science racks

160 media by topicpage 1 of 2
CAPE CANAVERAL, Fla. –  Space shuttle Discovery rolls to the Vehicle Assembly Building at NASA's Kennedy Space Center, Fla. The first motion of the shuttle out from Orbiter Processing Facility 3 was at 7:22 a.m. EDT. In the VAB, Discovery will be lifted into High Bay 1 and mated to the external fuel tank and solid rocket boosters already installed on the mobile launcher platform.  The shuttle is scheduled to roll out to Launch Pad 39A the first week of   August to prepare for the STS-128 mission to the International Space Station.  Discovery will carry the Leonardo Multi-Purpose Logistics Module containing life support racks and science racks and the Lightweight Multi-Purpose Experiment Support Structure Carrier in its payload bay.  Launch of Discovery is targeted for late August.  Photo credit: NASA/Kim Shiflett KSC-2009-4241

CAPE CANAVERAL, Fla. – Space shuttle Discovery rolls to the Vehicle A...

CAPE CANAVERAL, Fla. – Space shuttle Discovery rolls to the Vehicle Assembly Building at NASA's Kennedy Space Center, Fla. The first motion of the shuttle out from Orbiter Processing Facility 3 was at 7:22 a.m... More

CAPE CANAVERAL, Fla. – Brilliant flames spread light across Launch Pad 39A at NASA's Kennedy Space Center in Florida as space shuttle Discovery roars toward space on the STS-128 mission. Liftoff from Launch Pad 39A was on time at 11:59 p.m. EDT. The first launch attempt on Aug. 24 was postponed due to unfavorable weather conditions.  The second attempt on Aug. 25 also was postponed due to an issue with a valve in space shuttle Discovery's main propulsion system.  The STS-128 mission is the 30th International Space Station assembly flight and the 128th space shuttle flight. The 13-day mission will deliver more than 7 tons of supplies, science racks and equipment, as well as additional environmental hardware to sustain six crew members on the International Space Station. The equipment includes a freezer to store research samples, a new sleeping compartment and the COLBERT treadmill.  Photo courtesy of Scott Andrews KSC-2009-4927

CAPE CANAVERAL, Fla. – Brilliant flames spread light across Launch Pad...

CAPE CANAVERAL, Fla. – Brilliant flames spread light across Launch Pad 39A at NASA's Kennedy Space Center in Florida as space shuttle Discovery roars toward space on the STS-128 mission. Liftoff from Launch Pad... More

CAPE CANAVERAL, Fla. – In the Operations and Checkout Building at NASA's Kennedy Space Center in Florida, STS-128 crew members put on their launch-and-entry suits before heading to the Astrovan for the 3.4-mile drive to Launch Pad 39A.  There, crew members will complete their suitup and enter space shuttle Discovery for the 1:36 a.m. EDT liftoff. Seen here is Mission Specialist Nicole Stott, checking communications in her helmet. The 13-day mission will deliver more than 7 tons of supplies, science racks and equipment, as well as additional environmental hardware to sustain six crew members on the International Space Station. The equipment includes a freezer to store research samples, a new sleeping compartment and the COLBERT treadmill.  The mission is the 128th in the Space Shuttle Program, the 37th flight of Discovery and the 30th station assembly flight.  Photo credit: NASA/Kim Shiflett KSC-2009-4824

CAPE CANAVERAL, Fla. – In the Operations and Checkout Building at NASA...

CAPE CANAVERAL, Fla. – In the Operations and Checkout Building at NASA's Kennedy Space Center in Florida, STS-128 crew members put on their launch-and-entry suits before heading to the Astrovan for the 3.4-mile... More

CAPE CANAVERAL, Fla. –  In NASA Kennedy Space Center's Firing Room 4, STS-128  Launch Director Pete Nickolenko waits for the launch of space shuttle Discovery on the STS-128 mission. Liftoff from Launch Pad 39A was on time at 11:59 p.m. EDT. The first launch attempt on Aug. 24 was postponed due to unfavorable weather conditions.  The second attempt on Aug. 25 also was postponed due to an issue with a valve in space shuttle Discovery's main propulsion system.  The STS-128 mission is the 30th International Space Station assembly flight and the 128th space shuttle flight. The 13-day mission will deliver more than 7 tons of supplies, science racks and equipment, as well as additional environmental hardware to sustain six crew members on the International Space Station. The equipment includes a freezer to store research samples, a new sleeping compartment and the COLBERT treadmill.  Photo credit: NASA/Kim Shiflett KSC-2009-4901

CAPE CANAVERAL, Fla. – In NASA Kennedy Space Center's Firing Room 4, ...

CAPE CANAVERAL, Fla. – In NASA Kennedy Space Center's Firing Room 4, STS-128 Launch Director Pete Nickolenko waits for the launch of space shuttle Discovery on the STS-128 mission. Liftoff from Launch Pad 39A... More

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility Bay 3 at NASA's Kennedy Space Center in Florida, a crane lifts the gaseous nitrogen tank from space shuttle Discovery's payload bay with the aid of a "fish pole" lifting fixture.  The tank is being removed during processing for the shuttle's STS-131 mission to the International Space Station.    The tanks are used for atmosphere conditioning and for moving potable water in the crew module.  The seven-member STS-131 crew will deliver a Multi-Purpose Logistics Module filled with science racks to be transferred to laboratories on the station.  Three spacewalks will include work to attach a spare ammonia tank assembly to the station's exterior and return a European experiment from outside the station's Columbus module. This will be the 33rd shuttle mission to the station. Launch is targeted for March 18, 2010.  Photo credit: NASA/Troy Cryder KSC-2009-6101

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility Bay 3 at NASA's ...

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility Bay 3 at NASA's Kennedy Space Center in Florida, a crane lifts the gaseous nitrogen tank from space shuttle Discovery's payload bay with the aid of a "fish ... More

CAPE CANAVERAL, Fla. –  In the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida, the 250-ton high bay crane suspends space shuttle Discovery above the transfer aisle, ready to lift the shuttle into the upper levels and lower it into High Bay 1. Visible on Discovery's underside are the umbilical areas, the external fuel tank attach points. In High Bay 1, Discovery will be attached to the external tank and solid rocket boosters already stacked on the mobile launcher platform.  Discovery is scheduled to roll out to Launch Pad 39A the first week of August to prepare for the STS-128 mission to the International Space Station.  The shuttle will carry the Leonardo Multi-Purpose Logistics Module containing life support racks and science racks and the Lightweight Multi-Purpose Experiment Support Structure Carrier in its payload bay.  Launch of Discovery is targeted for late August.  Photo credit: NASA/Ben Smegelsky KSC-2009-4251

CAPE CANAVERAL, Fla. – In the Vehicle Assembly Building at NASA's Ken...

CAPE CANAVERAL, Fla. – In the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida, the 250-ton high bay crane suspends space shuttle Discovery above the transfer aisle, ready to lift the shuttl... More

CAPE CANAVERAL, Fla. – Brilliant flames spread light across Launch Pad 39A at NASA's Kennedy Space Center in Florida as space shuttle Discovery roars toward space on the STS-128 mission. Liftoff from Launch Pad 39A was on time at 11:59 p.m. EDT. The first launch attempt on Aug. 24 was postponed due to unfavorable weather conditions. The second attempt on Aug. 25 also was postponed due to an issue with a valve in space shuttle Discovery's main propulsion system. The STS-128 mission is the 30th International Space Station assembly flight and the 128th space shuttle flight. The 13-day mission will deliver more than 7 tons of supplies, science racks and equipment, as well as additional environmental hardware to sustain six crew members on the International Space Station. The equipment includes a freezer to store research samples, a new sleeping compartment and the COLBERT treadmill. Photo credit: NASA/Tony Gray-Tom Farrar KSC-2009-4921

CAPE CANAVERAL, Fla. – Brilliant flames spread light across Launch Pad...

CAPE CANAVERAL, Fla. – Brilliant flames spread light across Launch Pad 39A at NASA's Kennedy Space Center in Florida as space shuttle Discovery roars toward space on the STS-128 mission. Liftoff from Launch Pad... More

CAPE CANAVERAL, Fla. – In the Press Site auditorium at NASA's Kennedy Space Center in Florida, NASA managers brief the media following the scrub of a launch attempt of space shuttle Discovery. From left are briefing moderator Allard Beutel, Mission Management Team Chair Mike Moses and STS-128 Launch Director Pete Nickolenko.  The launch attempt was scrubbed due to a problem with a liquid hydrogen valve in the main propulsion system. Liftoff now is no earlier than 12:22 a.m. EDT on Aug. 28.The 13-day STS-128 mission will deliver more than seven tons of supplies, science racks and equipment, as well as additional environmental hardware to sustain six crew members on the International Space Station. The equipment includes a freezer to store research samples, a new sleeping compartment and the COLBERT treadmill.  The mission is the 128th in the Space Shuttle Program, the 37th flight of Discovery and the 30th station assembly flight.  Photo credit: NASA/Cory Huston KSC-2009-4866

CAPE CANAVERAL, Fla. – In the Press Site auditorium at NASA's Kennedy ...

CAPE CANAVERAL, Fla. – In the Press Site auditorium at NASA's Kennedy Space Center in Florida, NASA managers brief the media following the scrub of a launch attempt of space shuttle Discovery. From left are bri... More

CAPE CANAVERAL, Fla. – --  The STS-128 crew members pause in front of the Astrovan that will take them to Launch Pad 39A.  From left are Mission Specialists Danny Olivas, Nicole Stott, Christer Fuglesang, Jose Hernandez and Patrick Forrester, Pilot Kevin Ford and Commander Rick Sturckow. At the pad, the astronauts will complete their suit-up and enter space shuttle Discovery for the 11:59 p.m. EDT liftoff. The first launch attempt on Aug. 24 was postponed due to unfavorable weather conditions.  The second attempt on Aug. 25 also was postponed due to an issue with a valve in space shuttle Discovery's main propulsion system. The 13-day mission will deliver more than 7 tons of supplies, science racks and equipment, as well as additional environmental hardware to sustain six crew members on the International Space Station. The equipment includes a freezer to store research samples, a new sleeping compartment and the COLBERT treadmill.  The mission is the 128th in the Space Shuttle Program, the 37th flight of Discovery and the 30th station assembly flight.  Photo credit: NASA/Kim Shiflett KSC-2009-4890

CAPE CANAVERAL, Fla. – -- The STS-128 crew members pause in front of ...

CAPE CANAVERAL, Fla. – -- The STS-128 crew members pause in front of the Astrovan that will take them to Launch Pad 39A. From left are Mission Specialists Danny Olivas, Nicole Stott, Christer Fuglesang, Jose ... More

CAPE CANAVERAL, Fla. –  On Launch Pad 39A at NASA's Kennedy Space Center in Florida, the Closeout Crew in the White Room help STS-128 crew members complete their suit-up before entering space shuttle Discovery for the 11:59 p.m. EDT liftoff.  Seen here at center is Mission Specialist Patrick Forrester.  Near Discovery's hatch at right is Mission Specialist Danny Olivas. The first launch attempt on Aug. 24 was postponed due to unfavorable weather conditions.  The second attempt on Aug. 25 also was postponed due to an issue with a valve in space shuttle Discovery's main propulsion system.  The STS-128 mission is the 30th International Space Station assembly flight and the 128th space shuttle flight. The 13-day mission will deliver more than 7 tons of supplies, science racks and equipment, as well as additional environmental hardware to sustain six crew members on the International Space Station. The equipment includes a freezer to store research samples, a new sleeping compartment and the COLBERT treadmill.  Photo credit: NASA/Sandra Joseph-Kevin O'Connell KSC-2009-4960

CAPE CANAVERAL, Fla. – On Launch Pad 39A at NASA's Kennedy Space Cent...

CAPE CANAVERAL, Fla. – On Launch Pad 39A at NASA's Kennedy Space Center in Florida, the Closeout Crew in the White Room help STS-128 crew members complete their suit-up before entering space shuttle Discovery ... More

CAPE CANAVERAL, Fla. – Billows of smoke and steam rise alongside space shuttle Discovery as it lifts off Launch Pad 39A at NASA's Kennedy Space Center in Florida, racing toward space on the STS-128 mission. Liftoff was on time at 11:59 p.m. EDT. The first launch attempt on Aug. 24 was postponed due to unfavorable weather conditions.  The second attempt on Aug. 25 also was postponed due to an issue with a valve in space shuttle Discovery's main propulsion system.  The STS-128 mission is the 30th International Space Station assembly flight and the 128th space shuttle flight. The 13-day mission will deliver more than 7 tons of supplies, science racks and equipment, as well as additional environmental hardware to sustain six crew members on the International Space Station. The equipment includes a freezer to store research samples, a new sleeping compartment and the COLBERT treadmill.  Photo credit: NASA/Tony Gray-Tom Farrar KSC-2009-4937

CAPE CANAVERAL, Fla. – Billows of smoke and steam rise alongside space...

CAPE CANAVERAL, Fla. – Billows of smoke and steam rise alongside space shuttle Discovery as it lifts off Launch Pad 39A at NASA's Kennedy Space Center in Florida, racing toward space on the STS-128 mission. Lif... More

CAPE CANAVERAL, Fla. –  After rollover from Orbiter Processing Facility 3 at NASA's Kennedy Space Center, Fla., to the transfer aisle of the Vehicle Assembly Building, space shuttle Discovery is being raised to vertical.  It will be lifted into High Bay 1 where it will be mated to the external fuel tank and solid rocket boosters already installed on the mobile launcher platform.  The shuttle is scheduled to roll out to Launch Pad 39A the first week of August to prepare for the STS-128 mission to the International Space Station.  Discovery will carry the Leonardo Multi-Purpose Logistics Module containing life support racks and science racks and the Lightweight Multi-Purpose Experiment Support Structure Carrier in its payload bay.  Launch of Discovery is targeted for late August.  Photo credit: NASA/Kim Shiflett KSC-2009-4247

CAPE CANAVERAL, Fla. – After rollover from Orbiter Processing Facilit...

CAPE CANAVERAL, Fla. – After rollover from Orbiter Processing Facility 3 at NASA's Kennedy Space Center, Fla., to the transfer aisle of the Vehicle Assembly Building, space shuttle Discovery is being raised to... More

CAPE CANAVERAL, Fla. –  In the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida, the 250-ton high bay crane moves space shuttle Discovery toward the external fuel tank (foreground, left) and solid rocket boosters (lower right) in High Bay 1. The shuttle will be lowered into the bay and attached to the external tank and SRBs already stacked on the mobile launcher platform. Discovery is scheduled to roll out to Launch Pad 39A the first week of August to prepare for the STS-128 mission to the International Space Station.  The shuttle will carry the Leonardo Multi-Purpose Logistics Module containing life support racks and science racks and the Lightweight Multi-Purpose Experiment Support Structure Carrier in its payload bay.  Launch of Discovery is targeted for late August.  Photo credit: NASA/Ben Smegelsky KSC-2009-4253

CAPE CANAVERAL, Fla. – In the Vehicle Assembly Building at NASA's Ken...

CAPE CANAVERAL, Fla. – In the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida, the 250-ton high bay crane moves space shuttle Discovery toward the external fuel tank (foreground, left) and ... More

CAPE CANAVERAL, Fla. – In High Bay 1 of the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida, space shuttle Discovery is lowered onto the mobile launcher platform, or MLP.  It is in front of the external fuel tank and solid rocket boosters on either side that are already secured there.  The shuttle will be attached to the external tank on the MLP.  Discovery is scheduled to roll out to Launch Pad 39A the first week of August to prepare for the STS-128 mission to the International Space Station.  The shuttle will carry the Leonardo Multi-Purpose Logistics Module containing life support racks and science racks and the Lightweight Multi-Purpose Experiment Support Structure Carrier in its payload bay.  Launch of Discovery is targeted for late August.  Photo credit: NASA/Ben Smegelsky KSC-2009-4257

CAPE CANAVERAL, Fla. – In High Bay 1 of the Vehicle Assembly Building ...

CAPE CANAVERAL, Fla. – In High Bay 1 of the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida, space shuttle Discovery is lowered onto the mobile launcher platform, or MLP. It is in front of ... More

CAPE CANAVERAL, Fla. –  Space shuttle Discovery rolls toward the Vehicle Assembly Building (in the background) at NASA's Kennedy Space Center, Fla. The first motion of the shuttle out of Orbiter Processing Facility 3 was at 7:22 a.m. EDT. In the VAB, Discovery will be lifted into High Bay 1 and mated to the external fuel tank and solid rocket boosters already installed on the mobile launcher platform.  The shuttle is scheduled to roll out to Launch Pad 39A the first week of August to prepare for the STS-128 mission to the International Space Station.  Discovery will carry the Leonardo Multi-Purpose Logistics Module containing life support racks and science racks and the Lightweight Multi-Purpose Experiment Support Structure Carrier in its payload bay.  Launch of Discovery is targeted for late August.  Photo credit: NASA/Kim Shiflett KSC-2009-4240

CAPE CANAVERAL, Fla. – Space shuttle Discovery rolls toward the Vehic...

CAPE CANAVERAL, Fla. – Space shuttle Discovery rolls toward the Vehicle Assembly Building (in the background) at NASA's Kennedy Space Center, Fla. The first motion of the shuttle out of Orbiter Processing Faci... More

CAPE CANAVERAL, Fla. –  Space shuttle Discovery begins its move from Orbiter Processing Facility 3 to the Vehicle Assembly Building at NASA's Kennedy Space Center, Fla. The first motion of the shuttle out of its hangar was at 7:22 a.m. EDT. In the VAB, Discovery will be lifted into High Bay 1 and mated to the external fuel tank and solid rocket boosters already installed on the mobile launcher platform. The shuttle is scheduled to roll out to Launch Pad 39A the first week of August to prepare for the STS-128 mission to the International Space Station.  Discovery will carry the Leonardo Multi-Purpose Logistics Module containing life support racks and science racks and the Lightweight Multi-Purpose Experiment Support Structure Carrier in its payload bay.  Launch of Discovery is targeted for late August.  Photo credit: NASA/Kim Shiflett KSC-2009-4237

CAPE CANAVERAL, Fla. – Space shuttle Discovery begins its move from O...

CAPE CANAVERAL, Fla. – Space shuttle Discovery begins its move from Orbiter Processing Facility 3 to the Vehicle Assembly Building at NASA's Kennedy Space Center, Fla. The first motion of the shuttle out of it... More

CAPE CANAVERAL, Fla. –  After rollover from Orbiter Processing Facility 3 at NASA's Kennedy Space Center, Fla., to the transfer aisle of the Vehicle Assembly Building, space shuttle Discovery is being raised to vertical.  It will be lifted into High Bay 1 where it will be mated to the external fuel tank and solid rocket boosters already installed on the mobile launcher platform. The shuttle is scheduled to roll out to Launch Pad 39A the first week of August to prepare for the STS-128 mission to the International Space Station.  Discovery will carry the Leonardo Multi-Purpose Logistics Module containing life support racks and science racks and the Lightweight Multi-Purpose Experiment Support Structure Carrier in its payload bay.  Launch of Discovery is targeted for late August.  Photo credit: NASA/Kim Shiflett KSC-2009-4245

CAPE CANAVERAL, Fla. – After rollover from Orbiter Processing Facilit...

CAPE CANAVERAL, Fla. – After rollover from Orbiter Processing Facility 3 at NASA's Kennedy Space Center, Fla., to the transfer aisle of the Vehicle Assembly Building, space shuttle Discovery is being raised to... More

CAPE CANAVERAL, Fla. –  In the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida, space shuttle Discovery is suspended above the transfer aisle, ready to be lifted into the upper levels and lowered into High Bay 1.  There it will be attached to the external fuel tank and solid rocket boosters already stacked on the mobile launcher platform. Discovery is scheduled to roll out to Launch Pad 39A the first week of August to prepare for the STS-128 mission to the International Space Station.  The shuttle will carry the Leonardo Multi-Purpose Logistics Module containing life support racks and science racks and the Lightweight Multi-Purpose Experiment Support Structure Carrier in its payload bay.  Launch of Discovery is targeted for late August.  Photo credit: NASA/Ben Smegelsky KSC-2009-4250

CAPE CANAVERAL, Fla. – In the Vehicle Assembly Building at NASA's Ken...

CAPE CANAVERAL, Fla. – In the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida, space shuttle Discovery is suspended above the transfer aisle, ready to be lifted into the upper levels and lo... More

CAPE CANAVERAL, Fla. –  In the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida, space shuttle Discovery is lifted toward the upper reaches where it will be moved and lowered into High Bay 1. There it will be attached to the external fuel tank and solid rocket boosters already stacked on the mobile launcher platform.  Discovery is scheduled to roll out to Launch Pad 39A the first week of August to prepare for the STS-128 mission to the International Space Station.  The shuttle will carry the Leonardo Multi-Purpose Logistics Module containing life support racks and science racks and the Lightweight Multi-Purpose Experiment Support Structure Carrier in its payload bay.  Launch of Discovery is targeted for late August.  Photo credit: NASA/Ben Smegelsky KSC-2009-4252

CAPE CANAVERAL, Fla. – In the Vehicle Assembly Building at NASA's Ken...

CAPE CANAVERAL, Fla. – In the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida, space shuttle Discovery is lifted toward the upper reaches where it will be moved and lowered into High Bay 1.... More

CAPE CANAVERAL, Fla. – In High Bay 1 of the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida, the solid rocket boosters flank the external fuel tank that will be attached to space shuttle Discovery.  The SRBs and external tank are already stacked on the mobile launcher platform.  Discovery is scheduled to roll out to Launch Pad 39A the first week of August to prepare for the STS-128 mission to the International Space Station.  The shuttle will carry the Leonardo Multi-Purpose Logistics Module containing life support racks and science racks and the Lightweight Multi-Purpose Experiment Support Structure Carrier in its payload bay.  Launch of Discovery is targeted for late August.  Photo credit: NASA/Ben Smegelsky KSC-2009-4259

CAPE CANAVERAL, Fla. – In High Bay 1 of the Vehicle Assembly Building ...

CAPE CANAVERAL, Fla. – In High Bay 1 of the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida, the solid rocket boosters flank the external fuel tank that will be attached to space shuttle Dis... More

CAPE CANAVERAL, Fla. –  After rollover from Orbiter Processing Facility 3 at NASA's Kennedy Space Center, Fla., to the transfer aisle of the Vehicle Assembly Building, space shuttle Discovery is being raised to vertical.  It will be lifted into High Bay 1 where it will be mated to the external fuel tank and solid rocket boosters already installed on the mobile launcher platform.  The shuttle is scheduled to roll out to Launch Pad 39A the first week of August to prepare for the STS-128 mission to the International Space Station.  Discovery will carry the Leonardo Multi-Purpose Logistics Module containing life support racks and science racks and the Lightweight Multi-Purpose Experiment Support Structure Carrier in its payload bay.  Launch of Discovery is targeted for late August.  Photo credit: NASA/Kim Shiflett KSC-2009-4248

CAPE CANAVERAL, Fla. – After rollover from Orbiter Processing Facilit...

CAPE CANAVERAL, Fla. – After rollover from Orbiter Processing Facility 3 at NASA's Kennedy Space Center, Fla., to the transfer aisle of the Vehicle Assembly Building, space shuttle Discovery is being raised to... More

CAPE CANAVERAL, Fla. –  Space shuttle Discovery rolls from Orbiter Processing Facility 3 to the Vehicle Assembly Building (in the background) at NASA's Kennedy Space Center, Fla. The first motion of the shuttle out of its hangar was at 7:22 a.m. EDT. In the VAB, Discovery will be lifted into High Bay 1 and mated to the external fuel tank and solid rocket boosters already installed on the mobile launcher platform. The shuttle is scheduled to roll out to Launch Pad 39A the first week of August to prepare for the STS-128 mission to the International Space Station.  Discovery will carry the Leonardo Multi-Purpose Logistics Module containing life support racks and science racks and the Lightweight Multi-Purpose Experiment Support Structure Carrier in its payload bay.  Launch of Discovery is targeted for late August.  Photo credit: NASA/Kim Shiflett KSC-2009-4239

CAPE CANAVERAL, Fla. – Space shuttle Discovery rolls from Orbiter Pro...

CAPE CANAVERAL, Fla. – Space shuttle Discovery rolls from Orbiter Processing Facility 3 to the Vehicle Assembly Building (in the background) at NASA's Kennedy Space Center, Fla. The first motion of the shuttle... More

CAPE CANAVERAL, Fla. – In High Bay 1 of the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida, the external fuel tank is in position to be attached to space shuttle Discovery on the mobile launcher platform.  Discovery is scheduled to roll out to Launch Pad 39A the first week of August to prepare for the STS-128 mission to the International Space Station.  The shuttle will carry the Leonardo Multi-Purpose Logistics Module containing life support racks and science racks and the Lightweight Multi-Purpose Experiment Support Structure Carrier in its payload bay.  Launch of Discovery is targeted for late August.  Photo credit: NASA/Ben Smegelsky KSC-2009-4260

CAPE CANAVERAL, Fla. – In High Bay 1 of the Vehicle Assembly Building ...

CAPE CANAVERAL, Fla. – In High Bay 1 of the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida, the external fuel tank is in position to be attached to space shuttle Discovery on the mobile lau... More

CAPE CANAVERAL, Fla. – Space shuttle Discovery is lowered toward the external fuel tank in High Bay 1 of the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida.  Discovery will be attached to the external and solid rocket boosters already stacked on the mobile launcher platform. Visible on Discovery's underside are the umbilical areas, the external fuel tank attach points. Discovery is scheduled to roll out to Launch Pad 39A the first week of August to prepare for the STS-128 mission to the International Space Station.  The shuttle will carry the Leonardo Multi-Purpose Logistics Module containing life support racks and science racks and the Lightweight Multi-Purpose Experiment Support Structure Carrier in its payload bay.  Launch of Discovery is targeted for late August.  Photo credit: NASA/Ben Smegelsky KSC-2009-4256

CAPE CANAVERAL, Fla. – Space shuttle Discovery is lowered toward the e...

CAPE CANAVERAL, Fla. – Space shuttle Discovery is lowered toward the external fuel tank in High Bay 1 of the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida. Discovery will be attached to t... More

CAPE CANAVERAL, Fla. –  Space shuttle Discovery rolls to the Vehicle Assembly Building at NASA's Kennedy Space Center, Fla. The first motion of the shuttle out from Orbiter Processing Facility 3 was at 7:22 a.m. EDT. In the VAB, Discovery will be lifted into High Bay 1 and mated to the external fuel tank and solid rocket boosters already installed on the mobile launcher platform.  The shuttle is scheduled to roll out to Launch Pad 39A the first week of August to prepare for the STS-128 mission to the International Space Station.  Discovery will carry the Leonardo Multi-Purpose Logistics Module containing life support racks and science racks and the Lightweight Multi-Purpose Experiment Support Structure Carrier in its payload bay.  Launch of Discovery is targeted for late August.  Photo credit: NASA/Kim Shiflett KSC-2009-4242

CAPE CANAVERAL, Fla. – Space shuttle Discovery rolls to the Vehicle A...

CAPE CANAVERAL, Fla. – Space shuttle Discovery rolls to the Vehicle Assembly Building at NASA's Kennedy Space Center, Fla. The first motion of the shuttle out from Orbiter Processing Facility 3 was at 7:22 a.m... More

CAPE CANAVERAL, Fla. – In High Bay 1 of the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida, space shuttle Discovery is lowered onto the mobile launcher platform, or MLP.  It is in front of the external fuel tank and solid rocket boosters on either side.  The shuttle will be attached to the external tank on the MLP. Discovery is scheduled to roll out to Launch Pad 39A the first week of August to prepare for the STS-128 mission to the International Space Station.  The shuttle will carry the Leonardo Multi-Purpose Logistics Module containing life support racks and science racks and the Lightweight Multi-Purpose Experiment Support Structure Carrier in its payload bay.  Launch of Discovery is targeted for late August.  Photo credit: NASA/Ben Smegelsky KSC-2009-4258

CAPE CANAVERAL, Fla. – In High Bay 1 of the Vehicle Assembly Building ...

CAPE CANAVERAL, Fla. – In High Bay 1 of the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida, space shuttle Discovery is lowered onto the mobile launcher platform, or MLP. It is in front of ... More

CAPE CANAVERAL, Fla. – Seen from below, space shuttle Discovery is lowered into High Bay 1 of the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida.  In the bay, Discovery will be attached to the external fuel tank and solid rocket boosters already stacked on the mobile launcher platform. Discovery is scheduled to roll out to Launch Pad 39A the first week of August to prepare for the STS-128 mission to the International Space Station.  The shuttle will carry the Leonardo Multi-Purpose Logistics Module containing life support racks and science racks and the Lightweight Multi-Purpose Experiment Support Structure Carrier in its payload bay.  Launch of Discovery is targeted for late August.  Photo credit: NASA/Ben Smegelsky KSC-2009-4254

CAPE CANAVERAL, Fla. – Seen from below, space shuttle Discovery is low...

CAPE CANAVERAL, Fla. – Seen from below, space shuttle Discovery is lowered into High Bay 1 of the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida. In the bay, Discovery will be attached to ... More

CAPE CANAVERAL, Fla. –  Space shuttle Discovery rolls into the Vehicle Assembly Building at NASA's Kennedy Space Center, Fla. The first motion of the shuttle out Orbiter Processing Facility 3 was at 7:22 a.m. EDT. In the VAB, Discovery will be lifted into High Bay 1 and mated to the external fuel tank and solid rocket boosters already installed on the mobile launcher platform.  The shuttle is scheduled to roll out to Launch Pad 39A the first week of August to prepare for the STS-128 mission to the International Space Station.  Discovery will carry the Leonardo Multi-Purpose Logistics Module containing life support racks and science racks and the Lightweight Multi-Purpose Experiment Support Structure Carrier in its payload bay.  Launch of Discovery is targeted for late August.  Photo credit: NASA/Kim Shiflett KSC-2009-4243

CAPE CANAVERAL, Fla. – Space shuttle Discovery rolls into the Vehicle...

CAPE CANAVERAL, Fla. – Space shuttle Discovery rolls into the Vehicle Assembly Building at NASA's Kennedy Space Center, Fla. The first motion of the shuttle out Orbiter Processing Facility 3 was at 7:22 a.m. E... More

CAPE CANAVERAL, Fla. –  Space shuttle Discovery rolls out of Orbiter Processing Facility 3 to the Vehicle Assembly Building at NASA's Kennedy Space Center, Fla. The first motion of the shuttle out of its hangar was at 7:22 a.m. EDT. In the VAB, Discovery will be lifted into High Bay 1 and mated to the external fuel tank and solid rocket boosters already installed on the mobile launcher platform. The shuttle is scheduled to roll out to Launch Pad 39A the first week of August to prepare for the STS-128 mission to the International Space Station.  Discovery will carry the Leonardo Multi-Purpose Logistics Module containing life support racks and science racks and the Lightweight Multi-Purpose Experiment Support Structure Carrier in its payload bay.  Launch of Discovery is targeted for late August.  Photo credit: NASA/Kim Shiflett KSC-2009-4238

CAPE CANAVERAL, Fla. – Space shuttle Discovery rolls out of Orbiter P...

CAPE CANAVERAL, Fla. – Space shuttle Discovery rolls out of Orbiter Processing Facility 3 to the Vehicle Assembly Building at NASA's Kennedy Space Center, Fla. The first motion of the shuttle out of its hangar... More

CAPE CANAVERAL, Fla. –  In the transfer aisle of the Vehicle Assembly Building at NASA's Kennedy Space Center, Fla., space shuttle Discovery is lifted from its transporter.  The shuttle will be raised to vertical and lifted into High Bay 1. The first motion of the shuttle out of Orbiter Processing Facility 3 was at 7:22 a.m. EDT.  Discovery will be mated to the external fuel tank and solid rocket boosters already installed on the mobile launcher platform.  The shuttle is scheduled to roll out to Launch Pad 39A the first week of August to prepare for the STS-128 mission to the International Space Station.  Discovery will carry the Leonardo Multi-Purpose Logistics Module containing life support racks and science racks and the Lightweight Multi-Purpose Experiment Support Structure Carrier in its payload bay.  Launch of Discovery is targeted for late August.  Photo credit: NASA/Kim Shiflett KSC-2009-4244

CAPE CANAVERAL, Fla. – In the transfer aisle of the Vehicle Assembly ...

CAPE CANAVERAL, Fla. – In the transfer aisle of the Vehicle Assembly Building at NASA's Kennedy Space Center, Fla., space shuttle Discovery is lifted from its transporter. The shuttle will be raised to vertic... More

CAPE CANAVERAL, Fla. –  With the 250-ton high bay crane in its upright position, space shuttle Discovery is suspended above the transfer aisle  of the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida.  The shuttle is ready to be lifted into the upper levels and lowered into High Bay 1.  There it will be attached to the external fuel tank and solid rocket boosters already stacked on the mobile launcher platform.  Discovery is scheduled to roll out to Launch Pad 39A the first week of August to prepare for the STS-128 mission to the International Space Station.  The shuttle will carry the Leonardo Multi-Purpose Logistics Module containing life support racks and science racks and the Lightweight Multi-Purpose Experiment Support Structure Carrier in its payload bay.  Launch of Discovery is targeted for late August.  Photo credit: NASA/Ben Smegelsky KSC-2009-4249

CAPE CANAVERAL, Fla. – With the 250-ton high bay crane in its upright...

CAPE CANAVERAL, Fla. – With the 250-ton high bay crane in its upright position, space shuttle Discovery is suspended above the transfer aisle of the Vehicle Assembly Building at NASA's Kennedy Space Center in... More

CAPE CANAVERAL, Fla. –  After rollover from Orbiter Processing Facility 3 at NASA's Kennedy Space Center, Fla., to the transfer aisle of the Vehicle Assembly Building, space shuttle Discovery is being raised to vertical.  It will be lifted into High Bay 1 where it will be mated to the external fuel tank and solid rocket boosters already installed on the mobile launcher platform.  The shuttle is scheduled to roll out to Launch Pad 39A the first week of August to prepare for the STS-128 mission to the International Space Station.  Discovery will carry the Leonardo Multi-Purpose Logistics Module containing life support racks and science racks and the Lightweight Multi-Purpose Experiment Support Structure Carrier in its payload bay.  Launch of Discovery is targeted for late August.  Photo credit: NASA/Kim Shiflett KSC-2009-4246

CAPE CANAVERAL, Fla. – After rollover from Orbiter Processing Facilit...

CAPE CANAVERAL, Fla. – After rollover from Orbiter Processing Facility 3 at NASA's Kennedy Space Center, Fla., to the transfer aisle of the Vehicle Assembly Building, space shuttle Discovery is being raised to... More

CAPE CANAVERAL, Fla. – In the Operations and Checkout Building at NASA's Kennedy Space Center in Florida, STS-128 crew members put on their launch-and-entry suits before heading to the Astrovan for the 3.4-mile drive to Launch Pad 39A.  There, crew members will complete their suitup and enter space shuttle Discovery for the 1:36 a.m. EDT liftoff. Seen here is Mission Specialist Nicole Stott, who is making her first shuttle flight.  The 13-day mission will deliver more than 7 tons of supplies, science racks and equipment, as well as additional environmental hardware to sustain six crew members on the International Space Station. The equipment includes a freezer to store research samples, a new sleeping compartment and the COLBERT treadmill.  The mission is the 128th in the Space Shuttle Program, the 37th flight of Discovery and the 30th station assembly flight.  Photo credit: NASA/Kim Shiflett KSC-2009-4822

CAPE CANAVERAL, Fla. – In the Operations and Checkout Building at NASA...

CAPE CANAVERAL, Fla. – In the Operations and Checkout Building at NASA's Kennedy Space Center in Florida, STS-128 crew members put on their launch-and-entry suits before heading to the Astrovan for the 3.4-mile... More

CAPE CANAVERAL, Fla. –  In the Operations and Checkout Building at NASA's Kennedy Space Center in Florida, STS-128 crew members put on their launch-and-entry suits before heading to the Astrovan for the 3.4-mile drive to Launch Pad 39A.  There, crew members will complete their suitup and enter space shuttle Discovery for the 1:36 a.m. EDT liftoff. Seen here, Pilot Kevin Ford has the helmet communication system connected.  The 13-day mission will deliver more than 7 tons of supplies, science racks and equipment, as well as additional environmental hardware to sustain six crew members on the International Space Station. The equipment includes a freezer to store research samples, a new sleeping compartment and the COLBERT treadmill.  The mission is the 128th in the Space Shuttle Program, the 37th flight of Discovery and the 30th station assembly flight.  Photo credit: NASA/Kim Shiflett KSC-2009-4834

CAPE CANAVERAL, Fla. – In the Operations and Checkout Building at NAS...

CAPE CANAVERAL, Fla. – In the Operations and Checkout Building at NASA's Kennedy Space Center in Florida, STS-128 crew members put on their launch-and-entry suits before heading to the Astrovan for the 3.4-mil... More

CAPE CANAVERAL, Fla. – The STS-128 crew members pause in front of the Astrovan that will take them to Launch Pad 39A.  From left are Mission Specialists Danny Olivas, Nicole Stott, Christer Fuglesang, Jose Hernandez and Patrick Forrester, Pilot Kevin Ford and Commander Rick Sturckow. At the pad, the astronauts will complete their suitup and enter space shuttle Discovery for the 1:36 a.m. EDT liftoff.  The 13-day mission will deliver more than 7 tons of supplies, science racks and equipment, as well as additional environmental hardware to sustain six crew members on the International Space Station. The equipment includes a freezer to store research samples, a new sleeping compartment and the COLBERT treadmill.  The mission is the 128th in the Space Shuttle Program, the 37th flight of Discovery and the 30th station assembly flight.  Photo credit: NASA/Kim Shiflett KSC-2009-4838

CAPE CANAVERAL, Fla. – The STS-128 crew members pause in front of the ...

CAPE CANAVERAL, Fla. – The STS-128 crew members pause in front of the Astrovan that will take them to Launch Pad 39A. From left are Mission Specialists Danny Olivas, Nicole Stott, Christer Fuglesang, Jose Hern... More

CAPE CANAVERAL, Fla. – In the Operations and Checkout Building at NASA's Kennedy Space Center in Florida, STS-128 crew members put on their launch-and-entry suits before heading to the Astrovan for the 3.4-mile drive to Launch Pad 39A.  There, crew members will complete their suitup and enter space shuttle Discovery for the 1:36 a.m. EDT liftoff. Seen here, Commander Rick Sturckow has  his helmet communications system connected. The 13-day mission will deliver more than 7 tons of supplies, science racks and equipment, as well as additional environmental hardware to sustain six crew members on the International Space Station. The equipment includes a freezer to store research samples, a new sleeping compartment and the COLBERT treadmill.  The mission is the 128th in the Space Shuttle Program, the 37th flight of Discovery and the 30th station assembly flight.  Photo credit: NASA/Kim Shiflett KSC-2009-4831

CAPE CANAVERAL, Fla. – In the Operations and Checkout Building at NASA...

CAPE CANAVERAL, Fla. – In the Operations and Checkout Building at NASA's Kennedy Space Center in Florida, STS-128 crew members put on their launch-and-entry suits before heading to the Astrovan for the 3.4-mile... More

CAPE CANAVERAL, Fla. – In the Operations and Checkout Building at NASA's Kennedy Space Center in Florida, STS-128 crew members put on their launch-and-entry suits before heading to the Astrovan for the 3.4-mile drive to Launch Pad 39A.  There, crew members will complete their suitup and enter space shuttle Discovery for the 1:36 a.m. EDT liftoff. Seen here is Mission Specialist Danny Olivas, who is making his second shuttle flight. The 13-day mission will deliver more than 7 tons of supplies, science racks and equipment, as well as additional environmental hardware to sustain six crew members on the International Space Station. The equipment includes a freezer to store research samples, a new sleeping compartment and the COLBERT treadmill.  The mission is the 128th in the Space Shuttle Program, the 37th flight of Discovery and the 30th station assembly flight.  Photo credit: NASA/Kim Shiflett KSC-2009-4823

CAPE CANAVERAL, Fla. – In the Operations and Checkout Building at NASA...

CAPE CANAVERAL, Fla. – In the Operations and Checkout Building at NASA's Kennedy Space Center in Florida, STS-128 crew members put on their launch-and-entry suits before heading to the Astrovan for the 3.4-mile... More

CAPE CANAVERAL, Fla. – In the Operations and Checkout Building at NASA's Kennedy Space Center in Florida, STS-128 crew members put on their launch-and-entry suits before heading to the Astrovan for the 3.4-mile drive to Launch Pad 39A.  There, crew members will complete their suitup and enter space shuttle Discovery for the 1:36 a.m. EDT liftoff. Here, Mission Specialist Christer Fuglesang, gets connected with the communications system in his helmet. The 13-day mission will deliver more than 7 tons of supplies, science racks and equipment, as well as additional environmental hardware to sustain six crew members on the International Space Station. The equipment includes a freezer to store research samples, a new sleeping compartment and the COLBERT treadmill.  The mission is the 128th in the Space Shuttle Program, the 37th flight of Discovery and the 30th station assembly flight.  Photo credit: NASA/Kim Shiflett KSC-2009-4826

CAPE CANAVERAL, Fla. – In the Operations and Checkout Building at NASA...

CAPE CANAVERAL, Fla. – In the Operations and Checkout Building at NASA's Kennedy Space Center in Florida, STS-128 crew members put on their launch-and-entry suits before heading to the Astrovan for the 3.4-mile... More

CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, STS-128 crew members pose for the traditional portrait on launch day. From left are Mission Specialists Nicole Stott, Christer Fuglesang, John "Danny" Olivas, Jose Hernandez, and Patrick Forrester; Pilot Kevin Ford; and Commander Rick Sturckow.  Next, the crew will suit up and then head to the Astrovan for the 3.4-mile drive to Launch Pad 39A. Liftoff aboard space shuttle Discovery is scheduled for 1:36 a.m. EDT Aug. 25.    The 13-day mission will deliver more than 7 tons of supplies, science racks and equipment, as well as additional environmental hardware to sustain six crew members on the International Space Station. The equipment includes a freezer to store research samples, a new sleeping compartment and the COLBERT treadmill.  The mission is the 128th in the Space Shuttle Program, the 37th flight of Discovery and the 30th station assembly flight.  Photo credit: NASA/Kim Shiflett KSC-2009-4820

CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, STS-...

CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, STS-128 crew members pose for the traditional portrait on launch day. From left are Mission Specialists Nicole Stott, Christer Fuglesang, John "... More

CAPE CANAVERAL, Fla. – In the Operations and Checkout Building at NASA's Kennedy Space Center in Florida, STS-128 crew members put on their launch-and-entry suits before heading to the Astrovan for the 3.4-mile drive to Launch Pad 39A.  There, crew members will complete their suitup and enter space shuttle Discovery for the 1:36 a.m. EDT liftoff. Seen here, Mission Specialist Danny Olivas signals he is ready for launch.  The 13-day mission will deliver more than 7 tons of supplies, science racks and equipment, as well as additional environmental hardware to sustain six crew members on the International Space Station. The equipment includes a freezer to store research samples, a new sleeping compartment and the COLBERT treadmill.  The mission is the 128th in the Space Shuttle Program, the 37th flight of Discovery and the 30th station assembly flight.  Photo credit: NASA/Kim Shiflett KSC-2009-4827

CAPE CANAVERAL, Fla. – In the Operations and Checkout Building at NASA...

CAPE CANAVERAL, Fla. – In the Operations and Checkout Building at NASA's Kennedy Space Center in Florida, STS-128 crew members put on their launch-and-entry suits before heading to the Astrovan for the 3.4-mile... More

CAPE CANAVERAL, Fla. –In the Operations and Checkout Building at NASA's Kennedy Space Center in Florida, STS-128 crew members put on their launch-and-entry suits before heading to the Astrovan for the 3.4-mile drive to Launch Pad 39A.  There, crew members will complete their suitup and enter space shuttle Discovery for the 1:36 a.m. EDT liftoff. Seen here is Mission Specialist Jose Hernandez, who is making his first shuttle flight. The 13-day mission will deliver more than 7 tons of supplies, science racks and equipment, as well as additional environmental hardware to sustain six crew members on the International Space Station. The equipment includes a freezer to store research samples, a new sleeping compartment and the COLBERT treadmill.  The mission is the 128th in the Space Shuttle Program, the 37th flight of Discovery and the 30th station assembly flight.  Photo credit: NASA/Kim Shiflett KSC-2009-4832

CAPE CANAVERAL, Fla. –In the Operations and Checkout Building at NASA'...

CAPE CANAVERAL, Fla. –In the Operations and Checkout Building at NASA's Kennedy Space Center in Florida, STS-128 crew members put on their launch-and-entry suits before heading to the Astrovan for the 3.4-mile ... More

CAPE CANAVERAL, Fla. – In the Operations and Checkout Building at NASA's Kennedy Space Center in Florida, STS-128 crew members put on their launch-and-entry suits before heading to the Astrovan for the 3.4-mile drive to Launch Pad 39A.  There, crew members will complete their suitup and enter space shuttle Discovery for the 1:36 a.m. EDT liftoff. Seen here is  Mission Specialist Christer Fuglesang, who is making his second shuttle flight. Fuglesang represents the European Space Agency. The 13-day mission will deliver more than 7 tons of supplies, science racks and equipment, as well as additional environmental hardware to sustain six crew members on the International Space Station. The equipment includes a freezer to store research samples, a new sleeping compartment and the COLBERT treadmill.  The mission is the 128th in the Space Shuttle Program, the 37th flight of Discovery and the 30th station assembly flight.  Photo credit: NASA/Kim Shiflett KSC-2009-4825

CAPE CANAVERAL, Fla. – In the Operations and Checkout Building at NASA...

CAPE CANAVERAL, Fla. – In the Operations and Checkout Building at NASA's Kennedy Space Center in Florida, STS-128 crew members put on their launch-and-entry suits before heading to the Astrovan for the 3.4-mile... More

CAPE CANAVERAL, Fla. – The STS-128 crew members eagerly exit NASA Kennedy Space Center's Operations and Checkout Building to head to the Astrovan for the 3.4-mile drive to Launch Pad 39A. Clockwise from left are  Pilot Kevin Ford, Mission Specialists Jose Fernandez, Nicole Stott, Danny Olivas, Christer Fuglesang and Patrick Forrester, and Commander Rick Sturckow. At the pad, the astronauts will complete their suitup and enter space shuttle Discovery for the 1:36 a.m. EDT liftoff.  The 13-day mission will deliver more than 7 tons of supplies, science racks and equipment, as well as additional environmental hardware to sustain six crew members on the International Space Station. The equipment includes a freezer to store research samples, a new sleeping compartment and the COLBERT treadmill.  The mission is the 128th in the Space Shuttle Program, the 37th flight of Discovery and the 30th station assembly flight.  Photo credit: NASA/Kim Shiflett KSC-2009-4837

CAPE CANAVERAL, Fla. – The STS-128 crew members eagerly exit NASA Kenn...

CAPE CANAVERAL, Fla. – The STS-128 crew members eagerly exit NASA Kennedy Space Center's Operations and Checkout Building to head to the Astrovan for the 3.4-mile drive to Launch Pad 39A. Clockwise from left ar... More

CAPE CANAVERAL, Fla. –  In the Operations and Checkout Building at NASA's Kennedy Space Center in Florida, STS-128 crew members put on their launch-and-entry suits before heading to the Astrovan for the 3.4-mile drive to Launch Pad 39A.  There, crew members will complete their suitup and enter space shuttle Discovery for the 1:36 a.m. EDT liftoff. Seen here, Mission Specialist Jose Fernandez is ready for launch.  The 13-day mission will deliver more than 7 tons of supplies, science racks and equipment, as well as additional environmental hardware to sustain six crew members on the International Space Station. The equipment includes a freezer to store research samples, a new sleeping compartment and the COLBERT treadmill.  The mission is the 128th in the Space Shuttle Program, the 37th flight of Discovery and the 30th station assembly flight.  Photo credit: NASA/Kim Shiflett KSC-2009-4835

CAPE CANAVERAL, Fla. – In the Operations and Checkout Building at NAS...

CAPE CANAVERAL, Fla. – In the Operations and Checkout Building at NASA's Kennedy Space Center in Florida, STS-128 crew members put on their launch-and-entry suits before heading to the Astrovan for the 3.4-mil... More

CAPE CANAVERAL, Fla. – In the Operations and Checkout Building at NASA's Kennedy Space Center in Florida, STS-128 crew members put on their launch-and-entry suits before heading to the Astrovan for the 3.4-mile drive to Launch Pad 39A.  There, crew members will complete their suitup and enter space shuttle Discovery for the 1:36 a.m. EDT liftoff. Seen here, Mission Specialist Patrick Forrester has his helmet communications system connected.  The 13-day mission will deliver more than 7 tons of supplies, science racks and equipment, as well as additional environmental hardware to sustain six crew members on the International Space Station. The equipment includes a freezer to store research samples, a new sleeping compartment and the COLBERT treadmill.  The mission is the 128th in the Space Shuttle Program, the 37th flight of Discovery and the 30th station assembly flight.  Photo credit: NASA/Kim Shiflett KSC-2009-4830

CAPE CANAVERAL, Fla. – In the Operations and Checkout Building at NASA...

CAPE CANAVERAL, Fla. – In the Operations and Checkout Building at NASA's Kennedy Space Center in Florida, STS-128 crew members put on their launch-and-entry suits before heading to the Astrovan for the 3.4-mile... More

CAPE CANAVERAL, Fla. –  In the Operations and Checkout Building at NASA's Kennedy Space Center in Florida, STS-128 crew members put on their launch-and-entry suits before heading to the Astrovan for the 3.4-mile drive to Launch Pad 39A.  There, crew members will complete their suitup and enter space shuttle Discovery for the 1:36 a.m. EDT liftoff. Seen here is Pilot Kevin Ford, who is making his first shuttle flight.  The 13-day mission will deliver more than 7 tons of supplies, science racks and equipment, as well as additional environmental hardware to sustain six crew members on the International Space Station. The equipment includes a freezer to store research samples, a new sleeping compartment and the COLBERT treadmill.  The mission is the 128th in the Space Shuttle Program, the 37th flight of Discovery and the 30th station assembly flight.  Photo credit: NASA/Kim Shiflett KSC-2009-4836

CAPE CANAVERAL, Fla. – In the Operations and Checkout Building at NAS...

CAPE CANAVERAL, Fla. – In the Operations and Checkout Building at NASA's Kennedy Space Center in Florida, STS-128 crew members put on their launch-and-entry suits before heading to the Astrovan for the 3.4-mil... More

CAPE CANAVERAL, Fla. –  Xenon lights over Launch Pad 39A at NASA's Kennedy Space Center in Florida compete with the lightning strike seen to the left.  Space shuttle Discovery is on the pad waiting for a scheduled liftoff on the STS-128 mission.  Launch was scrubbed due to the weather conditions that violated the limitations for liftoff.  Another launch attempt was scheduled for 1:10 a.m. Aug. 26. Discovery's 13-day mission will deliver more than 7 tons of supplies, science racks and equipment, as well as additional environmental hardware to sustain six crew members on the International Space Station. The equipment includes a freezer to store research samples, a new sleeping compartment and the COLBERT treadmill.  The mission is the 128th in the Space Shuttle Program, the 37th flight of Discovery and the 30th station assembly flight.  Photo credit: NASA/Ben Cooper KSC-2009-4839

CAPE CANAVERAL, Fla. – Xenon lights over Launch Pad 39A at NASA's Ken...

CAPE CANAVERAL, Fla. – Xenon lights over Launch Pad 39A at NASA's Kennedy Space Center in Florida compete with the lightning strike seen to the left. Space shuttle Discovery is on the pad waiting for a schedu... More

CAPE CANAVERAL, Fla. – In the Press Site auditorium at NASA's Kennedy Space Center in Florida, NASA managers brief the media following the scrub of a launch attempt of space shuttle Discovery. From left are Mission Management Team Chair Mike Moses and STS-128 Launch Director Pete Nickolenko.  The launch attempt was scrubbed due to a problem with a liquid hydrogen valve in the main propulsion system. Liftoff now is no earlier than 12:22 a.m. EDT on Aug. 28.The 13-day STS-128 mission will deliver more than seven tons of supplies, science racks and equipment, as well as additional environmental hardware to sustain six crew members on the International Space Station. The equipment includes a freezer to store research samples, a new sleeping compartment and the COLBERT treadmill.  The mission is the 128th in the Space Shuttle Program, the 37th flight of Discovery and the 30th station assembly flight.  Photo credit: NASA/Cory Huston KSC-2009-4865

CAPE CANAVERAL, Fla. – In the Press Site auditorium at NASA's Kennedy ...

CAPE CANAVERAL, Fla. – In the Press Site auditorium at NASA's Kennedy Space Center in Florida, NASA managers brief the media following the scrub of a launch attempt of space shuttle Discovery. From left are Mis... More

CAPE CANAVERAL, Fla. – Racing to space atop a tower of flame, space shuttle Discovery lights the night sky at liftoff, all captured in the water near Launch Pad 39A at NASA's Kennedy Space Center in Florida.  Liftoff from Launch Pad 39A on the STS-128 mission was on time at 11:59 p.m. EDT. The first launch attempt on Aug. 24 was postponed due to unfavorable weather conditions.  The second attempt on Aug. 25 also was postponed due to an issue with a valve in space shuttle Discovery's main propulsion system.  The STS-128 mission is the 30th International Space Station assembly flight and the 128th space shuttle flight. The 13-day mission will deliver more than 7 tons of supplies, science racks and equipment, as well as additional environmental hardware to sustain six crew members on the International Space Station. The equipment includes a freezer to store research samples, a new sleeping compartment and the COLBERT treadmill.  Photo credit: NASA/Tony Gray-Tom Farrar KSC-2009-4934

CAPE CANAVERAL, Fla. – Racing to space atop a tower of flame, space sh...

CAPE CANAVERAL, Fla. – Racing to space atop a tower of flame, space shuttle Discovery lights the night sky at liftoff, all captured in the water near Launch Pad 39A at NASA's Kennedy Space Center in Florida. L... More

CAPE CANAVERAL, Fla. –  On Launch Pad 39A at NASA's Kennedy Space Center in Florida, the Closeout Crew in the White Room help STS-128 crew members complete their suit-up before entering space shuttle Discovery for the 11:59 p.m. EDT liftoff.  Seen here  is Mission Specialist Jose Hernandez.  The first launch attempt on Aug. 24 was postponed due to unfavorable weather conditions.  The second attempt on Aug. 25 also was postponed due to an issue with a valve in space shuttle Discovery's main propulsion system.  The STS-128 mission is the 30th International Space Station assembly flight and the 128th space shuttle flight. The 13-day mission will deliver more than 7 tons of supplies, science racks and equipment, as well as additional environmental hardware to sustain six crew members on the International Space Station. The equipment includes a freezer to store research samples, a new sleeping compartment and the COLBERT treadmill.  Photo credit: NASA/Sandra Joseph-Kevin O'Connell KSC-2009-4962

CAPE CANAVERAL, Fla. – On Launch Pad 39A at NASA's Kennedy Space Cent...

CAPE CANAVERAL, Fla. – On Launch Pad 39A at NASA's Kennedy Space Center in Florida, the Closeout Crew in the White Room help STS-128 crew members complete their suit-up before entering space shuttle Discovery ... More

CAPE CANAVERAL, Fla. –  Riding a tower of flames, space shuttle Discovery lights the night sky as it races toward space on the STS-128 mission.  In the foreground are a few of the dozens of media documenting the event at NASA's Kennedy Space Center in Florida.  Liftoff from Launch Pad 39A was on time at 11:59 p.m. EDT. The first launch attempt on Aug. 24 was postponed due to unfavorable weather conditions.  The second attempt on Aug. 25 also was postponed due to an issue with a valve in space shuttle Discovery's main propulsion system.  The STS-128 mission is the 30th International Space Station assembly flight and the 128th space shuttle flight. The 13-day mission will deliver more than 7 tons of supplies, science racks and equipment, as well as additional environmental hardware to sustain six crew members on the International Space Station. The equipment includes a freezer to store research samples, a new sleeping compartment and the COLBERT treadmill.  Photo credit: NASA/Laurel Lichtenberger KSC-2009-4895

CAPE CANAVERAL, Fla. – Riding a tower of flames, space shuttle Discov...

CAPE CANAVERAL, Fla. – Riding a tower of flames, space shuttle Discovery lights the night sky as it races toward space on the STS-128 mission. In the foreground are a few of the dozens of media documenting th... More

CAPE CANAVERAL, Fla. –   Reflected in the water next to Launch Pad 39A at NASA's Kennedy Space Center in Florida, space shuttle Discovery roars toward space on the STS-128 mission.  Liftoff from Launch Pad 39A was on time at 11:59 p.m. EDT. The first launch attempt on Aug. 24 was postponed due to unfavorable weather conditions.  The second attempt on Aug. 25 also was postponed due to an issue with a valve in space shuttle Discovery's main propulsion system.  The STS-128 mission is the 30th International Space Station assembly flight and the 128th space shuttle flight. The 13-day mission will deliver more than 7 tons of supplies, science racks and equipment, as well as additional environmental hardware to sustain six crew members on the International Space Station. The equipment includes a freezer to store research samples, a new sleeping compartment and the COLBERT treadmill.  Photo credit: NASA/Sandra Joseph-Kevin O'Connell KSC-2009-4918

CAPE CANAVERAL, Fla. – Reflected in the water next to Launch Pad 39A...

CAPE CANAVERAL, Fla. – Reflected in the water next to Launch Pad 39A at NASA's Kennedy Space Center in Florida, space shuttle Discovery roars toward space on the STS-128 mission. Liftoff from Launch Pad 39A ... More

CAPE CANAVERAL, Fla. – The flames beneath space shuttle Discovery at liftoff on the STS-128 mission glow through the rising clouds of smoke and steam on NASA  Kennedy Space Center's Launch Pad 39A. Liftoff from Launch Pad 39A was on time at 11:59 p.m. EDT. The first launch attempt on Aug. 24 was postponed due to unfavorable weather conditions.  The second attempt on Aug. 25 also was postponed due to an issue with a valve in space shuttle Discovery's main propulsion system.  The STS-128 mission is the 30th International Space Station assembly flight and the 128th space shuttle flight. The 13-day mission will deliver more than 7 tons of supplies, science racks and equipment, as well as additional environmental hardware to sustain six crew members on the International Space Station. The equipment includes a freezer to store research samples, a new sleeping compartment and the COLBERT treadmill.  Photo credit: NASA/Sandra Joseph-Kevin O'Connell KSC-2009-4932

CAPE CANAVERAL, Fla. – The flames beneath space shuttle Discovery at l...

CAPE CANAVERAL, Fla. – The flames beneath space shuttle Discovery at liftoff on the STS-128 mission glow through the rising clouds of smoke and steam on NASA Kennedy Space Center's Launch Pad 39A. Liftoff from... More

CAPE CANAVERAL, Fla. – --  The STS-128 crew members wave to spectators as they pause in front of the Astrovan that will take them to Launch Pad 39A.  From left are Mission Specialists Danny Olivas, Nicole Stott, Christer Fuglesang, Jose Hernandez and Patrick Forrester, Pilot Kevin Ford and Commander Rick Sturckow. At the pad, the astronauts will complete their suit-up and enter space shuttle Discovery for the 11:59 p.m. EDT liftoff. The first launch attempt on Aug. 24 was postponed due to unfavorable weather conditions.  The second attempt on Aug. 25 also was postponed due to an issue with a valve in space shuttle Discovery's main propulsion system. The 13-day mission will deliver more than 7 tons of supplies, science racks and equipment, as well as additional environmental hardware to sustain six crew members on the International Space Station. The equipment includes a freezer to store research samples, a new sleeping compartment and the COLBERT treadmill.  The mission is the 128th in the Space Shuttle Program, the 37th flight of Discovery and the 30th station assembly flight.  Photo courtesy of Scott Andrews KSC-2009-4891

CAPE CANAVERAL, Fla. – -- The STS-128 crew members wave to spectators...

CAPE CANAVERAL, Fla. – -- The STS-128 crew members wave to spectators as they pause in front of the Astrovan that will take them to Launch Pad 39A. From left are Mission Specialists Danny Olivas, Nicole Stott... More

CAPE CANAVERAL, Fla. –  Spewing fiery clouds of smoke over Launch Pad 39A at NASA's Kennedy Space Center in Florida, space shuttle Discovery trails a column of fire as it roars toward space on the STS-128 mission. Liftoff from Launch Pad 39A was on time at 11:59 p.m. EDT. The first launch attempt on Aug. 24 was postponed due to unfavorable weather conditions.  The second attempt on Aug. 25 also was postponed due to an issue with a valve in space shuttle Discovery's main propulsion system.  The STS-128 mission is the 30th International Space Station assembly flight and the 128th space shuttle flight. The 13-day mission will deliver more than 7 tons of supplies, science racks and equipment, as well as additional environmental hardware to sustain six crew members on the International Space Station. The equipment includes a freezer to store research samples, a new sleeping compartment and the COLBERT treadmill.  Photo courtesy of Scott Andrews KSC-2009-4911

CAPE CANAVERAL, Fla. – Spewing fiery clouds of smoke over Launch Pad ...

CAPE CANAVERAL, Fla. – Spewing fiery clouds of smoke over Launch Pad 39A at NASA's Kennedy Space Center in Florida, space shuttle Discovery trails a column of fire as it roars toward space on the STS-128 missi... More

CAPE CANAVERAL, Fla. – Brilliant flames spread light across Launch Pad 39A at NASA's Kennedy Space Center in Florida as space shuttle Discovery roars toward space on the STS-128 mission. Liftoff was on time at 11:59 p.m. EDT. The first launch attempt on Aug. 24 was postponed due to unfavorable weather conditions.  The second attempt on Aug. 25 also was postponed due to an issue with a valve in space shuttle Discovery's main propulsion system.  The STS-128 mission is the 30th International Space Station assembly flight and the 128th space shuttle flight. The 13-day mission will deliver more than 7 tons of supplies, science racks and equipment, as well as additional environmental hardware to sustain six crew members on the International Space Station. The equipment includes a freezer to store research samples, a new sleeping compartment and the COLBERT treadmill.  Photo credit: NASA/Sandra Joseph-Kevin O'Connell KSC-2009-4936

CAPE CANAVERAL, Fla. – Brilliant flames spread light across Launch Pad...

CAPE CANAVERAL, Fla. – Brilliant flames spread light across Launch Pad 39A at NASA's Kennedy Space Center in Florida as space shuttle Discovery roars toward space on the STS-128 mission. Liftoff was on time at ... More

CAPE CANAVERAL, Fla. – In the Operations and Checkout Building at NASA's Kennedy Space Center in Florida, STS-128 crew members put on their launch-and-entry suits before heading to the Astrovan for the 3.4-mile drive to Launch Pad 39A.  There, crew members will complete their suit-up and enter space shuttle Discovery for the 11:59 p.m. EDT liftoff. Seen here, Commander Rick Sturckow signals he is ready for launch.  The first launch attempt on Aug. 24 was postponed due to unfavorable weather conditions.  The second attempt on Aug. 25 also was postponed due to an issue with a valve in space shuttle Discovery's main propulsion system. The 13-day mission will deliver more than 7 tons of supplies, science racks and equipment, as well as additional environmental hardware to sustain six crew members on the International Space Station. The equipment includes a freezer to store research samples, a new sleeping compartment and the COLBERT treadmill.  The mission is the 128th in the Space Shuttle Program, the 37th flight of Discovery and the 30th station assembly flight.  Photo credit: NASA/Kim Shiflett KSC-2009-4878

CAPE CANAVERAL, Fla. – In the Operations and Checkout Building at NASA...

CAPE CANAVERAL, Fla. – In the Operations and Checkout Building at NASA's Kennedy Space Center in Florida, STS-128 crew members put on their launch-and-entry suits before heading to the Astrovan for the 3.4-mile... More

CAPE CANAVERAL, Fla. –   In NASA Kennedy Space Center's Firing Room 4, NASA Administrator Charles Bolden congratulates the mission team for the successful launch of space shuttle Discovery on the STS-128 mission. In the background, at center, is Center Director Bob Cabana. Liftoff from Launch Pad 39A was on time at 11:59 p.m. EDT. The first launch attempt on Aug. 24 was postponed due to unfavorable weather conditions.  The second attempt on Aug. 25 also was postponed due to an issue with a valve in space shuttle Discovery's main propulsion system.  The STS-128 mission is the 30th International Space Station assembly flight and the 128th space shuttle flight. The 13-day mission will deliver more than 7 tons of supplies, science racks and equipment, as well as additional environmental hardware to sustain six crew members on the International Space Station. The equipment includes a freezer to store research samples, a new sleeping compartment and the COLBERT treadmill.  Photo credit: NASA/Kim Shiflett KSC-2009-4907

CAPE CANAVERAL, Fla. – In NASA Kennedy Space Center's Firing Room 4,...

CAPE CANAVERAL, Fla. – In NASA Kennedy Space Center's Firing Room 4, NASA Administrator Charles Bolden congratulates the mission team for the successful launch of space shuttle Discovery on the STS-128 missio... More

CAPE CANAVERAL, Fla. – In the Operations and Checkout Building at NASA's Kennedy Space Center in Florida, STS-128 crew members put on their launch-and-entry suits before heading to the Astrovan for the 3.4-mile drive to Launch Pad 39A.  There, crew members will complete their suit-up and enter space shuttle Discovery for the 11:59 p.m. EDT liftoff. Seen here, Mission  Specialist Jose Hernandez is ready for launch. The first launch attempt on Aug. 24 was postponed due to unfavorable weather conditions.  The second attempt on Aug. 25 also was postponed due to an issue with a valve in space shuttle Discovery's main propulsion system. The 13-day mission will deliver more than 7 tons of supplies, science racks and equipment, as well as additional environmental hardware to sustain six crew members on the International Space Station. The equipment includes a freezer to store research samples, a new sleeping compartment and the COLBERT treadmill.  The mission is the 128th in the Space Shuttle Program, the 37th flight of Discovery and the 30th station assembly flight.  Photo credit: NASA/Kim Shiflett KSC-2009-4884

CAPE CANAVERAL, Fla. – In the Operations and Checkout Building at NASA...

CAPE CANAVERAL, Fla. – In the Operations and Checkout Building at NASA's Kennedy Space Center in Florida, STS-128 crew members put on their launch-and-entry suits before heading to the Astrovan for the 3.4-mile... More

CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, water flows over the mobile launch platform to act as sound suppression during space shuttle Discovery's liftoff from Launch Pad 39A on the STS-128 mission.  Liftoff from Launch Pad 39A was on time at 11:59 p.m. EDT. The first launch attempt on Aug. 24 was postponed due to unfavorable weather conditions.  The second attempt on Aug. 25 also was postponed due to an issue with a valve in space shuttle Discovery's main propulsion system.  The STS-128 mission is the 30th International Space Station assembly flight and the 128th space shuttle flight. The 13-day mission will deliver more than 7 tons of supplies, science racks and equipment, as well as additional environmental hardware to sustain six crew members on the International Space Station. The equipment includes a freezer to store research samples, a new sleeping compartment and the COLBERT treadmill.  Photo credit: NASA/Tony Gray-Tom Farrar KSC-2009-4926

CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, wate...

CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, water flows over the mobile launch platform to act as sound suppression during space shuttle Discovery's liftoff from Launch Pad 39A on the STS-... More

CAPE CANAVERAL, Fla. –Billows of smoke and steam flow across  Launch Pad 39A at NASA's Kennedy Space Center in Florida as space shuttle Discovery lifts off on the STS-128 mission. Liftoff was on time at 11:59 p.m. EDT. The first launch attempt on Aug. 24 was postponed due to unfavorable weather conditions.  The second attempt on Aug. 25 also was postponed due to an issue with a valve in space shuttle Discovery's main propulsion system.  The STS-128 mission is the 30th International Space Station assembly flight and the 128th space shuttle flight. The 13-day mission will deliver more than 7 tons of supplies, science racks and equipment, as well as additional environmental hardware to sustain six crew members on the International Space Station. The equipment includes a freezer to store research samples, a new sleeping compartment and the COLBERT treadmill.  Photo credit: NASA/Tony Gray-Tom Farrar KSC-2009-4939

CAPE CANAVERAL, Fla. –Billows of smoke and steam flow across Launch P...

CAPE CANAVERAL, Fla. –Billows of smoke and steam flow across Launch Pad 39A at NASA's Kennedy Space Center in Florida as space shuttle Discovery lifts off on the STS-128 mission. Liftoff was on time at 11:59 p... More

CAPE CANAVERAL, Fla. – In the Operations and Checkout Building at NASA's Kennedy Space Center in Florida, STS-128 crew members put on their launch-and-entry suits before heading to the Astrovan for the 3.4-mile drive to Launch Pad 39A.  There, crew members will complete their suit-up and enter space shuttle Discovery for the 11:59 p.m. EDT liftoff. Seen here is Mission Specialist Danny Olivas.  The first launch attempt on Aug. 24 was postponed due to unfavorable weather conditions.  The second attempt on Aug. 25 also was postponed due to an issue with a valve in space shuttle Discovery's main propulsion system. The 13-day mission will deliver more than 7 tons of supplies, science racks and equipment, as well as additional environmental hardware to sustain six crew members on the International Space Station. The equipment includes a freezer to store research samples, a new sleeping compartment and the COLBERT treadmill.  The mission is the 128th in the Space Shuttle Program, the 37th flight of Discovery and the 30th station assembly flight.  Photo credit: NASA/Kim Shiflett KSC-2009-4874

CAPE CANAVERAL, Fla. – In the Operations and Checkout Building at NASA...

CAPE CANAVERAL, Fla. – In the Operations and Checkout Building at NASA's Kennedy Space Center in Florida, STS-128 crew members put on their launch-and-entry suits before heading to the Astrovan for the 3.4-mile... More

CAPE CANAVERAL, Fla. – Space shuttle Discovery begins its rise from Launch Pad 39A at NASA's Kennedy Space Center in Florida to head for space on the STS-128 mission. Liftoff was on time at 11:59 p.m. EDT. The first launch attempt on Aug. 24 was postponed due to unfavorable weather conditions.  The second attempt on Aug. 25 also was postponed due to an issue with a valve in space shuttle Discovery's main propulsion system.  The STS-128 mission is the 30th International Space Station assembly flight and the 128th space shuttle flight. The 13-day mission will deliver more than 7 tons of supplies, science racks and equipment, as well as additional environmental hardware to sustain six crew members on the International Space Station. The equipment includes a freezer to store research samples, a new sleeping compartment and the COLBERT treadmill.  Photo credit: NASA/Tony Gray-Tom Farrar KSC-2009-4938

CAPE CANAVERAL, Fla. – Space shuttle Discovery begins its rise from La...

CAPE CANAVERAL, Fla. – Space shuttle Discovery begins its rise from Launch Pad 39A at NASA's Kennedy Space Center in Florida to head for space on the STS-128 mission. Liftoff was on time at 11:59 p.m. EDT. The ... More

CAPE CANAVERAL, Fla. –  On Launch Pad 39A at NASA's Kennedy Space Center in Florida, the Closeout Crew in the White Room help STS-128 crew members complete their suit-up before entering space shuttle Discovery for the 11:59 p.m. EDT liftoff. Seen here at left is Mission Specialist Danny Olivas.  Pilot Kevin Ford is at right, waiting to enter Discovery through the hatch behind him.  The first launch attempt on Aug. 24 was postponed due to unfavorable weather conditions.  The second attempt on Aug. 25 also was postponed due to an issue with a valve in space shuttle Discovery's main propulsion system.  The STS-128 mission is the 30th International Space Station assembly flight and the 128th space shuttle flight. The 13-day mission will deliver more than 7 tons of supplies, science racks and equipment, as well as additional environmental hardware to sustain six crew members on the International Space Station. The equipment includes a freezer to store research samples, a new sleeping compartment and the COLBERT treadmill.  Photo credit: NASA/Sandra Joseph-Kevin O'Connell KSC-2009-4959

CAPE CANAVERAL, Fla. – On Launch Pad 39A at NASA's Kennedy Space Cent...

CAPE CANAVERAL, Fla. – On Launch Pad 39A at NASA's Kennedy Space Center in Florida, the Closeout Crew in the White Room help STS-128 crew members complete their suit-up before entering space shuttle Discovery ... More

CAPE CANAVERAL, Fla. –  On Launch Pad 39A at NASA's Kennedy Space Center in Florida, the Closeout Crew in the White Room help STS-128 crew members complete their suit-up before entering space shuttle Discovery for the 11:59 p.m. EDT liftoff.  Seen here  is Mission Specialist Christer Fuglesang, who represents the European Space Agency.  The first launch attempt on Aug. 24 was postponed due to unfavorable weather conditions.  The second attempt on Aug. 25 also was postponed due to an issue with a valve in space shuttle Discovery's main propulsion system.  The STS-128 mission is the 30th International Space Station assembly flight and the 128th space shuttle flight. The 13-day mission will deliver more than 7 tons of supplies, science racks and equipment, as well as additional environmental hardware to sustain six crew members on the International Space Station. The equipment includes a freezer to store research samples, a new sleeping compartment and the COLBERT treadmill.  Photo credit: NASA/Sandra Joseph-Kevin O'Connell KSC-2009-4961

CAPE CANAVERAL, Fla. – On Launch Pad 39A at NASA's Kennedy Space Cent...

CAPE CANAVERAL, Fla. – On Launch Pad 39A at NASA's Kennedy Space Center in Florida, the Closeout Crew in the White Room help STS-128 crew members complete their suit-up before entering space shuttle Discovery ... More

CAPE CANAVERAL, Fla. –  Spewing fiery clouds of smoke over Launch Pad 39A at NASA's Kennedy Space Center in Florida, space shuttle Discovery trails a column of fire as it roars toward space on the STS-128 mission. Liftoff from Launch Pad 39A was on time at 11:59 p.m. EDT. The first launch attempt on Aug. 24 was postponed due to unfavorable weather conditions.  The second attempt on Aug. 25 also was postponed due to an issue with a valve in space shuttle Discovery's main propulsion system.  The STS-128 mission is the 30th International Space Station assembly flight and the 128th space shuttle flight. The 13-day mission will deliver more than 7 tons of supplies, science racks and equipment, as well as additional environmental hardware to sustain six crew members on the International Space Station. The equipment includes a freezer to store research samples, a new sleeping compartment and the COLBERT treadmill.  Photo credit: NASA/Jeffrey Marino KSC-2009-4912

CAPE CANAVERAL, Fla. – Spewing fiery clouds of smoke over Launch Pad ...

CAPE CANAVERAL, Fla. – Spewing fiery clouds of smoke over Launch Pad 39A at NASA's Kennedy Space Center in Florida, space shuttle Discovery trails a column of fire as it roars toward space on the STS-128 missi... More

CAPE CANAVERAL, Fla. – In the Operations and Checkout Building at NASA's Kennedy Space Center in Florida, STS-128 crew members put on their launch-and-entry suits before heading to the Astrovan for the 3.4-mile drive to Launch Pad 39A.  There, crew members will complete their suit-up and enter space shuttle Discovery for the 11:59 p.m. EDT liftoff. Seen here, Commander Rick is ready for launch.  The first launch attempt on Aug. 24 was postponed due to unfavorable weather conditions.  The second attempt on Aug. 25 also was postponed due to an issue with a valve in space shuttle Discovery's main propulsion system. The 13-day mission will deliver more than 7 tons of supplies, science racks and equipment, as well as additional environmental hardware to sustain six crew members on the International Space Station. The equipment includes a freezer to store research samples, a new sleeping compartment and the COLBERT treadmill.  The mission is the 128th in the Space Shuttle Program, the 37th flight of Discovery and the 30th station assembly flight.  Photo credit: NASA/Kim Shiflett KSC-2009-4885

CAPE CANAVERAL, Fla. – In the Operations and Checkout Building at NASA...

CAPE CANAVERAL, Fla. – In the Operations and Checkout Building at NASA's Kennedy Space Center in Florida, STS-128 crew members put on their launch-and-entry suits before heading to the Astrovan for the 3.4-mile... More

CAPE CANAVERAL, Fla. – In the Operations and Checkout Building at NASA's Kennedy Space Center in Florida, STS-128 crew members put on their launch-and-entry suits before heading to the Astrovan for the 3.4-mile drive to Launch Pad 39A.  There, crew members will complete their suit-up and enter space shuttle Discovery for the 11:59 p.m. EDT liftoff. Seen here, Mission Specialist Danny Olivas puts on his helmet. The first launch attempt on Aug. 24 was postponed due to unfavorable weather conditions.  The second attempt on Aug. 25 also was postponed due to an issue with a valve in space shuttle Discovery's main propulsion system. The 13-day mission will deliver more than 7 tons of supplies, science racks and equipment, as well as additional environmental hardware to sustain six crew members on the International Space Station. The equipment includes a freezer to store research samples, a new sleeping compartment and the COLBERT treadmill.  The mission is the 128th in the Space Shuttle Program, the 37th flight of Discovery and the 30th station assembly flight.  Photo credit: NASA/Kim Shiflett KSC-2009-4879

CAPE CANAVERAL, Fla. – In the Operations and Checkout Building at NASA...

CAPE CANAVERAL, Fla. – In the Operations and Checkout Building at NASA's Kennedy Space Center in Florida, STS-128 crew members put on their launch-and-entry suits before heading to the Astrovan for the 3.4-mile... More

CAPE CANAVERAL, Fla. –  At NASA's Kennedy Space Center in Florida, steam and smoke billow in the light from space shuttle Discovery's fiery launch on the STS-128 mission. Liftoff from Launch Pad 39A was on time at 11:59 p.m. EDT. The first launch attempt on Aug. 24 was postponed due to unfavorable weather conditions.  The second attempt on Aug. 25 also was postponed due to an issue with a valve in space shuttle Discovery's main propulsion system.  The STS-128 mission is the 30th International Space Station assembly flight and the 128th space shuttle flight. The 13-day mission will deliver more than 7 tons of supplies, science racks and equipment, as well as additional environmental hardware to sustain six crew members on the International Space Station. The equipment includes a freezer to store research samples, a new sleeping compartment and the COLBERT treadmill.  Photo credit: NASA/Sandra Joseph-Kevin O'Connell KSC-2009-4913

CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, ste...

CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, steam and smoke billow in the light from space shuttle Discovery's fiery launch on the STS-128 mission. Liftoff from Launch Pad 39A was on time... More

CAPE CANAVERAL, Fla. –  In NASA Kennedy Space Center's Firing Room 4, NASA management watch the console during the countdown toward launch of space shuttle Discovery on the STS-128 mission.  Seated (starting second from left) are Robert Lightfoot, director of NASA's Marshall Space Flight Center; Bob Cabana, director of Kennedy Space Center; Janet Kavandi, deputy director of Flight Crew Operations at Johnson Space Center; John Shannon, Shuttle Program manager (leaning forward); Bill Gerstenmaier, associate administrator for Space Operations; and Chris Scolese, NASA associate administrator. Standing in front of the windows at right is Charles Bolden, NASA Administrator. Liftoff from Launch Pad 39A was on time at 11:59 p.m. EDT. The first launch attempt on Aug. 24 was postponed due to unfavorable weather conditions.  The second attempt on Aug. 25 also was postponed due to an issue with a valve in space shuttle Discovery's main propulsion system.  The STS-128 mission is the 30th International Space Station assembly flight and the 128th space shuttle flight. The 13-day mission will deliver more than 7 tons of supplies, science racks and equipment, as well as additional environmental hardware to sustain six crew members on the International Space Station. The equipment includes a freezer to store research samples, a new sleeping compartment and the COLBERT treadmill.  Photo credit: NASA/Kim Shiflett KSC-2009-4903

CAPE CANAVERAL, Fla. – In NASA Kennedy Space Center's Firing Room 4, ...

CAPE CANAVERAL, Fla. – In NASA Kennedy Space Center's Firing Room 4, NASA management watch the console during the countdown toward launch of space shuttle Discovery on the STS-128 mission. Seated (starting se... More

CAPE CANAVERAL, Fla. –  The water close to Launch Pad 39A at NASA's Kennedy Space Center in Florida captures the brilliance from launch of space shuttle Discovery on the STS-128 mission.  Liftoff from Launch Pad 39A was on time at 11:59 p.m. EDT. The first launch attempt on Aug. 24 was postponed due to unfavorable weather conditions.  The second attempt on Aug. 25 also was postponed due to an issue with a valve in space shuttle Discovery's main propulsion system.  The STS-128 mission is the 30th International Space Station assembly flight and the 128th space shuttle flight. The 13-day mission will deliver more than 7 tons of supplies, science racks and equipment, as well as additional environmental hardware to sustain six crew members on the International Space Station. The equipment includes a freezer to store research samples, a new sleeping compartment and the COLBERT treadmill.  Photo credit: NASA/Tony Gray-Tom Farrar KSC-2009-4919

CAPE CANAVERAL, Fla. – The water close to Launch Pad 39A at NASA's Ke...

CAPE CANAVERAL, Fla. – The water close to Launch Pad 39A at NASA's Kennedy Space Center in Florida captures the brilliance from launch of space shuttle Discovery on the STS-128 mission. Liftoff from Launch Pa... More

CAPE CANAVERAL, Fla. –   In NASA Kennedy Space Center's Firing Room 4, STS-128  Launch Director Pete Nickolenko congratulates and thanks the mission team for the successful launch of space shuttle Discovery on the STS-128 mission. Liftoff from Launch Pad 39A was on time at 11:59 p.m. EDT. The first launch attempt on Aug. 24 was postponed due to unfavorable weather conditions.  The second attempt on Aug. 25 also was postponed due to an issue with a valve in space shuttle Discovery's main propulsion system.  The STS-128 mission is the 30th International Space Station assembly flight and the 128th space shuttle flight. The 13-day mission will deliver more than 7 tons of supplies, science racks and equipment, as well as additional environmental hardware to sustain six crew members on the International Space Station. The equipment includes a freezer to store research samples, a new sleeping compartment and the COLBERT treadmill.  Photo credit: NASA/Kim Shiflett KSC-2009-4905

CAPE CANAVERAL, Fla. – In NASA Kennedy Space Center's Firing Room 4,...

CAPE CANAVERAL, Fla. – In NASA Kennedy Space Center's Firing Room 4, STS-128 Launch Director Pete Nickolenko congratulates and thanks the mission team for the successful launch of space shuttle Discovery on ... More

CAPE CANAVERAL, Fla. – Billows of smoke and steam rise flow across Launch Pad 39A at NASA's Kennedy Space Center in Florida as space shuttle Discovery hurtles toward space on the STS-128 mission.  Liftoff from Launch Pad 39A was on time at 11:59 p.m. EDT. The first launch attempt on Aug. 24 was postponed due to unfavorable weather conditions.  The second attempt on Aug. 25 also was postponed due to an issue with a valve in space shuttle Discovery's main propulsion system.  The STS-128 mission is the 30th International Space Station assembly flight and the 128th space shuttle flight. The 13-day mission will deliver more than 7 tons of supplies, science racks and equipment, as well as additional environmental hardware to sustain six crew members on the International Space Station. The equipment includes a freezer to store research samples, a new sleeping compartment and the COLBERT treadmill.  Photo courtesy of Scott Andrews KSC-2009-4930

CAPE CANAVERAL, Fla. – Billows of smoke and steam rise flow across Lau...

CAPE CANAVERAL, Fla. – Billows of smoke and steam rise flow across Launch Pad 39A at NASA's Kennedy Space Center in Florida as space shuttle Discovery hurtles toward space on the STS-128 mission. Liftoff from ... More

CAPE CANAVERAL, Fla. – The STS-128 crew members turn toward the Astrovan after exiting NASA Kennedy Space Center's Operations and Checkout Building.  The vehicle will take them to Launch Pad 39A.  From left are Pilot Kevin Ford, Mission Specialists Jose Fernandez and Nicole Stott, Commander Rick Sturckow, and Mission Specialists Patrick Forrester, Christer Fuglesang and Danny Olivas. At the pad, the astronauts will complete their suit-up and enter space shuttle Discovery for the 11:59 p.m. EDT liftoff.  The first launch attempt on Aug. 24 was postponed due to unfavorable weather conditions.  The second attempt on Aug. 25 also was postponed due to an issue with a valve in space shuttle Discovery's main propulsion system. The 13-day mission will deliver more than 7 tons of supplies, science racks and equipment, as well as additional environmental hardware to sustain six crew members on the International Space Station. The equipment includes a freezer to store research samples, a new sleeping compartment and the COLBERT treadmill.  The mission is the 128th in the Space Shuttle Program, the 37th flight of Discovery and the 30th station assembly flight.  Photo credit: NASA/Kim Shiflett KSC-2009-4888

CAPE CANAVERAL, Fla. – The STS-128 crew members turn toward the Astrov...

CAPE CANAVERAL, Fla. – The STS-128 crew members turn toward the Astrovan after exiting NASA Kennedy Space Center's Operations and Checkout Building. The vehicle will take them to Launch Pad 39A. From left are... More

CAPE CANAVERAL, Fla. – In the Operations and Checkout Building at NASA's Kennedy Space Center in Florida, STS-128 crew members put on their launch-and-entry suits before heading to the Astrovan for the 3.4-mile drive to Launch Pad 39A.  There, crew members will complete their suit-up and enter space shuttle Discovery for the 11:59 p.m. EDT liftoff. Seen here is Mission Specialist Nicole Stott, who will join the Expedition 20 crew on the International Space Station, replacing flight engineer Tim Kopra. The first launch attempt on Aug. 24 was postponed due to unfavorable weather conditions.  The second attempt on Aug. 25 also was postponed due to an issue with a valve in space shuttle Discovery's main propulsion system. The 13-day mission will deliver more than 7 tons of supplies, science racks and equipment, as well as additional environmental hardware to sustain six crew members on the International Space Station. The equipment includes a freezer to store research samples, a new sleeping compartment and the COLBERT treadmill.  The mission is the 128th in the Space Shuttle Program, the 37th flight of Discovery and the 30th station assembly flight.  Photo credit: NASA/Kim Shiflett KSC-2009-4873

CAPE CANAVERAL, Fla. – In the Operations and Checkout Building at NASA...

CAPE CANAVERAL, Fla. – In the Operations and Checkout Building at NASA's Kennedy Space Center in Florida, STS-128 crew members put on their launch-and-entry suits before heading to the Astrovan for the 3.4-mile... More

CAPE CANAVERAL, Fla. –  On Launch Pad 39A at NASA's Kennedy Space Center in Florida, the Closeout Crew in the White Room help STS-128 crew members complete their suit-up before entering space shuttle Discovery for the 11:59 p.m. EDT liftoff. Seen here is Commander Rick Sturckow.  The first launch attempt on Aug. 24 was postponed due to unfavorable weather conditions.  The second attempt on Aug. 25 also was postponed due to an issue with a valve in space shuttle Discovery's main propulsion system.  The STS-128 mission is the 30th International Space Station assembly flight and the 128th space shuttle flight. The 13-day mission will deliver more than 7 tons of supplies, science racks and equipment, as well as additional environmental hardware to sustain six crew members on the International Space Station. The equipment includes a freezer to store research samples, a new sleeping compartment and the COLBERT treadmill.  Photo credit: NASA/Sandra Joseph-Kevin O'Connell KSC-2009-4956

CAPE CANAVERAL, Fla. – On Launch Pad 39A at NASA's Kennedy Space Cent...

CAPE CANAVERAL, Fla. – On Launch Pad 39A at NASA's Kennedy Space Center in Florida, the Closeout Crew in the White Room help STS-128 crew members complete their suit-up before entering space shuttle Discovery ... More

CAPE CANAVERAL, Fla. –  In NASA Kennedy Space Center's Firing Room 4, NASA Administrator Charles Bolden waits for the launch of space shuttle Discovery on the STS-128 mission. Liftoff from Launch Pad 39A was on time at 11:59 p.m. EDT. The first launch attempt on Aug. 24 was postponed due to unfavorable weather conditions.  The second attempt on Aug. 25 also was postponed due to an issue with a valve in space shuttle Discovery's main propulsion system.  The STS-128 mission is the 30th International Space Station assembly flight and the 128th space shuttle flight. The 13-day mission will deliver more than 7 tons of supplies, science racks and equipment, as well as additional environmental hardware to sustain six crew members on the International Space Station. The equipment includes a freezer to store research samples, a new sleeping compartment and the COLBERT treadmill.  Photo credit: NASA/Kim Shiflett KSC-2009-4900

CAPE CANAVERAL, Fla. – In NASA Kennedy Space Center's Firing Room 4, ...

CAPE CANAVERAL, Fla. – In NASA Kennedy Space Center's Firing Room 4, NASA Administrator Charles Bolden waits for the launch of space shuttle Discovery on the STS-128 mission. Liftoff from Launch Pad 39A was on... More

CAPE CANAVERAL, Fla. –  In NASA Kennedy Space Center's Firing Room4, Chris Scolese, NASA associate administrator, Bill Gerstenmaier, associate administrator for Space Operations, and Charles Bolden, NASA administrator, wait for the launch of space shuttle Discovery on the STS-128 mission. Liftoff from Launch Pad 39A was on time at 11:59 p.m. EDT. The first launch attempt on Aug. 24 was postponed due to unfavorable weather conditions.  The second attempt on Aug. 25 also was postponed due to an issue with a valve in space shuttle Discovery's main propulsion system.  The STS-128 mission is the 30th International Space Station assembly flight and the 128th space shuttle flight. The 13-day mission will deliver more than 7 tons of supplies, science racks and equipment, as well as additional environmental hardware to sustain six crew members on the International Space Station. The equipment includes a freezer to store research samples, a new sleeping compartment and the COLBERT treadmill.  Photo credit: NASA/Kim Shiflett KSC-2009-4899

CAPE CANAVERAL, Fla. – In NASA Kennedy Space Center's Firing Room4, C...

CAPE CANAVERAL, Fla. – In NASA Kennedy Space Center's Firing Room4, Chris Scolese, NASA associate administrator, Bill Gerstenmaier, associate administrator for Space Operations, and Charles Bolden, NASA admini... More

CAPE CANAVERAL, Fla. – In the Operations and Checkout Building at NASA's Kennedy Space Center in Florida, STS-128 crew members put on their launch-and-entry suits before heading to the Astrovan for the 3.4-mile drive to Launch Pad 39A.  There, crew members will complete their suit-up and enter space shuttle Discovery for the 11:59 p.m. EDT liftoff. Here, Mission Specialist Nicole Stott is helped with  her helmet. The first launch attempt on Aug. 24 was postponed due to unfavorable weather conditions.  The second attempt on Aug. 25 also was postponed due to an issue with a valve in space shuttle Discovery's main propulsion system. The 13-day mission will deliver more than 7 tons of supplies, science racks and equipment, as well as additional environmental hardware to sustain six crew members on the International Space Station. The equipment includes a freezer to store research samples, a new sleeping compartment and the COLBERT treadmill.  The mission is the 128th in the Space Shuttle Program, the 37th flight of Discovery and the 30th station assembly flight.  Photo credit: NASA/Kim Shiflett KSC-2009-4877

CAPE CANAVERAL, Fla. – In the Operations and Checkout Building at NASA...

CAPE CANAVERAL, Fla. – In the Operations and Checkout Building at NASA's Kennedy Space Center in Florida, STS-128 crew members put on their launch-and-entry suits before heading to the Astrovan for the 3.4-mile... More

CAPE CANAVERAL, Fla. – In the Operations and Checkout Building at NASA's Kennedy Space Center in Florida, STS-128 crew members put on their launch-and-entry suits before heading to the Astrovan for the 3.4-mile drive to Launch Pad 39A.  There, crew members will complete their suit-up and enter space shuttle Discovery for the 11:59 p.m. EDT liftoff. Seen here, Mission Specialist Christer Fuglesang puts on his helmet.  The first launch attempt on Aug. 24 was postponed due to unfavorable weather conditions.  The second attempt on Aug. 25 also was postponed due to an issue with a valve in space shuttle Discovery's main propulsion system. The 13-day mission will deliver more than 7 tons of supplies, science racks and equipment, as well as additional environmental hardware to sustain six crew members on the International Space Station. The equipment includes a freezer to store research samples, a new sleeping compartment and the COLBERT treadmill.  The mission is the 128th in the Space Shuttle Program, the 37th flight of Discovery and the 30th station assembly flight.  Photo credit: NASA/Kim Shiflett KSC-2009-4880

CAPE CANAVERAL, Fla. – In the Operations and Checkout Building at NASA...

CAPE CANAVERAL, Fla. – In the Operations and Checkout Building at NASA's Kennedy Space Center in Florida, STS-128 crew members put on their launch-and-entry suits before heading to the Astrovan for the 3.4-mile... More

CAPE CANAVERAL, Fla. – The fiery liftoff of space shuttle Discovery at NASA's Kennedy Space Center in Florida is captured in the water close to Launch Pad 39A. Liftoff on the STS-128 mission was on time at 11:59 p.m. EDT. The first launch attempt on Aug. 24 was postponed due to unfavorable weather conditions.  The second attempt on Aug. 25 also was postponed due to an issue with a valve in space shuttle Discovery's main propulsion system.  The STS-128 mission is the 30th International Space Station assembly flight and the 128th space shuttle flight. The 13-day mission will deliver more than 7 tons of supplies, science racks and equipment, as well as additional environmental hardware to sustain six crew members on the International Space Station. The equipment includes a freezer to store research samples, a new sleeping compartment and the COLBERT treadmill.  Photo credit: NASA/Tony Gray-Tom Farrar KSC-2009-4933

CAPE CANAVERAL, Fla. – The fiery liftoff of space shuttle Discovery at...

CAPE CANAVERAL, Fla. – The fiery liftoff of space shuttle Discovery at NASA's Kennedy Space Center in Florida is captured in the water close to Launch Pad 39A. Liftoff on the STS-128 mission was on time at 11:5... More

CAPE CANAVERAL, Fla. – -- In NASA Kennedy Space Center's Firing Room 4, NASA Administrator Charles Bolden has had his tie cut, a ritual for first-timers at a launch.  At left is Rita Willcoxon, director of Launch Vehicle Processing at Kennedy; at right is Jody Singer, deputy manager of the Shuttle Propulsion Office at NASA's Marshall Space Flight Center in Huntsville. Bolden is at Kennedy for the launch of space shuttle Discovery on the STS-128 mission. Liftoff from Launch Pad 39A was on time at 11:59 p.m. EDT. The first launch attempt on Aug. 24 was postponed due to unfavorable weather conditions.  The second attempt on Aug. 25 also was postponed due to an issue with a valve in space shuttle Discovery's main propulsion system.  The STS-128 mission is the 30th International Space Station assembly flight and the 128th space shuttle flight. The 13-day mission will deliver more than 7 tons of supplies, science racks and equipment, as well as additional environmental hardware to sustain six crew members on the International Space Station. The equipment includes a freezer to store research samples, a new sleeping compartment and the COLBERT treadmill. Photo credit:  NASA/Kim Shiflett KSC-2009-4973

CAPE CANAVERAL, Fla. – -- In NASA Kennedy Space Center's Firing Room 4...

CAPE CANAVERAL, Fla. – -- In NASA Kennedy Space Center's Firing Room 4, NASA Administrator Charles Bolden has had his tie cut, a ritual for first-timers at a launch. At left is Rita Willcoxon, director of Laun... More

CAPE CANAVERAL, Fla. –  In NASA Kennedy Space Center's Firing Room 4, NASA management waits for the launch of space shuttle Discovery on the STS-128 mission.  From left are Janet Kavandi, deputy director of Flight Crew Operations at Johnson Space Center; John Shannon, Shuttle Program manager; Bill Gerstenmaier, associate administrator for Space Operations; Chris Scolese, NASA associate administrator; and Charles Bolden, NASA Administrator. Liftoff from Launch Pad 39A was on time at 11:59 p.m. EDT. The first launch attempt on Aug. 24 was postponed due to unfavorable weather conditions.  The second attempt on Aug. 25 also was postponed due to an issue with a valve in space shuttle Discovery's main propulsion system.  The STS-128 mission is the 30th International Space Station assembly flight and the 128th space shuttle flight. The 13-day mission will deliver more than 7 tons of supplies, science racks and equipment, as well as additional environmental hardware to sustain six crew members on the International Space Station. The equipment includes a freezer to store research samples, a new sleeping compartment and the COLBERT treadmill.  Photo credit: NASA/Kim Shiflett KSC-2009-4902

CAPE CANAVERAL, Fla. – In NASA Kennedy Space Center's Firing Room 4, ...

CAPE CANAVERAL, Fla. – In NASA Kennedy Space Center's Firing Room 4, NASA management waits for the launch of space shuttle Discovery on the STS-128 mission. From left are Janet Kavandi, deputy director of Fli... More

CAPE CANAVERAL, Fla. –  At NASA's Kennedy Space Center in Florida, steam and smoke billow in the light from space shuttle Discovery's fiery launch on the STS-128 mission.  Liftoff from Launch Pad 39A was on time at 11:59 p.m. EDT. The first launch attempt on Aug. 24 was postponed due to unfavorable weather conditions.  The second attempt on Aug. 25 also was postponed due to an issue with a valve in space shuttle Discovery's main propulsion system.  The STS-128 mission is the 30th International Space Station assembly flight and the 128th space shuttle flight. The 13-day mission will deliver more than 7 tons of supplies, science racks and equipment, as well as additional environmental hardware to sustain six crew members on the International Space Station. The equipment includes a freezer to store research samples, a new sleeping compartment and the COLBERT treadmill.  Photo courtesy of Scott Andrews KSC-2009-4896

CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, ste...

CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, steam and smoke billow in the light from space shuttle Discovery's fiery launch on the STS-128 mission. Liftoff from Launch Pad 39A was on tim... More

CAPE CANAVERAL, Fla. –   Viewed from the Banana River Viewing Site at NASA's Kennedy Space Center in Florida, space shuttle Discovery arcs through a cloud-brushed sky lighted by the trail of fire after launch on the STS-128 mission.   Liftoff from Launch Pad 39A was on time at 11:59 p.m. EDT. The first launch attempt on Aug. 24 was postponed due to unfavorable weather conditions.  The second attempt on Aug. 25 also was postponed due to an issue with a valve in space shuttle Discovery's main propulsion system.  The STS-128 mission is the 30th International Space Station assembly flight and the 128th space shuttle flight. The 13-day mission will deliver more than 7 tons of supplies, science racks and equipment, as well as additional environmental hardware to sustain six crew members on the International Space Station. The equipment includes a freezer to store research samples, a new sleeping compartment and the COLBERT treadmill.  Photo credit: NASA/Ben Cooper KSC-2009-4893

CAPE CANAVERAL, Fla. – Viewed from the Banana River Viewing Site at ...

CAPE CANAVERAL, Fla. – Viewed from the Banana River Viewing Site at NASA's Kennedy Space Center in Florida, space shuttle Discovery arcs through a cloud-brushed sky lighted by the trail of fire after launch o... More

CAPE CANAVERAL, Fla. – The water close to Launch Pad 39A at NASA's Kennedy Space Center in Florida captures the brilliance from launch of space shuttle Discovery on the STS-128 mission.  Liftoff from Launch Pad 39A was on time at 11:59 p.m. EDT. The first launch attempt on Aug. 24 was postponed due to unfavorable weather conditions.  The second attempt on Aug. 25 also was postponed due to an issue with a valve in space shuttle Discovery's main propulsion system.  The STS-128 mission is the 30th International Space Station assembly flight and the 128th space shuttle flight. The 13-day mission will deliver more than 7 tons of supplies, science racks and equipment, as well as additional environmental hardware to sustain six crew members on the International Space Station. The equipment includes a freezer to store research samples, a new sleeping compartment and the COLBERT treadmill.  Photo credit: NASA/Tony Gray-Tom Farrar KSC-2009-4922

CAPE CANAVERAL, Fla. – The water close to Launch Pad 39A at NASA's Ken...

CAPE CANAVERAL, Fla. – The water close to Launch Pad 39A at NASA's Kennedy Space Center in Florida captures the brilliance from launch of space shuttle Discovery on the STS-128 mission. Liftoff from Launch Pad... More

CAPE CANAVERAL, Fla. – Rising on twin columns of fire from Launch Pad 39A at NASA's Kennedy Space Center in Florida, space shuttle Discovery hurtles toward space on the STS-128 mission. Liftoff from Launch Pad 39A was on time at 11:59 p.m. EDT. The first launch attempt on Aug. 24 was postponed due to unfavorable weather conditions.  The second attempt on Aug. 25 also was postponed due to an issue with a valve in space shuttle Discovery's main propulsion system.  The STS-128 mission is the 30th International Space Station assembly flight and the 128th space shuttle flight. The 13-day mission will deliver more than 7 tons of supplies, science racks and equipment, as well as additional environmental hardware to sustain six crew members on the International Space Station. The equipment includes a freezer to store research samples, a new sleeping compartment and the COLBERT treadmill.  Photo courtesy of Scott Andrews KSC-2009-4929

CAPE CANAVERAL, Fla. – Rising on twin columns of fire from Launch Pad ...

CAPE CANAVERAL, Fla. – Rising on twin columns of fire from Launch Pad 39A at NASA's Kennedy Space Center in Florida, space shuttle Discovery hurtles toward space on the STS-128 mission. Liftoff from Launch Pad ... More

CAPE CANAVERAL, Fla. –  In the Press Site auditorium at NASA's Kennedy Space Center in Florida, STS-128 Launch Director Pete Nickolenko answers questions about the launch of space shuttle Discovery on the STS-128 mission. Liftoff from Launch Pad 39A was on time at 11:59 p.m. EDT. The first launch attempt on Aug. 24 was postponed due to unfavorable weather conditions.  The second attempt on Aug. 25 also was postponed due to an issue with a valve in space shuttle Discovery's main propulsion system.  The STS-128 mission is the 30th International Space Station assembly flight and the 128th space shuttle flight. The 13-day mission will deliver more than 7 tons of supplies, science racks and equipment, as well as additional environmental hardware to sustain six crew members on the International Space Station. The equipment includes a freezer to store research samples, a new sleeping compartment and the COLBERT treadmill.  Photo credit: NASA/Kim Shiflett KSC-2009-4910

CAPE CANAVERAL, Fla. – In the Press Site auditorium at NASA's Kennedy...

CAPE CANAVERAL, Fla. – In the Press Site auditorium at NASA's Kennedy Space Center in Florida, STS-128 Launch Director Pete Nickolenko answers questions about the launch of space shuttle Discovery on the STS-1... More

STS128-S-030 (28 Aug. 2009) --- Against a black night sky, Space Shuttle Discovery and its seven-member STS-128 crew head toward Earth orbit and rendezvous with the International Space Station (ISS). Liftoff was on time at 11:59 p.m. (EDT) on Aug. 28, 2009 from launch pad 39A at NASA?s Kennedy Space Center. Onboard are astronauts Rick Sturckow, commander; Kevin Ford, pilot; John ?Danny? Olivas, European Space Agency astronaut Christer Fuglesang, Patrick Forrester, Jose Hernandez and Nicole Stott, all mission specialists. Stott will join Expedition 20 in progress to serve as a flight engineer aboard the ISS. The 13-day mission will deliver more than seven tons of supplies, science racks and equipment, as well as additional environmental hardware to sustain six crew members on the space station. The equipment includes a freezer to store research samples, a new sleeping compartment and the COLBERT treadmill. The mission is the 128th in the Space Shuttle Program, the 37th flight of Discovery and the 30th station assembly flight. sts128-s-030

STS128-S-030 (28 Aug. 2009) --- Against a black night sky, Space Shutt...

STS128-S-030 (28 Aug. 2009) --- Against a black night sky, Space Shuttle Discovery and its seven-member STS-128 crew head toward Earth orbit and rendezvous with the International Space Station (ISS). Liftoff wa... More

STS128-S-026 (28 Aug. 2009) --- Against a black night sky, Space Shuttle Discovery and its seven-member STS-128 crew head toward Earth orbit and rendezvous with the International Space Station (ISS). Liftoff was on time at 11:59 p.m. (EDT) on Aug. 28, 2009 from launch pad 39A at NASA?s Kennedy Space Center. Onboard are astronauts Rick Sturckow, commander; Kevin Ford, pilot; John ?Danny? Olivas, European Space Agency astronaut Christer Fuglesang, Patrick Forrester, Jose Hernandez and Nicole Stott, all mission specialists. Stott will join Expedition 20 in progress to serve as a flight engineer aboard the ISS. The 13-day mission will deliver more than seven tons of supplies, science racks and equipment, as well as additional environmental hardware to sustain six crew members on the space station. The equipment includes a freezer to store research samples, a new sleeping compartment and the COLBERT treadmill. The mission is the 128th in the Space Shuttle Program, the 37th flight of Discovery and the 30th station assembly flight. sts128-s-026

STS128-S-026 (28 Aug. 2009) --- Against a black night sky, Space Shutt...

STS128-S-026 (28 Aug. 2009) --- Against a black night sky, Space Shuttle Discovery and its seven-member STS-128 crew head toward Earth orbit and rendezvous with the International Space Station (ISS). Liftoff wa... More

STS128-S-011 (28 Aug. 2009) --- Viewed from the Banana River Viewing Site, Space Shuttle Discovery and its seven-member STS-128 crew head toward Earth orbit and rendezvous with the International Space Station (ISS). Liftoff was on time at 11:59 p.m. (EDT) on Aug. 28, 2009 from launch pad 39A at NASA?s Kennedy Space Center. Onboard are astronauts Rick Sturckow, commander; Kevin Ford, pilot; John ?Danny? Olivas, European Space Agency astronaut Christer Fuglesang, Patrick Forrester, Jose Hernandez and Nicole Stott, all mission specialists. Stott will join Expedition 20 in progress to serve as a flight engineer aboard the ISS. The 13-day mission will deliver more than seven tons of supplies, science racks and equipment, as well as additional environmental hardware to sustain six crew members on the space station. The equipment includes a freezer to store research samples, a new sleeping compartment and the COLBERT treadmill. The mission is the 128th in the Space Shuttle Program, the 37th flight of Discovery and the 30th station assembly flight. sts128-s-011

STS128-S-011 (28 Aug. 2009) --- Viewed from the Banana River Viewing S...

STS128-S-011 (28 Aug. 2009) --- Viewed from the Banana River Viewing Site, Space Shuttle Discovery and its seven-member STS-128 crew head toward Earth orbit and rendezvous with the International Space Station (... More

STS128-S-007 (28 Aug. 2009) --- After suiting up, the STS-128 crew members exit the Operations and Checkout Building to board the Astrovan, which will take them to launch pad 39A for the launch of Space Shuttle Discovery on the STS-128 mission. From right to left are astronauts Rick Sturckow, commander; Kevin Ford, pilot; Patrick Forrester, Jose Hernandez, European Space Agency astronaut Christer Fuglesang, Nicole Stott and John ?Danny? Olivas, all mission specialists. Stott will join Expedition 20 in progress to serve as a flight engineer aboard the International Space Station. The 13-day mission will deliver more than seven tons of supplies, science racks and equipment, as well as additional environmental hardware to sustain six crew members on the space station. The equipment includes a freezer to store research samples, a new sleeping compartment and the COLBERT treadmill. The mission is the 128th in the Space Shuttle Program, the 37th flight of Discovery and the 30th station assembly flight. sts128-s-007

STS128-S-007 (28 Aug. 2009) --- After suiting up, the STS-128 crew mem...

STS128-S-007 (28 Aug. 2009) --- After suiting up, the STS-128 crew members exit the Operations and Checkout Building to board the Astrovan, which will take them to launch pad 39A for the launch of Space Shuttle... More

STS128-S-041 (28 Aug. 2009) --- Against a black night sky, Space Shuttle Discovery and its seven-member STS-128 crew head toward Earth orbit and rendezvous with the International Space Station (ISS). Liftoff was on time at 11:59 p.m. (EDT) on Aug. 28, 2009 from launch pad 39A at NASA?s Kennedy Space Center. Onboard are astronauts Rick Sturckow, commander; Kevin Ford, pilot; John ?Danny? Olivas, European Space Agency astronaut Christer Fuglesang, Patrick Forrester, Jose Hernandez and Nicole Stott, all mission specialists. Stott will join Expedition 20 in progress to serve as a flight engineer aboard the ISS. The 13-day mission will deliver more than seven tons of supplies, science racks and equipment, as well as additional environmental hardware to sustain six crew members on the space station. The equipment includes a freezer to store research samples, a new sleeping compartment and the COLBERT treadmill. The mission is the 128th in the Space Shuttle Program, the 37th flight of Discovery and the 30th station assembly flight. sts128-s-041

STS128-S-041 (28 Aug. 2009) --- Against a black night sky, Space Shutt...

STS128-S-041 (28 Aug. 2009) --- Against a black night sky, Space Shuttle Discovery and its seven-member STS-128 crew head toward Earth orbit and rendezvous with the International Space Station (ISS). Liftoff wa... More

STS128-S-034 (28 Aug. 2009) --- Against a black night sky, Space Shuttle Discovery and its seven-member STS-128 crew head toward Earth orbit and rendezvous with the International Space Station (ISS). Liftoff was on time at 11:59 p.m. (EDT) on Aug. 28, 2009 from launch pad 39A at NASA?s Kennedy Space Center. Onboard are astronauts Rick Sturckow, commander; Kevin Ford, pilot; John ?Danny? Olivas, European Space Agency astronaut Christer Fuglesang, Patrick Forrester, Jose Hernandez and Nicole Stott, all mission specialists. Stott will join Expedition 20 in progress to serve as a flight engineer aboard the ISS. The 13-day mission will deliver more than seven tons of supplies, science racks and equipment, as well as additional environmental hardware to sustain six crew members on the space station. The equipment includes a freezer to store research samples, a new sleeping compartment and the COLBERT treadmill. The mission is the 128th in the Space Shuttle Program, the 37th flight of Discovery and the 30th station assembly flight. sts128-s-034

STS128-S-034 (28 Aug. 2009) --- Against a black night sky, Space Shutt...

STS128-S-034 (28 Aug. 2009) --- Against a black night sky, Space Shuttle Discovery and its seven-member STS-128 crew head toward Earth orbit and rendezvous with the International Space Station (ISS). Liftoff wa... More

STS128-S-012 (28 Aug. 2009) --- Lighting up the clouds in the night sky, Space Shuttle Discovery and its seven-member STS-128 crew head toward Earth orbit and rendezvous with the International Space Station (ISS). Liftoff was on time at 11:59 p.m. (EDT) on Aug. 28, 2009 from launch pad 39A at NASA?s Kennedy Space Center. Onboard are astronauts Rick Sturckow, commander; Kevin Ford, pilot; John ?Danny? Olivas, European Space Agency astronaut Christer Fuglesang, Patrick Forrester, Jose Hernandez and Nicole Stott, all mission specialists. Stott will join Expedition 20 in progress to serve as a flight engineer aboard the ISS. The 13-day mission will deliver more than seven tons of supplies, science racks and equipment, as well as additional environmental hardware to sustain six crew members on the space station. The equipment includes a freezer to store research samples, a new sleeping compartment and the COLBERT treadmill. The mission is the 128th in the Space Shuttle Program, the 37th flight of Discovery and the 30th station assembly flight. sts128-s-012

STS128-S-012 (28 Aug. 2009) --- Lighting up the clouds in the night sk...

STS128-S-012 (28 Aug. 2009) --- Lighting up the clouds in the night sky, Space Shuttle Discovery and its seven-member STS-128 crew head toward Earth orbit and rendezvous with the International Space Station (IS... More

STS128-S-033 (28 Aug. 2009) --- Against a black night sky, Space Shuttle Discovery and its seven-member STS-128 crew head toward Earth orbit and rendezvous with the International Space Station (ISS). Liftoff was on time at 11:59 p.m. (EDT) on Aug. 28, 2009 from launch pad 39A at NASA?s Kennedy Space Center. Onboard are astronauts Rick Sturckow, commander; Kevin Ford, pilot; John ?Danny? Olivas, European Space Agency astronaut Christer Fuglesang, Patrick Forrester, Jose Hernandez and Nicole Stott, all mission specialists. Stott will join Expedition 20 in progress to serve as a flight engineer aboard the ISS. The 13-day mission will deliver more than seven tons of supplies, science racks and equipment, as well as additional environmental hardware to sustain six crew members on the space station. The equipment includes a freezer to store research samples, a new sleeping compartment and the COLBERT treadmill. The mission is the 128th in the Space Shuttle Program, the 37th flight of Discovery and the 30th station assembly flight. sts128-s-033

STS128-S-033 (28 Aug. 2009) --- Against a black night sky, Space Shutt...

STS128-S-033 (28 Aug. 2009) --- Against a black night sky, Space Shuttle Discovery and its seven-member STS-128 crew head toward Earth orbit and rendezvous with the International Space Station (ISS). Liftoff wa... More

STS128-S-029 (28 Aug. 2009) --- Against a black night sky, Space Shuttle Discovery and its seven-member STS-128 crew head toward Earth orbit and rendezvous with the International Space Station (ISS). Liftoff was on time at 11:59 p.m. (EDT) on Aug. 28, 2009 from launch pad 39A at NASA?s Kennedy Space Center. Onboard are astronauts Rick Sturckow, commander; Kevin Ford, pilot; John ?Danny? Olivas, European Space Agency astronaut Christer Fuglesang, Patrick Forrester, Jose Hernandez and Nicole Stott, all mission specialists. Stott will join Expedition 20 in progress to serve as a flight engineer aboard the ISS. The 13-day mission will deliver more than seven tons of supplies, science racks and equipment, as well as additional environmental hardware to sustain six crew members on the space station. The equipment includes a freezer to store research samples, a new sleeping compartment and the COLBERT treadmill. The mission is the 128th in the Space Shuttle Program, the 37th flight of Discovery and the 30th station assembly flight. sts128-s-029

STS128-S-029 (28 Aug. 2009) --- Against a black night sky, Space Shutt...

STS128-S-029 (28 Aug. 2009) --- Against a black night sky, Space Shuttle Discovery and its seven-member STS-128 crew head toward Earth orbit and rendezvous with the International Space Station (ISS). Liftoff wa... More

STS128-S-038 (28 Aug. 2009) --- Against a black night sky, Space Shuttle Discovery and its seven-member STS-128 crew head toward Earth orbit and rendezvous with the International Space Station (ISS). Liftoff was on time at 11:59 p.m. (EDT) on Aug. 28, 2009 from launch pad 39A at NASA?s Kennedy Space Center. Onboard are astronauts Rick Sturckow, commander; Kevin Ford, pilot; John ?Danny? Olivas, European Space Agency astronaut Christer Fuglesang, Patrick Forrester, Jose Hernandez and Nicole Stott, all mission specialists. Stott will join Expedition 20 in progress to serve as a flight engineer aboard the ISS. The 13-day mission will deliver more than seven tons of supplies, science racks and equipment, as well as additional environmental hardware to sustain six crew members on the space station. The equipment includes a freezer to store research samples, a new sleeping compartment and the COLBERT treadmill. The mission is the 128th in the Space Shuttle Program, the 37th flight of Discovery and the 30th station assembly flight. sts128-s-038

STS128-S-038 (28 Aug. 2009) --- Against a black night sky, Space Shutt...

STS128-S-038 (28 Aug. 2009) --- Against a black night sky, Space Shuttle Discovery and its seven-member STS-128 crew head toward Earth orbit and rendezvous with the International Space Station (ISS). Liftoff wa... More

STS128-S-042 (28 Aug. 2009) --- Against a black night sky, Space Shuttle Discovery and its seven-member STS-128 crew head toward Earth orbit and rendezvous with the International Space Station (ISS). Liftoff was on time at 11:59 p.m. (EDT) on Aug. 28, 2009 from launch pad 39A at NASA?s Kennedy Space Center. Onboard are astronauts Rick Sturckow, commander; Kevin Ford, pilot; John ?Danny? Olivas, European Space Agency astronaut Christer Fuglesang, Patrick Forrester, Jose Hernandez and Nicole Stott, all mission specialists. Stott will join Expedition 20 in progress to serve as a flight engineer aboard the ISS. The 13-day mission will deliver more than seven tons of supplies, science racks and equipment, as well as additional environmental hardware to sustain six crew members on the space station. The equipment includes a freezer to store research samples, a new sleeping compartment and the COLBERT treadmill. The mission is the 128th in the Space Shuttle Program, the 37th flight of Discovery and the 30th station assembly flight. sts128-s-042

STS128-S-042 (28 Aug. 2009) --- Against a black night sky, Space Shutt...

STS128-S-042 (28 Aug. 2009) --- Against a black night sky, Space Shuttle Discovery and its seven-member STS-128 crew head toward Earth orbit and rendezvous with the International Space Station (ISS). Liftoff wa... More

STS128-S-025 (28 Aug. 2009) --- Against a black night sky, Space Shuttle Discovery and its seven-member STS-128 crew head toward Earth orbit and rendezvous with the International Space Station (ISS). Liftoff was on time at 11:59 p.m. (EDT) on Aug. 28, 2009 from launch pad 39A at NASA?s Kennedy Space Center. Onboard are astronauts Rick Sturckow, commander; Kevin Ford, pilot; John ?Danny? Olivas, European Space Agency astronaut Christer Fuglesang, Patrick Forrester, Jose Hernandez and Nicole Stott, all mission specialists. Stott will join Expedition 20 in progress to serve as a flight engineer aboard the ISS. The 13-day mission will deliver more than seven tons of supplies, science racks and equipment, as well as additional environmental hardware to sustain six crew members on the space station. The equipment includes a freezer to store research samples, a new sleeping compartment and the COLBERT treadmill. The mission is the 128th in the Space Shuttle Program, the 37th flight of Discovery and the 30th station assembly flight. sts128-s-025

STS128-S-025 (28 Aug. 2009) --- Against a black night sky, Space Shutt...

STS128-S-025 (28 Aug. 2009) --- Against a black night sky, Space Shuttle Discovery and its seven-member STS-128 crew head toward Earth orbit and rendezvous with the International Space Station (ISS). Liftoff wa... More

Previous

of 2

Next