The early morning light reveals STS-95 Space Shuttle Discovery, on the Mobile Launch Platform, on its 6-hour, 4.2-mile trek to Launch Complex Pad 39B from the Vehicle Assembly Building. To the left is the Fixed Service Structure that provides access to the orbiter and the Rotating Service Structure. In the background is th eelevated water tank that helps reduce sound levels during launch. At the launch pad, the orbiter, external tank and solid rocket boosters will undergo final preparations for the launch, scheduled to lift off Oct. 29. The mission includes research payloads such as the Spartan solar-observing deployable spacecraft, the Hubble Space Telescope Orbital Systems Test Platform, the International Extreme Ultraviolet Hitchhiker, as well as the SPACEHAB single module with experiments on space flight and the aging process KSC-98pc1105

Similar

The early morning light reveals STS-95 Space Shuttle Discovery, on the Mobile Launch Platform, on its 6-hour, 4.2-mile trek to Launch Complex Pad 39B from the Vehicle Assembly Building. To the left is the Fixed Service Structure that provides access to the orbiter and the Rotating Service Structure. In the background is th eelevated water tank that helps reduce sound levels during launch. At the launch pad, the orbiter, external tank and solid rocket boosters will undergo final preparations for the launch, scheduled to lift off Oct. 29. The mission includes research payloads such as the Spartan solar-observing deployable spacecraft, the Hubble Space Telescope Orbital Systems Test Platform, the International Extreme Ultraviolet Hitchhiker, as well as the SPACEHAB single module with experiments on space flight and the aging process KSC-98pc1105

description

Summary

The early morning light reveals STS-95 Space Shuttle Discovery, on the Mobile Launch Platform, on its 6-hour, 4.2-mile trek to Launch Complex Pad 39B from the Vehicle Assembly Building. To the left is the Fixed Service Structure that provides access to the orbiter and the Rotating Service Structure. In the background is th eelevated water tank that helps reduce sound levels during launch. At the launch pad, the orbiter, external tank and solid rocket boosters will undergo final preparations for the launch, scheduled to lift off Oct. 29. The mission includes research payloads such as the Spartan solar-observing deployable spacecraft, the Hubble Space Telescope Orbital Systems Test Platform, the International Extreme Ultraviolet Hitchhiker, as well as the SPACEHAB single module with experiments on space flight and the aging process

The Space Shuttle program was the United States government's manned launch vehicle program from 1981 to 2011, administered by NASA and officially beginning in 1972. The Space Shuttle system—composed of an orbiter launched with two reusable solid rocket boosters and a disposable external fuel tank— carried up to eight astronauts and up to 50,000 lb (23,000 kg) of payload into low Earth orbit (LEO). When its mission was complete, the orbiter would re-enter the Earth's atmosphere and lands as a glider. Although the concept had been explored since the late 1960s, the program formally commenced in 1972 and was the focus of NASA's manned operations after the final Apollo and Skylab flights in the mid-1970s. It started with the launch of the first shuttle Columbia on April 12, 1981, on STS-1. and finished with its last mission, STS-135 flown by Atlantis, in July 2011.

date_range

Date

21/09/1998
create

Source

NASA
copyright

Copyright info

Public Domain Dedication (CC0)

Explore more

kennedy space center
kennedy space center