arm, kennedy space center

1,871 media by topicpage 1 of 19
KENNEDY SPACE CENTER, FLA. --  Space Shuttle Discovery, on top of the mobile launcher platform and crawler-transporter, reaches Launch Pad 39B for launch of mission STS-116. On the right edge of the photo can be seen the White Room at the end of the orbiter access arm.  On the horizon at left is Launch Pad 39A.  The rollout from the Vehicle Assembly Building began at 12:29 a.m. The mission is No. 20 to the International Space Station and construction flight 12A.1. The mission payload is the SPACEHAB module, the P5 integrated truss structure and other key components. The launch window for mission STS-116 opens Dec. 7. Photo credit: NASA/Amanda Diller KSC-06pd2482

KENNEDY SPACE CENTER, FLA. -- Space Shuttle Discovery, on top of the ...

KENNEDY SPACE CENTER, FLA. -- Space Shuttle Discovery, on top of the mobile launcher platform and crawler-transporter, reaches Launch Pad 39B for launch of mission STS-116. On the right edge of the photo can b... More

CAPE CANAVERAL, Fla. - On Launch Pad 39A at NASA's Kennedy Space Center in Florida, STS-129 Mission Specialist Randy Bresnik prepares to enter space shuttle Atlantis with the help of the closeout crew in the White Room.  The six astronauts for space shuttle Atlantis’ STS-129 mission are participating in their launch dress rehearsal, the Terminal Countdown Demonstration Test.    Additional training associated with the test was done last month, but the simulated countdown was postponed because of a scheduling conflict with the launch of NASA’s Ares I-X test rocket.  Launch of Atlantis on its STS-129 mission to the International Space Station is set for Nov. 16.  On STS-129, the crew will deliver to the station two spare gyroscopes, two nitrogen tank assemblies, two pump modules, an ammonia tank assembly and a spare latching end effector for the station's robotic arm.  For information on the STS-129 crew and mission objectives, visit http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts129/index.html. Photo credit: NASA/Jim Grossmann KSC-2009-6065

CAPE CANAVERAL, Fla. - On Launch Pad 39A at NASA's Kennedy Space Cente...

CAPE CANAVERAL, Fla. - On Launch Pad 39A at NASA's Kennedy Space Center in Florida, STS-129 Mission Specialist Randy Bresnik prepares to enter space shuttle Atlantis with the help of the closeout crew in the Wh... More

KENNEDY SPACE CENTER, Fla. - STS-112 Mission Specialist Sandra Magnus gets help donning her boots during suit check,  part of Terminal Countdown Demonstration Test activities.   The TCDT also includes emergency egress training and a simulated launch countdown.  The mission aboard Space Shuttle Atlantis  is scheduled to launch no earlier than Oct. 2, between 2 and 6 p.m. EDT.  STS-112 is the 15th assembly mission to the International Space Station.  Atlantis will be carrying the S1 Integrated Truss Structure, the first starboard truss segment.  The S1 will be attached to the central truss segment, S0, during the 11-day mission.  Magnus will serve as one of two operators of the Canadarm2 robotic arm for S1 truss installation and during three scheduled spacewalks.  STS-112 is her first Shuttle flight. KSC-02pd1320

KENNEDY SPACE CENTER, Fla. - STS-112 Mission Specialist Sandra Magnus ...

KENNEDY SPACE CENTER, Fla. - STS-112 Mission Specialist Sandra Magnus gets help donning her boots during suit check, part of Terminal Countdown Demonstration Test activities. The TCDT also includes emergency... More

KENNEDY SPACE CENTER, FLA. -- Technicians unload the replacement wrist joint for the Space Station Remote Manipulator System before installing it in Space Shuttle Endeavour's payload bay. The new wrist joint, called an Orbital Replacement Unit (ORU), will be installed next to the arm's Latching End Effector during the final of three planned spacewalks. Mission STS-111 is designated UF-2, the 14th assembly flight to the International Space Station. Endeavour's payload includes the Multi-Purpose Logistics Module Leonardo and Mobile Base System. The mission also will swap resident crews on the Station, carrying the Expedition 5 crew and returning to Earth Expedition 4. Liftoff of Endeavour is scheduled between 4 and 8 p.m. May 30, 2002 KSC-02pd0640

KENNEDY SPACE CENTER, FLA. -- Technicians unload the replacement wrist...

KENNEDY SPACE CENTER, FLA. -- Technicians unload the replacement wrist joint for the Space Station Remote Manipulator System before installing it in Space Shuttle Endeavour's payload bay. The new wrist joint, c... More

KENNEDY SPACE CENTER, FLA. -    Huge clouds roll over Launch Pad 39B where Space Shuttle Atlantis still sits after the scrub of its launch on mission STS-115.  Atlantis was originally scheduled to launch at 12:29 p.m. EDT on this date, but  a 24-hour scrub was called by mission managers due to a concern with fuel cell 1.  Towering above the shuttle is the 80-foot lightning mast.  At left is the rolled-back rotating service structure with the payload changeout room open.  Just above the orange external tank is the  vent hood (known as the "beanie cap") at the end of the gaseous oxygen vent arm. Vapors are created as the liquid oxygen in the external tank boil off. The hood vents the gaseous oxygen vapors away from the space shuttle vehicle.  During the STS-115 mission, Atlantis' astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment on the station. The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. This mission is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the International Space Station. STS-115 is scheduled to last 11 days with a planned landing at KSC.   Photo credit: NASA/Ken Thornsley KSC-06pd2055

KENNEDY SPACE CENTER, FLA. - Huge clouds roll over Launch Pad 39B w...

KENNEDY SPACE CENTER, FLA. - Huge clouds roll over Launch Pad 39B where Space Shuttle Atlantis still sits after the scrub of its launch on mission STS-115. Atlantis was originally scheduled to launch at 12:... More

CAPE CANAVERAL, Fla. - At NASA's Kennedy Space Center in Florida, STS-129 Pilot Barry E. Wilmore, right, arrives at the Shuttle Landing Facility to practice landings in a Shuttle Training Aircraft in preparation for space shuttle Atlantis' STS-129 mission.    The Shuttle Training Aircraft is a Gulfstream II jet, modified to handle like the space shuttle.  On STS-129, the crew will deliver to the International Space Station two spare gyroscopes, two nitrogen tank assemblies, two pump modules, an ammonia tank assembly and a spare latching end effector for the station's robotic arm.  Launch is set for Nov. 16.  For information on the STS-129 mission objectives and crew, visit http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts129/index.html. Photo credit: NASA/Kim Shiflett KSC-2009-6256

CAPE CANAVERAL, Fla. - At NASA's Kennedy Space Center in Florida, STS-...

CAPE CANAVERAL, Fla. - At NASA's Kennedy Space Center in Florida, STS-129 Pilot Barry E. Wilmore, right, arrives at the Shuttle Landing Facility to practice landings in a Shuttle Training Aircraft in preparatio... More

KENNEDY SPACE CENTER, FLA. -- Robotic arm experts get ready for ultrasound testing on Endeavour's robotic arm.  A scrape of the honeycomb shell around the arm occurred while work platforms were being installed to gain access to repair the oxygen leak in the Shuttle's mid-body.  Launch of Endeavour on mission STS-113 has been postponed until no earlier than Nov. 22. KSC-02pd1737

KENNEDY SPACE CENTER, FLA. -- Robotic arm experts get ready for ultras...

KENNEDY SPACE CENTER, FLA. -- Robotic arm experts get ready for ultrasound testing on Endeavour's robotic arm. A scrape of the honeycomb shell around the arm occurred while work platforms were being installed ... More

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility 1 at NASA's Kennedy Space Center in Florida, United Space Alliance technicians, lying on a work platform, remove window #8 from the top of the crew module of space shuttle Atlantis.    Inspection and maintenance of the crew module windows is standard procedure between shuttle missions.  Atlantis is next slated to deliver an Integrated Cargo Carrier and Russian-built Mini Research Module to the International Space Station on the STS-132 mission.  The second in a series of new pressurized components for Russia, the module will be permanently attached to the Zarya module. Three spacewalks are planned to store spare components outside the station, including six spare batteries, a boom assembly for the Ku-band antenna and spares for the Canadian Dextre robotic arm extension. A radiator, airlock and European robotic arm for the Russian Multi-purpose Laboratory Module also are payloads on the flight.  Launch is targeted for May 14.  Photo credit: NASA/Glenn Benson KSC-2010-1082

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility 1 at NASA's Kenn...

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility 1 at NASA's Kennedy Space Center in Florida, United Space Alliance technicians, lying on a work platform, remove window #8 from the top of the crew module o... More

KENNEDY SPACE CENTER, Fla. --  In the early morning hours, the Rotating Service Structure (left) begins rolling back to free Space Shuttle Discovery for launch of mission STS-92 at 8:05 p.m. Oct. 9. Above the external tank can be seen the Gaseous Oxygen Vent Arm with its vent hood, commonly referred to as the “beanie cap.” The system is designed to vent gaseous oxygen vapors away from the Shuttle after cryogenic loading. The scheduled launch is the second attempt after an earlier scrub. STS-92 is making the fifth flight for construction of the International Space Station. The mission is also the 100th in the history of the Shuttle program KSC-00pp1508

KENNEDY SPACE CENTER, Fla. -- In the early morning hours, the Rotatin...

KENNEDY SPACE CENTER, Fla. -- In the early morning hours, the Rotating Service Structure (left) begins rolling back to free Space Shuttle Discovery for launch of mission STS-92 at 8:05 p.m. Oct. 9. Above the e... More

KENNEDY SPACE CENTER, FLA. -    The morning sky lightens behind Space Shuttle Atlantis while lights on the fixed service structure (FSS) still illuminate the orbiter on Launch Pad 39B. Atlantis was originally scheduled to launch at 12:29 p.m. EDT on this date, but  a 24-hour scrub was called by mission managers due to a concern with Fuel Cell 1.  Seen poised above the orange external tank is the vent hood (known as the "beanie cap") at the end of the gaseous oxygen vent arm. Vapors are created as the liquid oxygen in the external tank boil off. The hood vents the gaseous oxygen vapors away from the space shuttle vehicle. Extending from the FSS to Atlantis is the orbiter access arm with the White Room at the end.  The White Room provides entry into the orbiter through the hatch.  During the STS-115 mission, Atlantis' astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment on the station. The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. This mission is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the International Space Station. STS-115 is scheduled to last 11 days with a planned landing at KSC.   Photo credit: NASA/Troy Cryder KSC-06pd2050

KENNEDY SPACE CENTER, FLA. - The morning sky lightens behind Space ...

KENNEDY SPACE CENTER, FLA. - The morning sky lightens behind Space Shuttle Atlantis while lights on the fixed service structure (FSS) still illuminate the orbiter on Launch Pad 39B. Atlantis was originally s... More

CAPE CANAVERAL, Fla. - At Launch Pad 39A at NASA's Kennedy Space Center in Florida, the rotating service structure has been retracted from space shuttle Atlantis as the countdown progresses toward launch on Nov. 16 at 2:28 p.m. EST of the STS-129 mission.  The movable structure, which provides weather protection and access for technicians to work on the shuttle, began being retracted at 5:20 p.m. EST and was in the park position by 5:56 p.m.     STS-129 crew members are Commander Charles O. Hobaugh; Pilot Barry E. Wilmore; and Mission Specialists Leland Melvin, Randy Bresnik, Mike Foreman and Robert L. Satcher Jr.  On the STS-129 mission to the International Space Station, the crew will deliver two spare gyroscopes, two nitrogen tank assemblies, two pump modules, an ammonia tank assembly and a spare latching end effector for the station's robotic arm.  Atlantis will return to Earth a station crew member, Nicole Stott, who has spent more than two months aboard the orbiting laboratory.  STS-129 is slated to be the final space shuttle Expedition crew rotation flight. For information on the STS-129 mission and crew, visit http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts129/index.html. Photo credit: NASA/Troy Cryder KSC-2009-6299

CAPE CANAVERAL, Fla. - At Launch Pad 39A at NASA's Kennedy Space Cente...

CAPE CANAVERAL, Fla. - At Launch Pad 39A at NASA's Kennedy Space Center in Florida, the rotating service structure has been retracted from space shuttle Atlantis as the countdown progresses toward launch on Nov... More

KENNEDY SPACE CENTER, FLA. --    The payload for mission STS-118 is being installed in the payload bay on Space Shuttle Endeavour on Launch Pad 39A. Seen at center is the SPACEHAB module.   At left and right in the photo are the shuttle robotic arm and the orbiter boom sensor system. The payload also includes the S5 truss and external stowage platform 3. The mission is the 22nd flight to the International Space Station and is targeted for launch on Aug.7.   Photo credit: NASA/Amanda Diller KSC-07pd1860

KENNEDY SPACE CENTER, FLA. -- The payload for mission STS-118 is be...

KENNEDY SPACE CENTER, FLA. -- The payload for mission STS-118 is being installed in the payload bay on Space Shuttle Endeavour on Launch Pad 39A. Seen at center is the SPACEHAB module. At left and right in... More

CAPE CANAVERAL, Fla. - Inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, United Space Alliance workers attach lifting cranes to the container holding the remote manipulator system, or RMS. The RMS is placed on a flatbed truck for shipment back to the Canadian Space Agency.    The RMS, also called the Canadarm, was manufactured for NASA’s Space Shuttle Program by SPAR Aerospace Ltd., which later became a part of MD Robotics in Ontario, Canada.  During shuttle missions, the RMS was attached in the payload bay. Mission specialists operated the arm to remove payloads from the payload bay and hand them off to the larger Canadarm 2 on the International Space Station. The shuttle arm also was used during astronaut spacewalks. Photo credit: NASA/Kim Shiflett KSC-2012-3838

CAPE CANAVERAL, Fla. - Inside the Vehicle Assembly Building at NASA’s ...

CAPE CANAVERAL, Fla. - Inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, United Space Alliance workers attach lifting cranes to the container holding the remote manipulator system,... More

CAPE CANAVERAL, Fla. – Outside the massive Vehicle Assembly Building at NASA's Kennedy Space Center in Florida, members of the news media (foreground) wait in the dark for the rollout of the Ares I-X to begin. The rocket will travel the 4.2 miles to Launch Pad 39B atop the crawler-transporter.     The transfer of the pad from the Space Shuttle Program to the Constellation Program took place May 31. Modifications made to the pad include the removal of shuttle unique subsystems, such as the orbiter access arm and a section of the gaseous oxygen vent arm, along with the installation of three 600-foot lightning towers, access platforms, environmental control systems and a vehicle stabilization system.  Part of the Constellation Program, the Ares I-X is the test vehicle for the Ares I. The Ares I-X flight test is targeted for Oct. 27. For information on the Ares I-X vehicle and flight test, visit http://www.nasa.gov/aresIX. Photo credit: NASA/Jack Pfaller KSC-2009-5534

CAPE CANAVERAL, Fla. – Outside the massive Vehicle Assembly Building a...

CAPE CANAVERAL, Fla. – Outside the massive Vehicle Assembly Building at NASA's Kennedy Space Center in Florida, members of the news media (foreground) wait in the dark for the rollout of the Ares I-X to begin. ... More

The STS-98 crew, gathered at Launch Pad 39A one day before launch, wave and give a thumbs up. From left, they are Pilot Mark Polansky, Commander Ken Cockrell and Mission Specialists Marsha Ivins, Robert Curbeam and Thomas Jones. Behind them is Space Shuttle Atlantis, poised for launch.This mission marks the seventh Shuttle flight to the International Space Station and the first Shuttle mission of the year. On the mission, the crew will deliver the U.S. Laboratory Destiny to the growing Space Station. Destiny will be attached to the Unity node using the Shuttle’s robotic arm. Three spacewalks are required to complete the planned construction work. The 11-day STS-98 mission is scheduled to launch Feb. 7 at 6:11 p.m. EST, with a planned KSC landing about 1:39 p.m. on Feb. 18 KSC01padig051

The STS-98 crew, gathered at Launch Pad 39A one day before launch, wav...

The STS-98 crew, gathered at Launch Pad 39A one day before launch, wave and give a thumbs up. From left, they are Pilot Mark Polansky, Commander Ken Cockrell and Mission Specialists Marsha Ivins, Robert Curbeam... More

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-1 at NASA's Kennedy Space Center in Florida, technicians prepare to move an aft access platform into place behind shuttle Atlantis, following the installation of the spacecraft's three main engines. Shown is the right-hand orbital maneuvering system (OMS) pod and engine taken from the right-hand access arm.            Atlantis is being prepared for the "launch on need," or potential rescue mission, for the final planned shuttle flight, Endeavour's STS-134 mission. For more information, visit www.nasa.gov/shuttle. Photo credit: NASA/Kim Shiflett KSC-2010-5830

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-1 at NASA's Ken...

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-1 at NASA's Kennedy Space Center in Florida, technicians prepare to move an aft access platform into place behind shuttle Atlantis, following the installat... More

KENNEDY SPACE CENTER, FLA. -  In NASA Kennedy Space Center’s Orbiter Processing Facility Bay 3, technicians install a remote manipulator system, or space shuttle arm, previously installed on the orbiter Atlantis, in Discovery’s payload bay.  The arms were switched because the arm that was installed on Atlantis has special instrumentation to gather loads data from the second return-to-flight mission, STS-121.  Discovery is the designated orbiter to fly on STS-121. scheduled to launch no earlier than May 2006. KSC-05pd2490

KENNEDY SPACE CENTER, FLA. - In NASA Kennedy Space Center’s Orbiter P...

KENNEDY SPACE CENTER, FLA. - In NASA Kennedy Space Center’s Orbiter Processing Facility Bay 3, technicians install a remote manipulator system, or space shuttle arm, previously installed on the orbiter Atlanti... More

KENNEDY SPACE CENTER, Fla. -- After rollback of the Rotating Service Structure on Launch Pad 39B, Space Shuttle Endeavour is bathed in light.  Twin solid rocket boosters flank the orange external tank behind Endeavour.  Above the external tank is the Gaseous Oxygen Vent Arm that vents gaseous oxygen vapors away from the Shuttle.  The vent hood assembly at the end is often referred to as the "beanie cap."  Stretching to the crew hatch on the side of Endeavour is the Orbiter Access Arm with its environmentally controlled White Room at the end, through which the crew enters the vehicle.  The Shuttle sits on the Mobile Launcher Platform with the two service tail masts on either side of the main engines.  The tail masts support the fluid, gas and electrical requirements of the orbiter's liquid oxygen and liquid hydrogen aft T-0 umbilicals.  Each tail mast is 31 feet (9.4 meters) high, 15 feet (4.6 meters) long and 9 feet (3.1 meters) wide.   Endeavour is scheduled to launch on mission STS-108 Dec. 4 at 5:45  p.m. EST.  On this 12th flight to the International Space Station, known as a Utilization Flight, Endeavour will carry a crew of four plus the Expedition 4 crew, who will replace Expedition 3 aboard the ISS.  The payload includes the Multi-Purpose Logistics Module Raffaello, filled with supplies, equipment and experiments KSC01PD1763

KENNEDY SPACE CENTER, Fla. -- After rollback of the Rotating Service S...

KENNEDY SPACE CENTER, Fla. -- After rollback of the Rotating Service Structure on Launch Pad 39B, Space Shuttle Endeavour is bathed in light. Twin solid rocket boosters flank the orange external tank behind En... More

CAPE CANAVERAL, Fla. - At the Shuttle Landing Facility at NASA's Kennedy Space Center, STS-129 Mission Specialist Robert L. Satcher Jr. addresses the media and others on hand to welcome his crew to Florida.    The six astronauts for space shuttle Atlantis’ STS-129 mission arrived at Kennedy aboard a NASA Shuttle Training Aircraft, a modified Gulfstream II jet, to make final preparations for their launch.  On STS-129, the crew will deliver to the International Space Station two spare gyroscopes, two nitrogen tank assemblies, two pump modules, an ammonia tank assembly and a spare latching end effector for the station's robotic arm.  Launch is set for Nov. 16.  For information on the STS-129 mission objectives and crew, visit http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts129/index.html. Photo credit: NASA/Kim Shiflett KSC-2009-6201

CAPE CANAVERAL, Fla. - At the Shuttle Landing Facility at NASA's Kenne...

CAPE CANAVERAL, Fla. - At the Shuttle Landing Facility at NASA's Kennedy Space Center, STS-129 Mission Specialist Robert L. Satcher Jr. addresses the media and others on hand to welcome his crew to Florida. ... More

CAPE CANAVERAL, Fla. - Twitter followers and media representatives at the NASA Press Site have front-row seats as space shuttle Atlantis launches through the clouds from Launch Pad 39A on a balmy Florida afternoon at NASA's Kennedy Space Center.    Liftoff on its STS-129 mission came at 2:28 p.m. EST Nov. 16.  Aboard are crew members Commander Charles O. Hobaugh; Pilot Barry E. Wilmore; and Mission Specialists Leland Melvin, Randy Bresnik, Mike Foreman and Robert L. Satcher Jr.  On STS-129, the crew will deliver two ExPRESS Logistics Carriers to the International Space Station, the largest of the shuttle's cargo carriers, containing 15 spare pieces of equipment including two gyroscopes, two nitrogen tank assemblies, two pump modules, an ammonia tank assembly and a spare latching end effector for the station's robotic arm.  Atlantis will return to Earth a station crew member, Nicole Stott, who has spent more than two months aboard the orbiting laboratory.  STS-129 is slated to be the final space shuttle Expedition crew rotation flight. For information on the STS-129 mission and crew, visit http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts129/index.html.  Photo credit: NASA/Gianni Woods KSC-2009-6337

CAPE CANAVERAL, Fla. - Twitter followers and media representatives at ...

CAPE CANAVERAL, Fla. - Twitter followers and media representatives at the NASA Press Site have front-row seats as space shuttle Atlantis launches through the clouds from Launch Pad 39A on a balmy Florida aftern... More

Before entering the orbiter Endeavour, STS-99 Mission Specialist Gerhard Thiele of Germany is helped with final suit preparations by Travis Thompson, mechanical technician and a member of the White Room closeout crew. The White Room is an environmental chamber at the end of the orbiter access arm, on the fixed service structure, that provides entry to the orbiter crew compartment. STS-99, known as the Shuttle Radar Topography Mission (SRTM), will chart a new course to produce unrivaled 3-D images of the Earth's surface. The result of the Shuttle Radar Topography Mission could be close to 1 trillion measurements of the Earth's topography. Scheduled for liftoff at 12:30 p.m. EST, the mission is expected to last 11days, with Endeavour landing at KSC Tuesday, Feb. 22, at 4:36 p.m. EST. This is the 97th Shuttle flight and 14th for Shuttle Endeavour KSC-00pp0235

Before entering the orbiter Endeavour, STS-99 Mission Specialist Gerha...

Before entering the orbiter Endeavour, STS-99 Mission Specialist Gerhard Thiele of Germany is helped with final suit preparations by Travis Thompson, mechanical technician and a member of the White Room closeou... More

KENNEDY SPACE CENTER, FLA. -   After rollback of the rotating service structure (RSS) on Launch Pad 39B, Space Shuttle Discovery stands bathed in lights from the RSS and fixed service structure.  The rollback was in preparation for launch July 1 on mission STS-121.  Extending toward the cockpit of the shuttle is the orbiter access arm with the White Room extended.  The White Room provides access into the orbiter for the astronauts.  The RSS provides protected access to the orbiter for changeout and servicing of payloads at the pad. The structure is supported by a rotating bridge that pivots about a vertical axis on the west side of the pad's flame trench. The hinge column rests on the pad surface and is braced to the fixed service structure. Support for the outer end of the bridge is provided by two eight-wheel, motor-driven trucks that move along circular twin rails installed flush with the pad surface. The track crosses the flame trench on a permanent bridge.  The RSS is 102 feet long, 50 feet wide and 130 feet high. The structure has orbiter access platforms at five levels to provide access to the payload bay while the orbiter is being serviced in the RSS. Each platform has independent extendable planks that can be arranged to conform to a payload's configuration.  This mission is the 115th shuttle flight and the 18th U.S. flight to the International Space Station. Photo credit: NASA/Kim Shiflett KSC-06pd1308

KENNEDY SPACE CENTER, FLA. - After rollback of the rotating service ...

KENNEDY SPACE CENTER, FLA. - After rollback of the rotating service structure (RSS) on Launch Pad 39B, Space Shuttle Discovery stands bathed in lights from the RSS and fixed service structure. The rollback w... More

CAPE CANAVERAL, Fla. - At the Shuttle Landing Facility at NASA's Kennedy Space Center in Florida, workers prepare to roll the transportation case protecting the Russian-built Mini Research Module1, or MRM1, from the cargo bay of a Volga-Dnepr Antonov AN-124-100, a Ukranian/Russian aircraft.    The second in a series of new pressurized components for Russia, the module, named Rassvet, will be permanently attached to the International Space Station's Zarya module on space shuttle Atlantis' STS-132 mission. An Integrated Cargo Carrier will join the MRM in Atlantis' payload bay. Three spacewalks are planned to store spare components outside the station, including six spare batteries, a boom assembly for the Ku-band antenna and spares for the Canadian Dextre robotic arm extension. A radiator, airlock, and European robotic arm for the Russian Multi-purpose Laboratory Module also will be delivered to the station.  Launch is targeted for May 14, 2010.  Photo credit: NASA/Jack Pfaller KSC-2009-6857

CAPE CANAVERAL, Fla. - At the Shuttle Landing Facility at NASA's Kenne...

CAPE CANAVERAL, Fla. - At the Shuttle Landing Facility at NASA's Kennedy Space Center in Florida, workers prepare to roll the transportation case protecting the Russian-built Mini Research Module1, or MRM1, fro... More

KENNEDY SPACE CENTER, Fla. -- With the Rotating Service Structure rolled back, Space Shuttle Discovery is revealed, poised for launch on mission STS-102 at 6:42 a.m. EST March 8. It sits on the Mobile Launcher Platform, which straddles the flame trench below that helps deflect the intense heat of launch. Made of concrete and refractory brick, the trench is 490 feet long, 58 feet wide and 40 feet high. Situated above the external tank is the Gaseous Oxygen Vent Arm with the “beanie cap,” a vent hood. On this eighth construction flight to the International Space Station, Discovery carries the Multi-Purpose Logistics Module Leonardo, the primary delivery system used to resupply and return Station cargo requiring a pressurized environment. Leonardo will deliver up to 10 tons of laboratory racks filled with equipment, experiments and supplies for outfitting the newly installed U.S. Laboratory Destiny KSC01padig145

KENNEDY SPACE CENTER, Fla. -- With the Rotating Service Structure roll...

KENNEDY SPACE CENTER, Fla. -- With the Rotating Service Structure rolled back, Space Shuttle Discovery is revealed, poised for launch on mission STS-102 at 6:42 a.m. EST March 8. It sits on the Mobile Launcher ... More

KENNEDY SPACE CENTER, FLA. -- Sitting atop the Mobile Launcher Platform, Space Shuttle Atlantis inches its way to the launch pad.  The Shuttle and MLP rest on top of the crawler-transporter beneath it, which moves about 1 mile per hour. Atlantis is scheduled for launch April 4 on mission STS-110, which will install the S0 truss, the framework that eventually will hold the power and cooling systems needed for future international research laboratories on the International Space Station.  The  Canadarm2 robotic arm will be used exclusively to hoist the 13-ton truss from the payload bay to the Station.  The S0 truss will be the first major U.S. component launched to the Station since the addition of the Quest airlock in July 2001.  The four spacewalks planned for the construction will all originate from the airlock.  The mission will be Atlantis' 25th trip to space KSC-02pd0275

KENNEDY SPACE CENTER, FLA. -- Sitting atop the Mobile Launcher Platfor...

KENNEDY SPACE CENTER, FLA. -- Sitting atop the Mobile Launcher Platform, Space Shuttle Atlantis inches its way to the launch pad. The Shuttle and MLP rest on top of the crawler-transporter beneath it, which mo... More

KENNEDY SPACE CENTER, FLA. -- Flags wave near Launch Pad 39A where space shuttle Endeavour waits for liftoff.  The rotating service structure was rolled back starting at 8:23 a.m. and complete at 8:55 a.m.  Above the orange external tank is seen the "beanie cap" at the end of the gaseous oxygen vent arm, extending from the fixed service structure. Vapors are created as the liquid oxygen in the external tank boil off. The hood vents the gaseous oxygen vapors away from the space shuttle vehicle.  Below is the orbiter access arm with the White Room at the end, flush against the shuttle.  The crew gains access into the orbiter through the White Room.  The rotating structure provides protected access to the orbiter for changeout and servicing of payloads at the pad. The structure is supported by a rotating bridge that pivots about a vertical axis on the west side of the pad's flame trench. After the RSS is rolled back, the orbiter is ready for fuel cell activation and external tank cryogenic propellant loading operations.  The pad is cleared to the perimeter gate for operations to fill the external tank with about 500,000 gallons of cryogenic propellants used by the shuttle’s main engines. This is done at the pad approximately eight hours before the scheduled launch.  Endeavour and its crew will deliver the first section of the Japan Aerospace Exploration Agency's Kibo laboratory and the Canadian Space Agency's two-armed robotic system, Dextre.  Launch is scheduled for 2:28 a.m. EDT March 11.  Photo credit: NASA/Kim Shiflett KSC-08pd0673

KENNEDY SPACE CENTER, FLA. -- Flags wave near Launch Pad 39A where spa...

KENNEDY SPACE CENTER, FLA. -- Flags wave near Launch Pad 39A where space shuttle Endeavour waits for liftoff. The rotating service structure was rolled back starting at 8:23 a.m. and complete at 8:55 a.m. Abo... More

CAPE CANAVERAL, Fla. - In the Payload Changeout Room on Launch Pad 39A at NASA's Kennedy Space Center in Florida, members of the STS-129 crew, dressed in clean-room attire known as "bunny suits," pause a moment during their payload familiarization training for a photo. From left are Mission Specialists Robert L. Satcher Jr. and Leland Melvin.    The training affords the crew an opportunity to observe the placement of the Express Logistics Carriers 1 and 2 in space shuttle Atlantis' payload bay before launch.  The six astronauts for space shuttle Atlantis’ STS-129 mission came to Kennedy to participate in their launch dress rehearsal, the Terminal Countdown Demonstration Test.  Additional training associated with the test was done last month, but the simulated countdown was postponed because of a scheduling conflict with the launch of NASA’s Ares I-X test rocket.  Launch of Atlantis on its STS-129 mission to the International Space Station is set for Nov. 16.  On STS-129, the crew will deliver to the station two spare gyroscopes, two nitrogen tank assemblies, two pump modules, an ammonia tank assembly and a spare latching end effector for the station's robotic arm.  For information on the STS-129 crew and mission objectives, visit http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts129/index.html. Photo credit: NASA/Kim Shiflett KSC-2009-6105

CAPE CANAVERAL, Fla. - In the Payload Changeout Room on Launch Pad 39A...

CAPE CANAVERAL, Fla. - In the Payload Changeout Room on Launch Pad 39A at NASA's Kennedy Space Center in Florida, members of the STS-129 crew, dressed in clean-room attire known as "bunny suits," pause a moment... More

KENNEDY SPACE CENTER, FLA. -   After rollback of the rotating service structure (RSS) on Launch Pad 39B, Space Shuttle Discovery stands bathed in lights from the RSS and fixed service structure.  The rollback was in preparation for launch July 1 on mission STS-121.  Extending toward the cockpit of the shuttle is the orbiter access arm with the White Room extended.  The White Room provides access into the orbiter for the astronauts.  The RSS provides protected access to the orbiter for changeout and servicing of payloads at the pad. The structure is supported by a rotating bridge that pivots about a vertical axis on the west side of the pad's flame trench. The hinge column rests on the pad surface and is braced to the fixed service structure. Support for the outer end of the bridge is provided by two eight-wheel, motor-driven trucks that move along circular twin rails installed flush with the pad surface. The track crosses the flame trench on a permanent bridge.  The RSS is 102 feet long, 50 feet wide and 130 feet high. The structure has orbiter access platforms at five levels to provide access to the payload bay while the orbiter is being serviced in the RSS. Each platform has independent extendable planks that can be arranged to conform to a payload's configuration.  This mission is the 115th shuttle flight and the 18th U.S. flight to the International Space Station. Photo credit: NASA/Kim Shiflett KSC-06pd1307

KENNEDY SPACE CENTER, FLA. - After rollback of the rotating service ...

KENNEDY SPACE CENTER, FLA. - After rollback of the rotating service structure (RSS) on Launch Pad 39B, Space Shuttle Discovery stands bathed in lights from the RSS and fixed service structure. The rollback w... More

CAPE CANAVERAL, Fla. - Like a phoenix rising from the flames, space shuttle Atlantis emerges from the exhaust cloud building on Launch Pad 39A at NASA's Kennedy Space Center in Florida.    Liftoff on its STS-129 mission came at 2:28 p.m. EST Nov. 16.  Aboard are crew members Commander Charles O. Hobaugh; Pilot Barry E. Wilmore; and Mission Specialists Leland Melvin, Randy Bresnik, Mike Foreman and Robert L. Satcher Jr.  On STS-129, the crew will deliver two ExPRESS Logistics Carriers to the International Space Station, the largest of the shuttle's cargo carriers, containing 15 spare pieces of equipment including two gyroscopes, two nitrogen tank assemblies, two pump modules, an ammonia tank assembly and a spare latching end effector for the station's robotic arm.  Atlantis will return to Earth a station crew member, Nicole Stott, who has spent more than two months aboard the orbiting laboratory.  STS-129 is slated to be the final space shuttle Expedition crew rotation flight. For information on the STS-129 mission and crew, visit http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts129/index.html.    Photo credit: NASA/Tom Farrar and Tony Gray KSC-2009-6361

CAPE CANAVERAL, Fla. - Like a phoenix rising from the flames, space sh...

CAPE CANAVERAL, Fla. - Like a phoenix rising from the flames, space shuttle Atlantis emerges from the exhaust cloud building on Launch Pad 39A at NASA's Kennedy Space Center in Florida. Liftoff on its STS-12... More

CAPE CANAVERAL, Fla. - As the sun sets behind Launch Pad 39A at NASA's Kennedy Space Center in Florida, the rotating service structure has been moved away from space shuttle Atlantis during the T-11 hour hold in the launch countdown.  Liftoff of the STS-129 mission is set for 2:28 p.m. EST Nov. 16.  The movable structure, which provides weather protection and access for technicians to work on the shuttle, began being retracted at 5:20 p.m. EST and was in the park position by 5:56 p.m.    STS-129 crew members are Commander Charles O. Hobaugh; Pilot Barry E. Wilmore; and Mission Specialists Leland Melvin, Randy Bresnik, Mike Foreman and Robert L. Satcher Jr.  On the STS-129 mission to the International Space Station, the crew will deliver two spare gyroscopes, two nitrogen tank assemblies, two pump modules, an ammonia tank assembly and a spare latching end effector for the station's robotic arm.  Atlantis will return to Earth a station crew member, Nicole Stott, who has spent more than two months aboard the orbiting laboratory.  STS-129 is slated to be the final space shuttle Expedition crew rotation flight. For information on the STS-129 mission and crew, visit http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts129/index.html. Photo credit: NASA/Troy Cryder KSC-2009-6300

CAPE CANAVERAL, Fla. - As the sun sets behind Launch Pad 39A at NASA's...

CAPE CANAVERAL, Fla. - As the sun sets behind Launch Pad 39A at NASA's Kennedy Space Center in Florida, the rotating service structure has been moved away from space shuttle Atlantis during the T-11 hour hold i... More

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility 1 at NASA's Kennedy Space Center in Florida, United Space Alliance technicians roll the test equipment away from an external tank door on space shuttle Atlantis following the successful completion of a push test.    Two umbilical doors, located on the shuttle's aft fuselage, close after external tank separation following launch. The test confirms that the door's actuators are functioning properly and that signals sent from the actuators correctly indicate that the doors have closed, creating the necessary thermal barrier for reentry.  Atlantis is next slated to deliver an Integrated Cargo Carrier and Russian-built Mini Research Module to the International Space Station on the STS-132 mission.  The second in a series of new pressurized components for Russia, the module will be permanently attached to the Zarya module. Three spacewalks are planned to store spare components outside the station, including six spare batteries, a boom assembly for the Ku-band antenna and spares for the Canadian Dextre robotic arm extension. A radiator, airlock and European robotic arm for the Russian Multi-purpose Laboratory Module also are payloads on the flight.  Launch is targeted for May 14, 2010.  Photo credit: NASA/Troy Cryder KSC-2010-1076

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility 1 at NASA's Kenn...

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility 1 at NASA's Kennedy Space Center in Florida, United Space Alliance technicians roll the test equipment away from an external tank door on space shuttle Atla... More

CAPE CANAVERAL, Fla. –In Orbiter Processing Facility 3 at NASA's Kennedy Space Center in Florida, STS-128 crew members check out the space shuttle Discovery's robotic arm.  Seen here are Mission Specialists Christer Fuglesang and John "Danny" Olivas. The crew is at Kennedy for a crew equipment interface test, or CEIT, which provides hands-on training and observation of shuttle and flight hardware. The STS-128 flight will carry science and storage racks to the International Space Station on Discovery.  Launch is targeted for Aug. 7.   Photo credit: NASA/Jim Grossmann KSC-2009-3608

CAPE CANAVERAL, Fla. –In Orbiter Processing Facility 3 at NASA's Kenne...

CAPE CANAVERAL, Fla. –In Orbiter Processing Facility 3 at NASA's Kennedy Space Center in Florida, STS-128 crew members check out the space shuttle Discovery's robotic arm. Seen here are Mission Specialists Chr... More

KENNEDY SPACE CENTER, Fla. --  In the glow of a setting sun, Space Shuttle Endeavour is revealed after the rollback of the Rotating Service Structure (left) on Launch Pad 39A. At the top of the external tank can be seen the “beanie cap,” a venting apparatus at the end of the Gaseous Oxygen Vent Arm. Endeavour is expected to lift off on mission STS-100 on April 19, carrying the Multi-Purpose Logistics Module Raffaello and the Canadian robotic arm, SSRMS, with a crew of seven to the International Space Station KSC-01pp0909

KENNEDY SPACE CENTER, Fla. -- In the glow of a setting sun, Space Shu...

KENNEDY SPACE CENTER, Fla. -- In the glow of a setting sun, Space Shuttle Endeavour is revealed after the rollback of the Rotating Service Structure (left) on Launch Pad 39A. At the top of the external tank ca... More

KENNEDY SPACE CENTER, FLA. -- At Launch Pad 39-A, the STS-111 and Expedition Five crews take time out from a tour of the pad with their friends and family to pose for a group portrait.  From left, they are STS-111 Pilot Paul Lockhart, STS-111 Commander Kenneth Cockrell, Expedition Five Commander Valeri Korzun (RSA), Expedition Five astronaut Peggy Whitson, Expedition Five cosmonaut Sergei Treschev (RSA), and STS-111 Mission Specialists Philippe Perrin (CNES) and Franklin Chang-Diaz.  Expedition Five is traveling to the International Space Station on Space Shuttle Endeavour as the replacement crew for Expedition Four, who will return to Earth aboard the orbiter. Known as Utilization Flight 2, STS-111 is carrying supplies and equipment to the Station. The payload includes the Multi-Purpose Logistics Module Leonardo, the Mobile Base System, which will be installed on the Mobile Transporter to complete the Canadian Mobile Servicing System, or MSS, and a replacement wrist/roll joint for Canadarm 2. The mechanical arm will then have the capability to "inchworm" from the U.S. Lab Destiny to the MSS and travel along the truss to work sites. Launch is scheduled for May 30, 2002 KSC-02pd0814

KENNEDY SPACE CENTER, FLA. -- At Launch Pad 39-A, the STS-111 and Expe...

KENNEDY SPACE CENTER, FLA. -- At Launch Pad 39-A, the STS-111 and Expedition Five crews take time out from a tour of the pad with their friends and family to pose for a group portrait. From left, they are STS-... More

CAPE CANAVERAL, Fla. - STS-129 Commander Charles O. Hobaugh, left, is welcomed by Space Shuttle Launch Director Mike Leinbach at the Shuttle Landing Facility at NASA's Kennedy Space Center in Florida. The six astronauts for space shuttle Atlantis’ STS-129 mission have arrived at Kennedy for their launch dress rehearsal, the Terminal Countdown Demonstration Test.    Additional training associated with the test was done last month, but the simulated countdown was postponed because of a scheduling conflict with the launch of NASA’s Ares I-X test rocket.  Launch of Atlantis on its STS-129 mission to the International Space Station is set for Nov. 16. On STS-129, the crew will deliver to the station two spare gyroscopes, two nitrogen tank assemblies, two pump modules, an ammonia tank assembly and a spare latching end effector for the station's robotic arm.  For information on the STS-129 mission objectives and crew, visit http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts129/index.html. Photo credit: NASA/Troy Cryder KSC-2009-6035

CAPE CANAVERAL, Fla. - STS-129 Commander Charles O. Hobaugh, left, is ...

CAPE CANAVERAL, Fla. - STS-129 Commander Charles O. Hobaugh, left, is welcomed by Space Shuttle Launch Director Mike Leinbach at the Shuttle Landing Facility at NASA's Kennedy Space Center in Florida. The six a... More

CAPE CANAVERAL, Fla. – In the White Room on Launch Pad 39A at NASA's Kennedy Space Center in Florida, STS-119 Mission Specialists Koichi Wakata (center) and Steve Swanson are getting into their harnesses, which include a parachute pack, before crawling through the open hatch into space shuttle Discovery. The White Room is at the end of the orbiter access arm on the fixed service structure and provides access into the shuttle. The STS-119 mission is the 28th to the International Space Station and the 125th space shuttle flight.  Discovery will deliver the final pair of power-generating solar array wings and the S6 truss segment.  Installation of S6 will signal the station's readiness to house a six-member crew for conducting increased science. Liftoff is scheduled for 7:43 p.m. EDT. Photo credit: NASA/Tony Gray, Tom Farrar KSC-2009-2056

CAPE CANAVERAL, Fla. – In the White Room on Launch Pad 39A at NASA's K...

CAPE CANAVERAL, Fla. – In the White Room on Launch Pad 39A at NASA's Kennedy Space Center in Florida, STS-119 Mission Specialists Koichi Wakata (center) and Steve Swanson are getting into their harnesses, which... More

CAPE CANAVERAL, Fla. – In the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, a battery charge-discharge unit is lifted by crane high above the hardware on the bay's floor. The unit is being moved toward an EXPRESS Logistics Carrier where it will be installed for flight.  The carrier is part of the STS-129 payload on space shuttle Atlantis, which will deliver to the International Space Station two spare gyroscopes, two nitrogen tank assemblies, two pump modules, an ammonia tank assembly and a spare latching end effector for the station's robotic arm. STS-129 is targeted to launch Nov. 12. Photo credit: NASA/Jim Grossmann KSC-2009-4680

CAPE CANAVERAL, Fla. – In the Space Station Processing Facility at NAS...

CAPE CANAVERAL, Fla. – In the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, a battery charge-discharge unit is lifted by crane high above the hardware on the bay's floor. The unit... More

CAPE CANAVERAL, Fla. - With nearly 7 million pounds of thrust generated with the aid of twin solid rocket boosters, space shuttle Atlantis roars into the blue skies over Launch Pad 39A at NASA's Kennedy Space Center in Florida.     Liftoff on its STS-129 mission came at 2:28 p.m. EST Nov. 16.  Aboard are crew members Commander Charles O. Hobaugh; Pilot Barry E. Wilmore; and Mission Specialists Leland Melvin, Randy Bresnik, Mike Foreman and Robert L. Satcher Jr.  On STS-129, the crew will deliver two ExPRESS Logistics Carriers to the International Space Station, the largest of the shuttle's cargo carriers, containing 15 spare pieces of equipment including two gyroscopes, two nitrogen tank assemblies, two pump modules, an ammonia tank assembly and a spare latching end effector for the station's robotic arm.  Atlantis will return to Earth a station crew member, Nicole Stott, who has spent more than two months aboard the orbiting laboratory.  STS-129 is slated to be the final space shuttle Expedition crew rotation flight. For information on the STS-129 mission and crew, visit http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts129/index.html.    Photo credit: NASA/Rusty Backer and Tom Farrar KSC-2009-6387

CAPE CANAVERAL, Fla. - With nearly 7 million pounds of thrust generate...

CAPE CANAVERAL, Fla. - With nearly 7 million pounds of thrust generated with the aid of twin solid rocket boosters, space shuttle Atlantis roars into the blue skies over Launch Pad 39A at NASA's Kennedy Space C... More

KENNEDY SPACE CENTER, FLA. -- From the deck of Liberty Star, one of two KSC solid rocket booster recovery ships, a crane lowers a one-man submarine into the ocean near Cape Canaveral, Fla. Called DeepWorker 2000, the sub is being tested on its ability to duplicate the sometimes hazardous job United Space Alliance (USA) divers perform to recover the expended boosters in the ocean after a launch. The boosters splash down in an impact area about 140 miles east of Jacksonville and after recovery are towed back to KSC for refurbishment by the specially rigged recovery ships. DeepWorker 2000 will be used in a demonstration during retrieval operations after the upcoming STS-101 launch. The submarine pilot will demonstrate capabilities to cut tangled parachute riser lines using a manipulator arm and attach a Diver Operator Plug to extract water and provide flotation for the booster. DeepWorker 2000 was built by Nuytco Research Ltd., North Vancouver, British Columbia. It is 8.25 feet long, 5.75 feet high, and weighs 3,800 pounds. USA is a prime contractor to NASA for the Space Shuttle program KSC-00padig014

KENNEDY SPACE CENTER, FLA. -- From the deck of Liberty Star, one of tw...

KENNEDY SPACE CENTER, FLA. -- From the deck of Liberty Star, one of two KSC solid rocket booster recovery ships, a crane lowers a one-man submarine into the ocean near Cape Canaveral, Fla. Called DeepWorker 200... More

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility 1 at NASA's Kennedy Space Center in Florida, preparations are under way to install the chin panel on space shuttle Atlantis.    The chin panel is a semicircular-shaped section of reinforced carbon-carbon that fits under the shuttle's nose cap and is part of its thermal protection system.  Atlantis is next slated to deliver an Integrated Cargo Carrier and Russian-built Mini Research Module to the International Space Station on the STS-132 mission. The second in a series of new pressurized components for Russia, the module will be permanently attached to the Zarya module. Three spacewalks are planned to store spare components outside the station, including six spare batteries, a boom assembly for the Ku-band antenna and spares for the Canadian Dextre robotic arm extension. A radiator, airlock and European robotic arm for the Russian Multi-purpose Laboratory Module also are payloads on the flight.  Launch is targeted for May 14, 2010.    Photo credit: NASA/Troy Cryder KSC-2010-1243

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility 1 at NASA's Kenn...

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility 1 at NASA's Kennedy Space Center in Florida, preparations are under way to install the chin panel on space shuttle Atlantis. The chin panel is a semicirc... More

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, testing of the Tilt-Up Umbilical Arm (TUUA) prototype's Environmental Control System Quick Disconnect takes place in the Launch Equipment Test Facility's 6,000-square-foot high bay. The prototype is used to demonstrate the safe disconnect and retraction of ground umbilical plates and associated hardware of a launch vehicle's upper stage and service module. The Environmental Control System consists of regulated air, which would be used to purge an inner tank and crew module.     Since 1977, the facility has supported NASA’s Launch Services, shuttle, International Space Station, and Constellation programs, as well as commercial providers. The facility recently underwent a major upgrade to support even more programs, projects and customers. It houses a cable fabrication and molding shop, pneumatics shop, machine and weld shop and full-scale control room. Outside, the facility features a water flow test loop, vehicle motion simulator, 600-ton test fixture, launch simulation towers and a cryogenic system. Photo credit: NASA/Jack Pfaller KSC-2010-5293

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, tes...

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, testing of the Tilt-Up Umbilical Arm (TUUA) prototype's Environmental Control System Quick Disconnect takes place in the Launch Equipment Test ... More

CAPE CANAVERAL, Fla. – In NASA Kennedy Space Center's Orbiter Processing Facility 1, technicians begin a functional test on the orbital docking system on space shuttle Atlantis.  The STS-129 mission will deliver to the International Space Station two spare gyroscopes, two nitrogen tank assemblies, two pump modules, an ammonia tank assembly and a spare latching end effector for the station's robotic arm. STS-129 is targeted to launch Nov. 12. Photo credit: NASA/Kim Shiflett KSC-2009-4811

CAPE CANAVERAL, Fla. – In NASA Kennedy Space Center's Orbiter Processi...

CAPE CANAVERAL, Fla. – In NASA Kennedy Space Center's Orbiter Processing Facility 1, technicians begin a functional test on the orbital docking system on space shuttle Atlantis. The STS-129 mission will delive... More

CAPE CANAVERAL, Fla. - In the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, the accordion-like arm of a rack insertion device moves a science rack into position for installation inside Multi-Purpose Logistics Module Leonardo during processing for space shuttle Discovery's STS-131 mission to the International Space Station.    The science racks Leonardo delivers will be transferred to laboratories on the station. Three spacewalks during STS-131 will include work to attach a spare ammonia tank assembly to the station's exterior and return a European experiment from outside the station's Columbus module. STS-131 will be the 33rd shuttle mission to the station. Launch is targeted for March 18, 2010.  Photo credit: NASA/Amanda Diller KSC-2009-6568

CAPE CANAVERAL, Fla. - In the Space Station Processing Facility at NAS...

CAPE CANAVERAL, Fla. - In the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, the accordion-like arm of a rack insertion device moves a science rack into position for installation i... More

KENNEDY SPACE CENTER, Fla.  -- In the White Room on Launch Pad 39A, Mission Specialist Barbara R. Morgan adjusts the collar of her launch and entry suit before she enters Space Shuttle Endeavour.  Morgan, the teacher-turned-astronaut, and the rest of the crew are taking part in a simulated launch countdown, the culmination of terminal countdown demonstration test activities.  The White Room is situated at the end of the orbiter access arm and provides entry into the orbiter. TCDT activities also include M-113 training, payload familiarization and emergency egress training at the pad.  The mission is the 22nd flight to the International Space Station and Space Shuttle Endeavour will carry a payload including the S5 truss, a SPACEHAB module and external stowage platform 3. STS-118 is targeted for launch on Aug. 7.  Photo credit: NASA/Amanda Diller KSC-07pd1993

KENNEDY SPACE CENTER, Fla. -- In the White Room on Launch Pad 39A, Mi...

KENNEDY SPACE CENTER, Fla. -- In the White Room on Launch Pad 39A, Mission Specialist Barbara R. Morgan adjusts the collar of her launch and entry suit before she enters Space Shuttle Endeavour. Morgan, the t... More

KENNEDY SPACE CENTER, FLA. -- The late afternoon sun highlights the external tank and solid rocket booster on Space Shuttle Columbia after rollback of the Rotating Service Structure on Launch Pad 39A. Visible are the orbiter access arm with the White Room extended to Columbia's cockpit, and at the top, the gaseous oxygen vent arm and cap, called the "beanie cap." Columbia is scheduled for launch Jan. 16 at 10:39 a.m. EST on mission STS-107, a research mission. KSC-03pd0077

KENNEDY SPACE CENTER, FLA. -- The late afternoon sun highlights the ex...

KENNEDY SPACE CENTER, FLA. -- The late afternoon sun highlights the external tank and solid rocket booster on Space Shuttle Columbia after rollback of the Rotating Service Structure on Launch Pad 39A. Visible a... More

CAPE CANAVERAL, Fla. –  In Orbiter Processing Facility 2 at NASA's Kennedy Space Center, STS-126 crew members are lowered inside space shuttle Endeavour's payload bay to inspect hardware like the shuttle's robotic arm and orbiter boom sensor system.  Members of space shuttle Endeavour's STS-126 crew are at Kennedy to participate in a crew equipment interface test, or CEIT.  The CEIT provides experience handling tools, equipment and hardware they will use on the mission. Endeavour will deliver a multi-purpose logistics module to the International Space Station on the STS-126 mission. Launch is targeted for Nov. 10.  Photo credit: NASA/Kim Shiflett KSC-08pd2255

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility 2 at NASA's Ken...

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility 2 at NASA's Kennedy Space Center, STS-126 crew members are lowered inside space shuttle Endeavour's payload bay to inspect hardware like the shuttle's robo... More

KENNEDY SPACE CENTER, FLA. --  While in the White Room to complete suiting up before climbing into Space Shuttle Discovery, STS-116 Mission Specialist Nicholas Patrick sends a message home.  In the background is Mission Specialist Christer Fuglesang, who represents the European Space Agency. The White Room is at the end of the orbiter access arm that extends from the fixed service structure and provides entry into the orbiter.  The first launch attempt of STS-116 on Dec. 7 was postponed due a low cloud ceiling over Kennedy Space Center. This second launch attempt is scheduled for 8:47 p.m. This is Discovery's 33rd mission and the first night launch since 2002.   The 20th shuttle mission to the International Space Station, STS-116 carries another truss segment, P5. It will serve as a spacer, mated to the P4 truss that was attached in September.  After installing the P5, the crew will reconfigure and redistribute the power generated by two pairs of U.S. solar arrays. Landing is expected Dec. 21 at KSC.    Photo credit: NASA/Tony Gray & Don Kight KSC-06pp2776

KENNEDY SPACE CENTER, FLA. -- While in the White Room to complete sui...

KENNEDY SPACE CENTER, FLA. -- While in the White Room to complete suiting up before climbing into Space Shuttle Discovery, STS-116 Mission Specialist Nicholas Patrick sends a message home. In the background i... More

CAPE CANAVERAL, Fla. - On Launch Pad 39A at NASA's Kennedy Space Center in Florida, STS-129 Mission Specialist Robert L. Satcher Jr., dressed in his launch-and-entry suit, is strapped into his seat aboard space shuttle Atlantis.  The six astronauts for space shuttle Atlantis’ STS-129 mission are participating in their launch dress rehearsal, the Terminal Countdown Demonstration Test.    Additional training associated with the test was done last month, but the simulated countdown was postponed because of a scheduling conflict with the launch of NASA’s Ares I-X test rocket.  Launch of Atlantis on its STS-129 mission to the International Space Station is set for Nov. 16.  On STS-129, the crew will deliver to the station two spare gyroscopes, two nitrogen tank assemblies, two pump modules, an ammonia tank assembly and a spare latching end effector for the station's robotic arm.  For information on the STS-129 crew and mission objectives, visit http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts129/index.html. Photo credit: NASA/Kim Shiflett KSC-2009-6068

CAPE CANAVERAL, Fla. - On Launch Pad 39A at NASA's Kennedy Space Cente...

CAPE CANAVERAL, Fla. - On Launch Pad 39A at NASA's Kennedy Space Center in Florida, STS-129 Mission Specialist Robert L. Satcher Jr., dressed in his launch-and-entry suit, is strapped into his seat aboard space... More

CAPE CANAVERAL, Fla. - With nearly 7 million pounds of thrust generated by twin solid rocket boosters and three main engines, space shuttle Atlantis clears the tower on Launch Pad 39A at NASA's Kennedy Space Center in Florida.     Liftoff on its STS-129 mission came at 2:28 p.m. EST Nov. 16.  Aboard are crew members Commander Charles O. Hobaugh; Pilot Barry E. Wilmore; and Mission Specialists Leland Melvin, Randy Bresnik, Mike Foreman and Robert L. Satcher Jr.  On STS-129, the crew will deliver two ExPRESS Logistics Carriers to the International Space Station, the largest of the shuttle's cargo carriers, containing 15 spare pieces of equipment including two gyroscopes, two nitrogen tank assemblies, two pump modules, an ammonia tank assembly and a spare latching end effector for the station's robotic arm.  Atlantis will return to Earth a station crew member, Nicole Stott, who has spent more than two months aboard the orbiting laboratory.  STS-129 is slated to be the final space shuttle Expedition crew rotation flight. For information on the STS-129 mission and crew, visit http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts129/index.html.    Photo credit: NASA/Tom Farrar and Tony Gray KSC-2009-6392

CAPE CANAVERAL, Fla. - With nearly 7 million pounds of thrust generate...

CAPE CANAVERAL, Fla. - With nearly 7 million pounds of thrust generated by twin solid rocket boosters and three main engines, space shuttle Atlantis clears the tower on Launch Pad 39A at NASA's Kennedy Space Ce... More

CAPE CANAVERAL, Fla. – On Launch Pad 39A at NASA's Kennedy Space Center in Florida, the orbiter access arm and White Room are extended toward space shuttle Discovery after rollback of the rotating service structure.  Above the external tank is the oxygen vent hood, called the "beanie cap."  The rollback is in preparation for Discovery's liftoff on the STS-119 mission with a crew of seven. The rotating structure provides protected access to the shuttle for changeout and servicing of payloads at the pad. After the RSS is rolled back, the orbiter is ready for fuel cell activation and external tank cryogenic propellant loading operations. The mission is the 28th to the International Space Station and the 125th space shuttle flight.  Discovery will deliver the final pair of power-generating solar array wings and the S6 truss segment.  Installation of S6 will signal the station's readiness to house a six-member crew for conducting increased science.  Liftoff of Discovery is scheduled for 9:20 p.m. EDT on March 11.   Photo credit: NASA/Kim Shiflett KSC-2009-2020

CAPE CANAVERAL, Fla. – On Launch Pad 39A at NASA's Kennedy Space Cente...

CAPE CANAVERAL, Fla. – On Launch Pad 39A at NASA's Kennedy Space Center in Florida, the orbiter access arm and White Room are extended toward space shuttle Discovery after rollback of the rotating service struc... More

CAPE CANAVERAL, Fla. – Inside the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, a strongback crane is lowered toward the EXPRESS Logistics Carrier to lift it to a stand. The carrier is part of the payload on space shuttle Atlantis, which will deliver to the International Space Station components including two spare gyroscopes, two nitrogen tank assemblies, two pump modules, an ammonia tank assembly and a spare latching end effector for the station's robotic arm.  STS-129 is targeted to launch Nov. 12.  Photo credit: NASA/Tim Jacobs KSC-2009-2247

CAPE CANAVERAL, Fla. – Inside the Space Station Processing Facility at...

CAPE CANAVERAL, Fla. – Inside the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, a strongback crane is lowered toward the EXPRESS Logistics Carrier to lift it to a stand. The carri... More

CAPE CANAVERAL, Fla. – In the Space Station Processing Facility at NASA's Kennedy Space Center in Florida,  a crane lifts the plasma contactor unit, or PCU, that will be installed on the Express Logistics Carrier, or ELC.  The PCU is used to disperse electrical charge build-ups on the International Space Station. The carrier is part of the STS-129 payload on space shuttle Atlantis, which will deliver to the International Space Station two spare gyroscopes, two nitrogen tank assemblies, two pump modules, an ammonia tank assembly and a spare latching end effector for the station's robotic arm. STS-129 is targeted to launch Nov. 12.  Photo credit: NASA/Jack Pfaller KSC-2009-5127

CAPE CANAVERAL, Fla. – In the Space Station Processing Facility at NAS...

CAPE CANAVERAL, Fla. – In the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, a crane lifts the plasma contactor unit, or PCU, that will be installed on the Express Logistics Carri... More

CAPE CANAVERAL, Fla. – Just before dawn, space shuttle Endeavour, installed on the mobile launcher platform  atop the crawler-transporter, is on Launch Pad 39B at NASA's Kennedy Space Center in Florida.  First motion out of the Vehicle Assembly Building was at 11:57 p.m. EDT April 16.  The shuttle was secure on the pad at 7:17 a.m. EDT April 17. On the left of the shuttle is the White Room at the end of the orbiter access arm, 147 feet above the pad. When in place against the shuttle, the White Room provides access into the crew compartment on the shuttle. Endeavour will be prepared on the pad for liftoff in the unlikely event that a rescue mission is necessary following space shuttle Atlantis' launch on the STS-125 mission to service NASA's  Hubble Space Telescope. After Atlantis is cleared to land, Endeavour will move to Launch Pad 39A for its upcoming STS-127 mission to the International Space Station, targeted to launch June 13.   Photo credit: NASA/Jack Pfaller KSC-2009-2690

CAPE CANAVERAL, Fla. – Just before dawn, space shuttle Endeavour, inst...

CAPE CANAVERAL, Fla. – Just before dawn, space shuttle Endeavour, installed on the mobile launcher platform atop the crawler-transporter, is on Launch Pad 39B at NASA's Kennedy Space Center in Florida. First ... More

CAPE CANAVERAL, Fla. - Inside the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida, the 327-foot-tall Ares I-X rocket stands on its mobile launcher platform.    The transfer of the pad from the Space Shuttle Program to the Constellation Program took place May 31. Modifications made to the pad include the removal of shuttle unique subsystems, such as the orbiter access arm and a section of the gaseous oxygen vent arm, along with the installation of three 600-foot lightning towers, access platforms, environmental control systems and a vehicle stabilization system.  Part of the Constellation Program, the Ares I-X is the test vehicle for the Ares I. The Ares I-X flight test is targeted for Oct. 27. For information on the Ares I-X vehicle and flight test, visit http://www.nasa.gov/aresIX. Photo credit: NASA/Kim Shiflett KSC-2009-5541

CAPE CANAVERAL, Fla. - Inside the Vehicle Assembly Building at NASA's ...

CAPE CANAVERAL, Fla. - Inside the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida, the 327-foot-tall Ares I-X rocket stands on its mobile launcher platform. The transfer of the pad from t... More

KENNEDY SPACE CENTER, FLA. - Expedition 5 crew member Peggy Whitson undergoes a suit check as part of Terminal Countdown Demonstration Test activities at KSC.  The TCDT includes emergency egress training at the pad and a simulated launch countdown.  Expedition 5 will travel to the International Space Station on mission STS-111 as the replacement crew for Expedition 4, who will return to Earth aboard Endeavour.  Known as Utilization Flight -2, the mission includes attaching a Canadian-built mobile base system to the International Space Station that will enable the Canadarm2 robotic arm to move along a railway on the Station's truss to build and maintain the outpost.  The crew will also replace a faulty wrist/roll joint on the Canadarm2 as well as unload almost three tons of experiments and supplies from the Italian-built Multi-Purpose Logistics Module Leonardo.  Launch of Space Shuttle Endeavour on mission STS-111 is scheduled for May 30, 2002 KSC-02pd0675

KENNEDY SPACE CENTER, FLA. - Expedition 5 crew member Peggy Whitson un...

KENNEDY SPACE CENTER, FLA. - Expedition 5 crew member Peggy Whitson undergoes a suit check as part of Terminal Countdown Demonstration Test activities at KSC. The TCDT includes emergency egress training at the... More

KENNEDY SPACE CENTER, FLA. -- Access platforms at Launch Pad 39A are moved into position against Space Shuttle Discovery atop a mobile launch platform. Discovery arrived at its seaside launch pad around noon and was hard down at 1:15 p.m.  First motion out of the Vehicle Assembly Building was at 6:47 a.m. EDT.  Rollout is a milestone for Discovery's launch to the International Space Station on mission STS-120, targeted for Oct. 23. The crew will be delivering and installing the Italian-built U.S. Node 2, named Harmony. The pressurized module will act as an internal connecting port and passageway to additional international science labs and cargo spacecraft. In addition to increasing the living and working space inside the station, it also will serve as a work platform outside for the station's robotic arm.   Photo credit: NASA/George Shelton KSC-07pd2634

KENNEDY SPACE CENTER, FLA. -- Access platforms at Launch Pad 39A are m...

KENNEDY SPACE CENTER, FLA. -- Access platforms at Launch Pad 39A are moved into position against Space Shuttle Discovery atop a mobile launch platform. Discovery arrived at its seaside launch pad around noon an... More

KENNEDY SPACE CENTER, FLA. -   The STS-115 crew is in the White Room on the orbiter access arm on Launch Pad 39B to get instruction on using the emergency egress system. From left are Commander Brent Jett, Pilot Chris Ferguson, and Mission Specialists Heidemarie Stefanyshyn-Piper, Joseph Tanner, Steven MacLean and Daniel Burbank.  MacLean is with the Canadian Space Agency.  The White Room provides access into the orbiter through the crew access hatch. The mission crew is at KSC for Terminal Countdown Demonstration Test (TCDT) activities that are preparation for launch on Space Shuttle Atlantis, scheduled to take place in a window that opens Aug. 27.  During their 11-day mission to the International Space Station, the STS-115 crew will continue construction of the station and attach the payload elements, the Port 3/4 truss segment with its two large solar arrays.  Photo credit: NASA/Cory Huston KSC-06pd1774

KENNEDY SPACE CENTER, FLA. - The STS-115 crew is in the White Room o...

KENNEDY SPACE CENTER, FLA. - The STS-115 crew is in the White Room on the orbiter access arm on Launch Pad 39B to get instruction on using the emergency egress system. From left are Commander Brent Jett, Pilo... More

CAPE CANAVERAL, Fla. -- In NASA Kennedy Space Center's Space Station Processing Facility, STS-129 Mission Specialist Randy Bresnik gets a close look at hardware installed on the Express Logistics Carrier, or ELC.  The crew is at Kennedy for a Crew Equipment Interface Test, which provides hands-on training and observation of shuttle and flight hardware. The carrier is part of the STS-129 payload on space shuttle Atlantis, which will deliver to the International Space Station two spare gyroscopes, two nitrogen tank assemblies, two pump modules, an ammonia tank assembly and a spare latching end effector for the station's robotic arm. STS-129 is targeted to launch Nov. 12.   Photo credit: NASA/Jim Grossmann KSC-2009-5080

CAPE CANAVERAL, Fla. -- In NASA Kennedy Space Center's Space Station P...

CAPE CANAVERAL, Fla. -- In NASA Kennedy Space Center's Space Station Processing Facility, STS-129 Mission Specialist Randy Bresnik gets a close look at hardware installed on the Express Logistics Carrier, or EL... More

CAPE CANAVERAL, Fla. – In NASA Kennedy Space Center's Space Station Processing Facility, an overhead crane moves the Express Logistics Carrier, or ELC, to a rotation stand.  The carrier is part of the STS-129 payload on space shuttle Atlantis, which will deliver to the International Space Station two spare gyroscopes, two nitrogen tank assemblies, two pump modules, an ammonia tank assembly and a spare latching end effector for the station's robotic arm. STS-129 is targeted to launch Nov. 12.  Photo credit: NASA/Kim Shiflett KSC-2009-4686

CAPE CANAVERAL, Fla. – In NASA Kennedy Space Center's Space Station Pr...

CAPE CANAVERAL, Fla. – In NASA Kennedy Space Center's Space Station Processing Facility, an overhead crane moves the Express Logistics Carrier, or ELC, to a rotation stand. The carrier is part of the STS-129 p... More

CAPE CANAVERAL, Fla. – Lights bathe space shuttle Discovery on Launch Pad 39A at NASA's Kennedy Space Center in Florida after rollback of the rotating service structure. The orbiter access arm and White Room are extended toward Discovery. The White Room provides crew access into the shuttle. Above the external tank is the oxygen vent hood, called the "beanie cap."  The rollback is in preparation for Discovery's liftoff on the STS-119 mission with a crew of seven. The rotating structure provides protected access to the shuttle for changeout and servicing of payloads at the pad. After the RSS is rolled back, the orbiter is ready for fuel cell activation and external tank cryogenic propellant loading operations. The mission is the 28th to the International Space Station and the 125th space shuttle flight.  Discovery will deliver the final pair of power-generating solar array wings and the S6 truss segment.  Installation of S6 will signal the station's readiness to house a six-member crew for conducting increased science.  Liftoff of Discovery is scheduled for 9:20 p.m. EDT on March 11.   Photo credit: NASA/Kim Shiflett KSC-2009-2024

CAPE CANAVERAL, Fla. – Lights bathe space shuttle Discovery on Launch ...

CAPE CANAVERAL, Fla. – Lights bathe space shuttle Discovery on Launch Pad 39A at NASA's Kennedy Space Center in Florida after rollback of the rotating service structure. The orbiter access arm and White Room ar... More

Space Shuttle Endeavour finally rests on Launch Pad 39B after its rollout was stalled several hours to fix a broken cleat on the crawler-transporter. At the far left is the Rotating Service Structure. From the Fixed Service Structure, the Orbiter Access Arm is already extended to the orbiter. Endeavour is scheduled to be launched Nov. 30 at 10:01 p.m. EST on mission STS-97, the sixth construction flight to the International Space Station. Its payload includes the P6 Integrated Truss Structure and a photovoltaic (PV) module, with giant solar arrays that will provide power to the Station. The mission includes two spacewalks to complete the solar array connections KSC-00dig069

Space Shuttle Endeavour finally rests on Launch Pad 39B after its roll...

Space Shuttle Endeavour finally rests on Launch Pad 39B after its rollout was stalled several hours to fix a broken cleat on the crawler-transporter. At the far left is the Rotating Service Structure. From the ... More

KENNEDY SPACE CENTER, FLA. -- With the Rotating Service Structure rolled back, Space Shuttle Atlantis stands ready for launch on mission STS-110.  The Orbiter Access Arm extends from the Fixed Service Structure (FSS) to the crew compartment hatch, through which the STS-110 crew will enter Atlantis. Above the golden external tank is the vent hood (known as the "beanie cap") at the end of the gaseous oxygen vent arm.  Vapors are created as the liquid oxygen in the external tank boil off.   The hood vents the gaseous oxygen vapors away from the Space Shuttle vehicle.  The RSS provides protected access to the orbiter for changeout and servicing of payloads at the pad.  The structure has access platforms at five levels to provide access to the payload bay.  The FSS provides access to the orbiter and the RSS.  Mission STS-110 is scheduled to launch April 4 on its 11-day mission to the International Space Station KSC-02pd0392

KENNEDY SPACE CENTER, FLA. -- With the Rotating Service Structure roll...

KENNEDY SPACE CENTER, FLA. -- With the Rotating Service Structure rolled back, Space Shuttle Atlantis stands ready for launch on mission STS-110. The Orbiter Access Arm extends from the Fixed Service Structure... More

CAPE CANAVERAL, Fla. –  In Orbiter Processing Facility bay 3 at NASA's Kennedy Space Center in Florida, technicians secure the remote manipulator system, or RMS, removed from space shuttle Discovery onto a storage platform.  The RMS is used to grab, or grapple, the payload as well as retrieve, repair and deploy satellites; provide a mobile extension ladder for spacewalking crewmembers; and be used as an inspection aid to allow flight crew members to view the orbiter’s or payload’s surfaces through a TV camera on the arm. Discovery is targeted to launch Aug. 6 on the STS-128 mission.  Photo credit: NASA/Jack Pfaller KSC-2009-2968

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility bay 3 at NASA's...

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility bay 3 at NASA's Kennedy Space Center in Florida, technicians secure the remote manipulator system, or RMS, removed from space shuttle Discovery onto a stor... More

KENNEDY SPACE CENTER, FLA. -- Space Shuttle Endeavour, atop the mobile launcher platform, is hard down on Launch Pad 39A after rolling out overnight.  First motion out of the Vehicle Assembly Building was at 8:10 p.m.  July 10.  The components of the shuttle are, first, the orbiter and then the solid rocket boosters flanking the external tank behind it.  To the left of the shuttle is the rotating service structure, which can be rolled around to enclose the vehicle for access during processing.  Behind it is the fixed service structure, topped by an 80-foot-tall lightning mast.  Extending from it to Endeavour is the orbiter access arm, which provides access into the vehicle. Endeavour is scheduled to launch on mission STS-118 on Aug. 7.  During the mission, Endeavour will carry into orbit the S5 truss, SPACEHAB module and external stowage platform 3. The mission is the 22nd flight to the International Space Station and will mark the first flight of Mission Specialist Barbara Morgan, the teacher-turned-astronaut whose association with NASA began more than 20 years ago.  STS-118 will be the first flight since 2002 for Endeavour, which has undergone extensive modifications, including the addition of safety upgrades already added to orbiters Discovery and Atlantis.  Photo credit: NASA/Ken Thornsley KSC-07pd1852

KENNEDY SPACE CENTER, FLA. -- Space Shuttle Endeavour, atop the mobile...

KENNEDY SPACE CENTER, FLA. -- Space Shuttle Endeavour, atop the mobile launcher platform, is hard down on Launch Pad 39A after rolling out overnight. First motion out of the Vehicle Assembly Building was at 8:... More

The Marshall Space Flight Center (MSFC) played a crucial role in the development of the huge Saturn rockets that delivered humans to the moon in the 1960s.  Many unique facilities existed at MSFC for the development and testing of the Saturn rockets.  Affectionately nicknamed “The Arm Farm”, the Random Motion/ Lift-Off Simulator was one of those unique facilities. This facility was developed to test the swing arm mechanisms that were used to hold the rocket in position until liftoff. The Arm Farm provided the capability of testing the detachment and reconnection of various arms under brutally realistic conditions.  The 18-acre facility consisted of more than a half dozen arm test positions and one position for testing access arms used by the Apollo astronauts. Each test position had two elements: a vehicle simulator for duplicating motions during countdown and launch; and a section duplicating the launch tower. The vehicle simulator duplicated the portion of the vehicle skin that contained the umbilical connections and personnel access hatches. Driven by a hydraulic servo system, the vehicle simulator produced relative motion between the vehicle and tower. On the Arm Farm, extreme environmental conditions (such as a launch scrub during an approaching Florida thunderstorm) could be simulated. The dramatic scenes that the Marshall engineers and technicians created at the Arm Farm permitted the gathering of crucial technical and engineering data to ensure a successful real time launch from the Kennedy Space Center. This photo depicts a close up of the S-IV-B aft swing arm cam lever stop strain guage. n/a

The Marshall Space Flight Center (MSFC) played a crucial role in the d...

The Marshall Space Flight Center (MSFC) played a crucial role in the development of the huge Saturn rockets that delivered humans to the moon in the 1960s. Many unique facilities existed at MSFC for the develo... More

CAPE CANAVERAL, Fla. –At NASA's Kennedy Space Center in Florida, the crawler-transporter delivers space shuttle Discovery atop the mobile launcher platform onto Launch Pad 39A.  Traveling from the Vehicle Assembly Building, the shuttle took nearly 12 hours on the journey as technicians stopped several times to clear mud from the crawler's treads and bearings caused by the waterlogged crawlerway.  First motion out of the VAB was at 2:07 a.m. EDT Aug. 4. Rollout was delayed approximately 2 hours due to lightning in the area.  In the background is the blue water of the Atlantic Ocean.  At left is the White Room at the end of the orbiter access arm.  When in place against shuttle, the White Room provides entry into the cockpit.  Discovery's 13-day flight will deliver a new crew member and 33,000 pounds of equipment to the International Space Station. The equipment includes science and storage racks, a freezer to store research samples, a new sleeping compartment and the COLBERT treadmill.  Launch of Discovery on its STS-128 mission is targeted for late August.   Photo credit: NASA/Troy Cryder KSC-2009-4423

CAPE CANAVERAL, Fla. –At NASA's Kennedy Space Center in Florida, the c...

CAPE CANAVERAL, Fla. –At NASA's Kennedy Space Center in Florida, the crawler-transporter delivers space shuttle Discovery atop the mobile launcher platform onto Launch Pad 39A. Traveling from the Vehicle Assem... More

CAPE CANAVERAL, Fla. - Space shuttle Atlantis rumbles off Launch Pad 39A at NASA's Kennedy Space Center in Florida on the STS-132 mission to the International Space Station at 2:20 p.m. EDT on May 14.      The Russian-built Mini Research Module-1 known as Rassvet, or "dawn," is inside the shuttle's cargo bay. It will provide additional storage space and a new docking port for Russian Soyuz and Progress spacecraft. The laboratory will be attached to the bottom port of the station's Zarya module.  The mission's three spacewalks will focus on storing spare components outside the station, including six batteries, a communications antenna and parts for the Canadian Dextre robotic arm.  STS-132 is the 132nd shuttle flight, the 32nd for Atlantis and the 34th shuttle mission dedicated to station assembly and maintenance. For more information on the STS-132 mission objectives, payload and crew, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts132/index.html. Photo Credit: NASA/Jack Pfaller KSC-20103367

CAPE CANAVERAL, Fla. - Space shuttle Atlantis rumbles off Launch Pad 3...

CAPE CANAVERAL, Fla. - Space shuttle Atlantis rumbles off Launch Pad 39A at NASA's Kennedy Space Center in Florida on the STS-132 mission to the International Space Station at 2:20 p.m. EDT on May 14. The ... More

KENNEDY SPACE CENTER, FLA. -  The STS-115 crew members complete their suitup in the White Room before entering Space Shuttle Atlantis on Launch Pad 39B for a simulated launch countdown.  Shown here are Mission Specialists Daniel Burbank (left) and Steven MacLean. The White Room, which is located at the end of the orbiter access arm, allows entry into the orbiter through the crew access hatch.  The mission crew is at KSC for Terminal Countdown Demonstration Test (TCDT) activities that are preparation for launch.  Liftoff of Atlantis is scheduled to take place in a window that opens Aug. 27.  During their 11-day mission to the International Space Station, the STS-115 crew will continue construction of the station and attach the payload elements, the Port 3/4 truss segment with its two large solar arrays.  Photo credit: NASA/Jim Grossmann KSC-06pd1822

KENNEDY SPACE CENTER, FLA. - The STS-115 crew members complete their ...

KENNEDY SPACE CENTER, FLA. - The STS-115 crew members complete their suitup in the White Room before entering Space Shuttle Atlantis on Launch Pad 39B for a simulated launch countdown. Shown here are Mission ... More

KENNEDY SPACE CENTER, Fla.  --  In the White Room on Launch Pad 39A, STS-118 Pilot Charlie Hobaugh waits for the closeout crew to finish checking his launch and entry suit before he enters Space Shuttle Endeavour.  Hobaugh and the rest of the crew are taking part in a simulated launch countdown, the culmination of terminal countdown demonstration test activities.  The White Room is situated at the end of the orbiter access arm and provides entry into the orbiter. TCDT activities also include M-113 training, payload familiarization and emergency egress training at the pad.  The mission is the 22nd flight to the International Space Station and Space Shuttle Endeavour will carry a payload including the S5 truss, a SPACEHAB module and external stowage platform 3. STS-118 is targeted for launch on Aug. 7.  Photo credit: NASA/Amanda Diller KSC-07pd1985

KENNEDY SPACE CENTER, Fla. -- In the White Room on Launch Pad 39A, S...

KENNEDY SPACE CENTER, Fla. -- In the White Room on Launch Pad 39A, STS-118 Pilot Charlie Hobaugh waits for the closeout crew to finish checking his launch and entry suit before he enters Space Shuttle Endeavo... More

CAPE CANAVERAL, Fla. - At NASA's Kennedy Space Center in Florida, a transporter carrying the canister containing the payload for space shuttle Atlantis' STS-129 mission to the International Space Station - Express Logistics Carriers 1 and 2 - moves past the Vehicle Assembly Building on its way to Launch Pad 39A. Once at the pad, the payload will be transferred into the Payload Changeout Room for installation in Atlantis' payload bay.    The STS-129 crew will deliver two spare gyroscopes, two nitrogen tank assemblies, two pump modules, an ammonia tank assembly and a spare latching end effector for the station's robotic arm.  Launch is set for Nov. 16. For information on the STS-129 mission objectives and crew, visit http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts129/index.html. Photo credit: NASA/Amanda Diller KSC-2009-6011

CAPE CANAVERAL, Fla. - At NASA's Kennedy Space Center in Florida, a tr...

CAPE CANAVERAL, Fla. - At NASA's Kennedy Space Center in Florida, a transporter carrying the canister containing the payload for space shuttle Atlantis' STS-129 mission to the International Space Station - Expr... More

CAPE CANAVERAL, Fla. - On Launch Pad 39A at NASA's Kennedy Space Center in Florida, STS-129 Commander Charles O. Hobaugh, dressed in his launch-and-entry suit, is strapped into his seat aboard space shuttle Atlantis.  The six astronauts for space shuttle Atlantis’ STS-129 mission are participating in their launch dress rehearsal, the Terminal Countdown Demonstration Test.    Additional training associated with the test was done last month, but the simulated countdown was postponed because of a scheduling conflict with the launch of NASA’s Ares I-X test rocket.  Launch of Atlantis on its STS-129 mission to the International Space Station is set for Nov. 16.  On STS-129, the crew will deliver to the station two spare gyroscopes, two nitrogen tank assemblies, two pump modules, an ammonia tank assembly and a spare latching end effector for the station's robotic arm.  For information on the STS-129 crew and mission objectives, visit http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts129/index.html. Photo credit: NASA/Kim Shiflett KSC-2009-6071

CAPE CANAVERAL, Fla. - On Launch Pad 39A at NASA's Kennedy Space Cente...

CAPE CANAVERAL, Fla. - On Launch Pad 39A at NASA's Kennedy Space Center in Florida, STS-129 Commander Charles O. Hobaugh, dressed in his launch-and-entry suit, is strapped into his seat aboard space shuttle Atl... More

CAPE CANAVERAL, Fla. - Launch of space shuttle Atlantis from Pad 39A at NASA's Kennedy Space Center in Florida is reflected in the marsh near the pad.     Liftoff on its STS-129 mission came at 2:28 p.m. EST Nov. 16.  Aboard are crew members Commander Charles O. Hobaugh; Pilot Barry E. Wilmore; and Mission Specialists Leland Melvin, Randy Bresnik, Mike Foreman and Robert L. Satcher Jr.  On STS-129, the crew will deliver two ExPRESS Logistics Carriers to the International Space Station, the largest of the shuttle's cargo carriers, containing 15 spare pieces of equipment including two gyroscopes, two nitrogen tank assemblies, two pump modules, an ammonia tank assembly and a spare latching end effector for the station's robotic arm.  Atlantis will return to Earth a station crew member, Nicole Stott, who has spent more than two months aboard the orbiting laboratory.  STS-129 is slated to be the final space shuttle Expedition crew rotation flight. For information on the STS-129 mission and crew, visit http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts129/index.html.    Photo credit: NASA/Tom Farrar and Tony Gray KSC-2009-6374

CAPE CANAVERAL, Fla. - Launch of space shuttle Atlantis from Pad 39A a...

CAPE CANAVERAL, Fla. - Launch of space shuttle Atlantis from Pad 39A at NASA's Kennedy Space Center in Florida is reflected in the marsh near the pad. Liftoff on its STS-129 mission came at 2:28 p.m. EST No... More

KENNEDY SPACE CENTER, FLA. --  In the Space Station Processing Facility, Mission STS-120 Pilot George Zamka (left) and Commander Pam Melroy begin to unveil the Node 2 module's new name, Harmony, as Russ Romanella, director of International Space Station and Spacecraft Processing presides over the ceremony. The name, Harmony, was chosen from an academic competition involving thousands of students in kindergarten through high school. The Node 2 Challenge required students to learn about the International Space Station, build a scale model of the module, and write an essay explaining their proposed name. This will be the first U.S. piece of the space station named by someone other than a NASA official.  Node 2 is a pressurized module that will act as a connecting port and passageway to additional international science labs and supply spacecraft. It also will be a work platform for the station's robotic arm.  The module is scheduled to fly on mission STS-120 aboard Space Shuttle Atlantis targeted for later this year.   Photo credit: NASA/Jim Grossmann KSC-07pd0637

KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facilit...

KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility, Mission STS-120 Pilot George Zamka (left) and Commander Pam Melroy begin to unveil the Node 2 module's new name, Harmony, as Russ Romanel... More

KENNEDY SPACE CENTER, FLA. --    Looking into the open payload bay doors of Space Shuttle Endeavour, workers conclude closeouts.  At center foreground is the orbital docking system.  The red ring at top comprises rain gutters to prevent leaks into the bay from rain while the shuttle is on the pad.   The payload bay doors were opened to allow for payload closeouts, including camera tests on the shuttle robotic arm and the extension, known as the orbiter boom sensor system.  Endeavour is scheduled to launch Aug. 7 on mission STS-118, the 22nd flight to the International Space Station.  NASA/Charisse Nahser KSC-07pd2121

KENNEDY SPACE CENTER, FLA. -- Looking into the open payload bay doo...

KENNEDY SPACE CENTER, FLA. -- Looking into the open payload bay doors of Space Shuttle Endeavour, workers conclude closeouts. At center foreground is the orbital docking system. The red ring at top compris... More

CAPE CANAVERAL, Fla. –– In the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, the Japan Aerospace Exploration Agency's Kibo Exposed Facility, or EF, is moved across the room to transfer it to a workstand. When it is installed on the Kibo laboratory, the EF will provide a multipurpose platform where science experiments can be deployed and operated in the exposed environment. The payloads attached to the EF can be exchanged or retrieved by Kibo's robotic arm, the JEM Remote Manipulator System. The EF, along with the Experiment Logistics Module Exposed Section,  will be carried aboard space shuttle Endeavour on the STS-127 mission targeted for launch June 13, 2009.  Photo credit: NASA/Kim Shiflett KSC-2009-2789

CAPE CANAVERAL, Fla. –– In the Space Station Processing Facility at NA...

CAPE CANAVERAL, Fla. –– In the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, the Japan Aerospace Exploration Agency's Kibo Exposed Facility, or EF, is moved across the room to tra... More

CAPE CANAVERAL, Fla. - The crawler-transporter is positioned under the mobile launcher platform with the 327-foot-tall Ares I-X rocket. The rocket is prepared to leave the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida, on its way to Launch Pad 39B. The move to the launch pad, known as "rollout," began at 1:39 a.m. EDT.    The transfer of the pad from the Space Shuttle Program to the Constellation Program took place May 31. Modifications made to the pad include the removal of shuttle unique subsystems, such as the orbiter access arm and a section of the gaseous oxygen vent arm, along with the installation of three 600-foot lightning towers, access platforms, environmental control systems and a vehicle stabilization system.  Part of the Constellation Program, the Ares I-X is the test vehicle for the Ares I. The Ares I-X flight test is targeted for Oct. 27. For information on the Ares I-X vehicle and flight test, visit http://www.nasa.gov/aresIX. Photo credit: NASA/Kim Shiflett KSC-2009-5544

CAPE CANAVERAL, Fla. - The crawler-transporter is positioned under the...

CAPE CANAVERAL, Fla. - The crawler-transporter is positioned under the mobile launcher platform with the 327-foot-tall Ares I-X rocket. The rocket is prepared to leave the Vehicle Assembly Building at NASA's Ke... More

KENNEDY SPACE CENTER, FLA. --  Viewed from behind inside the Vehicle Assembly Building, space shuttle Discovery is lifted into the upper regions for transfer to high bay 1.  In the bay, Discovery will be mated with the external tank and solid rocket boosters waiting on the mobile launcher platform. Discovery is targeted for launch to the International Space Station for mission STS-120 on Oct. 23.  The crew will be delivering and installing the Italian-built U.S. Node 2, named Harmony.  The pressurized module will act as an internal connecting port and passageway to additional international science labs and cargo spacecraft. In addition to increasing the living and working space inside the station, it also will serve as a work platform outside for the station's robotic arm.  Photo credit: NASA/Troy Cryder KSC-07pd2553

KENNEDY SPACE CENTER, FLA. -- Viewed from behind inside the Vehicle A...

KENNEDY SPACE CENTER, FLA. -- Viewed from behind inside the Vehicle Assembly Building, space shuttle Discovery is lifted into the upper regions for transfer to high bay 1. In the bay, Discovery will be mated ... More

KENNEDY SPACE CENTER, FLA. -  In preparation for the July 1 launch of Space Shuttle Discovery on mission STS-121, the Launch Pad 39B rotating service structure (RSS) enclosing the shuttle rolls away.  Above the golden external tank is the vent hood (known as the "beanie cap") at the end of the gaseous oxygen vent arm. Vapors are created as the liquid oxygen in the external tank boil off. The hood vents the gaseous oxygen vapors away from the space shuttle vehicle. The RSS provides protected access to the orbiter for changeout and servicing of payloads at the pad. The structure is supported by a rotating bridge that pivots about a vertical axis on the west side of the pad's flame trench. The hinge column rests on the pad surface and is braced to the fixed service structure. Support for the outer end of the bridge is provided by two eight-wheel, motor-driven trucks that move along circular twin rails installed flush with the pad surface. The track crosses the flame trench on a permanent bridge.  The RSS is 102 feet long, 50 feet wide and 130 feet high. The structure has orbiter access platforms at five levels to provide access to the payload bay while the orbiter is being serviced in the RSS. Each platform has independent extendable planks that can be arranged to conform to a payload's configuration.  This mission is the 115th shuttle flight and the 18th U.S. flight to the International Space Station. Photo credit: NASA/Kim Shiflett KSC-06pd1302

KENNEDY SPACE CENTER, FLA. - In preparation for the July 1 launch of ...

KENNEDY SPACE CENTER, FLA. - In preparation for the July 1 launch of Space Shuttle Discovery on mission STS-121, the Launch Pad 39B rotating service structure (RSS) enclosing the shuttle rolls away. Above the... More

CAPE CANAVERAL, Fla. - On Launch Pad 39A at NASA's Kennedy Space Center in Florida, members of the STS-129 crew, dressed in their launch-and-entry suits, enter a slidewire basket as they practice making an emergency exit from space shuttle Atlantis.  The six astronauts for space shuttle Atlantis’ STS-129 mission are participating in their launch dress rehearsal, the Terminal Countdown Demonstration Test.    Additional training associated with the test was done last month, but the simulated countdown was postponed because of a scheduling conflict with the launch of NASA’s Ares I-X test rocket.  Launch of Atlantis on its STS-129 mission to the International Space Station is set for Nov. 16.  On STS-129, the crew will deliver to the station two spare gyroscopes, two nitrogen tank assemblies, two pump modules, an ammonia tank assembly and a spare latching end effector for the station's robotic arm.  For information on the STS-129 crew and mission objectives, visit http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts129/index.html. Photo credit: NASA/Kim Shiflett KSC-2009-6074

CAPE CANAVERAL, Fla. - On Launch Pad 39A at NASA's Kennedy Space Cente...

CAPE CANAVERAL, Fla. - On Launch Pad 39A at NASA's Kennedy Space Center in Florida, members of the STS-129 crew, dressed in their launch-and-entry suits, enter a slidewire basket as they practice making an emer... More

CAPE CANAVERAL, Fla. – Inside the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, a crane carries the EXPRESS Logistics Carrier toward a stand. The carrier is part of the payload on space shuttle Atlantis, which will deliver to the International Space Station components including two spare gyroscopes, two nitrogen tank assemblies, two pump modules, an ammonia tank assembly and a spare latching end effector for the station's robotic arm.  STS-129 is targeted to launch Nov. 12.  Photo credit: NASA/Tim Jacobs KSC-2009-2249

CAPE CANAVERAL, Fla. – Inside the Space Station Processing Facility at...

CAPE CANAVERAL, Fla. – Inside the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, a crane carries the EXPRESS Logistics Carrier toward a stand. The carrier is part of the payload on... More

CAPE CANAVERAL, Fla. - With nearly 7 million pounds of thrust generated with the aid of twin solid rocket boosters, space shuttle Atlantis clears the tower on Launch Pad 39A at NASA's Kennedy Space Center in Florida.     Liftoff on its STS-129 mission came at 2:28 p.m. EST Nov. 16.  Aboard are crew members Commander Charles O. Hobaugh; Pilot Barry E. Wilmore; and Mission Specialists Leland Melvin, Randy Bresnik, Mike Foreman and Robert L. Satcher Jr.  On STS-129, the crew will deliver two ExPRESS Logistics Carriers to the International Space Station, the largest of the shuttle's cargo carriers, containing 15 spare pieces of equipment including two gyroscopes, two nitrogen tank assemblies, two pump modules, an ammonia tank assembly and a spare latching end effector for the station's robotic arm.  Atlantis will return to Earth a station crew member, Nicole Stott, who has spent more than two months aboard the orbiting laboratory.  STS-129 is slated to be the final space shuttle Expedition crew rotation flight. For information on the STS-129 mission and crew, visit http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts129/index.html.    Photo credit: NASA/Rusty Backer and Tom Farrar KSC-2009-6386

CAPE CANAVERAL, Fla. - With nearly 7 million pounds of thrust generate...

CAPE CANAVERAL, Fla. - With nearly 7 million pounds of thrust generated with the aid of twin solid rocket boosters, space shuttle Atlantis clears the tower on Launch Pad 39A at NASA's Kennedy Space Center in Fl... More

KENNEDY SPACE CENTER, FLA. -  In Orbiter Processing Facility bay 1 at NASA's Kennedy Space Center, workers complete installation of the orbiter boom sensor system into Atlantis' payload bay. The 50-foot-long boom attaches to the shuttle arm and is one of the new safety measures added prior to Return to Flight last year. It equips the orbiter with cameras and laser systems to inspect the shuttle's heat shield while in space.  Atlantis is scheduled to launch on mission STS-115 no earlier than Aug. 28.  Photo credit: NASA/Jim Grossmann KSC-06pd0568

KENNEDY SPACE CENTER, FLA. - In Orbiter Processing Facility bay 1 at ...

KENNEDY SPACE CENTER, FLA. - In Orbiter Processing Facility bay 1 at NASA's Kennedy Space Center, workers complete installation of the orbiter boom sensor system into Atlantis' payload bay. The 50-foot-long bo... More

Workers in the Space Station Processing Facility help maneuver the Space Station Remote Manipulator System (SSRMS) onto a test stand. A component of the International Space Station provided by the Canadian Space Agency, the SSRMS will be mated to its payload carrier and later installed into the payload bay of Space Shuttle Endeavour for launch to the Station on STS-100 in April 2001. The 56-foot-long arm will be the primary means of transferring payloads between the orbiter payload bay and the Station. Its three segments comprise seven joints for highly flexible land precise movement, making it capable of moving around the Station’s exterior like an inchworm KSC-00pp1153

Workers in the Space Station Processing Facility help maneuver the Spa...

Workers in the Space Station Processing Facility help maneuver the Space Station Remote Manipulator System (SSRMS) onto a test stand. A component of the International Space Station provided by the Canadian Spac... More

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility 1 at NASA's Kennedy Space Center in Florida, a United Space Alliance technician, lying on a work platform, works inside the crew module of space shuttle Atlantis following removal of window #8.    Inspection and maintenance of the crew module windows is standard procedure between shuttle missions.  Atlantis is next slated to deliver an Integrated Cargo Carrier and Russian-built Mini Research Module to the International Space Station on the STS-132 mission.  The second in a series of new pressurized components for Russia, the module will be permanently attached to the Zarya module. Three spacewalks are planned to store spare components outside the station, including six spare batteries, a boom assembly for the Ku-band antenna and spares for the Canadian Dextre robotic arm extension. A radiator, airlock and European robotic arm for the Russian Multi-purpose Laboratory Module also are payloads on the flight.  Launch is targeted for May 14.  Photo credit: NASA/Glenn Benson KSC-2010-1083

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility 1 at NASA's Kenn...

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility 1 at NASA's Kennedy Space Center in Florida, a United Space Alliance technician, lying on a work platform, works inside the crew module of space shuttle Atl... More

KENNEDY SPACE CENTER, FLA. - Sitting atop the Mobile Launcher Platform, Space Shuttle Atlantis towers above the workers aboard.  The Shuttle and MLP rest on top of the crawler-transporter beneath it, which moves about 1 mile per hour. Atlantis is scheduled for launch April 4 on mission STS-110, which will install the S0 truss, the framework that eventually will hold the power and cooling systems needed for future international research laboratories on the International Space Station.  The  Canadarm2 robotic arm will be used exclusively to hoist the 13-ton truss from the payload bay to the Station.  The S0 truss will be the first major U.S. component launched to the Station since the addition of the Quest airlock in July 2001.  The four spacewalks planned for the construction will all originate from the airlock.  The mission will be Atlantis' 25th trip to space KSC-02pd0274

KENNEDY SPACE CENTER, FLA. - Sitting atop the Mobile Launcher Platform...

KENNEDY SPACE CENTER, FLA. - Sitting atop the Mobile Launcher Platform, Space Shuttle Atlantis towers above the workers aboard. The Shuttle and MLP rest on top of the crawler-transporter beneath it, which move... More

KENNEDY SPACE CENTER, FLA. --    Under a blue sky streaked with clouds, Launch Pad 39B holds Space Shuttle Discovery, ready for launch of mission STS-116.  At the far left is the rotating service structure, rolled back after midnight in preparation for launch.  Next to Discovery is the fixed service structure, with the 80-foot-high lightning mast on top, part of the lightning protection system on the pad. Beneath Discovery's wings are the tail masts, which provide several umbilical connections to the orbiter, including a liquid-oxygen line through one and a liquid-hydrogen line through another.  Seen above the golden external tank is the vent hood (known as the "beanie cap") at the end of the gaseous oxygen vent arm, extending from the FSS. Vapors are created as the liquid oxygen in the external tank boil off. The hood vents the gaseous oxygen vapors away from the space shuttle vehicle. Below it, also extending toward Discovery from the FSS, is the orbiter access arm with the White Room at the end. The crew gains access into the orbiter through the White Room.  Discovery is scheduled to launch on mission STS-116 at 9:35 p.m. today.  On the mission, the crew will deliver truss segment, P5, to the International Space Station and begin the intricate process of reconfiguring and redistributing the power generated by two pairs of U.S. solar arrays. The P5 will be mated to the P4 truss that was delivered and attached during the STS-115 mission in September. Photo credit: NASA/Ken Thornsley KSC-06pd2674

KENNEDY SPACE CENTER, FLA. -- Under a blue sky streaked with clouds...

KENNEDY SPACE CENTER, FLA. -- Under a blue sky streaked with clouds, Launch Pad 39B holds Space Shuttle Discovery, ready for launch of mission STS-116. At the far left is the rotating service structure, rol... More

STS053-79-014 - STS-053 - KSC launch personnel on the swing arm gantry to the orbiter vehicle.

STS053-79-014 - STS-053 - KSC launch personnel on the swing arm gantry...

The original finding aid described this as: Description: KSC launch personnel on the swing arm gantry to the orbiter vehicle. Mission Specialists Guion Bluford and Michael Clifford are on the gantry in scene #... More

STS053-79-015 - STS-053 - KSC launch personnel on the swing arm gantry to the orbiter vehicle.

STS053-79-015 - STS-053 - KSC launch personnel on the swing arm gantry...

The original finding aid described this as: Description: KSC launch personnel on the swing arm gantry to the orbiter vehicle. Mission Specialists Guion Bluford and Michael Clifford are on the gantry in scene #... More

STS053-79-013 - STS-053 - KSC launch personnel on the swing arm gantry to the orbiter vehicle.

STS053-79-013 - STS-053 - KSC launch personnel on the swing arm gantry...

The original finding aid described this as: Description: KSC launch personnel on the swing arm gantry to the orbiter vehicle. Mission Specialists Guion Bluford and Michael Clifford are on the gantry in scene #... More

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, the Russian-built Docking Module is lowered for installation into the payload bay of the space shuttle Atlantis while it is in bay 2 of the Orbiter Processing Facility. The module will fly as a primary payload on the second Space Shuttle/Mir space station docking mission, STS-74. During the mission, the module will first be attached with the orbiter's robot arm to the Orbiter Docking System in the payload bay of the orbiter Atlantis and then be docked with the Mir. When Atlantis undocks from the Mir, it will leave the new docking module permanently attached to the space station for use during future shuttle Mir docking missions. The new module will simplify future Shuttle linkups with Mir by improving orbiter clearances when it serves as a bridge between the two spacecraft. The white structures attached to the module's sides are solar panels that will be attached to the Mir after the conclusion of the STS-74 mission. Photo Credit: NASA KSC-95PC-1324

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, the...

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, the Russian-built Docking Module is lowered for installation into the payload bay of the space shuttle Atlantis while it is in bay 2 of the Orb... More

View of the Wake Shield Facility on the RMS arm

View of the Wake Shield Facility on the RMS arm

STS069-723-072 (11 September 1995) --- Prior to being released by Space Shuttle Endeavour's Remote Manipulator System (RMS) for a period of time, the Wake Shield Facility (WSF) is backdropped against the darkne... More

Returning NASA astronaut and former Mir 22 crew member John E. Blaha (left), puts his arm around his wife, Brenda, as they prepare to depart with the STS-81 crew for Johnson Space Center Jan. 23 from the Skid Strip at Cape Canaveral Air Station. NASA’s Patrick McGinnis is on the right. The STS-81 crew arrived at KSC aboard the Space Shuttle Atlantis Jan. 22 to conclude the fifth ShuttleMir docking mission and return Blaha to Earth after four months in space KSC-97pc217

Returning NASA astronaut and former Mir 22 crew member John E. Blaha (...

Returning NASA astronaut and former Mir 22 crew member John E. Blaha (left), puts his arm around his wife, Brenda, as they prepare to depart with the STS-81 crew for Johnson Space Center Jan. 23 from the Skid S... More

STS-82 crew members participate in a practice launch countdown inside the crew cabin of the Space Shuttle Discovery during Terminal Countdown Demonstration Test (TCDT) activities. Pilot Scott J. "Doc" Horowitz is in foreground at left. Seated across from him, with only an arm and part of his helmet showing, is Mission Commander Kenneth D. Bowersox. At rear, from left, are Mission Specialists Joseph R. "Joe" Tanner and Steven A. Hawley. STS-82 will be the second Hubble Space Telescope servicing mission. Liftoff is targeted for Feb. 11 KSC-97pc220

STS-82 crew members participate in a practice launch countdown inside ...

STS-82 crew members participate in a practice launch countdown inside the crew cabin of the Space Shuttle Discovery during Terminal Countdown Demonstration Test (TCDT) activities. Pilot Scott J. "Doc" Horowitz ... More

KENNEDY SPACE CENTER, FLA. -   STS-82 Mission Specialist Steven A Hawley stands beside part of Discovery's Remote Manipulator System (RMS) arm, at right, which he will operate for the capture, berthing and redeployment of the Hubble Space Telescope (HST).  The robotic arm also will be used as work platform for the four spacewalkers.  Hawley is the prime RMS operator on the flight, which will be the second HST servicing mission.  He and the other six members of the crew are making a final inspection of the payload at Launch Pad 39A before launch. STS-82 is scheduled for liftoff on Feb. 11 during a 65-minute launch window that opens at 3:56 a.m. EST.

KENNEDY SPACE CENTER, FLA. - STS-82 Mission Specialist Steven A Hawl...

KENNEDY SPACE CENTER, FLA. - STS-82 Mission Specialist Steven A Hawley stands beside part of Discovery's Remote Manipulator System (RMS) arm, at right, which he will operate for the capture, berthing and rede... More

Three members of the STS-83 flight crew head toward the orbiter access arm on the 195-foot level Launch of Pad 39A that will take them to the crew hatch of the Space Shuttle Columbia during Terminal Countdown Demonstration Test (TCDT) exercises for that mission. Mission Specialist Donald A. Thomas is in the center of the group. Other crew members on the 16-day Microgravity Science Laboratory-1 (MSL-1) mission are: Mission Commander James D. Halsell, Jr.; Pilot Susan L. Still; Payload Commander Janice Voss; Mission Specialist Michael L.Gernhardt; and Payload Specialists Gregory T. Linteris and Roger K. Crouch KSC-97pc464

Three members of the STS-83 flight crew head toward the orbiter access...

Three members of the STS-83 flight crew head toward the orbiter access arm on the 195-foot level Launch of Pad 39A that will take them to the crew hatch of the Space Shuttle Columbia during Terminal Countdown D... More

The Manipulator Flight Demonstration (MFD) payload is lowered into the payload bay of the Space Shuttle Orbiter Discovery in Orbiter Processing Facility 2. The MFD is one of several payloads that will fly on the STS-85 mission. This payload is designed to test the operational capability of the Japanese Experiment Module Remote Manipulator System (JEM RMS) Small Fine Arm (SFA), which can be seen atop its Multi-Purpose Experiment Support Structure (MPESS) carrier that will serve as a platform in the payload bay for the robotic arm experiment. The arm, which will be a part of the JEM element of the International Space Station, will be operated from the orbiter’s aft flight deck during the 11-day mission. Other payloads that will be aboard Discovery on this space flight include the Cryogenic Infrared Spectro-meters and Telescopes for the Atmosphere-Shuttle Pallet Satellite-2 (CRISTA-SPAS-2),  Technology Applications and Science-1 (TAS-1) and International Extreme Ultraviolet Hitchhiker (IEH-2) experiments KSC-97PC815

The Manipulator Flight Demonstration (MFD) payload is lowered into the...

The Manipulator Flight Demonstration (MFD) payload is lowered into the payload bay of the Space Shuttle Orbiter Discovery in Orbiter Processing Facility 2. The MFD is one of several payloads that will fly on th... More

The Manipulator Flight Demonstration (MFD) payload is installed into the payload bay of the Space Shuttle Orbiter Discovery in Orbiter Processing Facility 2. The MFD is one of several payloads that will fly on the STS-85 mission. This payload is designed to test the operational capability of the Japanese Experiment Module Remote Manipulator System (JEM RMS) Small Fine Arm (SFA), which can be seen atop its Multi-Purpose Experiment Support Structure (MPESS) carrier that will serve as a platform in the payload bay for the robotic arm experiment. The arm, which will be a part of the JEM element of the International Space Station, will be operated from the orbiter’s aft flight deck during the 11-day mission. Other payloads that will be aboard Discovery on this space flight include the  Cryogenic Infrared Spectrometers and Telescopes for the Atmosphere-Shuttle Pallet Satellite-2 (CRISTA- SPAS-2),  Technology Applications and Science-1 (TAS-1) and International Extreme Ultraviolet Hitchhiker (IEH-2) experiments KSC-97PC816

The Manipulator Flight Demonstration (MFD) payload is installed into t...

The Manipulator Flight Demonstration (MFD) payload is installed into the payload bay of the Space Shuttle Orbiter Discovery in Orbiter Processing Facility 2. The MFD is one of several payloads that will fly on ... More

The Manipulator Flight Demonstration (MFD) payload is hoisted for installation into the payload bay of the Space Shuttle Orbiter Discovery in Orbiter Processing Facility 2. The MFD is one of several payloads that will fly on the STS-85 mission. This payload is designed to test the operational capability of the Japanese Experiment Module Remote Manipulator System (JEM RMS) Small Fine Arm (SFA), which can be seen atop its Multi-Purpose Experiment Support Structure (MPESS) carrier that will serve as a platform in the payload bay for the robotic arm experiment. The arm, which will be a part of the JEM element of the International Space Station, will be operated from the orbiter’s aft flight deck during the 11-day mission. Other payloads that will be aboard Discovery on this space flight include the  Cryogenic Infrared Spectrometers and Telescopes for the Atmosphere-Shuttle Pallet Satellite-2 (CRISTA-SPAS-2), Technology Applications and Science-1 (TAS-1) and International Extreme Ultraviolet Hitchhiker (IEH-2) experiments KSC-97PC814

The Manipulator Flight Demonstration (MFD) payload is hoisted for inst...

The Manipulator Flight Demonstration (MFD) payload is hoisted for installation into the payload bay of the Space Shuttle Orbiter Discovery in Orbiter Processing Facility 2. The MFD is one of several payloads th... More

The Manipulator Flight Demonstration (MFD) payload is installed into the payload bay of the Space Shuttle Orbiter Discovery in Orbiter Processing Facility 2. The MFD is one of several payloads that will fly on the STS-85 mission. This payload is designed to test the operational capability of the Japanese Experiment Module Remote Manipulator System (JEM RMS) Small Fine Arm (SFA), which can be seen atop its Multi-Purpose Experiment Support Structure (MPESS) carrier that will serve as a platform in the payload bay for the robotic arm experiment. The arm, which will be a part of the JEM element of the International Space Station, will be operated from the orbiter’s aft flight deck during the 11-day mission. Other payloads that will be aboard Discovery on this space flight include the  Cryogenic Infrared Spectrometers and Telescopes for the Atmosphere-Shuttle Pallet Satellite-2 (CRISTA- SPAS-2),  Technology Applications and Science-1 (TAS-1) and International Extreme Ultraviolet Hitchhiker (IEH-2) experiments KSC-97PC817

The Manipulator Flight Demonstration (MFD) payload is installed into t...

The Manipulator Flight Demonstration (MFD) payload is installed into the payload bay of the Space Shuttle Orbiter Discovery in Orbiter Processing Facility 2. The MFD is one of several payloads that will fly on ... More

The Manipulator Flight Demonstration (MFD) payload is prepared for hoisting and installation into the payload bay of the Space Shuttle Orbiter Discovery in Orbiter Processing Facility 2. The MFD is one of several payloads that will fly on the STS-85 mission. This payload is designed to test the operational capability of the Japanese Experiment Module Remote Manipulator System (JEM RMS) Small Fine Arm (SFA), which can be seen atop its Multi-Purpose Experiment Support Structure (MPESS) carrier that will serve as a platform in the payload bay for the robotic arm experiment. The arm, which will be a part of the JEM element of the International Space Station, will be operated from the orbiter’s aft flight deck during the 11-day mission. Other payloads that will be aboard Discovery on this space flight include the  Cryogenic Infrared Spectrometers and Telescopes for the Atmosphere-Shuttle Pallet Satellite-2 (CRISTA-SPAS-2), Technology Applications and Science-1 (TAS-1) and International Extreme Ultraviolet Hitchhiker (IEH-2) experiments KSC-97PC813

The Manipulator Flight Demonstration (MFD) payload is prepared for hoi...

The Manipulator Flight Demonstration (MFD) payload is prepared for hoisting and installation into the payload bay of the Space Shuttle Orbiter Discovery in Orbiter Processing Facility 2. The MFD is one of sever... More

Previous

of 19

Next