CAPE CANAVERAL, Fla. – --  The STS-128 crew members pause in front of the Astrovan that will take them to Launch Pad 39A.  From left are Mission Specialists Danny Olivas, Nicole Stott, Christer Fuglesang, Jose Hernandez and Patrick Forrester, Pilot Kevin Ford and Commander Rick Sturckow. At the pad, the astronauts will complete their suit-up and enter space shuttle Discovery for the 11:59 p.m. EDT liftoff. The first launch attempt on Aug. 24 was postponed due to unfavorable weather conditions.  The second attempt on Aug. 25 also was postponed due to an issue with a valve in space shuttle Discovery's main propulsion system. The 13-day mission will deliver more than 7 tons of supplies, science racks and equipment, as well as additional environmental hardware to sustain six crew members on the International Space Station. The equipment includes a freezer to store research samples, a new sleeping compartment and the COLBERT treadmill.  The mission is the 128th in the Space Shuttle Program, the 37th flight of Discovery and the 30th station assembly flight.  Photo credit: NASA/Kim Shiflett KSC-2009-4890

Similar

CAPE CANAVERAL, Fla. – -- The STS-128 crew members pause in front of the Astrovan that will take them to Launch Pad 39A. From left are Mission Specialists Danny Olivas, Nicole Stott, Christer Fuglesang, Jose Hernandez and Patrick Forrester, Pilot Kevin Ford and Commander Rick Sturckow. At the pad, the astronauts will complete their suit-up and enter space shuttle Discovery for the 11:59 p.m. EDT liftoff. The first launch attempt on Aug. 24 was postponed due to unfavorable weather conditions. The second attempt on Aug. 25 also was postponed due to an issue with a valve in space shuttle Discovery's main propulsion system. The 13-day mission will deliver more than 7 tons of supplies, science racks and equipment, as well as additional environmental hardware to sustain six crew members on the International Space Station. The equipment includes a freezer to store research samples, a new sleeping compartment and the COLBERT treadmill. The mission is the 128th in the Space Shuttle Program, the 37th flight of Discovery and the 30th station assembly flight. Photo credit: NASA/Kim Shiflett KSC-2009-4890

description

Summary

CAPE CANAVERAL, Fla. – -- The STS-128 crew members pause in front of the Astrovan that will take them to Launch Pad 39A. From left are Mission Specialists Danny Olivas, Nicole Stott, Christer Fuglesang, Jose Hernandez and Patrick Forrester, Pilot Kevin Ford and Commander Rick Sturckow. At the pad, the astronauts will complete their suit-up and enter space shuttle Discovery for the 11:59 p.m. EDT liftoff. The first launch attempt on Aug. 24 was postponed due to unfavorable weather conditions. The second attempt on Aug. 25 also was postponed due to an issue with a valve in space shuttle Discovery's main propulsion system. The 13-day mission will deliver more than 7 tons of supplies, science racks and equipment, as well as additional environmental hardware to sustain six crew members on the International Space Station. The equipment includes a freezer to store research samples, a new sleeping compartment and the COLBERT treadmill. The mission is the 128th in the Space Shuttle Program, the 37th flight of Discovery and the 30th station assembly flight. Photo credit: NASA/Kim Shiflett

The Space Shuttle program was the United States government's manned launch vehicle program from 1981 to 2011, administered by NASA and officially beginning in 1972. The Space Shuttle system—composed of an orbiter launched with two reusable solid rocket boosters and a disposable external fuel tank— carried up to eight astronauts and up to 50,000 lb (23,000 kg) of payload into low Earth orbit (LEO). When its mission was complete, the orbiter would re-enter the Earth's atmosphere and lands as a glider. Although the concept had been explored since the late 1960s, the program formally commenced in 1972 and was the focus of NASA's manned operations after the final Apollo and Skylab flights in the mid-1970s. It started with the launch of the first shuttle Columbia on April 12, 1981, on STS-1. and finished with its last mission, STS-135 flown by Atlantis, in July 2011.

date_range

Date

1960 - 1969
place

Location

Cape Canaveral, FL
create

Source

NASA
copyright

Copyright info

Public Domain Dedication (CC0)

Explore more

kennedy space center
kennedy space center