room, nasa

3,973 media by topicpage 1 of 40
KENNEDY SPACE CENTER, FLA.  -    In NASA Kennedy Space Center's Space Station Processing Facility (SSPF), the overhead crane carries the multi-purpose logistics module Donatello from its work stand across the floor to a payload canister.  Donatello is being transferred to the Operations and Checkout Building to make room in the SSPF for the arrival of elements for future flights from other ISS partners. Photo credit: NASA/Jim Grossmann KSC-06pd0530

KENNEDY SPACE CENTER, FLA. - In NASA Kennedy Space Center's Space ...

KENNEDY SPACE CENTER, FLA. - In NASA Kennedy Space Center's Space Station Processing Facility (SSPF), the overhead crane carries the multi-purpose logistics module Donatello from its work stand across the f... More

KENNEDY SPACE CENTER, FLA.  -    In NASA Kennedy Space Center's Space Station Processing Facility (SSPF), the overhead crane lifts the multi-purpose logistics module Donatello from its work stand to move it to a payload canister.  Donatello is being transferred to the Operations and Checkout Building to make room in the SSPF for the arrival of elements for future flights from other ISS partners. Photo credit: NASA/Jim Grossmann KSC-06pd0529

KENNEDY SPACE CENTER, FLA. - In NASA Kennedy Space Center's Space ...

KENNEDY SPACE CENTER, FLA. - In NASA Kennedy Space Center's Space Station Processing Facility (SSPF), the overhead crane lifts the multi-purpose logistics module Donatello from its work stand to move it to ... More

KENNEDY SPACE CENTER, FLA.  -   In NASA Kennedy Space Center's Space Station Processing Facility (SSPF), the  multi-purpose logistics module Donatello is being prepared for a move to a payload canister.  Donatello is being transferred to the Operations and Checkout Building to make room in the SSPF for the arrival of elements for future flights from other ISS partners. Photo credit: NASA/Jim Grossmann KSC-06pd0527

KENNEDY SPACE CENTER, FLA. - In NASA Kennedy Space Center's Space S...

KENNEDY SPACE CENTER, FLA. - In NASA Kennedy Space Center's Space Station Processing Facility (SSPF), the multi-purpose logistics module Donatello is being prepared for a move to a payload canister. Donate... More

KENNEDY SPACE CENTER, FLA.  -    In NASA Kennedy Space Center's Space Station Processing Facility (SSPF), the overhead crane carries the multi-purpose logistics module Donatello toward the open doors of the payload canister at left.  Donatello is being transferred to the Operations and Checkout Building to make room in the SSPF for the arrival of elements for future flights from other ISS partners. Photo credit: NASA/Jim Grossmann KSC-06pd0531

KENNEDY SPACE CENTER, FLA. - In NASA Kennedy Space Center's Space ...

KENNEDY SPACE CENTER, FLA. - In NASA Kennedy Space Center's Space Station Processing Facility (SSPF), the overhead crane carries the multi-purpose logistics module Donatello toward the open doors of the pay... More

KENNEDY SPACE CENTER, FLA.  -   In NASA Kennedy Space Center's Space Station Processing Facility (SSPF), the overhead crane lowers the multi-purpose logistics module Donatello into the waiting payload canister.  Donatello is being transferred to the Operations and Checkout Building to make room in the SSPF for the arrival of elements for future flights from other ISS partners. Photo credit: NASA/Jim Grossmann KSC-06pd0532

KENNEDY SPACE CENTER, FLA. - In NASA Kennedy Space Center's Space S...

KENNEDY SPACE CENTER, FLA. - In NASA Kennedy Space Center's Space Station Processing Facility (SSPF), the overhead crane lowers the multi-purpose logistics module Donatello into the waiting payload canister.... More

USS Macon: port side control room ARC-1934-A91-0261-27
Close view of  Macon Dirigible Cabin - control room housing while moored at Moffett Field (1935) ARC-1935-A83-0499-25

Close view of Macon Dirigible Cabin - control room housing while moor...

Close view of Macon Dirigible Cabin - control room housing while moored at Moffett Field (1935)

Interior View of Drafting Room in ERB

Interior View of Drafting Room in ERB

Description: (September 21, 1942) Interior view of Drafting Room in Engine Research Building showing men at work at the Aircraft Engine Research Laboratory. This building was considered the research heart of NA... More

Altitude Wind Tunnel Control Room

Altitude Wind Tunnel Control Room

Researchers at the National Advisory Committee for Aeronautics (NACA) Aircraft Engine Research Laboratory monitor a ramjet's performance in the Altitude Wind Tunnel from the control room. The soundproof control... More

Engine Research Building’s Central Control Room

Engine Research Building’s Central Control Room

Operators in the Engine Research Building’s Central Control Room at the National Advisory Committee for Aeronautics (NACA) Lewis Flight Propulsion Laboratory. The massive 4.25-acre Engine Research Building cont... More

A-15219. Balance House for the 40x80-foot Wind Tunnel Control Room.

A-15219. Balance House for the 40x80-foot Wind Tunnel Control Room.

40x80 wind tunnel manometers control room at NACA's Ames Research Center. Control panel (called the bench board) showing five of the seven scale heads which measured the forces on the model (ie. Lift, drag, si... More

Control Room at the NACA’s Rocket Engine Test Facility

Control Room at the NACA’s Rocket Engine Test Facility

Test engineers monitor an engine firing from the control room of the Rocket Engine Test Facility at the National Advisory Committee for Aeronautics (NACA) Lewis Flight Propulsion Laboratory. The Rocket Engine T... More

CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, space shuttle Endeavour's main engine no. 2 is moved out of Orbiter Processing Bay 2 after removal from the shuttle. Engine removal is part of the post-landing processing. Endeavour returned from the STS-127 mission July 31.  Endeavour's next mission is STS-130 targeted for February 2010.  Endeavour will deliver to the International Space Station the Tranquility pressurized module that will provide room for many of the station's life support systems.  Photo credit: NASA/Jack Pfaller KSC-2009-4706

CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, spac...

CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, space shuttle Endeavour's main engine no. 2 is moved out of Orbiter Processing Bay 2 after removal from the shuttle. Engine removal is part of t... More

CAPE CANAVERAL, Fla. – At NASA’s Kennedy Space Center in Florida, old racks are being excessed in high bay 3 in the Vehicle Assembly Building, or VAB, as part of a centerwide refurbishment initiative under the Ground Systems Development and Operations GSDO Program      The cable replacement project is under way in high bays 1 and 3 on the east side of the building, facing Launch Complex 39’s pads A and B.  Approximately 150 miles of existing Apollo/shuttle era cabling is being removed to make room for installation of state-of-the-art command, communication and control systems that will be needed by future users to perform vehicle testing and verification prior to rollout to the launch pad.  For more information, visit http://go.nasa.gov/groundsystems.  Photo credit: NASA/Jim Grossmann KSC-2012-2595

CAPE CANAVERAL, Fla. – At NASA’s Kennedy Space Center in Florida, old ...

CAPE CANAVERAL, Fla. – At NASA’s Kennedy Space Center in Florida, old racks are being excessed in high bay 3 in the Vehicle Assembly Building, or VAB, as part of a centerwide refurbishment initiative under the ... More

KENNEDY SPACE CENTER, FLA. --   The payload canister arrives under the payload changeout room in the rotating service structure on Launch Pad 39B at NASA's Kennedy Space Center.  The canister holds the payloads for mission STS-121: the multi-purpose logistics module Leonardo, with supplies and equipment for the International Space Station; the lightweight multi-purpose experiment support structure carrier; and the integrated cargo carrier, with the mobile transporter reel assembly and a spare pump module. The payload canister will be lifted into the changeout room where the payloads will be transferred to Space Shuttle Discovery's payload bay.  Discovery is scheduled to launch on mission STS-121 from Launch Pad 39B in a window that opens July 1 and extends to July 19. Photo credit: NASA/Kim Shiflett KSC-06pd0851

KENNEDY SPACE CENTER, FLA. -- The payload canister arrives under the...

KENNEDY SPACE CENTER, FLA. -- The payload canister arrives under the payload changeout room in the rotating service structure on Launch Pad 39B at NASA's Kennedy Space Center. The canister holds the payloads... More

KENNEDY SPACE CENTER, FLA. --  Space Shuttle Discovery, on top of the mobile launcher platform and crawler-transporter, reaches Launch Pad 39B for launch of mission STS-116. On the right edge of the photo can be seen the White Room at the end of the orbiter access arm.  On the horizon at left is Launch Pad 39A.  The rollout from the Vehicle Assembly Building began at 12:29 a.m. The mission is No. 20 to the International Space Station and construction flight 12A.1. The mission payload is the SPACEHAB module, the P5 integrated truss structure and other key components. The launch window for mission STS-116 opens Dec. 7. Photo credit: NASA/Amanda Diller KSC-06pd2482

KENNEDY SPACE CENTER, FLA. -- Space Shuttle Discovery, on top of the ...

KENNEDY SPACE CENTER, FLA. -- Space Shuttle Discovery, on top of the mobile launcher platform and crawler-transporter, reaches Launch Pad 39B for launch of mission STS-116. On the right edge of the photo can b... More

KENNEDY SPACE CENTER, FLA. - NASA Test Director Ted Mosteller (center) briefs the media about Firing Room 4 (FR4), which has been undergoing renovations for two years. FR4 is now designated the primary firing room for all remaining shuttle launches, and will also be used daily to manage operations in the Orbiter Processing Facilities and for integrated processing for the shuttle. The firing room now includes sound-suppressing walls and floors, new humidity control, fire-suppression systems and consoles, support tables with  computer stations, communication systems and laptop computer ports.  FR 4 also has power and computer network connections and a newly  improved Checkout, Control and Monitor Subsystem. The renovation is part of the Launch Processing System Extended  Survivability Project that began in 2003. United Space Alliance's Launch Processing System directorate managed the FR 4 project for NASA. Photo credit: NASA/Dimitri Gerondidakis KSC-06pd1203

KENNEDY SPACE CENTER, FLA. - NASA Test Director Ted Mosteller (center)...

KENNEDY SPACE CENTER, FLA. - NASA Test Director Ted Mosteller (center) briefs the media about Firing Room 4 (FR4), which has been undergoing renovations for two years. FR4 is now designated the primary firing r... More

CAPE CANAVERAL, Fla. - On Launch Pad 39A at NASA's Kennedy Space Center in Florida, STS-129 Mission Specialist Randy Bresnik prepares to enter space shuttle Atlantis with the help of the closeout crew in the White Room.  The six astronauts for space shuttle Atlantis’ STS-129 mission are participating in their launch dress rehearsal, the Terminal Countdown Demonstration Test.    Additional training associated with the test was done last month, but the simulated countdown was postponed because of a scheduling conflict with the launch of NASA’s Ares I-X test rocket.  Launch of Atlantis on its STS-129 mission to the International Space Station is set for Nov. 16.  On STS-129, the crew will deliver to the station two spare gyroscopes, two nitrogen tank assemblies, two pump modules, an ammonia tank assembly and a spare latching end effector for the station's robotic arm.  For information on the STS-129 crew and mission objectives, visit http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts129/index.html. Photo credit: NASA/Jim Grossmann KSC-2009-6065

CAPE CANAVERAL, Fla. - On Launch Pad 39A at NASA's Kennedy Space Cente...

CAPE CANAVERAL, Fla. - On Launch Pad 39A at NASA's Kennedy Space Center in Florida, STS-129 Mission Specialist Randy Bresnik prepares to enter space shuttle Atlantis with the help of the closeout crew in the Wh... More

CAPE CANAVERAL, Fla. - In the Operations and Checkout Building at NASA's Kennedy Space Center in Florida, members of space shuttle Endeavour's STS-130 crew put on their launch-and-entry suits before heading to the Astrovan for the ride to Launch Pad 39A. The crew is participating in a dress rehearsal for their upcoming launch, known as the Terminal Countdown Demonstration Test.  Making his second spaceflight on STS-130 is Mission Specialist Robert Behnken, seen here.    The primary payload for the STS-130 mission is the International Space Station's Tranquility node, a pressurized module that will provide room for many of the station's life support systems. Attached to one end of Tranquility is a cupola, a unique work area with six windows on its sides and one on top.  The cupola resembles a circular bay window and will provide a vastly improved view of the station's exterior. The multi-directional view will allow the crew to monitor spacewalks and docking operations, as well as provide a spectacular view of Earth and other celestial objects. The module was built in Turin, Italy, by Thales Alenia Space for the European Space Agency.  Launch of STS-130 is targeted for Feb. 7. For information on the STS-130 mission and crew, visit http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts130/index.html.  Photo credit: NASA/Kim Shiflett KSC-2010-1354

CAPE CANAVERAL, Fla. - In the Operations and Checkout Building at NASA...

CAPE CANAVERAL, Fla. - In the Operations and Checkout Building at NASA's Kennedy Space Center in Florida, members of space shuttle Endeavour's STS-130 crew put on their launch-and-entry suits before heading to ... More

CAPE CANAVERAL, Fla. -- In Firing Room No. 1 in the Launch Control Center at NASA's Kennedy Space Center, the number of new equipment cabinets increases as workers put the elements together.  The firing room will support the future Ares rocket launches as part of the Constellation Program.  Future astronauts will ride to orbit on Ares I, which uses a single five-segment solid rocket booster, a derivative of the space shuttle's solid rocket booster, for the first stage.  Ares will be launched from Pad 39B, which is being reconfigured from supporting space shuttle launches.  The Launch Control Center firing rooms face the launch pads.   Photo credit: NASA/Kim Shiflett KSC-08pd1095

CAPE CANAVERAL, Fla. -- In Firing Room No. 1 in the Launch Control Cen...

CAPE CANAVERAL, Fla. -- In Firing Room No. 1 in the Launch Control Center at NASA's Kennedy Space Center, the number of new equipment cabinets increases as workers put the elements together. The firing room wi... More

KENNEDY SPACE CENTER, FLA. --   In the white room on Launch Pad 39B, STS-116 Mission Specialist Sunita Williams is helped with her gear before entering Space Shuttle Discovery.  The mission crew is taking part in a simulated launch countdown, part of the terminal countdown demonstration test that includes prelaunch preparations. The STS-116 mission is No. 20 to the International Space Station and construction flight 12A.1.  The mission payload is the SPACEHAB module, the P5 integrated truss structure and other key components. Launch is scheduled for no earlier than Dec. 7. Photo credit: NASA/Amanda Diller KSC-06pd2602

KENNEDY SPACE CENTER, FLA. -- In the white room on Launch Pad 39B, S...

KENNEDY SPACE CENTER, FLA. -- In the white room on Launch Pad 39B, STS-116 Mission Specialist Sunita Williams is helped with her gear before entering Space Shuttle Discovery. The mission crew is taking part ... More

KENNEDY SPACE CENTER, FLA. -    Huge clouds roll over Launch Pad 39B where Space Shuttle Atlantis still sits after the scrub of its launch on mission STS-115.  Atlantis was originally scheduled to launch at 12:29 p.m. EDT on this date, but  a 24-hour scrub was called by mission managers due to a concern with fuel cell 1.  Towering above the shuttle is the 80-foot lightning mast.  At left is the rolled-back rotating service structure with the payload changeout room open.  Just above the orange external tank is the  vent hood (known as the "beanie cap") at the end of the gaseous oxygen vent arm. Vapors are created as the liquid oxygen in the external tank boil off. The hood vents the gaseous oxygen vapors away from the space shuttle vehicle.  During the STS-115 mission, Atlantis' astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment on the station. The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. This mission is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the International Space Station. STS-115 is scheduled to last 11 days with a planned landing at KSC.   Photo credit: NASA/Ken Thornsley KSC-06pd2055

KENNEDY SPACE CENTER, FLA. - Huge clouds roll over Launch Pad 39B w...

KENNEDY SPACE CENTER, FLA. - Huge clouds roll over Launch Pad 39B where Space Shuttle Atlantis still sits after the scrub of its launch on mission STS-115. Atlantis was originally scheduled to launch at 12:... More

CAPE CANAVERAL, Fla. – In the clean room of the Payload Hazardous Processing Facility at NASA's Kennedy Space Center, a worker from NASA's Goddard Space Flight Center uses black light inspection for a thorough cleaning of the Cosmic Origins Spectrograph, or COS.  Black light inspection uses UVA fluorescence to detect possible particulate microcontamination, minute cracks or fluid leaks. The COS will be installed on the Hubble Space Telescope on space shuttle Atlantis' STS-125 mission. COS will be the most sensitive ultraviolet spectrograph ever flown on Hubble and will probe the "cosmic web" - the large-scale structure of the universe whose form is determined by the gravity of dark matter and is traced by galaxies and intergalactic gas. The COS far-ultraviolet channel has a sensitivity 30 times greater than that of previous spectroscopic instruments for the detection of extremely low light levels. Launch of Atlantis on the STS-125 mission is targeted for Oct. 8. Photo credit: NASA/Kim Shiflett KSC-08pd2325

CAPE CANAVERAL, Fla. – In the clean room of the Payload Hazardous Proc...

CAPE CANAVERAL, Fla. – In the clean room of the Payload Hazardous Processing Facility at NASA's Kennedy Space Center, a worker from NASA's Goddard Space Flight Center uses black light inspection for a thorough ... More

CAPE CANAVERAL, Fla. – As seen on Google Maps, Firing Room 4 inside the Launch Control Center at NASA's Kennedy Space Center was one of the four control rooms used by NASA and contractor launch teams to oversee a space shuttle countdown. This firing room was the most advanced of the control rooms used for shuttle missions and was the primary firing room for the shuttle's final series of launches before retirement. It is furnished in a more contemporary style with wood cabinets and other features, although it retains many of the computer systems the shuttle counted on to operate safely. Specialized operators worked at consoles tailored to keep track of the status of shuttle systems while the spacecraft was processed in the Orbiter Processing Facility, being stacked inside the Vehicle Assembly Building and standing at the launch pad before liftoff. The firing rooms, including 3, were also used during NASA's Apollo Program. Google precisely mapped the space center and some of its historical facilities for the company's map page. The work allows Internet users to see inside buildings at Kennedy as they were used during the space shuttle era. Photo credit: Google/Wendy Wang KSC-2013-3235

CAPE CANAVERAL, Fla. – As seen on Google Maps, Firing Room 4 inside th...

CAPE CANAVERAL, Fla. – As seen on Google Maps, Firing Room 4 inside the Launch Control Center at NASA's Kennedy Space Center was one of the four control rooms used by NASA and contractor launch teams to oversee... More

CAPE CANAVERAL, Fla. -- The container that carries the Raffaello multi-purpose logistics module (MPLM), secured on its transportation vehicle, begins its journey from the Canister Rotation Facility to Launch Pad 39A at NASA's Kennedy Space Center in Florida. Once there, the canister will be lifted to the payload changeout room. The payload ground-handling mechanism then will be used to transfer Raffaello out of the canister into space shuttle Atlantis' payload bay. Next, the rotating service structure that protects the shuttle from the elements and provides access will be rotated back into place.                Commander Chris Ferguson, Pilot Doug Hurley and Mission Specialists Sandra Magnus and Rex Walheim are targeted to lift off on Atlantis July 8, taking with them the MPLM packed with supplies, logistics and spare parts to the station. The STS-135 mission also will fly a system to investigate the potential for robotically refueling existing satellites and return a failed ammonia pump module to help NASA better understand the failure mechanism and improve pump designs for future systems. STS-135 will be the 33rd flight of Atlantis, the 37th shuttle mission to the space station, and the 135th and final mission of NASA's Space Shuttle Program. For more information visit, www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Frank Michaux KSC-2011-4484

CAPE CANAVERAL, Fla. -- The container that carries the Raffaello multi...

CAPE CANAVERAL, Fla. -- The container that carries the Raffaello multi-purpose logistics module (MPLM), secured on its transportation vehicle, begins its journey from the Canister Rotation Facility to Launch Pa... More

JSC2010-E-046777 (5 April 2010) --- Astronaut Rick Sturckow, spacecraft communicator (CAPCOM) for the STS-131 mission, is pictured at his console in the space shuttle flight control room in the Johnson Space Center's Mission Control Center during launch countdown activities a few hundred miles away in Florida, site of space shuttle Discovery's STS-131 launch. jsc2010e046777

JSC2010-E-046777 (5 April 2010) --- Astronaut Rick Sturckow, spacecraf...

JSC2010-E-046777 (5 April 2010) --- Astronaut Rick Sturckow, spacecraft communicator (CAPCOM) for the STS-131 mission, is pictured at his console in the space shuttle flight control room in the Johnson Space Ce... More

KENNEDY SPACE CENTER, Fla. --  The payload canister arrives at the Rotating Service Structure (RSS) on Launch Pad 39B. The canister with its cargo of the SPACEHAB module and Integrated Cargo Carrier will be lifted up into the Payload Changeout Room near the top of the RSS for transfer to the payload bay of Shuttle Atlantis for mission STS-106. The PCR provides an environmentally controlled facility for the transfer. The 11-day mission to the International Space Station will include service module support tasks on orbit, transfer supplies and outfit the Space Station for the first long-duration crew. Atlantis is scheduled to launch Sept. 8 at 8:31 a.m. EDT. KSC-00pp1116

KENNEDY SPACE CENTER, Fla. -- The payload canister arrives at the Rot...

KENNEDY SPACE CENTER, Fla. -- The payload canister arrives at the Rotating Service Structure (RSS) on Launch Pad 39B. The canister with its cargo of the SPACEHAB module and Integrated Cargo Carrier will be lif... More

KENNEDY SPACE CENTER, FLA. --  After greeting the media on the Shuttle Landing Facility at NASA's Kennedy Space Center, the STS-122 crew stands in front of space shuttle Atlantis for a final group photo.  From left are Mission Specialists Leland Melvin, Hans Schlegel, Rex Walheim  and Stanley Love, Pilot Alan Poindexter and Commander Steve Frick.  Schlegel represents the European Space Agency.  After a round trip of nearly 5.3 million miles, space shuttle Atlantis and crew returned to Earth with a landing at 9:07 a.m. EST. The shuttle landed on orbit 202 to complete the 13-day STS-122 mission. Main gear touchdown was 9:07:10 a.m. Nose gear touchdown was 9:07:20 a.m. Wheel stop was at 9:08:08 a.m. Mission elapsed time was 12 days, 18 hours, 21 minutes and 44 seconds. During the mission, Atlantis' crew installed the new Columbus laboratory, leaving a larger space station and one with increased science capabilities. The Columbus Research Module adds nearly 1,000 cubic feet of habitable volume and affords room for 10 experiment racks, each an independent science lab. Photo credit: NASA/Jack Pfaller KSC-08pd0407

KENNEDY SPACE CENTER, FLA. -- After greeting the media on the Shuttle...

KENNEDY SPACE CENTER, FLA. -- After greeting the media on the Shuttle Landing Facility at NASA's Kennedy Space Center, the STS-122 crew stands in front of space shuttle Atlantis for a final group photo. From ... More

CAPE CANAVERAL, Fla. -- The Commercial Crew and Cargo Processing Facility, or C3PF, at NASA's Kennedy Space Center in Florida is going through major renovations to support the manufacturing of The Boeing Company's CST-100 spacecraft. Known throughout the space shuttle era as Orbiter Processing Facilty-3, or OPF-3, the facility's orbiter-specific platforms were removed recently to make room for a clean-floor factory-like facility. The modernization will allow Boeing to process its new fleet of low-Earth-orbit bound spacecraft, which is under development in collaboration with NASA's Commercial Crew Program, or CCP. Boeing is leasing the excess government facility for next-generation commercial activities through a land-use agreement with Space Florida.    To learn more about CCP and its industry partners, visit www.nasa.gov/commercialcrew. Photo credit: Dimitri Gerondidakis KSC-2012-6485

CAPE CANAVERAL, Fla. -- The Commercial Crew and Cargo Processing Facil...

CAPE CANAVERAL, Fla. -- The Commercial Crew and Cargo Processing Facility, or C3PF, at NASA's Kennedy Space Center in Florida is going through major renovations to support the manufacturing of The Boeing Compan... More

KENNEDY SPACE CENTER, FLA. -    The morning sky lightens behind Space Shuttle Atlantis while lights on the fixed service structure (FSS) still illuminate the orbiter on Launch Pad 39B. Atlantis was originally scheduled to launch at 12:29 p.m. EDT on this date, but  a 24-hour scrub was called by mission managers due to a concern with Fuel Cell 1.  Seen poised above the orange external tank is the vent hood (known as the "beanie cap") at the end of the gaseous oxygen vent arm. Vapors are created as the liquid oxygen in the external tank boil off. The hood vents the gaseous oxygen vapors away from the space shuttle vehicle. Extending from the FSS to Atlantis is the orbiter access arm with the White Room at the end.  The White Room provides entry into the orbiter through the hatch.  During the STS-115 mission, Atlantis' astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment on the station. The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. This mission is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the International Space Station. STS-115 is scheduled to last 11 days with a planned landing at KSC.   Photo credit: NASA/Troy Cryder KSC-06pd2050

KENNEDY SPACE CENTER, FLA. - The morning sky lightens behind Space ...

KENNEDY SPACE CENTER, FLA. - The morning sky lightens behind Space Shuttle Atlantis while lights on the fixed service structure (FSS) still illuminate the orbiter on Launch Pad 39B. Atlantis was originally s... More

Inside the Payload Changeout Room (PCR), workers prepare to move the Integrated Truss Structure Z1 out of the payload canister. Once inside the PCR, workers will get ready to move the Z1 into the payload bay of Space Shuttle Discovery. The Z1 truss is the first of 10 that will become the backbone of the International Space Station, eventually stretching the length of a football field. Along with its companion payload, the third Pressurized Mating Adapter, the Z1 is scheduled to be launched aboard Discovery Oct. 5 at 9:38 p.m. EDT KSC-00pp1358

Inside the Payload Changeout Room (PCR), workers prepare to move the I...

Inside the Payload Changeout Room (PCR), workers prepare to move the Integrated Truss Structure Z1 out of the payload canister. Once inside the PCR, workers will get ready to move the Z1 into the payload bay of... More

KENNEDY SPACE CENTER, FLA. --  Installed on a transporter, the payload canister moves out of the Vertical Processing Facility.  Inside the canister are the SPACEHAB module and the port 5 truss segment for mission STS-116.  They will be moved into the payload changeout room at the pad and transferred into Space Shuttle Discovery's payload bay once the vehicle has rolled out to the pad. The payload canister is 65 feet long, 18 feet wide and 18 feet, 7 inches high. It has the capability to carry vertically or horizontally processed payloads up to 15 feet in diameter and 60 feet long, matching the capacity of the orbiter payload bay. It can carry payloads weighing up to 65,000 pounds. Clamshell-shaped doors at the top of the canister operate like the orbiter payload bay doors, with the same allowable clearances. Photo credit: NASA/George Shelton KSC-06pd2451

KENNEDY SPACE CENTER, FLA. -- Installed on a transporter, the payload...

KENNEDY SPACE CENTER, FLA. -- Installed on a transporter, the payload canister moves out of the Vertical Processing Facility. Inside the canister are the SPACEHAB module and the port 5 truss segment for missi... More

CAPE CANAVERAL, Fla. - At NASA's Kennedy Space Center in Florida, the crew members of space shuttle Endeavour's STS-130 mission pause from their M113 training for a group portrait.  From left are Commander George Zamka; Pilot Terry Virts; and Mission Specialists Robert Behnken, Kathryn Hire, Stephen Robinson and Nicholas Patrick.    An M113 is kept at the foot of the launch pad in case an emergency egress from the vicinity of the pad is needed.  The crew members of space shuttle Endeavour's STS-130 mission are at Kennedy for training related to their launch dress rehearsal, the Terminal Countdown Demonstration Test.  The primary payload on STS-130 is the International Space Station's Node 3, Tranquility, a pressurized module that will provide room for many of the station's life support systems. Attached to one end of Tranquility is a cupola, a unique work area with six windows on its sides and one on top.  Endeavour's launch is targeted for Feb. 7.  For information on the STS-130 mission and crew, visit http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts130/index.html.  Photo credit: NASA/Kim Shiflett KSC-2010-1307

CAPE CANAVERAL, Fla. - At NASA's Kennedy Space Center in Florida, the ...

CAPE CANAVERAL, Fla. - At NASA's Kennedy Space Center in Florida, the crew members of space shuttle Endeavour's STS-130 mission pause from their M113 training for a group portrait. From left are Commander Geor... More

KENNEDY SPACE CENTER, FLA. -- After a nearly 5.3 million mile round trip to the International Space Station, space shuttle Atlantis slows down with the aid of a drag chute after landing on Runway 15 of the Shuttle Landing Facility at NASA's Kennedy Space Center.  The shuttle landed on orbit 202 to complete the 13-day STS-122 mission. Main gear touchdown was 9:07:10 a.m. Nose gear touchdown was 9:07:20 a.m. Wheel stop was at 9:08:08 a.m. Mission elapsed time was 12 days, 18 hours, 21 minutes and 44 seconds. During the mission, Atlantis' crew installed the new Columbus laboratory, leaving a larger space station and one with increased science capabilities. The Columbus Research Module adds nearly 1,000 cubic feet of habitable volume and affords room for 10 experiment racks, each an independent science lab. Photo credit: NASA/Kenny Allen, Robert Murray KSC-08pp0440

KENNEDY SPACE CENTER, FLA. -- After a nearly 5.3 million mile round tr...

KENNEDY SPACE CENTER, FLA. -- After a nearly 5.3 million mile round trip to the International Space Station, space shuttle Atlantis slows down with the aid of a drag chute after landing on Runway 15 of the Shut... More

CAPE CANAVERAL, Fla. -- A tunnel beneath Launch Pad 39B at NASA's Kennedy Space Center in Florida leads to the blast-resistant "rubber room." The room is a steel dome floating on rubber isolators and was used as an escape route during the Apollo Program in case of an emergency. It has since been abandoned by astronauts, but throughout the years nature found its way inside, including raccoons, snakes, birds and even a bobcat and opossum.    Starting in 2009, the structure above the room on the pad was no longer needed for NASA's Space Shuttle Program, so it is being restructured for future use. The new design will feature a "clean pad" for rockets to come with their own launcher, making it more versatile for a number of vehicles. For information on NASA's future plans, visit www.nasa.gov. Photo credit: NASA/Kim Shiflett KSC-2010-4668

CAPE CANAVERAL, Fla. -- A tunnel beneath Launch Pad 39B at NASA's Kenn...

CAPE CANAVERAL, Fla. -- A tunnel beneath Launch Pad 39B at NASA's Kennedy Space Center in Florida leads to the blast-resistant "rubber room." The room is a steel dome floating on rubber isolators and was used a... More

CAPE CANAVERAL, Fla. – In the White Room on Launch Pad 39A at NASA's Kennedy Space Center in Florida, STS-126 Commander Chris Ferguson is helped by suit technicians to put on a harness over his launch and entry suit. In the background is the hatch for entry into space shuttle Endeavour. STS-126 is the 124th space shuttle flight and the 27th flight to the International Space Station. The mission will feature four spacewalks and work that will prepare the space station to house six crew members for long- duration missions.  Liftoff is scheduled for 7:55 p.m. EST Nov. 14.   Photo credit: NASA/Sandra Joseph-Kevin O'Connell KSC-08pd3688

CAPE CANAVERAL, Fla. – In the White Room on Launch Pad 39A at NASA's K...

CAPE CANAVERAL, Fla. – In the White Room on Launch Pad 39A at NASA's Kennedy Space Center in Florida, STS-126 Commander Chris Ferguson is helped by suit technicians to put on a harness over his launch and entry... More

KENNEDY SPACE CENTER, FLA. --   On Launch Pad 39A at NASA's Kennedy Space Center, STS-123 Mission Specialist Takao Doi of the Japan Aerospace Exploration Agency is helped with the final flight suit fit check in the White Room before entering space shuttle Endeavour for launch.  In the background is Mission Specialist Robert L. Behnken.  The White Room provides access into the shuttle.  Liftoff was on time at 2:28 a.m. EDT.  The crew will make a record-breaking 16-day mission to the International Space Station and deliver the first section of the Japan Aerospace Exploration Agency's Kibo laboratory and the Canadian Space Agency's two-armed robotic system, Dextre.  Photo credit: NASA/Scott Haun, Richard Prickett KSC-08pd0721

KENNEDY SPACE CENTER, FLA. -- On Launch Pad 39A at NASA's Kennedy Sp...

KENNEDY SPACE CENTER, FLA. -- On Launch Pad 39A at NASA's Kennedy Space Center, STS-123 Mission Specialist Takao Doi of the Japan Aerospace Exploration Agency is helped with the final flight suit fit check in... More

CAPE CANAVERAL, Fla. –  After moving out of high bay 1 in the Vehicle Assembly Building at NASA's Kennedy Space Center, space shuttle Atlantis' external fuel tank-solid rocket booster stack, atop a mobile launcher platform, rolls into high bay 3.  The move makes room in high bay 1 for the ET-SRB stack for space shuttle Endeavour.  Atlantis is targeted for launch on the STS-125 mission on May 12 to service NASA's Hubble Space Telescope.  Endeavour will fly on the STS-127 mission to the International Space Station and bring the final segments for Japan's Kibo laboratory. Photo credit: NASA/Dimitri Gerondidakis KSC-2009-1525

CAPE CANAVERAL, Fla. – After moving out of high bay 1 in the Vehicle ...

CAPE CANAVERAL, Fla. – After moving out of high bay 1 in the Vehicle Assembly Building at NASA's Kennedy Space Center, space shuttle Atlantis' external fuel tank-solid rocket booster stack, atop a mobile launc... More

CAPE CANAVERAL, Fla. –  In the White Room on Launch Pad 39A at NASA's Kennedy Space Center in Florida, STS-126 Mission Specialist Shane Kimbrough gets help with his suit before entering space shuttle Endeavour. He and other crew members will take part in a simulated launch countdown.  The crew is at Kennedy to take part in the Terminal Countdown Demonstration Test, which includes equipment familiarization, emergency exit training and the simulated countdown. On the STS-126 mission, space shuttle Endeavour's crew will deliver equipment and supplies to the International Space Station in preparation for expansion from a three- to six-person resident crew aboard the complex. The mission also will include four spacewalks to service the station’s Solar Alpha Rotary Joints. Endeavour is targeted to launch Nov. 14. Photo credit: NASA/Troy Cryder KSC-08pd3433

CAPE CANAVERAL, Fla. – In the White Room on Launch Pad 39A at NASA's ...

CAPE CANAVERAL, Fla. – In the White Room on Launch Pad 39A at NASA's Kennedy Space Center in Florida, STS-126 Mission Specialist Shane Kimbrough gets help with his suit before entering space shuttle Endeavour.... More

KENNEDY SPACE CENTER, Fla. -- After rollback of the Rotating Service Structure on Launch Pad 39B, Space Shuttle Endeavour is bathed in light.  Twin solid rocket boosters flank the orange external tank behind Endeavour.  Above the external tank is the Gaseous Oxygen Vent Arm that vents gaseous oxygen vapors away from the Shuttle.  The vent hood assembly at the end is often referred to as the "beanie cap."  Stretching to the crew hatch on the side of Endeavour is the Orbiter Access Arm with its environmentally controlled White Room at the end, through which the crew enters the vehicle.  The Shuttle sits on the Mobile Launcher Platform with the two service tail masts on either side of the main engines.  The tail masts support the fluid, gas and electrical requirements of the orbiter's liquid oxygen and liquid hydrogen aft T-0 umbilicals.  Each tail mast is 31 feet (9.4 meters) high, 15 feet (4.6 meters) long and 9 feet (3.1 meters) wide.   Endeavour is scheduled to launch on mission STS-108 Dec. 4 at 5:45  p.m. EST.  On this 12th flight to the International Space Station, known as a Utilization Flight, Endeavour will carry a crew of four plus the Expedition 4 crew, who will replace Expedition 3 aboard the ISS.  The payload includes the Multi-Purpose Logistics Module Raffaello, filled with supplies, equipment and experiments KSC01PD1763

KENNEDY SPACE CENTER, Fla. -- After rollback of the Rotating Service S...

KENNEDY SPACE CENTER, Fla. -- After rollback of the Rotating Service Structure on Launch Pad 39B, Space Shuttle Endeavour is bathed in light. Twin solid rocket boosters flank the orange external tank behind En... More

KENNEDY SPACE CENTER, FLA. -   After its overnight rollout from the Vehicle Assembly Building, Space Shuttle Atlantis rests on the hard stand on Launch Pad 39B.   The shuttle sits on top of the mobile launcher platform.  The crawler, which transported it, is still underneath.  To the left is the rotating service structure, with the payload changeout room (PCR) open.  When the shuttle's payload is transported to the pad, it will be lifted into the PCR, the service structure will rotate to enclose the shuttle and the payload will be installed in Atlantis' payload bay.  The slow speed of the crawler results in a 6-hour trek to the pad approximately 4 miles away.  Atlantis' launch window begins Aug. 27 for an 11-day mission to the International Space Station. The STS-115 crew of six astronauts will continue construction of the station and install their cargo, the Port 3/4 truss segment with its two large solar arrays.   Photo credit: NASA/Troy Cryder KSC-06pd1713

KENNEDY SPACE CENTER, FLA. - After its overnight rollout from the Ve...

KENNEDY SPACE CENTER, FLA. - After its overnight rollout from the Vehicle Assembly Building, Space Shuttle Atlantis rests on the hard stand on Launch Pad 39B. The shuttle sits on top of the mobile launcher ... More

CAPE CANAVERAL, Fla. – On Launch Pad 39A at NASA's Kennedy Space Center in Florida, the closeout crew in the White Room help STS-127 crew members complete their suitup before entering space shuttle Endeavour for the 7:13 p.m. EDT liftoff.  Seen here is Mission Specialist Tom Marshburn.  This is the fourth launch attempt for the STS-127 mission. The first two launch attempts on June 13 and June 17 were scrubbed when a hydrogen gas leak occurred during tanking due to a misaligned Ground Umbilical Carrier Plate. Mission managers also decided to delay tanking on July 11 for a launch attempt later in the day to allow engineers and safety personnel time to analyze data captured during lightning strikes near the pad on July 10. Endeavour will deliver the Japanese Experiment Module's Exposed Facility, or JEM-EF, and the Experiment Logistics Module-Exposed Section, or ELM-ES, in the final of three flights dedicated to the assembly of the Japan Aerospace Exploration Agency's Kibo laboratory complex on the International Space Station.  STS-127 is the 29th flight for the assembly of the space.   Photo credit: NASA/Sandra Joseph & Kevin O'Connell KSC-2009-3980

CAPE CANAVERAL, Fla. – On Launch Pad 39A at NASA's Kennedy Space Cente...

CAPE CANAVERAL, Fla. – On Launch Pad 39A at NASA's Kennedy Space Center in Florida, the closeout crew in the White Room help STS-127 crew members complete their suitup before entering space shuttle Endeavour fo... More

CAPE CANAVERAL, Fla. -  At Launch Pad 39A at NASA’s Kennedy Space Center in Florida, technicians work to move the Hubble payload canister into the payload changeout room for space shuttle Atlantis’ STS-125 mission.  The canister arrived at the pad on Saturday evening, however, early Sunday morning technicians were unable to place the canister into the pad’s payload changeout room. Teflon pads on “shoes” attached to the outside of the payload canister that help the canister move along guide rails didn’t fit properly. The shoes were removed and several options were considered, including slightly shaving down the pads so the shoes will fit onto the rails.  STS-125 is the fifth and final shuttle Hubble Space Telescope servicing mission. Atlantis’ launch is targeted for Oct. 10. Photo credit: NASA/Kim Shiflett. KSC-08pd2758

CAPE CANAVERAL, Fla. - At Launch Pad 39A at NASA’s Kennedy Space Cent...

CAPE CANAVERAL, Fla. - At Launch Pad 39A at NASA’s Kennedy Space Center in Florida, technicians work to move the Hubble payload canister into the payload changeout room for space shuttle Atlantis’ STS-125 miss... More

CAPE CANAVERAL, Fla. – In Firing Room 4 of the Launch Control Center at NASA's Kennedy Space Center in Florida, Deputy Director of NASA's Stennis Space Center Patrick Scheuermann and Mission Management Chair Mike Moses go through the tie-cutting ritual after working their first shuttle launch.  Space shuttle Discovery lifted off on time at 7:43 p.m. EDT. The STS-119 mission is the 28th to the space station and Discovery's 36th flight.  Discovery will deliver the final pair of power-generating solar array wings and the S6 truss segment.  Installation of S6 will signal the station's readiness to house a six-member crew for conducting increased science.  Photo credit: NASA/Kim Shiflett KSC-2009-2104

CAPE CANAVERAL, Fla. – In Firing Room 4 of the Launch Control Center a...

CAPE CANAVERAL, Fla. – In Firing Room 4 of the Launch Control Center at NASA's Kennedy Space Center in Florida, Deputy Director of NASA's Stennis Space Center Patrick Scheuermann and Mission Management Chair Mi... More

CAPE CANAVERAL, Fla. –  In the White Room on Launch Pad 39A at NASA's Kennedy Space Center in Florida, STS-126 Pilot Eric Boe waits to finish his suit-up. He and other crew members will take part in a simulated launch countdown after entering space shuttle Endeavour. The crew is at Kennedy to take part in the Terminal Countdown Demonstration Test, which includes equipment familiarization, emergency exit training and the simulated countdown.  On the STS-126 mission, space shuttle Endeavour's crew will deliver equipment and supplies to the International Space Station in preparation for expansion from a three- to six-person resident crew aboard the complex. The mission also will include four spacewalks to service the station’s Solar Alpha Rotary Joints. Endeavour is targeted to launch Nov. 14. Photo credit: NASA/Troy Cryder KSC-08pd3430

CAPE CANAVERAL, Fla. – In the White Room on Launch Pad 39A at NASA's ...

CAPE CANAVERAL, Fla. – In the White Room on Launch Pad 39A at NASA's Kennedy Space Center in Florida, STS-126 Pilot Eric Boe waits to finish his suit-up. He and other crew members will take part in a simulated... More

A long-lost spacesuit recently uncovered

A long-lost spacesuit recently uncovered

Description: KENNEDY SPACE CENTER, FLA. - This locker reveals a long-lost spacesuit recently uncovered at the Cape Canaveral Air Force Station (CCAFS) in Florida. A recent venture into a long-locked room at CCA... More

Before entering the orbiter Endeavour, STS-99 Mission Specialist Gerhard Thiele of Germany is helped with final suit preparations by Travis Thompson, mechanical technician and a member of the White Room closeout crew. The White Room is an environmental chamber at the end of the orbiter access arm, on the fixed service structure, that provides entry to the orbiter crew compartment. STS-99, known as the Shuttle Radar Topography Mission (SRTM), will chart a new course to produce unrivaled 3-D images of the Earth's surface. The result of the Shuttle Radar Topography Mission could be close to 1 trillion measurements of the Earth's topography. Scheduled for liftoff at 12:30 p.m. EST, the mission is expected to last 11days, with Endeavour landing at KSC Tuesday, Feb. 22, at 4:36 p.m. EST. This is the 97th Shuttle flight and 14th for Shuttle Endeavour KSC-00pp0235

Before entering the orbiter Endeavour, STS-99 Mission Specialist Gerha...

Before entering the orbiter Endeavour, STS-99 Mission Specialist Gerhard Thiele of Germany is helped with final suit preparations by Travis Thompson, mechanical technician and a member of the White Room closeou... More

CAPE CANAVERAL, Fla. –  On Launch Pad 39A at NASA's Kennedy Space Center in Florida, the rotating service structure is open, revealing space shuttle Atlantis on the pad for the STS-125 mission, the fifth and final shuttle servicing mission for NASA’s Hubble Space Telescope.  On the RSS, the payload canister is in position at the payload changeout room to receive the Hubble hardware.  The payload comprises four carriers holding various equipment for the mission.  The hardware will be transported back to Kennedy’s Payload Hazardous Servicing Facility where it will be stored until a new target launch date can be set for Atlantis’ STS-125 mission in 2009.  Atlantis’ October target launch date was delayed after a device on board Hubble used in the storage and transmission of science data to Earth shut down on Sept. 27.  Replacing the broken device will be added to Atlantis’ servicing mission to the telescope. Photo credit: NASA/Tim Jacobs KSC-08pd3113

CAPE CANAVERAL, Fla. – On Launch Pad 39A at NASA's Kennedy Space Cent...

CAPE CANAVERAL, Fla. – On Launch Pad 39A at NASA's Kennedy Space Center in Florida, the rotating service structure is open, revealing space shuttle Atlantis on the pad for the STS-125 mission, the fifth and fi... More

KENNEDY SPACE CENTER, FLA. -- At NASA's Kennedy Space Center, the payload canister atop its transporter rolls toward Launch Pad 39A. The canister contains the Columbus Lab module and integrated cargo carrier-lite payloads for space shuttle Atlantis on mission STS-122.  They will be transferred into the payload changeout room on the pad. Atlantis is targeted to launch on Dec. 6.  Photo credit: NASA/Dimitri Gerondidakis KSC-07pd3237

KENNEDY SPACE CENTER, FLA. -- At NASA's Kennedy Space Center, the payl...

KENNEDY SPACE CENTER, FLA. -- At NASA's Kennedy Space Center, the payload canister atop its transporter rolls toward Launch Pad 39A. The canister contains the Columbus Lab module and integrated cargo carrier-li... More

KENNEDY SPACE CENTER, FLA. -- In the Payload Changeout Room (part of the Rotation Service Structure at the launch pad), the doors of the payload canister open to reveal its cargo, the SPACEHAB module (bottom) and Unpressurized Cargo Pallet (top).  The payload will be transferred from this environmentally controlled room into the payload bay of Shuttle Atlantis for mission STS-106.  The 11-day mission to the International Space Station will include service module support tasks on orbit, transfer supplies and outfit the Space Station for the first long-duration crew.  Atlantis is scheduled to launch Sept. 8 at 8:30 a.m. EDT. KSC-00pp1126

KENNEDY SPACE CENTER, FLA. -- In the Payload Changeout Room (part of t...

KENNEDY SPACE CENTER, FLA. -- In the Payload Changeout Room (part of the Rotation Service Structure at the launch pad), the doors of the payload canister open to reveal its cargo, the SPACEHAB module (bottom) a... More

CAPE CANAVERAL, Fla. – In the Space Station Processing Facility at NASA's Kennedy Space Center, members of space shuttle Endeavour's STS-126 crew participate in a crew equipment interface test, or CEIT.  Here, Commander Chris Ferguson, second from right, and Mission Specialist Heidemarie Stefanyshyn-Piper, right, are dressed in clean room attire for a walkthrough of the multi-purpose logistics module. The CEIT provides hands-on experience with hardware and equipment slated to fly on their mission.  Endeavour will deliver a multi-purpose logistics module to the International Space Station on the STS-126 mission. Launch is targeted for Nov. 10.  Photo credit: NASA/Kim Shiflett KSC-08pd2214

CAPE CANAVERAL, Fla. – In the Space Station Processing Facility at NAS...

CAPE CANAVERAL, Fla. – In the Space Station Processing Facility at NASA's Kennedy Space Center, members of space shuttle Endeavour's STS-126 crew participate in a crew equipment interface test, or CEIT. Here, ... More

CAPE CANAVERAL, Fla. -- Sunrise at NASA's Kennedy Space Center in Florida finds space shuttle Atlantis on Launch Pad 39A after the payload canister carrying the Raffaello multi-purpose logistics module (MPLM) was lifted into the payload changeout room on the rotating service structure.            Commander Chris Ferguson, Pilot Doug Hurley and Mission Specialists Sandra Magnus and Rex Walheim are targeted to lift off on space shuttle Atlantis July 8, taking with them the MPLM packed with supplies, logistics and spare parts to the International Space Station. The STS-135 mission also will fly a system to investigate the potential for robotically refueling existing satellites and return a failed ammonia pump module to help NASA better understand the failure mechanism and improve pump designs for future systems. STS-135 will be the 33rd flight of Atlantis, the 37th shuttle mission to the space station, and the 135th and final mission of NASA's Space Shuttle Program. For more information visit, www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Kim Shiflett KSC-2011-4505

CAPE CANAVERAL, Fla. -- Sunrise at NASA's Kennedy Space Center in Flor...

CAPE CANAVERAL, Fla. -- Sunrise at NASA's Kennedy Space Center in Florida finds space shuttle Atlantis on Launch Pad 39A after the payload canister carrying the Raffaello multi-purpose logistics module (MPLM) w... More

CAPE CANAVERAL, Fla. -- In Firing Room 4 of the Launch Control Center at NASA's Kennedy Space Center in Florida, launch team members monitor the countdown to the launch of space shuttle Atlantis on its STS-135 mission to the International Space Station. Above the space shuttle countdown clock are five orbiter tributes on display. The tributes feature major accomplishments and significant achievements made by each shuttle, as well as mission patches and processing milestones.              Atlantis with its crew of four; Commander Chris Ferguson, Pilot Doug Hurley, Mission Specialists Sandy Magnus and Rex Walheim, lifted off at 11:29 a.m. EDT on July 8, 2011 to deliver the Raffaello multi-purpose logistics module packed with supplies and spare parts for the station. Atlantis also will fly the Robotic Refueling Mission experiment that will investigate the potential for robotically refueling existing satellites in orbit. In addition, Atlantis will return with a failed ammonia pump module to help NASA better understand the failure mechanism and improve pump designs for future systems. STS-135 will be the 33rd flight of Atlantis, the 37th shuttle mission to the space station, and the 135th and final mission of NASA's Space Shuttle Program. For more information, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Kim Shiflett KSC-2011-5278

CAPE CANAVERAL, Fla. -- In Firing Room 4 of the Launch Control Center ...

CAPE CANAVERAL, Fla. -- In Firing Room 4 of the Launch Control Center at NASA's Kennedy Space Center in Florida, launch team members monitor the countdown to the launch of space shuttle Atlantis on its STS-135 ... More

CAPE CANAVERAL, Fla. –  Center Director Bob Cabana watches the successful launch of space shuttle Endeavour on the STS-126 mission in the Firing Room of the Launch Control Center at NASA's Kennedy Space Center in Florida. Liftoff was on time at 7:55 p.m. EST. STS-126 is the 124th space shuttle flight and the 27th flight to the International Space Station. The mission will feature four spacewalks and work that will prepare the space station to house six crew members for long-duration missions.  Photo credit: NASA/Kim Shiflett KSC-08pd3700

CAPE CANAVERAL, Fla. – Center Director Bob Cabana watches the success...

CAPE CANAVERAL, Fla. – Center Director Bob Cabana watches the successful launch of space shuttle Endeavour on the STS-126 mission in the Firing Room of the Launch Control Center at NASA's Kennedy Space Center ... More

KENNEDY SPACE CENTER, FLA. -   After rollback of the rotating service structure (RSS) on Launch Pad 39B, Space Shuttle Discovery stands bathed in lights from the RSS and fixed service structure.  The rollback was in preparation for launch July 1 on mission STS-121.  Extending toward the cockpit of the shuttle is the orbiter access arm with the White Room extended.  The White Room provides access into the orbiter for the astronauts.  The RSS provides protected access to the orbiter for changeout and servicing of payloads at the pad. The structure is supported by a rotating bridge that pivots about a vertical axis on the west side of the pad's flame trench. The hinge column rests on the pad surface and is braced to the fixed service structure. Support for the outer end of the bridge is provided by two eight-wheel, motor-driven trucks that move along circular twin rails installed flush with the pad surface. The track crosses the flame trench on a permanent bridge.  The RSS is 102 feet long, 50 feet wide and 130 feet high. The structure has orbiter access platforms at five levels to provide access to the payload bay while the orbiter is being serviced in the RSS. Each platform has independent extendable planks that can be arranged to conform to a payload's configuration.  This mission is the 115th shuttle flight and the 18th U.S. flight to the International Space Station. Photo credit: NASA/Kim Shiflett KSC-06pd1308

KENNEDY SPACE CENTER, FLA. - After rollback of the rotating service ...

KENNEDY SPACE CENTER, FLA. - After rollback of the rotating service structure (RSS) on Launch Pad 39B, Space Shuttle Discovery stands bathed in lights from the RSS and fixed service structure. The rollback w... More

CAPE CANAVERAL, Fla. –  In NASA Kennedy Space Center's Firing Room 4, STS-128  Launch Director Pete Nickolenko waits for the launch of space shuttle Discovery on the STS-128 mission. Liftoff from Launch Pad 39A was on time at 11:59 p.m. EDT. The first launch attempt on Aug. 24 was postponed due to unfavorable weather conditions.  The second attempt on Aug. 25 also was postponed due to an issue with a valve in space shuttle Discovery's main propulsion system.  The STS-128 mission is the 30th International Space Station assembly flight and the 128th space shuttle flight. The 13-day mission will deliver more than 7 tons of supplies, science racks and equipment, as well as additional environmental hardware to sustain six crew members on the International Space Station. The equipment includes a freezer to store research samples, a new sleeping compartment and the COLBERT treadmill.  Photo credit: NASA/Kim Shiflett KSC-2009-4901

CAPE CANAVERAL, Fla. – In NASA Kennedy Space Center's Firing Room 4, ...

CAPE CANAVERAL, Fla. – In NASA Kennedy Space Center's Firing Room 4, STS-128 Launch Director Pete Nickolenko waits for the launch of space shuttle Discovery on the STS-128 mission. Liftoff from Launch Pad 39A... More

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, STS-133 launch team members rehearse procedures for the liftoff of space shuttle Discovery's final mission in Firing Room 4. The team at Kennedy also participated in launch simulations with personnel at NASA's Johnson Space Center in Houston.    Discovery's next launch opportunity to the International Space Station on the STS-133 mission is planned for no earlier than Feb. 24. For more information on STS-133, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts133/. Photo credit: NASA/Kim Shiflett KSC-2011-1049

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, STS...

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, STS-133 launch team members rehearse procedures for the liftoff of space shuttle Discovery's final mission in Firing Room 4. The team at Kenned... More

CAPE CANAVERAL, Fla. - In the Operations and Checkout Building at NASA's Kennedy Space Center in Florida, members of space shuttle Endeavour's STS-130 crew put on their launch-and-entry suits before heading to the Astrovan for the ride to Launch Pad 39A. The crew is participating in a dress rehearsal for their upcoming launch, known as the Terminal Countdown Demonstration Test.  Making his second spaceflight on STS-130 is Mission Specialist Nicholas Patrick, seen here in his helmet.    The primary payload for the STS-130 mission is the International Space Station's Tranquility node, a pressurized module that will provide room for many of the station's life support systems. Attached to one end of Tranquility is a cupola, a unique work area with six windows on its sides and one on top.  The cupola resembles a circular bay window and will provide a vastly improved view of the station's exterior. The multi-directional view will allow the crew to monitor spacewalks and docking operations, as well as provide a spectacular view of Earth and other celestial objects. The module was built in Turin, Italy, by Thales Alenia Space for the European Space Agency.  Launch of STS-130 is targeted for Feb. 7. For information on the STS-130 mission and crew, visit http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts130/index.html.  Photo credit: NASA/Kim Shiflett KSC-2010-1358

CAPE CANAVERAL, Fla. - In the Operations and Checkout Building at NASA...

CAPE CANAVERAL, Fla. - In the Operations and Checkout Building at NASA's Kennedy Space Center in Florida, members of space shuttle Endeavour's STS-130 crew put on their launch-and-entry suits before heading to ... More

KENNEDY SPACE CENTER, FLA. -- Flags wave near Launch Pad 39A where space shuttle Endeavour waits for liftoff.  The rotating service structure was rolled back starting at 8:23 a.m. and complete at 8:55 a.m.  Above the orange external tank is seen the "beanie cap" at the end of the gaseous oxygen vent arm, extending from the fixed service structure. Vapors are created as the liquid oxygen in the external tank boil off. The hood vents the gaseous oxygen vapors away from the space shuttle vehicle.  Below is the orbiter access arm with the White Room at the end, flush against the shuttle.  The crew gains access into the orbiter through the White Room.  The rotating structure provides protected access to the orbiter for changeout and servicing of payloads at the pad. The structure is supported by a rotating bridge that pivots about a vertical axis on the west side of the pad's flame trench. After the RSS is rolled back, the orbiter is ready for fuel cell activation and external tank cryogenic propellant loading operations.  The pad is cleared to the perimeter gate for operations to fill the external tank with about 500,000 gallons of cryogenic propellants used by the shuttle’s main engines. This is done at the pad approximately eight hours before the scheduled launch.  Endeavour and its crew will deliver the first section of the Japan Aerospace Exploration Agency's Kibo laboratory and the Canadian Space Agency's two-armed robotic system, Dextre.  Launch is scheduled for 2:28 a.m. EDT March 11.  Photo credit: NASA/Kim Shiflett KSC-08pd0673

KENNEDY SPACE CENTER, FLA. -- Flags wave near Launch Pad 39A where spa...

KENNEDY SPACE CENTER, FLA. -- Flags wave near Launch Pad 39A where space shuttle Endeavour waits for liftoff. The rotating service structure was rolled back starting at 8:23 a.m. and complete at 8:55 a.m. Abo... More

KENNEDY SPACE CENTER, FLA. -  The door of firing room 1 in the Launch Control Center at NASA's Kennedy Space Center shows its new designation as the Young · Crippen Firing Room.  The renaming was made in tribute to the 25th anniversary of the first space shuttle flight on April 12, 1981, dedicating the firing room that launched the historic flight and the crew of STS-1, Commander John Young and Pilot Robert Crippen.  Making the dedication were Center Director Jim Kennedy; the NASA test director for STS-1, Norm Carlson; and the project flight engineer for Space Shuttle Columbia,  Bob Sieck. Photo credit: NASA/Kim Shiflett KSC-06pd0571

KENNEDY SPACE CENTER, FLA. - The door of firing room 1 in the Launch ...

KENNEDY SPACE CENTER, FLA. - The door of firing room 1 in the Launch Control Center at NASA's Kennedy Space Center shows its new designation as the Young · Crippen Firing Room. The renaming was made in tribut... More

CAPE CANAVERAL, Fla. - In the Payload Changeout Room on Launch Pad 39A at NASA's Kennedy Space Center in Florida, members of the STS-129 crew, dressed in clean-room attire known as "bunny suits," pause a moment during their payload familiarization training for a photo. From left are Mission Specialists Robert L. Satcher Jr. and Leland Melvin.    The training affords the crew an opportunity to observe the placement of the Express Logistics Carriers 1 and 2 in space shuttle Atlantis' payload bay before launch.  The six astronauts for space shuttle Atlantis’ STS-129 mission came to Kennedy to participate in their launch dress rehearsal, the Terminal Countdown Demonstration Test.  Additional training associated with the test was done last month, but the simulated countdown was postponed because of a scheduling conflict with the launch of NASA’s Ares I-X test rocket.  Launch of Atlantis on its STS-129 mission to the International Space Station is set for Nov. 16.  On STS-129, the crew will deliver to the station two spare gyroscopes, two nitrogen tank assemblies, two pump modules, an ammonia tank assembly and a spare latching end effector for the station's robotic arm.  For information on the STS-129 crew and mission objectives, visit http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts129/index.html. Photo credit: NASA/Kim Shiflett KSC-2009-6105

CAPE CANAVERAL, Fla. - In the Payload Changeout Room on Launch Pad 39A...

CAPE CANAVERAL, Fla. - In the Payload Changeout Room on Launch Pad 39A at NASA's Kennedy Space Center in Florida, members of the STS-129 crew, dressed in clean-room attire known as "bunny suits," pause a moment... More

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, technicians in the payload changeout room have maneuvered space shuttle Atlantis' cargo, the Raffaello multi-purpose logistics module (MPLM) into the shuttle's payload bay using the payload ground-handling mechanism at Launch Pad 39A. The rotating service structure that protects the shuttle from the elements and provides access has been moved back into place.              STS-135 Commander Chris Ferguson, Pilot Doug Hurley and Mission Specialists Sandy Magnus and Rex Walheim are targeted to lift off on Atlantis July 8, taking with them the MPLM packed with supplies, logistics and spare parts to the station. The STS-135 mission also will fly a system to investigate the potential for robotically refueling existing satellites and return a failed ammonia pump module to help NASA better understand the failure mechanism and improve pump designs for future systems. STS-135 will be the 33rd flight of Atlantis, the 37th shuttle mission to the space station, and the 135th and final mission of NASA's Space Shuttle Program. For more information visit, www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Kim Shiflett KSC-2011-4598

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, tec...

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, technicians in the payload changeout room have maneuvered space shuttle Atlantis' cargo, the Raffaello multi-purpose logistics module (MPLM) in... More

In the White Room, STS-97 Pilot Michael Bloomfield (center) prepares for entry into Space Shuttle Endeavour with the help of the Closeout Crew, (left to right) Al Schmidt, Travis Thompson and Mike Birkenseher. Space Shuttle Endeavour is targeted to launch Nov. 30 at 10:06 p.m. EST for the six construction flight to the International Space Station. Endeavour is transporting the P6 Integrated Truss Structure that comprises Solar Array Wing-3 and the Integrated Electronic Assembly, to provide power to the Space Station. After the 11-day mission, which includes three spacewalks, it is expected to land at KSC Dec. 11 at 6:19 p.m. EST KSC00pp1820

In the White Room, STS-97 Pilot Michael Bloomfield (center) prepares f...

In the White Room, STS-97 Pilot Michael Bloomfield (center) prepares for entry into Space Shuttle Endeavour with the help of the Closeout Crew, (left to right) Al Schmidt, Travis Thompson and Mike Birkenseher. ... More

KENNEDY SPACE CENTER, FLA. --   On Launch Pad 39A at NASA's Kennedy Space Center, STS-123 Mission Specialist Mike Foreman is helped with the final flight suit fit check in the White Room before entering space shuttle Endeavour for launch. The White Room provides access into the shuttle.  Liftoff was on time at 2:28 a.m. EDT.  The crew will make a record-breaking 16-day mission to the International Space Station and deliver the first section of the Japan Aerospace Exploration Agency's Kibo laboratory and the Canadian Space Agency's two-armed robotic system, Dextre.  Photo credit: NASA/Scott Haun, Richard Prickett KSC-08pd0722

KENNEDY SPACE CENTER, FLA. -- On Launch Pad 39A at NASA's Kennedy Sp...

KENNEDY SPACE CENTER, FLA. -- On Launch Pad 39A at NASA's Kennedy Space Center, STS-123 Mission Specialist Mike Foreman is helped with the final flight suit fit check in the White Room before entering space s... More

CAPE CANAVERAL, Fla. - In the Operations and Checkout Building at NASA's Kennedy Space Center in Florida, members of space shuttle Endeavour's STS-130 crew put on their launch-and-entry suits before heading to the Astrovan for the ride to Launch Pad 39A. The crew is participating in a dress rehearsal for their upcoming launch, known as the Terminal Countdown Demonstration Test.  Making his first spaceflight on STS-130 is Pilot Terry Virts, seen here in his helmet.    The primary payload for the STS-130 mission is the International Space Station's Tranquility node, a pressurized module that will provide room for many of the station's life support systems. Attached to one end of Tranquility is a cupola, a unique work area with six windows on its sides and one on top.  The cupola resembles a circular bay window and will provide a vastly improved view of the station's exterior. The multi-directional view will allow the crew to monitor spacewalks and docking operations, as well as provide a spectacular view of Earth and other celestial objects. The module was built in Turin, Italy, by Thales Alenia Space for the European Space Agency.  Launch of STS-130 is targeted for Feb. 7. For information on the STS-130 mission and crew, visit http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts130/index.html.  Photo credit: NASA/Kim Shiflett KSC-2010-1363

CAPE CANAVERAL, Fla. - In the Operations and Checkout Building at NASA...

CAPE CANAVERAL, Fla. - In the Operations and Checkout Building at NASA's Kennedy Space Center in Florida, members of space shuttle Endeavour's STS-130 crew put on their launch-and-entry suits before heading to ... More

KENNEDY SPACE CENTER, FLA. -   After rollback of the rotating service structure (RSS) on Launch Pad 39B, Space Shuttle Discovery stands bathed in lights from the RSS and fixed service structure.  The rollback was in preparation for launch July 1 on mission STS-121.  Extending toward the cockpit of the shuttle is the orbiter access arm with the White Room extended.  The White Room provides access into the orbiter for the astronauts.  The RSS provides protected access to the orbiter for changeout and servicing of payloads at the pad. The structure is supported by a rotating bridge that pivots about a vertical axis on the west side of the pad's flame trench. The hinge column rests on the pad surface and is braced to the fixed service structure. Support for the outer end of the bridge is provided by two eight-wheel, motor-driven trucks that move along circular twin rails installed flush with the pad surface. The track crosses the flame trench on a permanent bridge.  The RSS is 102 feet long, 50 feet wide and 130 feet high. The structure has orbiter access platforms at five levels to provide access to the payload bay while the orbiter is being serviced in the RSS. Each platform has independent extendable planks that can be arranged to conform to a payload's configuration.  This mission is the 115th shuttle flight and the 18th U.S. flight to the International Space Station. Photo credit: NASA/Kim Shiflett KSC-06pd1307

KENNEDY SPACE CENTER, FLA. - After rollback of the rotating service ...

KENNEDY SPACE CENTER, FLA. - After rollback of the rotating service structure (RSS) on Launch Pad 39B, Space Shuttle Discovery stands bathed in lights from the RSS and fixed service structure. The rollback w... More

CAPE CANAVERAL, Fla. –  In the Space Station Processing Facility at NASA's Kennedy Space Center, members of space shuttle Endeavour's STS-126 crew participate in a crew equipment interface test, or CEIT.  Here, from left, Mission Specialists Sandra Magnus and Heidemarie Stefanyshyn-Piper, and Pilot Eric Boe are dressed in clean room attire for a walkthrough of the multi-purpose logistics module.  The CEIT provides hands-on experience with hardware and equipment slated to fly on their mission.  Endeavour will deliver a multi-purpose logistics module to the International Space Station on the STS-126 mission. Launch is targeted for Nov. 10.  Photo credit: NASA/Kim Shiflett KSC-08pd2217

CAPE CANAVERAL, Fla. – In the Space Station Processing Facility at NA...

CAPE CANAVERAL, Fla. – In the Space Station Processing Facility at NASA's Kennedy Space Center, members of space shuttle Endeavour's STS-126 crew participate in a crew equipment interface test, or CEIT. Here,... More

KENNEDY SPACE CENTER, FLA. -- In the White Room at Launch Pad 39B, STS-112  Mission Specialist Sandra Magnus, Ph.D., receives assistance with her spacesuit during a simulated launch countdown, part of Terminal Countdown Demonstration Test activities, a dress rehearsal for launch.  Launch of STS-112 aboard Space Shuttle Atlantis is scheduled for Oct. 2, between 2 and 6 p.m. EDT.  STS-112 is the 15th assembly mission to the International Space Station.  Atlantis will be carrying the S1 Integrated Truss Structure, the first starboard truss segment, which will be attached to the central truss segment, S0, and the Crew and Equipment Translation Aid (CETA) Cart A.  The CETA is the first of two human-powered carts that will ride along the ISS railway, providing mobile work platforms for future spacewalking astronauts. KSC-02pd1352

KENNEDY SPACE CENTER, FLA. -- In the White Room at Launch Pad 39B, STS...

KENNEDY SPACE CENTER, FLA. -- In the White Room at Launch Pad 39B, STS-112 Mission Specialist Sandra Magnus, Ph.D., receives assistance with her spacesuit during a simulated launch countdown, part of Terminal ... More

CAPE CANAVERAL, Fla. – As seen on Google Maps, Firing Room 3 inside the Launch Control Center at NASA's Kennedy Space Center was one of the four control rooms used by NASA and contractor launch teams to oversee a space shuttle countdown. This firing room is furnished in the classic style with the same metal computer cabinets and some of the same monitors in place when the first shuttle mission launched April 12, 1981. Specialized operators worked at consoles tailored to keep track of the status of shuttle systems while the spacecraft was processed in the Orbiter Processing Facility, being stacked inside the Vehicle Assembly Building and standing at the launch pad before liftoff. The firing rooms, including 3, were also used during NASA's Apollo Program. Google precisely mapped the space center and some of its historical facilities for the company's map page. The work allows Internet users to see inside buildings at Kennedy as they were used during the space shuttle era. Photo credit: Google/Wendy Wang KSC-2013-3234

CAPE CANAVERAL, Fla. – As seen on Google Maps, Firing Room 3 inside th...

CAPE CANAVERAL, Fla. – As seen on Google Maps, Firing Room 3 inside the Launch Control Center at NASA's Kennedy Space Center was one of the four control rooms used by NASA and contractor launch teams to oversee... More

CAPE CANAVERAL, Fla. -- This is a version of space shuttle Atlantis' orbiter tribute, or OV-104, which hangs in Firing Room 4 of the Launch Control Center at NASA's Kennedy Space Center in Florida. In the lower-left corner, it features Atlantis soaring above Earth and threaded through the design are the mission patches for each of Atlantis’ flights. Atlantis' accomplishments include seven missions to the Russian space station Mir and several assembly, construction and resupply missions to the International Space Station. Atlantis also flew the last Hubble Space Telescope servicing mission on STS-125. In the tribute, the planet Venus represents the Magellan probe being deployed during STS-30, and Jupiter represents the Galileo probe being deployed during STS-34. The inset photos illustrate various aspects of shuttle processing as well as significant achievements, such as the glass cockpit and the first shuttle docking with Mir during STS-71. The inset photo in the upper-left corner shows a rainbow over Atlantis on Launch Pad 39A and shuttle Endeavour on Launch Pad 39B at Kennedy. Endeavour was the assigned vehicle had Atlantis’ STS-125 mission needed rescue, and this was the last time both launch pads were occupied at the same time. The stars in the background represent the many people who have worked with Atlantis and their contributions to the vehicle’s success. Graphic design credit: NASA/Amy Lombardo. NASA publication number: SP-2010-08-161-KSC KSC-2010-4450A

CAPE CANAVERAL, Fla. -- This is a version of space shuttle Atlantis' o...

CAPE CANAVERAL, Fla. -- This is a version of space shuttle Atlantis' orbiter tribute, or OV-104, which hangs in Firing Room 4 of the Launch Control Center at NASA's Kennedy Space Center in Florida. In the lower... More

KENNEDY SPACE CENTER, FLA. -- The STS-112 crew pauses for a photo in the White Room during Terminal Countdown Demonstration Test activities.  Kneeling in front are Mission Specialists Piers Sellers and David Wolf;  standing, left to right, are Mission Specialist Sandra Magnus,  Pilot Pamela Melroy, Commander Jeffrey Ashby and Mission Specialist Fyodor Yurchikhin. (with the Russian Space Agency). Mission STS-112 aboard Space Shuttle Atlantis is scheduled to launch no earlier than Oct. 2, between 2 and 6 p.m. EDT.  STS-112 is the 15th assembly mission to the International Space Station.  Atlantis will be carrying the S1 Integrated Truss Structure, the first starboard truss segment, to be attached to the central truss segment, S0, and the Crew and Equipment Translation Aid (CETA) Cart A.  The CETA is the first of two human-powered carts that will ride along the ISS railway, providing mobile work platforms for future spacewalking astronauts. KSC-02pd1335

KENNEDY SPACE CENTER, FLA. -- The STS-112 crew pauses for a photo in t...

KENNEDY SPACE CENTER, FLA. -- The STS-112 crew pauses for a photo in the White Room during Terminal Countdown Demonstration Test activities. Kneeling in front are Mission Specialists Piers Sellers and David Wo... More

CAPE CANAVERAL, Fla. --  With red umbilical lines attached, the payload containing space shuttle Discovery's S6 truss and solar arrays is lifted up to the Payload Changeout Room, or PCR, on Launch Pad 39A at NASA's Kennedy Space Center in Florida. The payload will be transferred inside the PCR where it will wait until Discovery rolls out to the pad. Then the payload will be installed in the shuttle's payload bay. Launch of Discovery on the STS-119 mission is scheduled for Feb. 12. During Discovery's 14-day mission, the crew will install the S6 truss segment and its solar arrays to the starboard side of the station, completing the station's backbone, or truss.  Photo credit: NASA/Jim Grossmann KSC-2009-1096

CAPE CANAVERAL, Fla. -- With red umbilical lines attached, the payloa...

CAPE CANAVERAL, Fla. -- With red umbilical lines attached, the payload containing space shuttle Discovery's S6 truss and solar arrays is lifted up to the Payload Changeout Room, or PCR, on Launch Pad 39A at NA... More

KENNEDY SPACE CENTER, FLA. -- At Launch Pad 39A, the payload canister with the SPACEHAB Double Module and the Integrated Cargo Carrier (ICC) inside is lifted off the payload transporter toward the Payload Changeout Room (PCR) on the Rotating Service Structure (RSS). The PCR is an environmentally controlled facility supporting cargo delivery to the pad and vertical installation in the orbiter cargo bay. At right of the RSS is the Fixed Service Structure. The primary payloads on mission STS-101, the module and ICC contain internal logistics and resupply cargo for restoring full redundancy to the International Space Station power system in preparation for the arrival of the next pressurized module, the Russian-built Zvezda. The payloads will be transferred to Space Shuttle Atlantis after Atlantis rolls out to the pad. Launch of Atlantis on mission STS-101 is scheduled no earlier than April 17, 2000 KSC-00pp0369

KENNEDY SPACE CENTER, FLA. -- At Launch Pad 39A, the payload canister ...

KENNEDY SPACE CENTER, FLA. -- At Launch Pad 39A, the payload canister with the SPACEHAB Double Module and the Integrated Cargo Carrier (ICC) inside is lifted off the payload transporter toward the Payload Chang... More

KENNEDY SPACE CENTER, FLA. -- Following the simulated launch countdown, STS-123 crew members begin exiting space shuttle Endeavour into the White Room on Launch Pad 39 at NASA's Kennedy Space Center.  To leave the pad, the STS-123 crew will practice emergency egress using the slidewire baskets.  The countdown was the culmination of the terminal countdown demonstration test, or TCDT. The TCDT provides astronauts and ground crews with an opportunity to participate in various countdown activities, including equipment familiarization and emergency egress training. Endeavour is targeted to launch at 2:28 a.m. EDT March 11 on the 16-day STS-123 mission to the International Space Station.  Endeavour and its crew will deliver the first section of the Japan Aerospace Exploration Agency's Kibo laboratory and the Canadian Space Agency's two-armed robotic system, Dextre.   Photo credit: NASA/Kim Shiflett KSC-08pd0583

KENNEDY SPACE CENTER, FLA. -- Following the simulated launch countdown...

KENNEDY SPACE CENTER, FLA. -- Following the simulated launch countdown, STS-123 crew members begin exiting space shuttle Endeavour into the White Room on Launch Pad 39 at NASA's Kennedy Space Center. To leave ... More

CAPE CANAVERAL, Fla. – In the White Room on Launch Pad 39A at NASA's Kennedy Space Center in Florida, STS-119 Mission Specialists Koichi Wakata (center) and Steve Swanson are getting into their harnesses, which include a parachute pack, before crawling through the open hatch into space shuttle Discovery. The White Room is at the end of the orbiter access arm on the fixed service structure and provides access into the shuttle. The STS-119 mission is the 28th to the International Space Station and the 125th space shuttle flight.  Discovery will deliver the final pair of power-generating solar array wings and the S6 truss segment.  Installation of S6 will signal the station's readiness to house a six-member crew for conducting increased science. Liftoff is scheduled for 7:43 p.m. EDT. Photo credit: NASA/Tony Gray, Tom Farrar KSC-2009-2056

CAPE CANAVERAL, Fla. – In the White Room on Launch Pad 39A at NASA's K...

CAPE CANAVERAL, Fla. – In the White Room on Launch Pad 39A at NASA's Kennedy Space Center in Florida, STS-119 Mission Specialists Koichi Wakata (center) and Steve Swanson are getting into their harnesses, which... More

CAPE CANAVERAL, Fla. – In the Firing Room at NASA's Kennedy Space Center in Florida, Steven Hoyle, left, and Russ Brucker, center, receive a VIP award for their efforts associated with the STS-125 mission and NASA's Hubble Space Telescope.  Hoyle is the payload test operations manager with NASA's Goddard Space Flight Center; Brucker is the Atlantis payload project manager with United Space Alliance.  A crew of seven launched today on space shuttle Atlantis to service Hubble. Liftoff was on time at 2:01 p.m. EDT. Atlantis' 11-day flight will include five spacewalks to refurbish and upgrade the telescope with state-of-the-art science instruments that will expand Hubble's capabilities and extend its operational lifespan through at least 2014.  The payload includes a Wide Field Camera 3, fine guidance sensor and the Cosmic Origins Spectrograph.  Photo credit: NASA/Kim Shiflett KSC-2009-3074

CAPE CANAVERAL, Fla. – In the Firing Room at NASA's Kennedy Space Cent...

CAPE CANAVERAL, Fla. – In the Firing Room at NASA's Kennedy Space Center in Florida, Steven Hoyle, left, and Russ Brucker, center, receive a VIP award for their efforts associated with the STS-125 mission and N... More

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, testing of the Tilt-Up Umbilical Arm (TUUA) prototype's Environmental Control System Quick Disconnect takes place in the Launch Equipment Test Facility's 6,000-square-foot high bay. The prototype is used to demonstrate the safe disconnect and retraction of ground umbilical plates and associated hardware of a launch vehicle's upper stage and service module. The Environmental Control System consists of regulated air, which would be used to purge an inner tank and crew module.     Since 1977, the facility has supported NASA’s Launch Services, shuttle, International Space Station, and Constellation programs, as well as commercial providers. The facility recently underwent a major upgrade to support even more programs, projects and customers. It houses a cable fabrication and molding shop, pneumatics shop, machine and weld shop and full-scale control room. Outside, the facility features a water flow test loop, vehicle motion simulator, 600-ton test fixture, launch simulation towers and a cryogenic system. Photo credit: NASA/Jack Pfaller KSC-2010-5293

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, tes...

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, testing of the Tilt-Up Umbilical Arm (TUUA) prototype's Environmental Control System Quick Disconnect takes place in the Launch Equipment Test ... More

CAPE CANAVERAL, Fla. -- In Firing Room 4 of the Launch Control Center at NASA's Kennedy Space Center in Florida, launch team members monitor the countdown to the launch of space shuttle Atlantis on its STS-135 mission to the International Space Station. Seen here is NASA Test Director Steve Payne.      Atlantis with its crew of four; Commander Chris Ferguson, Pilot Doug Hurley, Mission Specialists Sandy Magnus and Rex Walheim, lifted off at 11:29 a.m. EDT on July 8, 2011 to deliver the Raffaello multi-purpose logistics module packed with supplies and spare parts for the station. Atlantis also will fly the Robotic Refueling Mission experiment that will investigate the potential for robotically refueling existing satellites in orbit. In addition, Atlantis will return with a failed ammonia pump module to help NASA better understand the failure mechanism and improve pump designs for future systems. STS-135 will be the 33rd flight of Atlantis, the 37th shuttle mission to the space station, and the 135th and final mission of NASA's Space Shuttle Program. For more information, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Kim Shiflett KSC-2011-5292

CAPE CANAVERAL, Fla. -- In Firing Room 4 of the Launch Control Center ...

CAPE CANAVERAL, Fla. -- In Firing Room 4 of the Launch Control Center at NASA's Kennedy Space Center in Florida, launch team members monitor the countdown to the launch of space shuttle Atlantis on its STS-135 ... More

STS-106 Mission Specialist Richard A. Mastracchio is helped with his launch and entry suit in the White Room before entering Space Shuttle Atlantis. The perfect on-time liftoff of Atlantis on mission STS-106 occurred at 8:45:47 a.m. EDT. On the 11-day mission to the International Space Station, the seven-member crew will perform support tasks on orbit, transfer supplies and prepare the living quarters in the newly arrived Zvezda Service Module. The first long-duration crew, dubbed “Expedition One,” is due to arrive at the Station in late fall. Landing of Atlantis is targeted for 4:45 a.m. EDT on Sept. 19 KSC-00pp1283

STS-106 Mission Specialist Richard A. Mastracchio is helped with his l...

STS-106 Mission Specialist Richard A. Mastracchio is helped with his launch and entry suit in the White Room before entering Space Shuttle Atlantis. The perfect on-time liftoff of Atlantis on mission STS-106 oc... More

CAPE CANAVERAL, Fla. --- STS-123 Commander Dominic Gorie, in front, and Mission Specialist Mike Foreman exit the crew transport vehicle at NASA Kennedy Space Center's Shuttle Landing Facility.  The vehicle provides a "white room" in which a physician performs a brief preliminary medical examination of the crew members before they leave the shuttle.  Space shuttle Endeavour landed on Runway 15 to end the STS-123 mission, a 16-day flight to the International Space Station.  This was the 16th night landing at Kennedy.  The main landing gear touched down at 8:39:08 p.m. EDT.  The nose landing gear touched down at 8:39:17 p.m. and wheel stop was at 8:40:41 p.m.  The mission completed nearly 6.6 million miles.  The landing was on the second opportunity after the first was waved off due to unstable weather in the Kennedy Space Center area.   The STS-123 mission delivered the first segment of the Japan Aerospace Exploration Agency's Kibo laboratory and the Canadian Space Agency's two-armed robotic system, known as Dextre.  Photo credit: NASA/Kim Shiflett KSC-08pd0820

CAPE CANAVERAL, Fla. --- STS-123 Commander Dominic Gorie, in front, an...

CAPE CANAVERAL, Fla. --- STS-123 Commander Dominic Gorie, in front, and Mission Specialist Mike Foreman exit the crew transport vehicle at NASA Kennedy Space Center's Shuttle Landing Facility. The vehicle prov... More

CAPE CANAVERAL, Fla. - At NASA's Kennedy Space Center in Florida, STS-130 Mission Specialist Kathryn Hire takes her crew and instructor for a ride in an M113 armored personnel carrier during driving practice. Left of Hire is the instructor, Battalion Chief David Seymour.    An M113 is kept at the foot of the launch pad in case an emergency egress from the vicinity of the pad is needed.  The crew members of space shuttle Endeavour's STS-130 mission are at Kennedy for training related to their launch dress rehearsal, the Terminal Countdown Demonstration Test.  The primary payload on STS-130 is the International Space Station's Node 3, Tranquility, a pressurized module that will provide room for many of the station's life support systems. Attached to one end of Tranquility is a cupola, a unique work area with six windows on its sides and one on top.  Endeavour's launch is targeted for Feb. 7.  For information on the STS-130 mission and crew, visit http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts130/index.html.  Photo credit: NASA/Kim Shiflett KSC-2010-1298

CAPE CANAVERAL, Fla. - At NASA's Kennedy Space Center in Florida, STS-...

CAPE CANAVERAL, Fla. - At NASA's Kennedy Space Center in Florida, STS-130 Mission Specialist Kathryn Hire takes her crew and instructor for a ride in an M113 armored personnel carrier during driving practice. L... More

KENNEDY SPACE CENTER, FLA. --   On Launch Pad 39B at NASA's Kennedy Space Center, the payload canister holding Space Shuttle Discovery's payloads is lifted off its transporter toward the payload changeout room on the rotating service structure. The payload changeout room provides an environmentally clean or "white room" condition in which to receive a payload transferred from a protective payload canister. After the shuttle arrives at the pad, the rotating service structure will close around it and the payloads, which include the multi-purpose logistics module and integrated cargo carrier, will then be transferred from the changeout room into Discovery's payload bay. Discovery's launch to the International Space Station on mission STS-121 is targeted for July 1 in a launch window that extends to July 19. During the 12-day mission, crew members will test new hardware and techniques to improve shuttle safety. Photo credit: NASA/Kim Shiflett KSC-06pd0855

KENNEDY SPACE CENTER, FLA. -- On Launch Pad 39B at NASA's Kennedy Sp...

KENNEDY SPACE CENTER, FLA. -- On Launch Pad 39B at NASA's Kennedy Space Center, the payload canister holding Space Shuttle Discovery's payloads is lifted off its transporter toward the payload changeout room ... More

CAPE CANAVERAL, Fla. –– On Launch Pad 39A at NASA's Kennedy Space Center in Florida, the payload canister is lifted toward the payload changeout room, or PCR, on the rotating service structure. The red umbilical lines are still attached. The canister's cargo of Hubble Space Telescope equipment will be deposited in the PCR and later transferred to the payload bay on space shuttle Atlantis, at right. Atlantis' 11-day STS-125 mission to service Hubble is targeted for launch May 12.  The flight will include five spacewalks in which astronauts will refurbish and upgrade the telescope with state-of-the-art science instruments. As a result, Hubble's capabilities will be expanded and its operational lifespan extended through at least 2014.  Photo credit: NASA/Kim Shiflett KSC-2009-2784

CAPE CANAVERAL, Fla. –– On Launch Pad 39A at NASA's Kennedy Space Cent...

CAPE CANAVERAL, Fla. –– On Launch Pad 39A at NASA's Kennedy Space Center in Florida, the payload canister is lifted toward the payload changeout room, or PCR, on the rotating service structure. The red umbilica... More

KENNEDY SPACE CENTER, FLA.  -- At Launch Complex 39A, the P1 Truss Segment is lifted to the level of the Payload Changeout Room. The P1 truss is the primary payload for Mission STS-113 to the International Space Station. It is the first port truss segment which will be attached to the Station’s central truss segment, S0. Once delivered, the P1 truss will remain stowed until flight 12A.1. The mission will also deliver the Expedition 6 crew to the Station and return Expedition 5 to Earth. Space Shuttle Endeavour is scheduled to launch no earlier than Nov. 10 on the 11-day mission. KSC-02pd1505

KENNEDY SPACE CENTER, FLA. -- At Launch Complex 39A, the P1 Truss Seg...

KENNEDY SPACE CENTER, FLA. -- At Launch Complex 39A, the P1 Truss Segment is lifted to the level of the Payload Changeout Room. The P1 truss is the primary payload for Mission STS-113 to the International Spac... More

KENNEDY SPACE CENTER, Fla.  -- In the White Room on Launch Pad 39A, Mission Specialist Barbara R. Morgan adjusts the collar of her launch and entry suit before she enters Space Shuttle Endeavour.  Morgan, the teacher-turned-astronaut, and the rest of the crew are taking part in a simulated launch countdown, the culmination of terminal countdown demonstration test activities.  The White Room is situated at the end of the orbiter access arm and provides entry into the orbiter. TCDT activities also include M-113 training, payload familiarization and emergency egress training at the pad.  The mission is the 22nd flight to the International Space Station and Space Shuttle Endeavour will carry a payload including the S5 truss, a SPACEHAB module and external stowage platform 3. STS-118 is targeted for launch on Aug. 7.  Photo credit: NASA/Amanda Diller KSC-07pd1993

KENNEDY SPACE CENTER, Fla. -- In the White Room on Launch Pad 39A, Mi...

KENNEDY SPACE CENTER, Fla. -- In the White Room on Launch Pad 39A, Mission Specialist Barbara R. Morgan adjusts the collar of her launch and entry suit before she enters Space Shuttle Endeavour. Morgan, the t... More

KENNEDY SPACE CENTER, FLA. -- The late afternoon sun highlights the external tank and solid rocket booster on Space Shuttle Columbia after rollback of the Rotating Service Structure on Launch Pad 39A. Visible are the orbiter access arm with the White Room extended to Columbia's cockpit, and at the top, the gaseous oxygen vent arm and cap, called the "beanie cap." Columbia is scheduled for launch Jan. 16 at 10:39 a.m. EST on mission STS-107, a research mission. KSC-03pd0077

KENNEDY SPACE CENTER, FLA. -- The late afternoon sun highlights the ex...

KENNEDY SPACE CENTER, FLA. -- The late afternoon sun highlights the external tank and solid rocket booster on Space Shuttle Columbia after rollback of the Rotating Service Structure on Launch Pad 39A. Visible a... More

CAPE CANAVERAL, Fla. - At NASA's Kennedy Space Center in Florida, STS-130 Mission Specialist Stephen Robinson takes his crew and instructor for a ride in an M113 armored personnel carrier during driving practice. Left of Robinson is the instructor, Battalion Chief David Seymour.    An M113 is kept at the foot of the launch pad in case an emergency egress from the vicinity of the pad is needed.  The crew members of space shuttle Endeavour's STS-130 mission are at Kennedy for training related to their launch dress rehearsal, the Terminal Countdown Demonstration Test.  The primary payload on STS-130 is the International Space Station's Node 3, Tranquility, a pressurized module that will provide room for many of the station's life support systems. Attached to one end of Tranquility is a cupola, a unique work area with six windows on its sides and one on top.  Endeavour's launch is targeted for Feb. 7.  For information on the STS-130 mission and crew, visit http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts130/index.html.  Photo credit: NASA/Kim Shiflett KSC-2010-1300

CAPE CANAVERAL, Fla. - At NASA's Kennedy Space Center in Florida, STS-...

CAPE CANAVERAL, Fla. - At NASA's Kennedy Space Center in Florida, STS-130 Mission Specialist Stephen Robinson takes his crew and instructor for a ride in an M113 armored personnel carrier during driving practic... More

KENNEDY SPACE CENTER, FLA. --  While in the White Room to complete suiting up before climbing into Space Shuttle Discovery, STS-116 Mission Specialist Nicholas Patrick sends a message home.  In the background is Mission Specialist Christer Fuglesang, who represents the European Space Agency. The White Room is at the end of the orbiter access arm that extends from the fixed service structure and provides entry into the orbiter.  The first launch attempt of STS-116 on Dec. 7 was postponed due a low cloud ceiling over Kennedy Space Center. This second launch attempt is scheduled for 8:47 p.m. This is Discovery's 33rd mission and the first night launch since 2002.   The 20th shuttle mission to the International Space Station, STS-116 carries another truss segment, P5. It will serve as a spacer, mated to the P4 truss that was attached in September.  After installing the P5, the crew will reconfigure and redistribute the power generated by two pairs of U.S. solar arrays. Landing is expected Dec. 21 at KSC.    Photo credit: NASA/Tony Gray & Don Kight KSC-06pp2776

KENNEDY SPACE CENTER, FLA. -- While in the White Room to complete sui...

KENNEDY SPACE CENTER, FLA. -- While in the White Room to complete suiting up before climbing into Space Shuttle Discovery, STS-116 Mission Specialist Nicholas Patrick sends a message home. In the background i... More

CAPE CANAVERAL, Fla. -- After sunset, lights glow on Launch Pad 39A at NASA's Kennedy Space Center in Florida as space shuttle Atlantis awaits delivery of the Raffaello multi-purpose logistics module (MPLM) in its transportation canister. Once delivered, the canister will be lifted to the payload changeout room. The payload ground-handling mechanism then will be used to transfer Raffaello out of the canister into Atlantis' payload bay. Next, the rotating service structure that protects the shuttle from the elements and provides access will be rotated back into place.                Commander Chris Ferguson, Pilot Doug Hurley and Mission Specialists Sandra Magnus and Rex Walheim are targeted to lift off on Atlantis July 8, taking with them the MPLM packed with supplies, logistics and spare parts to the station. The STS-135 mission also will fly a system to investigate the potential for robotically refueling existing satellites and return a failed ammonia pump module to help NASA better understand the failure mechanism and improve pump designs for future systems. STS-135 will be the 33rd flight of Atlantis, the 37th shuttle mission to the space station, and the 135th and final mission of NASA's Space Shuttle Program. For more information visit, www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Frank Michaux KSC-2011-4479

CAPE CANAVERAL, Fla. -- After sunset, lights glow on Launch Pad 39A at...

CAPE CANAVERAL, Fla. -- After sunset, lights glow on Launch Pad 39A at NASA's Kennedy Space Center in Florida as space shuttle Atlantis awaits delivery of the Raffaello multi-purpose logistics module (MPLM) in ... More

KENNEDY SPACE CENTER, FLA. - With the help of the Closeout Crew in the White Room on Launch Pad 39B, STS-114 Commander Eileen Collins adjusts her launch suit before entering Space Shuttle Discovery.  The crew is taking part in a full dress rehearsal for launch, including countdown and culminating in main engine cutoff. The rehearsal is the final part of Terminal Countdown Demonstration Test (TCDT) activities that the crew has been involved in for three days.  TCDT provides the crew of each mission an opportunity to participate in various simulated countdown activities, including equipment familiarization and emergency egress training. STS-114 is the first Return to Flight mission to the International Space Station. The launch window extends July 13 through July 31. KSC-05pp0997

KENNEDY SPACE CENTER, FLA. - With the help of the Closeout Crew in the...

KENNEDY SPACE CENTER, FLA. - With the help of the Closeout Crew in the White Room on Launch Pad 39B, STS-114 Commander Eileen Collins adjusts her launch suit before entering Space Shuttle Discovery. The crew i... More

KENNEDY SPACE CENTER, FLA. -- On Launch Pad 39B, the payload transport canister, with the P6 integrated truss segment inside, is lifted toward the payload changeout room (PCR). The PCR is the enclosed, environmentally controlled portion of the Rotating Service Structure (RSS) (on the left) that supports payload delivery at the pad. At right is Space Shuttle Endeavour with its orange external tank and one solid rocket booster showing behind it. When the RSS is closed around Endeavour, the P6 truss will be able to be moved into the orbiter’s payload bay. The P6, payload on mission STS-97, comprises Solar Array Wing-3 and the Integrated Electronic Assembly, to be installed on the International Space Station. The Station’s electrical power system will use eight photovoltaic solar arrays, each 112 feet long by 39 feet wide, to convert sunlight to electricity. The solar arrays are mounted on a “blanket” that can be folded like an accordion for delivery. Once in orbit, astronauts will deploy the blankets to their full size. Gimbals will be used to rotate the arrays so that they will face the Sun to provide maximum power to the Space Station. Launch of STS-97 is scheduled for Nov. 30 at 10:06 p.m. EST KSC00pp1733

KENNEDY SPACE CENTER, FLA. -- On Launch Pad 39B, the payload transport...

KENNEDY SPACE CENTER, FLA. -- On Launch Pad 39B, the payload transport canister, with the P6 integrated truss segment inside, is lifted toward the payload changeout room (PCR). The PCR is the enclosed, environm... More

CAPE CANAVERAL, Fla. – In Firing Room 4 of the Launch Control Center at NASA's Kennedy Space Center in Florida, Shuttle Launch Director Mike Leinbach, Assistant Launch Director Pete Nickolenko and Flow Director for space shuttle Discovery Stephanie Stilson applaud the successful launch of space shuttle Discovery on the STS-119 mission.  Launch was on time at 7:43 p.m. EDT. The STS-119 mission is the 28th to the space station and Discovery's 36th flight.  Discovery will deliver the final pair of power-generating solar array wings and the S6 truss segment.  Installation of S6 will signal the station's readiness to house a six-member crew for conducting increased science.  Photo credit: NASA/Kim Shiflett KSC-2009-2101

CAPE CANAVERAL, Fla. – In Firing Room 4 of the Launch Control Center a...

CAPE CANAVERAL, Fla. – In Firing Room 4 of the Launch Control Center at NASA's Kennedy Space Center in Florida, Shuttle Launch Director Mike Leinbach, Assistant Launch Director Pete Nickolenko and Flow Director... More

CAPE CANAVERAL, Fla. -   At NASA's Kennedy Space Center in Florida, workers check data on the payload ground handling mechanism, or PGHM, in the Payload Changeout Room on Launch Pad 39A.  The PGHM is being used to transfer the STS-125 mission payload into space shuttle Atlantis’ payload bay. STS-125 is the fifth and final shuttle servicing mission for NASA’s Hubble Space Telescope.  The payload comprises four carriers holding various equipment for the mission. Atlantis is targeted to launch Oct. 14 on the 11-day mission.  Photo credit: NASA/Jack Pfaller KSC-08pd2957

CAPE CANAVERAL, Fla. - At NASA's Kennedy Space Center in Florida, wo...

CAPE CANAVERAL, Fla. - At NASA's Kennedy Space Center in Florida, workers check data on the payload ground handling mechanism, or PGHM, in the Payload Changeout Room on Launch Pad 39A. The PGHM is being used... More

KENNEDY SPACE CENTER, FLA. -- With umbilical lines still attached, the payload canister containing the Columbus Laboratory module and integrated cargo carrier-lite is lifted up toward the payload changeout room on Launch Pad 39A at NASA's Kennedy Space Center.  Once in place, the canister will be opened and the module transferred inside the payload changeout room. The payload will be installed in space shuttle Atlantis' payload bay. The canister contains the Columbus Lab module and integrated cargo carrier-lite payloads for space shuttle Atlantis on mission STS-122.  Atlantis is targeted to launch on Dec. 6.  Photo credit: NASA/Dimitri Gerondidakis KSC-07pd3243

KENNEDY SPACE CENTER, FLA. -- With umbilical lines still attached, the...

KENNEDY SPACE CENTER, FLA. -- With umbilical lines still attached, the payload canister containing the Columbus Laboratory module and integrated cargo carrier-lite is lifted up toward the payload changeout room... More

CAPE CANAVERAL, Fla. – On Launch Pad 39A at NASA's Kennedy Space Center in Florida, the orbiter access arm and White Room are extended toward space shuttle Discovery after rollback of the rotating service structure.  Above the external tank is the oxygen vent hood, called the "beanie cap."  The rollback is in preparation for Discovery's liftoff on the STS-119 mission with a crew of seven. The rotating structure provides protected access to the shuttle for changeout and servicing of payloads at the pad. After the RSS is rolled back, the orbiter is ready for fuel cell activation and external tank cryogenic propellant loading operations. The mission is the 28th to the International Space Station and the 125th space shuttle flight.  Discovery will deliver the final pair of power-generating solar array wings and the S6 truss segment.  Installation of S6 will signal the station's readiness to house a six-member crew for conducting increased science.  Liftoff of Discovery is scheduled for 9:20 p.m. EDT on March 11.   Photo credit: NASA/Kim Shiflett KSC-2009-2020

CAPE CANAVERAL, Fla. – On Launch Pad 39A at NASA's Kennedy Space Cente...

CAPE CANAVERAL, Fla. – On Launch Pad 39A at NASA's Kennedy Space Center in Florida, the orbiter access arm and White Room are extended toward space shuttle Discovery after rollback of the rotating service struc... More

CAPE CANAVERAL, Fla. -- A canister, carrying the Raffaello multi-purpose logistics module (MPLM) for space shuttle Atlantis' STS-135 mission to the International Space Station, arrives at Launch Pad 39A at NASA's Kennedy Space Center in Florida. The canister will be lifted to the payload changeout room. The payload ground-handling mechanism then will be used to transfer Raffaello out of the canister into Atlantis' payload bay. Next, the rotating service structure that protects the shuttle from the elements and provides access will be rotated back into place.          Commander Chris Ferguson, Pilot Doug Hurley and Mission Specialists Sandra Magnus and Rex Walheim are targeted to lift off on Atlantis July 8, taking with them the MPLM packed with supplies, logistics and spare parts to the station. The STS-135 mission also will fly a system to investigate the potential for robotically refueling existing satellites and return a failed ammonia pump module to help NASA better understand the failure mechanism and improve pump designs for future systems. STS-135 will be the 33rd flight of Atlantis, the 37th shuttle mission to the space station, and the 135th and final mission of NASA's Space Shuttle Program. For more information visit, www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Dimitri Gerondidakis KSC-2011-4453

CAPE CANAVERAL, Fla. -- A canister, carrying the Raffaello multi-purpo...

CAPE CANAVERAL, Fla. -- A canister, carrying the Raffaello multi-purpose logistics module (MPLM) for space shuttle Atlantis' STS-135 mission to the International Space Station, arrives at Launch Pad 39A at NASA... More

KENNEDY SPACE CENTER, FLA. -  STS-110 Mission Specialist Steven Smith is wished good luck by a member of the Closeout Crew before entering Space Shuttle Atlantis for launch. The White Room provides entry into the cockpit area of the orbiter.  This is Smith's fourth Shuttle flight. STS-110 is carrying the S0 Integrated Truss Structure and Mobile Transporter (MT) on this 13th assembly flight to the International Space Station.  On the 11-day mission, astronauts, including Smith, will make four spacewalks to attach the S0 truss, which will become the backbone of the Space Station, to the U.S. Lab, "Destiny."   The  MT, a space "railcar," is attached to the truss segment and will make its debut run during the flight.  Launch is scheduled for 4:40 p.m. EDT (20:40 GMT) KSC-02pp0477

KENNEDY SPACE CENTER, FLA. - STS-110 Mission Specialist Steven Smith ...

KENNEDY SPACE CENTER, FLA. - STS-110 Mission Specialist Steven Smith is wished good luck by a member of the Closeout Crew before entering Space Shuttle Atlantis for launch. The White Room provides entry into t... More

CAPE CANAVERAL, Fla. -  Space shuttle Endeavour is hard down on Launch Pad 39B.  The shuttle and mobile launcher platform it sits on rest atop the crawler-transporter that carried them from the Vehicle Assembly Building. First motion out of the VAB was at 11:15 p.m. Sept. 18.  At left of the shuttle is the open rotating service structure with the payload changeout room revealed. Endeavour completed the 4.2-mile journey to Launch Pad 39B on Sept. 19 at 6:59 a.m. EDT. For the first time since July 2001, two shuttles are on the launch pads at the same time at the center. Endeavour will stand by at pad B in the unlikely event that a rescue mission is necessary during space shuttle Atlantis' upcoming mission to repair NASA's Hubble Space Telescope, targeted to launch Oct. 10. After Endeavour is cleared from its duty as a rescue spacecraft, it will be moved to Launch Pad 39A for the STS-126 mission to the International Space Station. That flight is targeted for launch Nov. 12. Photo credit: NASA/Dimitri Gerondidakis KSC-08pd2675

CAPE CANAVERAL, Fla. - Space shuttle Endeavour is hard down on Launch...

CAPE CANAVERAL, Fla. - Space shuttle Endeavour is hard down on Launch Pad 39B. The shuttle and mobile launcher platform it sits on rest atop the crawler-transporter that carried them from the Vehicle Assembly... More

CAPE CANAVERAL, Fla. – Inside the Launch Control Center at NASA’s Kennedy Space Center in Florida, workers remove the Public Affairs Office console and chairs from Firing Room 3.    The console will be moved to the Kennedy Space Center Visitor Complex in Florida and will be preserved for use in the space shuttle Atlantis display. During the 30-year history of NASA’s space shuttle launches, Public Affairs Officers sat at the console to provide commentary during shuttle tanking and launches.  Photo credit: NASA/Glenn Benson KSC-2012-2610

CAPE CANAVERAL, Fla. – Inside the Launch Control Center at NASA’s Kenn...

CAPE CANAVERAL, Fla. – Inside the Launch Control Center at NASA’s Kennedy Space Center in Florida, workers remove the Public Affairs Office console and chairs from Firing Room 3. The console will be moved to... More

KENNEDY SPACE CENTER, Fla. --  As the sky grows lighter, , the payload canister (left) with the Integrated Truss Structure Z1 inside is slowly lifted up the side of the Rotating Service Structure to the Payload Changeout Room. There the Z1 truss will be removed and later transferred to Space Shuttle Discovery’s payload bay. The Z1 truss is the first of 10 that will become the backbone of the International Space Station, eventually stretching the length of a football field. Along with its companion payload, the third Pressurized Mating Adapter, the Z1 is scheduled to be launched aboard Discovery Oct. 5 at 9:38 p.m. EDT KSC00pp1355

KENNEDY SPACE CENTER, Fla. -- As the sky grows lighter, , the payload...

KENNEDY SPACE CENTER, Fla. -- As the sky grows lighter, , the payload canister (left) with the Integrated Truss Structure Z1 inside is slowly lifted up the side of the Rotating Service Structure to the Payload... More

Previous

of 40

Next