orbiter access arm

457 media by topicpage 1 of 5
KENNEDY SPACE CENTER, FLA. --  Space Shuttle Discovery, on top of the mobile launcher platform and crawler-transporter, reaches Launch Pad 39B for launch of mission STS-116. On the right edge of the photo can be seen the White Room at the end of the orbiter access arm.  On the horizon at left is Launch Pad 39A.  The rollout from the Vehicle Assembly Building began at 12:29 a.m. The mission is No. 20 to the International Space Station and construction flight 12A.1. The mission payload is the SPACEHAB module, the P5 integrated truss structure and other key components. The launch window for mission STS-116 opens Dec. 7. Photo credit: NASA/Amanda Diller KSC-06pd2482

KENNEDY SPACE CENTER, FLA. -- Space Shuttle Discovery, on top of the ...

KENNEDY SPACE CENTER, FLA. -- Space Shuttle Discovery, on top of the mobile launcher platform and crawler-transporter, reaches Launch Pad 39B for launch of mission STS-116. On the right edge of the photo can b... More

KENNEDY SPACE CENTER, FLA. -    The morning sky lightens behind Space Shuttle Atlantis while lights on the fixed service structure (FSS) still illuminate the orbiter on Launch Pad 39B. Atlantis was originally scheduled to launch at 12:29 p.m. EDT on this date, but  a 24-hour scrub was called by mission managers due to a concern with Fuel Cell 1.  Seen poised above the orange external tank is the vent hood (known as the "beanie cap") at the end of the gaseous oxygen vent arm. Vapors are created as the liquid oxygen in the external tank boil off. The hood vents the gaseous oxygen vapors away from the space shuttle vehicle. Extending from the FSS to Atlantis is the orbiter access arm with the White Room at the end.  The White Room provides entry into the orbiter through the hatch.  During the STS-115 mission, Atlantis' astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment on the station. The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. This mission is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the International Space Station. STS-115 is scheduled to last 11 days with a planned landing at KSC.   Photo credit: NASA/Troy Cryder KSC-06pd2050

KENNEDY SPACE CENTER, FLA. - The morning sky lightens behind Space ...

KENNEDY SPACE CENTER, FLA. - The morning sky lightens behind Space Shuttle Atlantis while lights on the fixed service structure (FSS) still illuminate the orbiter on Launch Pad 39B. Atlantis was originally s... More

CAPE CANAVERAL, Fla. – Outside the massive Vehicle Assembly Building at NASA's Kennedy Space Center in Florida, members of the news media (foreground) wait in the dark for the rollout of the Ares I-X to begin. The rocket will travel the 4.2 miles to Launch Pad 39B atop the crawler-transporter.     The transfer of the pad from the Space Shuttle Program to the Constellation Program took place May 31. Modifications made to the pad include the removal of shuttle unique subsystems, such as the orbiter access arm and a section of the gaseous oxygen vent arm, along with the installation of three 600-foot lightning towers, access platforms, environmental control systems and a vehicle stabilization system.  Part of the Constellation Program, the Ares I-X is the test vehicle for the Ares I. The Ares I-X flight test is targeted for Oct. 27. For information on the Ares I-X vehicle and flight test, visit http://www.nasa.gov/aresIX. Photo credit: NASA/Jack Pfaller KSC-2009-5534

CAPE CANAVERAL, Fla. – Outside the massive Vehicle Assembly Building a...

CAPE CANAVERAL, Fla. – Outside the massive Vehicle Assembly Building at NASA's Kennedy Space Center in Florida, members of the news media (foreground) wait in the dark for the rollout of the Ares I-X to begin. ... More

KENNEDY SPACE CENTER, Fla. -- After rollback of the Rotating Service Structure on Launch Pad 39B, Space Shuttle Endeavour is bathed in light.  Twin solid rocket boosters flank the orange external tank behind Endeavour.  Above the external tank is the Gaseous Oxygen Vent Arm that vents gaseous oxygen vapors away from the Shuttle.  The vent hood assembly at the end is often referred to as the "beanie cap."  Stretching to the crew hatch on the side of Endeavour is the Orbiter Access Arm with its environmentally controlled White Room at the end, through which the crew enters the vehicle.  The Shuttle sits on the Mobile Launcher Platform with the two service tail masts on either side of the main engines.  The tail masts support the fluid, gas and electrical requirements of the orbiter's liquid oxygen and liquid hydrogen aft T-0 umbilicals.  Each tail mast is 31 feet (9.4 meters) high, 15 feet (4.6 meters) long and 9 feet (3.1 meters) wide.   Endeavour is scheduled to launch on mission STS-108 Dec. 4 at 5:45  p.m. EST.  On this 12th flight to the International Space Station, known as a Utilization Flight, Endeavour will carry a crew of four plus the Expedition 4 crew, who will replace Expedition 3 aboard the ISS.  The payload includes the Multi-Purpose Logistics Module Raffaello, filled with supplies, equipment and experiments KSC01PD1763

KENNEDY SPACE CENTER, Fla. -- After rollback of the Rotating Service S...

KENNEDY SPACE CENTER, Fla. -- After rollback of the Rotating Service Structure on Launch Pad 39B, Space Shuttle Endeavour is bathed in light. Twin solid rocket boosters flank the orange external tank behind En... More

Before entering the orbiter Endeavour, STS-99 Mission Specialist Gerhard Thiele of Germany is helped with final suit preparations by Travis Thompson, mechanical technician and a member of the White Room closeout crew. The White Room is an environmental chamber at the end of the orbiter access arm, on the fixed service structure, that provides entry to the orbiter crew compartment. STS-99, known as the Shuttle Radar Topography Mission (SRTM), will chart a new course to produce unrivaled 3-D images of the Earth's surface. The result of the Shuttle Radar Topography Mission could be close to 1 trillion measurements of the Earth's topography. Scheduled for liftoff at 12:30 p.m. EST, the mission is expected to last 11days, with Endeavour landing at KSC Tuesday, Feb. 22, at 4:36 p.m. EST. This is the 97th Shuttle flight and 14th for Shuttle Endeavour KSC-00pp0235

Before entering the orbiter Endeavour, STS-99 Mission Specialist Gerha...

Before entering the orbiter Endeavour, STS-99 Mission Specialist Gerhard Thiele of Germany is helped with final suit preparations by Travis Thompson, mechanical technician and a member of the White Room closeou... More

KENNEDY SPACE CENTER, FLA. -   After rollback of the rotating service structure (RSS) on Launch Pad 39B, Space Shuttle Discovery stands bathed in lights from the RSS and fixed service structure.  The rollback was in preparation for launch July 1 on mission STS-121.  Extending toward the cockpit of the shuttle is the orbiter access arm with the White Room extended.  The White Room provides access into the orbiter for the astronauts.  The RSS provides protected access to the orbiter for changeout and servicing of payloads at the pad. The structure is supported by a rotating bridge that pivots about a vertical axis on the west side of the pad's flame trench. The hinge column rests on the pad surface and is braced to the fixed service structure. Support for the outer end of the bridge is provided by two eight-wheel, motor-driven trucks that move along circular twin rails installed flush with the pad surface. The track crosses the flame trench on a permanent bridge.  The RSS is 102 feet long, 50 feet wide and 130 feet high. The structure has orbiter access platforms at five levels to provide access to the payload bay while the orbiter is being serviced in the RSS. Each platform has independent extendable planks that can be arranged to conform to a payload's configuration.  This mission is the 115th shuttle flight and the 18th U.S. flight to the International Space Station. Photo credit: NASA/Kim Shiflett KSC-06pd1308

KENNEDY SPACE CENTER, FLA. - After rollback of the rotating service ...

KENNEDY SPACE CENTER, FLA. - After rollback of the rotating service structure (RSS) on Launch Pad 39B, Space Shuttle Discovery stands bathed in lights from the RSS and fixed service structure. The rollback w... More

KENNEDY SPACE CENTER, FLA. -- Flags wave near Launch Pad 39A where space shuttle Endeavour waits for liftoff.  The rotating service structure was rolled back starting at 8:23 a.m. and complete at 8:55 a.m.  Above the orange external tank is seen the "beanie cap" at the end of the gaseous oxygen vent arm, extending from the fixed service structure. Vapors are created as the liquid oxygen in the external tank boil off. The hood vents the gaseous oxygen vapors away from the space shuttle vehicle.  Below is the orbiter access arm with the White Room at the end, flush against the shuttle.  The crew gains access into the orbiter through the White Room.  The rotating structure provides protected access to the orbiter for changeout and servicing of payloads at the pad. The structure is supported by a rotating bridge that pivots about a vertical axis on the west side of the pad's flame trench. After the RSS is rolled back, the orbiter is ready for fuel cell activation and external tank cryogenic propellant loading operations.  The pad is cleared to the perimeter gate for operations to fill the external tank with about 500,000 gallons of cryogenic propellants used by the shuttle’s main engines. This is done at the pad approximately eight hours before the scheduled launch.  Endeavour and its crew will deliver the first section of the Japan Aerospace Exploration Agency's Kibo laboratory and the Canadian Space Agency's two-armed robotic system, Dextre.  Launch is scheduled for 2:28 a.m. EDT March 11.  Photo credit: NASA/Kim Shiflett KSC-08pd0673

KENNEDY SPACE CENTER, FLA. -- Flags wave near Launch Pad 39A where spa...

KENNEDY SPACE CENTER, FLA. -- Flags wave near Launch Pad 39A where space shuttle Endeavour waits for liftoff. The rotating service structure was rolled back starting at 8:23 a.m. and complete at 8:55 a.m. Abo... More

KENNEDY SPACE CENTER, FLA. -   After rollback of the rotating service structure (RSS) on Launch Pad 39B, Space Shuttle Discovery stands bathed in lights from the RSS and fixed service structure.  The rollback was in preparation for launch July 1 on mission STS-121.  Extending toward the cockpit of the shuttle is the orbiter access arm with the White Room extended.  The White Room provides access into the orbiter for the astronauts.  The RSS provides protected access to the orbiter for changeout and servicing of payloads at the pad. The structure is supported by a rotating bridge that pivots about a vertical axis on the west side of the pad's flame trench. The hinge column rests on the pad surface and is braced to the fixed service structure. Support for the outer end of the bridge is provided by two eight-wheel, motor-driven trucks that move along circular twin rails installed flush with the pad surface. The track crosses the flame trench on a permanent bridge.  The RSS is 102 feet long, 50 feet wide and 130 feet high. The structure has orbiter access platforms at five levels to provide access to the payload bay while the orbiter is being serviced in the RSS. Each platform has independent extendable planks that can be arranged to conform to a payload's configuration.  This mission is the 115th shuttle flight and the 18th U.S. flight to the International Space Station. Photo credit: NASA/Kim Shiflett KSC-06pd1307

KENNEDY SPACE CENTER, FLA. - After rollback of the rotating service ...

KENNEDY SPACE CENTER, FLA. - After rollback of the rotating service structure (RSS) on Launch Pad 39B, Space Shuttle Discovery stands bathed in lights from the RSS and fixed service structure. The rollback w... More

CAPE CANAVERAL, Fla. – In the White Room on Launch Pad 39A at NASA's Kennedy Space Center in Florida, STS-119 Mission Specialists Koichi Wakata (center) and Steve Swanson are getting into their harnesses, which include a parachute pack, before crawling through the open hatch into space shuttle Discovery. The White Room is at the end of the orbiter access arm on the fixed service structure and provides access into the shuttle. The STS-119 mission is the 28th to the International Space Station and the 125th space shuttle flight.  Discovery will deliver the final pair of power-generating solar array wings and the S6 truss segment.  Installation of S6 will signal the station's readiness to house a six-member crew for conducting increased science. Liftoff is scheduled for 7:43 p.m. EDT. Photo credit: NASA/Tony Gray, Tom Farrar KSC-2009-2056

CAPE CANAVERAL, Fla. – In the White Room on Launch Pad 39A at NASA's K...

CAPE CANAVERAL, Fla. – In the White Room on Launch Pad 39A at NASA's Kennedy Space Center in Florida, STS-119 Mission Specialists Koichi Wakata (center) and Steve Swanson are getting into their harnesses, which... More

CAPE CANAVERAL, Fla. – On Launch Pad 39A at NASA's Kennedy Space Center in Florida, the orbiter access arm and White Room are extended toward space shuttle Discovery after rollback of the rotating service structure.  Above the external tank is the oxygen vent hood, called the "beanie cap."  The rollback is in preparation for Discovery's liftoff on the STS-119 mission with a crew of seven. The rotating structure provides protected access to the shuttle for changeout and servicing of payloads at the pad. After the RSS is rolled back, the orbiter is ready for fuel cell activation and external tank cryogenic propellant loading operations. The mission is the 28th to the International Space Station and the 125th space shuttle flight.  Discovery will deliver the final pair of power-generating solar array wings and the S6 truss segment.  Installation of S6 will signal the station's readiness to house a six-member crew for conducting increased science.  Liftoff of Discovery is scheduled for 9:20 p.m. EDT on March 11.   Photo credit: NASA/Kim Shiflett KSC-2009-2020

CAPE CANAVERAL, Fla. – On Launch Pad 39A at NASA's Kennedy Space Cente...

CAPE CANAVERAL, Fla. – On Launch Pad 39A at NASA's Kennedy Space Center in Florida, the orbiter access arm and White Room are extended toward space shuttle Discovery after rollback of the rotating service struc... More

CAPE CANAVERAL, Fla. – Just before dawn, space shuttle Endeavour, installed on the mobile launcher platform  atop the crawler-transporter, is on Launch Pad 39B at NASA's Kennedy Space Center in Florida.  First motion out of the Vehicle Assembly Building was at 11:57 p.m. EDT April 16.  The shuttle was secure on the pad at 7:17 a.m. EDT April 17. On the left of the shuttle is the White Room at the end of the orbiter access arm, 147 feet above the pad. When in place against the shuttle, the White Room provides access into the crew compartment on the shuttle. Endeavour will be prepared on the pad for liftoff in the unlikely event that a rescue mission is necessary following space shuttle Atlantis' launch on the STS-125 mission to service NASA's  Hubble Space Telescope. After Atlantis is cleared to land, Endeavour will move to Launch Pad 39A for its upcoming STS-127 mission to the International Space Station, targeted to launch June 13.   Photo credit: NASA/Jack Pfaller KSC-2009-2690

CAPE CANAVERAL, Fla. – Just before dawn, space shuttle Endeavour, inst...

CAPE CANAVERAL, Fla. – Just before dawn, space shuttle Endeavour, installed on the mobile launcher platform atop the crawler-transporter, is on Launch Pad 39B at NASA's Kennedy Space Center in Florida. First ... More

CAPE CANAVERAL, Fla. - Inside the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida, the 327-foot-tall Ares I-X rocket stands on its mobile launcher platform.    The transfer of the pad from the Space Shuttle Program to the Constellation Program took place May 31. Modifications made to the pad include the removal of shuttle unique subsystems, such as the orbiter access arm and a section of the gaseous oxygen vent arm, along with the installation of three 600-foot lightning towers, access platforms, environmental control systems and a vehicle stabilization system.  Part of the Constellation Program, the Ares I-X is the test vehicle for the Ares I. The Ares I-X flight test is targeted for Oct. 27. For information on the Ares I-X vehicle and flight test, visit http://www.nasa.gov/aresIX. Photo credit: NASA/Kim Shiflett KSC-2009-5541

CAPE CANAVERAL, Fla. - Inside the Vehicle Assembly Building at NASA's ...

CAPE CANAVERAL, Fla. - Inside the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida, the 327-foot-tall Ares I-X rocket stands on its mobile launcher platform. The transfer of the pad from t... More

KENNEDY SPACE CENTER, Fla.  -- In the White Room on Launch Pad 39A, Mission Specialist Barbara R. Morgan adjusts the collar of her launch and entry suit before she enters Space Shuttle Endeavour.  Morgan, the teacher-turned-astronaut, and the rest of the crew are taking part in a simulated launch countdown, the culmination of terminal countdown demonstration test activities.  The White Room is situated at the end of the orbiter access arm and provides entry into the orbiter. TCDT activities also include M-113 training, payload familiarization and emergency egress training at the pad.  The mission is the 22nd flight to the International Space Station and Space Shuttle Endeavour will carry a payload including the S5 truss, a SPACEHAB module and external stowage platform 3. STS-118 is targeted for launch on Aug. 7.  Photo credit: NASA/Amanda Diller KSC-07pd1993

KENNEDY SPACE CENTER, Fla. -- In the White Room on Launch Pad 39A, Mi...

KENNEDY SPACE CENTER, Fla. -- In the White Room on Launch Pad 39A, Mission Specialist Barbara R. Morgan adjusts the collar of her launch and entry suit before she enters Space Shuttle Endeavour. Morgan, the t... More

KENNEDY SPACE CENTER, FLA. -- The late afternoon sun highlights the external tank and solid rocket booster on Space Shuttle Columbia after rollback of the Rotating Service Structure on Launch Pad 39A. Visible are the orbiter access arm with the White Room extended to Columbia's cockpit, and at the top, the gaseous oxygen vent arm and cap, called the "beanie cap." Columbia is scheduled for launch Jan. 16 at 10:39 a.m. EST on mission STS-107, a research mission. KSC-03pd0077

KENNEDY SPACE CENTER, FLA. -- The late afternoon sun highlights the ex...

KENNEDY SPACE CENTER, FLA. -- The late afternoon sun highlights the external tank and solid rocket booster on Space Shuttle Columbia after rollback of the Rotating Service Structure on Launch Pad 39A. Visible a... More

KENNEDY SPACE CENTER, FLA. --  While in the White Room to complete suiting up before climbing into Space Shuttle Discovery, STS-116 Mission Specialist Nicholas Patrick sends a message home.  In the background is Mission Specialist Christer Fuglesang, who represents the European Space Agency. The White Room is at the end of the orbiter access arm that extends from the fixed service structure and provides entry into the orbiter.  The first launch attempt of STS-116 on Dec. 7 was postponed due a low cloud ceiling over Kennedy Space Center. This second launch attempt is scheduled for 8:47 p.m. This is Discovery's 33rd mission and the first night launch since 2002.   The 20th shuttle mission to the International Space Station, STS-116 carries another truss segment, P5. It will serve as a spacer, mated to the P4 truss that was attached in September.  After installing the P5, the crew will reconfigure and redistribute the power generated by two pairs of U.S. solar arrays. Landing is expected Dec. 21 at KSC.    Photo credit: NASA/Tony Gray & Don Kight KSC-06pp2776

KENNEDY SPACE CENTER, FLA. -- While in the White Room to complete sui...

KENNEDY SPACE CENTER, FLA. -- While in the White Room to complete suiting up before climbing into Space Shuttle Discovery, STS-116 Mission Specialist Nicholas Patrick sends a message home. In the background i... More

CAPE CANAVERAL, Fla. – The arms of the vehicle stabilization system are closed around the towering 327-foot-tall Ares I-X rocket, newly arrived on Launch Pad 39B at NASA's Kennedy Space Center in Florida.    The test rocket left the Vehicle Assembly Building at 1:39 a.m. EDT on its 4.2-mile trek to the pad and was "hard down" on the pad’s pedestals at 9:17 a.m.  The transfer of the pad from the Space Shuttle Program to the Constellation Program took place May 31. Modifications made to the pad include the removal of shuttle unique subsystems, such as the orbiter access arm and a section of the gaseous oxygen vent arm, along with the installation of three 600-foot lightning towers, access platforms, environmental control systems and a vehicle stabilization system.  Part of the Constellation Program, the Ares I-X is the test vehicle for the Ares I. The Ares I-X flight test is targeted for Oct. 27. For information on the Ares I-X vehicle and flight test, visit http://www.nasa.gov/aresIX.  Photo credit: NASA/Kim Shiflett KSC-2009-5596

CAPE CANAVERAL, Fla. – The arms of the vehicle stabilization system ar...

CAPE CANAVERAL, Fla. – The arms of the vehicle stabilization system are closed around the towering 327-foot-tall Ares I-X rocket, newly arrived on Launch Pad 39B at NASA's Kennedy Space Center in Florida. Th... More

KENNEDY SPACE CENTER, FLA. -   The STS-115 crew is in the White Room on the orbiter access arm on Launch Pad 39B to get instruction on using the emergency egress system. From left are Commander Brent Jett, Pilot Chris Ferguson, and Mission Specialists Heidemarie Stefanyshyn-Piper, Joseph Tanner, Steven MacLean and Daniel Burbank.  MacLean is with the Canadian Space Agency.  The White Room provides access into the orbiter through the crew access hatch. The mission crew is at KSC for Terminal Countdown Demonstration Test (TCDT) activities that are preparation for launch on Space Shuttle Atlantis, scheduled to take place in a window that opens Aug. 27.  During their 11-day mission to the International Space Station, the STS-115 crew will continue construction of the station and attach the payload elements, the Port 3/4 truss segment with its two large solar arrays.  Photo credit: NASA/Cory Huston KSC-06pd1774

KENNEDY SPACE CENTER, FLA. - The STS-115 crew is in the White Room o...

KENNEDY SPACE CENTER, FLA. - The STS-115 crew is in the White Room on the orbiter access arm on Launch Pad 39B to get instruction on using the emergency egress system. From left are Commander Brent Jett, Pilo... More

CAPE CANAVERAL, Fla. – Lights bathe space shuttle Discovery on Launch Pad 39A at NASA's Kennedy Space Center in Florida after rollback of the rotating service structure. The orbiter access arm and White Room are extended toward Discovery. The White Room provides crew access into the shuttle. Above the external tank is the oxygen vent hood, called the "beanie cap."  The rollback is in preparation for Discovery's liftoff on the STS-119 mission with a crew of seven. The rotating structure provides protected access to the shuttle for changeout and servicing of payloads at the pad. After the RSS is rolled back, the orbiter is ready for fuel cell activation and external tank cryogenic propellant loading operations. The mission is the 28th to the International Space Station and the 125th space shuttle flight.  Discovery will deliver the final pair of power-generating solar array wings and the S6 truss segment.  Installation of S6 will signal the station's readiness to house a six-member crew for conducting increased science.  Liftoff of Discovery is scheduled for 9:20 p.m. EDT on March 11.   Photo credit: NASA/Kim Shiflett KSC-2009-2024

CAPE CANAVERAL, Fla. – Lights bathe space shuttle Discovery on Launch ...

CAPE CANAVERAL, Fla. – Lights bathe space shuttle Discovery on Launch Pad 39A at NASA's Kennedy Space Center in Florida after rollback of the rotating service structure. The orbiter access arm and White Room ar... More

Space Shuttle Endeavour finally rests on Launch Pad 39B after its rollout was stalled several hours to fix a broken cleat on the crawler-transporter. At the far left is the Rotating Service Structure. From the Fixed Service Structure, the Orbiter Access Arm is already extended to the orbiter. Endeavour is scheduled to be launched Nov. 30 at 10:01 p.m. EST on mission STS-97, the sixth construction flight to the International Space Station. Its payload includes the P6 Integrated Truss Structure and a photovoltaic (PV) module, with giant solar arrays that will provide power to the Station. The mission includes two spacewalks to complete the solar array connections KSC-00dig069

Space Shuttle Endeavour finally rests on Launch Pad 39B after its roll...

Space Shuttle Endeavour finally rests on Launch Pad 39B after its rollout was stalled several hours to fix a broken cleat on the crawler-transporter. At the far left is the Rotating Service Structure. From the ... More

KENNEDY SPACE CENTER, FLA. -- With the Rotating Service Structure rolled back, Space Shuttle Atlantis stands ready for launch on mission STS-110.  The Orbiter Access Arm extends from the Fixed Service Structure (FSS) to the crew compartment hatch, through which the STS-110 crew will enter Atlantis. Above the golden external tank is the vent hood (known as the "beanie cap") at the end of the gaseous oxygen vent arm.  Vapors are created as the liquid oxygen in the external tank boil off.   The hood vents the gaseous oxygen vapors away from the Space Shuttle vehicle.  The RSS provides protected access to the orbiter for changeout and servicing of payloads at the pad.  The structure has access platforms at five levels to provide access to the payload bay.  The FSS provides access to the orbiter and the RSS.  Mission STS-110 is scheduled to launch April 4 on its 11-day mission to the International Space Station KSC-02pd0392

KENNEDY SPACE CENTER, FLA. -- With the Rotating Service Structure roll...

KENNEDY SPACE CENTER, FLA. -- With the Rotating Service Structure rolled back, Space Shuttle Atlantis stands ready for launch on mission STS-110. The Orbiter Access Arm extends from the Fixed Service Structure... More

KENNEDY SPACE CENTER, FLA. -- Space Shuttle Endeavour, atop the mobile launcher platform, is hard down on Launch Pad 39A after rolling out overnight.  First motion out of the Vehicle Assembly Building was at 8:10 p.m.  July 10.  The components of the shuttle are, first, the orbiter and then the solid rocket boosters flanking the external tank behind it.  To the left of the shuttle is the rotating service structure, which can be rolled around to enclose the vehicle for access during processing.  Behind it is the fixed service structure, topped by an 80-foot-tall lightning mast.  Extending from it to Endeavour is the orbiter access arm, which provides access into the vehicle. Endeavour is scheduled to launch on mission STS-118 on Aug. 7.  During the mission, Endeavour will carry into orbit the S5 truss, SPACEHAB module and external stowage platform 3. The mission is the 22nd flight to the International Space Station and will mark the first flight of Mission Specialist Barbara Morgan, the teacher-turned-astronaut whose association with NASA began more than 20 years ago.  STS-118 will be the first flight since 2002 for Endeavour, which has undergone extensive modifications, including the addition of safety upgrades already added to orbiters Discovery and Atlantis.  Photo credit: NASA/Ken Thornsley KSC-07pd1852

KENNEDY SPACE CENTER, FLA. -- Space Shuttle Endeavour, atop the mobile...

KENNEDY SPACE CENTER, FLA. -- Space Shuttle Endeavour, atop the mobile launcher platform, is hard down on Launch Pad 39A after rolling out overnight. First motion out of the Vehicle Assembly Building was at 8:... More

CAPE CANAVERAL, Fla. –At NASA's Kennedy Space Center in Florida, the crawler-transporter delivers space shuttle Discovery atop the mobile launcher platform onto Launch Pad 39A.  Traveling from the Vehicle Assembly Building, the shuttle took nearly 12 hours on the journey as technicians stopped several times to clear mud from the crawler's treads and bearings caused by the waterlogged crawlerway.  First motion out of the VAB was at 2:07 a.m. EDT Aug. 4. Rollout was delayed approximately 2 hours due to lightning in the area.  In the background is the blue water of the Atlantic Ocean.  At left is the White Room at the end of the orbiter access arm.  When in place against shuttle, the White Room provides entry into the cockpit.  Discovery's 13-day flight will deliver a new crew member and 33,000 pounds of equipment to the International Space Station. The equipment includes science and storage racks, a freezer to store research samples, a new sleeping compartment and the COLBERT treadmill.  Launch of Discovery on its STS-128 mission is targeted for late August.   Photo credit: NASA/Troy Cryder KSC-2009-4423

CAPE CANAVERAL, Fla. –At NASA's Kennedy Space Center in Florida, the c...

CAPE CANAVERAL, Fla. –At NASA's Kennedy Space Center in Florida, the crawler-transporter delivers space shuttle Discovery atop the mobile launcher platform onto Launch Pad 39A. Traveling from the Vehicle Assem... More

KENNEDY SPACE CENTER, FLA. -  The STS-115 crew members complete their suitup in the White Room before entering Space Shuttle Atlantis on Launch Pad 39B for a simulated launch countdown.  Shown here are Mission Specialists Daniel Burbank (left) and Steven MacLean. The White Room, which is located at the end of the orbiter access arm, allows entry into the orbiter through the crew access hatch.  The mission crew is at KSC for Terminal Countdown Demonstration Test (TCDT) activities that are preparation for launch.  Liftoff of Atlantis is scheduled to take place in a window that opens Aug. 27.  During their 11-day mission to the International Space Station, the STS-115 crew will continue construction of the station and attach the payload elements, the Port 3/4 truss segment with its two large solar arrays.  Photo credit: NASA/Jim Grossmann KSC-06pd1822

KENNEDY SPACE CENTER, FLA. - The STS-115 crew members complete their ...

KENNEDY SPACE CENTER, FLA. - The STS-115 crew members complete their suitup in the White Room before entering Space Shuttle Atlantis on Launch Pad 39B for a simulated launch countdown. Shown here are Mission ... More

KENNEDY SPACE CENTER, Fla.  --  In the White Room on Launch Pad 39A, STS-118 Pilot Charlie Hobaugh waits for the closeout crew to finish checking his launch and entry suit before he enters Space Shuttle Endeavour.  Hobaugh and the rest of the crew are taking part in a simulated launch countdown, the culmination of terminal countdown demonstration test activities.  The White Room is situated at the end of the orbiter access arm and provides entry into the orbiter. TCDT activities also include M-113 training, payload familiarization and emergency egress training at the pad.  The mission is the 22nd flight to the International Space Station and Space Shuttle Endeavour will carry a payload including the S5 truss, a SPACEHAB module and external stowage platform 3. STS-118 is targeted for launch on Aug. 7.  Photo credit: NASA/Amanda Diller KSC-07pd1985

KENNEDY SPACE CENTER, Fla. -- In the White Room on Launch Pad 39A, S...

KENNEDY SPACE CENTER, Fla. -- In the White Room on Launch Pad 39A, STS-118 Pilot Charlie Hobaugh waits for the closeout crew to finish checking his launch and entry suit before he enters Space Shuttle Endeavo... More

CAPE CANAVERAL, Fla. - The crawler-transporter is positioned under the mobile launcher platform with the 327-foot-tall Ares I-X rocket. The rocket is prepared to leave the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida, on its way to Launch Pad 39B. The move to the launch pad, known as "rollout," began at 1:39 a.m. EDT.    The transfer of the pad from the Space Shuttle Program to the Constellation Program took place May 31. Modifications made to the pad include the removal of shuttle unique subsystems, such as the orbiter access arm and a section of the gaseous oxygen vent arm, along with the installation of three 600-foot lightning towers, access platforms, environmental control systems and a vehicle stabilization system.  Part of the Constellation Program, the Ares I-X is the test vehicle for the Ares I. The Ares I-X flight test is targeted for Oct. 27. For information on the Ares I-X vehicle and flight test, visit http://www.nasa.gov/aresIX. Photo credit: NASA/Kim Shiflett KSC-2009-5544

CAPE CANAVERAL, Fla. - The crawler-transporter is positioned under the...

CAPE CANAVERAL, Fla. - The crawler-transporter is positioned under the mobile launcher platform with the 327-foot-tall Ares I-X rocket. The rocket is prepared to leave the Vehicle Assembly Building at NASA's Ke... More

KENNEDY SPACE CENTER, FLA. --    Under a blue sky streaked with clouds, Launch Pad 39B holds Space Shuttle Discovery, ready for launch of mission STS-116.  At the far left is the rotating service structure, rolled back after midnight in preparation for launch.  Next to Discovery is the fixed service structure, with the 80-foot-high lightning mast on top, part of the lightning protection system on the pad. Beneath Discovery's wings are the tail masts, which provide several umbilical connections to the orbiter, including a liquid-oxygen line through one and a liquid-hydrogen line through another.  Seen above the golden external tank is the vent hood (known as the "beanie cap") at the end of the gaseous oxygen vent arm, extending from the FSS. Vapors are created as the liquid oxygen in the external tank boil off. The hood vents the gaseous oxygen vapors away from the space shuttle vehicle. Below it, also extending toward Discovery from the FSS, is the orbiter access arm with the White Room at the end. The crew gains access into the orbiter through the White Room.  Discovery is scheduled to launch on mission STS-116 at 9:35 p.m. today.  On the mission, the crew will deliver truss segment, P5, to the International Space Station and begin the intricate process of reconfiguring and redistributing the power generated by two pairs of U.S. solar arrays. The P5 will be mated to the P4 truss that was delivered and attached during the STS-115 mission in September. Photo credit: NASA/Ken Thornsley KSC-06pd2674

KENNEDY SPACE CENTER, FLA. -- Under a blue sky streaked with clouds...

KENNEDY SPACE CENTER, FLA. -- Under a blue sky streaked with clouds, Launch Pad 39B holds Space Shuttle Discovery, ready for launch of mission STS-116. At the far left is the rotating service structure, rol... More

STS-32 MS Dunbar looks on as technicians prepare LES equipment in white room

STS-32 MS Dunbar looks on as technicians prepare LES equipment in whit...

STS-32 Mission Specialist (MS) Bonnie J. Dunbar, wearing launch and entry suit (LES), looks on as technicians prepare LES equipment in the white room on the orbiter access arm at Kennedy Space Center (KSC) Laun... More

STS-75 Columbia OV-102 launch. NASA public domain image colelction.

STS-75 Columbia OV-102 launch. NASA public domain image colelction.

STS075-S-004 (22 Feb. 1996) --- The space shuttle Columbia clears the tower to begin the mission. The liftoff occurred on schedule at 3:18:00 p.m. (EST), Feb. 22, 1996. Visible at left is the White Room on th... More

Space Shuttle Columbia, Space Shuttle Project

Space Shuttle Columbia, Space Shuttle Project

The Space Shuttle Columbia (STS-75) cleared the tower following an on-time liftoff from Launch Pad 39B. Visible at lower left is the white room on the orbiter access arm through which the flight crew entered th... More

Three members of the STS-83 flight crew head toward the orbiter access arm on the 195-foot level Launch of Pad 39A that will take them to the crew hatch of the Space Shuttle Columbia during Terminal Countdown Demonstration Test (TCDT) exercises for that mission. Mission Specialist Donald A. Thomas is in the center of the group. Other crew members on the 16-day Microgravity Science Laboratory-1 (MSL-1) mission are: Mission Commander James D. Halsell, Jr.; Pilot Susan L. Still; Payload Commander Janice Voss; Mission Specialist Michael L.Gernhardt; and Payload Specialists Gregory T. Linteris and Roger K. Crouch KSC-97pc464

Three members of the STS-83 flight crew head toward the orbiter access...

Three members of the STS-83 flight crew head toward the orbiter access arm on the 195-foot level Launch of Pad 39A that will take them to the crew hatch of the Space Shuttle Columbia during Terminal Countdown D... More

KENNEDY SPACE CENTER, FLA. -- The Space Shuttle Columbia arrives at the top of Launch Pad 39B after its morning rollout prior to STS-90. The white room of the Orbiter Access Arm where astronauts suit up for launch can be seen to the left of the orbiter. The Neurolab experiments are the primary payload on this nearly 17-day space flight. Investigations during the Neurolab mission will focus on the effects of microgravity on the nervous system. The crew of STS-90, slated for launch April 16 at 2:19 p.m. EDT, includes Commander Richard Searfoss, Pilot Scott Altman, Mission Specialists Richard Linnehan, Dafydd (Dave) Williams, M.D., and Kathryn (Kay) Hire, and Payload Specialists Jay Buckey, M.D., and James Pawelczyk, Ph.D KSC-98pc406

KENNEDY SPACE CENTER, FLA. -- The Space Shuttle Columbia arrives at th...

KENNEDY SPACE CENTER, FLA. -- The Space Shuttle Columbia arrives at the top of Launch Pad 39B after its morning rollout prior to STS-90. The white room of the Orbiter Access Arm where astronauts suit up for lau... More

Space Shuttle Discovery sits atop a mobile launcher platform at Launch Complex 39A after its move this morning from Vehicle Assembly Building high bay 1, where it was mated to the first Space Shuttle super lightweight external tank/solid rocket booster stack. This unusual image was taken from the 95-foot level of the pad as the Orbiter Access Arm supporting the white room (arm on right) and the External Tank Gaseous Oxygen Vent Arm were moved into place on the orbiter and its stack. Discovery will be launched on mission STS-91, concluding Phase I of the joint U.S.-Russian International Space Station Program, on June 2 with a launch window opening around 6:10 p.m. EDT. This will be the ninth Shuttle docking with the Russian Space Station Mir, but the first Mir docking for Discovery. The STS-91 flight crew includes Commander Charles Precourt; Pilot Dominic Gorie; and Mission Specialists Wendy B. Lawrence; Franklin Chang-Diaz, Ph.D.; Janet Kavandi, Ph.D.; and Valery Ryumin, with the Russian Space Agency. Andrew Thomas, Ph.D., will be returning to Earth with the crew after living more than four months aboard Mir KSC-98dc552

Space Shuttle Discovery sits atop a mobile launcher platform at Launch...

Space Shuttle Discovery sits atop a mobile launcher platform at Launch Complex 39A after its move this morning from Vehicle Assembly Building high bay 1, where it was mated to the first Space Shuttle super ligh... More

KENNEDY SPACE CENTER, FLA. -- Space Shuttle Discovery sits atop a mobile launcher platform at Launch Complex 39A after its move this morning from Vehicle Assembly Building high bay 1, where it was mated to the first Space Shuttle super lightweight external tank/solid rocket booster stack. The Orbiter Access Arm, with the white room located at its outer end, is being positioned into place on the orbiter. This white room provides personnel entry into the orbiter while it is on the pad. Discovery will be launched on mission STS-91, concluding Phase I of the joint U.S.-Russian International Space Station Program, on June 2 with a launch window opening around 6:10 p.m. EDT. This will be the ninth Shuttle docking with the Russian Space Station Mir, but the first Mir docking for Discovery. The STS-91 flight crew includes Commander Charles Precourt; Pilot Dominic Gorie; and Mission Specialists Wendy B. Lawrence; Franklin Chang-Diaz, Ph.D.; Janet Kavandi, Ph.D.; and Valery Ryumin, with the Russian Space Agency. Andrew Thomas, Ph.D., will be returning to Earth with the crew after living more than four months aboard Mir KSC-98pc569

KENNEDY SPACE CENTER, FLA. -- Space Shuttle Discovery sits atop a mobi...

KENNEDY SPACE CENTER, FLA. -- Space Shuttle Discovery sits atop a mobile launcher platform at Launch Complex 39A after its move this morning from Vehicle Assembly Building high bay 1, where it was mated to the ... More

The STS-91 flight crew poses for a group portrait in the white room on the Orbiter Access Arm at Launch Complex 39A during Terminal Countdown Demonstration Test (TCDT) activities. The TCDT is held at KSC prior to each Space Shuttle flight to provide crews with an opportunity to participate in simulated countdown activities. From left to right, they are (back row) Pilot Dominic Gorie; Mission Specialist Wendy B. Lawrence and Mission Commander Charles Precourt; and (front row) Mission Specialists Franklin Chang-Diaz, Ph.D.; Valery Ryumin, with the Russian Space Agency; and Janet Kavandi, Ph.D. STS-91 is scheduled to be launched on June 2 with a launch window opening around 6:10 p.m. EDT. The mission will feature the ninth Shuttle docking with the Russian Space Station Mir, the first Mir docking for Discovery, the conclusion of Phase I of the joint U.S.-Russian International Space Station Program, and the first flight of the new Space Shuttle super lightweight external tank. Andrew Thomas, Ph.D., will be returning to Earth with the crew after living more than four months aboard Mir KSC-98pc593

The STS-91 flight crew poses for a group portrait in the white room on...

The STS-91 flight crew poses for a group portrait in the white room on the Orbiter Access Arm at Launch Complex 39A during Terminal Countdown Demonstration Test (TCDT) activities. The TCDT is held at KSC prior ... More

As daylight creeps over the horizon, STS-95 Space Shuttle Discovery, on the Mobile Launch Platform, arrives at Launch Complex Pad 39B after a 4.2-mile trip taking approximately 6 hours. At the left is the "white room," attached to the orbiter access arm. The white room is an environmental chamber that mates with the orbiter and holds six persons. At the launch pad, the orbiter, external tank and solid rocket boosters will undergo final preparations for the launch, scheduled to lift off Oct. 29. The mission includes research payloads such as the Spartan solar-observing deployable spacecraft, the Hubble Space Telescope Orbital Systems Test Platform, the International Extreme Ultraviolet Hitchhiker, as well as the SPACEHAB single module with experiments on space flight and the aging process KSC-98pc1101

As daylight creeps over the horizon, STS-95 Space Shuttle Discovery, o...

As daylight creeps over the horizon, STS-95 Space Shuttle Discovery, on the Mobile Launch Platform, arrives at Launch Complex Pad 39B after a 4.2-mile trip taking approximately 6 hours. At the left is the "whit... More

At Launch Pad 39-B, the STS-95 crew pose for a closeup photo while in the white room, an environmental chamber that mates with the orbiter and can provide emergency egress for the flight crew before launch. The white room is the outer end of the orbiter access arm, which is part of the fixed service structure on the pad. Pictured are (left to right) Mission Specialist Scott E. Parazynski, Mission Commander Curtis L. Brown, Payload Specialist John H. Glenn Jr. (seated), senator from Ohio, Payload Specialist Chiaki Mukai (behind Glenn), representing the National Space Development Agency of Japan (NASDA), Mission Specialist Stephen K. Robinson, Mission Specialist Pedro Duque of Spain, representing the European Space Agency (ESA), and Pilot Steven W. Lindsey. The STS-95 crew are at KSC to participate in a Terminal Countdown Demonstration Test (TCDT) which includes mission familiarization activities, emergency egress training, and a simulated main engine cut-off exercise. The STS-95 mission, targeted for liftoff on Oct. 29, includes research payloads such as the Spartan solar-observing deployable spacecraft, the Hubble Space Telescope Orbital Systems Test Platform, the International Extreme Ultraviolet Hitchhiker, as well as the SPACEHAB single module with experiments on space flight and the aging process. Following the TCDT, the crew will be returning to Houston for final flight preparations KSC-98pc1274

At Launch Pad 39-B, the STS-95 crew pose for a closeup photo while in ...

At Launch Pad 39-B, the STS-95 crew pose for a closeup photo while in the white room, an environmental chamber that mates with the orbiter and can provide emergency egress for the flight crew before launch. The... More

At Launch Pad 39-B, the STS-95 crew gather in the white room, an environmental chamber that mates with the orbiter and can provide emergency egress for the flight crew before launch. The white room is the outer end of the orbiter access arm, which is part of the fixed service structure on the pad. Pictured are (left to right) Mission Specialist Scott E. Parazynski, Mission Commander Curtis L. Brown, Payload Specialist John H. Glenn Jr. (seated), senator from Ohio, Payload Specialist Chiaki Mukai (behind Glenn), representing the National Space Development Agency of Japan (NASDA), Mission Specialist Stephen K. Robinson, Mission Specialist Pedro Duque of Spain, representing the European Space Agency (ESA), and Pilot Steven W. Lindsey. The STS-95 crew are at KSC to participate in a Terminal Countdown Demonstration Test (TCDT) which includes mission familiarization activities, emergency egress training, and a simulated main engine cut-off exercise. The STS-95 mission, targeted for liftoff on Oct. 29, includes research payloads such as the Spartan solar-observing deployable spacecraft, the Hubble Space Telescope Orbital Systems Test Platform, the International Extreme Ultraviolet Hitchhiker, as well as the SPACEHAB single module with experiments on space flight and the aging process. Following the TCDT, the crew will be returning to Houston for final flight preparations KSC-98pc1273

At Launch Pad 39-B, the STS-95 crew gather in the white room, an envir...

At Launch Pad 39-B, the STS-95 crew gather in the white room, an environmental chamber that mates with the orbiter and can provide emergency egress for the flight crew before launch. The white room is the outer... More

KENNEDY SPACE CENTER,  Fla. -- In the cloud-dimmed light of early morning, Space Shuttle Endeavour sits in place at Launch Pad 39A , atop the mobile launcher platform and crawler transporter, after rollout from the Vehicle Assembly Building. At its left are the Rotating Service Structure and Fixed Service Structure with the orbiter access arm extended. The access arm swings out to the orbiter crew compartment hatch to allow personnel to enter the crew compartment. At its outer end is the white room, an environmental chamber, that mates with the orbiter. While at the pad, the orbiter, external tank and solid rocket boosters will undergo final preparations for the STS-88 launch targeted for Dec. 3, 1998. Mission STS-88 is the first U.S. flight for the assembly of the International Space Station and will carry the Unity connecting module. While on orbit, the flight crew will deploy Unity from the payload bay and connect it to the Russian-built Zarya control module which will be in orbit at that time. Unity will be the main connecting point for later U.S. station modules and components. More than 40 launches are planned over five years involving the resources and expertise of 16 cooperating nations. Comprising the STS-88 crew are Commander Robert D. Cabana, Pilot Frederick W. "Rick" Sturckow, Mission Specialists Nancy J. Currie, Jerry L. Ross, James H. Newman and Russian cosmonaut Sergei Konstantinovich Krikalev. Ross and Newman will make three spacewalks to connect power, data and utility lines and install exterior equipment KSC-98pc1360

KENNEDY SPACE CENTER, Fla. -- In the cloud-dimmed light of early morn...

KENNEDY SPACE CENTER, Fla. -- In the cloud-dimmed light of early morning, Space Shuttle Endeavour sits in place at Launch Pad 39A , atop the mobile launcher platform and crawler transporter, after rollout from... More

KENNEDY SPACE CENTER, FLA. -- Rollback of the Rotating Service Structure on Launch Pad 39B reveals the Space Shuttle Discovery, scheduled to launch on mission STS-96 at 6:49 a.m. EDT on May 27. Above the top of the external tank is the external tank gaseous oxygen vent arm, with a vent hood, known as the "beanie cap," at the outer end. Below it up against Discovery is the orbiter access arm, which allows entry into the orbiter crew compartment. through an environmental chamber or "white room" at the outer end. STS-96 is a 10-day logistics and resupply mission for the International Space Station, carrying about 4,000 pounds of supplies to be stored aboard the station, for use by future crews, including laptop computers, cameras, tools, spare parts, and clothing. The mission also includes such payloads as a Russian crane, the Strela; a U.S.-built crane; the Spacehab Oceaneering Space System Box (SHOSS), a logistics items carrier; and STARSHINE, a student-involved experiment. The mission will include a space walk to attach the cranes to the outside of the ISS for use in future construction. Space Shuttle Discovery is due to launch on May 27 at 6:49 a.m. EDT. Landing is expected at the SLF on June 6 about 1:58 a.m. EDT KSC-99pp0580

KENNEDY SPACE CENTER, FLA. -- Rollback of the Rotating Service Structu...

KENNEDY SPACE CENTER, FLA. -- Rollback of the Rotating Service Structure on Launch Pad 39B reveals the Space Shuttle Discovery, scheduled to launch on mission STS-96 at 6:49 a.m. EDT on May 27. Above the top of... More

STS-96 Mission Specialist Ellen Ochoa chats with white room closeout crew members while being checked out for entry into the orbiter Discovery. At left are Mechanical Technicians Al Schmidt and Chris meinert; at right is Quality Assurance Specialist James Davis and Closeout Chief Travis Thompson. The white room is an environmental chamber at the end of the orbiter access arm that provides entry to the orbiter crew compartment. STS-96 is a 10-day logistics and resupply mission for the International Space Station, carrying about 4,000 pounds of supplies, to be stored aboard the station for use by future crews, including laptop computers, cameras, tools, spare parts, and clothing. The mission also includes such payloads as a Russian crane, the Strela; a U.S.-built crane; the Spacehab Oceaneering Space System Box (SHOSS), a logistics items carrier; and STARSHINE, a student-involved experiment. It will include a space walk to attach the cranes to the outside of the ISS for use in future construction. Space Shuttle Discovery is due to launch today at 6:49 a.m. EDT. Landing is expected at the SLF on June 6 about 1:58 a.m. EDT KSC-99pp0606

STS-96 Mission Specialist Ellen Ochoa chats with white room closeout c...

STS-96 Mission Specialist Ellen Ochoa chats with white room closeout crew members while being checked out for entry into the orbiter Discovery. At left are Mechanical Technicians Al Schmidt and Chris meinert; a... More

In the white room prior to launch, STS-96 Commander Kent V. Rominger reaches to shake hands with Suit Technician Jean Alexander. The white room is an environmental chamber at the end of the orbiter access arm that provides entry to the orbiter crew compartment. At right are closeout crew members Chief Travis Thompson and Quality Assurance Specialist James Davis; at left is Mechanical Technician Chris Meinert. STS-96 is a 10-day logistics and resupply mission for the International Space Station, carrying about 4,000 pounds of supplies, to be stored aboard the station for use by future crews, including laptop computers, cameras, tools, spare parts, and clothing. The mission also includes such payloads as a Russian crane, the Strela; a U.S.-built crane; the Spacehab Oceaneering Space System Box (SHOSS), a logistics items carrier; and STARSHINE, a student-involved experiment. It will include a space walk to attach the cranes to the outside of the ISS for use in future construction. Space Shuttle Discovery is due to launch today at 6:49 a.m. EDT. Landing is expected at the SLF on June 6 about 1:58 a.m. EDT KSC-99pp0600

In the white room prior to launch, STS-96 Commander Kent V. Rominger r...

In the white room prior to launch, STS-96 Commander Kent V. Rominger reaches to shake hands with Suit Technician Jean Alexander. The white room is an environmental chamber at the end of the orbiter access arm t... More

Before entering the orbiter Discovery, STS-96 Mission Specialist Valery Ivanovich Tokarev (center) is checked out by white room closeout crew members Mechanical Technician Chris Meinert and Quality Assurance Specialist Jim Davis on the left, and Closeout Chief Travis Thompson and Suit Technician Jean Alexander on the right. The white room is an environmental chamber at the end of the orbiter access arm that provides entry to the orbiter crew compartment. STS-96 is a 10-day logistics and resupply mission for the International Space Station, carrying about 4,000 pounds of supplies, to be stored aboard the station for use by future crews, including laptop computers, cameras, tools, spare parts, and clothing. The mission also includes such payloads as a Russian crane, the Strela; a U.S.-built crane; the Spacehab Oceaneering Space System Box (SHOSS), a logistics items carrier; and STARSHINE, a student-involved experiment. It will include a space walk to attach the cranes to the outside of the ISS for use in future construction. Space Shuttle Discovery is due to launch today at 6:49 a.m. EDT. Landing is expected at the SLF on June 6 about 1:58 a.m. EDT KSC-99pp0601

Before entering the orbiter Discovery, STS-96 Mission Specialist Valer...

Before entering the orbiter Discovery, STS-96 Mission Specialist Valery Ivanovich Tokarev (center) is checked out by white room closeout crew members Mechanical Technician Chris Meinert and Quality Assurance Sp... More

Before entering the orbiter Discovery, STS-96 Mission Specialist Julie Payette, with the Canadian Space Agency, is checked out in the white room by Quality Assurance Specialist James Davis (left) and Closeout Crew Chief Travis Thompson (right). In the background, Suit Technician Carlouse Gillis checks another crew member. The white room is an environmental chamber at the end of the orbiter access arm that provides entry to the orbiter crew compartment. STS-96 is a 10-day logistics and resupply mission for the International Space Station, carrying about 4,000 pounds of supplies, to be stored aboard the station for use by future crews, including laptop computers, cameras, tools, spare parts, and clothing. The mission also includes such payloads as a Russian crane, the Strela; a U.S.-built crane; the Spacehab Oceaneering Space System Box (SHOSS), a logistics items carrier; and STARSHINE, a student-involved experiment. It will include a space walk to attach the cranes to the outside of the ISS for use in future construction. Space Shuttle Discovery is due to launch today at 6:49 a.m. EDT. Landing is expected at the SLF on June 6 about 1:58 a.m. EDT KSC-99pp0603

Before entering the orbiter Discovery, STS-96 Mission Specialist Julie...

Before entering the orbiter Discovery, STS-96 Mission Specialist Julie Payette, with the Canadian Space Agency, is checked out in the white room by Quality Assurance Specialist James Davis (left) and Closeout C... More

Before entering the orbiter Discovery, STS-96 Mission Specialist Daniel T. Barry is checked out in the white room by Closeout Crew Chief Travis Thompson and Mechanical Technician Al Schmidt. The white room is an environmental chamber at the end of the orbiter access arm that provides entry to the orbiter crew compartment. STS-96 is a 10-day logistics and resupply mission for the International Space Station, carrying about 4,000 pounds of supplies, to be stored aboard the station for use by future crews, including laptop computers, cameras, tools, spare parts, and clothing. The mission also includes such payloads as a Russian crane, the Strela; a U.S.-built crane; the Spacehab Oceaneering Space System Box (SHOSS), a logistics items carrier; and STARSHINE, a student-involved experiment. It will include a space walk to attach the cranes to the outside of the ISS for use in future construction. Space Shuttle Discovery is due to launch today at 6:49 a.m. EDT. Landing is expected at the SLF on June 6 about 1:58 a.m. EDT KSC-99pp0604

Before entering the orbiter Discovery, STS-96 Mission Specialist Danie...

Before entering the orbiter Discovery, STS-96 Mission Specialist Daniel T. Barry is checked out in the white room by Closeout Crew Chief Travis Thompson and Mechanical Technician Al Schmidt. The white room is a... More

Before entering the orbiter Discovery, STS-96 Mission Specialist Tamara E. Jernigan is checked out in the white room by Closeout Crew Chief Travis Thompson (back to camera) and Quality Assurance Specialist James Davis. The white room is an environmental chamber at the end of the orbiter access arm that provides entry to the orbiter crew compartment. STS-96 is a 10-day logistics and resupply mission for the International Space Station, carrying about 4,000 pounds of supplies, to be stored aboard the station for use by future crews, including laptop computers, cameras, tools, spare parts, and clothing. The mission also includes such payloads as a Russian crane, the Strela; a U.S.-built crane; the Spacehab Oceaneering Space System Box (SHOSS), a logistics items carrier; and STARSHINE, a student-involved experiment. It will include a space walk to attach the cranes to the outside of the ISS for use in future construction. Space Shuttle Discovery is due to launch today at 6:49 a.m. EDT. Landing is expected at the SLF on June 6 about 1:58 a.m. EDT KSC-99pp0605

Before entering the orbiter Discovery, STS-96 Mission Specialist Tamar...

Before entering the orbiter Discovery, STS-96 Mission Specialist Tamara E. Jernigan is checked out in the white room by Closeout Crew Chief Travis Thompson (back to camera) and Quality Assurance Specialist Jame... More

STS-96 Pilot Rick D. Husband is checked out by white room closeout crew members before entering the orbiter Discovery. At left is Closeout Chief Travis Thompson; at right is Quality Assurance Specialist James Davis. The white room is an environmental chamber at the end of the orbiter access arm that provides entry to the orbiter crew compartment. STS-96 is a 10-day logistics and resupply mission for the International Space Station, carrying about 4,000 pounds of supplies, to be stored aboard the station for use by future crews, including laptop computers, cameras, tools, spare parts, and clothing. The mission also includes such payloads as a Russian crane, the Strela; a U.S.-built crane; the Spacehab Oceaneering Space System Box (SHOSS), a logistics items carrier; and STARSHINE, a student-involved experiment. It will include a space walk to attach the cranes to the outside of the ISS for use in future construction. Space Shuttle Discovery is due to launch today at 6:49 a.m. EDT. Landing is expected at the SLF on June 6 about 1:58 a.m. EDT KSC-99pp0602

STS-96 Pilot Rick D. Husband is checked out by white room closeout cre...

STS-96 Pilot Rick D. Husband is checked out by white room closeout crew members before entering the orbiter Discovery. At left is Closeout Chief Travis Thompson; at right is Quality Assurance Specialist James D... More

STS-93 Mission Specialist Michel Tognini of France is checked out by white room closeout crew members before entering the orbiter Columbia. Tognini is with the Centre National d'Etudes Spatiales (CNES). The white room is an environmental chamber at the end of the orbiter access arm that provides entry to the orbiter crew compartment. STS-93 is a five-day mission primarily to release the Chandra X-ray Observatory, which will allow scientists from around the world to study some of the most distant, powerful and dynamic objects in the universe. After Space Shuttle Columbia's July 20 and 22 launch attempts were scrubbed, the launch was again rescheduled for Friday, July 23, at 12:24 a.m. EDT. The target landing date is July 27 at 11:20 p.m. EDT KSC-99pp0966

STS-93 Mission Specialist Michel Tognini of France is checked out by w...

STS-93 Mission Specialist Michel Tognini of France is checked out by white room closeout crew members before entering the orbiter Columbia. Tognini is with the Centre National d'Etudes Spatiales (CNES). The whi... More

STS-93 Commander Eileen M. Collins is checked out by white room closeout crew members before entering the orbiter Columbia. The white room is an environmental chamber at the end of the orbiter access arm that provides entry to the orbiter crew compartment. STS-93 is a five-day mission primarily to release the Chandra X-ray Observatory, which will allow scientists from around the world to study some of the most distant, powerful and dynamic objects in the universe. After Space Shuttle Columbia's July 20 and 22 launch attempts were scrubbed, the launch was again rescheduled for Friday, July 23, at 12:24 a.m. EDT. The target landing date is July 27 at 11:20 p.m. EDT KSC-99pp0963

STS-93 Commander Eileen M. Collins is checked out by white room closeo...

STS-93 Commander Eileen M. Collins is checked out by white room closeout crew members before entering the orbiter Columbia. The white room is an environmental chamber at the end of the orbiter access arm that p... More

STS-93 Mission Specialist Steven A. Hawley (Ph.D.) is checked out by white room closeout crew members before entering the orbiter Columbia. In the background is Mission Specialist Michel Tognini of France, waiting to enter Columbia. The white room is an environmental chamber at the end of the orbiter access arm that provides entry to the orbiter crew compartment. STS-93 is a five-day mission primarily to release the Chandra X-ray Observatory, which will allow scientists from around the world to study some of the most distant, powerful and dynamic objects in the universe. After Space Shuttle Columbia's July 20 and 22 launch attempts were scrubbed, the launch was again rescheduled for Friday, July 23, at 12:24 a.m. EDT. The target landing date is July 27 at 11:20 p.m. EDT KSC-99pp0967

STS-93 Mission Specialist Steven A. Hawley (Ph.D.) is checked out by w...

STS-93 Mission Specialist Steven A. Hawley (Ph.D.) is checked out by white room closeout crew members before entering the orbiter Columbia. In the background is Mission Specialist Michel Tognini of France, wait... More

STS-93 Mission Specialist Catherine G. Coleman (Ph.D.) (left) and Pilot Jeffrey S. Ashby (right) are checked out by white room closeout crew members before entering the orbiter Columbia. The white room is an environmental chamber at the end of the orbiter access arm that provides entry to the orbiter crew compartment. STS-93 is a five-day mission primarily to release the Chandra X-ray Observatory, which will allow scientists from around the world to study some of the most distant, powerful and dynamic objects in the universe. After Space Shuttle Columbia's July 20 and 22 launch attempts were scrubbed, the launch was again rescheduled for Friday, July 23, at 12:24 a.m. EDT. The target landing date is July 27 at 11:20 p.m. EDT KSC-99pp0965

STS-93 Mission Specialist Catherine G. Coleman (Ph.D.) (left) and Pilo...

STS-93 Mission Specialist Catherine G. Coleman (Ph.D.) (left) and Pilot Jeffrey S. Ashby (right) are checked out by white room closeout crew members before entering the orbiter Columbia. The white room is an en... More

STS-93 Pilot Jeffrey S. Ashby is checked out by white room closeout crew members before entering the orbiter Columbia. The white room is an environmental chamber at the end of the orbiter access arm that provides entry to the orbiter crew compartment. STS-93 is a five-day mission primarily to release the Chandra X-ray Observatory, which will allow scientists from around the world to study some of the most distant, powerful and dynamic objects in the universe. After Space Shuttle Columbia's July 20 and 22 launch attempts were scrubbed, the launch was again rescheduled for Friday, July 23, at 12:24 a.m. EDT. The target landing date is July 27 at 11:20 p.m. EDT KSC-99pp0964

STS-93 Pilot Jeffrey S. Ashby is checked out by white room closeout cr...

STS-93 Pilot Jeffrey S. Ashby is checked out by white room closeout crew members before entering the orbiter Columbia. The white room is an environmental chamber at the end of the orbiter access arm that provid... More

As part of Terminal Countdown Demonstration Test (TCDT) activities, the STS-103 crew inspect the "white room," an environmentally controlled chamber at the end of the orbiter access arm through which the crew enters the orbiter. Standing from left to right are Mission Specialists C. Michael Foale (Ph.D.), Claude Nicollier of Switzerland, Jean-François Clervoy of France, John M. Grunsfeld (Ph.D.), Commander Curtis L. Brown Jr., Mission Specialist Steven L. Smith, and Pilot Scott J. Kelly. Clervoy and Nicollier are with the European Space Agency. The TCDT provides the crew with the emergency egress training, opportunities to inspect their mission payloads in the orbiter's payload bay, and simulated countdown exercises. STS-103 is a "call-up" mission due to the need to replace and repair portions of the Hubble Space Telescope, including the gyroscopes that allow the telescope to point at stars, galaxies and planets. The STS-103 crew will be replacing a Fine Guidance Sensor, an older computer with a new enhanced model, an older data tape recorder with a solid-state digital recorder, a failed spare transmitter with a new one, and degraded insulation on the telescope with new thermal insulation. The crew will also install a Battery Voltage/Temperature Improvement Kit to protect the spacecraft batteries from overcharging and overheating when the telescope goes into a safe mode. Four EVA's are planned to make the necessary repairs and replacements on the telescope. The mission is targeted for launch Dec. 6 at 2:37 a.m. EST KSC-99pp1335

As part of Terminal Countdown Demonstration Test (TCDT) activities, th...

As part of Terminal Countdown Demonstration Test (TCDT) activities, the STS-103 crew inspect the "white room," an environmentally controlled chamber at the end of the orbiter access arm through which the crew e... More

At Launch Pad 39B. STS-103 Mission Specialist Jean-François Clervoy of France, who is with the European Space Agency (ESA), and Pilot Steven J. Kelly inspect the slidewire basket, part of the emergency egress system for persons in the Shuttle vehicle or on the Rotating Service Structure. Seven slidewires extend from the orbiter access arm, with a netted, flatbottom basket suspended from each wire. The STS-103 crew have been participating in Terminal Countdown Demonstration Test (TCDT) activities at KSC. Other crew members are Commander Curtis L. Brown Jr. and Mission Specialists Steven L. Smith, C. Michael Foale (Ph.D.), John M. Grunsfeld (Ph.D.), and Claude Nicollier of Switzerland, also with ESA. The TCDT provides the crew with the emergency egress training, opportunities to inspect their mission payloads in the orbiter's payload bay, and simulated countdown exercises. STS-103 is a "call-up" mission due to the need to replace and repair portions of the Hubble Space Telescope, including the gyroscopes that allow the telescope to point at stars, galaxies and planets. The STS-103 crew will be replacing a Fine Guidance Sensor, an older computer with a new enhanced model, an older data tape recorder with a solid-state digital recorder, a failed spare transmitter with a new one, and degraded insulation on the telescope with new thermal insulation. The crew will also install a Battery Voltage/Temperature Improvement Kit to protect the spacecraft batteries from overcharging and overheating when the telescope goes into a safe mode. Four EVA's are planned to make the necessary repairs and replacements on the telescope. The mission is targeted for launch Dec. 6 at 2:37 a.m. EST KSC-99pp1334

At Launch Pad 39B. STS-103 Mission Specialist Jean-François Clervoy of...

At Launch Pad 39B. STS-103 Mission Specialist Jean-François Clervoy of France, who is with the European Space Agency (ESA), and Pilot Steven J. Kelly inspect the slidewire basket, part of the emergency egress s... More

In the slidewire basket on Launch Pad 39B, STS-103 Commander Curtis L. Brown Jr. (left) and Pilot Scott J. Kelly (right) adjust their equipment. The baskets are part of the emergency egress system for persons in the Shuttle vehicle or on the Rotating Service Structure. Seven slidewires extend from the orbiter access arm, with a netted, flatbottom basket suspended from each wire. The other crew members are Mission Specialists Steven L. Smith, C. Michael Foale (Ph.D.), John M. Grunsfeld (Ph.D.), Claude Nicollier of Switzerland, with the European Space Agency (ESA), and Jean-François Clervoy of France, also with ESA.. The STS-103 crew are taking part in Terminal Countdown Demonstration Test (TCDT) activities in preparation for launch. The TCDT provides the crew with the emergency egress training, opportunities to inspect their mission payloads in the orbiter's payload bay, and simulated countdown exercises. STS-103 is a "call-up" mission due to the need to replace and repair portions of the Hubble Space Telescope, including the gyroscopes that allow the telescope to point at stars, galaxies and planets. The STS-103 crew will be replacing a Fine Guidance Sensor, an older computer with a new enhanced model, an older data tape recorder with a solid-state digital recorder, a failed spare transmitter with a new one, and degraded insulation on the telescope with new thermal insulation. The crew will also install a Battery Voltage/Temperature Improvement Kit to protect the spacecraft batteries from overcharging and overheating when the telescope goes into a safe mode. Four EVA's are planned to make the necessary repairs and replacements on the telescope. The mission is targeted for launch Dec. 6 at 2:37 a.m. EST KSC-99pp1340

In the slidewire basket on Launch Pad 39B, STS-103 Commander Curtis L....

In the slidewire basket on Launch Pad 39B, STS-103 Commander Curtis L. Brown Jr. (left) and Pilot Scott J. Kelly (right) adjust their equipment. The baskets are part of the emergency egress system for persons i... More

Standing left to right, STS-103 Pilot Scott J. Kelly, Commander Curtis L. Brown Jr., and Mission Specialist Jean-François Clervoy of France take a break during practice using the slidewire baskets, part of Terminal Countdown Demonstration Test (TCDT) activities in preparation for launch. The other crew members taking part are Mission Specialists Steven L. Smith, C. Michael Foale (Ph.D.), John M. Grunsfeld (Ph.D.), and Claude Nicollier of Switzerland. Clervoy and Nicollier are with the European Space Agency. The baskets are part of the emergency egress system for persons in the Shuttle vehicle or on the Rotating Service Structure. Seven slidewires extend from the orbiter access arm, with a netted, flatbottom basket suspended from each wire. The TCDT also provides the crew with opportunities to inspect their mission payloads in the orbiter's payload bay, and simulated countdown exercises. STS-103 is a "call-up" mission due to the need to replace and repair portions of the Hubble Space Telescope, including the gyroscopes that allow the telescope to point at stars, galaxies and planets. The STS-103 crew will be replacing a Fine Guidance Sensor, an older computer with a new enhanced model, an older data tape recorder with a solid-state digital recorder, a failed spare transmitter with a new one, and degraded insulation on the telescope with new thermal insulation. The crew will also install a Battery Voltage/Temperature Improvement Kit to protect the spacecraft batteries from overcharging and overheating when the telescope goes into a safe mode. Four EVA's are planned to make the necessary repairs and replacements on the telescope. The mission is targeted for launch Dec. 6 at 2:37 a.m. EST KSC-99pp1341

Standing left to right, STS-103 Pilot Scott J. Kelly, Commander Curtis...

Standing left to right, STS-103 Pilot Scott J. Kelly, Commander Curtis L. Brown Jr., and Mission Specialist Jean-François Clervoy of France take a break during practice using the slidewire baskets, part of Term... More

In the slidewire basket on Launch Pad 39B, STS-103 Mission Specialist C. Michael Foale (Ph.D.) gets ready to pull the lever, which will release the basket. With Foale are fellow crew members Mission Specialists Claude Nicollier of Switzerland and John M. Grunsfeld (Ph.D.). The baskets are part of the emergency egress system for persons in the Shuttle vehicle or on the Rotating Service Structure. Seven slidewires extend from the orbiter access arm, with a netted, flatbottom basket suspended from each wire. The STS-103 crew are taking part in Terminal Countdown Demonstration Test (TCDT) activities in preparation for launch. The other crew members taking part are Commander Curtis L. Brown Jr., Pilot Scott J. Kelly, and Mission Specialists Steven L. Smith, and Jean-François Clervoy of France. Clervoy and Nicollier are with the European Space Agency. The TCDT provides the crew with the emergency egress training, opportunities to inspect their mission payloads in the orbiter's payload bay, and simulated countdown exercises. STS-103 is a "call-up" mission due to the need to replace and repair portions of the Hubble Space Telescope, including the gyroscopes that allow the telescope to point at stars, galaxies and planets. The STS-103 crew will be replacing a Fine Guidance Sensor, an older computer with a new enhanced model, an older data tape recorder with a solid-state digital recorder, a failed spare transmitter with a new one, and degraded insulation on the telescope with new thermal insulation. The crew will also install a Battery Voltage/Temperature Improvement Kit to protect the spacecraft batteries from overcharging and overheating when the telescope goes into a safe mode. Four EVA's are planned to make the necessary repairs and replacements on the telescope. The mission is targeted for launch Dec. 6 at 2:37 a.m. EST KSC-99pp1337

In the slidewire basket on Launch Pad 39B, STS-103 Mission Specialist ...

In the slidewire basket on Launch Pad 39B, STS-103 Mission Specialist C. Michael Foale (Ph.D.) gets ready to pull the lever, which will release the basket. With Foale are fellow crew members Mission Specialists... More

In the slidewire basket on Launch Pad 39B, STS-103 Mission Specialist Steven L. Smith reaches for the lever that will release the basket. With Smith is fellow crew member Mission Specialist Jean-François Clervoy of France. The baskets are part of the emergency egress system for persons in the Shuttle vehicle or on the Rotating Service Structure. Seven slidewires extend from the orbiter access arm, with a netted, flatbottom basket suspended from each wire. The STS-103 crew are taking part in Terminal Countdown Demonstration Test (TCDT) activities in preparation for launch. The other crew members are Commander Curtis L. Brown Jr., Pilot Scott J. Kelly, and Mission Specialists C. Michael Foale (Ph.D.), John M. Grunsfeld (Ph.D.), and Claude Nicollier of Switzerland. Clervoy and Nicollier are with the European Space Agency. The TCDT provides the crew with the emergency egress training, opportunities to inspect their mission payloads in the orbiter's payload bay, and simulated countdown exercises. STS-103 is a "call-up" mission due to the need to replace and repair portions of the Hubble Space Telescope, including the gyroscopes that allow the telescope to point at stars, galaxies and planets. The STS-103 crew will be replacing a Fine Guidance Sensor, an older computer with a new enhanced model, an older data tape recorder with a solid-state digital recorder, a failed spare transmitter with a new one, and degraded insulation on the telescope with new thermal insulation. The crew will also install a Battery Voltage/Temperature Improvement Kit to protect the spacecraft batteries from overcharging and overheating when the telescope goes into a safe mode. Four EVA's are planned to make the necessary repairs and replacements on the telescope. The mission is targeted for launch Dec. 6 at 2:37 a.m. EST KSC-99pp1338

In the slidewire basket on Launch Pad 39B, STS-103 Mission Specialist ...

In the slidewire basket on Launch Pad 39B, STS-103 Mission Specialist Steven L. Smith reaches for the lever that will release the basket. With Smith is fellow crew member Mission Specialist Jean-François Clervo... More

In the slidewire basket on Launch Pad 39B, STS-103 Mission Specialists Jean-François Clervoy of France (left) and Steven L. Smith take a break to pose for the photographer. The baskets are part of the emergency egress system for persons in the Shuttle vehicle or on the Rotating Service Structure. Seven slidewires extend from the orbiter access arm, with a netted, flatbottom basket suspended from each wire. The STS-103 crew are taking part in Terminal Countdown Demonstration Test (TCDT) activities in preparation for launch. The other crew members are Commander Curtis L. Brown Jr., Pilot Scott J. Kelly, and Mission Specialists C. Michael Foale (Ph.D.), John M. Grunsfeld (Ph.D.), and Claude Nicollier of Switzerland. Clervoy and Nicollier are with the European Space Agency. The TCDT provides the crew with the emergency egress training, opportunities to inspect their mission payloads in the orbiter's payload bay, and simulated countdown exercises. STS-103 is a "call-up" mission due to the need to replace and repair portions of the Hubble Space Telescope, including the gyroscopes that allow the telescope to point at stars, galaxies and planets. The STS-103 crew will be replacing a Fine Guidance Sensor, an older computer with a new enhanced model, an older data tape recorder with a solid-state digital recorder, a failed spare transmitter with a new one, and degraded insulation on the telescope with new thermal insulation. The crew will also install a Battery Voltage/Temperature Improvement Kit to protect the spacecraft batteries from overcharging and overheating when the telescope goes into a safe mode. Four EVA's are planned to make the necessary repairs and replacements on the telescope. The mission is targeted for launch Dec. 6 at 2:37 a.m. EST KSC-99pp1339

In the slidewire basket on Launch Pad 39B, STS-103 Mission Specialists...

In the slidewire basket on Launch Pad 39B, STS-103 Mission Specialists Jean-François Clervoy of France (left) and Steven L. Smith take a break to pose for the photographer. The baskets are part of the emergency... More

KENNEDY SPACE CENTER, Fla. -- Under partly cloudy skies and the Atlantic Ocean as a backdrop, Space Shuttle Endeavour, atop the mobile launcher platform, arrives at Launch Pad 39A for mission STS-99. The white cubicle at left is the environmental chamber, the White Room, that provides entry into the orbiter for the astronauts. It is at the outer end of the Orbiter Access Arm on the Fixed Service Structure. STS-99, named the Shuttle Radar Topography Mission (SRTM), involves an international project spearheaded by the National Imagery and Mapping Agency and NASA, with participation of the German Aerospace Center DLR. SRTM will chart a new course, using two antennae and a 200-foot-long section of space station-derived mast protruding from its payload bay, to produce unrivaled 3-D images of the Earth's surface. The result of the Shuttle Radar Topography Mission could be close to 1 trillion measurements of the Earth's topography. Besides contributing to the production of better maps, these measurements could lead to improved water drainage modeling, more realistic flight simulators, better locations for cell phone towers, and enhanced navigation safety. STS-99 is scheduled for launch in January 2000 KSC-99pp1419

KENNEDY SPACE CENTER, Fla. -- Under partly cloudy skies and the Atlant...

KENNEDY SPACE CENTER, Fla. -- Under partly cloudy skies and the Atlantic Ocean as a backdrop, Space Shuttle Endeavour, atop the mobile launcher platform, arrives at Launch Pad 39A for mission STS-99. The white ... More

Just after sundown, Space Shuttle Discovery is framed with light from the Fixed Service Structure on Launch Pad 39B as it waits for liftoff on mission STS-103. At the top is seen the external tank gaseous oxygen vent arm system with the vent hood (commonly called the "beanie cap") poised above the external tank. The retractable arm and the beanie cap are designed to vent gaseous oxygen vapors away from the Space Shuttle. The arm truss section is 65 feet long and the diameter of the beanie cap is 13 feet. Extending toward the cabin of the orbiter is the orbiter access arm, with the environmental chamber (called the White Room) at the end. Through this chamber the crew enters the orbiter. The STS-103 mission, to service the Hubble Space Telescope, is scheduled for launch Dec. 17 at 8:47 p.m. EST. Mission objectives include replacing gyroscopes and an old computer, installing another solid state recorder, and replacing damaged insulation in the telescope. The mission is expected to last about 8 days and 21 hours. Discovery is expected to land at KSC Sunday, Dec. 26, at about 6:25 p.m. EST KSC-99padig045

Just after sundown, Space Shuttle Discovery is framed with light from ...

Just after sundown, Space Shuttle Discovery is framed with light from the Fixed Service Structure on Launch Pad 39B as it waits for liftoff on mission STS-103. At the top is seen the external tank gaseous oxyge... More

After sunup, which is obscured by a cloud-filled sky, Space Shuttle Discovery waits atop the mobile launcher platform for launch of mission STS-103. At the top is seen the external tank gaseous oxygen vent arm system with the vent hood (commonly called the "beanie cap") poised above the external tank. The retractable arm and the beanie cap are designed to vent gaseous oxygen vapors away from the Space Shuttle. The arm truss section is 65 feet long and the diameter of the vent hood is 13 feet. Extending toward the cabin of the orbiter below is the orbiter access arm, with the environmental chamber (called the White Room) at the end. Through this chamber the crew enters the orbiter. The STS-103 mission, to service the Hubble Space Telescope, is scheduled for launch Dec. 17 at 8:47 p.m. EST. Mission objectives include replacing gyroscopes and an old computer, installing another solid state recorder, and replacing damaged insulation in the telescope. The mission is expected to last about 8 days and 21 hours. Discovery is expected to land at KSC Sunday, Dec. 26, at about 6:25 p.m. EST KSC-99padig047

After sunup, which is obscured by a cloud-filled sky, Space Shuttle Di...

After sunup, which is obscured by a cloud-filled sky, Space Shuttle Discovery waits atop the mobile launcher platform for launch of mission STS-103. At the top is seen the external tank gaseous oxygen vent arm ... More

In the early morning hours, Space Shuttle Discovery is framed with light from the Fixed Service Structure on Launch Pad 39B as it waits for flight and mission STS-103. At the top is seen the external tank gaseous oxygen vent arm system with the vent hood (commonly called the "beanie cap") poised above the external tank. The retractable arm and the beanie cap are designed to vent gaseous oxygen vapors away from the Space Shuttle. The arm truss section is 65 feet long and the diameter of the vent hood is 13 feet. Extending toward the cabin of the orbiter below is the orbiter access arm, with the environmental chamber (called the White Room) at the end. Through this chamber the crew enters the orbiter. The STS-103 mission, to service the Hubble Space Telescope, is scheduled for launch Dec. 17 at 8:47 p.m. EST. Mission objectives include replacing gyroscopes and an old computer, installing another solid state recorder, and replacing damaged insulation in the telescope. The mission is expected to last about 8 days and 21 hours. Discovery is expected to land at KSC Sunday, Dec. 26, at about 6:25 p.m. EST KSC-99padig046

In the early morning hours, Space Shuttle Discovery is framed with lig...

In the early morning hours, Space Shuttle Discovery is framed with light from the Fixed Service Structure on Launch Pad 39B as it waits for flight and mission STS-103. At the top is seen the external tank gaseo... More

A cloud-streaked sky provides backdrop for Space Shuttle Discovery as it waits for liftoff on mission STS-103 from Launch Pad 39B. The tower at its left is the Fixed Service Structure, topped by the 80-foot-tall fiberglass mast that helps provide protection from lightning strikes. Below it, extending outward, is the external tank gaseous oxygen vent arm system with the vent hood (commonly called the "beanie cap") poised above the external tank. The retractable arm and the beanie cap are designed to vent gaseous oxygen vapors away from the Space Shuttle. The arm truss section is 65 feet long and the diameter of the vent hood is 13 feet. Extending toward the cabin of the orbiter below is the orbiter access arm, with the environmental chamber (called the White Room) at the end. Through this chamber the crew enters the orbiter. The STS-103 mission, to service the Hubble Space Telescope, is scheduled for launch Dec. 17 at 8:47 p.m. EST. Mission objectives include replacing gyroscopes and an old computer, installing another solid state recorder, and replacing damaged insulation in the telescope. The mission is expected to last about 8 days and 21 hours. Discovery is expected to land at KSC Sunday, Dec. 26, at about 6:25 p.m. EST KSC-99pp1440

A cloud-streaked sky provides backdrop for Space Shuttle Discovery as ...

A cloud-streaked sky provides backdrop for Space Shuttle Discovery as it waits for liftoff on mission STS-103 from Launch Pad 39B. The tower at its left is the Fixed Service Structure, topped by the 80-foot-tal... More

KENNEDY SPACE CENTER, FLA. -- STS-103 Mission Specialist John M. Grunsfeld (Ph.D.), in his orange launch and entry suit, is assisted by closeout crew members in the White Room before entering the orbiter. At left is United Space Alliance Mechanical Technician Vinny Defranzo and at right is NASA Quality Assurance Specialist Danny Wyatt. The White Room is an environmental chamber at the end of the orbiter access arm on the fixed service structure. It provides entry to the orbiter crew compartment. The mission, to service the Hubble Space Telescope, is scheduled to lift off at 7:50 p.m. EST Dec. 19 on mission STS-103, servicing the Hubble Space Telescope. Objectives for the nearly eight-day mission include replacing gyroscopes and an old computer, installing another solid state recorder, and replacing damaged insulation in the telescope. Discovery is expected to land at KSC Monday, Dec. 27, at about 5:24 p.m. EST KSC-99pp1484

KENNEDY SPACE CENTER, FLA. -- STS-103 Mission Specialist John M. Gruns...

KENNEDY SPACE CENTER, FLA. -- STS-103 Mission Specialist John M. Grunsfeld (Ph.D.), in his orange launch and entry suit, is assisted by closeout crew members in the White Room before entering the orbiter. At le... More

KENNEDY SPACE CENTER, FLA. -- STS-103 Mission Specialist Claude Nicollier, in his orange launch and entry suit, shakes hands with NASA Quality Assurance Specialist Danny Wyatt in the White Room before entering the orbiter. Other closeout crew members are United Space Alliance (USA) Suit Technician Ray Cuevas (left) and USA Orbiter Vehicle Closeout Chief Travis Thompson. The White Room is an environmental chamber at the end of the orbiter access arm on the fixed service structure. It provides entry to the orbiter crew compartment. The mission, to service the Hubble Space Telescope, is scheduled to lift off at 7:50 p.m. EST Dec. 19 on mission STS-103, servicing the Hubble Space Telescope. Objectives for the nearly eight-day mission include replacing gyroscopes and an old computer, installing another solid state recorder, and replacing damaged insulation in the telescope. Discovery is expected to land at KSC Monday, Dec. 27, at about 5:24 p.m. EST KSC-99pp1481

KENNEDY SPACE CENTER, FLA. -- STS-103 Mission Specialist Claude Nicoll...

KENNEDY SPACE CENTER, FLA. -- STS-103 Mission Specialist Claude Nicollier, in his orange launch and entry suit, shakes hands with NASA Quality Assurance Specialist Danny Wyatt in the White Room before entering ... More

KENNEDY SPACE CENTER, FLA. -- STS-103 Mission Specialist C. Michael Foale (Ph.D.), in his orange launch and entry suit, is assisted by closeout crew members in the White Room before entering the orbiter. At left is United Space Alliance (USA) Orbiter Vehicle Closeout Chief Travis Thompson and USA Mechanical Technician Vinny Defranzo. The White Room is an environmental chamber at the end of the orbiter access arm on the fixed service structure. It provides entry to the orbiter crew compartment. The mission, to service the Hubble Space Telescope, is scheduled to lift off at 7:50 p.m. EST Dec. 19 on mission STS-103, servicing the Hubble Space Telescope. Objectives for the nearly eight-day mission include replacing gyroscopes and an old computer, installing another solid state recorder, and replacing damaged insulation in the telescope. Discovery is expected to land at KSC Monday, Dec. 27, at about 5:24 p.m. EST KSC-99pp1483

KENNEDY SPACE CENTER, FLA. -- STS-103 Mission Specialist C. Michael Fo...

KENNEDY SPACE CENTER, FLA. -- STS-103 Mission Specialist C. Michael Foale (Ph.D.), in his orange launch and entry suit, is assisted by closeout crew members in the White Room before entering the orbiter. At lef... More

KENNEDY SPACE CENTER, FLA. -- In the White Room, STS-103 Mission Specialists Steven L. Smith and Jean-Francois Clervoy, in their orange launch and entry suits, are getting ready to enter Space Shuttle Discovery. Assisting them are closeout crew members (from left) United Space Alliance (USA) Mechanical Technician Rene Arriens, NASA Quality Assurance Specialist Danny Wyatt, USA Orbiter Vehicle Closeout Chief Travis Thompson and USA Mechanical Technician Vinny Defranzo. The White Room is an environmental chamber at the end of the orbiter access arm on the fixed service structure. It provides entry to the orbiter crew compartment. The mission, to service the Hubble Space Telescope, is scheduled to lift off at 7:50 p.m. EST Dec. 19 on mission STS-103, servicing the Hubble Space Telescope. Objectives for the nearly eight-day mission include replacing gyroscopes and an old computer, installing another solid state recorder, and replacing damaged insulation in the telescope. Discovery is expected to land at KSC Monday, Dec. 27, at about 5:24 p.m. EST KSC-99pp1486

KENNEDY SPACE CENTER, FLA. -- In the White Room, STS-103 Mission Speci...

KENNEDY SPACE CENTER, FLA. -- In the White Room, STS-103 Mission Specialists Steven L. Smith and Jean-Francois Clervoy, in their orange launch and entry suits, are getting ready to enter Space Shuttle Discovery... More

KENNEDY SPACE CENTER, FLA. -- STS-103 Pilot Scott J. Kelly, in his orange launch and entry suit, waits for assistance from closeout crew members in the White Room before entering the orbiter. Seen at left is United Space Alliance Mechanical Technician Rene Arriens. The White Room is an environmental chamber at the end of the orbiter access arm on the fixed service structure. It provides entry to the orbiter crew compartment. The mission, to service the Hubble Space Telescope, is scheduled to lift off at 7:50 p.m. EST Dec. 19 on mission STS-103, servicing the Hubble Space Telescope. Objectives for the nearly eight-day mission include replacing gyroscopes and an old computer, installing another solid state recorder, and replacing damaged insulation in the telescope. Discovery is expected to land at KSC Monday, Dec. 27, at about 5:24 p.m. EST KSC-99pp1482

KENNEDY SPACE CENTER, FLA. -- STS-103 Pilot Scott J. Kelly, in his ora...

KENNEDY SPACE CENTER, FLA. -- STS-103 Pilot Scott J. Kelly, in his orange launch and entry suit, waits for assistance from closeout crew members in the White Room before entering the orbiter. Seen at left is Un... More

KENNEDY SPACE CENTER, FLA. -- STS-103 Mission Specialist Steven L. Smith, in his orange launch and entry suit, waits for assistance from closeout crew members in the White Room before entering the orbiter. From left, they are NASA Quality Assurance Specialist Danny Wyatt, United Space Alliance (USA) Mechanical Technician Vinny Defranzo and USA Orbiter Vehicle Closeout Chief Travis Thompson. The White Room is an environmental chamber at the end of the orbiter access arm on the fixed service structure. It provides entry to the orbiter crew compartment. The mission, to service the Hubble Space Telescope, is scheduled to lift off at 7:50 p.m. EST Dec. 19 on mission STS-103, servicing the Hubble Space Telescope. Objectives for the nearly eight-day mission include replacing gyroscopes and an old computer, installing another solid state recorder, and replacing damaged insulation in the telescope. Discovery is expected to land at KSC Monday, Dec. 27, at about 5:24 p.m. EST KSC-99pp1485

KENNEDY SPACE CENTER, FLA. -- STS-103 Mission Specialist Steven L. Smi...

KENNEDY SPACE CENTER, FLA. -- STS-103 Mission Specialist Steven L. Smith, in his orange launch and entry suit, waits for assistance from closeout crew members in the White Room before entering the orbiter. From... More

KENNEDY SPACE CENTER, FLA. -- STS-103 Commander Curtis L. Brown Jr., in his orange launch and entry suit, enjoys a laugh with closeout crew members in the White Room before entering the orbiter. From left are United Space Alliance (USA) Mechanical Technician Rene Arriens, USA Orbiter Vehicle Closeout Chief Travis Thompson, and NASA Quality Assurance Specialist Danny Wyatt. The white room is an environmental chamber at the end of the orbiter access arm on the fixed service structure. It provides entry to the orbiter crew compartment. The mission, to service the Hubble Space Telescope, is scheduled to lift off at 7:50 p.m. EST Dec. 19 on mission STS-103, servicing the Hubble Space Telescope. Objectives for the nearly eight-day mission include replacing gyroscopes and an old computer, installing another solid state recorder, and replacing damaged insulation in the telescope. Discovery is expected to land at KSC Monday, Dec. 27, at about 5:24 p.m. EST KSC-99pp1480

KENNEDY SPACE CENTER, FLA. -- STS-103 Commander Curtis L. Brown Jr., i...

KENNEDY SPACE CENTER, FLA. -- STS-103 Commander Curtis L. Brown Jr., in his orange launch and entry suit, enjoys a laugh with closeout crew members in the White Room before entering the orbiter. From left are U... More

KENNEDY SPACE CENTER, Fla.  -- On Launch Pad 39A, Space Shuttle Endeavour is viewed late at night from a point on the Rotating Service Structure more than 225 feet from the ground. Abutting the side of Endeavour is the orbiter access arm with the environmental chamber known as the White Room at the end. The White Room provides access to the crew compartment. Endeavour waits for mission STS-99, known as the Shuttle Radar Topography Mission (SRTM), which will chart a new course to produce unrivaled 3-D images of the Earth's surface. The result of the SRTM could be close to 1 trillion measurements of the Earth's topography. The mission is expected to last 11days, with Endeavour landing at KSC Tuesday, Feb. 22, at 4:36 p.m. EST. This is the 97th Shuttle flight and 14th for Shuttle Endeavour KSC00pp0216

KENNEDY SPACE CENTER, Fla. -- On Launch Pad 39A, Space Shuttle Endeav...

KENNEDY SPACE CENTER, Fla. -- On Launch Pad 39A, Space Shuttle Endeavour is viewed late at night from a point on the Rotating Service Structure more than 225 feet from the ground. Abutting the side of Endeavou... More

KENNEDY SPACE CENTER, Fla.  -- On Launch Pad 39A, Space Shuttle Endeavour is viewed late at night from a point on the Rotating Service Structure more than 225 feet from the ground. Abutting the side of Endeavour is the orbiter access arm with the environmental chamber known as the White Room at the end. The White Room provides access to the crew compartment. Endeavour waits for mission STS-99, known as the Shuttle Radar Topography Mission (SRTM), which will chart a new course to produce unrivaled 3-D images of the Earth's surface. The result of the SRTM could be close to 1 trillion measurements of the Earth's topography. The mission is expected to last 11days, with Endeavour landing at KSC Tuesday, Feb. 22, at 4:36 p.m. EST. This is the 97th Shuttle flight and 14th for Shuttle Endeavour KSC-00pp0216

KENNEDY SPACE CENTER, Fla. -- On Launch Pad 39A, Space Shuttle Endeav...

KENNEDY SPACE CENTER, Fla. -- On Launch Pad 39A, Space Shuttle Endeavour is viewed late at night from a point on the Rotating Service Structure more than 225 feet from the ground. Abutting the side of Endeavou... More

Before entering the orbiter Endeavour, STS-99 Commander Kevin Kregel shakes hands with Chris Meinert, closeout chief of the White Room closeout crew. In the background is Carlos Gillis, suit technician. The White Room is an environmental chamber at the end of the orbiter access arm, on the fixed service structure, that provides entry to the orbiter crew compartment. STS-99, known as the Shuttle Radar Topography Mission (SRTM), will chart a new course to produce unrivaled 3-D images of the Earth's surface. The result of the Shuttle Radar Topography Mission could be close to 1 trillion measurements of the Earth's topography. Scheduled for liftoff at 12:30 p.m. EST, the mission is expected to last 11days, with Endeavour landing at KSC Tuesday, Feb. 22, at 4:36 p.m. EST. This is the 97th Shuttle flight and 14th for Shuttle Endeav KSC00pp0231

Before entering the orbiter Endeavour, STS-99 Commander Kevin Kregel s...

Before entering the orbiter Endeavour, STS-99 Commander Kevin Kregel shakes hands with Chris Meinert, closeout chief of the White Room closeout crew. In the background is Carlos Gillis, suit technician. The Whi... More

Before entering the orbiter Endeavour, STS-99 Mission Specialist Janet Kavandi is helped with final suit preparations by members of the White Room closeout crew Travis Thompson (hidden), mechanical technician, and Chris Meinert, closeout chief. The White Room is an environmental chamber at the end of the orbiter access arm, on the fixed service structure, that provides entry to the orbiter crew compartment. STS-99, known as the Shuttle Radar Topography Mission (SRTM), will chart a new course to produce unrivaled 3-D images of the Earth's surface. The result of the Shuttle Radar Topography Mission could be close to 1 trillion measurements of the Earth's topography. Scheduled for liftoff at 12:30 p.m. EST, the mission is expected to last 11days, with Endeavour landing at KSC Tuesday, Feb. 22, at 4:36 p.m. EST. This is the 97th Shuttle flight and 14th for Shuttle Endeavour KSC-00pp0236

Before entering the orbiter Endeavour, STS-99 Mission Specialist Janet...

Before entering the orbiter Endeavour, STS-99 Mission Specialist Janet Kavandi is helped with final suit preparations by members of the White Room closeout crew Travis Thompson (hidden), mechanical technician, ... More

Before entering the orbiter Endeavour, STS-99 Mission Specialist Gerhard Thiele of Germany is helped with final suit preparations by Travis Thompson, mechanical technician and a member of the White Room closeout crew. The White Room is an environmental chamber at the end of the orbiter access arm, on the fixed service structure, that provides entry to the orbiter crew compartment. STS-99, known as the Shuttle Radar Topography Mission (SRTM), will chart a new course to produce unrivaled 3-D images of the Earth's surface. The result of the Shuttle Radar Topography Mission could be close to 1 trillion measurements of the Earth's topography. Scheduled for liftoff at 12:30 p.m. EST, the mission is expected to last 11days, with Endeavour landing at KSC Tuesday, Feb. 22, at 4:36 p.m. EST. This is the 97th Shuttle flight and 14th for Shuttle Endeavour KSC00pp0235

Before entering the orbiter Endeavour, STS-99 Mission Specialist Gerha...

Before entering the orbiter Endeavour, STS-99 Mission Specialist Gerhard Thiele of Germany is helped with final suit preparations by Travis Thompson, mechanical technician and a member of the White Room closeou... More

STS-99 Pilot Dominic Gorie appears to wave while the closeout crew in the White Room checks his launch and entry suit before he enters orbiter Endeavour. In the foreground is Chris Meinert, closeout chief. The White Room is an environmental chamber at the end of the orbiter access arm, on the fixed service structure, that provides entry to the orbiter crew compartment. STS-99, known as the Shuttle Radar Topography Mission (SRTM), will chart a new course to produce unrivaled 3-D images of the Earth's surface. The result of the Shuttle Radar Topography Mission could be close to 1 trillion measurements of the Earth's topography. Scheduled for liftoff at 12:30 p.m. EST, the mission is expected to last 11days, with Endeavour landing at KSC Tuesday, Feb. 22, at 4:36 p.m. EST. This is the 97th Shuttle flight and 14th for Shuttle Endeavour KSC-00pp0233

STS-99 Pilot Dominic Gorie appears to wave while the closeout crew in ...

STS-99 Pilot Dominic Gorie appears to wave while the closeout crew in the White Room checks his launch and entry suit before he enters orbiter Endeavour. In the foreground is Chris Meinert, closeout chief. The ... More

STS-99 Mission Specialist Mamoru Mohri of Japan holds a memento from friends before entering orbiter Endeavour. With him are members of the White Room closeout crew, Chris Meinert (left), closeout chief, and Jack Burritt (background), Quality Assurance specialist. The White Room is an environmental chamber at the end of the orbiter access arm, on the fixed service structure, that provides entry to the orbiter crew compartment. STS-99, known as the Shuttle Radar Topography Mission (SRTM), will chart a new course to produce unrivaled 3-D images of the Earth's surface. The result of the Shuttle Radar Topography Mission could be close to 1 trillion measurements of the Earth's topography. Scheduled for liftoff at 12:30 p.m. EST, the mission is expected to last 11days, with Endeavour landing at KSC Tuesday, Feb. 22, at 4:36 p.m. EST. This is the 97th Shuttle flight and 14th for Shuttle Endeavour KSC-00pp0232

STS-99 Mission Specialist Mamoru Mohri of Japan holds a memento from f...

STS-99 Mission Specialist Mamoru Mohri of Japan holds a memento from friends before entering orbiter Endeavour. With him are members of the White Room closeout crew, Chris Meinert (left), closeout chief, and Ja... More

Before entering the orbiter Endeavour, STS-99 Mission Specialist Janice Voss is helped by Travis Thompson and Jack Burritt, members of the White Room closeout crew. The White Room is an environmental chamber at the end of the orbiter access arm, on the fixed service structure, that provides entry to the orbiter crew compartment. STS-99, known as the Shuttle Radar Topography Mission (SRTM), will chart a new course to produce unrivaled 3-D images of the Earth's surface. The result of the Shuttle Radar Topography Mission could be close to 1 trillion measurements of the Earth's topography. Scheduled for liftoff at 12:30 p.m. EST, the mission is expected to last 11days, with Endeavour landing at KSC Tuesday, Feb. 22, at 4:36 p.m. EST. This is the 97th Shuttle flight and 14th for Shuttle Endeavour KSC00pp0234

Before entering the orbiter Endeavour, STS-99 Mission Specialist Janic...

Before entering the orbiter Endeavour, STS-99 Mission Specialist Janice Voss is helped by Travis Thompson and Jack Burritt, members of the White Room closeout crew. The White Room is an environmental chamber at... More

Before entering the orbiter Endeavour, STS-99 Commander Kevin Kregel shakes hands with Chris Meinert, closeout chief of the White Room closeout crew. In the background is Carlos Gillis, suit technician. The White Room is an environmental chamber at the end of the orbiter access arm, on the fixed service structure, that provides entry to the orbiter crew compartment. STS-99, known as the Shuttle Radar Topography Mission (SRTM), will chart a new course to produce unrivaled 3-D images of the Earth's surface. The result of the Shuttle Radar Topography Mission could be close to 1 trillion measurements of the Earth's topography. Scheduled for liftoff at 12:30 p.m. EST, the mission is expected to last 11days, with Endeavour landing at KSC Tuesday, Feb. 22, at 4:36 p.m. EST. This is the 97th Shuttle flight and 14th for Shuttle Endeav KSC-00pp0231

Before entering the orbiter Endeavour, STS-99 Commander Kevin Kregel s...

Before entering the orbiter Endeavour, STS-99 Commander Kevin Kregel shakes hands with Chris Meinert, closeout chief of the White Room closeout crew. In the background is Carlos Gillis, suit technician. The Whi... More

Before entering the orbiter Endeavour, STS-99 Mission Specialist Janet Kavandi is helped with final suit preparations by members of the White Room closeout crew Travis Thompson (hidden), mechanical technician, and Chris Meinert, closeout chief. The White Room is an environmental chamber at the end of the orbiter access arm, on the fixed service structure, that provides entry to the orbiter crew compartment. STS-99, known as the Shuttle Radar Topography Mission (SRTM), will chart a new course to produce unrivaled 3-D images of the Earth's surface. The result of the Shuttle Radar Topography Mission could be close to 1 trillion measurements of the Earth's topography. Scheduled for liftoff at 12:30 p.m. EST, the mission is expected to last 11days, with Endeavour landing at KSC Tuesday, Feb. 22, at 4:36 p.m. EST. This is the 97th Shuttle flight and 14th for Shuttle Endeavour KSC00pp0236

Before entering the orbiter Endeavour, STS-99 Mission Specialist Janet...

Before entering the orbiter Endeavour, STS-99 Mission Specialist Janet Kavandi is helped with final suit preparations by members of the White Room closeout crew Travis Thompson (hidden), mechanical technician, ... More

STS-99 Mission Specialist Mamoru Mohri of Japan holds a memento from friends before entering orbiter Endeavour. With him are members of the White Room closeout crew, Chris Meinert (left), closeout chief, and Jack Burritt (background), Quality Assurance specialist. The White Room is an environmental chamber at the end of the orbiter access arm, on the fixed service structure, that provides entry to the orbiter crew compartment. STS-99, known as the Shuttle Radar Topography Mission (SRTM), will chart a new course to produce unrivaled 3-D images of the Earth's surface. The result of the Shuttle Radar Topography Mission could be close to 1 trillion measurements of the Earth's topography. Scheduled for liftoff at 12:30 p.m. EST, the mission is expected to last 11days, with Endeavour landing at KSC Tuesday, Feb. 22, at 4:36 p.m. EST. This is the 97th Shuttle flight and 14th for Shuttle Endeavour KSC00pp0232

STS-99 Mission Specialist Mamoru Mohri of Japan holds a memento from f...

STS-99 Mission Specialist Mamoru Mohri of Japan holds a memento from friends before entering orbiter Endeavour. With him are members of the White Room closeout crew, Chris Meinert (left), closeout chief, and Ja... More

STS-99 Pilot Dominic Gorie appears to wave while the closeout crew in the White Room checks his launch and entry suit before he enters orbiter Endeavour. In the foreground is Chris Meinert, closeout chief. The White Room is an environmental chamber at the end of the orbiter access arm, on the fixed service structure, that provides entry to the orbiter crew compartment. STS-99, known as the Shuttle Radar Topography Mission (SRTM), will chart a new course to produce unrivaled 3-D images of the Earth's surface. The result of the Shuttle Radar Topography Mission could be close to 1 trillion measurements of the Earth's topography. Scheduled for liftoff at 12:30 p.m. EST, the mission is expected to last 11days, with Endeavour landing at KSC Tuesday, Feb. 22, at 4:36 p.m. EST. This is the 97th Shuttle flight and 14th for Shuttle Endeavour KSC00pp0233

STS-99 Pilot Dominic Gorie appears to wave while the closeout crew in ...

STS-99 Pilot Dominic Gorie appears to wave while the closeout crew in the White Room checks his launch and entry suit before he enters orbiter Endeavour. In the foreground is Chris Meinert, closeout chief. The ... More

Before entering the orbiter Endeavour, STS-99 Mission Specialist Janice Voss is helped by Travis Thompson and Jack Burritt, members of the White Room closeout crew. The White Room is an environmental chamber at the end of the orbiter access arm, on the fixed service structure, that provides entry to the orbiter crew compartment. STS-99, known as the Shuttle Radar Topography Mission (SRTM), will chart a new course to produce unrivaled 3-D images of the Earth's surface. The result of the Shuttle Radar Topography Mission could be close to 1 trillion measurements of the Earth's topography. Scheduled for liftoff at 12:30 p.m. EST, the mission is expected to last 11days, with Endeavour landing at KSC Tuesday, Feb. 22, at 4:36 p.m. EST. This is the 97th Shuttle flight and 14th for Shuttle Endeavour KSC-00pp0234

Before entering the orbiter Endeavour, STS-99 Mission Specialist Janic...

Before entering the orbiter Endeavour, STS-99 Mission Specialist Janice Voss is helped by Travis Thompson and Jack Burritt, members of the White Room closeout crew. The White Room is an environmental chamber at... More

KENNEDY SPACE CENTER, Fla.  --  After rollback of the Rotating Service Structure, Space Shuttle Atlantis is poised and ready on Launch Pad 39A for a fourth launch attempt on mission STS-101. At the top of the photo can be seen the Gaseous Oxygen Vent Hood, often called the "beanie cap." The hood helps vent gaseous oxygen vapors away from the Space Shuttle. The hood will be raised and retracted two and a half minutes before launch. Abutting the side of Atlantis is the orbiter access arm with the environmental chamber known as the White Room at the end. The White Room provides access to the crew compartment. In the background of the photo is the Atlantic Ocean. This will be the third assembly flight to the International Space Station. Liftoff of Space Shuttle Atlantis for the 10-day mission is scheduled for about 6:12 a.m. EDT from Launch Pad 39A. Landing is targeted for May 29 at 2:19 a.m. EDT. This is the 98th Shuttle flight and the 21st flight for Shuttle Atlantis KSC-00pp0634

KENNEDY SPACE CENTER, Fla. -- After rollback of the Rotating Service...

KENNEDY SPACE CENTER, Fla. -- After rollback of the Rotating Service Structure, Space Shuttle Atlantis is poised and ready on Launch Pad 39A for a fourth launch attempt on mission STS-101. At the top of the p... More

KENNEDY SPACE CENTER, Fla.  --  After rollback of the Rotating Service Structure at Launch Pad 39A, Space Shuttle Atlantis awaits a fourth launch attempt on mission STS-101. At the top of the orange external tank can be seen the Gaseous Oxygen Vent Hood, often called the "beanie cap." The hood helps vent gaseous oxygen vapors away from the Space Shuttle. The hood will be raised and retracted two and a half minutes before launch. Abutting the side of Atlantis is the orbiter access arm with the environmental chamber known as the White Room at the end. The White Room provides access to the crew compartment. This will be the third assembly flight to the International Space Station. Liftoff of Space Shuttle Atlantis for the 10-day mission is scheduled for about 6:12 a.m. EDT from Launch Pad 39A. Landing is targeted for May 29 at 2:19 a.m. EDT. This is the 98th Shuttle flight and the 21st flight for Shuttle Atlantis KSC00pp0635

KENNEDY SPACE CENTER, Fla. -- After rollback of the Rotating Service...

KENNEDY SPACE CENTER, Fla. -- After rollback of the Rotating Service Structure at Launch Pad 39A, Space Shuttle Atlantis awaits a fourth launch attempt on mission STS-101. At the top of the orange external ta... More

KENNEDY SPACE CENTER, Fla.  --  After rollback of the Rotating Service Structure at Launch Pad 39A, Space Shuttle Atlantis awaits a fourth launch attempt on mission STS-101. At the top of the orange external tank can be seen the Gaseous Oxygen Vent Hood, often called the "beanie cap." The hood helps vent gaseous oxygen vapors away from the Space Shuttle. The hood will be raised and retracted two and a half minutes before launch. Abutting the side of Atlantis is the orbiter access arm with the environmental chamber known as the White Room at the end. The White Room provides access to the crew compartment. This will be the third assembly flight to the International Space Station. Liftoff of Space Shuttle Atlantis for the 10-day mission is scheduled for about 6:12 a.m. EDT from Launch Pad 39A. Landing is targeted for May 29 at 2:19 a.m. EDT. This is the 98th Shuttle flight and the 21st flight for Shuttle Atlantis KSC-00pp0635

KENNEDY SPACE CENTER, Fla. -- After rollback of the Rotating Service...

KENNEDY SPACE CENTER, Fla. -- After rollback of the Rotating Service Structure at Launch Pad 39A, Space Shuttle Atlantis awaits a fourth launch attempt on mission STS-101. At the top of the orange external ta... More

KENNEDY SPACE CENTER, Fla.  --  After rollback of the Rotating Service Structure at Launch Pad 39A, Space Shuttle Atlantis awaits a fourth launch attempt on mission STS-101. At the top of the orange external tank can be seen the Gaseous Oxygen Vent Hood, often called the “beanie cap.” The hood helps vent gaseous oxygen vapors away from the Space Shuttle. The hood will be raised and retracted two and a half minutes before launch. Abutting the side of Atlantis is the orbiter access arm with the environmental chamber known as the White Room at the end. The White Room provides access to the crew compartment. This will be the third assembly flight to the International Space Station. Liftoff of Space Shuttle Atlantis for the 10-day mission is scheduled for about 6:12 a.m. EDT from Launch Pad 39A. Landing is targeted for May 29 at 2:19 a.m. EDT. This is the 98th Shuttle flight and the 21st flight for Shuttle Atlantis KSC-00pp0636

KENNEDY SPACE CENTER, Fla. -- After rollback of the Rotating Service...

KENNEDY SPACE CENTER, Fla. -- After rollback of the Rotating Service Structure at Launch Pad 39A, Space Shuttle Atlantis awaits a fourth launch attempt on mission STS-101. At the top of the orange external ta... More

KENNEDY SPACE CENTER, Fla.  --  After rollback of the Rotating Service Structure, Space Shuttle Atlantis is poised and ready on Launch Pad 39A for a fourth launch attempt on mission STS-101. At the top of the photo can be seen the Gaseous Oxygen Vent Hood, often called the "beanie cap." The hood helps vent gaseous oxygen vapors away from the Space Shuttle. The hood will be raised and retracted two and a half minutes before launch. Abutting the side of Atlantis is the orbiter access arm with the environmental chamber known as the White Room at the end. The White Room provides access to the crew compartment. In the background of the photo is the Atlantic Ocean. This will be the third assembly flight to the International Space Station. Liftoff of Space Shuttle Atlantis for the 10-day mission is scheduled for about 6:12 a.m. EDT from Launch Pad 39A. Landing is targeted for May 29 at 2:19 a.m. EDT. This is the 98th Shuttle flight and the 21st flight for Shuttle Atlantis KSC00pp0634

KENNEDY SPACE CENTER, Fla. -- After rollback of the Rotating Service...

KENNEDY SPACE CENTER, Fla. -- After rollback of the Rotating Service Structure, Space Shuttle Atlantis is poised and ready on Launch Pad 39A for a fourth launch attempt on mission STS-101. At the top of the p... More

KENNEDY SPACE CENTER, Fla.  --  After rollback of the Rotating Service Structure at Launch Pad 39A, Space Shuttle Atlantis awaits a fourth launch attempt on mission STS-101. At the top of the orange external tank can be seen the Gaseous Oxygen Vent Hood, often called the “beanie cap.” The hood helps vent gaseous oxygen vapors away from the Space Shuttle. The hood will be raised and retracted two and a half minutes before launch. Abutting the side of Atlantis is the orbiter access arm with the environmental chamber known as the White Room at the end. The White Room provides access to the crew compartment. This will be the third assembly flight to the International Space Station. Liftoff of Space Shuttle Atlantis for the 10-day mission is scheduled for about 6:12 a.m. EDT from Launch Pad 39A. Landing is targeted for May 29 at 2:19 a.m. EDT. This is the 98th Shuttle flight and the 21st flight for Shuttle Atlantis KSC00pp0636

KENNEDY SPACE CENTER, Fla. -- After rollback of the Rotating Service...

KENNEDY SPACE CENTER, Fla. -- After rollback of the Rotating Service Structure at Launch Pad 39A, Space Shuttle Atlantis awaits a fourth launch attempt on mission STS-101. At the top of the orange external ta... More

KENNEDY SPACE CENTER, Fla.  --  After rollback of the Rotating Service Structure, Space Shuttle Atlantis can be seen atop the mobile launcher platform (MLP) on Launch Pad 39A. Below the MLP is the flame trench, part of the flame deflector system that insulates pad structures from the intense heat of launch. Made of concrete and refractory brick, the trench is 490 feet long, 48 feet wide and 40 feet high. At the top of the orange external tank can be seen the Gaseous Oxygen Vent Hood, often called the "beanie cap." The hood helps vent gaseous oxygen vapors away from the Space Shuttle. The hood will be raised and retracted two and a half minutes before launch. Abutting the side of Atlantis is the orbiter access arm with the environmental chamber known as the White Room at the end. The White Room provides access to the crew compartment. This will be the third assembly flight to the International Space Station. Liftoff of Space Shuttle Atlantis for the 10-day STS-101 mission is scheduled for about 6:12 a.m. EDT from Launch Pad 39A. Landing is targeted for May 29 at 2:19 a.m. EDT. This is the 98th Shuttle flight and the 21st flight for Shuttle Atlantis KSC-00pp0637

KENNEDY SPACE CENTER, Fla. -- After rollback of the Rotating Service...

KENNEDY SPACE CENTER, Fla. -- After rollback of the Rotating Service Structure, Space Shuttle Atlantis can be seen atop the mobile launcher platform (MLP) on Launch Pad 39A. Below the MLP is the flame trench,... More

KENNEDY SPACE CENTER, Fla.  --  After rollback of the Rotating Service Structure, Space Shuttle Atlantis can be seen atop the mobile launcher platform (MLP) on Launch Pad 39A. Below the MLP is the flame trench, part of the flame deflector system that insulates pad structures from the intense heat of launch. Made of concrete and refractory brick, the trench is 490 feet long, 48 feet wide and 40 feet high. At the top of the orange external tank can be seen the Gaseous Oxygen Vent Hood, often called the "beanie cap." The hood helps vent gaseous oxygen vapors away from the Space Shuttle. The hood will be raised and retracted two and a half minutes before launch. Abutting the side of Atlantis is the orbiter access arm with the environmental chamber known as the White Room at the end. The White Room provides access to the crew compartment. This will be the third assembly flight to the International Space Station. Liftoff of Space Shuttle Atlantis for the 10-day STS-101 mission is scheduled for about 6:12 a.m. EDT from Launch Pad 39A. Landing is targeted for May 29 at 2:19 a.m. EDT. This is the 98th Shuttle flight and the 21st flight for Shuttle Atlantis KSC00pp0637

KENNEDY SPACE CENTER, Fla. -- After rollback of the Rotating Service...

KENNEDY SPACE CENTER, Fla. -- After rollback of the Rotating Service Structure, Space Shuttle Atlantis can be seen atop the mobile launcher platform (MLP) on Launch Pad 39A. Below the MLP is the flame trench,... More

KENNEDY SPACE CENTER, Fla. -- With the Rotating Service Structure rolling back, Space Shuttle Atlantis is revealed on the Mobile Launcher Platform. At the top is the 13-foot-wide “beanie cap,” at the end of the Gaseous Oxygen Vent Arm, designed to vent gaseous oxygen vapors away from the Space Shuttle. Lower is the Orbiter Access Arm with the environmental chamber, known as the “white room,” extended to the orbiter. The chamber provides entry for the crew into the orbiter and also serves as emergency egress up to 7 minutes 24 seconds before launch KSC-00pp1249

KENNEDY SPACE CENTER, Fla. -- With the Rotating Service Structure roll...

KENNEDY SPACE CENTER, Fla. -- With the Rotating Service Structure rolling back, Space Shuttle Atlantis is revealed on the Mobile Launcher Platform. At the top is the 13-foot-wide “beanie cap,” at the end of the... More

KENNEDY SPACE CENTER, Fla. -- Clouds hover overhead the Space Shuttle Atlantis after rollback of the Rotating Service Structure. On top of the external tank is the 13-foot-wide “beanie cap,” at the end of the Gaseous Oxygen Vent Arm, designed to vent gaseous oxygen vapors away from the Space Shuttle. Lower is the Orbiter Access Arm with the environmental chamber, known as the “white room,” extended to the orbiter. The chamber provides entry for the crew into the orbiter and also serves as emergency egress up to 7 minutes 24 seconds before launch. Ready for launch of mission STS-106 at 8:45 a.m. EDT on Sept. 8, Atlantis carries supplies to prepare the Russian Zvezda living quarters on the International Space Station for the first long-duration crew. The crew will also be transferring supplies from the Russian Progress resupply ship already docked to the aft of Zvezda. The fourth U.S. launch for the Space Station, the mission is expected to last 10 days, 19 hours and 9 minutes, landing at KSC 4:59 a.m. EDT on Sept. 19 KSC-00pp1251

KENNEDY SPACE CENTER, Fla. -- Clouds hover overhead the Space Shuttle ...

KENNEDY SPACE CENTER, Fla. -- Clouds hover overhead the Space Shuttle Atlantis after rollback of the Rotating Service Structure. On top of the external tank is the 13-foot-wide “beanie cap,” at the end of the G... More

KENNEDY SPACE CENTER, Fla. -- Clouds hover overhead the Space Shuttle Atlantis after rollback of the Rotating Service Structure. On top of the external tank is the 13-foot-wide “beanie cap,” at the end of the Gaseous Oxygen Vent Arm, designed to vent gaseous oxygen vapors away from the Space Shuttle. Lower is the Orbiter Access Arm with the environmental chamber, known as the “white room,” extended to the orbiter. The chamber provides entry for the crew into the orbiter and also serves as emergency egress up to 7 minutes 24 seconds before launch. Ready for launch of mission STS-106 at 8:45 a.m. EDT on Sept. 8, Atlantis carries supplies to prepare the Russian Zvezda living quarters on the International Space Station for the first long-duration crew. The crew will also be transferring supplies from the Russian Progress resupply ship already docked to the aft of Zvezda. The fourth U.S. launch for the Space Station, the mission is expected to last 10 days, 19 hours and 9 minutes, landing at KSC 4:59 a.m. EDT on Sept. 19 KSC00pp1251

KENNEDY SPACE CENTER, Fla. -- Clouds hover overhead the Space Shuttle ...

KENNEDY SPACE CENTER, Fla. -- Clouds hover overhead the Space Shuttle Atlantis after rollback of the Rotating Service Structure. On top of the external tank is the 13-foot-wide “beanie cap,” at the end of the G... More

KENNEDY SPACE CENTER, Fla. -- Against a backdrop of the cloudy sky and blue-gray Atlantic Ocean, Space Shuttle Atlantis is revealed after rollback of the Rotating Service Structure. On top of the external tank is the 13-foot-wide “beanie cap,” at the end of the Gaseous Oxygen Vent Arm, designed to vent gaseous oxygen vapors away from the Space Shuttle. Lower is the Orbiter Access Arm with the environmental chamber, known as the “white room,” extended to the orbiter. The chamber provides entry for the crew into the orbiter and also serves as emergency egress up to 7 minutes 24 seconds before launch. Ready for launch of mission STS-106 at 8:45 a.m. EDT on Sept. 8, Atlantis carries supplies to prepare the Russian Zvezda living quarters on the International Space Station for the first long-duration crew. The crew will also be transferring supplies from the Russian Progress resupply ship already docked to the aft of Zvezda. The fourth U.S. launch for the Space Station, the mission is expected to last 10 days, 19 hours and 9 minutes, landing at KSC 4:59 a.m. EDT on Sept. 19 KSC-00pp1250

KENNEDY SPACE CENTER, Fla. -- Against a backdrop of the cloudy sky and...

KENNEDY SPACE CENTER, Fla. -- Against a backdrop of the cloudy sky and blue-gray Atlantic Ocean, Space Shuttle Atlantis is revealed after rollback of the Rotating Service Structure. On top of the external tank ... More

KENNEDY SPACE CENTER, Fla. -- Against a backdrop of the cloudy sky and blue-gray Atlantic Ocean, Space Shuttle Atlantis is revealed after rollback of the Rotating Service Structure. On top of the external tank is the 13-foot-wide “beanie cap,” at the end of the Gaseous Oxygen Vent Arm, designed to vent gaseous oxygen vapors away from the Space Shuttle. Lower is the Orbiter Access Arm with the environmental chamber, known as the “white room,” extended to the orbiter. The chamber provides entry for the crew into the orbiter and also serves as emergency egress up to 7 minutes 24 seconds before launch. Ready for launch of mission STS-106 at 8:45 a.m. EDT on Sept. 8, Atlantis carries supplies to prepare the Russian Zvezda living quarters on the International Space Station for the first long-duration crew. The crew will also be transferring supplies from the Russian Progress resupply ship already docked to the aft of Zvezda. The fourth U.S. launch for the Space Station, the mission is expected to last 10 days, 19 hours and 9 minutes, landing at KSC 4:59 a.m. EDT on Sept. 19 KSC00pp1250

KENNEDY SPACE CENTER, Fla. -- Against a backdrop of the cloudy sky and...

KENNEDY SPACE CENTER, Fla. -- Against a backdrop of the cloudy sky and blue-gray Atlantic Ocean, Space Shuttle Atlantis is revealed after rollback of the Rotating Service Structure. On top of the external tank ... More

KENNEDY SPACE CENTER, Fla. -- With the Rotating Service Structure rolling back, Space Shuttle Atlantis is revealed on the Mobile Launcher Platform. At the top is the 13-foot-wide “beanie cap,” at the end of the Gaseous Oxygen Vent Arm, designed to vent gaseous oxygen vapors away from the Space Shuttle. Lower is the Orbiter Access Arm with the environmental chamber, known as the “white room,” extended to the orbiter. The chamber provides entry for the crew into the orbiter and also serves as emergency egress up to 7 minutes 24 seconds before launch KSC00pp1249

KENNEDY SPACE CENTER, Fla. -- With the Rotating Service Structure roll...

KENNEDY SPACE CENTER, Fla. -- With the Rotating Service Structure rolling back, Space Shuttle Atlantis is revealed on the Mobile Launcher Platform. At the top is the 13-foot-wide “beanie cap,” at the end of the... More

KENNEDY SPACE CENTER, Fla. -- In the bright morning sun, Space Shuttle Discovery towers above the landscape, and cars below, as it sits on Launch Pad 39A. At left can be seen the environmental chamber known as the “white room” that provides access inside the orbiter when it is in place. The white room is at the end of the Orbiter Access Arm, moved away from the Space Shuttle in this photograph. Discovery is scheduled to launch Oct. 5 at 9:30 p.m. EDT on mission STS-92. Making the 100th Space Shuttle mission launched from Kennedy Space Center, Discovery will carry two pieces of hardware for the International Space Station, the Z1 truss, which is the cornerstone truss of the Station, and the third Pressurized Mating Adapter. Discovery also will be making its 28th flight into space, more than any of the other orbiters to date KSC-00pp1292

KENNEDY SPACE CENTER, Fla. -- In the bright morning sun, Space Shuttle...

KENNEDY SPACE CENTER, Fla. -- In the bright morning sun, Space Shuttle Discovery towers above the landscape, and cars below, as it sits on Launch Pad 39A. At left can be seen the environmental chamber known as ... More

KENNEDY SPACE CENTER, Fla. -- In the bright morning sun, Space Shuttle Discovery towers above the landscape, and cars below, as it sits on Launch Pad 39A. At left can be seen the environmental chamber known as the “white room” that provides access inside the orbiter when it is in place. The white room is at the end of the Orbiter Access Arm, moved away from the Space Shuttle in this photograph. Discovery is scheduled to launch Oct. 5 at 9:30 p.m. EDT on mission STS-92. Making the 100th Space Shuttle mission launched from Kennedy Space Center, Discovery will carry two pieces of hardware for the International Space Station, the Z1 truss, which is the cornerstone truss of the Station, and the third Pressurized Mating Adapter. Discovery also will be making its 28th flight into space, more than any of the other orbiters to date KSC00pp1292

KENNEDY SPACE CENTER, Fla. -- In the bright morning sun, Space Shuttle...

KENNEDY SPACE CENTER, Fla. -- In the bright morning sun, Space Shuttle Discovery towers above the landscape, and cars below, as it sits on Launch Pad 39A. At left can be seen the environmental chamber known as ... More

The STS-92 crew poses for a photograph in the White Room, the environmentally controlled chamber on the orbiter access arm that provides entry for the crew into the orbiter. Standing, left to right, are Mission Specialists Peter J.K. “Jeff” Wisoff and Michael E. Lopez-Alegria; Commander Brian Duffy; Pilot Pamela Ann Melroy; and Mission Specialists William S. McArthur Jr. and Leroy Chiao. Crouching in front is Mission Specialist Koichi Wakata of Japan. The crew is at KSC for Terminal Countdown Demonstration Test activities that provide emergency egress training, opportunities to inspect the mission payload, and take part in a simulated countdown. STS-92 is scheduled to launch Oct. 5 at 9:38 p.m. EDT on the fifth flight to the International Space Station. It will carry two elements of the Space Station, the Integrated Truss Structure Z1 and the third Pressurized Mating Adapter. The mission is also the 100th flight in the Shuttle program KSC00pp1368

The STS-92 crew poses for a photograph in the White Room, the environm...

The STS-92 crew poses for a photograph in the White Room, the environmentally controlled chamber on the orbiter access arm that provides entry for the crew into the orbiter. Standing, left to right, are Mission... More

Previous

of 5

Next