KENNEDY SPACE CENTER, FLA. - A closeup of crawler-transportation (CT...
KENNEDY SPACE CENTER, FLA. - A closeup of crawler-transportation (CT) number 2 shows the new muffler system on the vehicle. The CT also recently underwent modifications to the cab. The CT is transporting a... More
Space Shuttle Endeavor, STS-57 Launch Preparations
Ed Muktarian, a structural engineer with Lockheed Space Operations Co., is assisting with the docking of the Space Shuttle Endeavour at Launch Pad 39B. Muktarian is using a surveying instrument called a zenith ... More
Space Shuttle Discovery, STS-63 Rollout
The Space Shuttle Discovery completes the final Earth-bound portion of its journey into space, leaving the Vehicle Assembly Building on the slow trip to Launch Pad 39B. Discovery is scheduled to fly the first S... More
Space Shuttle Discovery, STS-82 Rollout
The rising sun and some scattered clouds provide a picturesque backdrop for the Space Shuttle Discovery as it travels along the Crawlerway toward Launch Pad 39A in preparation for the STS-83 mission. The Shuttl... More
In this aerial view the Crawler Transporter Maintenance Building (cent...
In this aerial view the Crawler Transporter Maintenance Building (center) sits between two crawler transporters. The KSC crawlers are the largest tracked vehicles known. Once used to move assembled Apollo/Satur... More
In this aerial view looking south can be seen Launch Complex (LC) 39 a...
In this aerial view looking south can be seen Launch Complex (LC) 39 area, where assembly, checkout and launch of the Space Shuttle Orbiter and its External Tank and twin Solid Rocket Boosters take place. Centr... More
The early morning sun silhouettes STS-95 Space Shuttle Discovery, on t...
The early morning sun silhouettes STS-95 Space Shuttle Discovery, on the Mobile Launch Platform, at Launch Complex Pad 39B after a 6-hour, 4.2-mile trip from the Vehicle Assembly Building. At the launch pad, th... More
At the end of its 6-hour, 4.2-mile circular trek from the Vehicle Asse...
At the end of its 6-hour, 4.2-mile circular trek from the Vehicle Assembly Building, the STS-95 Space Shuttle Discovery, still on the Mobile Launch Platform and crawler transporter, sits at Launch Pad 39B. To i... More
As daylight creeps over the horizon, STS-95 Space Shuttle Discovery, o...
As daylight creeps over the horizon, STS-95 Space Shuttle Discovery, on the Mobile Launch Platform, arrives at Launch Complex Pad 39B after a 4.2-mile trip taking approximately 6 hours. At the left is the "whit... More
(Left) The crawler transporter makes its way across Launch Pad 39-B to...
(Left) The crawler transporter makes its way across Launch Pad 39-B to the Mobile Launch Platform and Space Shuttle Discovery to await possible orders for a rollback. KSC managers developed a precautionary plan... More
At the end of its 6-hour, 4.2-mile circular trek from the Vehicle Asse...
At the end of its 6-hour, 4.2-mile circular trek from the Vehicle Assembly Building, the STS-95 Space Shuttle Discovery sits on the Mobile Launch Platform, still atop the crawler transporter, at Launch Pad 39B.... More
Perched on the Mobile Launch Platform, in the early morning hours Spac...
Perched on the Mobile Launch Platform, in the early morning hours Space Shuttle Discovery approaches Launch Complex Pad 39B after a 6-hour, 4.2-mile trip from the Vehicle Assembly Building. At the launch pad, t... More
The STS-95 Space Shuttle Discovery sits on the Mobile Launch Platform,...
The STS-95 Space Shuttle Discovery sits on the Mobile Launch Platform, still atop the crawler transporter, at Launch Pad 39B, after its 4.2-mile, 6-hour trek from the Vehicle Assembly Building. On its left is t... More
Dawn breaks behind STS-95 Space Shuttle Discovery, on the Mobile Launc...
Dawn breaks behind STS-95 Space Shuttle Discovery, on the Mobile Launch Platform, as it approaches Launch Complex Pad 39B after a 6-hour, 4.2-mile trip from the Vehicle Assembly Building. At the launch pad, the... More
The early morning light reveals STS-95 Space Shuttle Discovery, on the...
The early morning light reveals STS-95 Space Shuttle Discovery, on the Mobile Launch Platform, on its 6-hour, 4.2-mile trek to Launch Complex Pad 39B from the Vehicle Assembly Building. To the left is the Fixed... More
In the pre-dawn hours, STS-95 Space Shuttle Discovery, on the Mobile L...
In the pre-dawn hours, STS-95 Space Shuttle Discovery, on the Mobile Launch Platform, begins rollout from the Vehicle Assembly Building to Launch Complex Pad 39B via the crawler transporter. The 4.2-mile trip t... More
In the pre-dawn hours, STS-95 Space Shuttle Discovery, on the Mobile L...
In the pre-dawn hours, STS-95 Space Shuttle Discovery, on the Mobile Launch Platform, exits the doors of the Vehicle Assembly Building as it begins rollout to Launch Complex Pad 39B via the crawler transporter.... More
The crawler transporter nears the Mobile Launch Platform and Space Shu...
The crawler transporter nears the Mobile Launch Platform and Space Shuttle Discovery to await possible orders for a rollback. KSC managers developed a precautionary plan to roll back Discovery to the Vehicle As... More
The STS-95 Space Shuttle Discovery sits on the Mobile Launch Platform,...
The STS-95 Space Shuttle Discovery sits on the Mobile Launch Platform, still atop the crawler transporter, at Launch Pad 39B. To its left is the Fixed Service Structure that provides access to the orbiter and t... More
Space Shuttle Discovery sits atop the Mobile Launch Platform on Launch...
Space Shuttle Discovery sits atop the Mobile Launch Platform on Launch Pad 39-B, with the Rotating Service Structure moved back, to await rollback decision. At the right is the 300,000-gallon water tank, part o... More
In this close-up, Space Shuttle Discovery sits atop the Mobile Launch ...
In this close-up, Space Shuttle Discovery sits atop the Mobile Launch Platform on Launch Pad 39-B, with the Rotating Service Structure moved back, to await rollback decision. The flag at right shows the increas... More
This close-up of the Space Shuttle Discovery shows it atop the Mobile ...
This close-up of the Space Shuttle Discovery shows it atop the Mobile Launch Platform on Launch Pad 39-B, with the "white room" still extended, awaiting rollback decision. KSC managers developed a precautionary... More
KENNEDY SPACE CENTER, FLA. -- At left, the payload canister for Space ...
KENNEDY SPACE CENTER, FLA. -- At left, the payload canister for Space Shuttle Discovery is lifted from its canister movement vehicle to the top of the Rotating Service Structure on Launch Pad 39-B. Discovery (r... More
KENNEDY SPACE CENTER, FLA. -- At left, the payload canister for Space ...
KENNEDY SPACE CENTER, FLA. -- At left, the payload canister for Space Shuttle Discovery is lifted from its canister movement vehicle to the top of the Rotating Service Structure on Launch Pad 39-B. Discovery (r... More
KENNEDY SPACE CENTER, FLA. -- After rollback of the Rotating Service ...
KENNEDY SPACE CENTER, FLA. -- After rollback of the Rotating Service Structure on Launch Pad 39A, Space Shuttle Columbia is revealed atop its Mobile Launch Platform. Visible is the gaseous oxygen vent arm and... More
KENNEDY SPACE CENTER, FLA. - Inside the cab of crawler-transporter (...
KENNEDY SPACE CENTER, FLA. - Inside the cab of crawler-transporter (CT) number 2, driver Sam Dove, with United Space Alliance, operates the vehicle on a test run to the launch pad. The CT recently underwent ... More
KENNEDY SPACE CENTER, FLA. - A closeup of crawler-transporter (CT) n...
KENNEDY SPACE CENTER, FLA. - A closeup of crawler-transporter (CT) number 2 shows the cab (left, above the tracks) that recently underwent modifications. The CT is transporting a Mobile Launch Platform (MLP)... More
KENNEDY SPACE CENTER, FLA. - Inside the cab of crawler-transporter (C...
KENNEDY SPACE CENTER, FLA. - Inside the cab of crawler-transporter (CT) number 2, driver Sam Dove, with United Space Alliance, operates the vehicle on a test run to the launch pad. The CT recently underwent m... More
KENNEDY SPACE CENTER, FLA. - A closeup of crawler-transporter (CT) n...
KENNEDY SPACE CENTER, FLA. - A closeup of crawler-transporter (CT) number 2 shows the cab, at left, that recently underwent modifications. The CT is transporting a Mobile Launch Platform (MLP) on a test run ... More
S126E006655 - STS-126 - STS-126 Launch Preparations
The original finding aid described this as: Description: An STS-126 crewmember stands on the concrete hardstand at the base of the Mobile Launch Platform at launch pad 39A prior to launch of the STS-126 missio... More
S126E006654 - STS-126 - STS-126 Launch Preparations
The original finding aid described this as: Description: View of a portion of the Mobile Launch Platform on the concrete hardstand at launch pad 39A, taken by a crewmember prior to launch of the STS-126 missio... More