. For information on the Ares I-X vehicle and flight test, visit http://www.nasa.gov/aresIX. Photo credit: NASA/Kim Shiflett KSC-2009-5541

CAPE CANAVERAL, Fla. - Inside the Vehicle Assembly Building at NASA's ...

CAPE CANAVERAL, Fla. - Inside the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida, the 327-foot-tall Ares I-X rocket stands on its mobile launcher platform. The transfer of the pad from t... More

KENNEDY SPACE CENTER, FLA. -- Access platforms at Launch Pad 39A are moved into position against Space Shuttle Discovery atop a mobile launch platform. Discovery arrived at its seaside launch pad around noon and was hard down at 1:15 p.m.  First motion out of the Vehicle Assembly Building was at 6:47 a.m. EDT.  Rollout is a milestone for Discovery's launch to the International Space Station on mission STS-120, targeted for Oct. 23. The crew will be delivering and installing the Italian-built U.S. Node 2, named Harmony. The pressurized module will act as an internal connecting port and passageway to additional international science labs and cargo spacecraft. In addition to increasing the living and working space inside the station, it also will serve as a work platform outside for the station's robotic arm.   Photo credit: NASA/George Shelton KSC-07pd2634

KENNEDY SPACE CENTER, FLA. -- Access platforms at Launch Pad 39A are m...

KENNEDY SPACE CENTER, FLA. -- Access platforms at Launch Pad 39A are moved into position against Space Shuttle Discovery atop a mobile launch platform. Discovery arrived at its seaside launch pad around noon an... More

KENNEDY SPACE CENTER, FLA. -   The STS-115 crew is in the White Room on the orbiter access arm on Launch Pad 39B to get instruction on using the emergency egress system. From left are Commander Brent Jett, Pilot Chris Ferguson, and Mission Specialists Heidemarie Stefanyshyn-Piper, Joseph Tanner, Steven MacLean and Daniel Burbank.  MacLean is with the Canadian Space Agency.  The White Room provides access into the orbiter through the crew access hatch. The mission crew is at KSC for Terminal Countdown Demonstration Test (TCDT) activities that are preparation for launch on Space Shuttle Atlantis, scheduled to take place in a window that opens Aug. 27.  During their 11-day mission to the International Space Station, the STS-115 crew will continue construction of the station and attach the payload elements, the Port 3/4 truss segment with its two large solar arrays.  Photo credit: NASA/Cory Huston KSC-06pd1774

KENNEDY SPACE CENTER, FLA. - The STS-115 crew is in the White Room o...

KENNEDY SPACE CENTER, FLA. - The STS-115 crew is in the White Room on the orbiter access arm on Launch Pad 39B to get instruction on using the emergency egress system. From left are Commander Brent Jett, Pilo... More

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians monitor the progress as a Hyster forklift moves replica shuttle main engine 2, or RSME 2, closer for installation on space shuttle Endeavour. The orbiter is surrounded by work platforms allowing access to all areas of the spacecraft.    The work is part of Transition and Retirement of the remaining space shuttles, Endeavour and Atlantis. Endeavour is being prepared for public display at the California Science Center in Los Angeles. Its ferry flight to California is targeted for mid-September. Endeavour was the last space shuttle added to NASA’s orbiter fleet. Over the course of its 19-year career, Endeavour spent 299 days in space during 25 missions. For more information, visit http://www.nasa.gov/shuttle.  Photo credit: NASA/David Lee KSC-2012-3823

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility-2 at NASA’s ...

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians monitor the progress as a Hyster forklift moves replica shuttle main engi... More

CAPE CANAVERAL, Fla. – Lights bathe space shuttle Discovery on Launch Pad 39A at NASA's Kennedy Space Center in Florida after rollback of the rotating service structure. The orbiter access arm and White Room are extended toward Discovery. The White Room provides crew access into the shuttle. Above the external tank is the oxygen vent hood, called the "beanie cap."  The rollback is in preparation for Discovery's liftoff on the STS-119 mission with a crew of seven. The rotating structure provides protected access to the shuttle for changeout and servicing of payloads at the pad. After the RSS is rolled back, the orbiter is ready for fuel cell activation and external tank cryogenic propellant loading operations. The mission is the 28th to the International Space Station and the 125th space shuttle flight.  Discovery will deliver the final pair of power-generating solar array wings and the S6 truss segment.  Installation of S6 will signal the station's readiness to house a six-member crew for conducting increased science.  Liftoff of Discovery is scheduled for 9:20 p.m. EDT on March 11.   Photo credit: NASA/Kim Shiflett KSC-2009-2024

CAPE CANAVERAL, Fla. – Lights bathe space shuttle Discovery on Launch ...

CAPE CANAVERAL, Fla. – Lights bathe space shuttle Discovery on Launch Pad 39A at NASA's Kennedy Space Center in Florida after rollback of the rotating service structure. The orbiter access arm and White Room ar... More

CAPE CANAVERAL, Fla. -- At NASA Kennedy Space Center's Launch Pad 39A, a worker inside space shuttle Endeavour's aft section removes a cover to provide access for the removal and replacement of the Load Control Assembly-2 (LCA-2).      Located in the orbiter's aft avionics bay 5, the LCA-2 assembly, which feeds power to the fuel line heaters, is believed to have caused the heaters for Endeavour's auxiliary power unit-1 (APU-1) to fail April 29 during the first launch attempt for the STS-134 mission. STS-134 will deliver the Express Logistics Carrier-3, Alpha Magnetic Spectrometer-2 (AMS), a high-pressure gas tank and additional spare parts for the Dextre robotic helper to the International Space Station. The mission also will be the final spaceflight for Endeavour. For more information, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts134/index.html. Photo credit: NASA/Kim Shiflett. KSC-2011-3212

CAPE CANAVERAL, Fla. -- At NASA Kennedy Space Center's Launch Pad 39A,...

CAPE CANAVERAL, Fla. -- At NASA Kennedy Space Center's Launch Pad 39A, a worker inside space shuttle Endeavour's aft section removes a cover to provide access for the removal and replacement of the Load Control... More

CAPE CANAVERAL, Fla. -- On a cloudy and overcast day on Launch Pad 39A at NASA's Kennedy Space Center in Florida, workers prepare to roll the rotating service structure (RSS) away from space shuttle Atlantis. The RSS provides weather protection and access to the shuttle while it awaits liftoff. RSS "rollback" marks a major milestone in Atlantis' STS-135 mission countdown.          Atlantis and its crew of four; Commander Chris Ferguson, Pilot Doug Hurley and Mission Specialists Sandy Magnus and Rex Walheim, are scheduled to lift off at 11:26 a.m. EDT on July 8 to deliver the Raffaello multi-purpose logistics module packed with supplies and spare parts to the International Space Station. Atlantis also will fly the Robotic Refueling Mission experiment that will investigate the potential for robotically refueling existing satellites in orbit. In addition, Atlantis will return with a failed ammonia pump module to help NASA better understand the failure mechanism and improve pump designs for future systems. STS-135 will be the 33rd flight of Atlantis, the 37th shuttle mission to the space station, and the 135th and final mission of NASA's Space Shuttle Program. For more information visit, www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Troy Cryder KSC-2011-5122

CAPE CANAVERAL, Fla. -- On a cloudy and overcast day on Launch Pad 39A...

CAPE CANAVERAL, Fla. -- On a cloudy and overcast day on Launch Pad 39A at NASA's Kennedy Space Center in Florida, workers prepare to roll the rotating service structure (RSS) away from space shuttle Atlantis. T... More

Space Shuttle Endeavour finally rests on Launch Pad 39B after its rollout was stalled several hours to fix a broken cleat on the crawler-transporter. At the far left is the Rotating Service Structure. From the Fixed Service Structure, the Orbiter Access Arm is already extended to the orbiter. Endeavour is scheduled to be launched Nov. 30 at 10:01 p.m. EST on mission STS-97, the sixth construction flight to the International Space Station. Its payload includes the P6 Integrated Truss Structure and a photovoltaic (PV) module, with giant solar arrays that will provide power to the Station. The mission includes two spacewalks to complete the solar array connections KSC-00dig069

Space Shuttle Endeavour finally rests on Launch Pad 39B after its roll...

Space Shuttle Endeavour finally rests on Launch Pad 39B after its rollout was stalled several hours to fix a broken cleat on the crawler-transporter. At the far left is the Rotating Service Structure. From the ... More

KENNEDY SPACE CENTER, FLA. -- With the Rotating Service Structure rolled back, Space Shuttle Atlantis stands ready for launch on mission STS-110.  The Orbiter Access Arm extends from the Fixed Service Structure (FSS) to the crew compartment hatch, through which the STS-110 crew will enter Atlantis. Above the golden external tank is the vent hood (known as the "beanie cap") at the end of the gaseous oxygen vent arm.  Vapors are created as the liquid oxygen in the external tank boil off.   The hood vents the gaseous oxygen vapors away from the Space Shuttle vehicle.  The RSS provides protected access to the orbiter for changeout and servicing of payloads at the pad.  The structure has access platforms at five levels to provide access to the payload bay.  The FSS provides access to the orbiter and the RSS.  Mission STS-110 is scheduled to launch April 4 on its 11-day mission to the International Space Station KSC-02pd0392

KENNEDY SPACE CENTER, FLA. -- With the Rotating Service Structure roll...

KENNEDY SPACE CENTER, FLA. -- With the Rotating Service Structure rolled back, Space Shuttle Atlantis stands ready for launch on mission STS-110. The Orbiter Access Arm extends from the Fixed Service Structure... More

CAPE CANAVERAL, Fla. -- Employees check out space shuttle Atlantis after it was uncovered on Launch Pad 39A at NASA's Kennedy Space Center in Florida following the move of the rotating service structure (RSS). The structure provides weather protection and access to the shuttle while it awaits liftoff on the pad. RSS "rollback" marks a major milestone in Atlantis' STS-135 mission countdown.        Atlantis and its crew of four; Commander Chris Ferguson, Pilot Doug Hurley and Mission Specialists Sandy Magnus and Rex Walheim, are scheduled to lift off at 11:26 a.m. EDT on July 8 to deliver the Raffaello multi-purpose logistics module packed with supplies and spare parts to the International Space Station. Atlantis also will fly the Robotic Refueling Mission experiment that will investigate the potential for robotically refueling existing satellites in orbit. In addition, Atlantis will return with a failed ammonia pump module to help NASA better understand the failure mechanism and improve pump designs for future systems. STS-135 will be the 33rd flight of Atlantis, the 37th shuttle mission to the space station, and the 135th and final mission of NASA's Space Shuttle Program. For more information visit, www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Troy Cryder KSC-2011-5147

CAPE CANAVERAL, Fla. -- Employees check out space shuttle Atlantis aft...

CAPE CANAVERAL, Fla. -- Employees check out space shuttle Atlantis after it was uncovered on Launch Pad 39A at NASA's Kennedy Space Center in Florida following the move of the rotating service structure (RSS). ... More

CAPE CANAVERAL, Fla. -- Space shuttle Endeavour glistens in the sun on Launch Pad 39A at NASA's Kennedy Space Center in Florida. The rotating service structure (RSS) that protects the shuttle from the elements and provides access to its components is open to allow crews to move the primary payload for Endeavour's STS-134 mission into the pad's structure before installing it into the spacecraft's cargo bay.          Endeavour and its six-member STS-134 crew are targeted to lift off April 19 at 7:48 p.m. EDT to deliver the Alpha Magnetic Spectrometer-2 (AMS) and Express Logistics Carrier-3 to the International Space Station. This is Endeavour's final scheduled mission. For more information visit, www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts134/index.html. Photo credit: NASA/Frank Michaux KSC-2011-2402

CAPE CANAVERAL, Fla. -- Space shuttle Endeavour glistens in the sun on...

CAPE CANAVERAL, Fla. -- Space shuttle Endeavour glistens in the sun on Launch Pad 39A at NASA's Kennedy Space Center in Florida. The rotating service structure (RSS) that protects the shuttle from the elements ... More

KENNEDY SPACE CENTER, FLA. -- Space Shuttle Endeavour, atop the mobile launcher platform, is hard down on Launch Pad 39A after rolling out overnight.  First motion out of the Vehicle Assembly Building was at 8:10 p.m.  July 10.  The components of the shuttle are, first, the orbiter and then the solid rocket boosters flanking the external tank behind it.  To the left of the shuttle is the rotating service structure, which can be rolled around to enclose the vehicle for access during processing.  Behind it is the fixed service structure, topped by an 80-foot-tall lightning mast.  Extending from it to Endeavour is the orbiter access arm, which provides access into the vehicle. Endeavour is scheduled to launch on mission STS-118 on Aug. 7.  During the mission, Endeavour will carry into orbit the S5 truss, SPACEHAB module and external stowage platform 3. The mission is the 22nd flight to the International Space Station and will mark the first flight of Mission Specialist Barbara Morgan, the teacher-turned-astronaut whose association with NASA began more than 20 years ago.  STS-118 will be the first flight since 2002 for Endeavour, which has undergone extensive modifications, including the addition of safety upgrades already added to orbiters Discovery and Atlantis.  Photo credit: NASA/Ken Thornsley KSC-07pd1852

KENNEDY SPACE CENTER, FLA. -- Space Shuttle Endeavour, atop the mobile...

KENNEDY SPACE CENTER, FLA. -- Space Shuttle Endeavour, atop the mobile launcher platform, is hard down on Launch Pad 39A after rolling out overnight. First motion out of the Vehicle Assembly Building was at 8:... More

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, space shuttle Endeavour is illuminated by bright xenon lights on Launch Pad 39A after the rotating service structure (RSS) was moved away. The structure provides weather protection and access to the shuttle while it awaits lift off on the pad. RSS "rollback," as it's called, began at 11:52 p.m. EDT on April 28. The move was scheduled to begin at 7 p.m., but storms over Kennedy delayed pad operations for a few hours. STS-134 will deliver the Express Logistics Carrier-3, Alpha Magnetic Spectrometer-2 (AMS), a high-pressure gas tank and additional spare parts for the Dextre robotic helper to the International Space Station. Endeavour was scheduled to launch at 3:47 p.m. on April 29, but that attempt was scrubbed for at least 72 hours while engineers assess an issue associated with the shuttle's Auxiliary Power Unit 1. STS-134 will be the final spaceflight for Endeavour. For more information visit, www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts134/index.html. Photo credit: NASA/Ken Thornsley KSC-2011-3184

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, spa...

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, space shuttle Endeavour is illuminated by bright xenon lights on Launch Pad 39A after the rotating service structure (RSS) was moved away. The ... More

CAPE CANAVERAL, Fla. -- At NASA Kennedy Space Center's Launch Pad 39A, a worker inside space shuttle Endeavour's aft section removed a cover to provide access for the removal and replacement of the Load Control Assembly-2 (LCA-2).      Located in the orbiter's aft avionics bay 5, the LCA-2 assembly, which feeds power to the fuel line heaters, is believed to have caused the heaters for Endeavour's auxiliary power unit-1 (APU-1) to fail April 29 during the first launch attempt for the STS-134 mission. STS-134 will deliver the Express Logistics Carrier-3, Alpha Magnetic Spectrometer-2 (AMS), a high-pressure gas tank and additional spare parts for the Dextre robotic helper to the International Space Station. The mission also will be the final spaceflight for Endeavour. For more information, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts134/index.html. Photo credit: NASA/Kim Shiflett. KSC-2011-3214

CAPE CANAVERAL, Fla. -- At NASA Kennedy Space Center's Launch Pad 39A,...

CAPE CANAVERAL, Fla. -- At NASA Kennedy Space Center's Launch Pad 39A, a worker inside space shuttle Endeavour's aft section removed a cover to provide access for the removal and replacement of the Load Control... More

CAPE CANAVERAL, Fla. –At NASA's Kennedy Space Center in Florida, the crawler-transporter delivers space shuttle Discovery atop the mobile launcher platform onto Launch Pad 39A.  Traveling from the Vehicle Assembly Building, the shuttle took nearly 12 hours on the journey as technicians stopped several times to clear mud from the crawler's treads and bearings caused by the waterlogged crawlerway.  First motion out of the VAB was at 2:07 a.m. EDT Aug. 4. Rollout was delayed approximately 2 hours due to lightning in the area.  In the background is the blue water of the Atlantic Ocean.  At left is the White Room at the end of the orbiter access arm.  When in place against shuttle, the White Room provides entry into the cockpit.  Discovery's 13-day flight will deliver a new crew member and 33,000 pounds of equipment to the International Space Station. The equipment includes science and storage racks, a freezer to store research samples, a new sleeping compartment and the COLBERT treadmill.  Launch of Discovery on its STS-128 mission is targeted for late August.   Photo credit: NASA/Troy Cryder KSC-2009-4423

CAPE CANAVERAL, Fla. –At NASA's Kennedy Space Center in Florida, the c...

CAPE CANAVERAL, Fla. –At NASA's Kennedy Space Center in Florida, the crawler-transporter delivers space shuttle Discovery atop the mobile launcher platform onto Launch Pad 39A. Traveling from the Vehicle Assem... More

KENNEDY SPACE CENTER, FLA. -  The STS-115 crew members complete their suitup in the White Room before entering Space Shuttle Atlantis on Launch Pad 39B for a simulated launch countdown.  Shown here are Mission Specialists Daniel Burbank (left) and Steven MacLean. The White Room, which is located at the end of the orbiter access arm, allows entry into the orbiter through the crew access hatch.  The mission crew is at KSC for Terminal Countdown Demonstration Test (TCDT) activities that are preparation for launch.  Liftoff of Atlantis is scheduled to take place in a window that opens Aug. 27.  During their 11-day mission to the International Space Station, the STS-115 crew will continue construction of the station and attach the payload elements, the Port 3/4 truss segment with its two large solar arrays.  Photo credit: NASA/Jim Grossmann KSC-06pd1822

KENNEDY SPACE CENTER, FLA. - The STS-115 crew members complete their ...

KENNEDY SPACE CENTER, FLA. - The STS-115 crew members complete their suitup in the White Room before entering Space Shuttle Atlantis on Launch Pad 39B for a simulated launch countdown. Shown here are Mission ... More

KENNEDY SPACE CENTER, Fla.  --  In the White Room on Launch Pad 39A, STS-118 Pilot Charlie Hobaugh waits for the closeout crew to finish checking his launch and entry suit before he enters Space Shuttle Endeavour.  Hobaugh and the rest of the crew are taking part in a simulated launch countdown, the culmination of terminal countdown demonstration test activities.  The White Room is situated at the end of the orbiter access arm and provides entry into the orbiter. TCDT activities also include M-113 training, payload familiarization and emergency egress training at the pad.  The mission is the 22nd flight to the International Space Station and Space Shuttle Endeavour will carry a payload including the S5 truss, a SPACEHAB module and external stowage platform 3. STS-118 is targeted for launch on Aug. 7.  Photo credit: NASA/Amanda Diller KSC-07pd1985

KENNEDY SPACE CENTER, Fla. -- In the White Room on Launch Pad 39A, S...

KENNEDY SPACE CENTER, Fla. -- In the White Room on Launch Pad 39A, STS-118 Pilot Charlie Hobaugh waits for the closeout crew to finish checking his launch and entry suit before he enters Space Shuttle Endeavo... More

KENNEDY SPACE CENTER, FLA. -   After rollback of the rotating service structure on Launch Pad 39B, Space Shuttle Atlantis shines in the late afternoon sun.  The RSS provides protected access to the orbiter for changeout and servicing of payloads at the pad and then is rolled away before liftoff. At right is the 300,000-gallon water tank that releases a deluge of water across the mobile launcher platform during liftoff to aid sound suppression.  Atlantis is scheduled to launch Sept. 6 at 12:29 p.m. EDT on mission STS-115.  During the mission, Atlantis' astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment on the station. The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. This mission is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the International Space Station. STS-115 is scheduled to last 11 days with a planned KSC landing at about 8:03 a.m. EDT on Sept. 17.    Photo credit: NASA/Ken Thornsley KSC-06pd2045

KENNEDY SPACE CENTER, FLA. - After rollback of the rotating service ...

KENNEDY SPACE CENTER, FLA. - After rollback of the rotating service structure on Launch Pad 39B, Space Shuttle Atlantis shines in the late afternoon sun. The RSS provides protected access to the orbiter for ... More

KENNEDY SPACE CENTER, FLA. --  In the waning light, space shuttle Discovery is towed along a two-mile tow-way to the Orbital Processing Facility, or OPF, where processing Discovery for another flight begins.  Towing normally begins within four hours after landing and is completed within six hours unless removal of time-sensitive experiments is required on the runway.   In the OPF, turnaround processing procedures on Discovery will include various post-flight deservicing and maintenance functions, which are carried out in parallel with payload removal and the installation of equipment needed for the next mission.  Before post-flight deservicing can continue beyond initial safing operations, certain vehicle systems must be mechanically secured and access platforms installed.  Discovery completed mission STS-120 with an on-time landing at 1:01 p.m. EST. Photo credit: NASA/Jim Grossmann KSC-07pd3216

KENNEDY SPACE CENTER, FLA. -- In the waning light, space shuttle Disc...

KENNEDY SPACE CENTER, FLA. -- In the waning light, space shuttle Discovery is towed along a two-mile tow-way to the Orbital Processing Facility, or OPF, where processing Discovery for another flight begins. T... More

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, space shuttle Discovery is illuminated by bright xenon lights on Launch Pad 39A after the rotating service structure was moved away. The structure provides weather protection and access to the shuttle while it awaits lift off on the pad. RSS "rollback," as it's called, began at 8:02 p.m. EST on Feb. 23 and wrapped up at 8:37 p.m.           Scheduled to lift off Feb. 24 at 4:50 p.m. EST, Discovery and its six-member crew will deliver the Permanent Multipurpose Module, packed with supplies and critical spare parts, as well as Robonaut 2, the dexterous humanoid astronaut helper, to the International Space Station. Discovery, which will fly its 39th mission, is scheduled to be retired following STS-133. This will be the 133rd Space Shuttle Program mission and the 35th shuttle voyage to the space station. For more information on the STS-133 mission, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts133/. Photo credit: NASA/Jack Pfaller KSC-2011-1585

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, spa...

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, space shuttle Discovery is illuminated by bright xenon lights on Launch Pad 39A after the rotating service structure was moved away. The struct... More

CAPE CANAVERAL, Fla. - The crawler-transporter is positioned under the mobile launcher platform with the 327-foot-tall Ares I-X rocket. The rocket is prepared to leave the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida, on its way to Launch Pad 39B. The move to the launch pad, known as "rollout," began at 1:39 a.m. EDT.    The transfer of the pad from the Space Shuttle Program to the Constellation Program took place May 31. Modifications made to the pad include the removal of shuttle unique subsystems, such as the orbiter access arm and a section of the gaseous oxygen vent arm, along with the installation of three 600-foot lightning towers, access platforms, environmental control systems and a vehicle stabilization system.  Part of the Constellation Program, the Ares I-X is the test vehicle for the Ares I. The Ares I-X flight test is targeted for Oct. 27. For information on the Ares I-X vehicle and flight test, visit http://www.nasa.gov/aresIX. Photo credit: NASA/Kim Shiflett KSC-2009-5544

CAPE CANAVERAL, Fla. - The crawler-transporter is positioned under the...

CAPE CANAVERAL, Fla. - The crawler-transporter is positioned under the mobile launcher platform with the 327-foot-tall Ares I-X rocket. The rocket is prepared to leave the Vehicle Assembly Building at NASA's Ke... More

KENNEDY SPACE CENTER, FLA. -- On a cloudy Florida day, Space Shuttle Atlantis awaits launch atop a mobile launch platform at Launch Pad 39A. At the right of the pad is the 290-foot tall, 300,000-gallon water tank that is part of the sound suppression system during launches. In the foreground is the crawlerway. a 130-foot-wide roadway with a 5-percent grade leading to the top of the launch pad. Rollback of the pad's rotating service structure, or RSS, is one of the milestones in preparation for the launch of mission STS-117 on June 8. Rollback started at 10:56 p.m. EDT June 7 and was complete at 11:34 p.m. The RSS, the massive structure to the left of the shuttle, provides protected access to the orbiter for changeout and servicing of payloads at the pad. The structure is supported by a rotating bridge that pivots about a vertical axis on the side of the pad's flame trench. The hinge column rests on the pad surface and is braced to the fixed service structure. Support for the outer end of the bridge is provided by two eight-wheel, motor-driven trucks that move along circular twin rails installed flush with the pad surface. The track crosses the flame trench on a permanent bridge. The RSS is 102 feet long, 50 feet wide and 130 feet high. The structure has orbiter access platforms at five levels to provide access to the payload bay while the orbiter is being serviced in the RSS. Each platform has independent extendable planks that can be arranged to conform to a payload's configuration. This mission is the 118th shuttle flight and the 21st U.S. flight to the International Space Station and will deliver and install the S3/S4 truss segment, deploy a set of solar arrays and prepare them for operation. Photo credit: NASA/Ken Thornsley KSC-07pd1403

KENNEDY SPACE CENTER, FLA. -- On a cloudy Florida day, Space Shuttle A...

KENNEDY SPACE CENTER, FLA. -- On a cloudy Florida day, Space Shuttle Atlantis awaits launch atop a mobile launch platform at Launch Pad 39A. At the right of the pad is the 290-foot tall, 300,000-gallon water ta... More

KENNEDY SPACE CENTER, FLA. -  In preparation for the July 1 launch of Space Shuttle Discovery on mission STS-121, the Launch Pad 39B rotating service structure (RSS) enclosing the shuttle rolls away.  Above the golden external tank is the vent hood (known as the "beanie cap") at the end of the gaseous oxygen vent arm. Vapors are created as the liquid oxygen in the external tank boil off. The hood vents the gaseous oxygen vapors away from the space shuttle vehicle. The RSS provides protected access to the orbiter for changeout and servicing of payloads at the pad. The structure is supported by a rotating bridge that pivots about a vertical axis on the west side of the pad's flame trench. The hinge column rests on the pad surface and is braced to the fixed service structure. Support for the outer end of the bridge is provided by two eight-wheel, motor-driven trucks that move along circular twin rails installed flush with the pad surface. The track crosses the flame trench on a permanent bridge.  The RSS is 102 feet long, 50 feet wide and 130 feet high. The structure has orbiter access platforms at five levels to provide access to the payload bay while the orbiter is being serviced in the RSS. Each platform has independent extendable planks that can be arranged to conform to a payload's configuration.  This mission is the 115th shuttle flight and the 18th U.S. flight to the International Space Station. Photo credit: NASA/Kim Shiflett KSC-06pd1302

KENNEDY SPACE CENTER, FLA. - In preparation for the July 1 launch of ...

KENNEDY SPACE CENTER, FLA. - In preparation for the July 1 launch of Space Shuttle Discovery on mission STS-121, the Launch Pad 39B rotating service structure (RSS) enclosing the shuttle rolls away. Above the... More

CAPE CANAVERAL, Fla. -- The interior of NASA's new mobile launcher, or ML, support structure is outfitted with solid steel flooring, lights, air conditioning, electrical boxes and sprinkler piping at NASA's Kennedy Space Center in Florida.    The 355-foot-tall structure will support NASA's future human spaceflight program. The base of the launcher is lighter than space shuttle mobile launcher platforms so the crawler-transporter can pick up the heavier load of the tower and a taller rocket. The next step will be to add ground support equipment, such as umbilicals and access arms, for future rocket launches. For information on NASA's future plans, visit www.nasa.gov. Photo credit: NASA/Kim Shiflett KSC-2010-4436

CAPE CANAVERAL, Fla. -- The interior of NASA's new mobile launcher, or...

CAPE CANAVERAL, Fla. -- The interior of NASA's new mobile launcher, or ML, support structure is outfitted with solid steel flooring, lights, air conditioning, electrical boxes and sprinkler piping at NASA's Ken... More

KENNEDY SPACE CENTER, FLA. --  On Launch Pad 39A at NASA's Kennedy Space Center, STS-123 Rick Linnehan (front) is helped with his final flight suit fit check in the White Room before entering space shuttle Endeavour for launch. The White Room provides access into the shuttle. Liftoff was on time at 2:28 a.m. EDT.  The crew will make a record-breaking 16-day mission to the International Space Station and deliver the first section of the Japan Aerospace Exploration Agency's Kibo laboratory and the Canadian Space Agency's two-armed robotic system, Dextre.  Photo credit: NASA/Scott Haun, Richard Prickett KSC-08pd0719

KENNEDY SPACE CENTER, FLA. -- On Launch Pad 39A at NASA's Kennedy Spa...

KENNEDY SPACE CENTER, FLA. -- On Launch Pad 39A at NASA's Kennedy Space Center, STS-123 Rick Linnehan (front) is helped with his final flight suit fit check in the White Room before entering space shuttle Ende... More

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, workers monitor the progress of a crawler-transporter as it moves NASA's new mobile launcher (ML) support structure from a construction site, north of the Vehicle Assembly Building to the Mobile Launcher east park site.           The base of the launcher is lighter than space shuttle mobile launcher platforms so the crawler-transporter can pick up the heavier load of the tower and a taller rocket. Once there, the ML can be outfitted with ground support equipment, such as umbilicals and access arms, for future rocket launches. It took about two years to construct the 355-foot-tall structure, which will support NASA's future human spaceflight program. Photo credit: NASA/Jack Pfaller KSC-2010-4964

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, wor...

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, workers monitor the progress of a crawler-transporter as it moves NASA's new mobile launcher (ML) support structure from a construction site, n... More

CAPE CANAVERAL, Fla. –  In the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, workers are constructing flight support system (FSS) access scaffolding that will be used to prepare the Hubble Space Telescope, or HST, carriers for the STS-125 servicing mission 4.  The FSS will berth, secure and furnish power to Hubble and also contains the soft capture mechanism to be attached to the telescope. Upon completion of STS-125, the Hubble will provide even deeper and more detailed views of the Universe. The STS-125 mission will be the final space shuttle mission to the Hubble Space Telescope. Photo credit: NASA/Jack Pfaller KSC-08pd1913

CAPE CANAVERAL, Fla. – In the Payload Hazardous Servicing Facility at...

CAPE CANAVERAL, Fla. – In the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, workers are constructing flight support system (FSS) access scaffolding that will be used to prepare the Hubbl... More

CAPE CANAVERAL, Fla. -- This panoramic view shows NASA's new mobile launcher, or ML, support structure standing tall at NASA's Kennedy Space Center in Florida. It took about two years to construct the launcher in the Mobile Launcher Park site, north of the Vehicle Assembly Building, or VAB. The 355-foot-tall structure will support NASA's future human spaceflight program. The base of the launcher is lighter than space shuttle mobile launcher platforms so the crawler-transporter can pick up the heavier load of the tower and a taller rocket. The next step will be to add ground support equipment, such as umbilicals and access arms, for future rocket launches. For information on NASA's future plans, visit www.nasa.gov. Photo credit: NASA/Frankie Martin KSC-2010-4455

CAPE CANAVERAL, Fla. -- This panoramic view shows NASA's new mobile la...

CAPE CANAVERAL, Fla. -- This panoramic view shows NASA's new mobile launcher, or ML, support structure standing tall at NASA's Kennedy Space Center in Florida. It took about two years to construct the launcher ... More

CAPE CANAVERAL, Fla. –  On Launch Pad 39A at NASA's Kennedy Space Center in Florida, technicians in the control booth get ready to roll the rotating service structure, or RSS, above them away from space shuttle Endeavour. First motion was at 10:39 a.m. EDT. The rollback is in preparation for Endeavour's liftoff June 13 on the STS-127 mission with a crew of seven.  The rotating structure provides protected access to the shuttle for changeout and servicing of payloads at the pad. It is supported by a rotating bridge that pivots on a vertical axis on the west side of the pad's flame trench.  After the RSS is rolled back, the orbiter is ready for fuel cell activation and external tank cryogenic propellant loading operations. The launch will be Endeavour's 23rd flight.  The shuttle will carry the Japanese Experiment Module's Exposed Facility, or JEM-EF, and the Experiment Logistics Module-Exposed Section, or ELM-ES, on STS-127. The mission is the final of three flights dedicated to the assembly of the Japan Aerospace Exploration Agency's Kibo laboratory complex on the space station. Endeavour's launch is scheduled for June 13 at 7:17 a.m. EDT.  Photo credit: NASA/Jim Grossmann KSC-2009-3695

CAPE CANAVERAL, Fla. – On Launch Pad 39A at NASA's Kennedy Space Cent...

CAPE CANAVERAL, Fla. – On Launch Pad 39A at NASA's Kennedy Space Center in Florida, technicians in the control booth get ready to roll the rotating service structure, or RSS, above them away from space shuttle... More

KENNEDY SPACE CENTER, FLA. --    Under a blue sky streaked with clouds, Launch Pad 39B holds Space Shuttle Discovery, ready for launch of mission STS-116.  At the far left is the rotating service structure, rolled back after midnight in preparation for launch.  Next to Discovery is the fixed service structure, with the 80-foot-high lightning mast on top, part of the lightning protection system on the pad. Beneath Discovery's wings are the tail masts, which provide several umbilical connections to the orbiter, including a liquid-oxygen line through one and a liquid-hydrogen line through another.  Seen above the golden external tank is the vent hood (known as the "beanie cap") at the end of the gaseous oxygen vent arm, extending from the FSS. Vapors are created as the liquid oxygen in the external tank boil off. The hood vents the gaseous oxygen vapors away from the space shuttle vehicle. Below it, also extending toward Discovery from the FSS, is the orbiter access arm with the White Room at the end. The crew gains access into the orbiter through the White Room.  Discovery is scheduled to launch on mission STS-116 at 9:35 p.m. today.  On the mission, the crew will deliver truss segment, P5, to the International Space Station and begin the intricate process of reconfiguring and redistributing the power generated by two pairs of U.S. solar arrays. The P5 will be mated to the P4 truss that was delivered and attached during the STS-115 mission in September. Photo credit: NASA/Ken Thornsley KSC-06pd2674

KENNEDY SPACE CENTER, FLA. -- Under a blue sky streaked with clouds...

KENNEDY SPACE CENTER, FLA. -- Under a blue sky streaked with clouds, Launch Pad 39B holds Space Shuttle Discovery, ready for launch of mission STS-116. At the far left is the rotating service structure, rol... More

CAPE CANAVERAL, Fla. -- At the Kennedy Space Center in Florida, the shuttle service and access tower SSAT, left, is assembled at Launch Complex 39A from sections of launch umbilical tower 3. The lower 180 feet of the old ML-3 will be topped by the former uppermost section on which a hammerhead crane will be installed and the next lower section which houses the intact ML-3 elevator room and equipment. The SSAT will anchor and support a hinge column to the Payload Changeout Room PCR which will travel on a rail in a specified area to enclose the space shuttle's cargo bay on the pad for installation or removal of payloads. Mobile Launcher 2, center right, is on the pad to support the PCR during construction. Photo Credit: NASA KSC-76PC-0541

CAPE CANAVERAL, Fla. -- At the Kennedy Space Center in Florida, the sh...

CAPE CANAVERAL, Fla. -- At the Kennedy Space Center in Florida, the shuttle service and access tower SSAT, left, is assembled at Launch Complex 39A from sections of launch umbilical tower 3. The lower 180 feet ... More

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians begin to bond and seal the tiles around the access panels to space shuttle Endeavour’s forward reaction control system, or FRCS.    The FRCS helped a shuttle maneuver while in orbit. Endeavour’s FRCS was removed and sent to White Sands Test Facility in New Mexico to be cleaned of its toxic propellants and was reinstalled on the shuttle in February.  Endeavour is being prepared for public display at the California Science Center in Los Angeles. Over the course of its 19-year career, Endeavour spent 299 days in space during 25 missions. For more information, visit http://www.nasa.gov/shuttle.  Photo credit: NASA/Frankie Martin KSC-2012-1935

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility-2 at NASA’s Kenn...

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians begin to bond and seal the tiles around the access panels to space shuttle En... More

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, a United Space Alliance technician, with a tool tethered to his wrist, bonds and seals the tiles around the access panels to space shuttle Endeavour’s forward reaction control system, or FRCS.    The FRCS helped a shuttle maneuver while in orbit. Endeavour’s FRCS was removed and sent to White Sands Test Facility in New Mexico to be cleaned of its toxic propellants and was reinstalled on the shuttle in February.  Endeavour is being prepared for public display at the California Science Center in Los Angeles. Over the course of its 19-year career, Endeavour spent 299 days in space during 25 missions. For more information, visit http://www.nasa.gov/shuttle.  Photo credit: NASA/Frankie Martin KSC-2012-1936

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility-2 at NASA’s Kenn...

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, a United Space Alliance technician, with a tool tethered to his wrist, bonds and seals the tiles around the acc... More

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, preparations are under way to begin bonding and sealing the tiles around the access panels to space shuttle Endeavour’s forward reaction control system, or FRCS.    The FRCS helped a shuttle maneuver while in orbit. Endeavour’s FRCS was removed and sent to White Sands Test Facility in New Mexico to be cleaned of its toxic propellants and was reinstalled on the shuttle in February.  Endeavour is being prepared for public display at the California Science Center in Los Angeles. Over the course of its 19-year career, Endeavour spent 299 days in space during 25 missions. For more information, visit http://www.nasa.gov/shuttle.  Photo credit: NASA/Frankie Martin KSC-2012-1934

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility-2 at NASA’s Kenn...

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, preparations are under way to begin bonding and sealing the tiles around the access panels to space shuttle End... More

The Goodyear Blimp passes near the Space Transportation System (STS) shuttle. The shuttle, with access arms in place, is undergoing preparations prior to its maiden flight

The Goodyear Blimp passes near the Space Transportation System (STS) s...

The original finding aid described this photograph as: Base: Kennedy Space Center State: Florida (FL) Country: United States Of America (USA) Scene Camera Operator: Unknown Release Status: Released to Publ... More

The Space Transportation System (STS) shuttle Columbia, with access arms in place, at Launch Pad 39. The shuttle is undergoing preparations prior to its maiden flight

The Space Transportation System (STS) shuttle Columbia, with access ar...

The original finding aid described this photograph as: Base: Kennedy Space Center State: Florida (FL) Country: United States Of America (USA) Scene Camera Operator: Unknown Release Status: Released to Publ... More

61B-33-000A - STS-61B - Payload bay of Atlantis with EASE and ACCESS visible

61B-33-000A - STS-61B - Payload bay of Atlantis with EASE and ACCESS v...

The original finding aid described this as: Description: Photographic documentation showing the payload bay of the orbiter Atlantis during STS-61B. In the foreground are the parts to both Experimental Assembly... More

61B-41-054 - STS-61B - Ross and Spring work on EASE and ACCESS during Extravehicular Activity (EVA)

61B-41-054 - STS-61B - Ross and Spring work on EASE and ACCESS during ...

The original finding aid described this as: Description: Photographic documentation showing astronauts in Extravehicular Mobility Units (EMU) working on both Experimental Assembly of Structures in Extravehicul... More

61B-45-031 - STS-61B - Spring and Ross work on EASE & ACCESS during Extravehicular Activity (EVA)

61B-45-031 - STS-61B - Spring and Ross work on EASE & ACCESS during Ex...

The original finding aid described this as: Description: Photographic documentation showing astronauts in Extravehicular Mobility Units (EMU) working on both Experimental Assembly of Structures in Extravehicul... More

61B-41-015 - STS-61B - Ross and Spring work on EASE and ACCESS during Extravehicular Activity (EVA)

61B-41-015 - STS-61B - Ross and Spring work on EASE and ACCESS during ...

The original finding aid described this as: Description: Photographic documentation showing astronauts in Extravehicular Mobility Units (EMU) working on both Experimental Assembly of Structures in Extravehicul... More

61B-41-036 - STS-61B - Ross and Spring work on EASE and ACCESS during Extravehicular Activity (EVA)

61B-41-036 - STS-61B - Ross and Spring work on EASE and ACCESS during ...

The original finding aid described this as: Description: Photographic documentation showing astronauts in Extravehicular Mobility Units (EMU) working on both Experimental Assembly of Structures in Extravehicul... More

61B-41-035 - STS-61B - Ross and Spring work on EASE and ACCESS during Extravehicular Activity (EVA)

61B-41-035 - STS-61B - Ross and Spring work on EASE and ACCESS during ...

The original finding aid described this as: Description: Photographic documentation showing astronauts in Extravehicular Mobility Units (EMU) working on both Experimental Assembly of Structures in Extravehicul... More

61B-45-030 - STS-61B - Spring and Ross work on EASE & ACCESS during Extravehicular Activity (EVA)

61B-45-030 - STS-61B - Spring and Ross work on EASE & ACCESS during Ex...

The original finding aid described this as: Description: Photographic documentation showing astronauts in Extravehicular Mobility Units (EMU) working on both Experimental Assembly of Structures in Extravehicul... More

Previous

of 13

Next